HomeMy WebLinkAboutDERR-2025-000941UTAH STATE FUEL NETWORK AST ANNUAL INSPECTION
Facility Name and Site Address: Date:
Facility ID #
Purpose:Regular Reinspection Complaints Annual Inspection
Nu
m
b
e
r
Te
s
t
e
d
Sa
t
i
s
f
i
e
d
Re
j
e
c
t
e
d
A
d
v
i
s
e
Pumps Tested for Calibration
Is tank grounding strap in good condition ?
Is tank coating free of corrosion / damage ?
Is tank free of noticable distortion, denting, buckeling ?
Flanged connection bolts appear tight ?
Normal and emergency vents appear in good condition ?
Inspection Remarks:
Technician signature
Inspected By: Steven B. Martin UT121
Applied Environmental Services L.C.
UTAH DOT # 136
730 WEST 200 NORTH
LOGAN, UTAH
9-27-2024
100223
X
NOT TESTED
X
X
X
X
X
X
X
X
X NEW
X
State Fuel Contact : Brett Gurney 385-602-4872
801-540 9258 Aesutah@aol.com
Email: Brettgurney@utah.gov
X
X
X
X
X
X
X
Fill and vapor connections in good condition ?
NEW INSTALLATION, ABOVEGROUND COMPARTMENT AST WITH UNDERGROUND
PRODUCT LINES.
NEW PV VALVE INSTALLED ON UNLEADED VENT
XTank containment structure in satisfactory condition ?
Free of tank settlement and foundation washout ?
Tank supports in satisfactory condition ?
Is water able to drain off tank pad and tank top ?
Gasoline vent has P/V valve installed where required ?
Valves / syphons / solenoids appear in good condition ?
Spill containment visable and appears in good condition
Electrical junction boxes and conduits in good condition
Tank monitor free of active alarms ?
Emergency shutoff installed ?
Dispenser static test ?
Tank overfill equipment installed ?
Piping sumps appear in good condition ?
COMMENTS / ACTION
Digitally signed by STEVEN B MARTIN
cn=STEVEN B MARTIN, o=AES, c=US
Date: 2024.09.28 13:56:32 -07'00'
Reason: I am the author of this document