Loading...
HomeMy WebLinkAboutDRC-2008-002503 - 0901a06880abe184t DENlsOJY MINES Ire\_ Oenison Mines (USA) Corp. 1050 17th Street, Suite 950 Denver, CO 80265 USA Tel : 303 628-7798 Fax : 303 389-4125 www.denisonmines.com VlA OVERNIGHT DELIVERY September 3, 2008 Mr. Dane L. Finerfrock Director Division of Radiation Control Department of Environmental Quality 168 North 1950 West P.O Box 144850 Salt Lake City, UT 84114-4850 Re: Response to Request for lnformation; August 18, 2008, DUSA Cell 4A Construction Quality Assurance Report; Request for lnformation Dear Mr. Finerfrock: We are responding to your August'18,2008 letter, requesting additional information regarding the Cell 4A Construction Quality Assurance (COA) Report, and subsequent submittals related to the construction of the slimes drain system in Cell 4A. Attached to this letter are two (2) CD's containing additional photos of remedial work done on the sand bags covering the Cell 4A slimes drain system. Also attached is a key map showing the slimes drain laterals and the locations of each of the sand bags that were determined to require major alternation. Each of the slimes drain laterals was numbered, north 1 through 29, and east 1 through 19. Each of the sand bags, in each of the laterals, was also numbered. The approximate location of each of the bags requiring major alteration is noted on the key map, and each of the bags was photographed, before and after the alternation. The number of the lateral and number of the bag is visible in the photographs. A summary sheet listing all of the bags requiring major alternation is also attached. Minor alternations are also noted on the summary sheets, but these alternations were not photographed. The total number of bags in each lateral is also noted on the summary sheets. The photographs also document the addition of the sand bags to the slimes drain header to seal the junction between the woven and non-woven geotextile, and to fully cover the intersection of each of the slimes drain laterals with the header. I personally inspected the remedial work on August 27th and 28th, 2008, and it is my belief that the remedial work completed brings the installation into substantial compliance with the intent of the Cell 44 plans and specifications. lf you have any additional questions please feel free to contact me at (303) 389-4160. Yours very truly, Denison Mines (USA) Corp.7k'*ru Harold R. Roberts, P.E. Utah Registered Professional Engineer, No. 165838 o rockLetter to Dane L. Finerf September 3, 2008 Page 2 Executive Vice President - U.S. Operations cc: Ron F. Hochstein, DUSA Rich E. Bartlett, DUSA Gregory T. Corcoran, Geosyntec Enclosed 1) Two (2) CD's with Cell 4A Photographs2l Summary sheet listing alternations3) Cell4A Key map 2 DENISOJY/ Tailings Pond C4A List of Sandbags. on Laterals that received major alterations, minor alterations and total number of bags per row. 132;154;251;174;2 1,029 539;545;546;593;652 178;254;255;335:773 6;41 ;1 30;1 33;1 58;1 78;209; 8;137;151:153;1TO,ttA.JA4.J9a;985214;325;403;569;780;781 218;223;274:285:328;348:436; 748:722 171;384;385;386;658 37 6;440;528; 554; 576;598;858;932 880:910 24;1 45:324;384:61 4:61 5: 750 3 1 ;94;1 20;1 54:21 4.A+t ;qAA.At g 899 1 20 :263 ;266 ;27 0 ;27 6 :280 ;282 ; 289;309;323;328;378; 390; 394;464 :51 1 ;51 4:7 86 24 1 9 ;81 :202:203 ;256 :4 1 0 ;7 7 I 267 :30 5 :31 1 ;321 ;40 1 ; 403 :7 44 ; 746;749 841 800 22;33 : 1 47 ;267 ;282 ;37 6 ; 586 ; 636 38;239:473 772 N10 196:307 :737 21:87:197 742 714 685 N11 N12 185;474 233;566;675:684 415:441 1 9;395;576;609;6't 9;648;650;668 670:672 N13 1 7 7 ;29 1 :29 4 :29 5 ; 422; 43 5 ;1 50; 1 68;209 ;245;249 ;281 ;297 : 585 N14 207:241:294;385 421 ;57 1 ; 573;593; 594:637:638 38;40 :42;43; 44;7 4;82:1 33 ; 1 60 ; 1 7 0 ; 1 7 8 :21 8 ;220 ;226 ;227 ;235 ; 244;252:264 ;284;285;31 1 ;31 8: 3 43 : 4 48 ; 463 ; 46 4 : 46 5 ; 47 6 ; 489 ; 653 618 601 N15 40:311;333;543 44;95;1 09;1 1 0;1 1 2:1 1 4;1 37 ;1 43 1 79; 1 80; 1 86 :1 88;204;21 3;220 ; 224 ;234 ;242;246 ;25 1 :27 6 ;283 ; 284;288:29 1 ; 292 ; 300 ; 30 2;30 4 ; 306;320; 32 1 :322;327 :330;331 ; 360; 385 ;388; 394;406;46 4:468: 581 1 6;1 8;48;97 ;66; 1 78; 303; 471;520 ;541;545;558 9 4; 1 0 4 ;209 ;233:243:261 ;263 ;285 : 348;352;363;366;459;531 ; N17 88;1 05;21 9;352;363;364;1 27 ;1 4 1 ;21 0 :262;295 ; 300 ; 403 ;523 483;484:496 55;66;95; 1 88;239;308;396; 456;458 ;511 7 2;7 3;79;80; 1 00; 1 02; 1 33; 1 35; 1 57 ;1 7 5; 1 97 :240 ;325;350 ; 35 1 ; N18 :393:425:428 494 N19 47 ;86 ; 1 7 4 :328 :33 4;41 7 ;4 53 1 9 ;7 S ;T 9: 1 62;1 64; 1 66 ;21 1 :243; 268;296;326; 327; 333; 336 ; 338; 340;355;358;362;364;366;370; 374; 384;386 ;397 ;403;402 :41 3; 457 424;425: 2;7 8;1 26;1 46 ; 1 48; 1 86; 1 96; 9;88;90; 1 22 ;'t }6;ZO6;2U-,320 278;291;304:333: 92;9 4 ;1 06; 1 24 ; 1 7 0 ;1 7 2; 1 93 ; 21 5:254 ;258;263;3 1 9 ;3 48 26;28;46;50; 52 ;58 ;88 ; 1 0 4;1 22; 1 34:1 53 :1 7 8;1 88;228;236;242; 27 1 ;27 6;281 ;286;30 1 ;31 4;323: 327 ;328 ;33 1 :334;3 44;3 46 ; 35 1 ; 359;361:363:374 33;67;79;151;153;193;335 12;16:18:24;28;3q.g5pqaq6q 7 3;7 7 ;1 00 :1 1 3;1 1 7 ;1 1 9;1 21 :1 23; 1 30; 1 36; 1 39 ;1 40;1 47 ;1 58;162 1 65;1 66; 1 7 1 ;172;17 5;1 81 ; 1 91 ; 1 96; 1 98 ; 1 99 ;201 :2O8;209:21 0 : 21 2;21 3 :21 7 ;227 ;250 ;30 1 ; 305 ; 6 :20 ;7 9 ; 1 47 ;1 51 ;1 62; 1 96 ; 221:248:281;292;317 309;31 1;314:315:317 40;7 1 ;72;90;97 ;1 17 :1 21 :1 22;1 24; 1 26;1 33;1 36;1 39:1 45:153 ; 1 54; 1 55; 1 56; 1 68 ;17 5;17 8;1 83:1 87 : 1 92;207 :21 1 ;21 7 ;227 ;230 ;23 1 ; 7 4:81 :1 1 3; 1 1 5; 1 1 6 ; 1 83;209; 51 :1 32;1 81 :1 B2;Z2g;230 ;Zs2 23 5 ;243 :24 4 ;24 5 ;268 :269 ; 1 75;1 83; 1 89:1 99 20:25:40:65:71:79 52;68;1 O5 ;1 24 ;1 32;1 55 :1 63 47 : 52;58 ;64;69 ;7 1 ;7 2:80 ;86 ; 91 ;93;94; 1 00;1 1 4;1 22;1 30; 131 32;54 ;66 :67 ;68;7 O ;7 5:82: 88 ; 96 ; 98; 1 06; 1 08; 1 1 O;1 1 2;1 1 6;1 1 8;1 20 1 21 :1 23:1 24;1 25:1 26:1 27 :1 28: 129;133:134:137 17:23:35;107,113W: 1 35;1 37;1 53;1 63;1 69;1 73 237 major alterations on North Laterals Tailings Pond C4A List of Sandbags. on Laterals that received major alterations, minor alterations, and total number of bags per row. Row Number Majoralterationsnumber lMinoiEltCraiionnum6Ei Total number of baqs E1 9;10;24;62 I tS 66E226;104 l38;6q84 136 E3 29;77 ltoz;loa;tza;M9 204E45;37;59;83;85;99; 1 03; 1 66:167 : 69 :202;20 4 :207 :238 :27 5 280 E5 64;116;237 lSt ;oO;Zt g;29s 353 E6 34;228;245;246 ftA;,gS.JM.J2S 422 E7 1 5;87;307;308;309;31 0;31 1 ; 312;313;316;320;409 1 23 ;200 :20 3 ;20 4 ;255 ;257 :27 4 ; 27 5 ;293 ;302:303;323;325 ; 348 ; 349 ;37 3;4 1 8;458 ;466 ;48 1 495 E8 571 I52;95I58:23*ffi5 581 E9 29;297 ;341 ;51 1:573;57 4;630 I 120p1 057s:44*ss6 647 E10 95;570;611 3 4 ; 1 02: 1 83 :202:240 :242 :256 : 277;322:341:479:584 730 E11 13;632 51 ;1 93;3 1 1 ;434;483;582;77 1 792E1243:523;525;558;749 1 O0 ; 1 28 ; 1 32;20 1 ;203;235 ;25 1 256;305;309;31 3;31 9;369,327 ; 455;47 3;47 9 :480 ;481 ;529 ; S48 ; 665;669;799;820:828 856 E13 232;437 ;439 :597 :644 :693 ; 703 ; 867 8;59 :21 4 ;46 4;480 ;7 69 ;7 7 3;T 9T ; 830;885 929 E14 37 7 ;450 :506: 509;657;940 20;324;332;350 ;384;405 ;427 ;482 488; 534; 536 ;542;546;61 3; 6 1 4;660;688 ;7 31 :7 46;7 68:t I 0; 826 994 E15 27 1 ;27 3;391 ;565;61 1 ;630;694; 836;886 1 86; 1 88;306;308; 332;43 8:443;52 7 21 ;7 41 ;834:840:849:866:920 1,075 E16 1 2;1 92;347 ;4 1 9;634;958 :1,1 3T 9 4 ; 1 36 ; 1 37 ;254 ;260 ;26 1 ;2T B;29 S 304; 33 1 ;332;396;40 4:47 2;498: 499;500;501 ;51 5;523;537 ;62 2; 7 27 ;7 64;801 ;803;878;908;9 1 9; 97 2;97 8;979;981 ; 1,077; 1,080; 1,097 1,148 E17 57 ;1 42; 1 88;266;324;7 9 5 1 08;21 8;334:80 1 ;935;947;9S0; 1,009;1,025:1,026:1.029 1,226 E18 134;218;315;317 1 2:1 7 ;20;24; 36;40; 1 46; 1 4T ;1 7 8; 1 93; 351 :429;438;496;620;630 ; 678;682;688 ;77 3;981;983; 985; 1,1 07 ;1,17 5:1,203:1 .221 1,309 E19 1 02 ;27 5 ;365 ;68 1 ;7 1 8 ;7 92 ;992; 1,025 375:417:475:529 1,315 Note:107 major alterations on East Laterals \r-( r $${ fi$ I rm g+- .-+'s c.iC, *=(]S*.-.Y ,tjA e=-BL"q.t.€ ii-ri{Q '.8 {9n{ff agr, ,d* apg 1es, /&r4 s/? ,L e,rl). $\s trlt I IZ,# I *t s$14s s\s s\ h &l. !t s sS t0, 0ht Qrl 1v) -ilffiioF ose bo" e/e /st, , 4oo n tPt ., I $ \'h \R /rs 172" DENISOJ,/ MINES August 1 1, 2008 Mr. Dane L. Finerfrock Director Division of Radiation Control Department of Environmental Quality 168 North 1950 West P.O Box 144850 Salt Lake City, UT 84114-4850 tlcnlrmf,ino(tS )Gorp. t05O 17th shrcl, Sult! 950 [ranv!r, C:O tfilotl usA Tcl:3Gt02&7198 Frr : 3t3 30e"0125 wrw.dcnbormlnc!.com 4t Trc \ir ' .1 August 1, 2008 DUSA Response to Request for lnformation; July 22,2@8 DRC Findings and Request for lnformation; July 2, 2OOA DUSA Cell 4A Construction Quality Assurance Report; Request lor lnformation Dear Mr. Finerfrock: We are responding to your August 6, 2008 letter, requesting additional information regarding the Cell 4A Construction Quality Assurance (COA) Report. For ease of review, the Division of Radiation Control's ('DRC's') questions are repeated below in italics with Denison Mines (USA) Corp.'s ("DUSA's") responses following each question. We have reviewed your comments, which follow the numeric lormat of DRC's previous letter of July 22,2008 and August 6, 2008. l. Sandhg Coverino of Strio-Drains - We trrrte that the work of conecting the sandbag covering of the strip-dnins, mentioned in the previous coffespondence, is progressing as d*umented in the photographs sent by DUSA on compact disk, receivd I August fuO&. Our comments regarding that work will be pursued under sepante cover. DUSA is reviewing the sandbag installation in response to the August 7, 20O8 e-mailfrom Dave Rupp, and we are currently conducting additional re-positioning of sandbags. Additional photo documentation and key maps will be provided under separate cover. Revised Drawino -.An explanation regarding the repairs on the prduction seam summary log on pages 77/103 and 79/103 was received. However, the Comanco drawings forthe primary liner do not show any panel numbrc, as reterenced in the explanation. Please provide a revisd drawing showing the panel numbers for the primary liner. This drawing was provided to the DRC in a transmittal dated 6 August 2008. 3. Lmtion Coplrdinate6 - Regarding lof/afion cardinates, the suruey drawings frcm Comanco (Jones & DeMille Engineering) show the vertfu;al ebvatkns of numerous pipirrg, drains, sumps, etc. Please intorm us ot the extent of intormation you have regarding horizontal cmirdinates. Also, please supply the horizontal Lstter to Dane L. Finerfrock August 11,2008 Page 2 coordinates of important facilities in the LDS aN slimes drain system such as beginning and end of sumps, "spine backbone" header pipes, ollxtor drains to the headers, etc. The revised as-built survey drawings, Drawings P-01 and P{2, and new drawings, Drawings P-05 and P-06, provided by Comanco (Jones & DeMille Engineering) are attached to this letter. The revised drawings contain data tables that list the survey points along the "important facilities" and each point's associated horizontal and vertical coordinates. lf you have any additional questions please feelfree to contact me at (303) 389-4160. Yours very truly, Denison Mines (USA) Gorp. Harold R. Roberts Executive Vice President - U.S. Operations Ron F. Hochstein, DUSA Gregory T. Corcoran, Geosyntec Enclosed (Revised) As-Built Survey Drawings, P-01 - P-06, Comanco, lssued August 2008 OENISOJ)// ,WNE5 GeosyntecD consultants We are sending you I Original E copy iti I Dane L. Finerfrock Division of Radiation Control Department of Environmental Quality I Enclosed ! Report I Documents E Contracts .+. 10875 Rancho Bemardo Road, Suite 200 San Diego, CA 92127 PH 858.674.6-559 FAX 858.674.6-586 www.geosyntec.com Date: 6 August 2008 | Job No.: SC0349 168 North 1950 West POBox 1444850 Salt Lake City, UT 84114-4850 the following items: E Drilling Log(s) E Test Results E Photos ! under separate cover via ! Letter I Sepias/Drawings fl Specifications Copies Date Description 2 8/06/08 Cell4A Primary Liner As-Built Drawing, Comanco, Drawing I 2 8/06/08 Compressive Strength of Concrete Cylinders Test Results These are transmitted as checked below: ! For Approval [l For Your Use ! For Your Information E For Your Review E For Your Signature ! As Requested ! Approved as Submitted I Approved as Noted I Returned for Corrections EResubmit Copies For Approval E SuUmit Copies for Distribution E Return Corrected Prints REMARKS: Please replace Drawing I "Cell4,A. Primary Liner As-Built Drawing" in Appendix K with the enclosed revised drawing. The previous version of the as-built drawing submitted on I August 2008 did not have the panel numbers labeled and should be discarded. Please replace the table in Appendix J-2 with the enclosed updated compressive strength test results containing the 28-day compressive strength test results. The previous version of Appendix J-2 only had strengths test results from the 7-day test and should be discarded. Copy to: Harold R. Roberts Regional OIIices: Chicago, IL tColumbia, MD Boca Raton, FL ! Atlanta GA Austin, fi t Cuelph, Ontario, Canada Walnut Creek, CA lHuntington Beach, CA Laboratories Atlanta, GA Boca Raton, FL Huntington Beach, CA FROM: Gregory Corcoran at o o ct)tr II+,ooF N-o t$F O)qlP =EE- =NNalIJ 09lo|o -:C1l 0DL;irro *--os .E(E f -d(Eo3ooII L.9OFa8o oD = -lOLOOt-N*,ooF .crGo = oLott =o o+,oLo?ooltso F+.o?oL+,a o .zoooLo Eoo oo. tI)clllo, c'll N CE' 6a or,nFti o ro+ ooLoco:) +too- oooNt-r (o +to (5 E(Eo x(E ooc Joo o@(f) $s roF-(f) CJo oor (orr orrdNr -c.9q)I uo-c(.ic rc @ @ @ o o) E.oo aoEoE s s $$ oE' u oE rt o0N 00N a E(E =:foEooo o) E (nooo c ,oc oLo L) an 2aoE =Co 9.Cof oodLL o(!o .Y(U EtD @o\tN (o oo o |,-o @o @o F-o @o @o F-o o (5o al,(Uo @o F-r @o @o l- (oo @o l- (oo @o l-r (oo t,oo-oo oo .C o c) E(Uz -oo q)cLoo oo =2 (U =oa $ ot) o Page I of2 Dave Rupp - Re: Cell4A construction issues From: To: Date: Subject: CC: Attachments: Harold Roberts <HRoberts @ denisonmines.com> Dave Rupp <DRUPP@utah.gov> 71311200811:25 AM Re: Cell 4A construction issues Dane Finerfrock <dfinerfrock @ utah. gov>, Ron Hoch stein <RHochstein @ denisonmines.com>, Loren Morton <LMORTON @ utah. gov> HPIMO8 I 3. JPG ; FIPIM08 I 7. JPG; HPIMO8 1 6. JPG; HPIMOS 1 5.JPG ; HPIMOS 1 4. JPG Dave: I am sending you by overnight delivery a CD with 252 photos showing the work completed on the slimes drain sand bag placement. Most of the photos are in pairs that show a "before" of the area needing attention, and an "afte/'showing the modified placement. You will also note markings on the bags that indicate the location of the area photographed. Each lateralwas numbered in sequence across the pond. I hope this documentation addresses the concerns expressed during your site visit and in item ll. a. of your July 29th letter. I have also attached to this e-mail, 5 photographs documenting the modifications to the upstream end ol the slimes drain header. You had indicated that the last 25 feet was covered with non-woven geotextile, rather than woven geotextile as per the plans and specification. The non-woven material on top of the slimes drain was actually excess material that was laid over the top of the woven material as extra protection. This excess material has been removed in order to meet the detail on the plans and specification. The attached photos document the existence of the woven geotextile and the placement of sandbags along the edges of the woven and non-woven geotextile. This should hopefully address the concerns in item ll. b. of your July 29th letter. Our intent is to place sandbags along both edges of the slimes drain header to seal the areas of exposed gravel between the intersection of the woven and non-woven geotextile. Additional sand bags have been ordered and the work should be complete by Monday (8/4). This should hopefully address the concerns in item ll. c. of your July 29th letter. Please feel free to call me on my cell phone with any questions. (303) 902-2870 Harold Roberts Executive Vice President, US Operations t: (303) 389-4160 | f: 303-389-4125 1050 17th Street, Suite 950, Denver, CO DENISON MINES (USA) CORP file://C:\Documents and Settings\Drupp\Local Settings\TempU(Pgrpwise\4891A115EQD... 713112008 Page 2 of 2 80265 www.denisonmines.com This e-mail is intended for exclusive use the person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if you are not the intended recipient(s). file://C:\Documents and Settings\Drupp\Local Settings\Temp\XPgrpwise\489lAl l5EQD... 713112008 DENI Dcnilon Mlncr (USA) @rp. 1050 17lh str..t, Suitr 950 Dcnvrr, CO 8Oitrtl USA Tcl:30362&7798 Fil : tO3 3t9.4125 ww.dcnbonmlnca.com July 2,2AOB VIA OVERNIGHT DELIVERY Mr. Dane L. Finerfrock Director . Division of Radiation Control Department of Environmental Quality 168 North 1950 West P.O Box 144850 Salt Lake City, UT 84114-4850 Re: Cell4A Construction Quality Assurance Report Dear Mr. Finerfrock: Enclosed you will find two (2) copies of the White Mesa Mill Cell 4A Construction Quality Assurance Report. The-Report-vvas prepared lor Denison Mines (USA) Corp. ('DUSA') by GeoSyntec Coniultants, San Diego, California. _This report is in response to the requirements of the Design Approval issued by the Division oJ Radiation Controlon June 25,2OO7. I will be calling you to arrange a meeting sometime next week, after your technical staff has had a chance tocomplete their initial review of the Report, to discuss the Report and answer questions. lf 1ou have any immediate questions please feelfree to contact me at 303 3Bg-4160. Yours very truly, Deuson Mrnes (USA) Conp. Harold R. Roberts Executive Vice President - U.S. Operations Ron F. Hochstein, DUSA Gregory T. Corcoran, GeoSyntac Consultants a soJy INES ,d-, \tN $\ al{ ?;' ,\ ."$$$ '4.r :".srs$l's':'"'*(::)' Cc: DENE'J)// MINES August 1, 2008 Mr. Dane L. Finerfrock Director Division of Radiation Control Department of Environmental Quality 168 North 1950 West P.O Box 144850 Salt Lake City, UT 84114-4850 Denison Mines (USA) Corp. 1050 17th Street, Suite 950 Denver, CO 80265 USA Tel : 303 628-7798 Fax : 303 389-4125 www.denisonmines.com ,/ TE ,i 18." - u1_)J,r tC/ y,-..,"'t ,ir,, ,y' '"r ,t/C1l C,.:;ifOI July 2, 2008, Cell 4A Construction Quality Assurance Report Findings and Request for lnformation Dear Mr. Finerfrock: We are responding to your July 22, 2008 letter, requesting additional information regarding the Cell 4A Construction Quality Assurance (COA) Report. For ease of review, the Division of Radiation Control's ("DRC's") questions are repeated below in italics with Denison Mines (USA) Corp.'s ("DUSA's") responses following each question. 1. S/lmes Drain Sandbags -.Once an approvable configuration is accepted by DRC, it must be submitted as paft of the final as-built drawings. As per conversations between the DRC and DUSA, the sandbag configuration is currently being adjusted in the field to reflect the approved construction drawing details. The configuration of the slimes drain is reflected in the final as-built drawings. As agreed with DRC, photographic documentation of the adjusted sandbags will be submitted to verify completion of the work. The photo documentation will be transmitted under separate cover. 2. Appendix F - Repair Clarifications - ln volume ll, Appendix F of the report, two repaired areas of the primary geomembrane are shown in the production seam log on pages 77/103 and 79/103. Howeverthe outcome of these repairs is not clear. Please add verbiage with references to the report text and location on the drawings regarding the outcome of these repairs. The repaired area DRC indicated on page 771103 of Appendix F of the CQA report is located between Panel 95 and Panel 40 on the primary geomembrane. The three repairs made between these two panels are numbered 118, 119, and 120 (Appendix F-9, Repair Summary Log). These three repairs were performed and nondestructively tested in accordance with the technical specifications. The repaired area DRC indicated on page 791103 of Appendix F of the CQA report is located between Panels 115,29, 117, and 28 on the primary geomembrane. The four repairs made between these panels are numbered 225,225,2249, and 1014 (Appendix F-9, Repair Summary Log). These repairs were performed and nondestructively tested in accordance with the technical specifications. Letter to Dane L. Finerfrock August 1,2008 Page2 3. Suruey Coordinates - The basis of the surueying coordinates (x, y, and z) used to locate repair and other work is not clear. Please add verbiage and show on the drawings the basis of the coordinates. Also, please submit the surueyed coordinates of piping, drains, sumps, etc. The coordinates used to locate repair and other work in the field logs are based on measured distances from the end of each panel seam to the location of the destructive test or repair. The locations of the destructives and repairs shown on the as-built drawings were based on survey data using a handheld global positioning system (GPS) device. The surveyed coordinates of the pipe, drains, and sump are shown on the enclosed as-built survey drawings labeled P-01 through P-04. 4. Extrusion Weld Repairs - lndividual extrusion welds on the geomembrane panel bodies for repair of latent damage, wrinkles and folds were made and labeled. Please show the location of these repairs on the Comanco as-built drawings for both the primary and secondary geomembrane. The locations of these repairs have been clarilied on the revised secondary geomembrane liner as-built drawing. No repairs ol this nature were made to the primary geomembrane liner. 5. Appendix B - Sump Detail - ln Appendix B, the sump area drawing on revised sheet 6 of 7 needs to be corrected with respect to the as-built conditions described in paragraph 3.3.1 of the report, which details how the construction was revised. Sheet 6 of 7 provided in Appendix B-1 reflects the as-built conditions ol the sump area as described in the CQA report. 6. Final Construction Drawings - The complete final revised construction drawings need to be included in the report. This will include, but not be limited to finalconstruction drawings, sheets I thru 7. The complete final revised construction drawings are included with this letter. Enclosed, please find the following: o Construction Drawings, Sheets 1-7 (Geosyntec);o As-Built Survey Drawings, Sheets P-01 - P-04 (Comanco); ando (Revised) Cell 4A Primary and Secondary Liner As-Built Drawings (Comanco) with the incorporated edits as requested by DRC. Please insert these drawings into Appendix K of the CQA report. DRC also expressed a concern that the edge of the concrete spillway was not beveled and could possibly result in damage to the liner from solution dropping off the edge of the concrete on to the liner material. To address this concern a 20 foot wide by 20 foot long splash pad of 60 mil high density polyethylene geomembrane will be installed between the 16 oz./SY nonwoven geotextile underlying the edge of the concrete spillway, and the primary 60 mil HDPE geomembrane. Although damage to the surface of the primary geomembrane from moving liquid is not anticipated, this geomembrane splash pad will serye as a means to protect the primary geomembrane from potential damage from liquid passing over the edge of the concrete spillway, onto the primary geomembrane liner, and into Cell 4A. This materialwill be secured in place with an adhesive and sand bags. The As-built drawing will be modified to show the installation of this additional splash pad. DEM5OJ)/I ,UIINES ' Letter to Dane L. Finerfrock August 1,2OOB Pago 3 lf 1lou have any additional quections pleasa feelfrae to orrtact me at (3Gl) 389-4160. Youre verytruln Ilcnlson f,incr (tlSA) Gorp.m% Executive Vbe Preskiont- U.S. Operations cc: Ron F. Hochstein, DUSA Gregory T. Corcoran, Geoaptec Encloeed Construction Drawings, Sheets 1-7, Geosyntec, lgsuod July 2008 As-Built Survey Drawings, P-01 - P{4, Comanco, lscued July 200S cell 4A Primary and Secondary Liner As-Built Drawinge, sheets 1 &2, lssued July 2008 DEN'gOJY/mtNEs l Geosyntec consultants a D Dane L. Finerfrock Division of Radiation Control Department of Environmental Quality Heceived AUG ',",,',l Division of San Diego, CA 92127 PH 8-s8.674.6559 FAX 858.674.6586 Date: I August 2008 | Job No.: SC0349 168 North 1950 West POBox 1444850 Salt Lake ciry, uT 84114-4850 the following items: E Driuing Log(s) ! Test Results f]Photos We are sending you X originat flcopy fi Enclosed ! Report X Documents E Contracts E under separate cover via ! Letter fi Sepias/Drawings E Specifications Copies Date Description 2 8/01/08 Construction Drawings, Geosyntec, Sheets 1-7 2 8/01/08 As-Built Survey Drawings, Comanco, P-01 - P-04 2 8/01/08 Cell4A Primary and Secondary Liner As-Built Drawing, Sheets I & 2 2 8/0r/08 Letter response to July 2,2008, Cell 4A CQA Report, Findings and Request for Information These are transmitted as checked below: I For Approval X For Your Use f] For Your lnformation f] For Your Review I For Your Signature ! As Requested ! Approved as Submitted I Approved as Noted E Retumed for Corrections lResubmit - Copies For Approval E SuUmit - Copies for Distribution E Retum - Corrected Prints REMARKS: Please insert these fourteen ( 14) drawings provided in Appendix K of the CQA Report for Cell4,A. at the White Mesa Mill Facility in Blanding, Utah. Copy to: Harold R. Roberts Regional Offices: Chicago, IL tColumbia, MD Boca Raton, FL ! Atlanta GA Austin, TX I Guelph, Ontario, Canada Walnut Creek, CA lHuntington Beach, CA Laboratories Atlanta, GA Boca Raton, FL Huntington Beach, CA FROM: Gregory Corcoran UBo =>uH?f-l t- | LE{EU EEHEO6)D,-ir r' \J*-EB EFE*ofi lzl u Frr ItrIolc) IBll-alo lz IE ooz 7oJ- l,oz { (I, rrl ^A\z ils 9(Diaf I -36 F{o'oO:":f F g g*'- =$$n; F dsi$ Elo o,t.1;' Ji,Biig.cf6"orO @=.ifqr^o 1oo---- €'tz (1! Ot r)! HF (-)!oolJl I5o5 r)!5(rl(O a5lJl(x r.)'0 oto(x r)! FrN r')!oo zoo !oz{ wwoNNJ(,b (^)lvo5Olyr u.)(o (,NoUJ5Its!n t,F(oN5I(.o @ (rJP(otstDFN5 UJts@(o Ol!oOtu, u,P@ro(OIPur UJFro5o(o 5(o UJF(o{{Its{ zov-{ =zo Nut{(otJu.,IH{ t)ur{{{NJP .Jts N'(rl{UJ@5 iem N'ul{\lN(o @o{ N.,(,{{5NJI@{ N' UT\,1@(o UJI6(o Nut{roo5Io'l5 nJ(, (o P(lIPb{ l.JtJn\t(l, Ol\|Fbts m -{z6) (,(, @!oN5 (,ul@(, (.o5 t,(,/r Ul !olw L,T (, lJl5Io(^) ult.,r5 !.J(rl{ tJtUIOlIo(^, (.rl LNulJOlto tJ!(.,l{UJ i.,N (,'r cnoIoo(o mt-m -loz {m -lmDz N': (.)vT'P{Ul N' a a) €ma-{mvz mzov! ts{LN ImVt(.)v T'{oz oa ,.'-;:1 =i::-----------:::-l------ ll ll ,,77:;::'E[ fi ---::::-::::::-----\:_::::::: __,_.,/,1 //' d. ? HF ff ------6----/. iie-= )E = iir ; / or iiol n l^J + i!;f,i\-x:,:::::_. llF,', r,{,q:i;;-:::-r:-- ll ( T l,\\.i --<jj t u i-)t...--_ {nll ffi"f;-'tr{ftj*';'.,----------.-- l- ,ll ffi \".* jl=;=:=..= __.,,1 I EE-\H ."% )l-oo rkt/ ,$fu*{HruHsu Wlt"//-* ,$.k !* -q'u3u,ff ( AJ ,f. !::3gr* *s' ti -# d'Jffi L'r E6i (u- \;il-ut $\ u F,l H$: *r ffins. l' ii Ef # AJH* \kr *u././u{ &;q":" ru I HlY (q: \,*. ,:ii H'.l$ &,- -ii; I I E .....J\.. . I$ \::; ,' i,i, E"".V\ffi (""- Ll\---ri---_.\\.. -i\t: t:,,,1 /T/"\r_-_-.=_.::'.i_.$i,4..,.A_. t*,': ,l \q -----:::::::..__! lll '..\ .hf '1 \ ,.---'/r"--'/ ii li '-_i.__._i1..^ il \ ,r,.,j,,ii ii -------:\\- -----1 \,,ri' ll ii N ____.r\rr__t>4\r. ll jj ; '".':.- -,,'Alr N ll E '"'i:?:4fr!rt -\.'4_Vr il ltz\1'r'" '."1'=-'l"r ---- o \edllt /i: l - Hi 1/ ,,,/',..----.i.r. (; l;ai li W),)i"---------=.---:---:- ..::::::1, "i:.: II IIII Illlttttltttttttt I IIII I III liitititltltltltttltltltltlt I I I \ '\:( I I I I I I ! l I I I , I I I I I I I I I Eo! oro lil ilIFlil$B ii-----a: r I rrBlil sH exslgE ;=;Edp icEit -o>zma o1'a(,ro II(, tDtD>-Ez<>z'13 IEEnEE9Ef Ef;Hfi EiE; sEnezo!rrt C, oooNo2m' >V)lAa 6*i* z1e1 55gEz' =4fi 3rf,zo=lr5=eI ms,qo a2 TPEn'fn>mxtr, EgE eiri9=n = "-Ppi3a IIIa rg: i$ii-z\ Efi3eel =is8A 1<'t1{ - -riHi E=88 [E aj*= fia HqH EI ;ig;6 3Ea<{th- =.'r 6 6rFi*EL' tD Otmi o) IE Izo tIo t,t> il= 1E ]OMANCO ENVIRONMENTAL CORF .l la ;ones & DeMille EngineeringP '*ru;fr9t.;1ffiT;lHffi' Z ffi.duffi.MWHITE MESA MILL CELL 44 DATE REMRKS LEAK DETECTION SYSTEM GStd:REVIEW L.G. 07-08 credl oG: REVISIONS PROJECT NUMBER:0707-131 AmD 'qLE:1'=200'owccREATEO: 07/08/2008 lL sr 8l1l2OO8frr0E cEu.A'*,rm* l upoete,SHTSETT cmM-ffir oo :;t::i*i3-t=t-:::::::--:::::t: // ///ft:"' '[E6 --------\ tl ii :--:---*--iJ'/,= o. e HE [ -------:---:::::[: --1-rl llili^iT_l H qe = llll?.9,,'Xf+-- Het li llx K-V--:::::::\::-- 3E= ll (ll ffi-- -----\:::::::\__ I llll -ir f"_-"ft::-il------== ---::::r::----/------_-.- if m// // /,1'T;,,,,--.,.:::11,$:-:====.-.=...,/ Egll ll I lr'.f'\:::-::::-:-::-:-----:/::-t-=::\. il -)ll ll I I lig"tt-----------:-::-:----:-:----_::,-,*; Wll ll il ,i i 7rm--____---__-_-_---__-_-_---__-t ii I i I I ,,'lC;:--_-------- --- --- --::-i\-. ll| // //tt li1,$;::::-:.---=-:;.:::1-$ // ( ' ll liilll,'-"1tk-::-::-;:--:-:--l:----_:ff ll Ell llll ll li"-{**::-:-------------:::----.h; li Eil Li ,i I I I i l' i"g^,*s---:----::---=-----J:U li E // /llltlli'rli5*1.=S#, I E(Jtt' t/t /////l,,i ,.$l E\\.. *^/ri i :1...\-.i.1/"""{i I I i' I ,l l' ,r.:,,", -^---___::r*; li E't.'...- -\_J J,'-/ ; i i I ; i .r.di',"..,....._xil/i(i l/ l, ,i ffi:1a,::;f;: in\._------ -\--'o- ;#}J i ! i i i.*"3 -/"q--_\__p.,., s "d y,'.,/ ,i I i..*"-____ /"; lrrr-''=-l--=-_-.=__*:::::::_--ti;,.ii.i..1,Uil,1';1:_$: ll2 iiiii 'i\-- "t ,nr')i i "K- i-'; i! --'.1)ta iili -'-ll---._ f ssff^$fo,,-" ll ....;/1'-'tc liii _\_._ia*. +rr_ ll ,.:1j.,frE ii ii --i;'i-1rt.,. ll .,,u,,"W, i/ ii --\--\*.. il .,-',,'H ii ii -.-\>.-/l--;:fi,,"H ll il D "i.il---'='i'i'E il ij I ''..'., ,, ,,,tr t! lt ! '.6 ii ii E ',.'v',/'ts ii li A "):.1.H I ll u .,..,i,:!.... .E_2.__ li ii --"111""^'-\"' t )i ,)t-'-----: ------::1111-'' "'.1.'..,t'/ ' . . Hrftz.lo lii tll> , I i$e' I liiliis EHEIEI tg;g i 2 ()l,o)EzP53 E,6=pn6<oI 3s0I7;*.= *s**zfrJIti69 t-uEeil ^dir* {#eItt;i KA,\\*,\iJ {N 3N;ts E|I "k3li !.0 gi* eIcI9=n =IHpti! ;=;q iI;:$HeI EffBnq= lis8A 1<'t4{ ' -ltlHi E*EE [E ;inz4\ HeHi; i;IgE ?+x;f; gEa i<<tA- =rr6 $.. 5r6 H3$ @ImmIzI !IoN ,lyil c-llct> l= 3OMANCO ENVIRONMENTAL CORF .l I lon"r & DeMille EngineeringP '**x!J,T#s,;ffi?;ii*s# 7 ffi.'offi.m I I WHITE MESA MILL CELL 44 tc DATE REMARKS SLIMES DRAIN SYSTEM &std:REVIEW m*, L.G.07-08 Gq:OAlE REVISIONS PROJECT NUMBER:0707-'131 SCALEI 1"=200' owc NAME: ^$urrrs I owc CREATED: 07/0E/20o8 | usr glll2oog sHT sET: cff^Nco-wrEMlrflrq.cEu.t-**,od* I upolr:, .D $erB Oto \\\ I lrmatat{t1 24-==tr2 E*EEE E dgEasq 3ea-ooZoozzooCCnv ,L .,1 i-i. ti:==:--.=--.:=r----==-> ---4- : '-:,- - ..* I.fl ) ,i; .\'* \ o.ti \ -" _yu$^ >2boe.3 . f- \ """ ."r b. ^f \*o l\ ir.: 'X.t ,lX \ \)j,,'q !, t %o o'*'$',f i,.(."\d6'. ,? ,i?d ot' 1";' t .''s' \ / ,^. i\ 1r 'r:' \ "* (*..;frb'.* "j'\ ,i? \ '? ,,t' \ s{' )r^' f, \ ,J ,{::\ ,e} \. ,"" ,^tif N 1) u*"\*d "Ai t,d" F*sr\ .^. t- \.f .f,f ^- \ 4; df \ "{ ,rr\* .or i\,f , J\ "ir d" "Y {.'$'\ ,.*'' """' \*l' /\ ,.)r' 6'" \.to , .A .trff s" ,\ {./\ ,'" {i' ."XJ. $r '\, .} * ,!.:= -{C)I 1Y ,t;, ,Q & s} (a <t^ .t''lt' I llllltlllllt I I I I I I I I I I !9a: ,*, .q ;\ -.rt '|Y .rN" ,\; us \ utf -r*\ t ns' \ -"c"!. \ aa s(' \ .*\,\g i, roirrsr".\-'/ /\ii' " )_o, ,W7/////,o' , -l-'?Z/' \--t=r- ,' r) \ q'' *\l'11ci' \ :L {r ,S'9 \ \,o \ ,'! .6f -Y-:*-===- 1'=---=-)=:=-' =:==:-:-=:::==t1.-'=== :=-:=;1=---=F>-)>-- -- - - ---------- >-.::--===---==-'= IEIEI3II \ ;,,c ,1, cb J'd'#$'n ti',9.!ol 1!.Y'9',f1i' * qb -aid,?,8(:i{, amm U)-rnrn 1' IoGI 6i' rQ HSzFe1iPE IH EHo 3?,o a9 fi1r1.rI9b6il0 !vostr,mt, @ C) 3 zoo L mfr{ =9 1'Ioo) WHITE MESA MILL CELL 44 D BOTTOM SPOT ELEVATIONS i[fl*'=?I ozot-1sl it I @,:- ro!--98r sst^{>; arl{(r>P8i e=81ozB -IHp-.2O A,'iC,< IEi EH;F =si egg;q= =isBA J<'t1{ ' -FlHf ESEAi; glE; 8E zT--da ET HeH 3I FB36 3En6+ '9m6 ii!tittl!i L./ 1,,-' ,, Itl /'-' -t/,' --' ," /t' / ir, r r ////, I t ////// t/////il ::2 t/t -/---1-;: --t_--tt _--'. --t _--/ --/7'-:'-:-"-'l:------ ,l I.D 8esi Hg reE P3" F-o2s>1J- 2 ET= =6944 sBEBlas s =Egg2=tr,c, C)ooo22ooCCvv <=>= 5a lt --==== U "J.I tnlof CO). 6h tP {'d -{r'f* 's -( .c) u t \; -x ^e ==:-V / ,-/f( ci' .a' \'(!" \^"S'\'\;,, 4;. .! f'd - t,'\ ^$'\f .6t \ ,'! \,$' \ cl ..,,\1.i' \ ,,illii .t' -".V\. &",r.^9' \ ,.f \n\rta\oq\,i\;'\-,Xd" ^fdc \ ,,t\3\ ,:\ ',f \\{#\."""\ #,rc .,i.f \no ,,[lllll:,] WIttl J ..'/ "? $;'/ v#(^\ \\/ \",*'\o\!\ ,' "o .d {.9\,t\ 'r';' d4\8\ .s* .c1 & ,c 'ffiir "l'q,Ji'q,}<;ry ,l' 'J X' ..r, \r't 'e \ -.''r ,, -N / *i" \ .i'r (s) .N- ,{-X.-rn.,\r$r:Nr'oN,*,) \ /,d" x,o si \ ,,**' "J'\ *.o' ., _\ ;f \ .,*r,n s \' .d\ ,*i '* \:>tuk"r\ p bo \r" .,r r,"\ r 'r\.,u; ., N- { \.*o-.-}(.* *.:+ cf ,: ,,, '!1,f, (lj' ={c)- t-zm ,\r," *? $ )Es'I _ii oi' "<4.lv' ;la ;"\,!\ ab /-v .(4 q .i,(, \ .1,!$ .*, *lI a *. -(" {' ,af ,'\L A.' bq .f.$ J.it,e <\,{}a ,G, o' $' ov .n6 .9 oVd E rii 9 ,*,:l _1,'q .V(l.v .v I ;Y't'.! bo" \ .{I ,{9a^ 4'$' .r.'\ u 8- ,6.i. ,i,4' .v vo ,.!{ ,3'" of \ #tdr' X* ,9 ov .g" ""-" \ .,i?,ri \ S"f /\ a.r*3'.o'&*s\ ,{ - \v G ^fl) \ (I(,n{G \ (r{ - lro*:'i ; **t\.r ""d X/,t? Y) - .:(rt' #O. . d' 9oV\\9.- .T.) \ d)ra =- O'.)," \ ,x o$ \-..* - ,q6" ,i, dI ,9rYI\=?.--=..=': amm a-mm ! IoN"rh{- lclr\l: -"t" a? ;; 4. N EHa HT a2fi2rdthottr !nos(fmtr @ c)o =zoo l$5tt[ht00Wo* - B.ilhu.m 0amth(t$lE$,6 r.r(a$)&A[ffiJ6ffi.ffiWHITE MESA MILL CELL 4A BOTTOM SPOT ELEVATIONS omwx. L.G. 07-08[[flt??] otor-131 0a 6 (h o6 A o t o a @ o >oqrt,irq =oaE9=P "€.iD =I -^ o-n ^=.^(rr NvLl ts 9 nPA!":,6--==*i; kj>!a6E ='; ^a- 51J['-ioy; =!5Ae.FsEmd'?e> 9Afi 8 o .vEL3 3 n E!.V 3 T:i3^ C 9de<3 i v d9- a 7/ Eq Ed =.)= omo ?oH o<A O ;(t o 6 g d'g c. 9 5 EBtBEitfiia*qa#F i r I=flEEaq i+rq3 v qE!_*9 3 6o9o-5XY ='@86: : sfi6FJS .!HEs I e i;E[[ic gEgE d B IE9:qt€ dEs9 eEEEi3=3EFqii.X : a€;sEfa 3a9;* a g E; B.HEE 3 s;}i sriAiiC ;aer €aiti sgEg*q; [{q eEsi*Eg3sElA eEEa:+; 9IPB EiIII*E ili i;gt*gc Eir = . !&. € { ; -di i tu t1s-*I2 t zzv +l*Fs5 ; 3rA Hxe36Q 5 " -/O3 pE 9 j1"5 oodlteE .S 9€E SEEqE; E ;+; x5E=ep i 4 P.,Y. O?=<9.5 z H X -^ = ^--o u s.r 5 !??i39a F =9{ e6U- C}I . Ea:' nilhB= = a ":- -i ;i 4E> d-a=6=m = =d@ a r-'-X- A - c O h:.'96l6 uc9 i 7Z: *E:ijdE ? E:'l ==*3,3=NOP? rSfiE iAes.o = m6=. ulo H:6 r ^'- == d vAJ A aK E iir ; :-A;oq==.E d r€-i g flZ = lIil ee' a ISo :t ? id ets 6) x q -! = \ a*o I fq* 8 E ,- rD + a Ot i LX ?' o; 6_ i;1 E7i t ==* f> 6 ) ).=+ ,- @! i W O : Dftw9b="' =<dH m e:ixb4'.P-.DOE 5 96 :J=5U fu i:pI@ x s s3i5o= or9 ? 6 2*! 6 0 J.Eg6 0 !m a6= O-5Eii ;6+<-. =e5o5 f i ^.a6 ellF;= 65 E 3 < 3!pxv <or.: vt 6 I7Ao ai='i== 93; -v=,!il =.i'5a =P99 du50JOd-o = =p-o- ^<Xr; 8;t o =-J5 E 9'Pm={-.5- oo-B oaE^-xq- e - =s: d =--"J. ^m-m ci Y:r' ,d6- ;.bu{ ,-..l:' 0aqEO ad =_; o ^ o.JO m: t')qoo? Aard €q e oo h m-!oliAN7e;=n 's EdHt*tgVat*dE:qg: o a=.+ - " ==o @O-F q frE-S I FEHIE6:;6 ;eA " io^Lrroc 5 :;A H EEe:EiY; i5s B 6=is E'": s:= q - Fi 3d 5?o =. o< oeo O 6 OO =-6 o 6 fP 69f 8 o 3d J.-d 6P 33 E-3 Va dn io 5@ No =.- o:t +ai o3--p@ o :6 Pu6+6oo 9.6 ! = aa 3o te vo oDg ta v3 <- = JOr @o = oa6 Po - o6J. 6-o E<P 36d =3d u3o *o9, Qai; d*<pI E= o 90f qoa 69Y <dj oo@ *a, i-6.4a@ <:3co (,6-{(,nc666:B"":, Io = <...*'^3Jo *i,H R B J a'PS eGE9=E>!26---a<Qlfio 3;i E9. !?= No>FgP6of^6,9 3 Q oS E b o*@3d 9 BFO J<'Y =.5 e ,6 =ao Y:!20 =o= '-,frd : 6)do q odf 6);,8 lfo =,J oc o !d E fo fo €o o ='=oooo3o3 d aofo =.Eo a: +H6-= Y EI \ :- '4=o 2 "9zdd Xnidtc<@;;'o xryd auo 3qdoo-a^<o=o=6+83il6=E:6XE=B90a l-1@aqa1?aoL*o a35'@oa=-=Rdm70 o500E*88+=omE6i!gB<o ==Z;^o 5-6i=60ruUSogt!tr=.a3a- FO=.x^lp:a-o U6C 9)o>.==-98 N -o N r oao lJ.] t!lala @ 6;dao.X F il '5 6 = J eO{ .E a q E oo o\ ai o cho@OY E t6o -N =6ld'.r5 -3r*1!3=lQ^; 5E$PFB Bd,.A - \) :.6 a'= r ,, Y ^!4.aajiz=e.-!s':+6i =-.rgv-ItO=9 x 3A5c##rEii a&FE E ? " :; EE ; - =4q -O .a'a = ?9ltE F- oo pEs{, =E U3 --, c< = .:q =, ua Y d- 1 = > v E :r -aO o >Eh 9 u i ll; o 9E FF_l i! E- o aq L Z a EO-U6!s0 EP3 i:. =oe ?;z iE ;! .=€c J60 Eo i- Y a,^ o= - i +: -.:" ^ o-Y o.)d5 : 5iE :F frA3 r r!> ,E; =aI i =!- *c q = e ) q.9. 35- A'6E-!.1 ! u'EEE u a$.I ei E:t6!L L'i9o b d=.; -Yh-E E - d >v) L A ';lcel r =6= :g.i -EB3,;BEE e E;E tEa E;9: - d.= o -o oE6 >:'F ;. t oE = eS aEaY o O I edddiEE ! h;( Eie tu+Pt'Ftj I mEO ";=.= .:gAig:E ; EEr gE; E5-6 0 c= d > o a c M: x oetEeu E 8c* ,Ei ZEE5E.s'$ t e=Z €Es =i,.=-; l= a -dj.= aLqRdEES : i€: ieE E"; 'EEE6 , .4 XE* !Ee EE EEE8'E € H Ei; €g; 'ill -..E.:O : 6 :c.: o69 YaFE:YB E S EF2 8E: FEEEP,S; f ir - gd 3'g f = Od)u - aHt go;;q =-oH' .68+:o a,;; eaod iiE6 9to+o =E 3'3 g cOob8x 9.a6iiPq I.:6^ O E oo n =o = 6o 9.9 .9 6 q;? L:O< d6 >X =o= 6 F YAa ct6," I;?oi;^q 9 >o: a698 E o:- ca aE B60_ ooEE ;E! d F';o@ x9E o Eo'.5 I.!J O; 6qEE eE X= 6EEio c'6 b 6.E ?3 9s e 9E.*-, d :o og i 5 = q QE P $E Fb iouod99?s 6 ,;6 x 16 o Y49i6.a- P q o#tscs # g 3 'qo!c fepfi:Hq 5.n". EPE E EEgEEs$ tE=f EEg s lEEE-giE C5;; sfiE EEE,:;'EE*e *cFE o-= -- E BeiEE: €a:i' ;EE H IEEsE;E [cEEE B:i E ;Eg:E [* $qias gE: Ee=rEEgEE *ieE; ;Eb ;8E5o5?; EQqSa 5:E -Apbxe;.x.5_ cH!6o g;€ Z E aEI;E; ;;EEi gg: r ^ ?:ateer- Eg;EE $gg- ,g E,iI F: ie':E** EE e:; E:$ E 2E ;IEiE;HE $;EBE E$EE Eh-i E . E EAESEEEE EEEEa EHEq A: $- g EEEEEE:H gEg;i EE:E i =EEIEAAEEEF€qgi*IEiEEEEESElErs Eas v x;E;EEEa xe 5$€ ; $EE Z EE:;g;s I ; ErEEEAEH E€*a$ EEaf; E :6 * -'6 gq 66 cl. EE s ;e E36 F. Dd "acd X I> c995 E d€ uEso F .gA 2 .goa I of ;tsE - i; c a oEEE = E= EoE H F E 6 *X O - L O8EP 9., E€ :P;: -o. 39 PEOE €q E! AEt: :E Ea 3.>Et 6q :tr o6;€ E6 19 E- EEEP:E *E i;EE E6 #E iPi6 HB :ii 3*FEo 3E =P 3gEEEA EEA E€:fr€E ;EE sEEu Ei :H3 *-060 6o 9oo d;6€ u* 5Ei 4Et: EE e.sE E"E E lE -s::- :E t=E {g.='E c^ iOO Yo --.9 .9E Y-ii o iEs'P EF zEZ E;;eEli Eag uEEl B; E,E€ Eoa6 ao ?e'c 6P*q aP EEO PE -: E^ cYqsts aE 8c,P HEEE +E g;{ g sEg 03 e6 @ 3oao o.fo o. =o)@ b{oNo@.E a s,o mo !,o mo u 9d mo s,o moA !,o moA @ moA I TL ts !, mo5 oir mo F o LJ mos lDo mo Po moA s,o mo s,o mo5 o m !^oo= <oooOro T T mo T! F TL E rrl IT C5 T F mo mo ts !oA OA C5 F o 7J Io mo t T o mo Io t. J T!- E po mo 9o IT C5 Io mo oi,Po moA Po m ,, T A Io mo , :, O)i, m , 5 't1 O)o mo f 5 T g o ll C5 I(r mo , ]'.] f Io mo ,t T!- E I(, mo o o i.n mo5 , J ot, mo5 ,t Po mos oi, rT C o, Ln mo ,)t, il Po mo Po mo (r !o CJ=o:.ofE-=o! rn O E C $c DE cr +qL + b s:F t sPo FJ,o 5{5Io AIC tr tr 5P 5N bo trt,N trI $Ni! Aiu 5N F N F 5Ni$ trI 5N5 F\ f sN@ : Ao L) I J so bD trtr ! F F 5(, 5 5o bo Ft.I !OF -J otr=-9 5a_e +,!a c N ts !N f N6 a t x tr J oo o@ t { 3g-6 oo irN IT Co T Ioomoo J F T o 'To n trf''tl c n C tDomo5 bor C5 ( T !io5mos N\IT C Nb Nb,omo5 T N) (,mos rT Gi\arT 5 o5omos JJT o-t m <)s +bcIT $ ! om 5 F!xT 55 D Fo{mo i 5io moA ob mo !, m s,N m Ur TNos 5 ir 5 5 F T! E o o 3 E :]-9,iE'Ei3;o Eo !t aruINoo F\ =, N--l 'ooo rJD (I .@o@o I E\CA {os@@ I ! 6] icNN o oNi!C! 5 90(nN5 5 s, !o 5NI c io6!5 (,:o@@ :.,,x (^IGoo Ni,3o ! N !coND ! : N! 5!o ,,! No'o, @s Fr\F F I t F N l.)(o(,{ NN5 u N os ,! N o i.o5 I o-ri; dfli-t- - Ioo N(^N c o Fu5 @@s xcj,o+I! P@o J oNsN D{$FGa , ! x (/, NE G N!N 9) NI{6 5 NNb5 N b t !ccC Io@ xA iI5 q o bo J o s J t oi!o ic 5 to@ I a u N io-ao=ro1)>d oide c "c+ bgo N N. ,I It i.J@ 5 !tnN Nob Not,o o bo CN :;5 !N J od t ) n l oo b,N JJ C U A ,t !IoN @Ni) x tsx IItI :r5 GGbo o, !! @@ -to o.5 Ic F1DO6s GI 'TI:iog{ ooiso J F o{i,@ o@5O C!o NoICoo t c ,t \, c \ I c NisO).o@O)O) io oo \N No,o, oo ,No,I@ 6 NNo k N oo @o,o \,, N.N 6)P@O)Cl) aI3 NN .oCoo N.NoI@o,o, \Jt NisO)P@o, I\N 6 NN o, iroo,o, !,i.)No,I@oo i!o -o t, c, N N tr ! 3 NL6 .oc \ c ! ,, \\ cI I J \Nc G gc =3;€o3o o o o P o fif -a Dl,a +.o o: =o @ f.ooo =' 0)x. 3c3ooo f f) fDDD) l o6' 0))oo @o3oolo o.l oo3ool UI-t o 3oog D D3 iDnI 1lc ca. N:ooo r T cirN 5 o3 @oo c)955t>e-{slE =ol-dgtmovo) e=g.- ! N No @ fu** ">l vI"?D, ,1>v=fr @)bq-(.tLo D,fu ' \4 l\;tl , zoo7 bua{cc4 : @c- lztl"* -+ Whp;\ Ob *a*\L url b'A^1u -t' *7"*tk"^d wY lo u y,b)a-.^- + bffitffi;;,.1, "o)og^x'4'P\- n) wv)*r.l1 Ytr 'l'-* TnJq*xo'7k-- ?"-v' 7{o ' ?-4' Vv\t' + cs.,^*-- ' '-z 1'$wovoc' +\up {'\+ ++\-, . pr ^-c,^A*, 5*=# bq; ts6(oa - toU,--+- 4 t.4t1 .o (tb t G.,r\, C-l(4tr o o o E oo q+ o u o oN a d o a tiOz dp(r) cn Er ,l z rl!rFt-Zori AtI] vEY!{ ir a &,'aaz0=aEi 2a;,Ei*tV<U)2oS<o3 =<o6?S i\Hd;qB :COi-4<EdFdzB9 jl IF'z1El a Z trJgv44 F3 1Oo Uoo o Ltra- 6 os E E !60 EO o^6 6ks-o=<- u:4Y 69 Lou*F trl' o oo vo ooo o9 -o- v.)r bll I o o E o oa o o o o obo ooo bo o .o o o o o o .T o !- o oo o >ro o O ';;iq. BO o o d d o oo 6o o o o d o o o o o 6 o o o d o ooo o o oo d o o o o Ea o ooo. o o o o o o bo oC o o Eo oo Eoooho6o d oH o IJ.it o oo oo- = ;iJ 2 a tr1& Z= r\ o e.9 Eo=>6! v= ovEd --.orr EC UU@ dEts o o oo o I oo a o, o j o)o o J il-z U t-,l O co o o o oaE oo o o E o.o .. oE! -? E}o.- E-.3 b9caJ> ilH =Nrb @d oa EI o oo! 't,o o E .=o OE -ca th@ ;N u.9c )<>(lo ooo L€ o o o3 dE o a- o .o6 oa o.o: E z CNJO o. lL O o,o o o. o €' Io o oo o oo o # E E X6 E 9> yo oF(-) ^j dl EO iJgotr ^ilaltr !o o9t .E g, ;* o 6o E o! o E E E E6 o- 6 O :'aF () cnr.l Fz O z bo o oN o d6o o o E I -6 o o o o C d o o0 o o o o oOda =G o o oo 'd o Lo 6 oo o o oN o o d olEI6 o = z 3O \o o .o <f,=.o 9o :o q .o o F o o o o EEE E6 o 6 o E!o .o GJ tJrBOo = o d do o d o o ! o Lo o o o oxo! oo-EE {E o! do o9ooX OO E- io-o o o o o o E d E! d o d o o ILq 6 B oN o 6c Loren Morton Dave Rupp 3ltU200B 12:21 PM Denison: Cell 4A - Harold Roberts Called Dane Finerfrock; Dean Henderson; John Hultquist lg' (,i,'i, Date: Subject: CC: Dave, I spoke to Harold Roberts this morning. He said that FML construction will begin again in about 1 - 2 weeks. He estimated that the FML system would take about 6 weeks to flnish, and the slimes drain about 2 weeks after that. He then asked what was needed for DRC to issue an approval to use letter for Cell 4A. I rehearsed for him the requirements from the 6125108 DRC design approval letter. Here's what he has planned: 1. Surety - Harold says the surety report he just submitted does NOT include the cover construction for Cell 4A. Harold says he has done the calculations, and estimates that he needs to increase the surety by about $1.7 M, He said he will submit an addendum within 2 weeks that includes Cell 4A cover costs. I told him we would also need to receive evidence that the surety has been funded. Harold said he would start talking to his bond company. 2. Reclamation Plan - I asked Harold if the currently approved plan includes cover construction for Cell 44. He wasn't sure and said he would look at the plan to verify. I told him that if it didn't, he would need to amend the reclamation plan - and it would need to be consistent with the surety we approve. 3. O & M Plan - Harold said hewillsubmitan O &M planforCell4Awithin the next 10days. TheGW Permitoutlineswhat is needed there. 4. As-Built Repoft - Harold asked if he should submit the as-built report to us in pieces, 1 for the lower FML, the drain net, upper FML, and slimes drain. I said no, that it would be more efficient for us to review 1 report for the entire system. He said he thinks construction will be done by mid-May, and that Geosyntec can turn around the report in about 2 weeks. That would put the report into us in early June. I mentioned that you would need to do a flnal construction inspection, as a part of reviewing the As-built Report, Harold asked when we might be able to review these things, I told him that we would look at what was in your queue when the submittals arrive. I did tell him that we should be able to pick up the surety and O&M plan soon after arrival, and that we would need 4-6 weeks to get the as-built reviewed. He said that sometime this summer wastewater storage would become critical, and he will n eed the Cell 4A capacity. If you have any concerns with this schedule, let's talk. Loren DRC FONECON RECORD of David Rupp January 2,2N8; 3:40 p.m. Speaking with: Dave Turk, DUSA Dave stated that not too long after our inspection on November 28,2W7 the mill site received deep enough snow to close the construction on Cell 4A. Therefore the work is in winter shut-down until spring 2008. - - D.Ruoo or'l:k' FML '. Eruail fo 1" $rt f Tn u/ 4,2,ob..k ./ Dryil /.- Do,.Tt H- dr-- ,.>inb *r{-. f rr{"r,.* tr FnC J @0( & , { hrJ ,^rrt l,-*{ :?' nW {",^ /k s*/,i- .en,il/,, //**rJ //t tlV'J b- *'bL +, ,^r{^/l ry'df.r , .*l +f,t *l,J,* ; #.,1 *ou/Jn'fi..) t- *./ J,,-,'1 *d ^.h,j-'^'W' ; J* k -/lr* GcL insl/,- $",j;,^*b *tlt . { lirou'rol rLrf\u, +Lt t{ /r- ul.ruur + J4 ",^+ anLo* r {Lr'7 lrn. t u{st- sacL. p'ori* t u""d; TL i,L, +1"-.d e4,4 lr"'J efuJ .^r,fa Q.Qorar{t^- o*)u Fb^r* /w\-L bn.k e\ t,f",(o7, usrhu t/rJr* u{tE , rtf z1f,t f, /,I nol lo,, Pl.J,"tr lfiA ,,+[no pfc^ vvz"F, . Page I of I Dave Rupp - Cell 4A GCL Winter Construction Procedures From: lo: Date: Dave Rupp Ssnyder@den isonm i nes. com LLl5l2007 3:40 PM Cell 4A GCL Winter Construction Procedures H ro berts@den ison m i nes. com Subject: Steve, I am requesting a copy of the approved cold weather construction procedures for geo-membrane installation for the subject project. PleaseprovideanapprovedcopyorthestatusofapprovaloftheproceduresbyNovember9,200T. Ifyouhaveany questions on this request please let me know. - - David A. Rupp, P.E. Utah Division of Radiation Control P. O. Box 144850 Salt Lake City, UT 84114-4850 Telephone (801) 536-4023 Fax (801) 533-4097 Email: drupp@utah.gov file://C:\Documents and Settings\Drupp\Local Settings\Temp\XPgrpwise\472F398lEQDOMAINEQRAD... llll - H iHt [31!:t tHl fFt EB'l&r{ filt mt ffi{ HI H] t1 il il H IBI r:t t3l ffi IrI ldl!=lx3l[51 kt r*t lql [3 H FI ltililil ft I] il H { flqd o Er: ",dzI FiB P gs-s== -E= SFE E ggiEsEs EiEEe?.EEi sAE€ EqnHH ;s';gi F= €E=sd -'v - -Bf == $a! ozC" IF]tlilIIltililililililttiltt tBl tRlt61lo1t:ltilIEI t$lt6[totI Ol't6t teltEItc,tolt onIFI tol tql Iu1t@tt>tr6[ t3tt8lIs! I t5ltg ;.s i iXTE E It= ; t E:tt I! Ete r 6 b x6U 6 i ' 6e&: 5 s 5IEe i E.E .E* iEEEsfii"E; B a i*e5;YAEo.Eil' E$ E I t tp=$$I E I s Et*e #E g * * E{t* Eg ! E r E g n e [{ E IE IEII.! 5 f E i d = 6Bi nt n Et8 &: f i . . - * I {F ;t !!E. -E uE P6 .PE-6 €Es FtE ;9J EXc rF fi E6G.v, iE5!E9 fEd ordtF2oo< !b E e*P ETI EI Ir: ,t6 Igi9 "tt ,gE iE iiE $IE!, EgE$;IErtiE. flEI fig;x-'Eil; EgI{I$g;Igg;EIBgI g Ei!;PEiEEEEEEEt = Y f r I: l t t n f t t: r ! i I i; i i t i i t i i ! I. I = g I IE I E E I E E E E E p.8 E lE !cJhlBDo3E !!6.= g. tdE,{vdEEoo5t qE( li-o !6> Etr< Yts= ;Bi EY-c>o;}EbB 4B.vi3ErEE' -6<:Fc_s3 dd ogk -F €Er E, g i EFE*$EEEE*gEUfEE'Ezooro Ud tltttrtllllttlttt F i 3 cr FIto,loltdl t"lIIil ill ti illEl [*ol Ifl IEItot l6Ilotlallu, I lEl tFl I+ltott6l l?l I&l tEl t:l tsl tsl ohooo600006@FdOOOO6OONNFtsFtsNooooc666tsNNN6tstststsrFFddNdooo60000000000000EECCECEECCCECCCCCoooooooooooooooooaasaaaraaSraaaaaaaa talt--llNttoltotl{t lol I2 |lolI llllc ItEtIEIl'llalloilolt8lt@tl,ll+ltoltolIJIIf,toltolt-lt@ltEtIOIlolt=tl8 t lo I l6llTlt8tlNlldlI{l lelt-ltl t1ililillt l.lto It@llol Lgl d \ !H Y 3 2 !t , "g "E ^ g - r or *tiia ri aaaail1li; i [E[}; i[i61 iil ii g gglsafil I A'd.sss:E:q:8 lp 6Ii4t$ f,tai}EieeEriig;eIiE:$i Eiigg I i[]r[$ei[i i gffirE Et$gfl Ei] ia E i elfls i ilr[aisEi$ i [[]Fa [E3i**:E iE' g s d99 i EIlql tNttolIOIl{tt-lt0tIolt<tIo IIfillc I16 IlElt,ll@llot lelI@lI'tl+lto Ito Il]tt6iIDI l.DtIE'loltot totl4llo Ilfl lrllalINIl{lIolt{tlii Iloltttlttllltlllt{lltltllltlIIlollDll@llotI-l !9dt E;! d I 1! iiiii,i iEil iiEiii ii iis ill ilii BEii Bilii i iiEii i Eii Biiii I iEi iEEiigB igg iEli i { I q a - iFSeY O b UEI6 z .68Ei * Ii;II : ::E!x I if,=tta e oAQus a I{!E! ^J oh..t 6 < ;6 di I !qF6I a !fiElr EEiEEii= ; EEs;gB u i fl;-.i Ir;irietit I I:E-=q f;= 6 $E; E. ifE;I$Htu E" rE!:: fl ;d*.qES: ; EEFSIg it:9EI S X :EfiIII E;:;rfE E,r:;6:9 E Q I;ifEI +EI!$!Eg IE g}jgi*sf IEE;IS TE IE!Ei{ gE !tii!*c E E !gi;Itfl EI zoF o f fo EoFo cFzoo ErE $! !rai, Er oE EE= ;I EEoa pE f#g n* €Xlti $i E; EEE t; e1EEp -e; ;!]fH EI iI ;l*,iliE, EeiinE*tet IiEIiEIliiEBi; E{E EEd5E;* qii 6EEEEilil :i*; SEE E5 I6 ff .!I! I5 t; a PEEH 8E85=t rfii2; nE < !c, trt r EE :i fr EE E $ E !B i <6H< B .! d5 EE Er t LfE i$It E b:s rsE!!r c i!.9_;E-{ EisI ;.I FtE B*t . [.8.r5 E;E *$E H€T $6eril IJlollolloll'lllII lIItlltll t_llEltqll5tINIlNllollollLlt.t lEi tEll=ltolI3tlqlldllol tcltcltol t+tloll3ltotlollolt,tlol lrIitrllot l6llollrlloiIOttNl idll:j 2-oSioooEo6 roNNoo co 6.9 E,9cE o l o Noo{ o IcEE U) oo @ ooJf, p aEo 6'p 6'a q : + o rrn 9 o p >* -C [EEi$l il EE3 Elill ii3 g IEEIIEEH sriir:E it slE E t$ ;Ei i ;frr?s :i iEe E9 iiE$fi Ei a$ s*sr $$ f, isii$EBf;,iiiEiE'i'$$ t [g gsiiii g ;$ [flfii [{ i ElE$iiis Ei$EiE E $g ff ;iEt[{ i [s Eiri Ei *$i][t$n $iasft i gi il$ r !iii?i e i e ; e u f,i$ti il *$tsi rgast ei$;+$ir;gieiul}i$gBtE;aEgEtEii[i?='sE[[$-+[fEti?; rgiE E $r$i iiEE iiiglE$Egiarlr EtEt r i;is ;!ri o@N ^{{ I=lJtlett-ttNtlolIOtt{t tolIDI Io Itnllc IlEtlEll.tlrallol tElt6ll.ltollli lsl lrallEllolloll+l lDl to Itltl@llTltotl6llNlI{lIoll{llollslllltttttiIIfItltlllIIttlt tl l"llol lolt-lL3 E; E 9 I ! n ! o d99 a l-ll;llotl6ll*l !ilfl LIt!ttdllr ItoltNllNlIoliollLll6ll.ltol t3tl=llolt&llal fEltFItElLOItolIFIl'llol tollolIOIloltilloltottf,lItrllolt>ll6ll"llNltoltRll>tlblIE i;I l$ll'ltttlilHfI tlllll t_l lBit5tlNlINILOIlollrltott6t tottot lollollollaltEltolt-Il-llol tFlt;lIrl loltol l?llallollr,l(rllol l"llNllollol lsllot l=l F2J n zo F E 5t E =E 5 E d E Et 5o EI I!!I a 3i, I ! Ii p EI! & E) !t s =E 9 &f)I E 5 IaE 5 El I Tj d5 e a. U zoFo DI 3 2I 2I { o= ;:lE#! g:$i #:el$g$5 ff Eigl HilEi Eil ,i* ix i: iE*sitrEiitElilfgIiE$;*; Ef:Ei ;;gE EEEiE igiI{ F *IB fig ti i€E iE iElii Eilfl ; iEi iigf€ IF I Itu Iiiii g irigE I r ii;r ii' IIt Ei s c iEr $Eiffi 5 i:itE I E !lE{ $ri tri gE : ;!I b E Eg T6 b 3 5 T Qd;P#tP{,_5!o'-IiE = qaF tr{; b3T6ibadEEe.: dr =!b:;d b;nril ; E Y= PIEE€iIe6i.Elfo+"tuoT r 6a 6 i ,oFlt0-fti r* gEEE!E nBifrEixtEET.siIEsIi_=fiEE!.E.EU.ss!qEE8888 !8dtdt:t t $ E _2fi; 6 ,= x $t IEc I8d i E E E Eg E3 E tt E &' f!,e! ;!- €EI€ cE {t:€ ieeE cli! s=, 'EE" r-g; d-E8 {E!E;iHtIi ;*;:E E€; :e:XE! oEE !d8ii#a tEE Per:5a.;h 8!E:iIH Et= =aei E:i FEe si'3Nbql odb a'5s=frtEt xli 0! :tier :ti gl E ;iB$H iEi ;l p FIIet lti EE 8 =l-eil5 t!t :E- E,3tIi urE ffr'":: Efi s gr r :^r'* frEet.e=u :i! :H-6 E=T6:E EE; SEE E E $gtri !Efi es, +I. 6 o , E bE 6P .E; $ ei,9 5:- P,!s{- > 4rU *EE o!, EgEd ; E z< E 6op Rr{ iru -lBE E Ec a-,l 19d 6Fu :O- v ooE E,Yo -d= 6+ 2L 6! o , - Fh tJ = 0 E5 utE E ;e So g t= j -o<qFE-<qq i - l-llolt>tlsltoliolI{t lsll5llnllcl tElt,lIallol tE1 tii 191lrll8l lElto,loI tEl IaItoll@ttNlt3lf:{ttBt t-lilfltlIIlt1lttilltl l1 ["]foIloltJlt-l ,!!it{ EiEzQzPz9.eH e=eEh 6 frz fr'ptpp zo 92Ol c 14oI, HE d fi o € a I6d gig <o IIt f ,f,oI oz ! ?lI! I g t iI T 0IaEIoz q zI I=t-ltel Ir-] f8lI{llYltoltzlIo]trl t€l1,1lal t81 tHl l#lt9l tillblfuIt8l l8- It6llallTltot t$t telfol l*ltl tl t1t1 I] llollol t'31t^t € qi iit$;;;;e[gritE4t3i* Fr*iggili'tiiaE*EEE* Ee$rii$iiEH[ggsi;: iE iiB*'*r$ ta}Es igiFgl[g8i[n *1 g ;*g Ef,$ F Iasar I rt{ a t q o q o q p 5' =ee8 E "sf,E; n ff,fnIF 5alt s;iFE 5;[* e Esi;1iqt F E!*E tq =-; : s_ Eo ;qfi EE;-dEqE oi * id= q[$1 ioo$eo6,3 QElq UaEc-9. F4 tlE urE ;E fiHIE;B sp1l B.=I =e,l e$El dael t r-l E I I t;ll;l lFl il il ltttltttltlli [=ltc{tN!toIlNlINJloltollullal tEit 6lt.9i tEltdi luri tElt3ltFt t3]tot t?l tBl tEllolIel t".l tEl tgl HI .se !5hrg?, HAc; EI.,3 =cEa-6EEE; Et!; =lirfi E II i E i E€? !.8: I; F" E Et r{ IE I tG' TH EE # FEUg. " - fl T.E4U z'i buE;;E{t;BPEgE I* €tt g 6; U EE EEh e8i EEp *ET:tE IaB Egr d 6 E € =! T t t E E-,6 sr!6B s$t.Ep!,:Ei8 BT;i'Er;Eox gll . E$rr i EEi6 i I6tt E !if;; !;lIE f,Egt8 I ipTfiF i:H E-q+, x +g igEEr$[ii$sf g P {8 itEt c s Es 3E=I g '" I i!.!s I *iliE g* EB,.iui {ii! cE$i$;,fliE isgsi!i;IiEIi Err$i$iEEiEiE $5 & E 6 s d ? ! iug IPds i,Eo B H = Et E ! I dlgi !X v E E,5 &tE 5d & II l* I.t;t-8 l*; 18; IEfr ,E lexrEE I ;{fiE li! e Ht&B. Jrs9at3d.' $ir st g ,g*i! Tf E Ei i HE Et s I E E r! Fic r - o!'- ii ; Eri i s fiiiEiE-i$IiiE+irdE fE nlI I i ** g E ra rBi $l! I n sst:er.i i fg iHi Hiii E { ri*E;r:e{* i ii Eri Eitl aiE iEilliiIiE ii ii rii;d'! i'" EEgi EffEil'" :.-..:-r::: 6" t, di (r r;ll;ltqlI dJtotltilililIIt,1r1il tttt lsllsltotl:ll5l tEl lol tBl l3lt=t lEltFtt't16l Itlt3t lEll^ttEt lil I^t lel tNlto,toll{tl-i tslt<tIoltnitc ItEtlol l;1tollot tsll@l til l=ltall(,ltEtIOtlol lElt*tt9l l@llTlloll@1tNlldl ldltltltlllililL1tltlli t1tltltltlIIl.lIptt@tloltJ1t{tU nIQNnL9 e d d 9I Hd[ = I li Fee 3 i dl !eE'{ i rii& i 3 g f r; ! s Et: ^ o 5 -. =qq z S l--R*adq5n-i i iE* g: odorilI-t*Bst d* ts Eg 3$ i* i =dqd8ed.sa5' \ I iii H iiiemlP>8PFir=z l2 z P z 9 o o5oqHq:qEs {lg$ E E E = E "; ", ?g$ qp I =, g i5 $' = H irgtl;;E sreEii; ! {{ }n'q Eg i €! F; i FI6E 2 c xxlEI'ggl gaa;eEil ' gEE -iui*triilFq g I a:: E ig ig 1 dE i qE 6 rF :F S i- r eE q q8+!dza9 g =&{ E{ 3r*H ! s0 ! t d $ g i E H I:IINIt81l{l lPl EI iHl ldl I=1IO It;lt!l tqito IID-ltolIf!laltnlloll@ltNtI3l ldll il ilI llt!lloltolloi LE ilii$gEiE[$fllEErii,gi .) IRl tsl IflIttilil lliltllt,trtlltl L]t+tIFItoltNl t8l[rl tcll.o I tEttEl ial tqltdl tEllol [31 [6{ IHlett.l tBt td s !E 9l I :E; !5E =E EI i i5r EE E oE Ei r =s: ;!g !E fE ertl E€; ;t i* I rts ;-[! I; E[-]:il ;:g ol. l;Eg:g; tfte Ee sf{l Ei[ ,sI Ei tr!+ q :lgI s, iist;t.iiitsii i ;i itiqliry. ;i l gEi Ii I$ig E E$'fr Ur'dd{6dNd z_ iH< oi Eo d o E" 6"9 * 9! p{ f,;3 i E;E ! {tE" E.r!.9 EEt _-.; b ET E.E; $E f€str -ECf t- EE$ EIEE11 lEsifi3 IEltb fE!;e !lg* s !lsEi EsEE* i rfE!2=B H" ,!FE-<q !! 3 T $ talt-1tol,ol t3til tl iltlfl II il lel lpltNtto,totlrl lEl LqtEtt.91lcl 16l lFll'llol foltolt0l lal tEtloit^li5i lEl a E U] b EOza=' do2 cicitsciut-ut6ul@a*f=l!t6E6c66ziz6zoE{s5E lr FFFEEE l^lloltltI\ltN)lloltoi l-llollPllo IlnllcllElI!ll'llalIollollslI@lt,ll-rlloilotiJI I5tIDIlaltEtto Ilol lEll=lloltfLl@ltTt{olloltNtI{liolI{lliltott*lttt1 t1tlI1IIi1tttttlI]tlttll'l ltllttt1t1tlIIttlTllo It@tloltNtl-l l I \ EE!! ,E -8ldI $ EU ! II s I 3 o p "* e o , "9 o p "3 tr m p op E{ EE t$$ I[$*E $E$ {ii [t EgEB lfr E$ isi F[ [3 EE i Hi i$ f,i E iliE iBi *$ ri i E[[ $i ni E E[ BE Ei $ fi rE E$ sa ; nt$r ifii iE gE giE E$ $g E Ei,g'il 1 i=[ *] Eg am 1i i,e r$ isii *Ei s[ gil tei f,H gg rE ; $ ii $ i i r$ nEil*fil [E*i i['fl,8 i i s t fB ; B+ B;r $s fH F :t q i i } il B g t I=l -l lNltotIOtlrltotto It< Ilo IIrl IrtlElt;lloltoll6l l:1l+lto Ilol I=Il6l I '_ltbtl!llo IIolI=llo il=llottftl-lt8ll\llotl:Jlt!tlotI+l tllrlII|ll ltttttltlttltttittltlltl l-llol IollNll!l ii;=====EEi??"E fi d ';'E "[ "E "F'A'"+ riE E E ; E H **is$ E iEi te$ 'Fi' = *$ i' I E ' ;lq > &oloa6 zi: E ilig:: * igt 6 € ;Y e? 2 qr d 6-0" ,,1 = ;*i4i B; 3i ;$[ EE ] fri5r e3; Ea 6; *c tg ii, B iq?E aF3EE ;E {1 iE Ei I t]cfl ii6:; i$ ;t[ EIis( Fi r i: dE i'3*1 .t:s! Ec E *fr E g2; siti il ; q: i Eils I:39 tl t g; € i g;i F;**e {q E Ii a } aE$ ;l $i.i 6 el I s IiE it;$ i i qi H' E a: Eq e E g ild I "469 $ I t! ,tilldlt[t II tIlil iltltll IJ itel lEl : tEi l3.l lEllclI Ol t:Itslt8tI toltat t+l , lEl tNIt8lTNI lFl LO q !t5 E* 5fr F E EEEtrgiti i9rE E;{E tt i:g:iiEi,iE TitErq:HtiC ctdffi=a.E!I€: .9:! t:!,!:ri :{.Ht32EsP E* IEE;IEEIE , 5a :silt?ltE P iE *EgBi€E;E E Efi;EESIg{EEA I= ig€?!PgE* FE!EEIIEiii :E[!IEteqIE E ;$ti e ; EsEE*r i- E;*!ei 'rl f,Erlit ;eeE txils9 I!EE :EEiff $!EE Ef{[Ei iE EI ::EEssE*i .E si5f,E;rlg ? E E ti*iffiirgBEsE :H<di*J.lE= E E Eai III d{r I5gd a S t 5 6 f,ug tea8 J Ez o l I ! d {i 3 Iellol lFllI t1IIfttttti: Ittillttill=ltal tpl tHt lEl lol tgl,ollcl lEl l*llollol t?llollrl tcE IIslt6llol l5llNlt>ttdll-l $5 & ! HH IF UB 5_lai 6![brlUl{ [gE 6 CE=OOiM6H ; >;r,if;5 ; $ I EtEae! gTTEdE 3 I t-."." l;ll6l lilllott3tt;tlo1I<JIollnll€ilttI'llbltol lFiI@lt'l l o'llo Ilrllr I IOI I lillalt!tlo I Iptto I lallrllolt@!lt!ltalI:iltEtt*ltltlll IIt1ll ttIIttti H16ilolIN,l-l \ s s i*- @ PE '"E o o "E 7iP N -d5:,ig,rEtqlgq"* g*;ti;,l 7 flE ,ru; Fli iliiEr [g Ei:i rlqBfiE ii i gr $$aiii ; F Er[i e$ iiE;'' r Egi [e' iq E$ Efl;EI$ i{ffi Eq }Ei ffiF i; ;; B; rsg rii ir;; Fi si* $i$ fl} ar $EgEi[E[gt$i$EIE-liEH 1 EE$'E$ EIi; IE ii F} "i gEEer*E.il:tirBliB$E 3$g fc E+9 6 s*; rrr e-' dtt I E; E: ; d! fl:! I E fl I e d 9 $ t=tIOI INIlollotl{l tEttot IolltlIrll!lt;tloll8lt!ll@l l+ltoltotIJItrt tEt I urlt!lt6lI9.l lqltsllr llrltot lNlI{llolt{t lalttt,ltiItllltlll tl tl tlt1 l"ltoll@llol Itsl "E r rn o o p >* , lli s [;ggt[ i]ii il eig ,Eii $[i$ i ri ;tsi ffiffi t }E,isi[i *gEE [i iEE ii[ Ei$ u [$ il? [i;g $ ii[iigiiii*EigiggilEiil;lil .) G]INI l-lilil itililllItl:lfiil tdtRl tullL1 tclrol lEitEltdIlollal IUJ ItEIt.9 I tEt tPtt,l tsl IH t:l IEI tPlLA TbE}8! EEIs;r Fg TEd mE! =x! r*i PfrE;EF e9 f, il5 E EI E B$! =! Xi! 5 ! r E IFIE i e T , 6gEiEI;IEIiE .i I r: E€sli ,€i i E ne[tggilti$$ir,ig ,Iilgii,*iiFiiisiEifI fi Xsis g 1 I !! fi g, ii:ti i ! ii iil fu I .b d 8 E Bo Fl eE;o zl)OFEO HE2oo J d z o FE hI I s5 & .!6I8_o}Et{Ei tn!s "oF E!EE>biloriP=N 5b= uh€ *E E€2U EE C{i e*< 6 -@A J UAe -P cE- 2 A--E O u3H - H E 3 rB@ ) = ) = = A! 5 9 E E 5 E TEe i Ei>E "iJ.iFtsFEEE- $E>zoqs IEg8 ; I ts ET 8! bu a*EUBi IEoEz E6o ->E rE& 6E = Ev8 Exk si- -6tf --F afi".!3P t;I [pi IItl ililililIttlt!rtiltl l=l lBitrllel I.E I lol ItsI 12l lEl lellollolt-tldllrl IIE I lEl tsl ISIl.lI-Il-l I;]lol tNtloltotl{ll-llolIO II<lloltnltc IlEtlYllaltol lRll@ltrlt-{lto IlolIfltfl lDl l@1itlIO Itqlt51 I P.l l7ltalloir6l tsl lo'ltolI*lIIilIIttIItltltlt1IIt1 IItlt1I]t1rtttIlll[.]tpll@tlollNtt9 s; ; >_r!!ttl??tP8= s -" =s i E 19 i H 6 i 6 E t " "E;[ I g . 9. . d 1 $s t q E ' E I E d1[ E = i 5s aa s ! ; gg =.7 a 6 - *e tt I iEEr i* guifr {-r i9[d [g g HE= eE $ i'sA I nE9 ' 3a[ fi '8fr 8s Ieft .!s= tgd o=ilBif il [ts t3 o$ i I !*a I a *9 E { * H I=IJIlol tNltolIOIt{il:- |lol tHl[!ltc l lplI'l lcl l3lt;l tEl[il tsl ldIlolt{tliltstll tl t1 t1 l"llol lo Iloll01 EHE B I b b b b ; i iE EE r'E;ffiiigii i s; Hfl E i Ii*i6iii1i Iiilu ;i ${ri 6liE$E[i[',ii-'[gEliii:l'[iEiH*ii[i{il'I a gltf ra did ild:I q egi$ "$q [19 flfiI $ ;g*$ ig !$s*t$ gil $ isiB *! $lEEf,= [Sl F $*' Ir et "d q rEf;:sEEiit,rsli iiiEE ; l ru i$i it l3 H neE ! s iEEIEI;; E[ HEI iI I itgsi,iEtlI€{i$l$ iEEiEtE Erfu t;*,$s r t i i IgEe iE Es gr ; iiEE gB difo.u o d " H" . ;lB,<t ?Eo 3 S|HE ri! 6Uo t gE 5 6 EI E I r EE :it t a6 gI I !E :B,;ifrEE : "i 3I ; t= UE i =b ;; T ;H Ts E ;E I5 5 5{ :s p ia =; ! TE If X Is tF t 6,.H E !H id : d= E! t Ep *I I IE g H h- Elh 6E$ Efi Iqi,uii !f !aq !tFO U6 U?= >U { 8;: Hs . e7u e'. E I*; d6 E SIE P; EET TI -Eo E ^ q xi XI *EE iH tsEE T6 lEs f: i "'-o: oif *3E 3I; 9Ei 8it =r! t r$ !H€ iflE gE* EeE :ici ire;8! E *E EIi i€ a:* Eti :H I EE I;!- {E g Eb E=bY AE 6our"E Noo c o dn o o 6o g ei* EEiii Eg€g=t Iiige g,gi I' t ti if i *i EE Etiis ni iEE Erg l I E !i $E l ei EE iEEir i{ EIi iiE E I g ig, ii fu sl sit gEE iI sEu iff H$ $ is lnfi f,{ 3 I#E :,8 ;i *g: rgE *i gr EE E iEi il ffi, E Eii EEi Ei E E EEE Eis* tt Es ,$ di@ o 2" dj o ;" d o:=" . 5" d o ;Ifr-H F s: s SlsE Na E.9cE o o ooa o 6 NooN b t-ltsl tNtloll3l lslt rll [Ell!lI;1 tEll@lt.ltoltql !?1to IlD-ll(,lIolIOt la-lto Ilo I lelITIt8iINN Iiltttrdt It1tlrl tlIt1iltltl t1l[]tuBIlol IEl EIlaJ tBlt{1 t0tlot t51 [3irctroll;lio.1to{[$t@l t{i $slt= Il6lt;itEtt81tr=lao It9ll6l talITI;olt@ltNtt{l tel t'1I]tlttilil fltlililttltltll3lIAIto I tql t- o p ";io @>; ,"1. ____ _:: { iq{ iEi E E r; s; d I fgB d; d illF$ ssigi$ir E Erg frai ; ii Bg E i ffl* $ 3 i Eii E l,-E i*$E,gi'[[ggE Eiii i *ii'Elgfaiii*uEEu*ii$ sti:Egi$iIgisii F $ ,_ E EEE !E Ilf Ila iP .lftrlBI E,i,-i$agggg$li'*, i$ E *i$EEi$ ; ; ; ; a E g s fi i i9iB [E$]={E 5F'"i ': tff;:a6xi a P s c a fl N {i a a E I, t : r .g- D !I E i t }E g E I Bg6 E E * ;s I ! E s; :*"lfe9tiE,E,EgEgg g Eil gl ig;r r ;ie ;; $-[ IgE IE {ipi ; EEi !i. p- {fl+E €E; IE!E E *!E EEi , fg r E#t i*Eelf gi B [*c t.*,: !- efi E iEE ifiEEif,Ifl i iEEE iigf EE- ;E ;s g$ i, ;EE E i E i is E I {EE, gi$ 5 iiffrii$i o ,*o io Eoni ;o< di nE-qqq<q fi N & IH" .^8 fiE h!; {t<eB toE EEB T; i$st:Ei,Eg d EEE r i;8 i =!EEg*t a 6!T t ::9 q v-o b Etr'E I b!E i oEaq$;6 ,@ Ebi q i* E ; $s*,Bgn E EiE I Ed e E. e €tE E -Ui SE .s f* E=I$t iE fE fiE;; 6e =P I: IEE: r+ +;;ifl!€it*iE{#EiaiiiiliEsi; tE rt *cE 6ts;lI ;E :!f i; :E* :tg E:;lE df, .;8& iii Ei; EEH fiEeE S$ E;{ IIE:EEAIH *B -ir* f;rEE*3iYa s:e = g EEr f;:* qEEf; }E g Efr E i iEE E EE= IBB, E'9" i:" i $,igtiii,EE i_t $Sgn ?sfi.Elr e:$8 3 5. oti i p: Eii!E; t [E: br E r I619 Il1El& rEgu- I E E,rltl I * 5i; fi;BE iBEFl:'o -H!E;3S - I€Eb;*! b Ee8 iiE$ E ; $!f;Fr<N=< e_<q t;llollolloltdll.lI IIlI tl t1Iitttt lel r lPlIN1 181lrlI l@ltcitolldltol t6Itai l(/)l I:I l+l lsllolt(Jlt?t r l+l, lcrl lElI lrltollolr lNl tslI t:l :lolIol toltflfl IItl lit ,tllll ill il lel lpl lPllolt5l tdllolt6ltottdlt21 tsl t+tlolI3l t8llo1t'lloltol tEt lgltolt$t tol l=l $ $ & fr, frE I E a B 8 E 6 E E = dV8 z <dio tllolt>lt\tIN'lolto!I{IEIlo I t5llPl IE1I;] t8tl8li@l1,1l+lIO I t:l lslt(,lt!{t8ll=l tqttslla1lrlxolr6itNtt{lt3l tBl t-itt il t1 ilItiltl tl ["1rD It@! td :::i$$$$: ":i E s s s ss s3F;fisssnHgftg 3Ar E E E E: :iil 00f f :Hit$i-u, H I s $d d3' tgAfr,;iilq j ;$E$,$E$Et;ni$ra*$$i.iuEiiiEt;=i:a;g nra EggtlEi'$egiEi[gs;gI'IEEEEEESiEf'[;[;ggetE$EiE r:! [s] tql lEll?1 HIl;lloltoltPito,I,Ili+Jto{ tslt-l tqlt.o IIEI [?1 tglt{tlott{lttliolil iltt illl il [.1 E] H H EF 3 sp pA "B r rn eo *Bi "i , "e iigiig iE -EI ig iE E iEI iii[ iEi Eiii ;si€FiegiiaErIilE$BEtErii dE ng I P c6 fl 8B Ed # { I q ln* ilE rli sl: ilXr o - -.8;E AH EEr$ l$ ?Er5i eE 6ii30 EO 6=!- ts-,Es tt 5=PI:, ,8, fi{! iEE E,E ig! E IiiiiilEE;g* Eg*Eg*Egiii$ieHrcEEqE€q!=r X H,5',Ein6ioqaE;; C'& ri t E g$t lsi rgg i iiElErlliiq ieirsXEI6:-" qfi !6 x!tt!Bts:6!i9eI urpts 6Erdi:r!-sorl =rgBfi:z>96EdE?EuEcFoEd<6 E '<didciFE EI l-l!il ilil lellrj ItRl tullLlllo l tE1tEltol 16ltoi lr'ltEtt.o I tEltoltoltoll(/)l lel tEltol!olt{l tslt:l gilsiiiiigituiil; i i Fili E it i $gii i i IE i* Hii di i:" i" d'd :"'o c ilit n !L $ b I h $ d 6 aal gu T;2 z I dz 8 dz E.I q=& !:C ?H$ $l ES -Ub!gE;:iI gEf tE! EB5 Ebi&--9d E.E!;F tgEE:i EEHs8: fitE t*]iolr6lto- { ililtl lilIIttII lel tul[*ltottctiol 16,t.9 I loltgl l@ltEl IE1 trIlolIolloll,lloltollltlcE Iiol tEt lsl t^t lol INItottott{t loltol lollnllcilEltolt,l I rrlloll8ll$ll@ltlltoltottJllflt5ltDtl;1Irlloll6lt=l tsllot lallrllolt6tINNldlt{lIEIlott*l ltltltittIIII1tltllltltt l.ltot lolI+lL]J I=lal l\ltNttot tst lslI<tlollrlIC ItEtlEl lelloltol l@lI, tl+llollollJll=j161ID'talIttlolloll=tto It9ttol l;1lTllol lsltoll:{llEllsl ti tll.lIo It@lttll.l ",-iIsE, ";i I i i $ $ : H s $ $ H $g gBEf;$ I f;ooooooooo{B{3fi$ q $ fi68 H RBiil ttE:[q8{}i$;- ,$ $*gq tig r$r F{ t r ^ * fi 'Ee ;i[*; iiEI*HsilBE'rE$g[ -gAgili ge$iE$$ftiq$r$t$; te:Ai; *,Egr[$#F,$g=E$t ',gEi[$ *= $+il 5 fl E g;qt * n;3i+e[iI iifr#; Fg{E$g'Egs'gtEr3*gri €da { tq EA,'8 dIi? Raal E; li P 3 s e o016g -. =--- i g = = = e Eg[g$ r$EE[ iEE I gifl g$sr * ;$ [E$$ $' r[ s[ r[ [ $$rfr grgl Ea g EEE,$iE Bf *E[g sE ** i I igitHgiiElEiBgrlliE*Ei$EE d J {i q FI $ a !Igf;liri,E$Ei,=s*;;!r.i *r rEI ir,,{i irrI i { $g $l,Ei g, E E gii i E i E igi i*E EE $, $, Eg i'I EI#EEifi!g-:::sgEEr:ii i s* s*e!* g ; g i EE6 Eggise E Eg Ei, iqt iE i* $ i i i $Eii r i i i iiE lEi !E ii i is iifl i;i BE t;Il$llollol l*llllll llttIItlIIl1 L]lollNlloltFtlNttolIo1lulloltctlol tdlt9 I t 8.1lalIEIlotI'E I lollollFlt;tl3llolloltotl,tldlIelltrllol l1llNlioltottNtf>1tol l=l hj 8 - ts r{ 'E iE ie gIie EE i , t $sii' 6EiEEE lE gg El Ei EEEegg iE E EE Eiili:E :P dE qi tE,lit g: - g;'; iEBIle EE E!, ig ii tt iErg* gi i r ;r E * IlEgII gig iii iga iie il iiIgi gg g I il i gl liilii r < e-oi<@dl<dioF5 F $ s 3 B a fi. fiF orNI c.9o.9 o o a lslIoltotIJI tslI5llrl lel lsltotl6lt5t lil lfllrl tpllbll-lIol I6{loll6ltfttillol tEt tel tlftftl t1ttIrilNl lolIslt9l H Et €>=r>ol>o, 3i 9 s c$ { B;, I e*i sn i fl$$ i ' isEi[E E ui ri $sfrttft E iFllilgEg iEliEEi i3Fii $ Er g rr i g$ ii E Ei . i$iEgm H E ii EgF-tI i e 3rE*E $1 $E+iI$€ isEgi5 [[ E E*-[d Es iFt$5lE gairB ; s$ E re ig gfr tg61i$* g 6i}s! I gi It$[ rriE{3 * rfriIEi ali:6 [9'E $di g *$3=Fr giuE- =*E Bt ? g ,;_ r r $ EEaa E; 6 dIII \ E l=ttrttollltt\ttNtlolldllJlloitotl<tl6 tlrll5l Hl3ll8ll@l I -.,1IOtIol l=tlolloll,rllotlollo I lp I lslloltntlolI@llNll{lroll{tlntlott*ltl t1IJ t1 llill l"llDl loll-l 13i d t{qq1s-{6e*;!Hf t - 3ni$6[lg5' -i4>9 d :5qa.7 Ar=6EITT-l 9Efil[ t9!elI dq 3s3t g c1" I-o n 6(g 0s tr*s fl p s IEs j d 6 cIe td Iod. 6'It E f o 0€ * 6 II :o s q o B E o n =oaa o =q d q o H oI E a Ba H >T@ r g r I il;g ;lg [gigg lgg g;gig E$iiEi$'iilEiiEi$[i ='+i iB g['a i= E$:' 3- 8; 3H 8B P fl !0 Bt d ! { q le Ilo {lE llq slEEI:rl I f,Hr tsiiEgi$guaers;E i g Ei Ei ri ffi r;Eit$i fli ir ii r; i i ig iis ii igE lE Eb OEtt !E fl8.;dT.q n r.! H{ ;TA ET !=;e t!, tl$iEE ! EEE:F : ;TElr : IsE$E : Ee,gtr i Ea;Er s 3rgBE t !F" rrE iii2 ioI B 3oE EET ; ,NI ohtil E = rE;_+i-;slEE:g$E!iEE5 E { r=& r } sEE3 i =J-o 6<O -EEE E *, T* E EE E: ; I; I;!, E*EgI ii:EBii; " . . fl EE Ei E . ai o o : F o dj o qluca 5r ilf,E lal tNtlolloltJtlolIpl lollnllc It!lt€l laltottott6liat l:lloltolt=ll8ll6llEltotlol t3lt5ltr Il.llrllolt@tINIt3lI:{llBil-liltliltlrtttil tl tltl tlIIl"ltpllolIFIl-l o p "i p iEE gEEg i *[B,,$[ ${Biii,, iEEiE r$iEg $i BEdl tsli a; *iE;iflfl$EBig$[HEfr$EB$Btr{,E B[ ,36[ 4E ig [[[ii EE=* E*s-e -. + Bfi+Ef$rsr$qiru*iif,{ggIEsEgF;nl;i*[3gi[ar}[iE,irEB l)^tlol l\itNttotlolt{it-lIollo Il< IlollnlICIIEIlEll;ltoJtottol l@l l-rltoltollJt 16llo It-llb1IE]to Ilo Il=l t31 lollltl@llrllolt@tlNtt{tIoll{lIitl+ltllllltlIItttltttltlttlltliltltltttt!lrlIOIlalIol EJ gE n6 dr $4oE Ed ddiE0d sE fld cI EI flIi rcEr d Et€q { {g ri ri ir tc i igi #'gEi Ei*${ $ g tili;s n ss$ $i I s i [i*E r* EEg iEE iiEi Ei{li t $ii ; i r E E E $F $Ei $E$E q E[[ E EE Ei $e i a= [ 3[si*i 'l '[ii*BI tSEEE u;i* B f,gl[ 3 li:.li0lp 6l$ Bl[qE ;I it il IE li lo IFt8 le Il9 €l 3 flsal 6 9c 6l lcdnB '6 rle =EI p9T {EI fig; sE x c E!:s rs6.2 2!a! =!!3 IEPA 68F; EEtE EEBoJ >Es€ E,tsU > E= E{ EH &H E. *:E -, BEp 9o! $o fl E* E cEE E-; s; n. ;lissE EIEf,EEiiIiEEi $g ;; AEirfEsi i: EE fsEtgi$i isrsisgilii$gii l-l tBlloil6l ["1tttiillll,IIlltltllltltttlll t1IIt*llDllolINIlollhllolIollrl Irl tdtI.A I loltot t(/)lt- I tollci lol tPll-ll+1toltotI()t lu) II'l Iollrlltrltol fEltclloltollNtt\l lol [=l hI a; {riErEri fitgitelt i;$t i;ri i [l liiliggig-iiiiIiiiiiitgigiEIil i iiIiiigig iiiiliii iiEI E iiiiE i iE ,I c!,! I .64CAEaHqo"drOE a iB 5! f E, !.,tU-€rESt: H I'E a';+ EdE EBt- II l@1 ts1t6llel t1 I] tl il t_lLEItdltNl tRtINIt6lIoll*llelLOI lEl lBl tEl l5lIFIl;lI{l lollol l:lt+tldl lellolt^llNltol l$l EI 5 EI sd ts E H 3 6 iI ls iE E* k p t t56! E -o '5,6 c &5t!ts,: s 9.1 E$pP €t EE'a'3l?r t^tl-llo1I}I lNttollolI{t lEllo IlfrilcllElIE]l;ll8llol IPIl+ll3ll=ll1l lo Ilott;l tEl loltsl[3]tilleltNtl{it3llelt*l t1ttl tittIIttttttttill"ltotl@lloltotlol lo1 I i\l I8lt{il-ltoJ lHlIrIIEJIrl l!lt'ltbltott8lIDttott, t I --rltollol tftto IlD lloltrl t8l lD I lol l@ IIrllolI@tlNl I9l lellltlIItltttttltlI1 t1lllIItltl l"llo Il@llo Ilollol E8 ,8 s; ,I fl ! 0 iiiiEiEiiiEiiililsiiEEiiEEiiiiii$ii ;igr6*t irl g:fl $eEfifiti f,c5[$ n $ fiiffisfr $ trI;d & cq d i 3s8E Iiq i'r.\ {.t} B Er E-i e I 6iIE fr I i e#Qr E .P E n:iEE * H Efl- 6-- t 6I!: ; S s' IU-il ! EE^:6 b ! a IEI;E : BgiAE 9 ; E E I=59 I t !A:; I p E I I!E'o Eq n -E:; E : E I IeI{t i r"-r* EEEE$;qfr.$E;$ E i $;i;€ 3 !E E 6 : ! t -p !i Eign;iEiEEIEHI $I E€;EFEE!ltE*Etti;erHEiEi-...EiiiE . 3o . E. di qe fl;g€ iB!*i:sE*$ e$igEEEIlE:q o :n:= :6 .. iEgEEinHigilti E irfrt qX E EEEEEEHiEa?E iiE i; !ii,[ i* =iEIIiiEE!iig 5IIfE#EEEEEi FI & E: B 3 6P 6.siP!c 6 =6 a6 o b o = I6o Eo =6 E o =6 iF Eo 'E ,# En! E b6Gg 6 zItd II 4It i5{E II E!E e : t + ,, - Es = b c $ Eu i $i{i i ffEiE erE e E 'u€*e Ei r i- i E fl ii * giig!,, iiIEi $s s Ii iiilfl ii i gi i E ii ii Ei i$giig E iiiii f,i I gE iiigi:itu;"'igEEf,$lBiEiEfgEEE qq GItoltot l6ll'lilII t1IIiltltl I]il l1tll! t_tlDllollNllollNllNllollollul lpllol tdt lollot lelldl It)l3lliltott3lloll() I l:lldllrlItr] ldt l1llrltottollNl Idll=i EFI Ed \a B H 3 E E fl.o BE r-, 5'D EE' "Ei.. # r:H{ E E iEgE$$$isEE#f3E$85n{:i- i $$t;€ i.i g ; rit= ir { qiiHg \E q n r-, = - ' @- i'i ; gliflg f [igr'q 9:E {{" gifti- ;r.qF4G/W *$f;; ';[ s $a_=oitl Igafl [i+ s nlE :li9p AE l:I lol IN't6lL{l lolID I lo IIpl t€tl;l lFll@llrl t3tl(,ltEtloltoi toiIDJ lol lallT1toi tNll{lloll:{llEtloll-l illtl il II lrlIo It@tlolIoll.l !8 Hr "8I q !* I q 3 oEa o I oior =E >:z ,o !I # d g r It* ti q I cP EI fr 3 acPIIt d $i{i$E183e q E*{*f, 1', a o d j* E n I 5a t P{ I 3I I =I i; 1{ I EI a I -.E-.trq5'"j z 11 E t B sddB E 88 Ef,Eg q as a q ta q = & 9ae;id Ha q IE I = *! tBl tflilIIIIIittIItxtllltlilttflil t_t tpllNttotloltLttai lE1Idtt-q It=llo,IOttdl l@1P6Ilol trlrolIOItFt['ltol[9]io, 181N@t[,t[ilrott:=ttrt IoN[>it6ttroltsl lRl FI EI & i EE"ri $.E xf6 EIeEi *E *e EPt3 E*g *qIEdIIESEHEI i*i $*t [; ] { g E E' TEg;gItes*:EE.EXtEtEEE;EEEigE!il*IEibe ;uB :EB ipiElal p9p,pluto lrtr I"iil.it* s* t15 EIE I I5 I! I$ $iHI* Ii IaEEf * .En **; ;$ q *EEriilEf;sEEEEEHsfiiE ii E ; E E ;8. d o #rrIffEo'u E-<qqq E!t g 6 & E6I HilIIil il t1 lEl tFltNlt8l[LIta1tcltoltEttol fEltQ1ptlEt tEl IgI t+l lcc Itel [$I t5t Lel Er:€.e E',Ft TEEI E: 6E8trtr HTT Ert e.-i 9!;i"dEsi rB I EfiEtn Ef i: !E-'r trE oE FI & =sfi UE <fiF=og o Elo E E ts u 5 d i H,.;8 EE88 Ta oo : ts f # c 6 t = 5i To =B B 6 $ Gg6-J HS E z E E E ! E a E I E F o E 6 fi 6,a t;itl3l I*lt8lL{l lFl t6l [:olLC )IEI EItol tall,tt{ltolto,tJttf! lslt@ll3ita.t tql tsllrl taltNlt{ltoltJlbl leltltl t1IIttiltlB!tittIIiltt IIIItttt[-ltp Il@tIolIOIL1 EE E F i ii i iilEii' *E E i iiii [ $ E $ ii i1 sa rltE! {* }geEq r i; s$c* EBBEI fr$ *{B3r g s b I;Estr$Estg=gEEE; I=l fel t81tolr{tI-ttottoi 151t:rltc IlElIrlI'llaltotlol [81l@lt'!t-{tlotto Itfttflt5 ltDt[;ibt[6 Ito I[=l 181toltfll-l tsl t3tl!l l*1ttl1 iltltiilttililitII}ItlIItt [-llol lrl il $refr f*E fffie ie tg ge = EEi[EEEEiiiEEgEE,IE tgilii[g[igElgii' I dE E; d dl t c q 0 t =:.BaE 6'Iad 3 $Icv E os + 4 II 0 I1 It q o B I H do E E{o h a &E g c6 a g -8g 8 Rd E T _8 c H P >; Ao' - I sB i =#- . I B! g kBE ' : a 6 q8I i^; 4 r dtHt sfr f$if E = $*a fr rtuET +:6;=34a$ itrIl<35i&;f,q0!{rvaSPecl+xrg{ Eil<3 9. tBtI E6,! P fl -t ? t l {i E * I;1l@ltotlolt3ltittII lEltN!IOI INItolloltLl IPl t€lt.a ItElIOtLOt Ir'ltEltolt-lIEItottottFtI,ItolI{t tolIOIlolt'lldlIAIl-l tcr,ltoltellolIFILolLOIINIt--ltblf=l E !,tF., E e ri$e ;liit{EiEEIEIEIiEl ii t-t i*;r !*Eti f;t i Pi Ir*+ E Af!$,* 5i E Il e. EIEQ E rE$iE;sEEieggEIE;1,llEiEE *t -# ss Es ltEH eE -Eiffi $ EI EEiE-fri-gi{i,E; EE;E;E* i! eI EE;fl;EEiE:qfr[ i $E;ci g * Fie E s, : :- : E E S;gp; BEfio ,8" I" "Eo d qqeq E Ea e iti fP o ! 6e iE t E ;**" ;B E g Egg:.i 6 0 18;;: n b C+-E-aE : { !;s;[ * + gt*g[ E i *rA$;gtBgE 3; ; ;" KE€g-t E , 5til =o! o- o o*> fl;i IE I fEEi$l *P *; x$*F;; fii fiE figI i$! EE EE EEE N od B 6z it"18 aE l HI5 IEE! ;EE!q5 apbEoijE5FE{E s!i eIJIEE d Fo E o b.;v 6 F[ E E He : ! tE6 E *E * * *$o b bEf E E:E Ed E!5 A} A66 Er EE iigEi,iEsgi;iiiEEigis; q gft i5E i EiI Ii iE; IIEIIII EL lil iEgg ;ia ii ciii !;$igii ; r r i *E iqg g$i $ $ii, ri, ErgI iiEEei; : : : Esi gif, FrE E ffFi E! EEE !iE$ E ;iiE;EBEo o e "; i;" ; :" -cq<qq 5 5IE s tal@lloll6llolIGIlltlIIIlttIttl[]tl iliiilitlil LI lplINIt8ltLllollcl tElIclt6It8.t 19tlol lcllEllBltill6ll3llollollolLlloltdt l*ltetlollcltollollNl tblt-l 1I\Iqf t 6 B 3 6 dIu gE !ra t= lQilrl ltNt :toltJl ilsl lt<l Ilot I lgl i roi II'l ilal I IBI I l-+l ito Ilollft tdl Itol It!ir6Ilol tE{l4ltolt=t $@ I ltrt llolE@i ItNtFdl lI,:{l ItEl rlsl Ittltit illtlltilltt 11t 11ill[]ltii [11Bol It,8l Itot Ifol I[ol I*l Et iuNt I Ei Itol ifDI L IO t$rl I Fr Il@l Italt I IEI I [:l ito{ I [ni It@l I[o, lqi t8_l[61t5tl@lhnt falt\llotL{ttl [.llt ltttlilifllII tii It1 t1 I.olloltol E] Ec tdaf: E 9;s 8 iE *ffiB +3 i rEr *fr iiIfi 8= glei "B *A16 E n aoq ;frga *idI :i*I EIiil a8[ I' €tF $rou g bDb oiF>!trz'O,r$lf?iE$[E :;d g; igE$fi fia ft - $q*"s[ iii*i3eEf *$$flEiei T TE tsTg E$:6{ ir;e.{ ir8i : 0e9P; ;t;5I ;;ri$ lrE' # -rB dF 5;:g iqE-i Hitil d::[ ;l-F i L:.q gr: 9.E9 :Et =E* 84* fifi 1$d;. 5.= =@;qI9trIp:1 "3. a'.t PE =.t-9 P gi R**$3E!€1O -@ -N IG ^ErB.**.5ig1';i:. ii.4rd ;q q dt { RBdE tg I 2I fl Ig o t I a atdq E Ecv. d e$g a{d q =oi E o $ =I $ =o E t E d E d !( t c - f{r ,4qorrPld E e Ie tI E s6{ Iq Bdq oeBtE t =: Tq t o.d6a =0 E :.q ts !o !I =?.t =:,t =2_i =al =?. 3I =!( =?.l oc tr:! ! :s q ={ d I 8 N EH3ts E =0 E E o a 0 a a 0 a cl 0 E o I 0 $ = tdOro ! oE, o ao Er <EE.t! o,o oi jr E0I IAc62 t8tr I c s I a flIi g ilI csd Iig ilr Bs€gEiE;rEiEI{iiIEl' itBgilEEsE irilI*,t;--I,rgiiiiEifuglu E aut *g [, g [I[ [ i i; g I giilii, r g;g i drg {} $:EE;!=. d d+ 6 d E:=,EsEiEI** : gi, s E Sc ilBE aI,E i E.* g g .lE{ a8p; I p= i i ff I-Eueit$setggssiEEi ,igi$rEggi$iiEEiirii!,ieiq[*:sE{'itinEis$?igEiigi$xgi,i,iEi$i xtriEici$".ufa EE g E =tE$iEE*-sglilrqttrssta Ee e a tli d:$. . dEfiH..u 3oE.<qqqq FIp 6i H d d i fl" rH!8 l:l t\lINItoltott{t lEllo Ilnllc IIEIl:llialtoltollott5tt@lt'lt{l lollJtlfltotlolI -ltall!lto Il9.l lsllrllrlloltotlNlt{lloll{tIEItol t-lilIItlIItltiIIfttltl lrllollollott9 o r n e o p -:- o rtr e o i iEiiE ii iiiE$ Eg gE iE E E ii B[iE i ii E g I $i{iHEEE [EEni$E il E i Eiia $i E E iqlirfg$gHsrsigilf iqEi${if;E ssglg$fil-};Fg$+;t qaqlil-ies F'.'Eii ;[ ,;ua'l fl- ]3;; " a e + A (tr oa aE*zg'.-A9lD-\zdOEiqE s2 =o_a {-i E =;d 26'6{6i6 a E ce RB l0dE t: E; IE cl?:E0leil$;te clg,r -l t=tlJl l3l tBllolt{t tEtlNt I5ll3llEll!lt;tlollolt6ltblt.ltJl t3l tiitot tillialt6tl-l tsll3llillslII ll lt l"llol IoIlvll9l s 6 a5 g & a. ieg 6' ilI q; E o P Pi? In oO P Pi ia ll;a*E;E E'i[ BE I BE EE i; E i EE ii:; E$i e; +$ 4 [E r* = i[rga$t$qEEEt$iE$B [f,{Eif,{E[g?i$i{ i cffi Eig ut ii*Ei f;lifl iii i*t Hgt f;f s'; i [ ] l #lRl ,l il llli E eE ! or B r* E E g; lsifl E ;tss ErriaE= EEl ig* li iiiB,Beiii*rilgEiiEEItgIiifuissl;! * E;{ itu E i i iii iiiil i I s iiii iiiiiiE $lIi iii Jtc E q ilrE l 6x € hr :;! *s: *$ s i f;i EE:st,AE! s ;iE ,gE, gni iii affi I s *i EEig*iii$c i iii, Eiil*e Id€ EE s r;8,{E : ; sE rtgtgliiiE * tg$i=:t iiE Er;l rii I i ii EsfiEiiEri g ;iEg rsir fr EI$r iEii ffi E E, i, iis igEIiEE$EE Ia, Eigi iiii 5. d ., i. di d ci uJ E. o qqq [t lEl t3lllll IIlit it I] t_lloll+llNltotlhl l8llullPlIEI lslI6Itgtl0)ll6l1.9 Ilcllbttottfllol IHIlall,lldllollrl lcE Ilott>tIdtloltFtLolloltNlt:tlot l=l N8 & J B 3 Ei H,.-8EF8S t;tlol t€ltPtlo IIll tElIolt;lIo]loltell@lt,lt+tIO I I]I ter ItattElI6tIo Il=lI6ltsit9ttilro1i@tINIldlt{1 t!lrdt I]tltt t1tltl ilT}il iltlttl:lttut tEl tll ,,,i1*u;;i .'$1E$TEBEEF g i$i 3'ii E i3 E;e er fii$€I r$frE.rt-aer i n Efi;EiiEE iE$sgEt$[3F $ E{; frE$eaf [;ifi r* FgigEfl =EIE treiD " E{ esq 3:i iEE - ! r!I [[r"o *ie i!i i;g HrI 9.d;;qa0{ ."t!B BetBir9e +6 I fr 0G3 EBdttg + a P fl 9 0 fl t {itg {fr I E @ g E PI6Ig I IB6Ir! xot I !{ I !:z I a! l 1 b q a d g E a E E E B E E q 3 I EIIOtI:jl tsltlil tElFI tEl l@1t+ltoi [31 tElr -1t(/)tl!l t3l tqll@ltTl l8l telIol F *l il ililllil illil hl tdl .,"iIsEIE*, ";i 3 3 33 3 3*f,sHiIflEEEigiEi$-EEssEEEin$fl$$fl;gi;[i6 qiF$E$iE$ff,fi * gfl ia imE*a aq gu'u' 'q' dE' ;.=s=e<= = <o. Eg $gi a[fiaaltt fi iE 8 ::o i>iid*od E Fe i i*g *-S Erfl E$ $ E {E i ti$gFlE*n i F; e i{i3[+ia; +:t E $Hif$sf,ilEEtrflli!Fit$iltifgi Bg E; E # s Ii q ,l+ I;IINIlolIol l-l t_tlotIqltNttotlNltNllollolt[1loltcllol t61i9l Iolloltatt_ Il6l Icll-llolloltFll;l lEltot t?l lslltrllol I6ttnt lslIOttEl tstt9 i T E,E!:E:I -d b =,r;: iOI; lEPsii rEthN F aE!=idEHrri9;sFE!;! uE-& ;gg#br; b<- : I gE TE>6 6 E;8 b>'E--- E$85i3tsecY o _F qiaQcEPE;o P Egi: I o xI r E{E: E*E!.= nt g!i E$E!! !f 5Ix 86.Ii HiEe-t E,t d t6E EPE !g? ElE iiE;*H 8* uF f ei *Eb -n! s E Ei $!# d E PE SE! =p 3 E; fr; :s Ig EA: €I i.E :-!-E =I kP ;IEr E n t; g;g8 E $ !g F!s$ i * =. B€. t *I rir E E'E ' ;: EB-6 3;$ EErgEEElii" i6i i uu, I =: I;:-iii E il* i EE fi;E$B ! iiEe ! *qE s :: :g*r&tE E ifrE"i f$ EEi=r: [ * ttgs E* E;r g ? ;it gig rI+!iEfg;:lrlstii{*9rE - g: EE;I6 g *T E gEaIgE:EtifEgiE:egit ,9 eIo<d:<dicjE-<qq RI & e aR Eo Ro b 6o =b I o b 5ts Ebo 8t'z 6 I{6 Ea 8 B E f; I! 8"B ;e aiB'- E s EnBi s f.: e*8, gEieg$i$rEE EEt e! {;:tCEIqs ! { IgEi AtlBr iE lEEgfi ,Bgi lE I e5;!t :; feggEsegiiiig,if EgggEEii}i,E6gIti6i d ' n E :-ut' :t i f,t n te t ;e io IB $ !l- * iis *- i ;Hr : Br! etg€; $Ei$ Ei !;t ; Ig; i *'i$gtgEI*ig iE$i;IEIBgiEgT E * E!,sElt; i!$snB ii ciEgs$Erffei$a=rE!5,. $. - Eg€:. r 5o GIiNlIOItot t3lilttltlllttltltt l=ltqllNllolINIlNlt6tloll*ltPtl.o It6tt.a I tottottdl 12lIol tEI I+lloJ lolt() IlalI'tlol lrlItrlloltetlollNltotloltNtt\t t9lt-l II $t! d !6a 6! EI 6fi" BE f,c ht t=rl8lI:{l tEl tHlI rrltc IlE,LEII'iLbllc)iIOt tqlION t3l t8ltg,t8tIdl t !l.itoltal[.1totu@ttNt tdllpl il il il il I1 ilill'r,ItD i Iolf{lDI HHEHo p "9 p Pi , Pi P! r aq$i$,H,gE$ e gi! $$gg a IggI gfli l i i ; i i E, I :gFiicgsEIE[E$gqit[EsE 6$$i l Ef$ $$i st$ Eggr E; s $ IEEI$IEgH$I*iBEEH5rI} *i*l E ifq ffi EE$ Ei$ gt g $*iE3'$$r sBgEt E'$i; * sf,r; ,{* {e f,dr He a i !E og P no! 6 fl R d I Eg <.lt rel rNll8lt{l tHlbfil FIL,oltolfol [81tetlcl t=ltD I lal EIt6l tall@ IlatlallNlI{l FItt li il il II [1 ["1lolt@ltol tEl b>, ,Ii n e 2 s$s$Eti'iEEiEffig iEglE,[i$$Ei[[ l$,*i;[sgiqr{a E isiE *tHE*[Ei i {ffi E:fl Eg[ E o I Edc6; dd.A:I4 HE>tr)FP6rn9 ailgtii$i$gf,=g$8,[ Ei$sls Fi iE ;i 3i $ ;EtliEg i$fr f; cB-i e$[i{ti A$l t ?ni {s*ai: o 4t < &6' ; E EI*IE i ;l l 3E E, g trlgit'i{*E*Eifllsc I I t E q-xQA" c : 4 1 IiiFg f i ' 6 3g--d I 6' d ET:!E: 2 E il i ? sI il ti € (ti r ,liEIP *lXr :l96ief,>F, AI d$ E?6I ;E klEd HEi[. *$bt a ;8le I a E IT i E TFE aI.Ei c!;EiI*:!8s iaE InBIi r P f iiii! 3g h =b E Io: E] H' z El a $t 6 Eo E 5I E dJ f F.istrEtotr UF o=<tFO o Efo G s,I6 - :-iige;iH : * !!3- E E E.s€; i f;lsEIEEEg B ! Ii€r 6 EiiiiEiiii,,il,u+iEr :"'^* " ai IBI Ifl ti II iltlIi Iilr lEt i tRlI t8l; lulI @lt[51I I31I I=lI lolL IOI I lol1t8ll tEl tl:t1 lrl t?lt*l t;l tRl H ItI ' I3lil'llrllrttrltiil rlltlIil ll tEl tpl tH1tHl5l t6ltot i lol ltl t+l lsl t8t l?ll&l tEtlol ts l:1lelt\lIN]tottol lEllrllcll!lI!ll;lI3l l5ilflt3rI6ltoi lsltollolt=tlBt EI tBlt{tIsir-b Itqlt1[]l1II II tltlITIID I to IuolL:I e o,-ir;, ";i 3 : : 3 * 33 [ i r B Es I : e isfi' I ifegf 3F sH$snEnriE$g$$$iBliil'Eu ItE*;BE*EagEig;*i6liEil38 1 rF Ie{ I o'il iai d ei g : E.r *E:{Efr fr qg fl ? i* ;e 'i' t #[ F 3 r "E ir $fl* fl EBE $ a i"' ts f; fl EI \{ { B E8 EA ,"E o p Pe ii i iEi iii{iEIii E isi *iii ii I i i i i ; iilsrts'friigfirg$Ei; *i*.I i igii;E$ sI $ ; I $ E *Bl $ $t$ '; E * t i $rE n $n$ s flaaa l ( q lr+ E I fr -EZe ='6k:rE -8E€-Eifr 1!r BET TE i !*d THe! : $fig E T ;E g ;li '- *fi:Et6H € iE; P Eilx E , 3r=8 $-iitiflriiiisiEE;iEiiliiEg i!iig ;xE;:ii t$B { $ l 'igii ?iii{ii iEi I I ltiEiii E flgir : *ig$i iiigiii, iiie g l g ' IiilEiE i IiiE -3" di o 5".i< doFE-<qqq t;ll@ttol [] ltiltl I*li5liNttolloli[llol tEit3tI=ttot lollzlt8t IEI I:I tHtloltot lcr I lEl lRl Lel g 3 & ? E s ,jII;3 HK NE ud hit 3 xE ;! E { Ig P3 tIi * s* i!* ' t ;E i* er! ;EEteE i EffA;i l,s EEiEEi t Ei$*E* ii .$ii ffE =i iiii :i EIIiieiiEEii;EIliiit* i i'ii Eii EEg,tE! iiEEiEI; fii;ieIII,=,{ EiBIIE€ "EI{ :ii i:, II; r E I; iE,iiee E i ilnii ; I il iii iii e E ri= uiol-ooo<didoEon, @qq<qqq lBl t$l['lilII IIililtlilftiltt LI tBllNlloltNt 18l iEl lol lsltEl tEtIilloll{llolloltolla1t'l f+ll[llol l1itNttolt8t ldll=l * 8ep 6 B 3 iqB.!3F ->a I @I? EflE *o{ dils otr!:Io> orzts! 3 Etq H.o+6(z*q;t, T $I 1. dcIEq g J6 Iq .Ett$g$g3gEf,E llriiggiiii grait'9g$g i;is r t E g BBgoP >BoTI.oe,L. P ; i ii - I ;':ig I i;@E. { _- = IEgq tsC8 E :E{ B { PEgg e !*$ I fi.d='f {[e E rE-!.H'ci l+1.ecrno 6d{l 9. { B ilE8a + A'd* gE gia F& d rc EH iAYE i3 &&E - a;'73 -^t4x f;gd d?"r: :1BE !E[t ! Ie: otdr lard rdt *g[$:E- { s E * 14i'a ;{u E 6& Rgtr E" E i! o I e JI,ItIi&. s. qlqq Ec 6doyITil& s.cac tpd84S _8 6',E9a-L F 3i $ sal 1 ipi I i;fi * 3tq o x€e f 'ii ac$ It;I6$ 8 aq B e tsa fr. 6-*;poX{ dI E 5 tq l l qE g s, ,Ar PH, "f EEf,{f,$EE$$E$E $ fr$i' i *E' $ E[ ; = t-ei ur;u qt*E ![$ ait EE*sEEiEE=g["Efr-9 i € t raq 6dg s . ii* ig EErElglir :; 3F =$Ei$$r,?a ;,E i s!+ - 6- Pi*96*8u a g d I6 OE # EI v !Eq t^t lsllNl t81t{tt-lt0ltpl lo1Ia1lc Ilollrtt,1I (hllollol 181l@lI'ilottoll>lt!tlDllfllolt@ltNtl{ttotl{t[.1IEIlol t-lII!ttttlttttlIIitltttilltI1lt t1 l1 l1 iltlIrl IEllolIJ EI l-.1 IBIlrltot [iI EI t8l[>lr!l t5itolt@tlNt tdtI]ll!lldlt*1 tl il illilltl t1 IIlJll@1lollNl Efr E a' n = A E o{ giaE il gsae st- e cesgi *- e Er SaHH\ F v ? ;, : 9a=E tr{ ottlFFi El o.t zrg otr, 'rl l+ E eI E .E d &! $ HilIItlIIt1tttllIIilil lttlttttt{HIItl LI In'l tpl tBtLEIIdtldlt<t FI Isl t?lIHt3t lcE Ilol tElIAlN1tolt8t [=ltr,IY E Fg{ I H JF :8 :E:Ft@ioizi<:Uc;q.Ed goa,> 9uhoeA'60 Gd J :z Jo .9 z FE '= aE 2 - e:€: 'ad O6 .E-.9qbNo 't .9 oo N .9 sg P a q 6 g ggE E< >-3 -q : F6E e E F E o o 2 E .9 z e : io* la6 E.?E;SE EE>o6< o 6< E= q<no 6 E pIEa - '5 a &Y s<o I9=: qE- :s:: i@tl :o : :ie i6 i= iP!6 r9:3 ,6id - -!EE.E:E E.g Eg = 6 E-=o: 8E SE >a g IEEEE e.E o - E $II : trfo oz zotr N = 6o JUzzo d L Fz 5fzo o c; bE 2 .-:':aaaaa !: dl;:i:::i9:6;::i:::i3 ; iE : ; : : I: :L ; : ; : i : ro :c r : I :l; :* lli: i< :E : I i!!> !=: i!a I t= ,Z | 1 |F : !q :< : ! lu : rv :t: : :, i tE iE , I :O i iQ :o : : ;() ::E :c i ::E iiz 131 | iI i !o i90 ,u ::o :5o ::J ::9 t20. I@ ::- r6F ::< ::: :o.- :6F !o: !^Y ie .$8 :;I i: 6s 5 s€i i€FpBE'e>-^t^ 3 E c* Fe 5 =oFdEof:oo9ztr---+E-o=--- t6llol tslilil il lltltltl!ttiililil tallLl[sltRtl8l[?ltE,l[a-lt<lroltolt,ttoItst t?l tatfol!>l tolrNltotLoitEtlttlotlr Il-t $ F Utd d t d : iE l 9:6 : -&+ i E e< i EEE' CPgocLLF F =oo6 :Eg goE .goo6E-< r.u 6e& aF-oe6* 6:Eio6 a6='- o - .:9 ::.9 : 1E :.9.Q i.9.9>?:iiE= €:9Job<E:qo-=boJo ^;6; ^i E = o t 5q eEaI s4 t:tlol tNiuotl9ltYllolls1I<lto 1hltEltPlt;llolrot t$tIc)ltoN F>JtrIlDlI5l [81INtr{{ tel t rrlrcttst II il!t lt ll tl iltt Islkoltol f -.1 srI d* a * s. E6- :. d 2.d oo =E, fu1 !sroB Itsilf- 3.5e:P qo i:i<l o5 q: 5:Eie-: s:o: ::3: =: @o@@o6Eq bbqtu!5 b:a o = +.^ r: 6ie dai9 ao€g: aE-ox! =34:Bi { ,;rBi:6:3 3rs' i : i =: i : : :@i i is e HI E Ri I r8 f. -il tIt; od.3-p:<oe =su3 6=N-*J :iPii: b 1 t E E ng 3g :9 E 3 a i= b! a?8q ;E!agE =PHa ^6' :o el :i :l !id b-E 8sEJ-=-:-=a:-,:md: Ee.i ;a:o= !!q:l: i 9l : 91.dts ='oB9 a- n93JE-1@=' =i:: ;: I8 d E , iA t l hl IAtt<itN, lel lsllrltc {E:rot IH IEl$!lldlIf]Io:ib@tI N,l t:l[tltsl tlil iltltt il il il ilIi [1t1 hl za1 3q8 EEA< l.i [BDf,aOQ: el i+; :Et I :,, I,:: p ;;if d dr o9aE aa':{ :=' i, :l 1i:ti:::i,:::: f:!o:o1o!o Sbi.hirb 8.r<rm5"H_e€5_>o==.8B EB ri'g =.9 a =3n-sEi : : g.: ; ::iii i:::::ii:i **otu:o__ilSJ XP=J 3Er" rb h! *e366S'9>bbtn6.;' -of,oJd-geESE=3o==d a o o fr; gE', E'?edrS:E€zsi Bi ::: I: c : : i s=i i : : i :;: :i :: le a o -o-- =a;o =mIiirg:60-: : agli<.:: =Bi:ra: , XdirsEi o ZUd 3i=q = g; B =6 ! id3:l E Itr! Ri E : E I 6*a .+ry."I:l If] IIII ilttililt1 il tl [] tEiIRII lslI tolilciir6lldl t$l tsl tlHt o{[>l I l3^l r IEI tEil lElt__- Eg I 5 ,l! a3 F E= -E.^_a .!! *3 E"E.EEE9F 9{HBr*EeE@=<'6E.bqE E; E e I h Ic EEa.:6E €?€,$Ee*eI ;5EesE--3.->F>--t=r_uBPoE.6,I a qF t 9 giF!",!oeFFgt!€E-BE=qE E FE E;E E E:.8:{EoEEgEgE€:E3iEiEexoEpsEEssdS :E96qE 63 go ) E F BI 6 B <m<o i I l s g I oz; c N3<<I5 E B? s r;'1tol lE]il tlltil ilt1{ t1il tl IJ tRlt6t[oltEltaJ tqltol [31 tfl IHtoltot lsl 8 FgI E I iH ;6 >.9>6 =9 ririi;;li;i:it::tt i::::i:: :-.9:: ::::o= : : : :: I i ::lE: :::: : : : : :9 a : ! ! ! ! :: :: ::6-:: :t! :c 6 : : : : : : : : : : ;'= 6 : : ! ! !:6 p : : : : :Er=l6: : : :O.r;:! | | :-ts. : l.qE:5€E i i ib i::=IaE=F il:> : :56coto ;::I:> ,<*^gE:E lE i! .S .?EatEE,Ee i:lE=€<e:5e;:iE dE.o.5J5 oo.;zE 5-: :<*--:-.9-- =*H-{rudddd.9;;Edir:odia;d-i-;5-i-oGE:o--F--o-- \qz:q INNOo --o- : : :::* :,I :8 iF :gAFde-sEKEsFdFO e 5 5 T ; E Fc E aF FE oz o-- J 6; e.9 e.: Joo E J o := :g :tr i8 AEFO -.! EEET=A*E==?Hov Jq69)6 B { a J 0i5i i E.E 3eg;HEa4dE, =eE9i;sJE nac:EEseP*Itdao=a< z- d 7 - ii:ooEE)a^?sEeuEE5;g:: 5:E€=5?3?r€:.*{jE r4E5E -9.ooB o I'6i€g;.;81:Eo5€eF8s.6c'{ 4 G) aOJo .E E'6srq = ; -- o -d= <q;-o dr5-g = 6 a 6 >< E EeE BiAiFEi sgEigsE s i;Ei ealgEi! sg3EiEEB ;iir ireEEEE ggff3ii 3E:AEEEEEEEEI3Eiii i gEi+ EiBEE3A giEE;aB B -==93 69gA.aFA 13H3*sa tJ=lrtE8l*E13{l:,to P.s IIta l .-l\l i a" 4EEE6:3 rP 3alr B-.E 3;E adt6 =.E d=ag F86=aqo6'8dI =o38-a -.= la-Eq 8- <o469E :'> d =. o 9r q qo s 9> o ==.d =Eo )a9 i:d d5 h a?E GU6 3t-6 -=EFTF4EJ boE9. aa: 9.* I 6I55' I oo l 6' 6 a q a E ii !I Eg E gEgEgggggsggg oooo 9EEpEAAeAe'Pnd$*$fr$EgsEE33s-*-*-*e=*qqqqqEed EEEFg!???!fE3 -o;uooo-D=?ssesddd*=";--96666---+i-OoAEgEEEqEE{Etsggs=€odserES=or'*c*=J"".i;35 =,o x o = : -*€E E=te Q "a ;3 = - f > -1 ;3 -qI B*E l.* l.Il;ltol l"lil iliil il iltl[]Iiil tlil ;tili tNltoltNlidtr [81I cll l-glto- I tsl HIl3l EI l+llcr II lel l3lINI i tEt, 15l i5 Ec 8 !dI!d $ R UI E H .q€5saEE F5 Fs;; aEe E€"<eE6+gI; e- Eg aE'Hi'€ eE'=OPE-o! -E-EqcEci€€!fl,8 E:E Q'=€E;;; P6-gH;a;;IE eg€-EE5E.E:i EaAI ts; se;; ;is €iEBE:EE ;:E_ r e iBiri; EE. E;E gE $se E€:3EEEE$..6 EEE*€?i=Est E*F E s:5;irl5 EEE* ceie'EE: igA€ s,iH;r_1fl3 e:E - -i c d= q o . cEiExEsE e;E F f O E; 6 AE dr EI elEIol E: EEEE* E= EE -9oEE oETg q6 9=PP R 9 8 dEs u;iE. :E g:Eba - 6 os.=gF s n *Ee5 =3838 !; [:Eios 5Fa5"?= E*EE3t e5>a E t E:.EE'eE 5*EEk F olge:;* er € s?;E'; 9€ s e!=9F i-E S ,5=E: €- Ee 3 Ec;fl5e tF-69 =EoE > E=E-[5 ;E E ;lel EIUI aI I Ets:3€xed. EE.: 8PE o-: 5;9 o- q E.sE q €8qE o.*+2 ---6o o =gE PE: .s los*6 ., gEti; B E:r.!a g j.<3 .9 0l _ lo€ El - tsr':: d € E:$B -d E E:go ;l Q o"cp I d e=€F OI E FE= oc 6o"r EeN Ets H EE€E€ ET E;-:;<cF-==oo-6.=coE o 60=685.=eo-o-loOcooGa-s95:G:ii t -- g dE:EEE!.:B>i95 EE 8E FEeE ts- d os!=^.sEL o @ a) o ! ---9=>Hl.cs *3iEEE83*Ea;Ec 6tsOE=i @E L 5 6 = Esgi*i6435:-> :EElse-asEEfs ;5 E:.8:dgo.-oIB!c!?-E;ieEl I '5 .!:: i E: EEsHE;i iE ;;8;Eg6 :; EEEEiF8 E *'E P H -6 o - E 5 3 cB; E E:E<.3E:E EE;?S a =l ==EEoE9 <*E6:.5-E g EE flTEEfgI E: Y-*b6.d; q{ HHlscE E EA EIEEcSJ tO -l-Fk.-orE:e SHirF;E9 EE d:E;E;3F <o HEHeed< = oo,- =Eg 6e-oi u,E: EHEEe.:3 Fg= 3Ei6:p"-38 eEo95-;E FgEE€E" €i ;EEEBi t:]Id, [31 IIiltI il illl il tEltNtt8t tsl t5t l?llol[31roltoll(/)l tfl ls'l lEl H F Bt 6 IH l^tlol IN]loi t31 tEl 121lollnll€ll!l I rnllolloilottsll@lt;ltoll>lIr{io I t3t tHl lsl ililililt1lltl ililtlIi ilitil lsllollll fg-a *B B +€ t B qaJ =.-E rr AE = B=pgq= q3 ;e E id:BB**# E a.tJ e- E ::g I Pt s" E '"EBg g a9sg egaF€dAt aa'' 3-== =:{; id=EaegS;tH =iH.}:elE " :E * F ''a, E E r. 3*"-CA Ea =- Q. =.+4-- =: EdoBf5. Ea e; E a9-na= AE :.6' F Ei?BAt XE ;: n =iB+as -e. 3g s d.Eqo oo <q o9 o 3-eE;: ae a{ a =sji5a ;l Ex E ciEAEB g: EE=*i? sa BE 3 aE.F-= Bs ;= e BEfadq- =-4 -s; E g=-AF; Es ':; q :;::=a :- ed F ,tPefga 3a Es : $3i s'ic ca 3a H =+= f*'a, q; E-g E $Ie 33;E q* ;5 f; EE- AtAc B=E g3 fr egi s H I E Rd R 3 Bs B E t:llJltei LNIt8tt{lt;1Iolt6l lpl FI lEil@lt;l to:1Iillo,l5llolt61lNl t:itsltll t1 ll ll ItTtIo I t31 E] EdE- i€1sEEF'6 B EE EiEE i $I 3 E$;A;EAF EE EEES $Eg$ *'EIEiEESE * lE EEE B silEE * E igESiAE$III!BElEdEIIl;;; sg: _i3;B F;c :EaE 5€[a tsiE;s:E ;;i 3;EiEEea n;::;;*' d:i iEt;EiEiEiEiSseiEEBsF;es s€ela;Eb g.t;lqE.a:- F,iaa!dr=. rcFr-E=g =B* ;C;c $ HI E Bd E II B E I i J\ i- E P IE E;E EEE;EE: Ei E;a as:;5:s Er eEis esE:E:e EE:-g€ ;:HEE;E :;:;+ iE=Es,E EEEfF tF!E*Ea P ;ff€ Fii=EEg E'"Ee E6EH.;i; E r# ti =i;5"l3E d e d . x;E= B+ciEE=t E cc flg:fEEsEi;iEEEEgEE:B-- -a8-?g=€ s "EE€ €J;T.EFE P: Eet tgsti{Br € E P $ ad E B UI t-ll;lIolr6lI[lllil il ill tlltiilll l=l tElINlItNnlotto!rcIt 61ldlr<ttot HILolltsltoltottal[,! l+ltdtloltelIol tF{toJ!ot lsl[3 -l s B IgE$e:seeEi€cEEiiEE; ;ai:EgFEE,EEiEiEiE€EEEiEgEE;; E9:i E:a;; i;ui;EeEiiE.;!E!,;t;:E EgE EEEsE EiE H E EEEiE s EEig: ;eE EESE EE - EEgi FEE!: 8 R UI I B A d oi Eo:xE 3E, F= :6:EP +; 6< €.?5-R 3E =+ =B;Ei o < 6 =oE i=# iq5 :EE;E Co^ r9- 56o{ ses EiP eq-ei ge.+ qx-= a;: JBp _.q8 :9n {=.-.ti --6 ;-= -^o'Be - e <@ a6 c.qrg= ;eq sSigoBB 3qP ad-+eq.a $:E :;83rql :o*g lqF=- 9=o =- 43.- F; 4iia < e. oA :-d. =g= fls H3n=o?< y- --El9 9 - 9: +qE-6 E.B ;;--953= BE ;E;:olaFq 0s -H!e=- a do 63BBAeS BR >g4qBE3 .; rlB:.-== 5 :46=6?. cS :e.a-e 3q; ": Alcs:d ;.'. -.8 lqes H qHE ii $sg; 3-AP =a* =d I E EE =- tr 8Es--oFHq o &t8I g - EI tNl tql lPl i t5llrrl Itc I Ll!l I lHl t3l t8t lel till!llsl lli l1lll t1 t1 lll"ltot lol l;l = a oF - =a=6 e: EP a--- eg eaeqs {39= ^ -- l{53 !*o=E P++5gE EEE4a :=; ?r :oaq _d:- 4;eg E^=P - a ciEEa :>-eo -3+3 Ea5c -=df -6 .6 q9 o r; ^o>F> e3Is ii? aoa^ o va d: +5'6q 6f, # I I H B E R d R I da >E!tEE>c 2'5'6 E JA 3;fr< 5:o E- 5 :E o -9 E EE : - 9d E X*E 6-E* 33 l,t;6: FH E9 i U3dI $ B 6 lll EEl > =l t6 oilo6l !ol tr E EEE E Eg e gE ciO!€ E.E-€ 3 Ee ; PEE cE:s* EE E ESgi:s8i FE: Ei EE;:i;c:EAEEE3 EEp=;- c:-:to EE=: EEE€.s €EEE3 ;. 1EE i;EA* tsan: :gE: H;i; s ces:E i;as-;-iE:5et$e E:Ee* €*E; E=. I S:= e e 39e EE g;es 35 e €gB ag E iiE ! E:! -i E E7T E;:FH; -oo=g'9x 6 a< E!e oE > E g.e .E: H>6 =E8E 9d6io h 9--9! o . =o@tsl o-E H EEEE E,gE>e {gd! 09o O! aIhI t 9=EE5-E d.g ;d y: c z E o X = 6 oeg = ;E 3 sF"z a€ E oE6 E-E 5 g:- 6 :s gE P= oi €z .. cs 32 .=€ E Ee s< €; o oa i6d E? i g E: i5 =,5 E 5-, ;.4 n o- .s E E; gd ZR e -s t - -6g= 9. ; U 3 = Et;6 ;Ec eE B= E i E:Edt o:E P E - = a * =G =95E E:; 5;e-sgPE s E t[SA ="iE EgaBE,=E E .* EEsE 5a= sE€eEe€ E -d E:;Ia ErE 5*;;i;i 0 H,E 3ES 6n El a.e E?_ez_EeE Z E I e; e <E <l ozB .E d o05 H esH = ol coo ol tr=: . o ol tr .@= oe<6. - oS .! E Fg $ 6: 8 l^l tsl tHlI{l tEtt<,lollnl lfllol r8l[$t@it;lloi FI IJ t,t[,BilInIrlFOt t!l E cg ei sP e E e ge 3 e E ;q =; E: {; 3 x H i fr fr E 3 fr ; $a 3i Es = E g es s e r g a$iAxsEiE3';;aE€ 3 gAFg q; B E i e s ; € ssi3'-saE :c ai5i3iil EAE ee ;g.sI3o o 99 o .? o'Es e4p I +s !PY 6 = : E 3 3 IaE ; d E - i -e IE r € d i.e-- B-'.6t!EH ec * I Bt Ep! Rd) 8 IN dE EI $H{ IHl HItottottPti@jE,t $C)tlot Iix t;l tultrrlrclto, t-iil iliIiltl [.1lE II@1lol IE It Plrd a{m o !u Pmo{ooz{Toa = oo+ 5 5 =E l9 = cs6 i e".a.JE =. i[i - A-=eg€3 E.qE 33 -i. E Srii fl :;ga:E i*g=e g e[sga3 = -re *ege z =--- = lp5d3. E Eig E g:E;; 1 e-i= c3[*=E ==3 =;sBe= QBd ,33.to$ ei; g:g€ne =Br qgqa:a g=g e;q;;t E,si 331e.=: aga SEni:F I;B BsaEEr =ai i.:43; r E E H ga e f 3 g = 6 6 +3 E= ? a q 6ilqas'd*iEr-Es\? 3;- =; s Hd x Y E ee d aE r3e o 19 * *^ = = P L6-a+EiE:il4=s-'5.E!51eit r-5655=o9"^=1q6bEs = 6l;'-?-3q5Pos3* -6 lE<H3.a? *3. =FE 3 A3 ac-'-a-d5+f.i!d?oii:95?r@s 6',- -o BI p a R{ H II Ha t 9.E< oE a6bE sSE-8g:E E== oX-5eE = P€ EE€EA_ @ e ', ,r- ";-Q He8; € ds E:gE E H ==Sggee: E.Ets6LE'3Ee 9 FE3 !E g! Eo> AEUo Ao A HEB_o:0 E9 E .9: €t5 .- S E2299 3EES. =.2 o IEEEso.E==EE9bP;;.E x I g.E HlIIill ilill]tl ilil L]tElt+ilLit5i INItotIcltdttdt I$IlolI3l tslt-ltotlflllE Ilol IBI tRl tsl t=-] E c I Hq F std 6 6 tsbt EI 8 P s 3 E do H E:;s e:EE;E;:; ;:::EE$tEt ssE: s;EE; EgI +e;:;;f =,BsBeEgE! ;5qeeE eiEiu;EEt;ii;iE;+::; €Ei:* ;I;};EEEi ;tg!EEE;EE; E:=e E*=ls s E:EEAE:EEEE p€s:EB:Ee s;;gsa: BgEE: ;:$;;iE;iE E :E;EEt E;EEE g 6:;:Ege:EE E E;E;E€ Es8.=.E A *1s'5e;:E:: s EsF- -tE U;E€E F F5:gE$gEfi; H 5Cf:E;; €iEa : EEgEE:€EE : EEEE g€ ! dI!{i,d*dd 6E o6 ?o'=i Eo?E 2 X E .- E EEl9a! -=E=e-=e6=EiaE-',doa9O='E,:63EHE.g lolINI l-l ll t1il lilII tEltoltNtfNtIoltol tEl tsl t3it(/)lI,llalIqll5lttrl tEI tg t^1 loll>tt\ttNtloltolI{I IEIlPllolI fritcJtoJtott,tlallot tFltottolt>lIollo Ilfltol tHl l{i t1 I1tlilt1tliltlttttllII illlil hirclrol[ro]tel lOoIi8E;.z{{oz s 6I 66 I d E sEtE€s -;gBg Fi;t -.60='fdj=:o ieaEqgE E aEgEB ::=ei i:EEEE E iEEgE Fgiii'-Eas3E tu_Ai f}ie*;€EiEEi SEia isEs: rsi+sa EsEe 3gl=Egiele; F;-BF iiSar*;*E= E; t: ;5*= FEggag rEgg 3;Ea PD D A o o +Ad I Z I I 6-n f ; = ; +E: t e I J 6aq: .:: Ea^ - o _ - H "?l3 il 3 * i6@ 5 r 6 d 9=9<9doo^a ooedroI =; - o: o oE = Ei E?Edqf6a*.lE-3AA e eq_a' =aHsl.!F d, 9, H g E Rq R EItoll:tlNl t81l{, lsl H1 tFt tsllultdll=ll8llNlt{ttolt{t I r,lEi n II tl t1 il ! l*itNll?t Ei;gisAiEtsEga;Paa AE .3; Aq 4 I= s 5'=i e Eial B*g; a3:AiiEl EgE ;Eqig'3 iH:Ee;f* FE =: gqa *!qs > or ta E d oa a =E :6 a = ; a E se - :E s.' g5a ;Ei? o d,a o Eq e 68 € ;:.9 ?' ;'ct q Bs H :ii *i;- 3 ==. 52?,i i E "d: = q1 s @H s. ? i so ot = dE a; PE s3 a a 5E Ei B 6 E =.j6'' s 1E 36 -5,- 619 + o a e P -o ho * = - iiaa=e ii na egE=ts- q .=E 6*AI < lHq=5 H d <3+fo r. 6a5"' q 9 R o*E.ooX - - d3>,g g = d^.^g3 = i aEF3's ? q 3=F9g Et { B=,ES 3 e a €E-EE* E JAEtsEa 3 iei.i:: e :qE3a < 9. +=6o) ; "E 6e. o ;.8=a. - -;6fI a d !^ls .- EBaS d ae-I qa; BE I E fiq I $II P.6 8 dE ap I a F s 3 8 d bt E; fr ; ; r "-39: €E: E € €"i 'E'F E;€ ; E E€A,EE;B i ;E : ; tEgE E;Eg EE; E p s;Eg:gg: ! egE-= a :EEfiE:;E ; s .E$ai,;EE$EEi:,g'sE E iIE ig ; ;E EE ;;:E: S: S E ; EBE EE Eg EE EE E;BEE EE E i 90E s€ e.<€EI s =.E gE €I EEET:Eg ieca:EEBEeEt E +*e3 i ='nE;9€E=eE9Eo5:sUo o:^6s oo ^e =8.P.E€is;Bi€R.9aq =E;EsEr;E HE= fr -4-6'eX = E E FE E EEEiEE El g:PE;i xl uBFt;re8l "E e H =sEs 5#!;5a Htl il rll Iil il Itit-trtt t+1I lLlr 15l I tElMII Id'r ldli l<l ltell@ltJ tEl tFl iB sIsI ESEthP E.96U!.8; c c.9 =.1EE3:F clEESESs>eeEE9fio E=iP " 9s iEEES3>gsEoeeQE i e -<=E:3=g .EPE 6;E^ o3g-E Eno '8s E3.e 9 €E CE'a- P--€E s* Pt e-p ebsSe gE: E OE..3s$:.o- Ea -5E98E-6E= Ps trE: B g3 e;€E E:EE-5oc 0 d a'E e EE:cE ,;296.eSE:iee.?65E':;;E9is-€egpgg EE eEe6Ea 8gB€ ! e g 3g:e€E 3E f u ; E E,:8"8ts EE $gB E ! !;EEE: BEEE E f isg;;; E: EE;es;*C*IrEIE e E S: E;a"; *; :E;e;E g; E E H 3 *E E E € E; :: rsEC?E. E; EEEaEsE;:E:EEgEE E €iEEEg . 3E H ilII LI ldltdll5lt[l tsl lHlt\t t3l I RgId E x 6i t:t i-el tBlL{l IslI<ltollrllcltEtlEl lal tEtl@it,tiol t>{loltottflI8ltNll{llolt{i [illliltl iltltttltlil tlItililil tl iltrjlD!ffitINi t:?l oJq99ef,i a:,: {3 6 9aEe.;EPei;5'ie33J doo-l =cEsE= sg o f.aEt9a o sdfa-*;i.i e'{; E;3=d1<;9=.- 6 T \- o:3$"F!qlc-o>oodg.di.'E_P=AS9.oE =5.6E="eoa-a* = oo =g=-.=6='=-=.44F=dE; 3 gH'B gEIr9: df:-PYo- oo -6- 6 IFF15e. $ I x I E Rd I I dI I taJ tsl IN1 tslIp I r5ilPlt: tt!l tBl t$ltol telt!l tsiloltst Hil il! il ll il tlI l*lt@llol 181 $6I A g liE 136 o6Eo! a> {.8sild 9= E r = qa'. JB"B s =d'Ed 6 OE - o B "a aHe;6 a 9-3=E e '=-EFE5.4 aE"* PE",Od9> =s<:=86. Era&so e aEat3osll3d3-- old.-!-sq<:- ]E xa 6' i lI { i t I 8 E Rq E 3!23=i3 I T8e=83{. =6{E=. P 6;Bo3Z= 3rl;i, ; iiiEif,Eu gH gE is E ea 33iEii E;EEiE E Ei€EiF*E:EI3iF :?E=o533;E;4ii; :*i*s;i; aieic;ai**EasEa==;i E'Earq".*gci(: IEEEEc-rr=1s't ;Fss;88FB€=B= :q1s-iE'jflP;g g;deci; EEE ;i egiaAB;*Ea*g ;3F",r*I Ha gts 5 ;;9P* XEE: E 9.e t *;= e3 t +5 BIE H€E>EEe :85 Es oE5s. -s3 6 65 > \ E >E U =.9 .! -)?T iEa I E} H EI ol 6 9-'- = E 3 E5* EA 5 -i I.E,E = = E E=i =g E ?E E-EE E;= i ;EE e; E E$ ;l= 5E? E 5g=' EE I g 5 b - ;.! I,tssr Ea F = Ei7 =i E :aEa i; i - EFb E@ ; SE=E esp E =Hq Is - .2l3i :5: E s:s E: I ;'eE@ s:.s B =8, ;-g g i':< 6E; s :;; :E ; ESEEC E6 E - E5< 3; = .E EE-E .?,b = - =;o EosEtr EsE . S:: E= E ;Eeae Dg: '" c6F *2 E --*6FP :; E o- 6i; 3i ; e;X;i SEE E .a xEP 3E E Ei3IA ;A.i E 'E 3:i e-o , EEEEE EE;-* EExE PE E-a:iE: -. aE sd 2 --Zs S- Ei -!cp; o4 ok s o cx€ ts.EEE E* EX.:E d EE: !ke iX ==E;€€ E-TH:B* E E:I E€-9.;F:X E iHE Eees tE ; g=5 EtE EE E* -S =:aE e !Es!A 3=5-; A EESS -'= s6EE €3EE EfE ; EEE E] IoltDl l-lt1 ilIIilI ililIIll tl lEllLl lRllolIol td,trlt<ltol tet tgi l+l[Ei IEI t5ltNl [slI=l 3 cIiEe;E=;E ;EE sE::::! slcEe;E g;E Eqi E e ,9 xaEEa:a YsE :gE P i E" ZE;:;;E iI; EEE ; i e;EEEipE EEs ;Es : E E;IiiEs: '6'P =-t.H E 2-E€sI*r Eg: :Hi "tg;E#E :eE E;;!= E ;sEH;Ex; Ec; 1EHEe E-;sE!I!u: *eEeiEE =E; E=i= e :E E'::eEtrE a EE- <aEE 3; ;cr e=EE!; S .El -.=E =b;b €E E= + . ; EE;gE; 3 E gEc i5g* Et sE E E E;a;ta: g E ;i; :tAIgEg=3: F ;sEg:Ea 3 F :qE- E EiEE:= :=:,EE;Es3. Esi EpE} sEi;Egt : E ;$i } tE; EIloltollol l3ltltl tltlIIII il II ilil LI I=itNt t9tl6llall<ttotl()l lsltotlol l?ltoitoll=ltdl tslfotl^t tEl tal 8 F uI 6 B t----l t3ltNttoltotlrlIc,tID] loltrltEtl!l lalioltott8lt9t t8llil tal[{]tott{ltrltl [-l ti ti Iitt ri IJ iltrtlolrctto Iiol[91 33 3qS i Rr, I Sq?qg$ gA€ " t; - €?g?.j;s 3;;a s iEa s ieic i;F Erea i igE g Eet+Iq€ Sttl i a9" 3-Beug; H;r= i =-=f qASg uBi ;ii*'EEs ii:E;e ;#d'F Ea: s{Ha.:< i=EE s-i ?i e E€s€ii Ea1 Bl;taE 3i:r -1, 'Ege 13 s;a ;l a;e;3. s=13 Ei IBi-Pc Fii E8: ci :;g Es EF; $ra ri# +t feaB {*-. t B!I Rx;I I dE E1 [=l,NI belI-lIO]lol tilFolFI Igif.lrol[>l!T{t6l[f It8lt.Nlt{l tsllT{li" Ilolt*l illit llil t1 ilttIrl ililtt[-l IEI tlj E3 NEEqBSEE i -3EB IJ Elg E EuiEii*i EE* i€* *E E EgEE r* H i:EiiE;ieiEi€EEErEiEe*l; ifEEiEEiEEEsiEBig}E'Eiigia;lgliEEEsFE$qgiiaP aiaa:*gsaii*ii$aigssi B! 8 !! R 3 E I8 d'a > a BriIi g;:E g$ €#: :;€ BtEtg;BEEeEE: E;EE Eg E;E iis:gi:i g; E:; r€ir EgEi EE E;gE ggiE ;EiEE fEE - E;*; iE€E HiEiEgEEEEiEE;griEg x;EE - E: " r€; e5C: EqEE : E-+ : SEs EeE H] l-lrlilil .tl iflitt 1ilItt , l=ltLl I tRl I t?lI l-gtI lo- li [<lI tol I Iel i tglI lol llali ltrlI I.l r ldlI lol r t5ltel r [51 t-t- B FIId I fi E RI 8 P ut 6 TH i3$ ;;Eii:e ;gE:;:r5:; Ei:i:;f Eg ;EEEEE; E=EEE;g ::E:;g;;; ifeeErE e€ t E $, ge *A;; EEEiIEE E: i = Ef g:;XgEE E5EA;[F Ei Ee "_, E5 .$E E: E;* E EiEiEEEE H r iEE ga g= =€ =i 'E EH: ; giEEE$EE d E Eg;eug i_aeE;EE $EssE I $E$EEa; s s sE lqlI@ltolt6llaltlllI]tlltttl llIItlililttII ilit IJ IHlol tNtt8ll.lI6llall<ltoltoll,I iHll*ll=lItr]lol tdtlo1lcltol tEl lbl l:l t=tlol ID] tsi lslIo Itnt lEllElI'llol tEltotlol tiltdt t3ir@llNl ldllrrjt!tto!t*iililtlttililtt il iltlt1 ililt1tt[1tl H{rol ts ls3tcr lazlerE9l=-laot6,om ! I3!m o EP!oo3o!8OEa6-loma nd eo ?d a[1 r3-< ;9 jc.5 ao;6 f-oE +E 'o o2 a >q G;Eq 6daVt{; a9 ;o e-8 Ei<5od q3 =as. . o! o6gl N o-HEE O]od6{d5 36Q. E 4= :; il =:aL =sa_ :i-E o :4s EdB; a 6. I Pa3 i =9 6o- 9= E3.rA Ia! d + o*e ro3 I : P_dd $E =1a =oth ge FAE;E €-6 : h = c.=d9 a d:sE a =rtrdc < i c= P P=. A ga Et-'. +aoEi 9A' IIl$la EI-lalr E ;r5.=.8 ;9a:* a g== 3iE3; Eae. l5 EBEs= X o o -odE 39 a Q { sr;9 - =qgd c ; -6 j' IpEei- dlrFg EE 5aH:30F= 6=qe -! -B: T T E *H c t g lI Bi]I 14t? =bllB I da E]tst tN.tt8t HIIol EI rHl IE [II lHltpi!dl t-1 illlll ilil ilIil tlIoltoi l?l LqJ Ef.:G 613; Hg's A =6 -< = U aaplJ= i€Esq lsal.a€4d-o:E&-Eg-' 9.4- g 4d!x =.l{.=g 9-6rEI! E 996;,8:5Iqi" €3=s a5:ra i1:E S t3E;;- g l! l3 l= ls aq o o @ 64il: b < iD P-6ls F {.o€e I E'5eF + F4?J t9 3J lb ;E'ti t=rtsB E as l# 83-P! le 3> 1t$a* lE ia 3ri3:.< ld =6 d<;;g 6; -gE*d R'4 3€s'3s ia E+-g =Xr I-39 E'= aqHe S3 6d 6-, e =ot.a e = ?od :aX a o; E a 09Ea : *iE.= : i.3;3 6 65:ig q '-9; 3 5;1: i '.24 3. =E=: ? '383 H dEe€ E s3-4. i n- tI p 5 Bd E I dts n EEI e > heeg lisEE: ts FS-;E -*aE€o e EE-E g.EEE= ] :EBE a"; Eg;; ;€X;5E EG - E;Eg =-3sEg=E$ .e saEe icg=3g;5s E ea:E 6--cEs:sE ; eleg ssEEs E;E?E=Esi; EEEE=E€ e EitiEEE;g;EieEleEs::Ci.is;::CE6=; B; EqEE EEEE E;CBEEg;! cBes E;gE EEE5H.tss iiE IfEEE*.. E. eEEE e3,eE € Ei ,l gs.E -,:5 =q PE :{ g E eE CI A? Es'.= E eE s e tEE E- -.9 a \Q F I oot =338 ri idt g E F Ut I H t.li{lt oltdt [rlIlilIIll t1il ilil [] llIrl [*'] tpl[N]tolIOItcl tal tHlg olltelI f 1ItrItott>tt 6,tolIFI tfl ai EI :F € H'; S i;E; E €E E g€g . g E s f;g8 E E HE.= .s E 5 E EEs F E PEE E EE s - ssa ; €E e € Ec.E - B e E s .!: = E; O P =t E ;; : 3 EE:{ E aE ? f; Eie a d Z 5 *o.Y Y -3d: =t et$e E eEEE: EEeE = E = --do '- - .9 5 0 EFs odf € F Eo-;H :EE;r 3sg :g E ;iE EE E EE EH : E€E E;S EE E I €; Eg F Os6 ! &- a< € .r EN OO ! N E E i ggi aH€: E>ti €s- o -{ P e6 3 --P >OF c 'E-=H.g k<s3EEo._: aiH =E.XE8 EqEEp 3u 8ts*e itiE :H= = o=sEE ;t E€.Eg el IieEs ot tratE b6q -_E; i P=E 8 P BI 6 u bt l:ltJttoll>l lN)toltstl-llollDl lolIrllcilElIEIt'll6llot taiIt5t I@II'tlc)ltolI>llpltplIfilolt@itNtI{lloll{lLnltEl t-lililIIiltitttttlIII ililII iltEltolt@lloltstLri e a E 3 5gg E+=A ggqg3 [q E ;E; *i*a- ;EqEp FE 5l E re iiii eEieE g;$iEi 3,*,E:rH: E:5 :re: i=F"; a::H;'rn=i*s Fg Eg i EgES =gEg[ Siai;e *erEii EE *i' BBii siag *lE:E; iri;r: i 'i tiig ti.de gB[qE = I '-=Eri; ieiElfliFEE;;1 +iEEe g dBg dgra r:ag:* = IFs; d ;1€6 . ,uE +;g:iHi*aq ; ag,FE a 0€c i;=i 5I$a5P a -8 e!€ e i;3 gggfi *Es:' a;€[ i 3. I E.+3 5P=+ Lf +ss a ae E ==@6066 B B l b R c I tt s8 ds t= [-=l tBl t;1Irltc IlE!IEIt,l l8ltott8ll@lt;lrol lqllal tHl{Tllilloll-lilIIl il tl il llll Irl B Eg r gA E 3 3 s$H r 5Es aH = $, g :=;i Ig E ;if, a r s -q;*i tg c* ia:* H ;; 3 i:s g;$Hs E i 3i; F li a; EEig - q€ o35 E-j =* A tsSE- l= l< {EdE, eeE&; 1:e;a a g-q 15 €5 E=s= E'[;A_a a"arec i c "'n; li A€ =l3g t;S;l *;aqE - B. Fs= ls €= lqE qi =:EE E:E;iE Ei :g E;: r€;-: d6 do = g ga ,33 gn=g ?=:+i g;_ 6.d e+ o; E-s3g+ *A=e s5 -i i$a -i :E-- .E "= r8 S q#r g3iA fla i qiE':r =Q o {e* : =^-H; 1:;q ;d 1 -qH 3 e:l :- 3EH :h 3 $a t g;E Igs;g?EI i :E i*er i[f; tr4 :fi t ao B =qr FF l I l E HI e s >>; f -i e R > 9.=EGEE0b: 4=-sE:;sE3F gs": coo _.xoH=Ia>E=e =FE;3=EoE3tr 5!3;r;cEiE; eis.03e =.EiE .sEE ae*s;eE;- g:c;3eE-3 '; >.:-gaE:.s*45- O=e.sEbEE==E. d;--;el9;EgE t5=E -E==Eg€Efr }:$=-aio-=:oi 9=E"aEEEEI: =:SE-==Htir.:= -H-.-Eei:2i;i FesssrEE;'E: E;<Eac= =H.ss -=of'-'=aqSld= 9{odE5:EeE;Ee ?ie:R-o6os'r r O= c;Es9E::€8 oe reg--O9 o:o==tEsPiEaE FFE; D:-.6 cLAc Xoo+ts€,a€:s.H. EEB4FEgEEeX i:E E etso EA L9= I 90 -9 o .9-j 'E co 6 GE = q'eO EEEi -esi;5Ea iBE =5= E -oe Ie: sEE *zg E6! *o6 -E pEq:6- E e x =ss s5* EE9 Esk t; = o.- d o E! =E= 6 5 soI -9I -Y C gd 6 i;: 3;=E; E;i a6F,5 Ee e 5 EE =t -E o I 9s ;bf O E6 Ei;- b.PE 7ts,E€c >zSH= d'-.iE € EP:3 dd E@;E__ 6 ; 6- <cc =.i s:3 s s ^ s i*g s e-: 5 E a5 p .9 : ! F=> < r .a EE 9E H R $ F 6 B 3p 8 €5s ::;-*F:g FEFEE E;i:sEE ;E €an :-l*==E .egEii ;=-tseiEe Eih^tS -=os56= EEg;E ic;=tla EE€ c x F = E: r - E:€: :;;s:'E;? F:5gEEfiE *iiEEF : Eep-.;Sa fiEE EEE E A;eEg;E: =Eg.-E F *eoEoP=9 o= =Cp = = g:$Sis-e B;EB;; E F ;:e=isE; Ste-Eh8 E lQebuXS.J =32_p d !-i;€E...9 9==eE= ) .2.e<:;=-: 6"2:Ei E HE?;€;a: 5gEB:; E =_-EEsE;U .EE E€E t : i:;;E;l; EEC:€ ; {E€cagE ;E3E ; =AFEssE HA o>o= E e Eb<,: <9? E =ERge s3i : t'k-P.= :9gs ;::s€ E;; 8E=eF Et3i-> EEE E;E<8 E5E 5 E to o 6 bI c-YLo.,: >o6-.= :.9E sgOEE HE5 Seeai E-'o 5 o 55 Y i bi6 q .6 E oE b.9 s h R - !F EEFE; 3Eo dY :'= ! c-i 3>E..4 -ed o G= b.y d c o Es gE€'*E ;EEdo,reB ;S83p eeFoh E-=",: s!tr<E E-t;eE E"9qE ;Ee;E gE€€s Ee?Ig eEEeg kEEE; a=$FF =--h=E .elss= $EE-E EESCg S€ I;Itil tsl ['ll lrt1!! t_ttoltqllrllNlioltNlt$ltoltclt-g Ilalt<lfol t?1 tellol I?IIoltdlI=lItrIl@l Ist lsltotINI tblt9 GII;Ilol lallil tltlttttIIiltttltlltilltiltltt l=ll+ltLllsl I8tlEt IrlIiltotlol lolt<ll3t t8lt'llollol IEI tHtloltcltottolINI totl:.1 'E F 5 Ia 8 .a P s 3 6 B t^l lolt>ttNtloitotl{l loll2 |lo Ilrllc IlElloll;ltotlollellolt,tloltotl>tlpllBllolt@tlNlI{ltoll!llTltillolt -ltlt'liltl t1I]il ill tlil tlt!t Idllrit.J Iaa;Ef,si3E r s i$s* i$=aa r g*6 3 s 6€= 3 ar ;; €;E g€ i B r $€ E i =::; 5,aiBB i iE" HE rE qre ia *;t*p F g s$i; Eiiae i i;lara$.glgqiE*na E :;gie E:alq EEgsg:";:38 f;isiai a5;;;!;3i -i = gi * a :g; .i =3; la = =;€; sE3-eE ti5:a ;: t ;EFq B txil;:-x= - EEE;3i :;sg€s 3€;i :3Brg g -1.34 tJ d ^- -- = --r; c== ,!- =E=;F ?[ e EiEE: -5e; n*::r r9* i: a- ; dB q5 - =3' q€EEA AsI€1 Es = r= $3 g;P 3:ia3 l-l ap is ,I Jiii q:; Eetl! 3 =eE :: g iq:e rFo AE31P rD3:r i3 q ei?: li*a;g;,-q u$3 gBB 16 $ :6 ji a[s q:qEu qfiEEgE; E1;eE ;;; .;59; ;g t..\ I;- IloitaitN1I01IOIl{llolt2llolt!l FIlaltollolletlelloltott>lITI lrlI8llNll3ll{llrllil l.ll! iltllilil IIli,llolt@llol lal g 8BE BJ: +9 F dT 9E !*; si; E= 't* 3n o = d 9 -H e ;d €.8 36 i g . H'oQ;g s :dr; at3-= . +a* * q:g ediE eatB $H:a s;i F Bqs- ;E rB€=aE=' q;=E i[E3 Hs : :;; =; ie-iieEE EB:E -H;r* =B E EiA 8e rs;FE'* =i;; iE+ 3* *-:: t ;g:;5: , ==.8 q:i . 3s d:E o o -60: s :Eq a-"; e ;I ;*i i igi€gs : 3;= A?a F ns: e*3 E +. ei; i itaE;E: 5 ;s3 t=E i =3 ;iE. * ?5s3a = $ i;E -134 s Fs eHs ? gfl;$i =- -o 3;s q*1 a F6 833 e 3l;f?E a 3:3 s'lc 51 ;:i e s'qigEI a a;E. rs'_u ;a ggg * ?Eqe; EiE ;ii Ei il5 : rsE=sE \Xq ;gX -a: ";E = pea8 A; *E* e;g le €t ? t;Ei$ HIp! Rg I I8td E i.', . l E HI g e E .- 9 € ii 6 o a!=EvI ; i-f E E E- E eB E ;:E ; E; ; --8 H, EE; E ?-" q B EE ;rE i Ei E ;:E EI; E ;! E H Eg E gi; gE EE : E;E H EsE i:;E € E;: E;;i eE;* rrfl-q d 6! ! .c= s "lg E9 -g.eB8 E -r_ lEEE gge ES B ETEg HE iE =E E*E E A3;E19sg :IEt"E ,q 3€.Ee 8e SE" EE 5,g€ S sS*g-EEeeE:seH aa 3FE F . I IEg H pgI 6 dst 1 oq EE! g P.E RE> ;ts6' =a Eg oE#t 8 (o FsI 6 H )'t 2eg'- -a H +E E c 9;; i q.Pri trF E Iafi ;E € c eE= E BeE E B g EE ? ExF e ;Ee; E : Ec 6 Eoo5 A Eea cr €ss E E ; :o - = Z<E cs.= ss iE" irE 5 a E t;i eE iE s E;E E ;.= Foe B ;; f? - t E.s :=* t$ i:: ,i€E ;: = E:-e *E E EE - i;: s €e iP*g:g E FgE E;E.= tE :;EE :E ! Eg; sEr-EsE3: 960; ;* e E. EE;B Ei A t= e";g giE: t ^Y s* ce'H d g eE:Ee*:cE*E S f E ileE ;A t tc StEEEE tEl,* = - o 66 o o _ e oo a;-2E o6E F; FE:; F,a E . ; -'R :H asi E- JE T *3 XEE E t:I tsl II til ilil lil IIJI tLlI tsl I tEt I tfl I [8{!oltsl i tsli Iel I I*l iEl E ]H lll til t1ilil tJ lttl it;t IEIiottotI Jll {rE I tflI [51il"l I:I tel tslloltotI{ttvjlollollollnllc lEI tsl Its]l@l lol lelt!t lB{ tsl ldltrlt!ltolI *l ilIIilt,tfiltttt [] ll ll II ilfl [-ltotbIIoll5,it9 = :6eH 3- 3 3;48 E -! = ilE=- - ii ; ;J EeIq; ;J i # iR =qr 3:-<a '- o a ;s E ei B;gHg 3s :e eH ai iiEi q B;-dH;93 =: ie Fs;c 5I 3e- "{ 8i ig6:_ .:= Em ',;= Ef. a gaE : s *E gE*it .* E'a $ iE; = g =3* q E;a E:re q 8 r qB: ; E_;"as q a FH EgiS * + i *,. = zi es ; : :.5 .aHil; I g s a-- 4 -Bi-= E 5 i= ag.TI a 3 3 ;3a Eraa €EF gS;H {gs PI3 : s aI FsB-3 s ,i :m q : =E iHgE + E = 3 ;'; € E I *fr*: : F e oa 9. - ==3.< d 6 c lo 8 6d q r = J i $= + t=;Ag E g s e 6a = ;=qs F E a i $3 e +55.i ^ ts E E i I Hg r llr\ H BlI Bd 3 R F] tsltNtt8lr{l tEliD I t5tf!lt€1tEl t;1 t8l[8][@] [81[>lt11loltll t$l t-i il l1 il tlI il [-l|o I16ilolt61t9J < x E---Ed a+ = 6P-f 6 -o 9. 9*.91 E <.3 - 3 5'eXi8 - =:: r Fag ag:Hi; i a;*3 ;B €;e=;-- eEag [aig:i3: eAg!ig og iBs 5€; 5E E Hga g .- f;*it. I qE E=as d a ji=:;€ F i: €E=o a 4 eEinEs g' q 5E(;:i' gi igs E 3 g=_i:= t'E 3n-: r e Hle'=93 lE aEF E = ';'3*s?: ?* €i E E '=;qeg 3; 3g 6 a _Se,r<g <i =q q g:r€G ;g sE a 9E*;a s; I; 3 ff.qq=- B E pE I sr=1Bi a Bt5 A a;E:E i sb@m_; a g A8 a e39Ed e e ; BE I,= O EP33. -E B 3E'-, ol 5 P?g: E.: : ;E '- d; ; oao a o I =-a *E P @aI I3' r- g:E: a; a ra = ei + Ei: €{ B 3ea +; E 63 Q B. e 5Fa -= s. -.E 4ei Q 8o gr f E f = d dE I- e d.3 *E, E E 3 3* i ;a 5q 3 E5 bOE> 1. q. 6< 9g 95 oel.:l.o38::id il t. q ,4 ! I! L Rd I 6 ds lt,) I { H : EE F#a !i E = E :: gEE" E6 : -.. p ' E= E*F g6;3=" E E !E E ;E E;E ;# : e E FE E": EE E E: sEE dE * D ' q aB .=5E t-a Bi E g :E E€E *e; EE E 3 5E !E: EE- : . - 5 E: l= b E2I " E s .=5=E g; ; E ": A:E €6x i 5 o p.: E3I E$ : E E= Ect fU = : E f - i =- HE tsSE €g o < L E , O = X o^A oo = : ; E n = I -: =38E 5 Esi E e ic sei €EE f EEE 3. E;qEE+E eE7 2 EEE EE E:EEIeE E=3: 3 E; E H:E? € EE i EH.9 ,=6EE€sE:rgS tsltot161 fllltllltlItt il il illt IEIlLjLN]tollNt tqltEt tEll;lt3lIOt t?lt&lt 5[t(rllolI>tt3t ls'ltolttotlNl tEltvl nI a H FII 6 B EIFI I p EI d I H s s EE:E= se E :;s-E eE ; B :EEig :B E H pEEEP EE 6 : ^ aEPEn ;E r F 5 s1;Eg E .E- .= q F e63.E: .s Ex3EE.3 g€;Ei ciEH e e 5 EEE='E ; Bqs 3;3 ; q s *€:EEEt E;gSE ;*:; PaE E =g]=E -E EEE H.= 6 E =s.E,ae ? E : E; HiEg EiE:E:;q=E!r EE: EE!a== E €Efi3:€ !rg EE;=gE;:::E;fl 5Es u eFEE;e 3 8EE€aq = 5 E:;EE; E .s- ; EE'IE3 _E-EE i_ g, - 9Pe 8eS E;H 9U s;€ 5:cx A.s 5o'=E EC 9arXoq dFC> E.sEee EIo; !+E€9E EPo&3E!E E go--c cSEEFEEE;b9,E-vE E E E==EESEgE6666=: F] tflili{ilftIIIIiltiil il ilLllEllqllLl t5itFttstt?t t#l tslt;tI$ltol I?ltotlrlltrl IeIt5l[otI$l lFltril t^l tdlI\'IlNItolloll{lt;l lo Ilrltc ItEtIEI lalrotlol jlol ilall9l ilol I lel ilTl lsl L IOIt6tI\t I lsilrllir Ilol l-i tll]ltlllttililltl ti iltl lll lel llql Ilol r:lt^l lqll\l IlNl tt8tt{l l5i iIlill€ilEl talt@l I IslI>l lsiIflholt@tlNlt{tt01l{,Iri lel!II IItl titl t1!! l.ltD1i@t I 3,1l.l EaaE . 'tB:i iii$B '$iiqsal. = ;ia;r ' = dgEEiil$ii $ $EEEBE$E E *,ii:FEBiE=iEiEEsEiaililE Fetsg i i ig€E3i=PEEilEBFsEEi1iaEiE EIsg;a;;E€isgiEaFe*AEE s;ses$EiEaiiBig$EB3igEga ds tI pI R{ I tI!I Rn I J{8EFF * 3- o;aq3='>q?d*: e Ei. 3Ba;5ds, a S+ S_= E;:a=lga E iB 53 E A €3Fi:al E Bq EsHE€iFqr g: if =3s$ies i ig :Esa,i gPg ;: ra q*=qlili 5 q= €sEs :F[E EE EI ; grn8 FA F? '=e;Z ; 3:: ;E €\ ;=Eo;e 9c (!eH ;3;.1 Bc.F TTSS ; = :HEQ E;EE .:: =FFss: r =.E- E 36( f E9.iq.ro o_ q-:e - 6"1a 5d-:i: r H.fisr 3*3i aga S 3 g,9* dg !r*E+c 4 iElE Ecie EaB A,:qr=e ? dFsE ;i{1 B$3 ;st;iE : Fgi1 iiii ss .= 93FBE3 : e=*=: s a3=.e ase*ii a =g=E Ei;i g I= a = ; a o =, i -B*gEiE p =EB a€Ei ; t:{--e= e ;_o = <e--;;;48 ; e6> 6 6.d E t 93 3 e.Aa a = EB A =a'= 5 q 9= - q sF F 5 o5 E -8x = eae e tf + 9 * *B g E g II Ba ,a) -. i5Ig EEg;r ;ss;i i€; : ;E ;iHE;BEiiiEEiEEE;.EE:;E ;E;si ;$e$; E€i uE l: Iaff S;EEig g5igE iii i ;g g i$gEEg E E*gE: tEEH E tEur€E i;Eg: ic;s g $F E EE?E se. i Ei5; jtrEEs o .EeaiE EESgE, e;c: s eE S eE €E E :eE;E EE+ AE g;g E ; EI lFllllI t1llililil il il tsl tel t3llolt.llollslt8ttotlolltltolt3ttctlol t6llollNltotloltNt fottg EI I $p u $ 6 B a *I; i:: EE s 5 € - EEEEEEEigEEE:Es;s:',s;Ere;sE;;:gES; gire5EEEsHE sEE;i ie ; : ss x Eccterg*€E; != i=5 :E ; AECI;l=e E 33 ;; :3 : .i F ge;: c:E€8EE NE =ti lE ; ;E;g;:=s;*iii s sP =E -*- e! E0r; E :trEg; gi3 EEE'EcI; EgEgiiEt aE ; E g: Ea EE EE ;E = ig€;EEiE;Ei E EE! Bs 5E ss ;; 5 E;*!s=$= =:c=sEE;. sEssr3E:;*= EEE ;E E gticeEee t;Ilolialtd!t6l 11tt IIil il tl ti! tiil il tEtlrltNttoltlttoltctt-q ItLlt<ltot HI tBilollollllItrltoll>ltdtlolt^ltNl lsl l=l 8 F U t 6 B t^l Iel INIt8lI{tEIIoll.lI fr! t€tl;ltotlott6tt5tl@ll;l lelIrl i=l lallNttdll{ll:nitEltolt*t lil1IItitltttltt titl!tl tl hlt@lto I ts.l :aB: A Sg a: ra: eSIe : .I ; dei ** 5'e'5$ * a; B 3f, leg ;BE3;3 is i 'g flEg isaifg+E Es E sc*E EC $ t:+E g al ; ?; r;si;iiE 'g qu sg;F a ;g s *i iqgsii;F * 5iies a; a :i FSfrr;3;i s s Fsaf, " a Ea HEBfrBe: E lts:$ ; a:sesE133=i3ASHFA ; e g; a*arn;5a : E$.;I; a : :i, Bt;g?+E f, r*Bel r ai+cAE;ig;sesq;i; : : B: assqSa; I agir*r F + =F rr#Eirs e g F B E E Pa Ri]I I ds Ir1tal tBit-ltolIol Iolt rrllEtIt,l!tI't161 l8l I[1 Ist lul lul lilil il t1 I1 1"1lo It@llotlolt-l gsia slEsee i;5Bg * EqE;;q Ea aqa i q: ;.sE,E iE Fia:i *ig3E;--E;=" g i?r-== :tE n=taai E I lc E EsE FE EEE ;;€AI E iiEEiiEflI i EEE 3 3i; EEE5 H Eii;4,= f :.5 s *E r E : q.8 e;4:6;q3- s E.e E €-'e' 3EE; '31+eaE i a_ B. =i r i =. ; ;H.i =ecl=::q1 d 1;*- r= ; : t=a. +E-;iIq*3 - 63E s' = "E e'-;q g[;fgie.*3 =€; "; m E E=rjs: € ss' .= e B ail* E+E€'Bd e 3e *Z E a,fes ierEsI3 : i + A B Ea;i 3B6rF I t B !I Bq H E Ba i l ,--ti) -. . Ep I B Bi 6 B €fir Es g 5 E-E€ ;I o3 -.. H{eE e; s E eLBE fi#.-E =E 6 .- ;g:5 E6 !"8 =H E 3 ES -qEi8 ^I E = Eg E" .E:EE gE 3 E "tH; * c:s Er i E rsEt !*gEr .-E E_ EosEE eE $ :"EE=E EiooYEE; E;.; pe'gEEi* :E:.FEo*p'E :EA:"ggq :E;:EEe;; ::F€;EH EE fE€Ega E EE€EgCE*;E3E3 -& 0Es A EEE;#EEg sid=F g oIH g 'sot E o;j o o€PbE 5 Fa; E . . F'=- oE '=E*ES n? 6giEe Ag E EEoE 6 gO t EI leIil iltt llil ilIItl iltttl t1II[*tIE'[+llLl lRl [81tc{I di t3l[oit'Alolt3llo,ltoIt?ltoltoltft t5lIel!ol tExtEl ld c.sE g3 s .e BE.SB -3 3 iEg E: =; g E;g: EEE6fF E= EE A" e. €3;€ Ee'aE EE ; sr iE E . E E;E*E Ei;==?iEEE 9E:: car;Et g5q:;€E3E aEEE-E EEE:iE f;€E ;; EsE *;i BeE =; i:i;g c eE IiEi;EgEE € EE EEi.EE Ef:ff i il' gE6EE€EEg :g EEEgEE EiBEE 6E E3E :s:EE *e U! E.c ,tr$;EE ! 5= i; E i.sl I s xo *.9:?P H oo .E =E= EE;s s B5 .P.ESE d q H[{ t1 [] tl [] il tEltFIrNllottolI clt_gtlal1<ttot tgltu, I l;.1 [;'l trsl[6t t$ I'- t'y €e'd:EE sg= ie Ess?38 8€ J + gs:*[]+ E $F, t= e, € EI€=ii: H $?* lE q EEEe'qil 3 q= i EEga;sF H sEB lt !gsEEsi i 3F = E+tA:E: F ili'- F = BE '[ = 5a. 5 il_i=Eq=, Qr!* "F B E g: ; q3€Hs== €iiI F,it;E;:EEg [;ii H a gsr:iE: e=n3 F Fl*:gd.i iare :iiasg E;:E ai.*l3s o3? a aFedSE ;F-a EiisFE sZ3 =g;itl se $q T;5E1: EB Eg Et=es: 33 tE i-EBi;i Fd s H I! E Rd E 8 dE : 133 i il i E*6Fa HHE 385 g 6-=pe a=6 cs"= S ogSH! Eg lg EEgE H i; ;;;;, E E EEIIEd Eia iE *cEE E 3g i;aFE E ;EE:;} tEE E: P;g= E eg g 5. 3} = E*5F:E gE; q5Ea;E ;q FEE s€;:F5lgi3a :3i; q: = a:Ea;,F EE=ag si.EE 3* ::;iElgB iE q :caHils:?E a3 giit EE s €BEi[l qE; 1; EgF: i F FaEig da;-ai rcE B E eHg3;:-i=Ea14 0-9d < 5r? s;B B s eqiEs E;i€s 1B= I - EdsaE 9=tg.= *--3 3 afi=qA d3- i IBx ir ! 5 Bd R eI B.a a g ts E I E9 .EE s9 .sq'= B; EEt =E ," *EE eEBEEEEfi ec ::: EE **!;eEr"- ;Ei #E ;E: $gE:: IEe -gE EEEE;E*g i;E IE;Sggii;E ;E! :3;cEEEEf;E agE r * =i: =, ;ts H *E ig=:Ee€s Es r*flEgiggEggEia'Bts; fl 3geE g Eg Eb Eqaoo i =E "EEEgsg!E!E i i; sEE;EEEEE:g,EEE;iEgEiE;:E =S a€gr=eu;:E€ r* EEf;;EigEEg BEx;E::;F,;E$E EEEAiE$AEEEE;E EEI EEEsEESEE€€E F ui 6 t H sg IiE i= EgFEE E:cE E; EB;;E ::-=*s EEEE - ,s i :€ g;E€t =;; i ;5 i* gE fEEEB EEE E EE E; EE gEEE€ EI€ i EE I 5-EEEEEEE;EEEE;g,eE =i ;*EIg* ig=E q $E Eg fl EEEIE; * EgE E EEg F E; :g r€ gl, EE€gia F gis sa E f:E E EE:=; ; E;E,€q Ei g "EE r*E EE:EEE Ep tE 6gE; 8 Fgi I d B l:llol rbtlollolt{t F1 ts1FIlutltol lFl[@l1,1lolIOif>lt!liol t3ltsl ldl tili*lilti ilil [1t]8[tlltjltt ilil [1 f"ltotblIo{!o!!el B B ts€ i IH ;id a_ EEEEiii€Hel g+ru* B.ei gf,-= E. €i -=Fs re H i:H€E=;: sci E iA Eii F E gi5 giie=u+ g qE i:l , ;,sc"xs- oE. a .=! FS-i = P-.- i!-r ood , *i e*=l i -d=o a*{ eq* 3. 4< ,^;ts = e--lie=i; dl qas * lEE "'rq E6i : 06 {il: = B,$E E=3 :ri I -T l=E i d.a -1[iHls sqii;] :;x*::li 5de 6 s+ B;n c xEr E-IS:t = 3e d;q E {a= ;.iAaEF; a;:; ?q;i :;:931 a fr='n { al Egu=-EI' ? gig ; gi ;I=[ Bs' t ===se gF e- 9gi3_ r €F E * il 5o 66 =1.a d 6 d 9 I i =.o_ jd E;B!I Rnlo R I Fa FI !o1 rNl fi8t({tr-ltot tHtlrl FIta, [81 lFlto,ttol tgl tHl FI tl ll t1 tl il HI + o 9. 1 ? a E. a!gvEI dd *. I 5 -s = d6 a f+ 3 ac 66oa?xi-#a2 . 5Jz= 3oQ A qoio6'sg 3 i 3 :i' = 51 3 =itid A = d q'z *3I EE =JEA-- I e - 09o o 6 d *t3 ?. e Fis fr r F a;o 6 6 a :o cr6-qo ;6iB0966> Ee "Ealy)d == o< -a 33€d eQo69qE*a l*a- 3+ F I E Rd E 6 da fi l I EsNI 6E! E ::e e3:E i E9;= ieE E= . * =3-s eH; t€ p 5 F "i= '6=6 3E = 3 FEE"eE ; E. ;E* E€;s e gp e;j 9E! 3 5 6S aEe 60;; : EE *sE ;qEE :i 5E E;63 3YEE ; :E .]EEi €E3: € PE 3E€9 IE:E = EE EE:= E€E-- S o- = :: g=EE :=*=g E Ef; EE StsE Es-FEH =.:E E; se el;E=; $HE== ' e 5 t' >:; EP Bl EoEE E=::a- F * p s i F == q E=Ec >g€E€ : {gE=E s= El E€es si ;$5 El E *E:E; sE H EEgEgE;s: 3l E Er fl EHE: E€EeE: g= Eig E H PI{ E i H I EE EESIEC - s .};: Ei EE z.*e->s g E E;s $: E= ;g3EEA ; 5 :E; gF f:E sE*r=ts$ iEH EE::E3 E .* .ET:-:6 =lEsE-E : : EEE€;; E;H;ri ; : E;E€EE le€EE* S H ;*E685 EEECE; : E E:ia EEA EEE1EE q E EnEq:9 E=3 ?EeEcE E eC E EF p5aff =€E Eri :ip -;iEE€ : E; ; = gi EEE B ; {ifi i'-r== E : i e : :E =o;; lEt , EEE:ig E E: i ;= E5 gEE fi eI :BE H EiHEEiE E :i E i: gE EE: !gP EEsEiE i ;; 6:r iE: sglaE9 E EEB lslIollPltrlilililllililtl t1il l t_lIEII t+tI lrlI lrl I tgllclI t_otr IalL I<l i 18ll,ltott{ttottol I t8ltilt5ll(rlloltil t$ltbll=lU inrI Ioltolr l3lill itlitlil lltt!l IIil fJ tEltN.ttNltotr lol, IclI6lto-lt<ltc,t t$llolt,tIqItol l5llell6ltcllal tEt lBl o Noo{ oDol,cEo <n oo @ o !ill FI E Bd I E i E aEFE iiA a:i qiEB i ; . E. . f . ii:333c. ;3;.ig a;i #:ssCreE i?afl +$i;! d F $1; Eg i 3! .gs;+i$: r;E; "sgig E Eii Fi E 3: qsiifg: ille +igg E $;;5s-ag g9s;IEs 8igs Hsri 'tIteelliaEifEiE=saa;8< : =iE1 E = iiEs;i€ [3i i-";:!:. S Eg qagEEB= =*: qfifE+F 3 € cSeFi;E gE= sS;i $E: 3 3 ai=lig= +;F- rri* ti= d d Hls46e^d= sl3 HisS t" I d t'{rf, tI lsl IBIIOtt{l lsli5tl:Dl t:ItotI3l tFtloltolf>llplt6rllrlt8llNtl{tloll{llrlInl l*lIIttllill I tl tlttl l-llol IilIol g3 iE3 39;398 3 d =;ii F *it +ls lp ai iti E iii E i; lBg E r; $Sliieeiaed iE=' BHi iEE sii E E E:iiEiE$$EEiia g[:sseei ;=;;:iiiBEtr lEEAFEAi+lsig;qEi;a*s;; EgilE;iieg}EEEEEiliig t g E Rq E I8 H E t.}r i E; eEEEr ;€: : ${ €E E6IEE *aI o a6 ;P :E;;: EEE + E 66 si :g€Eg E:E E E-.sEtH -;; = Egc ::eH: gE; : gp 5Eg ;gEgE E€; E e:o_E 5.€F6 =EE g :E::E :i;E: *Ee E EE =ab -Pi*.8 cE:Er ;:EEE eEe = eia =3e ge?EA iipB ; ;i_ X; eEs sgiilsEEa gi€==FE H Er Eg$ H :E!$EE EEig s E : :: i i EE $sE :Er Fs;;g gBst cH t6tl:tloltdttal il illt [] il tl [1[{tt tJ lEl tE{ tFll<l [3J [fltetrfItEltelt 6llol tEl H Eg I f; d. E E E E ! g g E gEE E E ;E!€ E ; E issE E E sE'ES: ; i EE.q E E [$ -* s = : -t3;r.s 3i;ii ; H ;Ano oo I .- \ o: .9 .= E s;E E3: rE e3 E -- 3 =* sE ET FE:E!E s" E ; EPE:EE3 EIsEI€;-; ;=E,ri::d:FigCgEgs ;EE E; EE eE E" e€ s! ar!;E :;aE:E:geE:s:E EiE .=E .=E .=t .=8 .=e =p .Ei33 E:E€ESEXE:Ei€: E:; E€ E[ EE E* E: E: EE ssb= oE =E sSE: ' rEEE E 8 P ui d dd H t=l t-eltNt EIlo Il!ltc1t!t tTtlollol tElr@tr,!Ic)1toll>1t!ltDllf1loll@llNll{lIOIl{l EIllt1s,$4B{tltt ilI: IEllBrlIl ililtlt INllllrlt! x-lLO Ircl bl t9 lg l:rt.lal9to IE E g !I Rd lI 6*ort Siei X : X X B;3 'dEgE3: E:Es= l, = - dlg se€: i;: ri:ig r ;E ' E EEiE tieEitI Q*3ie s. sE' ld lE96 d--- aEg iaF€;=; li*=q€:Eii Ae.n ea;4 .F i;g= gF$€ i.='o q==a Z- o06o oi-8r S;9"= PE ;eEf ieEsAg; $ir"r EI aE=a 3a-'q6? 1;dB ;: *=:.eE =fig; e: 3e E I pE q.a:fr sFBi*;i ;His le -:sx €a*;e6= =o6* -= .281 aq_:+ea a;3€ E; E s g si +Al€= cilli 'e =s; *e;es<_ Df a: < F9= EJ+i.sf? e--_ig . =38 a5#i =:F Eg:A ; EFa ggEB-+; a*-;g a F?a i3r= $ aI Esd II d ts FI Ie{ tNl EIlolr f,l roil lelloil8l[@]l;l tell!t[6t [3tt6liNlldl[{ll:nl ri t1 ilttttililtltlttilII!lttlttItfltttr! t#l E] gE * I q f gEE f*a " 5 3 " €F: '; 'EE E Bi El;aEgEgESBai EE i gElg ? :i =B*eFEl'iEf'3;5e eiiHgEBiqiiFsirEi$sre$E1s3 r iE;g:if,EAi $; E c$;*B+ : Se[iii E *E;qgEBSit 3i a =iai sEi iiEE;3;3rii1i E:*[ H I B!ti E I BI '{ai-' - ' I -l l€5 d-l *.€ 3 da.!sE99 9 c6E EE 3 c-> 3t E€3: E: =a ZE 2- @O 8E E!Fe bEE E 8€EE 5c<o5-g ;si;E <6 Y=uh F6F! == c lPltoltdt[alilil ilil il il il[] il tFll5ltNif$l [Flt<,t t81 lHlto{roIr5lIEI tglt 6xlol t5lt{l[bl [--_J EI g g( P Ue 0 H fI I BE E5:eX e-s -E-crEo 9; -ie.s >- -PeE 8.8Uo:? Et-o-5_?;EE 3; 5=3 -9€ e' ,r o9i'El e s,Hdl fEoEA *3 ai s=_ 5 c P '= = o 5 6D fi ! 356.- epFE 3EE $ €= -; =HEt gE-srs EeEdo!9 9E 3E '-P 6o -E-E eE=e i-53 ;t>E a =EEB E O.EHE 6l EE=s el BgI g-l6 El aE=1E fl :EEtsg EI EE;E: ,fl E=EipE gEEi c o.=E ., eEE ! E is ESHs'Ee- E= B *= ;e IEE;;; ;5E E E oo 6; -_-o- o= :: AE EBg9ig E3 Eg "-E *EeIr: Es Es ;E i;sEei fl ieEfi =E E!=E:;€ eEEH;H q'E!:!t? i"- Et Ee g:;IE:g:*g E: E"s E$:6EEE E:I;i ;E E-;;lisE !*,B is Ea 5:g!EEE ggs iR-lto,td[ 6]to. lil tlII ilililil iltlttitrrltt IIilIItrlf+tfLttsltNllNl l?ll6llo1l<l I8lht lBl HItottqtI=l tc( Ilott>t RItottollNltiltett-t 8 P st I d B ctAoF E:I tslINItottott{ltvtlol IB]I:DIlc IIEI EI t81L@if;lloi[>]Irttdl lol tHlti, itot t-1ti[]lt1il il il il$,it!Iitl ililIItTlIPJrcttoIl{1tfl YB !, 8e !, a !, !, 5!ld !, sdga 3 3€ S E I - lSs iii = Eg; e gi s E ais* ;igg lB fr *F8 i *iE E FEE E E3EE ESBA EX= * -dE o {= ' e H 6 38=!ii giiiEE+ a;e asEiig iagi$i -$i ;;r.g l'tgE:g iq B+FEd S-si E =; =A t=til; eg.; s: "' 3liai =";- Iil IEil:f g:a er B;; Id: il=.= 6or I-P .dd . d-g dd* s.E= a = 9 'Eu=* g €9c- ?n= -.c l. +Ef i =l 6 HI E Ri I 3I dg t'._lr- Fi $e{ tBl IE]trl EIt01 IHt,itc)1FOtt>i tul t61t\ltet t-i il il ti lt il IIilIItt [*irclLo Il{lt9j g; * i5g * 3iEE E? $ qE$a E e;a r irar rs ;li;; _: 6E$ 3 $:laA i lAE* a:ia l* ,;E:a ru EEi I *sigg Esq- na$$ ci;;i;:-s;*ilsiit';Ei gi+i E:;;!:EEI*EE Eeai €;ir iE*c i'gi ;€iidBi aESE aS*i ; E*;A igie $q€: q e= ;=tlai Eg$i }€gg E Fi i3$i EF ig$ Eir= 3 Es Ee$i $EE iEE iEff i ;3 Er*B I ,e I B !! Bd R 3I$ EE ,/$,-. E E;E g: E E 3s;s E;: gE E ; EEg! gE.= a 5 .d:u ;EE :; E t ;E; A;E :eei aff=cE:E ;E; g"E= E ;Ig; egs *iE E€E ; EEEE E:: UE;E EC.EEgEE ;;ii 6r =g: q E a ;{;E E iEB El EE ii H iE El 5ig; =i EEE: i;: € : 3s E€€ tol talt6tlLl llll! I1illtltll il iltl lellullxllot tNttollollclt.g Ilalt<lloltot lsltoi l8ltil tEi[oltcll8lIEllbltg EI I H PgI 6 d, B sg I H P UI 6 H g olo! ;35 55,E xEi E:B E:t iE " a=- 5.? .90a =Egc; Ei3 0- =er=€;t:eFbE b3"3Es 3.eE.E= E+ .Y,E ! >.9 gl g:b lit 9 '6a , <.9 < 5gET; :E = B;,g ;:€a-'7 E€ - oqo d \e EE'? :EeE:-eg is:Ee €=E; 3EEaELco 65q EEZ 2zE EFS EH t;t t$l t"l ilil IIilililItt il ilt1 t_tto!tol[ul tplINI tolICIl6l lElt<ttollolI'll6ltslloltottoll(/,ll;ltgltdt l*l l.^llFltotlollElt=lt9lt! hltol iql IEIIpt lo I, lrllcll!llEl,']lalIolloi lFllotloll>lt'ollDllfllolt@llNt t:ltEtIolliltlttItIllttttlI]lir, 1tlIIt1ltltl tll l"ltol lol!@it-j {m@i !ToomIc!moI!{ m;mo<rDMF.C>Da oz oae@oI EomB86F8 F 5 === eEoT Bm EErm-{-B@I =oITmoCmz9mo F P! 5 Ri I _e n q 6 g 6. im I 3mi oo 9. P b. lq 9. n o a. Bs :. 3 omoIt+6z I f o Im I I zo To 2.2 26;- -iE ;d 5 2.2 odoE9.o?g Id I5 c Ta Le 5g 6'1mt + o I o I 0 -t o 4m@t =m+-oo I6 g a g e@o! Bm Er -'t 'l+* I=1l-llellJltNlt8ltJt lsl lolIPI tElt'ttaltolI01t8tl@lt,1toltotl>l t51i@tLNItxll{llrllii tIOJt*,il t1l ltl lt l"ltNll@llolloltll {m@I !ao6moGEmaao! l{IDME <m>N-DC{oz oa oo,m^6tr>9iBm3 st56 ==c = B89zfr8g,a=ri 3D+ 6=m r;i_q 31Z@mO9tJ'zfroocmzc mq Io, =a,3E E=E 9?', q € ga {m I =mIII t lEg E lq ed ir'Sas a-i Se fI f,!I 2 I o { a Im{ i zo Io I g s. g 2.{mai J o {mI =mtIoo EIEz om oo,mo Im -#,' r.- !, ,t! dto@ F2U =UE5ol!Eoo?ulE 6P<FFu oe =EoEzooJoo GIl6iIoltolI6ItGt illr ililltil illl! t{ tEI HI t6i [31rol t+l tEl ffilt3t tcc I tHl [ol tF{ tsl Eo tsI 3F!!slt Ei ;! d-EEI a{ ;E!gET tE tc fEF5tsi!I ir;t a€ IE TEi Ir! ETE g la;Fa2luB={ulE;=!6EU;EPOI -E!uuEJF! ?U:FOtaE=EEfeAZ:o*oPEfiE:o,uEV a E3. n E R sI I fr ozu =ou E = =z = ooI tu =hUF F 6 F U Ez 6uF .9 F ,6 E EF.9 - ozU EUtrE =: =z = L >,2 a oA 953 -8 3r ! E;! o F o F z o ts U =z lnUF tr Joo EE =i I o.9 >€ 9a b4mt E P 8 E.FIi6}Fd26UrEUul6E*5E! gss E:: o ee =!9+t btH ; HJUii 3? YY E:: IaH zqs O!! oU[8 ritrr E IEET F'lii 5lli uE;E O EI.E !33!2-r a!! .q:.6EF*zYUo= IJJE toulEoz Eu UUJ()EEF=EoEzoouz G@ =UI =oUo [;t tf, t1 il ilI{ LI lr'llNllo!lr'lNlIOttot lsll[l tgl tgl tgtt9 8 fl F U 3I B = (.))z =-u=d-uEEE q o. g o a ooI l! =t,UF 6 F o ts o F F o F u =z BuF Eo .2 c ,, E .n .= o E )ZJIl3IEf L t L 9 oo b =thUF I ?: € F o F o F o F o F o F o F o F IIJ Ez 6 UJF a =E .9F II I I Eo g F E I Eo I e O 6 € .9 -2o o 5 E 6 From: To: Date: Subject: Attachments: CC: Dave, As discussed, please find the revised Technical Specifications and CQA Plan for the DMC Cell 4A project. These documents reflect the following: I . a required minimum 5O7o GCL moisture content (not the 7 57o as indicated below, in accordance with our discussion on 26 September), 2. monitoring of GCL hydration process using small containers to measure water application to the surface of the GCL,3. moisture conditioning of the subgrade the day prior to GCL deployment to result in a subgrade soil with not more than I inch of dry soil thickness at the surface upon deployment, and4. collection and testing (ASTM D 2216) of 6-inch, hydrated GCL samples from secondary geomembrane destructive test locations at a frequency of I GCL sample per 4 destructive sample locations. These documents will be distributed to the contractor today and we anticipate starting GCL deployment Friday morning 28 September. Please let us know if you need additional information. Regards, Greg From: Dave Rupp [mailto:drupp@utah.gov] Sent: Wednesday, September 26,2007 9:49 ANI To: Greg Corcoran Cc: hroberts@ Subject: RE: DMC Cell4A - GCL Hydration G.eg, Thanks for the email. There are yet two main items to define. Will the subgrade normally be moistened one-day ahead, unless the surface is wet already from precipitation, or do you envision scratching the surface down l-inch, and if it is "moist" there not applying any water to the subgrade? The GCL water application rate submitted looks fine. We are no longer pursuing the water truck correlation. However, in order to verify by measurement the MC of the GCL to be>757o, samples of GCL will need to be taken from the FML covered GCL at an interval of I GCL sample per 2,000-feet. Removal of GCL coupons will be from the FML destructive seam samples which are specified to be taken at 500-foot intervals (Tech Specifications 2770, Section 3.03-J). Replacement of the GCL coupons will need to be by an acceptable bentonite paste or other approved method. Please review the above, and call to discuss, ifnecessary. The specifications will need to be formally revised and approved. Thanks. - - David A. Rupp, P.E. Utah Division of Radiation Control P. O. Box 144850 Salt Lake City, UT 84114-4850 Telephone (801) 536-4023 Fax (801) 533-4097 Email: drupp@utah.gov >>> Greg Corcoran <GCorcoran@Geosyntec.com> 912512007 5:43 PM >>> Dave, I will be traveling tomorrow to Blanding, UT. You can reach me on my mobile phone at 619.279.6333. My flight leaves at 6:35 am. Greg Corcoran <GCorcoran @ Geosyntec.com> Dave Rupp <drupp@utah.gov> 9127l2OOi l1:17 AM RE: DMC Cell 4A - GCL Hydration SC0349 - Technical SpecificationsF O927O7.pdf; SC0349 - CQA Plan092707 F. pdf "hroberts @denisonmines.com" <hroberts @denisonmines.com> In regards to the water truck measurement, although it would be a good check on the amount of water applied, I don't believe that this is accurate enough. Water trucks typically do not have a means to measure the water quantity in the tank, nor is it feasible to estimate the quantity in the truck based on a site gage (1/3 full vertically will not equal 1/3 of the volume based on the tank shape). Remember that with a 2 hour window, the contractor will likely be hydrating smaller areas of GCL to make sure they get covered expeditiously, which will require smaller amounts of water. This will be very difficult to track with any level ofaccuracy. I think that this will just cloud the data with respect to the amount of water applied and would not advise using this method. Regards, Greg From: Dave Rupp [mailto:drupp@utah.gov] Sent: Tuesday, September 25,2007 3:51 PM To: Greg Corcoran Cc: hroberts @denisonmines.com Subject: Re: DMC Cell4A - GCL Hydration Greg, Thanks. I will contact you on your figures tomorrow. I am here at 6:45 a.m. if you wish to contact me early. After internal meetings, an additional field control measure we need is for the volume of water applied from the water truck to the GCL area be averaged, as an additional check to the can depth. This volume over the area applied can then be compared to the required application rate, to verify it meets that minimum rate, and then if deficient, necessary additional water can be added. Please include this task to be documented by the field qalqc manager. - - David A. Rupp, P.E. Utah Division of Radiation Control P. O. Box 144850 Salt Lake City, uT 84114-4850 Telephone (801) 536-4023 Fax (801) 533-4097 Email: drupp@utah.gov >>> Greg Corcoran <GCorcoran@Geosyntec.com> 912512007 4:19 PM>>> Dave, As we discussed in our phone conversation this afternoon, Geosyntec will require the contractor to moisture condition the subgrade in an area to be covered with GCL the following day. Soil conditions will be moist to no less than I inch from the surface (i.e. the top one inch of subgrade soil can be dry). During GCL hydration, Geosyntec will deploy a small can on the surface of the GCL to measure the quantity of water applied to the surface. This testing will be performed at a minimum of once per acre of GCL deployed. Subsequent to spraying the GCL surface with water, the contractor will be required to cover the GCL with geomembrane within 2 hours. Based on pan evaporation rates for Mexican Hat, Utah (closest weather station to the site that reports pan evaporation rates), a monthly average of 9.37 inches of pan evaporation occurs in September and a monthly average of 5.52 inches of pan evaporation occurs in October. Using the September pan evaporation value and assuming that evaporation occurs during the approximately l2 hours ofdaylight and halfas much evaporation occurs in the l2 night hours (18 hours ofequal evaporation during a single day) and a total of 30 days in July, the estimated pan evaporation rate is approximately 0.017 inches per hour. Over a time period of 2 hours, a conservative estimate of water volume that could evaporate from free standing water is approximately 0.034 inches. Calculating the amount of water necessary for the hydration of l47o moisture content GCL, with a mass per unit area of bentonite of 0.75 lbs/SF (specification requirement), to a moisture content of 7 57o can be performed as follows: (157o-147o) x 0.75 lbs/SF I 62.4 lbslCF water = 0.0073 ft water = 0.088 inches of water Adding the potential evaporation of 0.034 inches in 2 hours, results in a water application rate of 0.122 inches or l/8 inch. The target value will be no less than l/8 inches, or approximately 3,400 gallons per acre. Please let us know if you need additional information. Regards, Greg Gregory T Corcoran, P.E. Principal Engineer 10875 Rancho Bernardo Road Suite 200 San Diego, California 92078 Phone: 858.674.6559 Fax: 858.674.6586 Mobile: 619.279.6333 www. Geosyntec.comchttp ://www. geosyntec.com/> [cid:imageOO I jpg @0 I C800EE.DCBA I C20] This electronic mail message contains information that (a) is or may be LEGALLY PRIVILEGED, CONFIDENTIAL, PROPRIETARY IN NATIJRE, OR OTI{ERWISE PROTECTED BY LAW FROM DISCLOSURE, and (b) is intended only for the use of the Addressee(s) named herein. If you are not the intended recipient, an addressee, or the person responsible for delivering this to an addressee, you are hereby notified that reading, using, copying, or distributing any part of this message is strictly prohibited. If you have received this electronic mail message in error, please contact us immediately and take the steps necessary to delete the message completely from your computer system. GeosyntecD consultants 10875 Rancho Bernardo lload Suire 200 San Diego, CA92121 Pl"t 858.674.65.s9 t;AX 8-s8.674.6586 \\,w\!..ger)s v t.t lcc. coll.l 20 September 2007 Mr. Dane Finerfrock Executive Secretary Utah Radiation Control Board State of Utah Department of Environmental Quality 168 North 1950 West P.O. Box 144850 Salt Lake city, uT 84114-4850 Subject:Geosynthetic Clay Liner Hydration Demonstration Letter Report Denison Mines Corporation White Mesa Mill, Cell4A Blanding, Utah Dear Mr. Finerfrock, Geosyntec Consultants (Geosyntec) is pleased to submit to the Utah Department of Environmental Quality (UDEQ), on behalf of Denison Mines (USA) Corp (DMC), this letter responding to comments provided in a letter dated l8 September 2A07 from Mr. David A. Rupp of UDEQ to Mr. Harold R. Roberts of DMC. For ease of review, the UDEQ comments are repeated below in italics with DMC's responses following each comment. 1. The specifications be revised for wetting and covering the GCL with the FML expeditiously to avoid evaporation losses. The attached specifications have been updated. 2. Consideration be given to adjusting the amount of water to be used to hydrate the GCL and subgrade, considering evaporation as noted above, as well as subgrade soil suction, per the enclosed article by Daniel, Shan, and Anderson. In the FD-3 demonstration, water losses (using the direct watering method to the GCL) appear to have been experienced, i.e. the hydration may have been lower than anticipated, from the amount of water added. Also, in the FD-3 fieM test, the subgrade appears it may have been pre- hydrated as well, .from the effects of the pre-hydrating the subgrade in the FD-Z Jield test. As identified in Table 2 of the UDEQ referenced article by Daniel, et. al. ("Effects of Partial Wetting on the Performance of Bentonite Component of a Geosynthetic Clay Liner", 1993), the water content of the bentonite at vapor equilibrium would be expected SC0349.Response to Cornrnents.200709 I 9. f.doc Mr. Dane Finerfrock 20 September 2001 Page2 SC0349.Response to Comrnents.200709 I 9.ldoc engineers I scientists I innovators to be approximately IUlVo. Based on this article, a water content of 1457o could be attained by direct soaking and adding a compressive stress of 14 kPa. Since the application for DMC Cell 44' has no compressive stress, the approximate 987o moisture contents observed in Field Demonstration 3 (FD-3) appears to comply with the water content - suction relationship. Based on this information, DMC does not believe that the underlying soil subgrade reduced the moisture content of the GCL. In addition, given the short duration of FD-3 ( I day), DMC does not believe that the hydration of the subgrade soils impacted the FD-3 testing, as the one week sample from soil subgrade hydration alone increased the moisture content of the GCL by approximately l27o (26Eo - l47o dry GCL). Lastly, the Daniel, et. al. article indicates that soil with a suction of greater than 15 bars would not support vegetation, but would still result in a bentonite moisture content of approximately 50Vo. Soils on the site were supporting vegetation prior to beginning construction of the re-lining project (vegetation has been stripped and removed) and will be moisture conditioned for dust control during construction, which based on Daniel, et. al., will result in moisture contents of between 50Vo and 1007o. Therefore, DMC proposes to wet the top surface of the GCL using the same methodology as in FD-3. This methodology will result in GCL moisture contents greater than 50Vo. 3. As per item 7 of our email to Greg Corcoran of Geosyntec from Loren Morton of DRC dated September 4, 2007, please provide the lab data used in making the permeability vs. time and pore volume graphs for the four MCs tested. Any additional completed lab data since the report submission is also requested. Laboratory data is attached, along with the final report on the permeability testing performed by TRI Environmental. Mr. Dane Finerfrock 20 September 2007 Page 3 If you have any questions or require additional (8s8) 674-6s59. Attachments: Copies to: SC0349. Response to Comments.200701) I 9.f.doc engineer$ I scientists I innovators please contact the undersigned at Revised Technical Specifications lrtter Report from TRI Environmental, Inc. dated 19 September 2007 Geosynthetic Clay Liner Permeability Data Harold R. Roberts - DMC David A. Rupp, P.E. - Utah Department of Environmental Quality ry T. Corcoran, PE ,ffir- III{EY*:,}Yffi*'J-' l9 September 2007 Gregory T Corcoran, P.E. Geosyntec Consultants, Inc. 10875 Rancho Bernardo Road Suite 200 San Diego, Califomia 92078 Phone: 858.674.6559 GCorcoran@Geosyntec.com Subject: Results for permeability of the Bentomat ST GCL for the Denison Mines Project, (TRI Log #: E2279-43-02) Dear Mr. Corcoran, The intent of letter is to provide you with the results for the compatibility of the Bentomat ST GCL with the hydrochloric acid solution for the Denison Mines Project. Representative specimens of the Bentomat ST GCL from roll number 6836, were selected for permeability testing per ASTM D 6766, Scenario l. Specimens were pre- hydrated with de-ionized water to target bentonite moishrre contents of 50, 15, 100 and 140%. Specimens were allowed to equilibrate prior to mounting in the triaxial permeameters. Upon mounting in the permeameter the specimen was immediately tested for permeability without back pressure saturating the sample at the client's request. The cell pressure was 80 psi, the head water pressure was l7 psi and the tail water pressure was 75 psi. The specimens were permeated with a hydrochloric (HCl) acid solution with a pH of 1. Permeability with time and pore volumes is presented in the attached figures for each of the hydration conditions. Individual specimen data are presented in Table l. Table 1 GCL Specimen Data Parameter Specimens Tarset Moisture Content 50%7s%100%140% Initial Diameter, mm 101.6 101.6 101.6 101.6 Final Diameter. mm 101.6 101.6 t0l 6 t0l 6 Initial Thickness, mm 1.6 1.6 7.6 7.6 Final Thickness. mm 6.9 8.6 7.4 8.9 |ll,i, o/o t9.9 19.9 19.9 19.9 @c-Yo I14.0 122.7 r31.3 136.8 219 168 196 161 n 0.85 0.83 0.88 0.88 Pore Volume,ml 47.2 51.8 52.5 63.6 K* (cm/sec)5.9 x l0-"2.3 x l0-"2.5 x l0-'8.2 x l0-" Sincerely, WWffi!^ John M. Allen, E.I.T. Director of the Geosynthetics Interaction Laboratory TRI/Environmental, Inc. 9063 Bee Caves Road. Austin, TX 78733 I 512 263 2l0l I fax 512 263 2558 / www.GeoslmtheticTesting.com cf,rr"", Denison Mines Project TRI Log No.82279-43-02 l9 September 2007 Page 2 of 5 ..t' @ o% o o o o'= 5 psi 200 300 400 500 600 700 800 900 1000 Time (hours) Figure I Permeability with time for 50% moisture content specimen with pH of I HCL Solution l.E-07 %o l.E-08 Permeability (cm/sec) l.E-09 LE-08 Permeability (cm/sec) l.E-09 o ooo ,% oo oi=5psi l.E-10 Figure 2 Permeabiliry with pore volumes for 50Yo moisture content specimen with pH of I HCL Solution l5 9063 Bee Caves Road. Austin, TX 78733 / 512 263 2l0l I fax 512 263 2558 / www.GeosyntheticTesting.com o Geosyntec, Denison Mines Project TRI Log No. E2279-43-02 l9 September 2007 Page 3 of5 t.E-08 Permeability (cm/sec) l.E-08 Permeability (cm/sec) l.E-09 oooooQo ooo o cooo t00 200 300 400 500 600 700 800 900 1000 Time (hours) Figure 3 Permeability with time for 75Yo moisture content specimen with pH of I HCL Solution % co o oo o ooo oooo =5psiIo' i + 0 Figure 4 Permeability with pore volumes for 75Yo moisture content specimen with pH of I HCL Solution 9063 Bee Caves Road. Austin, TX 78733 I 512 263 2l0l / fax 512 263 2558 / www.GeosyntheticTesting.com of,rr"., Denison Mines Project TRI Log No.E2279-43-02 l9 September 2007 Page 4 of 5 l.E-06 l.E-07 Permeability (cm/sec) l.E-08 3>O r.s-oe-] o o'= 5 I _E-10 DSI 100 200 300 400 500 600 700 800 900 1000 Time (hours) Figure 5 Permeability with time for 100% moisture content specimen with pH of I HCL Solution 1.E-06 t.E-07 Permeability (cm/sec) l.E-08 Figure 6 Permeability with pore volumes for 100% moisture content specimen with pH of I HCL Solution OC o 9063 Bee Caves Road. Austin, TX 78733 I 512 263 2l0l / fax 512 263 2558 / www.GeosyntheticTesting.com ?ryrt"", Denison Mines Project TRI Log No.E2279-43-02 l9 September 2007 Page 5 of5 l.E-07 r -l^ol\2 o o o o l.E-08 Permeability (cm/sec) t.E-09 o o o o'=5psi 100 200 300 400 500 600 700 800 900 1000 Time (hours) Figure 7 Permeability with time for l40Yo moisture content specimen with pH of I HCL Solution l.E-08 Permeability (cm/sec) l.E-09 Figure 8 Permeability with pore volumes for l40o/o moisture content specimen with pH of I HCL Solution 9063 Bee Caves Road. Austin, TX 78'733 I 512 263 2l0l I fax 512 263 2558 / www.GeosyntheticTesting.com <a>><aa tzal ?: $ $ q:3 I F3 =agE'sFFr diFe9.43*gPa d *r* -=r^=-r=o id?i-J :J }R$N $33Se ez :'-sfo@ooo N= Y roaOO)!!Co5!-{ f---t 5st-' ior!<oriog<C'u 9 9..P a Q d's m3a;;9pi3'<<9XE;3dq 6:ar =!! o = P(:€9o =-XE o o o -{f -iio>e @mz o = U, oo !m7 =m ID tr >qifo9s =17looo No c o ri!bob,qN!rf : ; J 6N)uso!a@5 '' !6J6 E+Ed'd; :oo. l!{^ !{6bb !ooc ,'n Df, D t)Df @ co !3 J Nlo Pc !! Pi No ac N! Co co a co 9 P 5 N co !c P 5 ooo ! co , F 5 , P 5 q co o co co a co O co co co P 5 co :J O o i$o {i!o ::oo IOo 9 o I I o oiio I@o o6q i!c o5o 9?Nu Ioo ? I f5 s4aO :Joo !9o ! N IO@ 6q L;q oAo Oi$o =3 :{N {N {i!oio o Ao o bo o iD P6 P@ Po oi,d o i.J oio q io , ! I sh{I !,! n o bo !h@ oio o P vf3oE3e @ !oa 5 ,O i\) Io Ia !!9)N 90!A o @! N !NPo !o !NIa NIo NI@ N @ No N!,N i! a33 -{EoaI=!@ I !Do {o o Io I&f{:{N @ A P6 P6 sl !,6 5 N b, Niu U D !i)Do f,P ob,o rdBE 4e-r 3 Nso @o qc a c N@O C G o@!o 5oo @oo GoG N Na Cc qc Nc o ?-{trj=o =oo @o o!o !o Oo oo ca qoq o a o II NN NN NN I I I!$u !U !!N NN NN NN NN !!!!NN Io f 9l f !l !f !D No 0-ooo3o! !f! s,NI@ NN bo I!,f I Ia @s NN bo !,t N LD !Oi,!5 Po o b, :o v{,N N ir fb Pa Eo =i 3 h(o Po lr{'5 o{N io N !Dq ),{D! ! !n!,a{ NoP N@p{ N P@ @P6 o,o,b (os,o {o {\o@ 5s,o NN! ,b {Nn N f E+!a-o= u ! NI :! oIo o!,{ o6o,ooNa ! o o{o {O {N u:N @ i! oNi) o 90N oNb o O oP oI! o!b 5{o DD 9 DD,,!{oPo qo \q l{o @ !o !c!o @ b)o l If {oc o{f a{oo ,j i,o oo o P h lI)I o fE)No 5!o f,f l c@9o-D 60t o )f, {@b !oo o,{ \ Lo oPo qN b, a{N Ln o o )a,o {5 O5 lso o bo f,,No Pq cn )n f,3$: @{ o soo !o b, o. oo Lo N@ b N@ 90N @!no @N@ I @:q \Ni,!)!No ! o5 ! irc :)))s,a qc I@ P f ! pQ c;aEi Nb,bo oa,Po N I sb ao @b @ o 5 o , N )$N N o )o f ob D 3 ob f, f f <o9rEco, OE@- N oo N o NNN @{!so fl !f)!!o @! NO@ NNN N@ 9,D ! f NA N5N N N N !!$No No No o so = IoT] fb !r!@mo@ o i\)NmL @ ioomo@ bamoo s, q mo@ boomo@ !! TI l! $ITI3! 5NmL @ !!m O@ Jomoo b@mo@ I n f Nb m Oo bomo@ @ LDNm bNmo@ i,mo@ Iom o :{ mo@ P!m O@ !, m @ 9e m @ 3 o I,n)D nTTI 3! ToTI)D !mo@ !D@moo obmob !n)! -,tTI)b P moo mo@ !m @ A moo r!TI) !cTIc|o on :)o !m! @ !iom o @{m i,mo@ @b,m o { TIf {mo@ P moo (o i$mo(o x ^D =N Es-o b 9@ b bN bO o ;bo bo oioo bo b@ O @@ i!u f,)f bO o I@o bO POO bO f,D bO O= o<{\ <a> > <cD@ r=a19qd 6 sgg SsgI =- P P -r J A 6 - -; Isq,f EE tAE640._3,_-qgB_ id **:i@_ = P 6' .-Yo id=J -3=l aSsN^'!l . \, {iOAi s? =S\oo@NbP- tn.* IiBqE:i "= 56o0 o o o= oJo)N -{ osA{ Ft- t--!<or,log<c-o 9 9.-Q o ." ; o mo ci o lj - ) * 6 u)2€dl f Yq;o 5 = i 9o.oc a 6<€9o o -^ i.o E-3!g o o -Jtea'R (D mz o = CN{oo !mv =m (Dr >rD-{3 B€o)Eoooooro N(J|N) F-I --sbotri.nNP-N ,'-9^oo)oo -{ rs! -n4yiooco@-4@A-_t; !9. s!-tl'^{{ooo !aoo ,nDJ oaoo aoo tco c c o Pj N6 co No co N! Co !, P 5 No c tr P N5 co NN tro Ntqo Nc P c !Itro o co 6 C o Co 5 Co c co o o co : c :NO Iaq :l5o )'oo !?oq I I!3 9.) q !foo i.5o + o I9f oo ivo T n 99No II,P o IOo !4o !o o56 @q6 3o P Pa o o @ l.)@ P@ No N N NN io @ o b,b)ir CN bo a33 oEaO9t=@ NN Po 5b,{N I !Io o J ! T !ro N! :{a N@ ! N @ N Ln !o5 I,o N N !!F v.rIag 5'E@ N th , ! !n N NPo @ 90 No ! No !I ! @ P!N 9DN T,N@ ! I io Po Eg$o o @ n oo a!o @!+Go o6 o5 5oC 5o NGC o oco O) 5N o o5 o o N!oo f, -ro5 ='ogo o oo NN !!NN NN NN !!NN !!NN NN !!!!!!NN Nu !f NO 9l f No NO !)o{o@@3o! NP@ N @ !No NNo N!\)@ ! 0 No $I ! ! ! 3 @ i@ 90 ,,! ! !Po :os 9oo ai, N i$I@ oo^=rdd-r 3o u-.t sdo hF tr 0Ds{ :r ! A ,r3 o@s,N t)aI5 ,\) b f{I $!$! N(rPo uD0 N(,!o, @ 6)P@ 5l$o !NO Itr,,trN 9 Nluo co E*E q:{o Io o @ o FoN o ! o:c,eo =o J Ns,@ @ 90N NP@ N NIN ,t N 90@ a o ooc oP o !6 oos o 9ro o,,oPo !o ! f,90@ f{o ! o5o 90@ D,!b P@ I@ qo i\)q I@ N6 ,n Noo I o IN Poo f PNo (, @9.o=o99r66'f !sP@ !I ! a I!@b s,a I@ a!b, oo I@ P@ !,!o o @ N6 f,N Po o LD @ s a>a39c3io{ PA @ bo ! f 9 o bl I@ i!9@ @s,o o 9oo o io @No !Io Io NI5 :{o Io b)I Io ,o =E{e O !o oof !oo { 3 tr T{t!o A f !,qo $ul oo o,3{o a I @ 3:! )f,Ioo 5fI f <o9rEcoJ=ildo:O- o oo @ ao !D !@ o!@O o o o @ o!@ @N @N @N @@ o ooo6!5 5 11 cD !@moo P@@moo ! !! T1 D, .!mo6 PN m @ , TI)! !D mo6 bNmo@ Loomo6 I!moo t\)N@ oo P m Oo N@@m o .amo6 b@mo@ aDTIco !TI fo ! Il 3o bmo@ o m o b)m O@ N@m o o oo l.)omoo ,TI f! bomoo !,om @ 3 11 o mo@ TI,! t TIf! 5mo@ Nmo@ l0m Oo l$Nmo@ f TI f)c snTI f,! .m O@ bm Oo P mo@ , TI) Nom O6 Jm @ o5m O b,m @ N@m @ $ on)! ox^p =N<o gE I@ c oo bo O!.o co!b I ! )0,I!Dl fj f IOo IoO Poo POO O= =o:{oN o oO bo Oo o@ (D mz{o3 {a{oo !mn3m ID tr+ IEqioolF5=.!ah9.oo6o :lt :rt qEH H FEE=:: o o ;J J =*6-aa=PP>6d----6c,r<9,5- =E,:i Pa;)C.9 -esu:e 3R$Nd:J, :osY oa 6\o o6'c o o@r(oor Ns<b in i -@! o Y' Y@o)(, o) (, Noo)N a o5(o sg5.EEEE#9€rs u Y8*d 3si ed; = PP:€9d 75:!'0-d o -3+ljo>R 5: >rr-J = s9qN)o--ro Nso F9 pbbi!a N 9:{:' 6 - o(rcoN(o!(rs@ -nTBooco@r-@a6; E9. 5-.l--ls::ooo o o)oo 5 of o (D6a a Co l P 5 !o 5 !! P 5 Na co N co N@ co NN co ! 5 co @ PNq Nu Pau :oo Il,I q , trT Tf,+Dl No No Iao I 3o D!90 )@ :{:{,o P{,,!Io N Po vJIsg== @ f a o Lo O O Io {I !, ! uI NP! ! o ! v vI8-r E 3€@ ! o irc N NIo N l I D @ o o ig$ @ N(c o!c o!!o oqo o O 5ooq o@o O@ @ l a<o5=o 900 9 !I !!NN NN No !f f,f If,vf,vD o -.,1oo@Jc)E P I@ NN ao NN bo NN bo N:{q Nu{!Ni,Do I,f N bo c,o^==od:3o !D ! !,3T !I, f No! tD Nstn @{o5 i\) oPu ',,a A{ bo ! D gri oas3s, l oI6 Po N!r I6 o i, o 906 oNo o 9no oo ol{ ! N )I, 5 o @o I N 5 id Nbo oi,o ot,o l, oEq.o=o-99r6 o-'{ ao !@IO qI! aai!s,! i$s,o @ !-dEzqr-f o@J N,w !,o o i! aNi !ob o@ bo NO)!@ br oA sro I =:li @bo ,,)n ff !wo o@ o !o o I{I o I o Oa o <oo -cEOI =r=doE !o 9f @ {O @! N o N o NN NNq NNo NNo o oq l.)o!mo! N bo@mo! oumc! I ! I f,! t,omo@ ! bomO@ 5mo@ NAmo@ Nom @ iDmo@ N.N mo@ I 3 o Pom ! !DTI3{ 0 Dn)D ,)TI))c I)TI f! ! bom (o sbm @ N5mo(o twumo(o i!m (o N i.Jmo(o N i.Jmo(o o-^o =NgE bo bo Ip bO .! No{P o P O O= =o3=l oo -?a1E E3 49_Ei.r9godO *trt ESH H FTS=:=o o -aa=eESeFEEP6d----6'of(9-_- =E',X P 6 -*=m= Xf (, g BqrN?;':d5S:a oo o\O =No 6', o N@Nb ^.' in .-!Yo o Y'5@! o, 1- Yo@q) (D N (,'.1(ON --l CoS(,oa --o<(] o o5<s:3,8a3d3 2.?dfl p YqFo 6'= i 3.o. oE @ 6<€Q o E-H!96 il e5+ {ioS r:- Emz{o}PJ =!Y -D -{Aig @d'a 3 -.t*fra o- io C):vaE.T mv =m @ 5{{ Ia:{: =(roo { o)(ro-{o fs(,tnbps+. lu 9lP@@(O(O'-l (OOCo oa {,a 3 ,'n DJ nnDf P 5 D t, 5 o !! P 5 N! co I P 5 ! P 5 $! P f N c qo :o fNo :i):hh PfI I q I sloo I l ?!i$9oq I3o N 5 Nb f,N ..c{9{P{i! 7!8 o? se -a a P i$ @ o b,t 90 NI@ N bo !o 5 Na{! ! N i$g +-' 9oa N !ro 5 !o 90!s,!!o No io b,Io ng$ A6 5@q qN @!o o!o,oo q5 ooo o@o o@ 5Co o =<E,J ='o3.3f !!NN !!u!II !,No sf No af tf !3 o{oo@3o! !!! NI@ !I u!F 9$ ! N:{o N 9r! {$FN I,) !tr! Eo3Filr-i tr3Ir, CD@ @ ,,,)) s:D{o I,@{oA i.r r,6 iI o)!,@ .t D aE!e;E s:o o!,N oN oIo oNo o,!,, f fN o66 =oa NIo 5IO oI 90 o :o,o qo Poo 6o s !T oo @ os 3! l, c@eo=o 60u o!o s ! o !!,o q s,sro !,!P !u Io -i35 da= ='6o5 o!NIo oN@ {I o)$on NPo F :@ sn! 5 =gr E I,@o,(jo {s-.1 ,,)s = ! IN(o D \) f 0 l)t <co -cE6:t6:o- ,t so oN {o@ {!@ @o !x{o 6s9o, &uomcb I Nm O6 :q mo@ Psom O6 !, m Oo .mo@ iom O@ N{mo@ l$Nmoo 9o{m o a mo@ x o oo 90Nm(3o ,oTI ! ]Nm C)o p Nmoo !, mOd .mc)o ts!TI o IJ!mc)(o ITI 5o 90-.1m O pEmI @ TI5o o-^orN<o 8B* @ f{P@s I@@ )0! I@o f 0 9@o I fx! Ia O= ===oP( -L.-t Hoo3;G-E{ =+Oder sli$: g E I EE3 93. == = * E ps a= za YUa'F#rsY:zo=sL o 5 tsvr ;:! *iia x ut* H 6l-- \ O[ 5 -cYg G ; {d= s.i;OLB.rngt, oo^o'da5(<9-l>Jr.r Fi HCD6c)I ?=56a{AEIYU;' Jv!s<J .? A3 =E -os-9 A = gh o 6E sxtr gF E-5 2 !i6gf {N u* a usiE'!-z'^q>a UHA ?12i7 E\=frTi i =;;f '- ozEb-= 3ireEU a' IEEgF i| ;c-, LlY"r= F,*iv>:.2.iX") Z6 EX= oH mmx3 = @mHE E. oo=.TEEo E_id,6 3 5'* q5"i'D@= HUP @<- q96;EaoiY ::roFX ='='&s Ed=-.- { s3 doe-Xo d6' ;i 8-o;?JO<a ;oo: @Y =d 9t i I Joc o ; o oo I I z qE SEgt ,-o€ trr* lta, s€!'i!+gcaoq 9F* E-3 3 x="oi=E ; ! r; r3 : S EErASoEIiE 3 E EE P:eqpe--16'XA.:EE;2 --Aase.r?:u-, = 3 €;5Ik'E ; i ;;iga E t XE;EE E E €;€g,; i ! i;! bE * E U.e S 'E I r EE' ci5 E s EsEEg E B EETEE E € EEgEi n E id>63r ; R50 S orf > ff 6 i ^i d; + dqiU t e=3€4 ..: g f .e*E € 9 a ESa V r gF r EE: t B E j - Ec9 @ E ! E !.95 E A 7 E $o i ;E3 E 3 Ht :EF. s EEE .f .;E :4 E ,P,iE E;,i3 5[; EEEIi I€ E4E sEer =!tsEE" ; i' E; ;' .E 3 [. E zZ "?x * 'EE H€€ EtsEs r?rE =3 E EE=* Elg *B;E$ sE -Ezi F tBgEiE Fs;€E qEEEEI 1=.egE iEEHf EEEE E-5EA;EE €a= ci" E rli ggEt F;E ki ,*s = E?';E- * E5;t;EEEEt$E€;;$g Vss2G. E ai H $ E E 19; I i i: ! I I: f E5 aE, ui e 3 y E €u E 3 3 3 € e e I 3 I uu F-Is EH = 5 5 a Ei .E !.E E E E E _! E 1 ;6 oct6 &; I 3 s + Et = ? = " d 6 6 6 6 :, =t "=6 5i ! !i iEe-i'ZZZ! Zi-EZ-EE F EE :E,l i >F } F .E EEE E En* E,^-,o r;Gr;.r!i=3: i ;E E.E49, _2r!ryO <la(,)<Ol L3= : 5edtrNL2-=-ioE.EE,.E.E6iS EEEE Ef, ? E53 E'Ei.Ei Ffl. g 6 eEE*5€E?iit3.EeE $EEE>=.EXH;Eg"FEEE=iEf:E'zEg:€:,€3EgAE;aEa66=fl6fiaAi36338 5 l ! I ?. 9, ohooohoeeonEc-N6oFNOOeO€eOdNFFrFreoootbhhrNNd€rrFr!EHdddNddNdoooeooooo€€eoooooe oo0eoooooooocoooo 9099900099990000qqoo@oocoocoooqoooo .2 (, tA (A A .4 q U) .h th th u) a a u) 0 o u)FzHFz l)fr ri,llq F |. F5 I oE n :- - F p:, ; rg€iiEr*ii 5 il EBiiEi ustrii Eai Ei E,i"iiEiili?El i EEE13 :iBial;isieiE iffiiiilEEEEEiIEEiiEiEElEiiEE EFiETEEEdi I gE =si Er;E i itl a[ E 'riV|q-$ii 1;; ? :, *eli iri +: cii 5c 3 z?irefli*-rs? 3 ==?xi iaZlA ts; Et : ,Es;i;3:8=il B EAEi: ;q5A'.: 3iE :9 33e=--?sEeqa 6' E,iBE +iagE e3? ii 3 a I 3irBFii'lI i EE"$ig' i;+; I iiE ilf F f 'zlBE,a*;i!3i P fra'EF* ; irr+E?giig Bgq;A3 iEiig€;E?+.E iie;F-€18&=3 E rEgfs :FEFX .-: is ="=Isiil9e,F E [jEFHi ses9fl ** E 7 P 33 ! SO ! t+H.ar; 3iEulD=.n;+-iIa fE -q,*E Fg 39ErfA++ ii'I.idr'. B3i e,"c E:F E ax= dist [ 5 iaoaoa i6EF9BI ?! - -1q !.9E *q =i Ifl;3;c sE< +3; 9.lbor' =x T^.2 .) a-':?iz9 E,(-16Ien IY:3;E' O;:,x i; pE - +q r)30="65-F:P d- Y.Y grH 3 +; -u-.+o i 3a r9 olE d3 el9 2 a,E<-831 t65'Cq- o :' d-92i!=[ q .5a r'E XI xxds i! t:!, I { -:EO:'!n9OpOE EEii EFEEEi EEgi Eigi SEEE EEEE EiliE gi E ;€ri33r+i1 if kX=? 'a'ii;ii; ae?li*1+? ! FEEr'ztZ"tEs !+ ii€ :ei uFtl;-sBi ?;aE a gEi Eeelli E; iii ili g*g FiiF iiii i Ei i t[;;iB E €s l g€5 :;ci ?,;i E iE l i alA rir:ei 3 a?-Z rii iiis Eca icFF i E;aiFa;:E i gii r,iEE?i ii5 E;33 s i:i aiiili i Eff rre g;Eg ;Ea ici: E ii;? aErlr, i X;i Eli a;; Hcq 3s'-; 1 z iEi Ei3iE i s€i iEi Eii l:E i+il i ' 6 o :-- zrl! oo> ,ooo >z{ lil A d: ,?3 z-tq .) q 8 J 2. o -,] ,, P 6;6Ba{ AE J"3 o E =r3*;6EA-:--*3:e',:?7 2 =9.: : o a :d"-:S= 6-r: a qo;t *Bc \ .. *9 qs95=ts= da3 ? : \l' ' e.5 666E ,.-o L'o 6E€9='.i o9;. o1 z a. +r iZ =BE-E'fi:E:9d g EE9Ai;lE x- = e :'i; Edc tr 5dr i E E,ttroP e g sY I i@a=EsEE 3soqoc; +l'io.-U6i c 9E>-eE i X9- 77=ij.Eo5' -E UE5 b-.!E u9UE:: PF7i= O@ ! 6 q {U .E fi YE, o z & z i :r oI,iz F- o a FJ J Iz ItiFh F Fld &t,Fz .: { i;= € E;E 13 :3 EEE;;! ; A. r.e L ai^ S: EE 'ahEd= ' a: soE o .Ei.e .-= iE H[EE:= A Zi i?-E 3 SE; ;E g; EEE5EE U i5 EEs = =.,!; E? S: ii;;€* E ;i e;i E HEa :E c; ;AEe;a t ;A' -.;B ' E:l €; 3i =2.6=ae e ;5 $Bi ? i5€ EE E'; :e!:eE E :"a=? - .1.> 5qo .59 --=ro= E 6>*ll g *cE di of :i+3€5Ze! + l.-E Ez E4 ;:E;:i ;A EH;i s qE; il E: gEgsgi €E 3Eee + .re E6 c+ :IEEFE EE Ee;i ; g3s fi i5 irfeii Ei E.,s; : iEi iE 5E E!;i6g 1g i0i! "-e;a, E iE!: Ei i*u g?EgiE Ef e ;iI; E i :EE, iEi EgI i iiEiEE iE ;;>9?" '1 = _M?! -:d 21 F opYE,bg E! 5:"oEEy:; -EErtE:;EEE t-EiaEE: >Pd' EEil ?Er E;ii; Ers EEE 5 Ei;:i!- €l =ci srsE E EE i EEEE ;El Eil i 5;E;irE Ei fisEEF E ;E = IEEE z:E d9!- b 9E;?;:E eE a=SEs; E sa ? EEl? i)=4 EEE ? IEE;"EEE Ei ;E2-z.; E" 8< d ., E< @ e 60q.:- I IE a6 oi 30^ 7"d€ OE i! E o E o g 6E >O e UE s s €.9.E !g!I! i ^ o= C o^.= q r --di Uo!-_uP'"!9e:.= d o.= alP -E.> -;: d -@E,-EEs': o o e eFE*irE€. >€ E E E9== 3.E Isai€ sf . Ei€.?;! i :a:EEEe ;e;;,qE9 r 3:.A;6+ Pa;e€ 5= aE o - >:,, Y .? c= E! o.{}EE} i a o Y!_, .EEE aE $o .9 9 zq -=;- P.046- 5;i Es5icIv 62E >;tz =.IlsOI 53P' i ! 10E', d od s r u! F =! u= o ! o.i= ! oE c u rE€=EEE €;5E:E< ;;EE€EEr €; I;;iEI EE€E$fsr BiE!ii; i'g r;EiiE;EiEiEEiiEiaEiiiEE iiigff ilia;siE ;EiiAita E;E-zzo,Zr":- xEe:piiE E€;E"gEAg 1:Eij;sie ;r$:a;;s :rEEi;a; ;:: iE;EEE- fiIEEEE€ EEiEii;F EEi E;EEsii :g:i;EH: ;:iiEi;l i:; (J ;ee r3:S 9 - E+EoE EE$ e!Ei euH f,9=x 5 E -tx; -e5"E 9HE7 Yo, 9uE3 Ee= S;5gi? : tiEi. 3EE J- 9 E 9 E 5€ g f E t" cD..! : 5 =O-o''=t*3E ErElzc. ile4 t- E O4 F,Es. EE; SE sE zazs"t.b -3.9EI-E'b e=d E EOE e= 3a ;: ,. ! I d 33 g'i.E E: H€3=I EE I.E;E; ?2Eloc io 6€ 9.! o 9,€ He >E: E E : C€: ., L 9lFqv& D FI cFz () r -: i; o :iF U a tr "g -F aiair a:; = ?€Fieiia aaaii:; e= riE E il i Ei;iE *?ii 1;istiiZ ellttii i; +iI E ii iqk;?= +EE Z iaili:Cfs"iEEs*I":- {? pZl,2 ?=*sgi !; g p?ie5::a sa:Eia €a g; ; ?;f?i? E. i =1;;;=i= rIi=ez E Ex t{-i-r ;7 a =7ga€43: iigii2 ; ?L gZfr*t; ltii,* ;E;:r= arEete = r; EI E=il Ea;A:igii'! la;;Ed; i€ iE +E lF ii iEiiEiEEE iEeiii ! ii igiiF;'AE uig$E3rEi:ig$*=i: 5i B: eas* e * [+iii i*a aiBig ? r gE ei ?r*fii i+ aiTia:3r ;;:E:: ; AE i: € : +a+ ; a "Ela3!;i i3ii; g q $; ?i ?iiai EE '!Aii=* XiEaFB * Es [5 ?61EE -G i"aiie;( e A.F;l I iE 4,.++In =3 =="Pi372 +Jin3il : ;3 E66bi 6o <i:5orZi 56iiqa= i <a Y E?$F55 ?E EFErl3_s^Bp <i ;;deeLlr; 3* e?S iia++F Ei liiSErilrl i7 "E*;-'<=zG.^ dr 9EaiT3*'1; :l, !'B;S.ESqaB ee daBa4TEEq 33 3gq18 13*s <3 e)?€oE3rc *; =:i i.A 3€ 'E E a v.Egipl]i E !'3 =Fdda: 4- oE.g'Friii r {.:ztEtia I alIEs{i" E 9;1e9iE.= 3 :*i;sfee f, riEBLa-oB 3 ;2s.?.q!E@- = i'^@ 9 -; Eo p Z =liSnI& ; =H'9 rrt S - v o oflEqF! c a=ocsFsE a g':!::3rd E 3;Ed6r:rF a 6'+ sz? ?.-'2 az iii?E!3!'F d^/>.:Y = e 7 i 7 z ar!<x €H 85X'at 3i€3g',; s i ; ; ; g+cii EE itrgz 1;EE36EErtir 3F?14 .. e:=-, Eir{:;i \le-{I # a'*i:-. ia-iau :=a&i o e7=i# ,rEE="E Er;et g- Ei:gr e:3,8E = ; fE?.se 3 EE EEi +rii6 = :-iflj 1 Zil,="H erTBe i79AA € FFiFs sEiEtrr ii+ii i aEi{r ?e-ar eelFE *?lai;;:i32 i: f;i I Ei ii€ l1E E =*a'= o f :.ii;o:-taia s TizL aiiT'aB=g i ;gH* Eiqp, i o 5 < o d; aii.t :iG+io c =-i= =.-51=i-31 a glgr 9Ai=a6?6 . FFa* ,62F, ilE$ + ;etn ieFg53;1 i !i6- d6e-7f E;Eia i =3=E 5:E+ i;E€ = i=at +9A- 2E-?o ^ --6+- 6BFS. ic-la Y eo=.-+*g'z = 7:a4 siz? i,n^a 6 <JA= ;rgo: =-o'Z=' r iE?@ €.-gg 3ciii ;. iE-:a e?!; i =6q; . o'-;5 1.9= !E tu2i 2 2 e o 3 7 o 4 I a Zai e. ?r,. =z J I J J J l z F d(J rl o coU F I AUr (J o Eoo 'e ort E Eo aA ooE El I j J Z FQE] a o c \\r \- 6 a I ! U ' ,Jo ,' a *'l a0< { J::o-.;:E;., i.= i EE t- 7;ez ;:; i! ;: =9122 gaa .a= - -{ sEE: Ezi e: i Ze ,2i* .E.Eg ;* + ;r .:EiE :FQ :: e E! 9.==S+ i6: ==^ 2 za c4za ;o= ax = o€ eiaaT !!; aE \ ;6 :iEEE eE1 EC 2 =6Y*i> gE u = v=,.8 i; i za: c i - ! dEr5C o.i Ja E : -9 Z ei-\,i =.= _: 3 F, 2 i "r-E,id 6;j: ;S I E 9 : t i-?P--3 E"; ;E i ! t + € iE::;: sEf E:- E E s ? - i =1q@:E 9!€ e, .z E f,.g € : 7,U;#iir -l!-- a- ? 2 q !;?sii Bii :E ?: a : E E * :-.d.aEE s:E 5e ?, Z B A € =- E g o :gEAF ;Ei :E E E E i E f E, ! EEtiii lil :; ? E f "a E ;"s i. EEEzl, :zE A: I a i H € ; ; H i*ZEE1 ii; ;z .E : 'i ?- = € i H.E::EE Ea€ J\ F .F 6. ; z, E E E '3 =FE;ii{AEE Et:i*31EI=rli;3!!grclE;EEi;Efioa A'{;;i; $E= Eri ? E s E c r. s -E E :E3f ; eA: ;.r; 4 ,; E E € € € E €t- lfle;2 EEE r'i't i ? a 1 a 1 I r qg FE;E; ;EE ;iE E F , ^i d; + h € r;6o:<ouz< EE € b eE "€.3t il:u-8 E?E Eg Ef gE pE ;F'g A;E; E,e:- =* :si E 6E ??,;E ii"!z !i; =o€ i; e; E E; E4$* E€gEE 3ifl -E: E: E"+t 'r H: i=s; EEfi! i;; E;t:t itB ! - Ez *ecz i;9i? iVi 3;; ;E a;J >-E ig iEEHs r;ais EE; zii'"; 7"2Zi a7 =lZiE EireZ 212 iE5 Ei i' ?-t i; ;s'E.E :c;sg €gE EEE,:* EEi9 E: EaE;! f::l: ;;= €si Ea [iF :* EE EE9E; :IH=IB : a€$ :E? Ei Eg5 rE :g 5 r;E; ilz=ri r, e1i *=; ;€ A:> ie . 5E :5E;E E^=ei 6- >;;u o q EE< 2 E g E; lI.E=i @6 i? a i=3 EAa niEE Ei i Eg i|Ezz =-;!€ r zzt ;os?i lE =z E; 1 :i =rg:51 ?ai!EE =*i:rlic iF?2. ai € €; ;ri;E ii:=E2 irl iel:E EFEE ;2 j iEhio YEZEZ + i:'i ->? =n =z"3 ie y Eyt E:;!H " iiEEc i f Eit *ZE Elg sE3 ir i Eia i,i EE ? EaiE= Ei lg€u cli E;i EE= v Ei ; iE= ;EgEA A r;ia-i E i lEEl l*3 9;i ii i zi= i 'E,EEI:i E i;sg€ i i ;iii iEe gEEE g i i,l e i i Eae i[!EE i 2:=;V i. E E;Ei E;E ;;; :;E gEE E E E sFF;5:E* s SasiE = ? s;E: E;E E€r Es :a"Eo?<o3oo3<diuci F&-<qqqq9L- A - e( o : o = l T!!ILLFH'.lH'lAONrtt ?6!;xv-E - E -e3vY-lYolE'='icEcS2Ca6ta2hFrdp199 z E F'z'l rdzUo tto.l o.z s i6 q-\A i ! 6 3 I o I c dE c c cN o.t oz C a 6 e 3 o 15 o rl z r z il E ip a P PR tr >g I4i;F' ={ a u N - a6 nJ 1 ,- oor I 3 ep riri F, eesp si$ ii r+ir E[ [a i lt igf ; = 3E sEfrEH rusle$ EiF EE EEi$'g 3$ E g[ EEi F;s peE :iE;sBdtsa *:EIA atEZig A]EiE I q + a nrn.5 {ii- a r; EEE E F'iFsEE $ isrs i ii H F[Egl :EA ;i,X E s rrl s ii+t r $s - ig E;i HE; Eie '$ *;E as;ga rl* 8sH:BZ Za-Z E" gA 6 aE1= q €€i as+ 1 d-s asge is; lquais F 3 A? F;ui sfns I ce r iie i +; ; Iii E ai i iB.a i 39 € E+a g Fx ?"i[ +ie a i* us 3 s$ a i7 ? s'9 3 B& €5 - = n fi E ge " ?2 i5 i i; r e t:e 3 Ei iE *1 1g g g33 * E$ it $ Fg 5 t'$ : s? zfr :9 x8 e ts Eg 6 d I 8 o o EC o9 o€ =a.:ril =.=q7a!E-* 6.= *5E! 960 = .. s9.9 I ; .=E ! E ?: EE H .E Ea b, ^ t ?a ?a ; ^ a I '*;q ; u.;- .9i xE I 9q >9 Eq E E,i 9u aQ 3 PocA.10 4OUOJ.i;C) o o: .,E - ,tr 9,- 2 9i ri i.i E;9't d.E = '.- i= s z -t : '; bE :3 2d e Uj.i p; EOY i-x r Y.i tr : '=!< ;.d,v +i dv 'a b '= 6E -6sf, .o > Sj4:.E;H ;; 'ail 3i E-xr '.7 EAP.q : "n bilo H = a zE<r -E€; U€g* 7 -,5 B ;5S= :E3 ?: d _ 9 d -u d'EOOO S:!o c'= E o = v M E,HEs i;:u !se !.- d ., !., u Lc E !- n { 9 s91o,'is:.E E- Hs € Pv.= E t q oE'a2E € 6 U-r" EaE:=,€ E ! E"r ;= d.=oa',G=60; - to!,, I .= EA ; o G = ddai ).-- o- -Ei oc=- ! c i .to9 E d .E- i = !j - i -E =iHEat;$ EE Ei. EEEi;aiE :,s !aY .en.ra a z -a 6:. E id ; e= 3 a a= s ! a I t-: d d ! i \ , o E e.3E;E !; E&! !-,'rp6 -oo .9o&, : -i og i ^i ! e z:2- €0Pz r i:=E Z. iiV1, X u Eia! > xeo Yo: o- .9 d E;"Sv = a u s irE'a I I E ? ='u,q 6 ? d 2 > = i! ;8.=EE ,:E€ SiE:: 5 3 e,? A E.>: EEJEfl gAi:,9 E + b 6'E P dEEE e; > E 3 :-e I?E = 2 5 3 e F ': :"3ee : 6 t : E e E a=gi ,Z 6E=,qE,EEuEi . E p € E t i : e E Ei;E E a !_ ,g : f F E $9s5"5 € a = a i E ( 3 cB 7-.V a 2 c ,, ''" E ; 3 EEcE 5 e : E ; € ; t -i fl=?tsE E € E g €; i s .:e= EE E i q E i E E i rriE€ E E'E i: =E + * s s s g € ;5EE€#rESrt€EiE:€ .orN6ih { E F F 2x]Eg: tz {€ E E E =}E i E.E t AEf E EE = itsE s E t E p -O--nos E ;5 E i"* riE i E EE ; i.s oiE ; E E I E i! Y.9= = 9 E a'6 =E-i L- 5 +2 83f, g s ; E e Xtr o aai ! X : CE rE ;€r ; i ;E ! E-g EE gtt ?. a 22 e z' !e == *.E .a E :; : 0 E: .. E ! i.i- E CE e '- F 37o e i i t E Hr f : E I: ,; sI l*e 4 A * E E::E E -s 4 Ed ! s a -*i ; E +.i E 9E.E i ^ !$,:; E jiE i g ,:E*i3a:€, * 'n 3E E aE * tE6 ? z iha6 'EH€a-E; o Ee o : i E I o .E e ;; * E : a = 2 s = 5 u = 9 A H.aP E 8.' = )€7 a -^ 6 c EE r! zzA -iE:; Z=qE E ;E E Iii 5 €r i * *iEEi ZEgz'?',=g ;C s € u E ai E€E liEg *ig Ea :;;ggEtEEiIi EEEE,=BEi&5 E Ep I f E-i E.- a E;a 9 fl€ E lEd-di EE; ;E?fi :;=sEi.""!c F :;E = E, E & d u zt oa oE E E E C 2 A! .:€g ? :E 6 E- "a? d 6'6 e D. E 5 >o* F F! a e aa F - d 6 I 6 0 @ - d 6 +ALza (J<a<mU a!JJ t O E * OE gfi 9.x += o a4 ?; r= FqE ii E3 d'i 5 ^=. JdE: =9 ?6 eca o- ^ :1b x -I; F <tr 5 !q- ! I€a- n= 5 e6A Ua F ?Pi eE ; ioorE ta E a =s E :re 5E s E6 3= i 9 i=e, ER5.) oG<l ih"a6. =o1J:a:<9-vg ;!l -;53=na; :, :loFd:_3_-.4 J6a160!46O =;; OIE>.lU.)fD>OOt!>qa'r6ieaFit a: 5fi F Ais9 rea ;:i =[ E ;if eq sF A i?ia a: €ii 3 i[ia 7i1 E+i 3; i €1i $= !, e;;Er Fe Lr o =iii F:l *3i 3E 9 1i3 3; 4E = EE=.i a=. =: Z gndo a7= 63 ^. - aiB :i Bg i e_eE;Ea E€ig=1=IEi iieep -+e=A?i-iEi ?* Ei 1i;ii+45:r s; ;i3sr'g32=?;€i!a iZ a€ e i;Ai d:s iA a_i = ::t ?? 3* 2'i_e;E ?* ig = ;i?5 €3i i;. z? - g[E Ea E* E 5i: o ; a v= j !3EE7 =a nB=ii3$r _iE:Z *}EiA ++=;=f; aA 9a 6r.i*< :-= -i mj .ii 1# 3E e ?d6; 5A E; ?i?i ire A? 5e =uz? ei EE q *:"i *:, rn i|ii I;E Z:rZ', A3+lEH;-g;* *d B, gl " p,. e= =.ii: +3.3 lg eg )zc Ei sH gi 1Ea la i:;+ia:;t:i inii: zt r:5'S :,9 A'CEi ?eF En -;= "q;; ae 9'n PEE I [; 3?i; 3C, ;; iE 'E e eE ii 1=I i ii i.agi5,'F Z:=;i 5#i,E.3r ll1 q g=' ffi"i rE._ +1 ;fl =E se zZ ?.tE = !l i+€i 3;: ;i E: iE ?; E; ?z " a= B?H= g:E :i + :: =f Ea #g H!,o 3 2 ?E "2'.-'3 c* ;6 == = 5: i ;E i$: q: il i€ Ag B E' ai i 3+ siF iH BE g ;g i ; I la '2 ! 37 !!E:-t-:-:-f-:-t- F,EEAFoe--lFli50etlt-= q E of oi "? -E tf >i trPiEfiQ.2=EFZlrr3 2 z 2 z = * C o> = 9p cr lEK E !p = ? f r < d+1? E I E e 6 E i a9 e !d 6 s1r ; +? = ? = Q F f+=i a = a = ; = i =3 ; ?,2 4. 4-6 < ^: > ; v i id*AE = fr 2 A 6 =aFep ! n q; 2 a' 2 7"o z:7 z F r B- ri vH*2o " *€5I€ee;iBEa!3at iaEii+F:Eia l;i =F iEEi li;EE{ ii iE;E8"1 :A ; aiE t e Z €a ,; E -:i -i.7 ; I ";u5 = alE ? 5 3l >4i 3 az ?: = 3 :ilz :gi gr q= Eg3 nl if i ;BE5: isg : ; \n g: €i p€ € g e;r ?;; ; 1 i= s€ 5t ;E E ='*9-4 4ii L i 3= i= Ha =-i i : i.< = -E ag I 3 5;i i;a;: E' 'q =a €=' 3 Z73: ?;= ; € Ei = .zE. $Es 1 { ;E z s3 tc ; '' iLa tsoE = 6 =a i Vi - a q EZi rEi *. € "+i E i7 a E. !1 A O =- ; di3 i* 1 e ?a B qe 3 3E'; ie * ? 1* : ii s ! o-=.de!' F; :a FI i 1i E i i1.a od H : i-; I 9E - o .F-; :8 E c "; E ti = e 3:, Hc ;-< 8 Y 3a ; e LiA q= - \ - ? dd 3 gie Tr lfi 6 € e* is5 t; r i i ; *? 5or o; i rF < 6 d 6 - 3K 2 2 j o t E o e E IZ Z. x 98 oC EE E EE 5 fr ''E',EO-A!Z= E;FifrEE ? -efE€xiu=F I e 3. e:€ i.8. =9 d k;;hY F c.u 5 1 a Z 5 --2E E€E:fr;E="'=,4 =b?i[i4>9!E cfE:;.e=Pgt-9 .c 7 ir; f,E;:€: €t:5EEh.6{60 N=d3l:EE: EE EFIBs:sgEE zli igq3€?EEE 8ga =-4*\ eEio aoEi4EEa--- 6E4 *l_3Eg,rEt6 I ;: !;EiI Eg cE a EI :E$EEFt:"E EE;g€;EF#r* E"$ EEgEs:EEii: .P i E{:B g€ H rl ztrl a t]i bt e ?o E;! 9€_ 'oq-ilB EE - 6 9; ! bg - d-! ? 5Z le.slE E" .E5!d; iE ESEEA :h :::!:r- .€E Ef;Aie EfEEAEE ; E!E+5E E1 :sE*eE ;C a8,iBs9 ;3 -aB:E:l EEr oE.U.:69 ;EoH ooPEES 5.:rEE EE};E; EEc> ia5 X b - 99>ra 9 tr ^5 dg x.!aa -E!c_d :E;- >aro36 ;=[5 €.8*E'E ;E Fai EE€?EI, E; z6t x-'< &=cEEE -€ tr){ IE;}EEIE ii x ;;H.-ad.E EZ !e F E54HeE EE 2 B ;EA:EE €A ci ci 2z Ee.E-I$s #d 3 z 3 e. I ,rrEE4= EE 2 5 A ? E3 E €HAI;F EA g E s e E ?, fr aqi'fr' E<dEG:l.l.llFt-FFc-d4,4, Ai;trAA l o r U o .26U d ).g"E,=r@gc =60=&.9 E e E'q+ 4 (co Y',=_9c .:>>=x ! E b:9E =fe63d jj o> € I ! I to _o F ,x YE I =ts;iItrPEo @6ozv6i =c 3 d - 7E i:3 i€ = Li:e u 3 :+= =i 0I g t a i_E aa zt F; 3 tss 3., I! i : i a*-a 7? {: : _ =. 50 VY.'3 - " 639 an; F? a e BE4 ila x "tr 9 Fr ;+ l{6 e 3 3.- J=o' a1 oo I D I1 85ts i& 7a-1 ! - ! 3 WE9 ;:i= I + PO" "L"-6 t=. >aV=.Z - <dErl e,= ;z3e:" <6 09o ? p 9 - >ql;i €3 J3 ==6 JY Po-g E o =ioo d @e)" mFPE= ao -ca 6^ = o -5 FF 5 E-i-'D o a6"e B ;ox-i' 5 Bmo ='oi 5 Q O! I5t,5d : 6- ;3 6 Zf9 i! 9.+ ri Qoa+aa- 2.9e3 B: 2af.=@3 g? =o ='.26 AS F >E " -E = e o=oE -Y = ; @ c - u, d Y16 e- a =2p- p: 1iA +t9H s-e-i 2 ;;tig gi E{p " =3x 3.3 = i i{+; iA - b= p:o Y35 id= ;x = ! E - === : =c d=2 e:; 3F3 i:i G F a;rA ';? *i lE: !3s ' EiHe EEt; +,i:;31 1Zi= s5ii 9FE ol3 o=54 z'6i; EE6+;+ E;;g 7,1il-.?v'9€r5 *1S ;** i' "- =?+p Er= as+ SaZE €i:8 .iEi =-'f ?Z=< i-iag +lF,fi'*i E:1F EI2t E2'= 7":=;- i;Ii I +== qs6S. EEit .=;4 br?' ;o=.== 76-= *B'EE Bgr 6i3 ioo@ q=6= 5!e.6o n.;E- o?.EU o5o PB- 9-.2i AB:F Hi,t;*E a=;E i;s 33'3 i; d 3E^P XX3 aga ia iF:"a iF; +=: ?e ia;i ,'i; tsg> !#- 6:9 ire s1r ;3 Ei',- ';? @ d= os 3Ei fra- ?*?, a = E3; =d +3* i- dEr =o 430 0 .i t: 2 : !r ;k -E :' .Et u Q F >E " E;i i Z1rgi1 EiEi t[ =r$ ae35 15+r i . \ : H ii: a eEi;;i +ri; s; EE* 'Eg; FiiE :ir" iEir [31{ E'iE ?[EE+B BEi+ eE +it [31 iiE d E;-ii? iilE Ev? Eaeia,iF=-7*t;iia iii 1?i izl +rin-;il5g* ia?Zp '*-1d ni q!+ q31 E€E q El 3 o '-eee =#: iBiF=E-is;';7. ltl as* 3E?,6s? 1€i;3;Fi35 'i:;7: ;gi? *i E-i€ 5:; ;3 i 1i iZE ie:-c iaz :; i,; ETE1 A; EE& ; i: i;^; r; i t= ;s5s. ?€s j:ia- liE.= ii iA? l+t ir5 F! E:6 *i-:=i '1 =* Eie rB 3EE; :; c=+ *6= ;':-f i: 1FA aitr =E s::9tr 1:'- ;1 e?= :e7 =DE !? e'6c 7'=:2z^ s=e,* d6r o+? le; P:: sei g; --iq E;gg;1 ;l+c? 6'a; s;=+i ;*g is; li it;irFlL=. 6:l-oF ?-L ,<: 60 :e* J-G PanJ i:E+"f ,H7 a7 FA 1i3 ji.z aF =;n 7:a*E? ;.:iE; ;gi +E i? ;D=7 ia+ ?r; ifr; i;z:'f. ca.o X;;E iE ii; ri; E: 1: ::3 ?-a; ia 7i; iai cii ;;77= ?V2 $; IE ! +.; L+; = e =e3 (r * ,T3 =riz-77 1i3 ii =q "Eia Eli z Ze; r1"L Ez? iila: aE; iz i' ;1E 1;; i i+i ;i i I) o s ! : :GEa =,.:6" iaA 3 F= ii.E rrE i :ei n?+ iii iAEEE i=.E a ;r Ei; ?iA q *'! i zlde.E []+A; [Fs t gi '"4; ig; a rav ==v ii I a E r aI6 l I Z e E E 2 EHSEE*!ii-co2t6ouBB-E'.qA9're8, -*. i E 3 EoE d 3 .E E>q a : E 3;E E E : gb; 3 6 E 3 EaSE ; ,,: i E H EE! o * a p € f i =.Ed E E g H = + 3 E-i=;H; E zE igEI a E e g a ii : x = :E E: E E i* E f E I iE €I EE € €;: EEI T gcE; E i" E i ;€ E E E i E; f Ha Z fi F Eu o d ! ii -a '.= E -n \ c.a E E < ; s|E e9F: o" i *E E E,a g EE.EEE Eg q ; EE.EET I Egg;si,8,5:.H ; -E Ea2 E ;E:E5f ;E,a: E ztr qEgi,5 ;H;HEB!5e s E E.; EE8 Es g€gr & p E o !=9 O .r= O I = o ox_ 5 C dg - c 96 d d_= ;.iE E € :'F .e. ?q99 .= d49 = 6sEEEi;Oq o E4-P ; Eo'- .! ! ,.:.=a E Eoo9E;O- E 5ocEE? € : CO= A = ! ! .ida .= - .Z 2-EsE E b * 696 a e + aflE{ 2 .E E =I o- .= E ^ uc qX - ti I o4 av d EtrdE-n)i E o g Y€[E I -- E 3e5€ ! g E o E'3 10 : 5 >;E d = 9 6 0ES- E H p Eo-- o : a 6E;U o 6 ", F 9!5€ E F E E EIa# e r ! 3 EE*- - E o U o E!E-r c E E EE a E6> 6 Z 60 A CL- o C i E L e, X oo69- > o o oE v : ETE! { E E EF E E*srsE E s 5 5e E ss?:zY I ! QrdF9 za)9ii,<iidaiz o I e 3 ooo aHc IrlI a 1)do@ trlz2EIV I F&- a; .: d. x 9.e ie-E' 3EE S =?i e €€E 8 -Eu 9 zag51 E E;SLfc,- x=" q kE; Bg5b-'e sE; :EE; ".NR8 ;i6 k 96trtdJoP 3-d =Ee -: Ao_2 - X =5- d.; FaE :8 H'E: 9= @o3 E!LE =6.E " 7: X'I: z ua zo* rc Et e.>3 1 oa7 EA i q Ed : e i. ;;E :X 2 i EEd ;F x = 5EE-B: a BZe;6y 3; o 3 A 3 A A EE! ai U h E i E 3 FXq 5E 2 Z " > ; 5 eg1 A H Tgscx- ttldo!FFFec&& iaoti .i s!!! J-l.laoutttPQ?1!r'Y=XFi>{o , ? z I z 9 !? } Pa9 > s o = o x ea d { J i \t aH.E : E s 9 s d i o .EQ ,. 2 g g E B *BE >i . Z. -i aaB 6 > q r foE a z I 9^E;: q e E s tst { r c = a93 i 3 i e, =! < d I dSH 3 E s =r E.d 6 e o Iz 91 z * i ;u a3 e : Cs. 6o rrg b' 3 :n6-3a I B q o otr &a E I *! rE a Eii.o E 5-z 6d z ='Bi, E voo o treo I { =e 5B* Udx o93o5E oa; 3 Iu=3r t) '9 aEiiNEoo I i 6 { tss t E i,, l:.-!o>€oeeo- ,;3 ,; -;P>Z**?p; P >;t re E i +EiEi a aai ;' * u i i i i E gis* EgE$ E 'E$ fE[B* aE*fl 'E*?',iljE;i+i e -Ei e[a$i FaE ; ' iii rHg F.iA 3=i:? .34 a ral +€s Er3, 3:3EA 9A p-9i 3ai ;iE r # ig AgE 4Bir Ei [E; i?e EEii ilsi ii p'EE g:a 5='I iE=F [r *7,i :Eg 2r iisf gi :[a Ei3* 1;lE rE' ?d?- 3-if 6i9rE E'+* Ei iig EIi s c;iE !=6 elsr i: Eo=: 3lE IEiurggEliaB['E 6 6 ! ac I ZaI +^ i luz= E = ;i ? E ! z '=o j s; ;;i" i !i3 j 2 E Ep + i ? :*, ! =u i ii o.r. 3 *;: o 3 E i$; ?€!iF i € i ii-, tEj +iiEg EE {;E ;qEEii:E i'i:$€E !€H i i r Es € :?EdE i E !e i1i €; =t?i f ;E!ii iii5i :sEE;Errg€ EiE E t = Ei z EEEoE E : iE BEE Ei5 BiiT E i Eg ! ;iiiE iE EF rgE i+li 3--e e == ei: e 2 E CE i ; iEi= ; E aZ E;E E$E:iii i EEEEi iEEEE€iiZ lii€E:: =EE 3 ; ; €= E : ' ::; i r =r 7i., >:;;b b+a ,; € ; E: : ! E E5E 3 ; EE €i: =;'E?E;: : I; €E E i;€i'qt; g ;I ;?E EEaE E6? ; f ; ;H 5 = I iieE q E. E; +Ei Eaiiriia E;=zi r ;E;;3rilE 5; iEi,$E =E €;i::=i E;rE !E;s:;€=iEE Erle:;E+,E+E;E=; E EI E,ziiiiiE'.n:lZ Ef€;-d?j-r€t;4i s€ E E!oI EiE;C!:EErE; iiiE-E=€:*E !ass.H;sEiEg;; ,!;ii It:s !€E- s: E 33 EE EEs tn .: i E Ea;:* r: ds HE 3 =*.8; Ftr.9E !:cE- 4E3 s!E: a'i, EE;E 'iEZ sE i i =;E;E E3 E; ;= i =Zte iE ci sj , E < di u cj fr o dj u cj Ej n P < d , a a ic 2 .: t, 2,.1 , g ;E E EE Ae ii, E €= i ' ii E iu ;z;ii gi€E=i iEsie f=gE; sa :i s ;E F; iiE ; 22 iEi eE E i7 Zi 8: -3 Ei EE A+E i ?z Er; €: E -EE E!" H3 = =1 :> lEt =g Ea Ei; zi v Z= az zE ; E; 35 i?e:a ;* iAf EZtu =zI gE Zo 'o P? E'c l;n e,i i= =2v .Ero * Ei ii ;, i i: E; :;: =t i; -=o Ev 2 -; :E HE E =. &u "=:!:i i; EJ-e a; 2 ; E tl E€ E ;; 'EE E?Ea; iqE ii; er E sI Es ei : =i EE- EEz =; "iZ aEi ir-'i =A:e =z E Ea ;:,8?tEE zi Ei;* E€E E,i" Ev- E, k; FE 6-i FE3, l? ;r," at! Ea; ,:Ef :E E; iiAE gsE q:E"ie 6EA r';i ;9-;L e z :c z> i: **E E;E ;: 7tz 2e= 1?"' z ZT: Ei E€ EiiE e?EA-F€Zi iiEelE Y!1eEf =: ; iE €E '": EEE E;i T; E=g €iE E? B +i; ?:==;'=i;E'F. ile E+ErE iEEi2'" ii!;ie 3E \ *ts zz €? =q.e =a.A =E i:E t3, == E ?;(!? F6 . E&E :E ;i EE; i-e 4,.. - ==2 4':4 +; ! ?iE,:: : E?E iE EE giE EB; Ei a C ii: E:E d E€ I* ;Ea= :rr o t ;E ia a :€E gE EEE s EEg EgE E3 * =;EE i;+ H EE Eg }g uaieSodi(r:?<di5"auool,ooFrq d-oo<oo..i.io;.i a-l |!oroc E >;i o E!r; E>4"'c7 ;5i lEi E E $i gi I : Fgr $ ; r B1$$p+E :f,"? e e6 ii =; z E?4 A 4 a i+leit :c? = :i Ai B e AiE B E : E:fEiiSEt ==Frs7i f;;.i.-E qia e 58 1rE > n-B Et E i;;g _r E lae*',e 439 3E-2 !!:^eEtt a aEE63=1 lig I r'6 q+ X ;ri' a = ==i3;qtaE iEsiT I Pe3: € f;BH'"{ ''J{ > ei ilq ij €,Er=+ ;i 5 H: F=: Iie = ; s;-=Fli zi 2zZi3r alii =a +i;iE *e !3:s? lii: i laE:a Ee ;=;1 I iiia E gE! E+ --; 9=- r< = s2- r = 3qi;': 4":^ r= i{ a 3:; i, i HAAse =q E.= g1 i' i:H I5: 7? eF ;r 3 si€ s E a;AEi [E E{i?- n3ae * I€r;E gi e?;i ;i i i€X =,e ;s i ii :H'* ."=o g * tll cQ < -l =gE ie g aa ;? ? azazi E; 3 &; *: a liE ?7a :5.;r ,i= a sE ;E s €*F =,=e i,{ * *= E_E + ";+* ';- a ;3 e -+;3 eI + $ - 931 ? o ,l o 2.o:o 9.oo !r I {o 3 F9=9t9p6XX;=oEo =; -i o;a€ i a 3 S 5'e=9iEi>56-a.?.ik < I Eoi P d3aa RSr P 2 ; rE ^ i =ua ; qloaa9Ao= ^:z=o =.@ ?z ,a€i 8ga E i ; F ; 5 =E>oor>@.@>E?tKgeFlgl'98;=teetsA,or 4 -..:^6i E r e. e E i i E 3 I eJ 93sJ 7 aa 4 - do + s:'o;+e = ?"EI ;€81 i z t, h a A \Z 2 S ! s s s :: ii;:; i Eqo ^ =io o=cd - ^ # I ; : d A g Gi q:9.9 ^ ,Ei E .ga 4eei 5 < 5 : : f E o u i ; : r E ;a iSga 2 t?6 z Ja ;El.o !d 'y - p I f g e E' < = Ei 3Z'"; IZ;e EasE'q'a SE i" Aq;?2€aaE;+!€=E li*aa* i -++*-z.a*a=; EI ! ?3 ;EeA @ 1 -J h g g 8'* {i4T xa.2 I ci xp?i 6 e e' 6 R a qg gd<:.r*u z;e:i; +?? +; "?::"d?e ;:38 c*dr:r lFiE{ z*tiI; l*11 E:si===i, z==i: i iEg aIi!e?=rE33E Ei+il; 1q5* xtre a g*gE:i iA11€ a r3i rs;l= ir?"[aE aEE=?i i 1:* ia;, it;3ei E;zA F g *5€ r Z1 3 t; lfi-r sEll!. f yfrE;e=€aE*=ii gii *aiEa E;*iai q5, *6i!i i * 3 ; < q a_Ei; q+ ;a! pii" 7 * alaFa ;; alE + !',i s "r ??E cTF li tri e a i a B *ig iag -s=* 35q ; : E i e aql ;E* ci Bi'* ,: r E '' E e'E'; iF€ "* Paa H _t a 2 *nE ?3 ql E '- E 3 ');r '+ 6 9, g 9_ 3 €: q it,5 t i o .. ai != 9:bEtr 2il.:6 M?T o d= .!- - j , ! = 9q oqE 6 ?n-E Et-B9r5E .= 6 7 F i dP .= r'.q E:e: g g ! - F=n=.=ioo-t 5q=u9;.!1.!l*: al axiqqqi- AUz@LJeEz€ t .. , i z = i'. A - E1 ; i v ai ; iJi C 9 E 'ii -E -r- : 3ii t ; E Ei = i =. =:; i E E 'E E ; E . € ti? : 9 ?o o': : 6 0 0 0 €=' E r= $ ii " $ ; Fi E E:i Ee : d? . NE -r . i: i ! -a E .F. 'EEE!st i= 3;; E Ei Zi: io a 9? EI ?; 9 ; e. E=: E€E iE ili$ E :TE E:Ez|i :E ETHA: Ef; ;*i ei ; E8e gl :: e' P ;a €o'.t :i E EIE Ie gE a i Ez E=; =Er €trt EEEE I r:; :Ea E!H ;EE+EEE: E s::- iy: = *1 E izzl s""€B i ;EEi t'-zr p=, E Es'z 2 e€ gE ; ? !: z 424E"=Ei il';ratfr? E :f: i i:EE Ei i IEE E gi ;} E " I ,",?", E€i51 -ra g f=-: | 4E iE ) &? z Ee64Ei?, E +SEiiEeE E,FEE*i sE;c ":eo e !o Eo ; iq > a Eg = EBi E$i=;= Ee-; **= iZ E EE: E;:E :EIE+E"$€f EEu.ai -d 8,?EEqic4;iH"=ai 3; r=EEE - ! EEE * =fr g E E#id 4 3 :ici dE<-a<Etolo< v.dooo<a;-i.ia;+ I E A '9 oo *= -4 !9E* EE < :.:: - F -3i Ela I un>" iii = H=qe t D'L! ,AZ Y F:E: ;d5 g E6a,larv..2uoE ==i E!X: tr o.^ =S d o 9-.: = ilUbEE :1=E i g lEt.lf; a=i? E = .=?at,-=?oo-a,Ev iiBE * A E=:ei .EA: t; e€ =1V i6e.. E = .eAZaZ +:F! 3 5 ;E-Ei .::':i! 2 e :E47,'r:.iit E A atE€E dit: 3 Z e*7.ol P=Ps .S E oia- a E.;= I b 9 ii. pro9 i, | ;.o" =a} a=Z- a e Er sIF E.=gE -s.: fr? ='-? sEEE 3 a-EEa:;:"r * g *:i=o FE:: i a:9 EE3 F::E 6 -438i; EsgE E E ;Eual oEEE ? . !?Z i= = €ia t 2 = ;o!t-;.= =oau z 2 9 €9H o . AE> 3 g eE - N - a a F(JU Ja<(!o d; I o N &dz E E"; h'- s I 3 0 =9 dz -!i 6! eE6 d6 E!= fE Ei! OC 62I iDd - ot4 ;.= C€ - =g aa Y \,'f i's EE.r Hd EEg iir E& -sE C- o "{ = E E! i ;T EE€ E1 i.er E; .;€ !: =i -"J_ e tr -.=€ -iE Eoz: Eg 'E,E: ts, sgEg "-i Z da, t o o 9!o 4 q >€9 { 'e=op ot L =N = il .= r OeX -Eg - E.e=i,Z ': z 9=An; aE+ z I ii=9- E >N ^ F ;d;;> F:q Z 4 e>."EA ' EZi S S ;EEE; E gsE B I 5eEe ; i Eza 5 = E€E . 3< I il oF o<o ^ia.i ;E s; f;? a > E 6i i I -?a'. ..a.t .=YD! Pd - E coa =i€ 3EE3 '-ae EUE- x 6=r:g 35Hi t - =l- Io J J H- dDEE; "i"[E= i 6- u3:= tt?A=! >u'e6 ej o F==,oi o';G = != <E ci E > e?2Er: E+E E E E [E E9 a a 4.= 9E=i E;E6=- Edr.Y.!+ Es+a= A; ; qa!!e: -E [=:ESEE Oi-9428 E?>gsg; E$EE906== 7,. = ihE€);€ r, d{;5:iE 5 ,^5E=E E ; -fE€ =€ -i ^ i uo o,iT€B E * &"EE&Prk :><&-4od.i 6F i o. ,,8?r .t\ i: = =iaE>F@a@@FbU]Eaaaa6,: e " E a A a a I o^0, H ; 3 3 3 3 i 3 3 ? 2; 5 j j ! S 7 e=:E8 i E i u o u u u u : .e 61 O O 9 j f:XE 6 -s B i il 5a ri3 siaErHFg3: 7 ;i + . ^':4.= E E_ss 3F s=r >? nr E asr i i E ELZ1 '{ io-B- E3- ;s da 5a: :Ea ; ' E 1?-'dg; S:1 !-i"i;;?1 e'ii}7 r 3iE; 3a:E*$ iiEEEE"lE€ 9fl1 !ii;=sEi5 laira 1 ;is E;9+;i rre ?2 x+2 A27 i35iEB gE* -E! i€3 ii? ; =3. !? f 9 ? E --; = a-=! ;ee*+? 7 q €3 5ii i:=i E*;F6? f d_ aI l=i-# i,Za,3I 7 I a d s ;Z C ri-=es E = ? + E ig E +EF;; : € P :ae s r *= :t:i; EEE o6n ; e ? i p !: i :=+ a'a i ,i i Fq 63$ a:: ;i E ? = 7 z 3 " ;48 i9. {a ' q = - 5A n"6-*Ets*1 N: E 5 5E ; E P P3 >: rr rn p1 P P:i r^ tr >?Zd.ir Eg EF elEE s E$ E ai ErE i[ 5 if Ei E E ?BaFi 3 [El eaii;5; FirE q €g 5 *[ €x3 fi I o? al = ; b===iz E r3B =;.:ErE ?igi = gE E isa?? i; ? [ dr z ag++E'l;s sgha E;-3;;€ 27 'gi iE5[€ Egg t'i:ei aisiEiiz.E.iiE i i€ ia :e EE a i :1 1i -'.- E:g EtgId= iP= BB r: d+ sE * 3 HE ldia :4€ IE,E€;1 aE? 1; A? Eiiaq t$i E;pa ?EEelEeii Eig ir zi iE;sa S=li +i;[ e$a=;l;_aii Bri ari Ya 9= 27 2zE iEA q? ei ii =r : ; r! eii4 ai$ aE?fi:gE ;i i iiigsi+e Zi-il. EE:ai* iT Eia 7? i E+17 iiE lia; ;1 16:Ei ;is i; a ;[ ii : ili 3i;i 7-z ;'i€ri :i= ri s ai =s d ;s i;;; i? X';irEe : jjJ- a- 6- =- a7 - >r ;=6! 9O 3.f qe? !.'1 ir i E7 ?i i 2=? iclE Y5 Eii A=? ?.<9 #; 2 L;6=la -=: -i 7 zz' ie 7 3"= i;a= Ei Zii \3 r,E ? a€-; F; '="""A gi E= ==v =" 6 Bl E- { * - " , :a 36 iv 2 5 .: s :e N:olj s F 1 B a- i- 9 r,e Vo ,a{. ;i. 4e ia ? 2! Fi Fa:, ! ;i =a aiY 6 z 5O 5O d.aq.1. i ag :c iE2E E 3: E: E;6.g H 30., 3a", J22 = E 4== @=; a2-,tr= 6>!o : ;9; :9J E3: .!+ E :=E :;€o i .=26 .=:2a .==i e> ? eEo .sEo ;?i g = e ! =; l =; := 9 -6 d a=; cit i i== ;i= i 9 06-- 6-. 6,:0 :: {E d jrSE sPE ::;i i .= -i E Ecr Eai Ei;; -s 6: E EJg 5Ji SFE 'Y I Fc - .=:i .:;a .=q9 = ; H'* C *f t *eE *er? ! c aEE TiEEiEEiE;E * E aHE CEEgEEiEEiE E ; E9 6 h > ,-e , >S i ' E I .= 'E U6 : ,aoo -rou uo:: ! E o= -".i i Ei€ qi€ g5= g : E: €8" a EIs 5ls E=' 3 q" q .s; C! 3 fll at; E;E g EE H . EE,! €: E ieI ipE iEg $ =9;.$.EE;Esj E€ ; s+E E+E Eg?:5asEEEs*$ssc ii fi 415 aE5 AiE -ts - - - - - -tr sE = iii'd. Eii& E.Eo tr .. I<o,-<cauoF vd E z FQaF di a 0 16ra !:x IEE iE; *E =T::E3g "Ei€ iiEiEs:i ; 3E;E ;g = rE€I;. € 3 :EE * € E ;E!;ii a c :=a . i ci 5=;EEE E ei:I gE EE:;r:;E > 5p"8€ E! I::;HIi:" € ii"?r tE f;Eg:€Ei q 6 E.b= * :iB;e E_ 1;;f iE Eia;lEii EsiE?E iZ E;iiEX\". ER E 6EE E = eE Eag+g$ ,jio ? gze E 5 i: lgI*.:g tV r€aol i5 EE;'{g€4; :t E ia:Z E 4 ;; EtEa='i E= 7 !?€a ; ] Ft ;=?Ea, F; 4 ZZi€ E 3 *-- :?lt5c"Eiiiig! il eI ];1'u,5 lEi€ 6 ii i *"o"iE , i" 2" *a ilii = zzrzE 3 *E E igiE i e ie :: EE: f ? EE;A E EE E Eiii i ? iE ?i€;1 r i E'aiE E iE f i€:€ ! I :- 5; sasr99= ;f<i<ciu3<au.ifl-dE<eoo4d;ri u o oo o os N dz ciz dz 9 oz !-^ 5 i' q 6+6 at e gu5d o9 c)o.,/,,E-38-= s E 9iF>EL >!- c >coo.- ELM ! sEE O_ =,-N ug ^! E>?;FA >a6 i< E 5 =EitrPE trtr€A P PH: i=.=.a.-lil> r l r e e fr 3^ 3- 3^ i sr Q o! 2 E 3 ; i 14 u v i: 14 e; "i?eEi i 9; ; ; 5 I E E i r r; E,Ei ;F's=s = i;; : $ : = u I ^ I Fj "it IiEPE , ?H sxse A,[yliglliiAe)eaeoi '1di'l="zii*laS?6 16 G o a ; a= =+= := = > > =- F ? = 3 =* -s!E;.g eE P = '{ ^- B;EE ;: ,: 3 ; € r-: AL!9;a.ua a .3- 6 6i q?a= d.^? a? 29 Er 't.t';. sr;i. ;e a 0 :: 'iePr oii+ es + s ;a =. la-E ii9 89 I < 1=4 +=.;rr r=6 at : a s3- +l:E 3i 1' 3 1- 1 r H.? 3Y1s FER 4 'j '4. s :: =: D{.- 4 z. a z !,frE; E"€ p I s € *.5*e, o -q : " :=iSiE : 3 F i ;i?E6 -: > ='-dZ.a;.e L ; ^ s= q{+3: ? i P ? L'}Z;Y : A 2 E somEa z n I "i i:iE.4 Y ." = ? F aB8; j g ! ;.o'5: oa '9 g i. 03e-.9 3I s H- 3 :est s-;' c e 3 HiE-" Bi a q 1 gtg- ,F '..t i9.gsqBa a@7^@@@ Ys!-!5€9=uao6{;uou a= ?" ! 3*, 2 -l 9V Af r3 8? ' 3*I 'di 33 33 ii 3ii ;< ii aE = a1. 1 3g +d 3c! g .! =i SA sc S; € J r! + i i :d.i Cm q o q =.x 2.2 9 1= it =o ! o 40 x o ^=' m = d nd ; O:.ri,t -; * A-* <9; 37 q FC I qic X's z 6'= il o97 =^ = qX =. oI i t + ili !6- a +*3 ;9 E E1 " eA 9a i ii @ i ii^ -: 62 P; 3i', 7 = FP -.P : d.... lg z -o a" 6 4"i ar : g P) ;2 I r aaP tE a 4 ! = E: i o ii: i? e- q 3o ;q I o ?J -o- 3 9-@.?{o-+L {I{ 8 o{ € b >oc aa@@ !ol2il!> S=66pu-o =-PSd-o- 9 Aa a6 A! r c Pd i'!E Pq PP Ad 'd l=1 XE oE X6C i: c: 5o 2 q r i'r go' o'o' ;o' ;'^< =< u.a 3?g s+ 2 ;-.j0 Pa n 3Fs a q d X o'1 > l bd ; a *d5 4 6 3 ;?. d f- i'gE L q i#= H 9 i 61. d x' d*- :- : E E .a -: b a C+f ! a5l I e "@ ,.*!- I X 3 : =5ii:=e52 P!e-OP:g " =- ts pJ =om re FSe griB S 3E ILqr; +Ro =:5'C -35r E f "33', e€EE' i 38', Zdie', EEr i ilE ietE + 1+ 3Ei+ €.xl 4 :8" EdL- :6 *add?E+ + *Ee 9gge Eq EgiS i* I iEE EEEA Ei ii;i*i 5 €i5 ;iEr ia ;iigE! q= Z=qe -"*;i +- it=i ia E alL 5E+ i2 Eis5- { := o1o: 3 ==3ai: r; i;* \ 2e'*"--z 2 =-* ;? t=-iE' i ,-- !Ei € E.=9'r F s -'- 3 i 9 +?-s =: ;=: E ?Fr5 5 ts: 3c S. E g 9.!aa daq A 6;il=+ G3 E6? i ;:+r: != e=? i :e E;== 77 i:# r nEi: J l; o ='3 a a., 1=- a^ - j. o - ,p aYA a ==jo - - r f 3 : Eiziane 9gPE > I *€E l e ifEr EEE ia s: at; [*icl€aqE a d *+a1iIi iiFi7-:-=? !aq3is;i aqii4! ra :dBiis;i itiH s q: i iaE:q=;6'' 3 +6t 89il q b i E I:F;F !:3= E€g E E;I5r ts E r 5 { i1 a rAE 1;3EeE3E', g E.axa- aoa+e rr 9p s ! E .! :3 E A i e. EE "!gE,tZ2zEEfE*ii i=EEE giiE,ii iEr1'rEEjEE EE,iE;E: g !iiEi?: : ., ;:t Ei€ E ! ! Ej EE Erd 5 : ,8 E3 E:e E E i +e ='.Ei e=; E ; E Aa E:F- d , =' !_E !!A;-:E F r E +- goa 3 E 6EEgri"E IEE€ T .::i 3P:EEo U^ ; ? Ei =6b 6^' c € ;3 :i5 Eq2 ; 3 5 :3i ."!.o" -E *o ,Ez !s;!**EFE;;?EEE 5;; E?i I: = c E E ElE EEF E5 i, *xBE- €EE F{; 4 € E iEg iEi 3x i ? a-E c? !!i !=i Z i i r :iE :iE EE e i.q, ;5 ;!E Eab A 5 f € -*EE -r;i 3; i ; E€ n: iis ^nt :; E + i 5tfl lgr EE ,a i ys =tiE ;;E 7+: E ? il E =;3 =?! :E q ! 5i, =!i :Ei :iE I ; 5 ; EEf Ef E EE e : or; ea" €ae sE:r e E ts 6- *'=? B=j f o :.. ! Uq E,5E bfi: !5E E E s * 5E* E;! d; Et E {H ;!: Z;A xEg:: :" E:*; EA; eg cs 3 E; E;: e;€ ag€ r iE5:j^ 3;5g5[Es; o 7 z dlro''. = tE€I a =p js o!a E ?3e.- i,=.? o 2eEJ O F =5= t?d; : EEIctrs I i]. 1 !83 o a s =o:; a = r.EE> E E ? X,:3 - i d5.A* € f ogre - = e+'Ii * e €ii; I E -=:9= ' " E;eE ; a E ,,o oi .3 ; : ? -*'i'! : Z E E f EIE E1:iE=*E5 ; f d i =BE." .Z = E : ,.!qoE = c > I c9.2E E 3 s i !=i o d o tr - - FG+.9: c E E = 6 06yz -e : 9 5 :Ej CZ i d i J < E@ i zr -E e i 3"3 =s * isE,A =z Zi eP t EeE" e; e ze-xi $i li :E ^r^; "ro€!!! EE € e si;;+9 F! E; gE ,ic iIjjl€ EE E H lT!:[' 'E; :i tE EE ii:r"5Ei 3; z z g gsi?HE: :E ;* EE ;:E=AE; :1 i 3: €E;EEi: A* ;i iE Ea ia€: ;A E T E Efili :E ;r qE ii ii;;iE gi . E : € iEr;t= Ef ;E €t eE €€ i'E=- 55 E : i-a * ;;iEE;EE,iEg E,1 E; IiiE;;S;; e EYi I;.E:€;EEE=e Et6 -EE Fu- =-; a.*3f,n E0 ; E Es * Es ZZiEeA"=a. a?l ia IEi:e =;:Ei;E ; i EI 5 rE i,;E;ii EE; i:; EE- aEE iEEiliE iI € E iE i =E E;IIE| €,-,8 Zzg =,?7 Ei+. ZZ Zi=iE z= z I i, t -i 2A122= n-=* -?? :AE Cfg ii;EEBf:{ E E !E E ti *i::58 Iii! i'E3:. Eg: iE€ ii i-zEZi, iE 3 ; z. E i" 3'"Ei;a EEa. aEZ €:2 ;zZ 2.1 .:ril,rEi €o > i co E =i zr.=F=9 E rsEi,s.,E! gEE E:Ai|! E#EgE EE* 3:"'E E;;i:iii E3iE2E€;lEEE, .; - E1;- ^E+- dE Fr 6 F!! > F c r -16 =- o ^ 7 < di t h€ jj 9 Z a €a.e,1 5 ii =-! p Pqi -q - ;,; ; ,i =i,*u,i $ it$ E ;+€Bffi€ 5 '* ue Egt €F E rs = 1?A +g s dii :- Ei a '"4 A r. @D = o=; : E?.+1A'e ; 3,a €iS 5B 'i ==" : e? n; : sis E 11;:l?-e Z i e'9- :;Y C+ i E+ c P9 qi E :1 5= = 3f E !f r iE 3i E i1f E is.ilaE E E E; :B? *z + B: i si E= i .5F = l:asEf: t 9C 5f;Ei;i.a i *i[:i q5E €E3ijiEA liE:gElaaaE Z i7;8',; E;, ii=}*[* "?',;e:?E;aait p aaiEi i; Eiailf a *'.i;1$uii i a EEsEE s1 iE+iiiE gFE:+! Z i i " 3[ u$ S 9F :,iE+#E = # az !6i i\ r :r iI *1 -;ilzeie;13*+1;-E; Ei:7 * *? Bgili$i $ iEEt +r i 1*;E El rE':uEE??, E **iaa E E f; ;+ a* +F3;i' a a-1;i ; i ,zc= 3 ; €5 -ri:eE t t ui sir i 1$e'Ei i$;EE *i5 ii ; 7e 6 ']' g. :i E : z 2i i -= i3 re 6 nAo-- ?4E:c: b >!-tD P !- : o E egsq; e e. r e? z ai,+r''3 ^ i.9 0: O 3 E E + " *EE3s EiE asFei ari aarEt i i 3 i s+Ei EEB ?i{li [+e E3Eii+ a e i :+*5 iAE i5*=5 i?e i?iE?e + E r ea=i g5; A|?Sg :=! *a;*; 3 a { s i+Ei 'ls ;aiiE ?"s. Iq 5ggi - ! iE"iE i+ {.31ir il a+iii = ! i..68 =1, -o=iii ?d =z=ii, a *E;i eiii+?i iigiegEs :iiF ia !?itl. tg eFi+:* ;6-E t5 =BA.iE :1 i'5'{6 7i "=7;; i= g7-=zzi =*;al :+ ",gi? =7 q7*SE.i ea;; i2 gi13 ?i lEFia= tcil:E =ir€ i€EaieTtf;ir Fi =;7Ei ii E#+4;ds=z :E 33:= ;; Q;s='l 6a;' =! o'o=,? S'. ijooo!4q33 v; f=+3 9- J,92-iui; *e Ei'7 rF iEEE 5E :z "x?i V "s* iA a i 3.i; r -i." dl^'j ;6<;-; E ird la: *='- ?!E m:Iaii -a - ? ac. I o1 I o ;i -la ! q I -t -l U -l ; -.1 E -J -l o J *o --i ; -l G ! T :3 i=9e 9= : 3=F I9 >I; e E 4 F ! 9 q ---a P=E 5=.C Xoo -Y :h :od s,6: liao- oE !H E:? hia4- -Yo = > - c di.,!6 a;! = o ! .. r c9A.N:E --Lo cqs =2Ar^ ; Ei *=9. :eE ':.x JE ttrP :p: ; o 2 * o<: d o^ X o E x o ,. o );-=- €qc =<Ei sEg 5: :€ 3ii3 =i!'.:EE EEE !-94o lYF ?ua; =E olio -==9X 9ng a:xEE i'C'i !EEE3 E!= EBE F d F 5.= F 4U Eli,3,E2 i E E bi I : E-, iB ii -? E r= *; E i,;i tZ iE= :" t :E A* E $;d el: z i,q p n XE iz t EqiEE ,;€; E = ;; E; E $:S =i = z 5i =( i >da:E ;;E : a [E is !; EE?;,= a -EA :.- 5 F3 Z; E E ,os:i E a'l E E :E iE r E z:Ed? 6 ;E ; € E= its 6 i 5$i!: EEi !iEilE.$FEiE-.E 3 =i { ,j 1_s 1: E = E; 4?,;EE Is-i isE EI fl !ssEEHi*E ;i5 fE:;E;; EEE;a;nyE , ;n ;? EE se s€ = = .l Eii.ia ; .-E ro pF E.i ET 6 i i; E{+E rEE _[;t E:g{;E;: rt:EreE = iEP-:;E ;EEA:g :9 i:EiEie"i cir .0 = zE =i r1 eE eY .g * Z: ,i,y,; E;; E E E; E E€ E€ "i*i lz1 E E E3 Eg-:"E * *5n E € 5E E ts ra Et.i, E:: B : 4:r 5;r; = E:E E E EEt S AI [€ Eif E*i i. i EE TEE> , t-- a - - *.:= -X - o o i A A .t3 E !='r e e- t;E E Eg EE E;.- Egs ! = : trt3 S < ditr.E { ii= ii.E (]6-b (,7dej F d ! o =?=_z!=:He.9.9>J-rr-N6$h r 2 st 2E 3!==,. q =( e; =9E .r o =E Z!€ :E:: E: -= u o:9 '9'.8 {;?. ::EB 2 O= ? - d o +zo ;E53 aeb .=;Fi E9E -. -. F o .: 3Ei ysEE E_ ".XF =EE- cE = o o E tr:^E o;o-^EE 4i^'ter :a=E e\?9"i E:E:A EE>-d= 9 > =.8 i o =E6 "iY P€E aE o L o Y -qo o.= - o c= : od h I a Z il.t EEE ItrlE:2 iEa 2 F E.,= ! 9 o du=E eEe?a:E =;3 :P'bBb EBi;i> i=Zo4 a-- .5'& :::'== .=EE!R €Eg:t E!;Ee b:EEE ;.:9.2= ,\2;E5 2= - v':: 'zEZec a2x 9 9 I = e I q ! a-= = =33, =33v-e .=e. ;- oi5 j ^i <. s ; -sE ,-E i = :ef h=, E E:.. EE" , € E EfE *a3 = 224 :i.-. E"; ECs-_E; Zpi I be> 69ri E 2 ,?1.71i :#i E =!! ,'2- , = eliFr o'6 D E=E €E;"; -at<E:sE EEr E CEi ;o.iE! Ei9f iBE E;" E e;* slrfE !,.";e:;a aE9, r=E sE;68 EgEneE; ,iEE z?i Ea€r: fErl9Ei ;3' ElE E;E.lEEsEri9! -iEu =.tE !,"=Y6tr .Ft29aa 6gil =Es iriE; eFa=Eae ;EE ^eE toqar r,5z?qr= d,d a 2 a .- 6 d E o o:E E = o o a}' EEr:E;€i*7=rEE:; iicH I iEI $EE€; SEE[;TF EZ3i E'.E TX;AE:E;E€:? EE6 !e :=a :ri8*. Ess=eEE ai6;" EEb illqe tZd;-:E: _ E=e i2 3:F tr1<€-: ;:;*uE= 7 ;-z aZ S;; F5,38 -Ee;E;iE E 5;< 5= -ri9 heE=i 5-oroat F 'o ;E EEi e:E-:;i ;t'f E!se 3 :!z =E z?.1 -ttE;; €ii;:E2 i ;-; i Ex -o^a.- =<6rz -:1ie1'e i ?.8 E ! < =E =_42 ielsE* E;_a,gEEE = ia: i = >; :EE ;=!Ez 3i Fe€aP H zdi s i z zE' lii zlEii Ei:EEiE 3 a ?EiE-Z?1. EPl, eE:a-r5i:A!; fE.i'"€ = e, =.= iz; ;E6EX sdE:iEE ; 5 EE9 = = d gE ;E* EEiiE EYE;]EE " 3 E'a L f qi =[EP FcBEE e,;EEEiEE E t ;:E 9. c -- = o: E o o$ -i e I EE ;€=6 ,3i€33 F;iiE53.I U = E; EoaiocjIE< =L6<o ^io-i a e tr -; e FS = { ,. .. f ; ??EiI e P 3 3 14 { = tio 6 i E5f'5efl irEgii E = EErig iilBE F; i;a :'.o= -= +q;3f-e =E*{= 2s-.! itr dZx-.= ar---! ia-HEE €* .Ea ''[E Bi :EQ=-:i =6i'Ei 1q a[ Es3_=1 eE='EE$i iilll eEEgiE[ +E $E Ia i3"tr9€ F:E[- ai3-: 2ig =*ie:aEgil Zti? ?i.,V r *E; ';! i'*=r-"*5 a;3; iaal ; I =: d;P 6 r * =i i: ==i ,2.; ,+1,1a: aU'i fi*f : Ega Ei q;3a8 =[g'ia =t zz??.7. ;e;! ;;i3 H Bi'+ *3 f€=i9 Ba'E+ EEr; d iLr ?*srF i5i; +Eii 6 iiE 1; Z.+iii EEia =EB€ ; Ezz ii +3F*6 :==E5 IE;g i Eet lE raE€i :"tii =YdE i 'r i+ iE ait+* EaF= as:' b ?ra €r i'sgti i=ni ii;? 5 ; ei= sE e;[aa 53e,s id a e, 3 PoE 3a iit*i iatH ;i 3 a ?'' =3') Y - 1 P 3> r3> c63ge3 I Q r pE *aae dni. ;3;A gF +a@ 6 =a a3; 3a1 EF!:a = t aa o =d 6 =-- iii6 9iEogi q;= i€Fs3E cH? 3*?E!. : dQ o i s- ZG ,1A* E$;,8ae ='3 C) d 3 s I'H'.1 -e zA 3T {E.)i F3E :;;Ei 1.ni [*u*. i'g iEF Eg Ag="ii : = 4n Ja ? =3 C \ -= I* dda x d: d19i eE 9;;;6 6 X Y =-=e {; s=E8. e"; {EE -9:? ig &: ,qr ddo6 t? a- : qs {{ s6t 8 3! 88 3 p :g " -g)r-) \, -g P F= j+ p s F f i6g 5 E6Eg Elill r f fiigg :{ g Er? sq g :€i e'i 3g {r = **'" a rs+g F?3=1i = ? ?ii1- 7' a- 7'-':4 ?i = e Ee ti Eg Ei s E?F, "3g€. iit$f ? i;EiE I; = aE:;: f ?v- iz si ?=* i 1E1- 7lE iirai i 'F lqii €; die -i =fr4 F,!+"?;Z iA:q ';?L';-e)ete a;*;'==r ,i-? iI!=i e€ ,=ggi aEgEeiIivtEZT*; E: 6r= 3Es ta =i v- z i--E ;9; gaa+* =.eila ;= r;.'d s si s4 HE E E 1gn +d: 7=ls;i e 1*!r -s r-cz A +i ig Ai t i rE= **F a;ii s +:rV ? EiF E 35aE"i ='':3; #lg *'?5i ;liSg s g€s er?i,- r i g?! ?3? gi+g AA{?; A Bg; i* = 3* ; I Eqa zti SFss F :iia ; :1i * iI 1s = ; -36 ;"i3 5+e= = ?3?.+ = 1i{ .s i! =-IF+ E i 7,i =i: iEil t f,i; { 5:i E i"' ;4 s_ g E= 331 E+54 s ",:;H -s .; I EE a1? x:-ig ? ;A; ; ;re '7e1 g P E e7 zad 5:-l- z F:* F eR= E ni E E a *i tii |?tt F ;FH ; iE H A? E, t i eE :E: jie=' : ?i; 3 1: a a o? i E s ;r eii =i+l ; E:i i Ea i i e5 + u s *i 'i: i*?i a iEE + a; *- ;d ; * i'ql a =37 g = i 2 t r t 8 9; =- ,.8= 9-z- =,I trp c-t^'i= [g 3 q3 bv - o- 9 sl -aE"e}gEisI d >aEL e f P€cta,.r,!L=-<e: E€5{et: o:!od9<au: ili r r - r :g Z cE,9 E t.EE E,-i J Cq c O i:n c o 19 {i o 6-'a ^ c ! = ! o^Y=!La-O-oE!g€:?E:sE .r a a o - d o ocE;ii E! s*9 !;- 6= 6 --i=s t 9 r F F-=.yE tr o X F Y= Aii HiE aa::Et?s'.Ete;",= E d tr E F6 +E*giE*EeIi ti q I-g; e *€9rit tr -E= aEX-,9!==6.=uE:;,F<+=,F fln€:E esE EiI g E€EE gr A:/F'UO CH 'T dE , ! o = r, u6E --C ;-3 :. jglsE ;E EA H a:?iiET gs EE^ +g'i'),A,VZsI Ei IE - t:E;Ei3 *i =E gsE ':F.-*Z""VA?:gE€ I:; EI$€afEEHE EB g1i E,s-is{.€2; :2 12o? i?^-d=Ec= E= :n FEE :!'3::*Ee!i *E ?Ee iE.sEEt:iAi as :AA ttr'i?!Egsi EE s* *;;€i+-3€EE.E3 EF€:giF gEE icEEEagE,?i ge E;; F[aE*A;HE33 := iEil!€ FH EEp- E.EEqnEiciEE rz ;1e eEiaYt-E;2 '.N ;a i, ilE , EEEAEEEEE " E 8;s,8. Z a E E.a E z1a z= = vt; 3 - E.Z?Ee. 1,E '.;; €= =n3.2 1;-"8i g i vi, 14E3, E,E r-",a sE lE iZiFi+li3 9: lE ;:[E*Egi"?q E! EaExliil3: ;i e72;EP--JiE iz cE!eA;atE F = X o o =a c.r >9EA ;g EepB=€E;:: !H E".fistzfiso^.2'^"'"-E; e9. i+Et:;:{aE-o -{E !;AE2eAE-?,?* €>3 5-:_83==?@Fis ie? e€:rEi;,r=AiE IeE iE€EE+!::Elt is; EHrsiigixlEi ts! E;-3€5c;irii EEE EAi;RfiEEELEHE =:^,2 <a;E&.i€3,5 3 .E F r q E = s o € ;E ! o ! z E-e - *s; r * EirB€g n#a;"88" iE; Ii*l i q";i t i, E it i,cile; E+:Eltir ;=*; :Hrt i tE3 E iz i iE;!i !i; ti.T;;EEa4 s?i= s;E= t =e F EE E E;;ieeai E;g;IiEi gi;E aEgi i Ei; €1 E E;65;Eia,€ii;f=r;E 6?iE ff:E si Eii Ei i ;iB$iI;;g isi:IiEI ;EaE ;;EE : i EEE icE liiir"E;i€I;E;=EE+ a:i; E=ri: ii.Ei= *; t EIE{ E€E5s ; E;E=i;t =El: € i=E : E f F;i.7 rP a F-i3:Bsl-be =g.E€2==l I:Er p 3:9H,. i *6 i=Ei E?:- :iErEiHgBEEi€i;gE =;EE r:eE;itE 4EEEE;,$Eii il;E;f;?!E;e;sE:i Ei;; ;ii:gl :i a;iE EEe ;zEa zifreliiEi#iraiinzaatE, 'uleic ;EE lE fi .E& 3"- 1i Fi ni <ts ,, izu_:aE;=; ES*EEE8HE EaE;i E E:*=FE . "i,, i EEEzcEEEiEiST?Ei=?i Eli EE:^i ;2; {\, a I Z ! -r -5 'E a rrrsE;E es:x +iat +gliEEiEE -ugi;il .gug E EffiiliEiq=qiq3g ;;19 ; BlEiiiiisi[€[EiEifiagiEisEFErii?EE;Eii3;r31_.J r.sf i;€ ![;3!se r3?11 ; ; # 1EIIEZatagg=; ;:; ii,i iiA:;5i ?i*?,i "; ia a?BFrrr:;r15E nis :€A *a=.Eari eii'i; i Ai li;;i*+rrtg1? E$e E*3 FeiBll€ iEiEl i s{ .-:;.5qi*a*i+ icr a:q q?,li:'=: iSas= i ai s;i5Et;r}44;5 i:tH :Ea +f !E:;i EF:;2 i : I e:=Br1 es5 ri+i *1; ;r* il a+ial filiA i : F rsi+iE *ia33$i aii giA ?1EriiE gEEEi - - +i€E*a ii -a3 ["] s A * eB" I e'rr-* Ee*l i €: a fP ? 8-ti*{ .m5=J ' 6x -e="= ce2': 93d3= eE. AeZlq >6*& 836!j; a;:nEr n rTrin 3:84 3il=Q r +1a, ++iiE i t;i[; +;it ilai+ E =[if BEraq atra 5e+a1 a ;iitr ilEE 7*ii1 c:i 71Eg1aE:i [EgiisirgiEiE*EggiElEr"iiEEsEEr iEiEi {€ii E[rE Eiir iia ;eit:giiF+A;5 s*E5ligA Srgi A,i +reEil;i as y$ ai5+ iabl agr a E;I 3g:[?.*L=ftaiE: =i;;i6ge Bii= ti= i?i-,rf[=alP;; oa-ri! h:- 35ij.3ii=e ar43 El5 E33E aqr :s"s€-.; Fs+B EF3E [ii +ii+ F3B A l5t;rEE ? EE r= ?E€E E$i EFi 95 € E +[AiriE ioE=8 L6 a ;iE :,jf 7z 'Z 5i=aa'i . i r a; 3=.3 :r _q -e =- i to a@ I > I !:.6' DE \ ? i! pFE , A ; i T Fr: 2A s+;+HS :d :@a I 5=. a. = 1FZ aE F'A:93-i iJ .z=r. Ae3 ;E eE iE = B'E il Z'"!= _:F E G *@ 3 Y G qZ 6E 5.siE : X P! P OG aq 3v- d* I o 3 !5o ;_ 6 =_=.a ; 9 E-; E z 4*E -oa = , s= ; 5 - *d-i 9 : Iqg B E, ETE = < B-I N O e:; 3 -2 Fo-a5 I 7 6 t;o ; I { € ro q Q ?'3 L+9:iiZo=.1 : .9 v .9na E I t b' '= i ! = Eqo> E I 1 ?w)'a a. o n r y ;c- $ x 9 0Eq= ., n o IE!: : t" i Ea;= € E =r>o-E , € h 4quE .2 2 n 6-Y ? = o ; dEN E P .9 Z gFlE A i 3 ?;ia r E e I -i2zd| e .q E E EEEe E .3 : : :uiE i 2 ; : 4:iE+ a z. e 3 EYEii d e ?, 4 =ZZ- F -E = E i;B;E 5 -- .e a E'i* o o.E*wrBgg E .V ; 3 E .tsf iyE,,1 I EcEr E s b:: q.9 u ! o i 2 )* .= = .9 09E; Z ii o E a 6 E A vc;=E ( rH 6 6 .= E a * Ee- {s F - } c o= E x a = = _Ec g Y 3 dlEi.-3 a ;: = : i :Z a A 4 -4.2:.t.! u s: , 6 E E6 q 7 s F; EgE : Ei E i E ZZ E i i EEFE z 2.9 E ? 3 .eE i O Z; :9 aE? E es E E * Ei : E a; 3r:"oa = e: * F ea 9"a:' i, 2- 2 u 92 =Ji=-3 E =E tr j ^i d o E F= =3oo@*ro<aiE<dEq66 F o o o F 6 o F zF os F F ti e o E o F (J (J a cq U !-di:- =e€e',!y.= : - , 33 + 4., 5 = : 1 --^.= 2 ECc E ,-r;= EJ o ? C O -* = O ErE f E;3= I!! Q= = o {i6?E 9 = a c - -s;+ = -=:; ; o! c > o c e I - trES.9 e ok I€ '= od L r 9 o 4= - {i 7 Ef,4 i Ec!? i4 {zr.2 o ;!,E=: E l"{[5-;E i = .=o.J l.hE e -=Et E: ?cF! = 9.;:a+i q- :i55 7 ide. +: E =ia .E; +E:i qE ;zEq u! .u:.F: iE Z1N3 E? EE:E g5 iai.: 'aZ E:;c ou .aaV.E C6 t.o.=E =2 =rEE 9€ 9v -r >= c9^x .:orl2- o. d5,i" x.: PE!P a: :66d Ea =i;i s€ iE xE ;i E. as4 lsEc z= AE o E 9'A A ;*!E; :A :ZL--. .E' P':E'=.i J> ';&n; ,z ,2Ee <ii z*:E TE €FEE ZF E3Ee F* €6ai ;:,e== i? 6.9:= =a ia,= E a= 4u:a F c F o lt I ! E : rr !9EAd ; E *< . E o tr- - 6uA?a 6;L6;u E-g=3{ E:; P O E a! -q !ia !E o ti*e77=q - c- 9 E!;!Eg o?.72c =9 E 9-, -!tr 3F:19H E€<E s 3<U; Es999:OUE OE a=" 1v .! = x,Y = c Er-3 E aE;3 E K9;€e.. 5 EE o o= 6 E 4.9EA;BE I eE::E!! :; E! EEEf,! ;p E E:eeEE; EA ts e: EsFeo 6; i d.:E.EIFP 9"q 5 :eEEss* Ee 3 +;["€e"i ;E : E_Ea9r€I ',o2 = ZiB€!el !-S + :E !E5gE 3; E E!E::g: :! tr -6^;THi;: :- E E; =€7-E !q ;. sAE;E:? 7F E :>,!!"*!"s E: € :q:;iE'; E: ; ige;E;: ;€ *= :39:'::e f; E oo--lErEE hu i aE ,qEE€; EE E Ei-E*E- "o d 499 0 E o? = tr - 2Etr$3$; A9 ? dv {ez-E z o E i -- : i : = ; ,E E; - 'EH;E,n 9 i E z 4'a e 2si:Ea = ' a F :; 2 :g,iZZe 2P I E i €: 1 aEE-e.e3 1= = I ; [E a iEiiqtr- ,e A ;; : Er a E4Az3PF ; I 2 a gE a s5;9Qa* ifAF:EF, taEE€;;e; EE * gj :t EEil:*=li r;r:l i ri iE" r"*ar;s? 4E 2 -zz s + E" 3E i: ;s:iE? E€:tE:E; iaI; sE iE[;i;E3E'l €E -E : AF ",8 3: Eg*sE? H.=*-Ee :- Eg ; P lE r-e .8: EF-s-Eg! ;:; ; *,E i i :3 :b E* €lgii; Eme t "E a '6 i5 *tz El E6:,:.aE EEi = E= ; 3 :a l?e En ei3o.3r F6; : oc e2 ? iA ;Ej E9" 'EYe=a L+E € gE { FH *; i:: E"i a +ZZECE igE g EE + =E e* rEt e; E ;E:;ii E; i s;=5aE 7, : j := ,= ,i r i ? g:E€g€ YE. I-f F : e ! Zi zF HF B](Jz orz U ri UO {\ |!o> IP PE; - ""__ 3 :+ r==i E ; Fard?6.dssEse* I Ef E5 F e g"€q33s0*Eii s g;9F t!,EEBgIsF;EE:F { !?3I E$'te3-a=3irg'3 ;E=ig =c X o P 9 Y aA I '1.m 5f >P TB E E =- ; B 3 r<- 2( ..Y3;- d a 3i=5 u' $.E3 i A i.gr-? is a -. a;rd { f E t ,:22 93 $ = ='-qe rI E ;F1€6 6 AET;a F i+;ef * ?si3E + Elli'e ia5 t-a la ri"= a74-zgq-od +B 3. ol6-3qa I9A ? go =t ao€1 E3+L .{6i 9594@gFv'ii ,^ F.aa 3 I 6 {{ { x o c o T4.I og E' E E E€ trn a 5uN- I t7' oH-r-r 4 &;E Aq 6 E E FE. F.A E93gP 5 E <9o5 = E!E8d ? [ B d E3-9 g i F - g :3 z 13 ! r r TN3o e tr zt 33 z I z ;B8H f I q tr a tr i U I o :<e,o q& a o G { I I oo z 3 E P :. -v rF ilE ) 6 ! I FE iE a:rgP!:t r!3h EE!UY zEI EF' .l F' o{ c { I ! =a !! rro E"lgF ,8 ,l i -i; oe 36 E 3 a .6 .jx F- z 3 A ; E =:?ss;; T.'nsE; i*3 E E sE t t E ? €3 sEg € I E I a =* u. E ;B;E $ E E E E E E Y EE3E g E Z E B E E H EEEEEE ?: EEi$lu,EtE gsE €; s E * a EE*Ea Ef g E E + s H E n!- {rH ig* Eerr5 s E E gi EB e-=A :G dEE fEE:E; Eii rE E EE; EEzx bEE lJE E E €E d E 5 5>:E EE; rgE ig3:s s E€::}58 ;EE eE ? E uE ; E, r r5 B B6Be €;E !-i 5 r' Fe -6'F.: t- Fg Fq F.5 EEEEIE F ;EgESEE EEEEJ5xEf;;s;3i .$E 3# iEiigEiii-€sE; .{* $$ * * u *; Z iB== i: -E !: uj o y ? - * = e o a o o o oAa E;€H-i-:i"EsF: srSS;f g;a AE A A i Ed k ocz, z q;Fi iE EE E S E5 5 Eiiso Ee 8o i s 5 3 S E 6 ; 516J'E'E'E'ET di u H "H "E "H 3'A < d o &-No<q?qr: at 2E a q 6 rr A + o= 9F;(J eo I I 3E D,6 g; e5 F E ,g E s c.AE E3!-brFF 2eaL aIJJFcrdtr * z 1atrtrlkzc<a4rl El9E r'l aI{d Dotrl e E29 i4z F ts F aH ad o F o:F o o F o F E1; at ?zp d J E E E a E E E E E E F4 4 of (r\a- 1., :0 :- :-oPF PI: .l ., > z *E iqs E i iaigEi E'$ ; ; E[ag e a cj a ga i ' '1 Y:r N qi B+=il ils 9 i5;; 'ii E [*A3t; ' ii q + eri3 i e 'E 3 3;? ii; iliira i;; eiElcii:iii t$e iL- =?53.; adF;EgEgEE ?>i Er 6*61is eqE=ti:*l if Vi i5 +1i== aq;fii ua,E+e€i*f € iiB =f, t=iri[ :=,if +ABAaE T;lg ?,iT[ AEAE€3 I€+F5EEi=E E''iE Egii iEs;*r siriE$$?' ;Ei is i+ r:qiEi ?i7 aEilBi i E€ 4I 'Id .Ei=el I 5 E&1: a n; ?; algs; E I =;if ; * E"l rg;i ErA+a gp FEE1- ; ; i!?6 ;EE1i *e 51[ + E ! aaa; Eiaf,E + i'E E I i Es EA -+ "a i * : + ! o{{ za 6 €i :i r I o P >E = E;gg +*E f,*Ef;= +3 *l:E iel 3a,*; =ri i+rFE 3i ng Ie 3:5 :i=g isf +teE.f i* z: t1 E?= -i=,i 7t* g=;+i 1E :'i c* 3:i +€E gqleriE[EiiBTE Az qe= XT a=l3i; i{ i4 EE E;* i;5 iEIlg=sgIF€aFF? E9 :g$ rE iii€i r; is + 35: I!e e3 341;-< =i 7n =- XV; As: 1+ EEn*i ;: ii E Ea? i[i i] 1iF*E '?,i Aa 5 e1'g -5;i io:ia;g ==; 33 E -lg iiE :* li_iii "af ilE ?ai i?e :* ;:9Ei L. se- ?3i +;3 Ti EeReT cH-!= E!a gi* fa *Fg?r CF + A-1 ilE +g er$r: 3 i A :E iA! l3- ;6EPr q: ? 6 o; a=6 ++ =sEEP +f B E- i = f 3 b ts * = o i o 6 - = Ga .;e saBliii+: 1 a ii i= -0 iazz-; EE = pr Z 4 5 ri Vl - ,=; ;1 a o i !\, >!o', ^9" X' A +#:9 z Aaaa :' r2'= , oa -. = ox3=. -E-ai2 x'ao7ea ==,a E9_ =='dcbo <oo:<a 6o)a :;, !-Ed 9a 2)Oq o NrF :6? 4dq a)P o 3 I =o{ a 2i 2 a 6 il ! a. q -l C -, -l? g ,.J I -l -.17 I J c ! a o - o{ a4 ts rr A e E B Za t, -l "e z r €-t *l o- ? ? ;B'"'s aaH;E EE i E ;EZP '* EEEfr €; E E ii:; Ez1aZ Ei 5 _r syE; EiE€E T: : E €E=; ::;-e8 :E s E = iB;i i'=i*E e! = t! zrC= E EEEg , ;: a EE *- I:E! E3"€Efi( B E,: E : : I E EiiE OE:s"cfli F; i E* 3s f;ai !-E y io>g q E!e6€oi i p; ; E E 4 E Ei;E ;Bi;}EiE ;E 4E E; E; ;E;!;E:EEFa E :s ? i } : E -FsIIa€ ;H E: Es" Ei gHEi :?:ciEeE 9"E il:; 3ieii E€i ii{EEE;i: ii i+ E*H;IEf;EEgI'g3d EP:Ea i f;: E .i E Ci ! t E F=zii &nig;bsEE i= 5r F^EH'ZETE;if E3 il;;z=s = ia+ = E= : :- : '*€EgEEl;orJ9o<r!4<r<cOA<raeqq€ fr, ao= 4 ^ q g, 9,! = .=i i! e 2Ei iE : -= e.!-. -, - o =t-A 3= = s 6F*3 EE I 1 nte-=[ Z Z Ea€;i E = *:boI 5 E =glEi r $ ETi3a = = E=?Jg i q :+Eu : !*@dd o ! {lJ=3C 6 7 :SE3: i Z i:e9s E d ':-;3+{ ; E IiAE: o 9o 6 E EZi ; = TEiE5 9 -:o =>dd4 = e iEt :d -dqi;u E; 3 e!a2- = 6I o 'F.6g?E .:E E EE: :qE Gl G= GggiD5> i? 5,V E1=!co -'E -!gF;E :€ :: ezziai :; Ei EgE;6u (/: U; U6Egk9 oZ .9 oXo9d= ! M E d EdU<FFF 2! E ai eE * E*a iE :Et e:;:;gE s ; = zp E-r E $a* zi ;E; s^:;?t;,5 E E; Es :i n i a:: Ei lil EEaE;:E : i; iE tEE;S:; yH €rE :SiEEig ; !": :t iiy. E x?i -Ei :€R =cia.ii= a E H il; €fE E ;iE ;i } f,: t+EA;;; E E s : ;rE ilE E iEE zc EEE' is:i?E:; ; a; i ! !i s5E E pE; ;E '.3€r zEl"eEEiE E E+AA.i=tl?zitap6 €r ta"gt g€iEg;gEE il iti *i.iEE ? E=i iE Ei?! EE{llEEii ii i EF EiE 3+E * gBi = iE, I:Ei E?EEEEi€ ; *E: E== I:F Eq! E ;=i z i EE;t s;p; c'i;:t=i'|. Z E=i E:3 EiC iiA E ; s ie i i Ei: ;F5i a EE€EEI;E E, eiE ii ;.gA EEg E gE$E s 3 ig€ ;E€H E E::E€Ere ;e Ee l-<OUOr.q<O1<OUi 3= : -99? I rr I Z,I a.t rr.;a:q rli t-l i 2 3:I >3: i:r.ea@ : + < iai:.9 !.F o a; g ! I 6 d',! I = 1 E o 9iZ'' =3 -.o_o3 ii=. \,@,@:P= i - c 5 :-J a + f g - 6 6 0 -!$ o:o a 6 -;a ,'a<a a -^ = ", =.od ;oDI =@e= oXg :t 5 Y@ S J: - - --t 6 g qg.i i =a; ox Po; ! ^b= o F' <r,=tr; ?3F ;g-^ = |!olo { tr lgi trPE 111'-r9t1 ---r 6 ? ^a :I Eli E i ii a i i;i3;t =a: F o< = ^ T9919; =:i E E1 i 7 iaiEiT P:e 3 ii E ; Asi':; q r:[ 3 ]E _s 5 i+_S]; i ! P o o A d am - r r ^Ej ==-e Z 9=: ^ ea€39g I x =. v 3 6 ij ell =Lotj :"t = 0^ * q;6a9I :, 2 is' c i31**P ;e = e-3 = ";;laz9 gf 274 1 ;5f;:!f ga I ?; i 3;Hie9 iE :s 7 i5ie3B. =g *z q, dfE{gq gi st3 E.*1;3n E? B i is€ai&P E =F+E;94 6 Ca)=:a E zz!.-,ii o < ba6i' - Aa--c= ts .io-! oa -:=';. ;i s5.9E:,P 6 3P;9,A; 3 ; a-6 E !o Y :- G 6:;;3a 6 ?i-FA'F: + ,84=i,. a.A =?o'; E E =dca ;+--A6' B YP:P'3= i AHA tE97<s99?3; d E sx € E g!2+q=E!=2.9 0; o n -3< =d o; oE ?@ ^UJ = E r i= -b';.^:5EEY<;=36'1A:aii?D6tr 6556 5r ' PN50d qq a 3. qei 9. !i ! PI a.g c 6 +i i o{ +i U ,.1 U ,l E 6 € 5r 1Agi 3 a ! t Z (o ea 3 -lo 2 I I I q o z E' -t a i z f 3 ? 3 3 ? i 3 3 3 3 73 e-5r! 3 q o ez,t I iB ad -lz -l o -l -t -t A { n 'J 16 -l-iEE@. E' e l! E-ra t:-i5 E-{ t! -tEx-Jr(! rz o 6oaoz c , I o Z i ,, !.4 i , ilz E i- ,o !==., Fa i z?i i Y c .o E i\'z ? :EF A ,E ?e i !;EgE i:; s 0:F L E ;€ E 5 --=2>c --i!i ._ .ee? = 2 .!.B. : i ;95;fJ ,rre u E,I g i ; E; = E 2Ft.e.-E 5aE lzE - i c; = q ==:o-: Erz E i :-a 3 ', E:eFs? xiEi.c[ e: Ei r ii z€Ei;i E: = Esr j E tE E E E E :€:Ei c?; iz= i i ;i 7 'z 1i FisEi i; :;d6ig-: ;.=: gEaE E; !:EE!E ;;=;U: trlQ ee ; e*a'E : s. ; Fle=E azz ?^eE E;? :-E E ;EE E : i x" 3:::;: E:t EZzr=E j*i EE"=:1:- € eEE',:.,E5" ji+;il *E: ob E : =E; p E F.; u;Egi:i Jr! =;;iiEE rEE ;qFEaE€si 4 iE:;;B !E*E;: ';eE ;,,H E : Eir = ? c; e E ;l"r7z-z "lE i-q: 272 E: ; € sg-e E i 3z ; i IEEE9g s=E 5E; E2^. *i E * ;E; ; i 2e Y 3 CEE'E;A Ein 3i3€;; EEi :EFEE i"":: i*E;E;; rt=*EEe:- e=F HE =o , i $:: i E Z; = : ,"E4,EE E E:r z EE EEE' EE En i E 5aE E J sE E A -;erE: E E:T ;r 3i 3_€,i{ *i E; a z €3; E E =a ,1 i = =-u3EEE; E E €'E I3 (] s ().c o E .--siEBr.qlEZ=E!!! :!.? yL,-o : -y.;g 9 9 €:S S -UB !:? tr,; trEE= ? ;E tra .J a >d2 z d n ua e .iY3lE.'i : : EE? ir i!-a 3!E^E!p;p{!EE!8 - - E iE i 6i di v r; sj B .oouo. E H r-jb tr a E< 8o llo d: : !: t'a j E 6O= =j: o o * E * : *g.S i g 5 = o E Fui g E H : 2 I i ==zA -.EA ! ,ES :E A E A iEt5 E_a; a E 6i B A 3 3 s dc*'?-6E '; I AV 5 E : h u P:iE:e g s= .Er , ,q : i E o:a6.Et E 6 FE: A: 3 E j .16lE; a ^ x? € s E < i a9"'q-E r f fr? l: F = E EeE- ;gEE ?Ei gi*? EE'EZ E;; I E:E 3: i s E t;;r E EE b E F,i = x a z * ,!E=nr l:F i > Y,x E g A E, E :=Es1 E=; = E i; i ai -: E E- ,;6ci: IEEs; $!5 EEiE s cu+;;6: =EE=E A ii airE E izi>jEE E;E5E, E:!,9:!S 5 E3!s;a2 5sr;tB = 5€EEEEE € € ;EeZZ^ Ei:z Ee i E=aE:-a:rzt ;;iiEe ;:ii ='i E . a -b?= ' -a? " =:E.7 -:E $ g ; i8I 3 #3 '?\ 3i ?E E:b :€ECiE,Z E E -- iJ-J :!E;$,,.EE:S i ( E i E E E 5 H E E E; :€E, i:=?eiE#s- sEr :r E 3 =E;E Y?g* 'gEtEE3iRiE*fiiF ;E i'i SSErEEE (, q *.Eti trE i ; .^ Z A A S -: o - d -a<daZza<d ua<Fd-N6I: : = = A 2 L a .5aa,a \Y\ 8; 2 aEorlnpoPaEFQ:ilTuQ ? i ?i lEgig iE ??i+r $q ii f,l I I lr iEsl i 3E li P . t E 3f i;ai? gi iieaE i[ Ea E[ E E E* ErEi ! Ei +i iI i€ E i lggf E is s=:i? r* ,.i {i E f 39 's;?== i ;: i:A a; i E 2 *;ii1E *g *ifif Er i*ri E E tE iifls ; ii $ i ?t'' iAiri;ig;EiE1 $i AFEiiiiif,AEl3ei E iiE = leEsi tI a3E-e: ;g ii F=' ? i E;.:+ i c8 I ; EE = a+3?; €E SirEE:e ?; iEi i:iil E !: 8 e r = a;saiir-5BarEli E EE = ars$E= E Ei3 $E$is3e;triFl ii l E a i IiE g eg i Eii ii6ir;EsEAtiETi i; lgie*ii;i; z 3i::=;Egi-iii A1 B + e 8.3:uz1_ a =€ *:;!;i+e?s_Eaail I i e lsss# s ?! is;=8n;&i7'==f; { 5 i ;i3i1i g fa Eiiii;;SEraiiaEIi riigsEifi, si sE?=11 =: =----e'^ E: , ! q a.:1 t-3 p E a"iEE-i3liigit*iE" 1:*l'?l a o! =i R orE>:ri-ootD>it, .! ?oi,+ <sea J X 37 3i i Eg Zi 1 I il iiic ;Ecg I E E? Es E EE Eg i + i i + E i4a ri*a *g;a 9' q; Ef ; 1€ E* e'2 =i t + F =i;ii[1 iES' 3=;aigi!asi-z i'i3 r;;lEE= *re a[=iigE:it ' 3=;2+AA31laz:=-+at;ZA-irE3E +c:.f 7si: 98 -E = Fi =a Z .a-i - a =1o. ,.=/ =_6 = - + ;.; O tqF ;i=s eL; E: ir a 11 ^- > :*i i:ii *5i TFEEiAI =3 i =;i;!i e;i +E954,=: EE ioiU Z'^97 o' j. x:' <Y ? -=*o: ii;r i+* a; 3; I 1; a 5 ;'."2 rsj? *ii Er :: 2 i: 3 t -a+ riE ei-"i 33 t? i [3 E $3 39 3 :E3 :ts :o > ri; I o =c L)= a 2a N =,6 Z@_; .{:a 7t ne - E'a g g = i=a <il :d T- Z l> : ..i ir I :a; J-.i : iis 6i'd iV u .q- =; E5& !i? 'ii 9q u <i * 6:r,i r=I 3e ?= q= r1 eg.o Hli 5l Ea 12 -' c8 +FI i=a -s g: AP ? i; ?27 2i1 ;9-* 3 a Ei:ik 2:i ;"a i :' ?? q55 =-= i a 1 2 L:---r; 1 ' ? i 7 6 i € I 3 rr s B ; b s:.i- !s -Et .:9! i- ==-? ?iE =eZ z=t,=e [ei.!E SEE ;8i iiE=; ;EEB;g :EE !;*; d;== E-33o98P':r,= E=Ze E.E g E; i; r-E E ei ?niE EiZi ;8Es#:= 3=E i=€r Ei3€ Ef ;":*gE i7, Ara{ :ES! E-=--"'= YooE EE? u EEig rs* EEi; €!E ,i E E=€: i3:;?;; g;:! g;€ 2, 37.2i iE€"Etir +i2i.=i? a: sE:g i:5=qii aEEi s++ i:, YEE; s:EFB[=^ 9?;? E:: it =Er: "B.EE::s g1:3 E?E :e _ ;E*; E 3iE:E; ia;E * 1; EA T :gEE E5 s" ;Vi> f.,.Bii-u azaa zn= ?: b E;EE ,EeEEEE rt8E7,:'c! ;3 i..!-:"=i; ?=E€!r';iEI"gr; z3 X 7 =ES= ::;ei?E E3;€ EEE x ; t : F yq.6q :pEc:EU dg'oE .rEl.7 e- is E 2 €Esgz iiEiEqE giEt If; : =*E; E t aSsEi E.EsE€ss 5F;i E:; e ,3E n e E<U€= :EE.E.]'E€ u3e: "eH i oJ; E P "ig:EE ;EEEE;'e ii'tE i"gE ! izacd. EE 1c = - eo o Sa 5 ' 2i zain'1 . = E: +Ba=A ; E AE i?,8;.3 ? e *i Ear-x€ > 9= >l?E;, 3 il aa E-;2- =' = oU iz=.2,E F gE -*Eg'.E.;e. ) :z c;=:.:3 E a: i O fDE g l?tr u x d= !5Ea 3 zAi p3Ii:.=Fic-d a a24 E =9,; -E;BE3; = EBZ e:eEiE A i,i* -i9=eu3. F Eiq ?o.:-Eli E t: i\z *iE =zo ; g i ?o "n: c F tr = -3 = E.F= B*o=3; E 9 Ug,E AY?LE- 6 o Eos +a d d a; E i t€: dEE9;L 3_ g^ ;e4 t:P€3;!5;i€": :5=:E? Ea: YBd" rsqE!Y Eo : € 9 E !!€€ oaV r ". ; (::: E edE oz ?E E :i€ ;?q'rc = a; I ac: sg:;;J !9, E !3= ?:358J EE * E;i g FgEgte =€ 5 EE L{o5<triur(< c'w) z ' = 9 E--. ". .3E f ; - Z -E Eze =1 zzt i sE ; i" ;; rir = €*E ei iE5 EiE E EEI : A TT gE3 E :?} E;E E;- e:E E, !3F , € ?= €3=. : xirE =!G ?s:EE E s-ya = = ;: ;.E; tr E=-E giE Zi-"Eg f rifl t f EE iil 3 isrliEr €$ E!6 E f;s : * iE g;: r ;e*iEi; 5;::s. = €i: E i ;A EEi .! :€S;iIE Ef€:! ;d =ie ! e E€€e F!q=g i ; EE ti; ; E€gaEsf;rbEC E";?iE vz €i! = ? n; €iE : eEEiiAi+eE3EE €5 EE: z E- i: lil. i ;If,l E:.:E EEa;; E* Eir E_ z tE iE; : E;i; !EE! i1Eai Ei Eli z = i aA ilJ E ;Ei= eiEi i.E"64 esi E _U = EE :E6 z i,E?i. :E EEi E E E iI* gii E !EE: EEii i;*423=?€EE:*€ti* .i $EE;;i n- iEaEc!:c;E: F Ei it nE ZiE i E _ iu jtE qgia :E iu,iE I;E; Ei? E !iF! i;i,l,i = E$EE ?Ea:IIE EE 3 3iZl.:Er! :iE*Ztrl 2".dio#"docitri5"Eie d6=.i.i; r 9 C Z ,|lE -i8,a ,.l ia\r-t rlPlsF II rex = ;'81 E VHi E FFT 3 ;iits E Es6 Y = i 3 a9-H tsl E aE ^ -=a 4 q3e sIE | €$B dE<- tr 5'+I i*,E i rf;. * g'il E !'33 ! JA 4 < v6 A. : r 8L9. = &B-B qie 6I tr l=e = X i i)g rE3 [,9 ^- cd5 6H; 5 ai = -7i =s^ iAE< 6 6 Li*e !r dl= cx o o =. I ae5.r *iFFA iTd=- 7B o=i p o =a=i o: A*2Q g* Ea'ai-i *i 3tll *t i6t-t sr9r71;999?a 3 d',;; &x d€ E Eq!rg9=EriE.*L H XE 3.8.N;gE:6-JErri.=o'-iia;eEEg5ld13 q I I Y q d.d =[i E E ii 5-a 3 r JFm5goco B qe artg'itpD@lo s .l- t sr H. E z4a: ao zt :i z {{ s E {{ E o: o e nEo t! 6a 4c J{ 4,i- F E' F.T =E 3.s E=T , iE iG e 3X3 3$3:38H A &a a :EY ia a rhm s',:.i ;{ - a= 90 az. oE c3 et ? ! I Eq 7 r @ {a o Fi 3 3 n 3 3 q a 3r s C2J o a rc I q I I 3 i o , i a 3 9 z t' ! i Ze s -B 8.. E e EZ z =I ;e i z; : ;"E r;: i iE" : ;Ee i C E';; = e E:r= zt*U iEEE;EE: €i gl€== :gEiEqE lii E Eai E ; ;Bg i i EEE! €:: E;t E *E: i ; t$; E r :;EC l5iEEE ? rtE ie€ €Eg =€=.EEiiEEie EEE ! Ei€. iF: . E?E , ! o ? ?sEE -=:i4 P o?e E EEEE E; s E o€i = e I 9:E;; r=IT?5i E iFEi i;E" Ig*;EF=: ETEE; E::E3iE EE'E:"5€ EAi f EEiEEES" 3Z*E-r eE !E lEE EA iEgE ;t i r €BE ! E€ g 3, ;EEE| tc "= Eii.v 2.= av.Ea +z .: 2 t+E E Eq -E < EE3=L nAi e = c'' 2i c o: cEi nEE iE s;?F EE [ ; E:; , ;! : ] uE€]r EEF =€ 3:E E; i.E-se sE ; i e_ !€5 +i 7i i: = EBEa; EiI 6. '-aE- E:,Ex: =F EEae gE E, E E :CE ! ii €,, i ;*!.*E !;- .E 2y ts-;F h aB a-E;E iq ;6 E ; :B': ; p{ E,; 5 H:E.. i6e E;i :,gg i $"c.:=€=; 6g Eii E EiE E Yz 3i a iEE+; €:= s ti zE! E E'i EE;e ! ii =e a i EE€ d i g .aEE:BE s?3 z Fa td =E j ^i E. ^ =ii - ^i;+ ;EEEtgE;3. , H " 3 < d *h9--- t'V A' 3 ! i!Xq ! tr tr.yE s € ! aEB E E ; ieB.g.a J a od_=e e 5 1 ,9 2iEc = ts ; .; ^ Y t: 'os+5 g 1 Z 2 Eo E^. eiy c S g .: : ; S reEc e EE 3 {EE_!EE;r9 3, = a -_ e €! ?J EbE! s E E ;' o dF?t-A e - ^ u. €o Eiztd ; > .a I : Ei fi ;--5E S 5 t -6 * :5 :9 !s$I E s 6 t ! :1 f,E '*o o o .Ei ::1E=EC EE== ; E E . s EE EE ,lEA x .U ? 2 { E= Zz e_ E5? y S I 3 C 3,i 3: :F 5EE E ;E .E .b.b€.aE.bh3 E=s -=" i z : : :5 =E:- ?'i Y { O O O O O o.5 OZZ =-- a E .= = = = t = =L Eoo ;:53 I 7 3 € o oc =X E:E Ez e i- : : :3 E; Z"ov c ! g = cX ,Erb sB 3. eH ,2e € ,:-E etr €E- Eg3 E; *E ::gE=EEEE!E=9zc.= := rir tr 6 != !-E-E€E,aE r; " E E-aEriE.=tie:Eo; .,E, $ f E ; ;6 i;e; ;3 ;s-;6:i 6 c; ;.= < ; i ,.llEi :E ; : z i + i,EE; Eg 2 E" E r 2 Z EsEEg;;siEt,Ai E:R i i* i gr iia:"[E::Jr":?, o!€! 3 !3 ! 3& AP*E Er o ;j R : r r 3 P 5 J E E - F F FB O f," g , o ^ d X a d rz y3=-ayi FsBBsBZii,t|Z 4 ?3 ? ? o E -oo< ts6 k 6 3 6 E b E " a r =9 < d PEEaEE H"dua-4ooed.i-:i a o il ..r {\--L H EEr F p a P lE * -gi 5 3r5g E3 Aii6 EiE sE E i3+ 3$ ;e islE= tran: 6a .1?':, *lZ AZ E EE; 9F E ; l:315 i=;,8 35 Ag35 :+s a{ v -.iL ae E e=ai* ai; :x i;gB ;ii:F X liE si : ;frE1 ::: i4 iii* ilr [i E ?-'1-"'- ig ' 7i1i; $r; a: gE{3 i?F v-l- : ii a ii i;+a F aie g! 'E3a xia ?2 l3g tH iErEI riiEe gi;;;E EE;€c'; t€]?s Efg gi sqF 'A= -= I cBq. -= ie=E Erd EE +il etr + o q+i E [+{; gtsi #; gEi i;' L zi? - e3r!'+ zE5 e- o'-i =E f q;= il ;eHirt +f i+h B; i ird s ; *5=21 j= e;e i{ 2 =-o E g:+?*ziF q:F [=: riEiEE tj =,'+ +g r ;.ii i 9*E:i3;** Ei+ g= *" i7'* = +iq Cf 3e =l 3;F iE a IaE € a6i ;i=,*1: =Ee €ii g gia a 3;- ; o = 3a Iu!a :: o I oo I 6' oI 9.€ -t -l ,.1 -t { e6 i 1f Edq!=B e; EE? a 8': E 'aoo;ed'e; ar oi 1s 3aB 3 >= I : Aag;? ? =o < o e'Bgi- -x Ix5=9 loia f2=: O=6 d ; =! z9lQ =3e;3 saRb OtD>EE>-,>FE2\38 H *a# aag= E ?B:g ia,d 7, ^ r ? P : s E 7i3 alE E;sr 3 ?;vi qXE I = a = ! = i 6 EiP -=a 6 ac - E6:g E<: = : z / : 6 .: ".?5 eg* si€E i ==iA= €eA : 5 i i E r ? 31 r !oP- i*EP ? =.E ci=; !-Ea; : =:t*. gBl z = i .q ? I i zr! a o =aaz = =aag :==j 5re -=ii F =Ea'7 3i7 i e i ;-t- z'zgaa?5;ihailiisE !4 B,i* at[s 4rai2 iE51 ;;A ? F = H-iE# :_* li*V ais 7 ;Eg{ rsa *t€q Fs- E :tii iET iF3; [i g :*-qi na€ 3+1:, ;s ; +7dX =Ja{ D!oii :+i qJle- EA f Ia{i qa:; ??EE r= g s--o=ii :1? €q€i, 3: i n=-d :+ ; gi#n q;i iTi i=pY=-a'*2d= ae= ;tl *3 1 i?xL lls ';_i* *i i ai7 lni ri[ ta s 5a,. i6iiE cs =j' !;e {Bg 3= 61d i< = z7 7 t:. : cH; lir; elq :'5 E ZE: =:E s:g ii i 7Te <AF ; g 3. ! "€6' q;gi: ; i Z7 a I=ago;:iE Y = A=E1T *F E'iPF *ag=* E# EE.3 +FEE:3 uq EIE EI,l's e =aiI = i3 r f o -.4a^ d o 6 a ^a i; eE5€r e EFrG-o<A-. 2 \'h- oex e i A B X=E x = G L=z--13 , 9A; -a=) = =-q =831 "; ?V{4.+F;n- E o€6;Eat E-' 56i+3;; r= iE;o -'= o = X F d'2'ii2 a 513;: E E 2 =.= dE;:* a f33. ;-=q q €=? =r qtu q 6-@ j)G:) o d o o <Ert-^ 2 -i=4s55 : rg*?E;3.=, g :En E=91+ 3 FfiE =E! - q€: 29e m-a3; n v. -.; I{ EA 9ir4 E 2 {{ 9. r 9 Zg a 9r J,D i c u I @ U6 h> trMEA v:"> oo.!E!o-::- d o - d I {,= E E -z.= dFF d a?ta6!;qqo6QAQ)OzEXF a )Y' '" i_3 , d " i =Aa z * 6i€, 6 E E99: - > laa ^ 6 E 3e:u ) .= ! E;r E ? ;=iE. E 9€E = .! iol6- JE E .z;Z9 A, E i!t _E ;i.Eld-- Z Eit .t .Y o XgA n 2b.= t ci 9, 9=v -HE ;S Eg: Ets! Oi ,E6 ;:,; ei g3; ;= b i 3 F o^d :ZE E2 A ihf, EcE = ==: ,)E3 &i i t.3= .= hg Ee d .i9= I:5 oF a >EE -?71Ei5ZE77tv == 1 c:? x a Io !o = dE.F =- Z = a !.^I 1E E * d tr* e- 93. g PE' E; 3E Ze 4 E;A E; E! :+ r 0El 26 F E : ts Z * == F r<oi<c 6<Jo; Z "tE aaiz oi g'e t 3 d9(e - 5 Y= -seEbSo€i:-.!2 F €;5€5 t Eu cI g i:.s :?: u ; : @4 U > H .e'9 .e, g.33;= A? * 9 t Est;'=;:.ttf35,9 = a' b 6.t ''9''aE- E F :o ..ii " e/o o d o- = E E': : ;e o i,i E*'--- 9 ^=E-E>E:.;EeilZz -qI$€*Eo;D?--;;Ea t 2 2.=.;.:"P;a<€ 6 H d I SE'ea =o i!!o9'E== ={A -9. ":s- -^J O s E-E; s= >. :: otr Y : >d L > 07 " E3 I E .Ee E> 2= 2 - ? ;z t * F gi - o a.Eo< != Y"€ 7.? Ei.i iz' 3? 39.o:E} E: !.Eo> ?: = s i= 6 a ' asg P; 3=i.n Fa ai z F z zz .i o ?, 24 * 3Z .= 9: E F5: E3 = 40 I .E?;o :3 tr U€ E 9. Fi e1t - Z.A €t ?-Ee -Eq inP E ..o iil? E!!l :E: b=: ZEE i 1 Zi s5E ;ti iz! E E'Et =e€ 26i li! E ;i! E'a:q 6'a East i*v EE; p f Ha- = t 6ElEE E5E ;F;I: gE;,3. s:E E;eE"; : g. AT#E?E: Es;€E *i",lii aBE! *Egi fi r i:-J.l-= EEi-9 :\67 c j jP:ii'*iZ=a EE;+ : 3 e?e.23 3>E3 E?:e E Igr:3 €EaE i?ei ! E f'ii;F g!E: lsFEr 5r=q!q d:E! =-ai z -;:€I ;3tri :=:E E n EEEi*eE;i :EHi{E EFsail;is; ;?;fE; =cEEE; sg5: ! illE i; c 3 lEtE ieEE = : g;[E .E E =<oEd Ee!- F a aJlg E, e 3oe?,e 3F!?..o6o :oxsi A Z i*Ee EE $ gxi'=-!Z AE $E Z ; EE'i 3;E e E e cjui;f<aiuci <arri I TH ri QT Jt z3K !!,e : I o E o F o FE' 8-lx>ZY;i r'l EPA{={d?F-rl ti Ir'b 6lq>re'E =.G;: 6294 q c€ xu =L2Fs4i 7 e.4 Z.z-='d !. :ei.? = aq 1a Iiqr - <6F dU E i g&o ;t+l! EIE!2 iis i lE! z i,- 3P EF 6! ?E>t 5e q{ a- "s- 3 q q 9 E o vi 3 r 35 e F , 3 S a cz I <H aee 3 E: 3t I i o t a t J I !A 5 5 EE FIP oP>q,i E * .Ei ,, t, t, >- a t, a E. B x x B B B B E g g E e il Efil E E = i I i : : = 4 ts = s s s ! = E E 6 I e ii l€a 6 fr) O O O O O > =. { 6 @ 5 { =. ^ .. dSE z tE F E E B 3 e i F F - : =e = 3E E;8 IU i.u i'i.i-eiE g H g e s a$iiF ai Hg$$f li [t ^ '=.EgsEi$t$iEs?idlit alE; FE.r i i i E E 5 q' 5 €. 3 6 E e e' ? ; E,F {-F g9fF*aI'*saEe;iliii' aig* eEiEB E HE gEE+g;5 AE A"7 H=33 i ;i I:'F.EEAg ig #; HB , d i 5 E 6' x E r i $ eP y?. # g' t e * ? ' 3 ; e . ir aE6 i i t n I E E 3 ii i;H6 a i3 t E Fa e€;EB € E I 5 4 c s t 1'e =B6 ; ; A g I rd 6 6€- i9 o" 3 i+ ' I F t Ye g 3 * s E eE IeaEiEl" F t3 ,^ {i T r _1, I Za 'tg 3r J-- o =: tr! = .:: EC ;!., E 3 :E ;: E:E g= =Eq E 1 ?l 4a ",o!- toe : E Pf If Eefl E+ :*'3 - 2 E; Ei lEE :E E*s e a" 4e Et :X3 $: iEE : r iir ;€ s-se EU oe= : E e4, -;= =a ;?= i i ==3 E : 4EE :6 EE3. E * EE= sE ; ;Eio Eo ?E'n' = 3 i-z =i > .E€- g "a7 E;; EE I !5+E; ;;;:J ., .-,e o o: i b= bEr Es i EE::= I E:(J = ";.I c2-> -E Eb =?E E;' i EEE E{ t Fgc a ';= -:* E B ; ;.:.i Eg E EB? = iE ;EE 2E i g;E €5 €:;- E F< ; : P.zE P+ g =-..lE t ;i Es; se 3Eo Hsi:EEE$ :ro;E E,ii 5E: EHH Er; EiE!E{:: EEi=-F=6.=O-g Ei,'f *sa Zg*riEi i$?,i'ri iE E?A EZt€e: EE? lEg!,: ;EslEEEEiisp ;;l iE iE i:=EiEn"iE *ge:i EE r; ;;: ;:g na gE" 13?,€ EEEEEE! 81, =55,Hc E ilElll.EiE EE;Ei3i=E r ^i XEE."-sEEJi;SF;E€$EEs€; = l2 6 Ea=<lf<do<EjucjA<d o{Fdo<ooo-.: L 6i 6i ^i ;b O E E B F E E?,2 € -3 : 3- cr? o E = o; o.,i I I:i ; 5 ; i ;:.924; E E a ? EEE E r a : s <3 iEE ! EAE ; i 1 E f E;EE Ef; :A* ; E E s * E reie € iE Egi E i- ! ; g i ;€,BEA ,E ;ZE: E zE a P ^ a iz Ei sEf,Ee EE: E ; i iE :Eii E g E!5!ts;,qiE "rEE.; s, 2-" iElg"; I uzEEEg::E g€s r € i Ei $;:i$E i qrie e E,q;:! 5E€ i : E 3* ;:iEE{ + s g E"x r.t.. : = de pei, : E :. ::.€ex:;E E i i :- - G .= I a = -3 =E_ S =i O t,a"- ) 7 = I -Pi6EHE!E !E; E i * i=:!Eri:iq :87:€ui c = = : ! 4 E c:s =uHE€ajr: :!E e.p^i ii!sEaE;: eiz:i;E;i'?!EiE E;irsEE E iatE€fEs* E;9;;€Ei =sE3€s i;i1;€;:-- it;5Ei';.zs sE='tiiE::!Eg? E nt!stE€€€ SA=tEE E = a s 5 $ = iEEi EE*,it5€iEaE;E E',y5A ; lEuuuuuutJ ,^ €i:E:_E*eH:€sd2adF<6 .55( iAe 5 l, E t ,, t l, S E*E€ ; 5 Et .9 ! Eg . - ,; -: u e :i, ! Ei ! i" p: fa<6L;E<tri €4 er i; __ \a[ ; E 3E E>!@>@o@>Eb *;i;aa; r i+sPgt;gBl+BaE:5 +Ea*5 =r o :t ? ==E a ^ 5 +;s;ilse A* e E iEEi iiil?lir E*ia; a a i;i;i?E s i E i [:il eiAiiriE iEi;e , ? F,*ffi;* i i; is'r €tg* l*i ai+tf, ;tgrl1fii 1i ;ei i13a+riai;CAZ4 -PY=<-A ^ r, aqX i9i*i3* +9;;F Eo fIIi++: 6E eEFdEi6= : B- iSI isC=E=1E CefiE 3,? e?iie7:- E f is= 3+3.118+ =e.iF> ?s 1B-5eE1X a E. iE, =1I1.r,i g;:=3 ?i i#i:ia. + g F:! li:aSlsa 3-;*c< ljB e,a;==a;," = ; g3€ q 3: a = Ba t; i E: 7B **sE_ar-i i 4 s=e "lir;di c13ix e*eai=,=;,i{; El lA;1:t;E;:ii';ai; =Zr=! !Eqi ii HEE eraa;Hi:lar;E:i;;€= B'Y EBr ii=:aEe ;aqiiI1ne€iF I ; 'Ex +;ri;rs SaBi ?:5= =t o ^665;-iiR ! U i5< atrE!E-|!'- i;-.q++3iE;A V ' EE; iaFr*e= liEF z':i1i la E s;E ir?ix [* ;?*; ;ilri'ifg ' ea? 5?EriFE aF;i i a I qo -:r1uo > g.o =.: oI 6 !- 936--=u.xE<:=9 s a= .d*;3 5 iE i;5i- f =5- Y6o *? q Fo 5-e3!v ^ ro m:a:q Q g; A;4i+ e :B ieii ! ' i < 9 tr tor g 4l !s3E* E =5 c;dgs d iit ixa-o a'6 5= e O.E E P,., 5;iaB a E 9rdE i * I Elsr- - + 6 X A=? * = n;Gi o l@F ! aEn : 5 @Ei ! o tn: =.e ; €-E; , E -- Oh'' 3. ;:g^ = <6i ! :: l: I 3;E P>8otrPBO:1!'9aP>3FOg3aEtiI vrn3I ?PE:EF*==<2= ar1 " eP:E€f E= Iaa ? 7 ; ;: " 7 a "iEE+ se fi; Ei €a tor:I33 * :- 'egiEEE ? 1 : q ers= 1s;; sEi:, gEE gEaE+ga Ei ::'i3',i ; iilicE $FEe r;t3;=*uBEx ;<=.8 z - 5 E- d E= _q : c-: iu iix j E ;d E ; B+6- as d = : :: = :-45€ : :l xF gE =;3iz ii s ?zgFiEl?i [aaEei''aEE i*Yii J- ?' 5i= ;B iB 5 *E i=Lt Ai1i:EB ;;jt $r ;: i* 3= ; + e i:r,: ; =A !a :? c':o n o;,:-,- P P = I Ae;;Z ," ?-" -a; is 6- t9 6 iq;> <i e ir -i 3 *.22 i Ei 3s a= : -96 c aa*;5u, r-'i 6SI+:ii'-uii ll a'g; :;3; E= E ; ; E slsE i E: iB i3 + g gg3a =4 i i i ; i4qa E ;e n riEf- EI 2v a d q*i= A:Faa-i F. ?* A!.i; ir F * a aii; c i:" i: i; =: a n* 1s ir 1 F iliE isB *7Ho' ii e;r ie ? + aaf a I i; zi ; s E, E 7t ii E E ai€liui€Eq;+ E E1* g: i ': Tzzz i 1l; g = E s iz? ii i t lai: A ie; = a ? s ?*i =i i ;:xlle-Fl ie z i o € I ie q-xa : *-. E J E o A g 9 E E ; € *eE E Ji - JE! E n? PyE ! 5: u=2 2 42 EE ig € EA :; EE EE EB Eq Jg u; H - ,tr6 a u E€ Fd aF O'5..E e"? 6E :E E$ f: }9 E.E EE *'to e? ;b s s P; H a -. boeOEirq-A cc iZ E . ZEE q; 8.1 i p IE= grl Ea e f; ,- bfiF EE e? : ii. ;, E" *:€ CiZ T1 E ?; H,E BE'*" E=g EE E !,! EE; 2EE i eil '.?, { -E.8- i;P ,.EEf *El 5lt€ E1IE ;Ei€EE it? FfEE. EFEiFgS;E - €; : t: E E:E $ EE?i€rEgi;tEi H €E ? rE E Ei5 3 €5a;;EE#EEs;sE EE P }3 d, €E€ A 'h ,E; O H F= q 5 E65 EE Jd v >3, _9. l1.* rda<@aFq e XaA; + 3xrx9i ] O o a k N $=N ! t85 *[i mt ffi fl T €! If I o E 1 { @ zt nEiqI T ti3 a oIt ui"|,l,i.l-l-i"|.l"l"i,i"li1]i1:l11 E oo-2o-o a-c38rg 19'i Ea9: c Fr.?t, r!!I != aq a o K :9 * E* gsieeii itil}t1gag gl' .j. .j. .:., - .-.,.. I .i. .i q. t N Dl B o a B B o: d, g + p N r.* io.o o o o o d o o,e o a o aro o e q q e.q ;,: r' l, q i i, { f a i J i: i r +, *, nl s tit r f' t EoJ6'oreL{'{{{:{{: {\I I H I H a I E n 5 I I I E'B.$ $ 8.I iiI E i It ;j oI REVISED TECHNICAL SPECIFICATIONS For the Construction of Cell 4A Lining System White Mesa Mitl Blanding, Utah Prepared for: NEF.Itr5 Mrrufr5 Denison Mines (USA) Corporation 6425 S. Highway 191 P.O. Box 809 Blanding, UT 84511 Phone: (306) 628-1798 Prepared by GeosyntecD consultalts Geosyntec Consultants 10875 Rancho Bernardo Rd. Suite 200 San Diego, California 92127 f ON JUNE 2OO7 Geosyntcc Consultants CERTIFICATION PAGE TECHNICAL SPECIFICATIONS CELL 4A LINING SYSTEM CONSTRUCTION DENTSON MINES (USA) CORPORATTON WHITE MESA MILL BLANDING, UTAH The Engineering material and data contained in these Technical Specifications were prepared under the supervision and direction of the undersigned, whose seal as a registered Professional Engineer is affixed below, No.602AOt?.220273 cREGoRyr. i &*uil*T. Corcoran, P.E. ineer of Record SC0l49/ /SC0l49 - Technical Specifications F 061 lo7.doc Geosyntec Consultants TABLE OF CONTENTS Section 01010 Summary of Work Section 01025 Measurement & Payment Section 01300 Submittals Section 01500 Construction Facilities Section 01505 Mobilization / Demobilization Section 01560 Temporary Controls Section 01700 Contract Closeout Section 02010 Demolition Section 02220 Subgrade Preparation Section 02225 Drainage Aggregate Section 02616 PVC Pipe Section 02770 Geomembrane Section 02771 Geotextile Section 02772 Geosynthetic Clay Liner Section 02773 Geonet Section 03400 Cast-In-Place Concrete SC0349/. ../SC0349 - Tcchnical Specifications F 06 I 307.dG lll Geosyntec Consultants SECTION 0101O SUMMARY OF WORK PARTl_ GENERAL 1.01 DESCRIPTION OF WORK A. The Work generally involves the preparation of subgrade, installation of geosynthetic liner system, and associated piping. B. The Work will generally consist of: l. Initial topographic survey; 2. Mass excavation and subgrade preparation; 3. Anchor trench and leak detection system trench excavation; 4. Installation of needle-punched geosynthetic clay liner (GCL) consisting of woven and nonwoven geotextiles; 5. Installation of 60-mil HDPE secondary geomembrane; 6. Installation of leak detection system 4-inch and l8-inch PVC pipe and fittings; 7. Installation of aggregate within leak detection system pipe trench and sump; 8. Installation of 300 mil geonet; 9. Installation of 60-mil HDPE primary geomembrane; 10. Installation of l6 oz./SY nonwoven geotextile cushion; 1 l. Installation of slimes drain 4-inch and 18-inch PVC pipe and fittings; 12. Installation of aggregate around slimes drain and within sump; and 13. Installation of strip composite drainage layer. I.O2 CONTRACTOR'S RESPONSIBILITIES A. Start, layout, construct, and complete the Project in accordance with the Technical Specifications, CQA Plan, and Drawings (Contract Documents). B. Provide a competent Site superintendent, capable of reading and understanding the Construction Documents, who shall receive instructions from the Construction Manager. C. Establish means, techniques, and procedures for constructing and otherwise executing the Work. D. Establish and maintain proper Health and Safety practices for the duration of the Project. E. Except as otherwise specified, fumish the following and pay the cost thereof: l. Labor, superintendent, and products. 2. Construction supplies, equipment, tools, and machinery. 3. Water, electricity, and other utilities required for construction. 4. Other facilities and services necessary to properly execute and complete the Work. Cell 44 Lining System Construction sc0349\...\sc0r4e - TECHNTcAL spEcrFrcArroNs F Page 0 I 01 0- I 06t307.DOC | 8 June 200? Geosyntec Consultants 5. A Registered Land Surveyor, licensed in the State of Utah, to survey and layout the Work, and to certify as-built Record Drawings. Pay cost oflegally required sales, consumer, and use taxes and governmental fees. Perform Work in accordance with codes, ordinances, rules, regulations, orders, and other legal requirements of governmental bodies and public agencies bearing on performance of Work. Forward submittals and communications to the Construction Manager. Where applicable, the Construction Manager will coordinate submittals and communications with the representatives who will give approvals and directions through the Construction Manager. Maintain order, safe practices, and proper conduct at all times among Contractor's employees. The Owner, and its authorized representative, may require that disciplinary action be taken against an employee of the Contractor for disorderly, improper, or unsafe conduct. Should an employee of the Contractor be dismissed from his duties for misconduct, incompetence, or unsafe practice, or combination thereof, that employee shall not be rehired for the duration of the Work. Coordinate the Work with the utilities, private utilities, and/or other parties performing work on or adjacent to the Site. Eliminate or minimize delays in the Work and conflicts with those utilities or contractors. Coordinate activities with the Constnrction Manager. Schedule private utility and public utility Work relying on survey points, lines, and grades established by the Contractor to occur immediately after those points, lines and grades have been established. Coordinate activities of the several trades, suppliers, and subcontractors, if any, performing the Work. 1.03 NOTIFICATION A. The Contractor shall notiry the Construction Manager in writing if he elects to subcontract, sublet, or reassign any portion of the Work. This shall be done at the time the bid is submitted. The written statement shall describe the portion of the Work to be performed by the Subcontractor and shall include an indication, by reference ifdesired by the Construction Manager, that the Subcontractor is particularly experienced and equipped to perform that portion of the Work. No portion of the Work shall be subcontracted, sublet, or reassigned without written permission of the Construction Manager. Consent to subcontract, sublet, or reassign any portion of the Work by the Construction Manager shall not be considered as a testimony of the Construction Manager as to the qualifications of the Subcontractor and shall not be construed to relieve the Contractor of any responsibilities for completion of the Work. 1.04 CONFORMANCE Work shall conform to the Technical Specifications, CQA Plan, and Drawings that form a part of these Contract Documents. Omissions from the Technical Specifications, CQA Plan, and Drawings or the misdescription of details of Work which are necessary to carry out the intent of the Contract Documents are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the Work, but they shall be performed as if fully and correctly set forth and described in the Technical Specifications, CQA Plan, and Drawings. Cell 4,A Linine System Construction F. G. H. K. A. SCO349\..,\SCO349 . TECHNICAL SPECIFICATIONS F 06 I l07.DOC Page 01010-2 I 8 June 2007 Geosyntec Consultants 1.05 DEFINITIONS A. OWNER - The term Owner means the Denison Mines (USA) Corporation for whom the Work is to be provided. E CONSTRUCTION MANAGER - The term Construction Manager means the firm responsible for project administration and project documentation control. All formal documents will be submitted to the Construction Manager for proper distribution and/or review. During the period of Work the Construction Manager will act as an authorized representative of the Owner. DESIGN ENGINEER - The term Design Engineer means the firm responsible for the design and preparation of the Construction Documents. The Engineer is responsible for approving all design changes, modifications, or clarifications encountered during construction. The Design Engineer reports directly to the Owner. CQA ENGINEER - The term CQA Engineer refers to the firm responsible for CQA related monitoring and testing activities. The CQA Engineer's authorized personnel will include CQA Engineer-of-Record and Lead CQA Monitor. The CQA Engineer may also perform CQC work as appropriate. The CQA Engineer reports directly to the Owner. CONTRACTOR - The term Contractor means the firm that is responsible for the Work. The Contractor's responsibilities include the Work of any and all of subcontractors and suppliers. The Contractor reports directly to the Construction Manager. All subcontractors report directly to the Contractor. SURVEYOR - The term Surveyor means the firm that will perform survey and provide as- built Record Drawings for the Work. The Surveyor shall be a Registered Land Surveyor, licensed to practice in the State of Utah. The Surveyor is employed by and reports directly to the Contractor. SITE - The term Site refers to all approved staging areas, and all areas where the Work is to be performed, both public and privately owned. WORK - The term Work means the entire completed construction, or various separately identifiable parts thereof, required to be furnished under the Contract Documents. Work includes any and all labor, services, materials, equipment, tools, supplies, and facilities required by the Contract Documents and necessary for the completion of the project. Work is the result of performing services, furnishing labor, and fumishing and incorporating materials and equipment into the construction, all as required by the Contract Documents. DAY - A calendar day on which weather and other conditions not under the control of the Contractor will permit construction operations to proceed for the major part of the day with the normal working force engaged in performing the controlling item or items of Work which would be in progress at that time. CONTRACT DOCUMENTS - Contract Documents consist of the Technical Specifications, CQA Plan, and Drawings. I.06 CONTRACT TIMES A. The time stated for completion and substantial completion shall be in accordance with the Contract Times specified in the Agreement. Extensions to the Contract Time of performance shall be granted for those days when the Contractor is unable to work due to adverse weather conditions or as a result of abnormal conditions. Extension of time of performance based on adverse weather conditions shall be granted when requested by the Contractor and reviewed Cell 4,A Linine System Construction B. C D. G. H. SCO349\.,,\SCO]49 - TECHNICAL SPECIFICATIONS F 06 I l07.DOC Page 01010-3 I 8 June 2007 Geosyntec Consultants in writing by the Construction Manager. All requests for extensions of time by the Contractor based on adverse weather conditions must be submitted in wnting to the Construction Manager within five (5) working days of the time in question. No claims for damages shall be made by the Contractor for delays. B. Contractor shall adhere to the schedule provided in the Contract. Unapproved extensions to the schedule will result in the Contractor paying liquidated damages in the amount of $4,000 per day to cover costs associated with Construction Management and construction oversight. I.O7 CONTRACTOR USE OF WORK SITE Confine Site operations to areas permitted by law, ordinances, permits, and the Contract Documents. The Contractor shall ensrue that all persons under his control (including Subcontractors and their workers and agents) are kept within the boundaries of the Site and shall be responsible for any acts oftrespass or damage to property by persons who are under his control. Consider the safety of the Work, and that of people and properfy on and adjacent to work Site, when determining amount, location, movement, and use of materials and equipment on work Site. The Contractor shall be responsible for protecting private and public property including pavements, drainage culverts, electricity, highway, telephone, and similar property and shall make good of, or pay for, all damage caused thereto. Control of erosion throughout the project is of prime importance and is the responsibility of the Contractor. The Contractor shall provide and maintain all necessary measures to control erosion during progress of the Work to the satisfaction of the Construction Manager and all applicable laws and regulations, and shall remove such measures and collected debris upon completion of the project. All provisions for erosion and sedimentation control apply equally to all areas of the Work. Contractor shall promptly notify the Construction Manager in writing of any subsurface or latent physical conditions at the Site that differ materially from those indicated or referred to in the Contract Documents. Construction Manager will promptly review those conditions and advise Owner in writing if further investigations or tests are necessary. If the Construction Manager finds that the results of such investigations or tests indicate that there are subsurface and latent physical conditions which differ materially from those intended in the Contract Documents, and which could not reasonably have been anticipated by Contractor, a Change Order shall be issued incorporating the necessary revisions. At no time shall Contractor interfere with operations of businesses on or in the vicinity of the Site. Should the Contractor need to work outside the regular working hours, the Contractor is required to submit a written request and obtain approval by the Construction Manager. 1.08 PRESERVATION OF SCIENTIFIC INFORMATION Federal and State legislation provides for the protection, preservation, and collection of data having scientific, prehistoric, historical, or archaeological value (including relics and specimens) that might otherwise be lost due to alteration of the terrain as a result of any construction work. If evidence of such information is discovered during the course of the Work, the Contractor shall notifu the Construction Manager immediately, giving the location and nature of the findings. Written confirmation shall be forwarded within two (2) working days. The Contractor shall exercise care so as not to damage artifacts uncovered during excavation operations, and shall provide such cooperation and assistance as may be necessary to preserve the findings for removal or other disposition by the Construction Manager or Government agency. Cell 4,{ Linins Svstem Construction C. A. B. D. A. B. SCO349\...\SC0349. TECHNICAL SPECIFICATIONS F 06B07.DOC Page 01010-4 18 June 2007 1.09 l.l0 Geosyntec Consultants C. Where appropriate, by reason of a discovery, the Construction Manager may order delays in the time of performance, or changes in the Work, or both. If such delays, or changes, or both, are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses of the Contract. MEASUREMENT AND PAYMENT A. Measurement for Work will be according to the work items listed in Section 01025 of these Specifications. EXISTING UTILITIES The Contractor shall be responsible for locating, uncovering, protecting, flagging, and identifuing all existing utilities encountered while performing the Work. The Contractor shall request that Underground Service Alert (USA) locate and identifu the existing utilities. The request shall be made 48 hours in advance. Costs resulting from damage to utilities shall be borne by the Contractor. Costs of damage shall include repair and compensation for incidental costs resulting from the unscheduled loss ofutility service to affected parties. The Contractor shall immediately stop work and notiff the Construction Manager of all utilities encountered and damaged. The Conffactor shall also Survey the exact location of any utilities encountered during construction. l.l I CONTRACTOR QUALIFICATIONS The Contractor, and all subcontractors, shall be licensed at the time of bidding, and throughout the period of the Contract, by the State of Utah to do the type of work required under terms of these Contract Documents. By submitting a bid, the Contractor certifies that he is skilled, competent, and knowledgeable on the nature, extent and inherent conditions of the Work to be performed and has been regularly engaged in the general class and type of work called for in these Contract Documents and meets the qualihcations required in these Specifications. The Construction Manager shall disqualify a bidder that either cannot provide references, or if the references cannot substantiate the Contractor's qualifications. By submission of a bid for this Project, the Contractor acknowledges that he is thoroughly familiar with the Site conditions. 1.72 INTERPRETATION OF TECHNICAL SPECIFICATIONS, CQA PLAN, AND DRAWINGS A. Should it appear that the Work to be done or any matters relative thereto are not sufficiently detailed or explained in the Technical Specifications, CQA Plan, and/or Drawings, the Design Engineer will further explain or clarifli, as may be necessary. In the event of any questions arising respecting the true meaning of the Contract Documents, the matter shall be referred to the Design Engineer, whose decision thereon shall be final. Cell 4A Linine System Construction A. C. A. B. C. SC0349\,..\SCO349 . TECFINICAL SPECIFICATIONS F 06t 307.DOC Page 01010-5 I 8 June 2007 Geosyntec Consultants 1.13 HEALTH AND SAFETY A. The Contractor shall be responsible for health and safety of its own crew, subcontractors, suppliers, and visitors. Contractor shall adhere to the Contractor Safety Rules for the site. t.t4 GENERAL REQUIREMENTS E. SURVEYING - The Surveyor shall be responsible for all surveying required to layout and control the Work. Surveying shall be conducted such that all applicable standards required by the State of California. PERMITS - The Contractor shall be required to obtain permits in accordance with construction of the facility. SEDIMENTATION, EROSION CONTROL, AND DEWATERING - Contractor shall comply with all laws, ordinances, and permits for controlling erosion, water pollution, and dust emissions resulting from construction activities; the Contractor shall be responsible for any hnes imposed due to noncompliance. The Contractor shall perform work in accordance with the Storm Water Pollution Prevention Plan (SWPPP) provided by the Owner. The Contractor shall pump all water generated from dewatering into Cell 3, as directed by the Construction Manager. PROTECTION OF EXISTING SERVICES AND WELLS - The Contractor shall exercisc care to avoid disturbing or damaging the existing monitor wells, electrical poles and lines, permanent below-ground utilities, permanent drainage structures, and temporary utilities and structures. When the Work requires the Conftactor to be near or to cross locations of known utilities, the Contractor shall carefully uncover, support and protect these utilities and shall not cut, damage, or otherwise disturb them without prior authorization from tle Construction Manager. All utilities or wells damaged by the Contractor shall be immediately repaired by the Contractor to the satisfaction of the Construction Manager at no additional cost. BURNING - The use of open fires for any reason is prohibited. F. TEMPORARY ROADS - The Contractor shall be responsible for constructing and maintaining all temporary roads and lay down areas that the Contractor may require in the execution of the Work. CONSTRUCTION WATER - The Contractor shall obtain for water from the Owner for construction and dust control. The Contractor shall not add substances (such as soap) to construction water. The Contractor shall utilize measuring devices that allow him to track the volume of water used. Such usage records shall be maintained and provided to the Construction Manager. COOPERATION - The Contractor shall cooperate with all other parties engaged in project- related activities to the greatest extent possible. Disputes or problems should be referred to the Construction Manager for resolution. FAMILIARIZATION - The Contractor is responsible for becoming familiar with all aspects of the Work prior to performing the Work. SAFEGUARDS - The Contractor shall provide and use all personnel safety equipment, barricades, guardrails, signs, lights, flares, and flagmen as required by OSHA, state, or local codes and ordinances. No excavations deeper than 4 feet with side slopes steeper than 2:l (horizontal:vertical) shall be made without the prior approval of the Design Engineer and the Construction Manager. When shoring is required, the design and inspection of such shoring shall be the Contractor's responsibility and shall be subject to the review of the Design Cell 4A Linins Svstem Construction D. A. C. G. H. SCO]49\,..\SCO349 . TEC}INICAL SPECIFICAIIONS F 06 I 307.DOC Page 01010-6 18 Junc 2007 K. Geosyntec Consultants Engineer and Construction Manager prior to use. No personnel shall Work within or next to an excavation requiring shoring until such shoring has been installed, inspected, and approved by an engineer registered in the State of Utah. The Contractor shall be responsible for any fines imposed due to violation of any laws and regulations relating to the safety of the Contractor's personnel. CLEAN-UP - The Contractor shall be responsible for general housekeeping during construction. Upon completion of the Work, the Contractor shall remove all of his equipment, facilities, construction materials, and trash. All disturbed surface areas shall be re-paved, re- vegetated, or otherwise put into the pre-existing condition before performing the Work, or a condition satisfactory to the Construction Manager. SECURIry - The Contractor is responsible for the safety and condition of all of his tools and equipment. ACCEPTANCE OF WORK - The Contractor shall retain ownership and responsibility for all Work until accepted by Construction Manager. Construction Manager will accept ownership and responsibility for the Work: (i) when all Work is completed; and (ii) after the Contractor has submitted all required documentation, including manufacturing quality control documentation and manufacturing certifications. L. M. PART2- PRODUCTS NOT USED. PART3_ EXECUTION NOTUSED. PART 4 - MEASUREMENT AND PAYMENT NOTUSED. IEND OF SECTTONI Cell 4A Lining System Construction SCO349\...\SCO]49 . TECHNICAL SPECIFICATIONS F 06t307.DOC Page 01010-7 18 June 2007 Geosyntec Consultants SECTION 01025 MEASUREMENT AND PAYMENT PART 1 _ GENERAL 1.01 DESCRIPTION OF WORK A. This section covers measurement and payment criteria applicable to the Work performed under lump sum and unit price payment methods, and non-payment for rejected work. I.O2 RELATED SECTIONS A. This section relates to all other sections of the contract. 1.03 AUTHORITY A. Measurement methods delineated in the individual specification sections are intended to complement the criteria of this section. In the event of conflict, the requirements of the individual specification section shall govern. B. A surveyor, licensed in the State of Utah, hired by the Contractor will take all measurements and compute quantities accordingly. All measurements, cross-sections and quantities shall be stamped and certified by the licensed surveyor and submitted to the Construction Manager. The Construction Manager maintains the right to provide additional measurements and calculation of quantities to veriff measurements and quantities submitted by the Contractor. 1.04 UNIT QUANTITIES SPECIFIED A. Quantities and measurements indicated in the Bid Schedule are for bidding and contract purposes only. Quantities and measurements supplied or placed in the Work and verified by the Construction Manager shall determine payment. If the actual work requires more or fewer quantities than those quantities indicated, the Contractor shall provide the required quantities at the lump sum and unit prices contracted unless modified elsewhere in these Contract Documents. B. Utah sales tax shall be included in each bid item as appropriate. 1.05 MEASUREMENT OF QUANTITIES A. Measurement by Volume: Measurement shall be by the cubic dimension using mean lengths, widths and heights or thickness, or by average end area method as measured by the surveyor. All measurement shall be the difference between the original ground surface and the design ("neat- line") dimensions and grades. B. Measurement by Area: Measurement shall be by the square dimension using mean lengths and widths and/or radius as measured by the surveyor. All measurement shall be the difference between the original ground surface and the design ("neatJine") dimensions and grades. C. Linear Measurement: Measurement shall be by the linear dimension, at the item centerline or mean chord. All measurement shall be the difference between the original ground surface and the design ("neat-line") dimensions and grades. D. Stipulated Lump Sum Measurement: Items shall be measured as a percentage by weight, volume, area, or linear means or combination, as appropriate, of a completed item or unit of Work. Cell 4A Linins SYstem Construction sc0349\...\scol4e-TECHNrcAr.spECrFrcATroNSF Page01025-l 06 t307.DOC | 8 Iune 200? Geosyntec Consultants I.06 PAYMENT A. Payment includes full compensation for all required labor, products, tools, equipment, transportation, services and incidentals, erection, application or installation of an item of the Work; and all overhead and profit. Final payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities accepted by the Construction Manager multiplied by the unit price for Work which is incorporated in or made necessary by the Work. B. A monthly progress payment schedule will be used to compensate the Contractor for the Work. The monthly amount to be paid to the Contractor is calculated as the percent of completed work for each bid item multiplied by the total anticipated work for that bid item minus a l0 percent retainer. C. When the Contractor has completed all Work associated with completion of the project, the remaining 10 percent retainer of the contract amount will be paid to the Contractor after filing the Notice of Completion. I.O7 NON.PAYMENTFORREJECTEDPRODUCTS A. Payment shall not be made for any of the following: 1.08 l. Products wasted or disposed of in a manner that is not acceptable. 2. Products determined as unacceptable before or after placement. 3. Products not completely unloaded from the transporting vehicle. 4. Products placed beyond the design lines, dimensions, grades and levels of the required Work 5. Products remaining on hand after completion of the Work. 6. Loading, hauling, and disposing ofrejected Products. 7. Products rejected because ofcontamination (i.e. soil residues, fuel spills, solvents, etc.). BID ITEMS A. The following bid items shall be used by the Owner and by the Contractor to bid the Work described in these bid documents. Cell 4A Linine System Construction BID TTEM SECTION DESCRIPTION UNITS I 01500 Construction Facilities LS 2 01505 Mobilization / Demobilization LS 3 02220 Subgrade Preparation SF 4 02220 Anchor Trench LF 5 02616 4-inch PVC Pipe and Fittings LF 6 02616 lS-inch PVC Pipe and Fittings LF 7 02616 Strip Drain Composite LF 8 02770 60-mil Smooth HDPE Geomembrane SF 9 02772 Geosynthetic Clay Liner SF SCO349\.,,\SCO349 - TECHNICAL SPECIFICATIONS F 06l 107 rro(l Page 01025-2 18 June 20O7 Geosyntec Consultants PART2_ PRODUCTS NOT USED. PART3_ EXECUTION NOT USED. PART 4 _ MEASUREMENT AND PAYMENT NOTUSED. IEND OF SECTTONI BID ITEM SECTION DESCRIPTION UNITS l0 02'773 300-mil Geonet SF l1 03400 Cast-In-Place Concrete LS Cell 4A Linins System Construction sc034e\...\sc0i4e - TECFINICAL SpECIFICATToNS F Page 01 025-3 06r307.DOC Geosyntec Consultants SECTION O13OO SUBMITTALS PARTl_ GENERAL 1.01 DESCRIPTION OFWORK A. This section contains requirements for administrative and work-related submittals such as construction progress schedules, Shop Drawings, test results, operation and maintenance data, and other submittals required by Contract Documents. B. Submit required materials to the Construction Manager for proper distribution and review in accordance with requirements of the Contract Documents. I.O2 CONSTRUCTION PROGRESS SCHEDULES A. The Contractor shall prepare and submit t'wo (2) copies of the construction progress Schedule to the Construction Manager for review within 5 days after the effective date of Contract. B. Schedules shall be prepared in the form ofa horizontal bar chart. The schedule shall include the following items. 1. A separate horizontal bar for each operation. 2. A horizontal time scale, which identifies the first workday of each week. 3. A scale with spacing to allow space for notations and future revisions. 4. Listings arranged in order of start for each item of the Work. C. The Construction Progress Schedule for construction of the Work shall include the following items where applicable. l. Submittals: dates for beginning and completion of each major element of construction and installation dates for major items. Elements shall include, but not be limited to, the following items which are applicable: a. Mobilizationschedule b. Demobilizationschedule. c. Final site clean-up. d. Show projected percentage ofcompletion for each item as offirst day ofeach week. e. Show each individual Bid ltem. Schedule Revisions: I . Bi-weekly to reflect changes in progress of Work. 2. Indicate progress of each activity at submittal date. 3. Show changes occurring since the previous schedule submittal. Changes shall include the following. a. Major changes in scope. b. Activities modified since previous submittal. Cell 4A Lining System Construction D. SCO]49\.,,LSC0349. TECHNICAL SPECIFICATIONS F 06B07.DOC Page 01300-l I 8 June 200? Geosyntec Consultants c. Revised projections of progress and completion. d. Other identifiable changes. 4. Provide narrative report as needed to define: a. Problem areas, anticipated delays, and impact on schedule. b. Recommended corrective action and its effect. 1.03 CONSTRUCTION WORK SCHEDULE A. The Contractor shall submit an updated l4-day work schedule at the beginning of each week by Monday morning at 8:00 a.m. The schedule shall address applicable line items from the construction project schedule with a refined level of detail for special activities. I.O4 SHOP DRAWINGS AND SAMPLES A. Shop Drawings, product data, and samples shall be submitted as required in individual Sections of the Specifications. B. TheContractor'sResponsibilities: l. Review Shop Drawings, product data, and samples prior to submittal. 2. Determine and veriff: a. Field measurements. b. Field construction criteria. c. Catalog numbers and similar data. d. ConformancewithSpecifications. 3. Coordinate each submittal with requirements of the Work and Conffact Documents. 4. Notifu the Construction Manager in writing, at the time of the submittal, of deviations from requirements of Contract Documents. 5. Begin no fabrication or Work pertaining to required submittals until return of the submittals with appropriate approval. 6. Designate dates for submittal and receipt of reviewed Shop Drawings and samples in the construction progress schedule. C. Submittals shall contain: l. Date of submittal and dates of previous submittals. 2. Project title and number. 3. Contractidentification. 4. Names of: a. The Contractor. b. Supplier. c. Manufacturer. 5. Summary of items contained in the submittal. Cell 4,{ Linine System Construction sc034e\...\sc034e - rEcHNrcAL spEcrFrcArroNs F Page 0l 300-2 061307.DOC l8 June 2007 Geosyntec Consultants 6. Identification of the product with identification numbers, and the Drawing and Specification section numbers. 7. Clearly identified field dimensions. 8. Details required on the Drawings and in the Specifications. 9. Manufacturer, model number, dimensions, and clearances, where applicable. 10. Relation to adjacent or critical feahrres of the Work or materials. I 1. Applicable standards, such as ASTM or Federal Specification numbers. 12. Identification of deviations from Contract Documents. 13. Identification of revisions on re-submittals. 14. 8-in. by 3-in. blank space for the Contractor's and proper approval stamp. 15. The Contractor's stamp, signed, certiffing to review of the submittal, verification of the products, field measurements, field construction criteria, and coordination of information within the submittal with requirements of Work and Contract Documents. D. Re-submittal Requirements: l. Re-submittal is required when corrections or changes in submittals are required by the Construction Manager, Design Engineer, or CQA Engineer. Re-submittals are required until all comments by the Construction Manager, Design Engineer, or CQA Engineer is addressed and the submittal is approved. 2. Shop Drawings and Product Data: a. Revise initial drawings or data and resubmit as specified for initial submittal. b. Indicate changes made other than those requested by the Construction Manager, Design Engineer, or CQA Engineer. E. Distribute reproductions of Shop Drawings and copies of product data which have been accepted by the Construction Manager to: 1. Job site file. 2. Record documents file. F. Construction Manager's Duties l. Verifu that review comments are technically correct and are consistent with technical and contractual requirements of the work. 2. Retum submittals to the Contractor for distribution or re-submittal. G. Design Engineer's Duties: l. Review submittals promptly for compliance with contract documents and in accordance with the schedule. 2. Affix stamp and signature, and indicate either the requirements for re-submittal or no comments. 3. Retum submittals to the Construction Manager. H. CQA Engineer's Duties: Cell 4A Lining System Construction sc0l49\...\scoi4e - TECHNTcAL spECrFrcATIoNS F Page 0l 300-3 06B07.DOC l8 June 2007 Geosyntec Consultants 1. Review submittals promptly for compliance with contract documents and in accordance with the schedule. 2. Affix stamp and signature, and indicate either the requirements for re-submittal or no comments. 3. Retum submittals to the Construction Manager. 1.05 TEST RESULTS AND CERTIFICATION A. Results of tests conducted by the Contractor on materials or products shall be submitted for review. B. Certification ofproducts shall be submitted for review. 1.06 SUBMITTAL REQUIREMENTS A. Provide complete copies of required submittals as follows. 1. Construction Work Schedule: a. Two copies of initial schedule. b. Two copies of each revision. 2. Construction Progress Schedule: a. Two copies of initial schedule. b. Two copies of each revision. 3. Shop Drawings: Two copies. 4. Certification Test Results: Two copies. 5. Other Required Submittals: a. Two copies if required for review. b. Two copies if required for record. B. Deliver the required copies of the submittals to the Construction Manager. PART2- PRODUCTS NOTUSED. PART 3 _ EXECUTION NOTUSED. PART 4 _ MEASUREMENT AND PAYMENT NOT USED. IEND OF SECTTONI Cell 4,{ Linine Svstem Construction sc0349\...rsc034e - TECHNIcAL spEClFrcATroNS F Page 01300-4 06t307.DOC I 8 Jrme 2007 Geosyntec Consultants SECTION O14OO QUALITY CONTROL PARTl- GENERAL 1.01 DESCRIPTION OF WORK A. Monitor quality control over suppliers, Manufacturers, products, seryices, Site conditions, and workmanship, to produce Work of specified quality. Comply with Manufacturers' instructions, including each step in sequence. Should Manufacturers' instructions conflict with Technical Specifications, request clarification from Design Engineer before proceeding. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. 1.02 E. Perform Work by persons qualified to produce workmanship of specified quality. TOLERANCES A. Monitor tolerance control of installed products to produce acceptable Work. Do not permit tolerances to accumulate. 1.03 B. Comply with Manufacturers' tolerances. Should Manufacturers' tolerances conflict with Technical Specifications, request clarification from Design Engineerbefore proceeding. C. Adjust products to appropriate dimensions; position before securing products in place. REFERENCES A. For products or workmanship specified by association, trade, or other consensus standards, complies with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B. Conform to reference standard by date of current issue on date of Notice to Proceed with construction, except where a specific date is established by code. C. Obtain copies of standards where required by product Specification sections. I.O4 INSPECTING AND TESTING SERVICES A. The CQA Engineer will perform construction quality assurance (CQA) inspections, tests, and other services specified in individual Sections ofthe Specification. B. The Contractor shall cooperate with CQA Engineer; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested. C. CQA testing or inspecting does not relieve Contractor, subcontractors, and suppliers from their requirements to perform quality control Work as indicated in the Technical Specifications. Cell 4A Linine System Construction B. C. D. SCO349\,,,\SCO349 . TECHNICAL SPECIFICATIONS F 06r307.DOC Page 01400-l 18 ,une 2007 Geosyntec Consultants PART2_ PRODUCTS NOTUSED. PART3- EXECUTION NOTUSED. PART 4_ MEASUREMENT ANID PAYMENT NOTUSED. IENDOF SECTTONI Cell 4A Linins Svstem Construction sc0349\...\.sc0349 - TEcHNTcAL spEcrFrcATtoNs F Page 01400-2 061307.mc Geosyntec Consultants SECTION O15OO CONSTRUCTION FACILITIES PARTl_ GENERAL 1.01 SECTION INCLT]DES A. Construction facilities include furnishing of all equipment, materials, tools, accessories, incidentals, labor, and performing all work for the installation of equipment and for construction of facilities, including their maintenance, operation, and removal, if required, at the completion of the Work under the Contract. I.O2 DESCRIPTION OF WORK A. Construction facilities include, but are not limited to, the following equipment, materials, facilities, areas, and services: Parking Areas. Temporary Roads. Storage of Materials and Equipment. Construction Equipment. Temporary Sanitary Facilities. Temporary Water. First Aid Facilities. Health and Safety. Security. 1.03 B. Construct/install, maintain, and operate construction facilities in accordance with the applicable federal, state, and local laws, nrles, and regulations, and the Contract Documents. GENERAL REQUIREMENTS A. B. Contractor is responsible for fumishing, installing, constructing, removing and disposing of the construction facilities, as specified required for the completion of the Work under the Contract. Contractor shall maintain construction facilities in a clean, safe and times until completion of the Work. operating, maintaining, in this Section, and as sanitary condition at all C. Contractor shall minimize land disturbances related to the construction facilities to the greatest extent possible and restore land, to the extent reasonable and practical, to its original contours by grading to provide positive drainage and by seeding the area to match with existing vegetation or as specified elsewhere. I.O4 TEMPORARY ROADS AND PARKING AREAS Temporary roads and parking areas are existing roads that are improved, or new roads constructed by Contractor for convenience of Contractor in the performance of the Work under the Contract. Cell 4A Linine System Construction A. SCO]49\-,,\SCO349 . TECHNICAL SPECIFICATIONS F 06 I 307.DOC Page 01500-l l8 June 2007 Geosyntec Consultants B. Contractor shall coordinate construction with Construction Manager. C. If applicable, coordinate all road construction activities with local utilities, fire, and police departments. D. Keep erosion to a minimum and maintain suitable grade and radii of curves to facilitate ease of movement of vehicles and equipment. E. Fumish and install longitudinal and cross drainage facilities, including, but not limited to, ditches, structures, pipes and the like. F. Clean equipment so that mud or dirt is not carried onto public roads. Clean up any mud or dirt transported by equipment on paved roads both on-site and off-site. 1.05 STORAGE OF MATERIALS AND EQUIPMENT A. Make arrangements for material and equipment storage areas. Locations and configurations of approved facilities are subject to the acceptance of the Construction Manager. B. Confine all operations, including storage of materials, to approved areas. Store materials in accordance with these Technical Specifications and the Construction Drawings. C. Store construction materials and equipment within boundaries of designated areas. Storage of gasoline or similar fuels must conform to state and local regulations and be limited to the areas approved for this purpose by the Construction Manager. 1.06 CONSTRUCTION EQUIPMENT A. Erect, equip, and maintain all construction equipment in accordance with all applicable statutes, laws, ordinances, rules, and regulations or other authority having jurisdiction. B. Provide and maintain scaffolding, staging, hoists, barricades, and similar equipment required for performance of the Work. Provide hoists or similar equipment with operators and signals, as required. C. Provide, maintain, and remove upon completion of the Work, all temporary rigging, scaffolding, hoisting equipment, debris boxes, barricades around openings and excavations, fences, ladders, and all other temporary work, as required for all Work hereunder. D. Construction equipment and temporary work must conform to all the requirements of state, county, and local authorities, OSHA, and underwriters that pertain to operation, safety, and f.re hazard. Fumish and install all items necessary for conformity with such requirements, whether or not called for under separate Sections ofthese Technical Speciftcations. I.O7 TEMPORARY SANITARY FACILITIES A. Provide temporary sanitary facilities for use by all employees and persons engaged in the Work, including subcontractors, their employees and authorized visitors, and the Construction Manager. B. Sanitary facilities include enclosed chemical toilets and washing facilities. These facilities must meet the requirements of local public health standards. C. Locate sanitary facilities as approved by Construction Manager, and maintain in a sanitary condition during the entire course of the Work. Cell 4A Linins Svstem Construction sc0349\...\sc0i49 - TECHNTcAL spECrFlcATroNs F Page 01 500-2 06r 307.DOC I 8 June 2007 Geosyntec Consultants I.O8 TEMPORARY WATER A. Make all arrangements for water needs from the Owner. B. Provide drinking water for all personnel at the site. 1.09 FIRST AID FACILITIES A. Provide first aid equipment and supplies to serve all Contractor personnel at the Site. 1.10 HEALTH AND SAFETY A. Provide necessary monitoring equipment and personal protective equipment in accordance with Contractor prepared Site Health and Safety Plan. 1.11 SECURITY A. Make all necessary provisions and be responsible for the security of the Work and the Site until final inspection and acceptance of the Work, unless otherwise directed by the Construction Manager. I.I2 SHUT-DOWN TIME OF SERVICE A. Do not disconnect or shut down any part of the existing utilities and services, except by express permission of Construction Manager. 1.13 MAINTENANCE A. Maintain all construction facilities, utilities, temporary roads, and the like in good working condition as required by the Construction Manager during the term of the Work. I.I4 STATUS AT COMPLETION A. Upon completion of the Work, or prior thereto, when so required by Construction Manager: 1. Repair damage to roads caused by or resulting from the Contractor's work or operations. 2. Remove and dispose of all construction facilities. Similarly, all areas utilized for temporary facilities shall be returned to near original, natural state, or as otherwise indicated or directed by the Construction Manager. PART2_ PRODUCTS NOT USED. PART 3 _ EXECUTION NOT USED. PART 4 _ MEASUREMENT AND PAYMENT A. Providing for and complying with the requirements set forth in this Section for Construction Facilities as lump sum (LS) and payment will be based on the unit price provided on the Bid Schedule. Cell 4A Lining System Construction sc0r4e\...\sc0i49 - TECr{NlcAL spECrFrcATroNS F Page 01 500-3 06 I307.DOC I 8 June 200? Geosyntec Consultants B. The following are considered incidental to the Work: 1. Mobilization. 2- Temporary roadways and parking areas. 3. Temporary sanitary facilities. 4. Decontamination of equipment. 5. Security. 6. Demobilization. IEND OF SECTTONI Cell 4A Linine System Construction sc034e\...\sc034e - rEclrNrcAl spEcrFrcAloNs F Page 0l500-4 061307.DOC Geosyntec Consultants SECTION 01505 MOBILIZATION / DEMOBILIZATION PARTl_ GENERAL 1.01 DESCRIPTION OF WORK A. Mobilization consists of preparatory work and operations, including but not limited to those necessary for the movement of personnel and project safety; including: adequate personnel, equipment, supplies, and incidentals to the project Site; establishment of facilities necessary for work on the project; premiums on bond and insurance for the project and for other work and operations the Contractor must perform or costs the Contractor must incur before beginning work on the project, which are not covered in other bid items. B. Demobilization consists of work and operations including, but not limited to, movement of personnel, equipment, supplies, and incidentals off-site. PART2_ PRODUCTS NOT USED. PART3- EXECUTION NOT USED. PART 4_ MEASUREMENT AND PAYMENT 4.01 GENERAL Providing for and complying with the requirements set forth in this Section as lump sum (LS) and payment will be based on the unit price provided on the Bid Schedule. The Contract Price for Mobilization / Demobilization shall include the provision for movement of equipment onto the job site; removal of all facilities and equipment at the completion of the project; cost of bonds, both prime and subconfactors; permits: preparation of a Health and Safety Plan; all necessary safety measures; and all other related mobilization and demobilization costs. Price bid for mobilization shall not exceed 10 percent of the total bid for the Project. Fifty percent of the mobilization bid price, less retention, will be paid on the initial billing provided all equipment and temporary facilities are in place and bond fees paid. The remaining 50 percent of the mobilization bid price will be paid on satisfactory removal of all facilities and equipment on completion of the project. IEND OF SECTIONI Cell 4A Linine System Construction A. B. SCO349\.-.\SCO]49 . TECHNICAL SPEClFICATIONS F 06 I 307.DoC Page 01505-l 18 June 2007 Geosyntec Consultants SECTION 01560 TEMPORARY CONTROLS PARTl- GENERAL 1.01 DESCRIPTION OF WORK Temporary Controls required during the term of the Contract for the protection of the environment and the health and safefy of workers and general public. Furnishing all equipment, materials, tools, accessories, incidentals, and labor, and performing all work for the installation of equipment and construction of facilities, including their maintenance and operation during the term of the Contract. Temporary Controls include: l. Dust Control. 2. Pollution Control. 3. Traffic and Safety Controls. D. Perform Work as specified in the Technical Specifications and as required Construction Manager. Maintain equipment and accessories in clean, safe and condition at all times until completion of the Work. 1.03 DUST CONTROL A. Provide dust control measures in-accordance with the Technical Specifications. Dust control measures must meet requirements of applicable laws, codes, ordinances, and permits. B. Dust control consists of transporting water, furnishing required equipment, testing of equipment, additives, accessories and incidentals, and carrying out proper and efficient measures wherever and as often as necessary to reduce dust nuisance, and to prevent dust originating from construction operations throughout the duration of the Work. POLLUTION CONTROL Pollution of Waterways: l. Perform Work using methods that prevent entrance or accidental spillage of solid or liquid matter, contaminants, debris, and other objectionable pollutants and wastes into watercourses, flowing or dry, and underground water sources. 2. Such pollutants and wastes will include, but will not be limited to, refuse, earth and earth products, garbage, cement, concrete, sewage effluent, industrial waste, hazardous chemicals, oil and other petroleum products, aggregate processing tailings, and mineral salts. Dispose of pollutants and wastes in accordance with applicable permit provisions or in a manner acceptable to and approved by the Construction Manager. Cell 4A Linine Svstem Construction A. B. C. by the sanitary 1.02 A. B. SC0l49\.. \S( 0349 - ThCI{NICAL SPECIFICATIONS F 06t t0? D(xl Page 01560-l l8 Junc 2007 Geosyntec Consultants C. Storage and Disposal of Petroleum Product: l. Petroleum products covered by this Section include gasoline, diesel fuel, lubricants, and refined and used oil. During project construction, store all petroleum products in such a way as to prevent contamination of all ground and surface waters and in accordance with local, state, and federal regulations. 2. Lubricating oil may be brought into the project area in steel drums or other means, as the Contractor elects. Store used lubricating oil in steel drums, or other approved means, and return them to the supplier for disposal. Do not bum or otherwise dispose of at the Site. 3. Secondary containment shall be provided for products stored on site, in accordance with the Owner provided Storm Water Pollution Prevention Plan. I.O4 TRAFFIC AND SAFETY CONTROLS Post construction areas and roads with traffic control signs or devices used for protection of workmen, the public, and equipment. Signs and devices must conform to the American National Standards Institute (ANSD Manual on Uniform Traffic Control Devices for Streets and Highways. Remove signs or traffic control devices after they have finished serving their purpose. It is particularly important to remove any markings on road surfaces that under conditions of poor visibility could cause a driver to turn off the road or into traffic moving in the opposite direction. Provide flag persons, properly equipped with International Orange protective clothing and flags, as necessary, to direct or divert pedestrian or vehicular traffic. A full-time flag person shall be required for the duration of importation of fill. Barricades for protection of employees must conform to the portions of the ANSI Manual on Uniform Traffic Control Devices for Streets and Highways, relating to barricades. Guard and protect all workers, pedestrians, and the public from excavations, construction equipment, all obstructions, and other dangerous items or areas by means of adequate railings, guard rails, temporary walks, barricades, warning signs, sirens, directional signs, overhead protection, planking, decking, danger lights, etc. Construct and maintain fences, planking, barricades, lights, shoring, and warning signs as required by local authorities and federal and state safety ordinances, and as required to protect all property from injury or loss and as necessary for the protection ofthe public, and provide walks around any obstructions made in a public place for carrying out the Work covered in this Contract. Leave all such protection in place and maintained until removal is authorized by the Construction Manager. 1.05 MAINTENANCE Maintain all temporary controls in good working conditions during the term of the Contract for the safe and efficient transport of equipment and supplies, and for construction of permanent works. Cell 4A Linins Svstem Construction A. B. C. D. E. F. A SCO349\.,,\SCO349 - TECHNICAL SPECIFICATIONS F 06 I l07.DOC Page 01560-2 I 8 June 2007 Geosyntec Consultants I.06 STATUS AT COMPLETION A. Upon completion of the Work, or prior thereto as approved by the Construction Manager, remove all temporary confrols and restore disturbed areas. PART2_ PRODUCTS NOT USED. PART 3 _ EXECUTION NOT USED. PART 4 _ MEASUREMENT AND PAYMENT 4.01 TEMPORARY CONTROLS A. Temporary Controls: the measurement and payment of temporary controls shall be rn accordance with and as a part of Mobilization / Demobilization, as outlined in Section 0 I 505. IEND OF SECTTONI Cell 4A Linins System Construction sc0349\...\sc034e - rEcHNrcAL spECrFrcArroNS F Page 0l 560-3 06 I 307.DOC I I lunc 2007 1.01 Geosyntec Consultants SECTION O17OO CONTRACT CLOSEOUT PARTl_ GENERAL 1.02 CLOSEOUT PROCEDURES A. Contractor shall submit written certification that the Technical Specifications, CQA Plan, and Drawings have been reviewed, Work has been inspected, and that Work is complete and in- accordance with the Technical Specifications, CQA Plan, and Drawings and ready for Owner's inspection. FINAL CLEANING A. Contractor shall execute final cleaning prior to final inspection. B. Contractor shall clean equipment and fxtures to a sanitary condition. C. Contractor shall remove waste and surplus materials, rubbish, and construction facilities from the construction Site. PROJECT RECORD DOCUMENTS A. Maintain on Site, one set of the following record documents and record actual revisions to the 1.03 Work. 1. Drawings. 2. Specifications. 3. Addenda. 4. Change Orders and other Modifications to the Contract. 5. Reviewed Shop Drawings, product data, and samples. Store Record Documents separate from documents used for construction. Record information concurrent with construction progress. Specifications: Legibly mark and record at each product Section a description of actual products installed, including the following: l. Manufacturer's name and product model and number. 2. Product substitutions or altemates utilized. 3. Changes made by Addenda and Modifications. Record Documents and Shop Drawings: Legibly mark each item to record actual construction including: l Measured horizontal and vertical location of underground utilities and appurtenances referenced to permanent surface features. 2. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible, accessible, and permanent features of the Work. Cell 4A Linine System Construction B. C. D. E. SCO]49\...\SC0349. TECHNICAL SPECIFICATIONS F 06r307.DOC Page 01700-1 18 June 2007 Geosyntec Consultants 3. Field changes of dimension and detail. 4. Details not shown on original Construction Drawings. F. Submit record documents to the Construction Manager. PART2- PRODUCTS NOT USED. PART3_ EXECUTION NOT USED. PART 4 _ MEASUREMENT AND PAYMENT 4.01 CONTRACT CLOSEOUT A. Contract Closeout: the measurement and payment of contract close out shall be in accordance with and as part of Mobilization / Demobilizatron, as outlined in Section 01505. IEND OF SECTTONI Cell 4A Linins Svstem Construction sc034e\...\sc034e - TECHNTcAL spEcrFrcATroNS F Page 0l 700-2 06r307.DOC 18 Junc 200? Geosyntec Consultants SECTION 02220 SUBGRADE PREPARATION PARTl- GENERAL 1.OI DESCRIPTION OFWORK A. The Contractor shall furnish all labor, materials, tools, supervision, transportation, equipment, and incidentals necessary to perform all Earthwork. The Work shall be carried out as specified herein and in accordance with the Drawings and the Construction Quality Assurance (CQA) Plan. B. The Work shall include, but not be limited to vegetation removal, re-conditioning, and grading ofsubgrade soil and construction ofgeosynthetics anchor trench. Earthwork shall conform to the dimensions, lines, grades, and sections shown on the Drawings or as directed by the Engineer. I.O2 RELATED SECTIONS Section 02770 - Geomembrane Section 0277 1 - Geotextile Section 02772 - Geosynthetic CIay Liner Section 02773 - Geonet 1.03 REFERENCES A. Drawings B. Site CQA Plan 1.04 QUALIFICATIONS A. The Contractor's Site Superintendent for the earthworks operations shall have supervised the construction ofat least two civil construction and earthworks projects in the last 5 years, including grading and trenching. I.O5 QUALITY ASSURANCE A. The Contractor shall ensure that the materials and methods used for subgrade preparation meet the requirements of the Drawings and this Section. Any material or method that does not conform to these documents, or to altematives approved in writing by the Design Engineer will be rejected and shall be repaired, or removed and replaced, by the Contractor at no additional expense to the Owner. PART2- PRODUCTS 2.OI SUBGRADE SOIL A. Subgrade surface be free of protrusions larger than 0.5 inches. Any such observed particles shall be removed prior to placement of geosynthetics. Cell 4A Linine System Construction SCO]49\,,.\SC0349. TECHNICAL SPECIFICATIONS F 06t 307.D(r Page 02220-l l8 lune 20o? Geosyntec Consultants B. Subgrade surface shall be free of large desiccation cracks at the time of geosynthetics placement. C. Additional subgrade soil, ifneeded, shall consist ofon-site soils that are free ofdeleterious, organic, and/or other soil impacts that can damage the overlying liner system. 2.02 ANCHOR TRENCH BACKFILL A. Anchor trench backfill is the soil material that is placed in the anchor trench, as shown on the Drawings. Rocks greater than 6-in. in any dimension shall not be permitted in anchor trench backfill material. B. Where rocks are included in the anchor trench backfill, they shall be mixed with suitable excavated materials to eliminate voids. C. Material removed during trench excavation may be utilized for anchor trench backfill, provided that all organic material, rubbish, debris, and other objectionable materials are first removed. 2.03 EQUTPMENT A. The Contractor shall fumish, operate, and maintain grading and compaction equipment as is necessary to produce smooth surfaces for the placement ofgeosynthetics and acceptable in- place soil density in the anchor trenches. B. The Contractor shall furnish, operate and maintain tank trucks, pressure distributors, or other equipment designed to apply water uniformly and in controlled quantities for dust control and for moisture conditioning soils to be placed as trench backfill. C. The Contractor shall be responsible for cleaning up all fuel, oil, or other spills, at the expense ofthe Contractor, and to the satisfaction ofthe Engineer. PART3_ EXECUTION 3.01 FAMILIARIZATION A. Prior to implementing any of the work in this Section, the Contractor shall become thoroughly familiar with the Site, the Site conditions, and all portions of the work falling within this and other related Sections. B. The Contractor shall provide for the protection of work installed in accordance with other Sections. In the event of damage to other work, the Contractor shall make repairs and replacements to the satisfaction of the Engineer, at the expense of the Contractor. 3.02 SUBGRADE SOIL A. The Contractor shall remove vegetation and roots to a minimum depth of 4-inches below ground surface in all areas where geosynthetic materials are to be installed. B. Contractor shall grade subgrade soil to be uniform in slope, free from mts, mounds, or depressions. C. Rock or soil particles larger than 0.5 inches in longest diameter shall be removed from the surface prior to geosynthetics placement. Cell 4,{ Linins System Construction sc034e\...\sc034e - TECHNTcAL spECrFrcArroNS F Page 02220-2 06 I 307.DOC I 8 Junc 2007 F. Prior to GCL installation, the subgrade surface shall be proof-rolled with appropriate compaction equipment to confirm subgrade stability. In the case additional soil is imported on the site for subgrade use, it shall be placed in loose lifts of no more than 8 inches and compactedto90o of the maximum density at a moisture content of between -3o/o and +3% of optimum moisture content, as determined by ASTM D 1557. Subgrade soils shall be moisture conditioned prior to installation of overlying GCL to a wet but workable condition. 3.03 TRENCH EXCAYATION A. The Contractor shall excavate the anchor trench to the limits and grades shown on the Drawings. B. Excavated anchor trench materials shall be returned as backfill for the anchor trench and compacted. C. Excavated materials not suitable for anchor trench backfill shall be stockpiled in an area as shown on the Drawings in accordance with Subpart 3.05 of this Section, or as designated by the Engineer. D. Material not suitable for anchor trench backfill shall be relocated as directed by the Engineer. 3.04 TRENCH BACKFILL F. The anchor trench backfill shall be placed to the lines and grades shown on the Drawings. Soil used for anchor trench backfill shall meet the requirements of Part 2.02 of this Section. Soil used for anchor trench backfill shall be placed in loose lifts of no more than 6 inches and compactedto 90o/o of maximum dry density per ASTM D 1557. Backfill shall be within -3Yolo +3%o of optimum moisture content. The maximum permissible pre- compaction soil clod size is 6 inches. The Contractor shall compact each lift of anchor trench backfill to the satisfaction of the CQA Consultant. The Contractor shall utilize compaction equipment suitable and sufficient for achieving the soil compaction requirements. During soil wetting or drying, the material shall be regularly disked or otherwise mixed so that uniform moisture conditions are obtained in the appropriate range. 3.05 STOCKPILING A. Soil and rock materials suitable for earthworks that are required to be stockpiled shall be stockpiled in areas as shown on the Drawings or as designated by the Engineer, and shall be free ofincompatible soil, clearing debris, vegetation, trash, large rocks, or other objectionable materials. B. Stockpiles shall be no steeper than 2H: 1V (Horizontal:Vertical) or other slope approved by the Engineer, graded to drain, sealed by tracking parallel to the direction of the slope with a Cel[ 4A Lining System Construction D. E. A. B. C. D. SCO]49\,..ISC0349. TECHNICAL SPECIFICATIONS F 061 307.DOC Page 02220-3 l8 June 2007 Geosyntec Consultants dozer or other means approved by the Engineer, and dressed daily during periods when fill is taken from the stockpile. The Contractor shall employ temporary erosion and sediment control measures (i.e. silt fence) as directed by the Engineer around all temporary stockpile areas. C. There are no compaction requirements for stockpiled materials. 3.06 SURVEY CONTROL A. The Contractor shall perform all surveys necessary for construction layout and control. B. The Contractor shall perform as built surveys for all completed surfaces for purposes of Record Drawing preparation. At a minimum, survey points shall be obtained at grade breaks, top of slope, toe of slope, and limits of material type. 3.07 PROTECTION OF WORK A. The Contractor shall protect completed work of this Section. B. At the end of each day, the Contractor shall veriff that the entire work area is left in a state that promotes drainage of surface water away from the area and from finished work. C. In the event of damage to Work, the Contractor shall make repairs and replacements to the satisfaction of the CQA Engineer, at the expense of the Contractor. PART 4 _ MEASUREMENT AND PAYMENT 4.01 GENERAL A. Providing for and complying with the requirements for subgrade preparation will be measured on a square foot (SF) basis and payment will be based on the unit price as provided on the Bid Schedule. B. Providing for and complying with the requirements for anchor trench excavation and backfill shall be measured on a lineal foot (LF) basis and payment will be based on the unit price as provided on the Bid Schedule. C. The following are considered incidental to the work: . Submittals.o Quality Assurance and Quality Control. o Excavation, loading, and hauling. r Temporary haul roads. r Dust control.o Placement, compaction, and moisture conditioning.. Stockpiling. o Record survey. IEND OF SECTTONI Cell 44' Linine Svstem Construction sc034el..\sc0i4e - TECHNIcAL spEclFrcAnoNs F Page 02220-4 06 I 307.DOC 18 June 2007 GeoSyntec Consultants SECTION 02225 DRAINAGE AGGREGATE PARTI_ GENERAL 1.01 DESCRIPTION OF WORK A. The Contractor shall furnish all labor, materials, tools, supervision, transportation, equipment and incidentals necessary for the installation of Drainage Aggregate. The work shall be carried out as specified herein and in accordance with the Drawings and the site Construction Quality Assurance (CQA) Plan. B. The work shall include, but not be limited to, delivery, offloading, storage, and placement of Drainage Aggregate (aggregate). 1.02 RELATED SECTIONS Section 02616 - PVC Pipe Section 02770 - Geomembrane Section 02771 - Geotextile Section 02773 - Geonet 1.03 REFERENCES A. Drawings B. Site CQA Plan C. Latest Version of American Society for Testing and Materials (ASTM) Standards: ASTM C 33 Standard Specification for Concrete Aggregates ASTM C 136 Test Method for Sieve Analysis of Fine and Coarse Aggregates ASTM D 2434 Test Method for Permeability of Granular Soils (Constant Head) ASTM D 3042 Standard Test Method for Insoluble Residue in Carbonate Aggregates I.O4 SUBMITTALS A. The Contractor shall submit to the Engineer for approval, at least 7 days prior to the start of construction, Certificates of Compliance for proposed aggregate materials. Certificates of Compliance shall include, at a minimum, typical gradation, insoluable residue content, representative sample, and source of aggregate materials. B. The Contractor shall submit to the Engineer a list of equipment and technical information for equipment proposed for use in placing the aggregate material in accordance with this Section. 1.0s CONSTRUCTTON QUALTTY ASSURANCE (CQA) MONTTORTNG A. The Contractor shall be aware of and accommodate all monitoring and field/laboratory conformance testing required by the CQA Plan. This monitoring and testing, including (ell 4.A Lining Syslem Construction sc0r4e\...\sc034e - TEClrNrcAL SpEClFrcATroNS F Page 02225-1 061107 D(x' I8 June 2007 GeoSyntec Consultants random conformance testing of construction materials and completed work, will be performed by the CQA Consultant. If nonconformances or other deficiencies are found in the materials or completed work, the Contractor will be required to repair the deficiency or replace the deficient materials. PART2_ PRODUCTS 2.OI MATERIALS A. Aggregate shall meet the requirements specified in ASTM C 33 and shall not contain limestone. Aggregate shall have a minimum permeability of I x l0-r cm./sec when tested in accordance with ASTM D 2434. The requirements of the Aggregate are presented below: Maximum Particle Size (in.)Percent Finer 3/r-in.r00 No.200 Sieve 0to2 B. Carbonate loss shall be no greater than 10% by d.y weight basis when tested in accordance with ASTM D3042. 2.02 EQUIPMENT A. The Contractor shall furnish, operate, and maintain hauling, placing, and grading equipment as necessary for aggregate placement, meeting the ground pressure requirements listed in Subpart 3.02.F. PART3- EXECUTION 3.01 FAMILIARIZATION A. Prior to implementing any of the work in this Section, the Contractor shall become thoroughly familiar with the site, the site conditions, and all portions of the work falling within this and other related Sections. B. Inspection: 1. The Contractor shall carefully inspect the installed work of all other Sections and venfu that all work is complete to the point where the installation of the work specified in this Section may properly commence without adverse impact. 2. If the Contractor has any concerns regarding the installed work of other Sections, the Engineer shall be notified in writing prior to commencing work. Failure to notify the Engineer or commencement of the work of this Section will be construed as Contractor's acceptance of the related work of all other Sections. 3.02 PLACEMENT A. Place after underlying geosynthetic installation is complete, including CQC and CQA work. B. Place to the lines, grades, and dimensions shown on the Drawings. C. The subgrade of the aggregate consists of a geotextile overlying a geomembrane. The Contractor shall avoid creating large wrinkles (greater than 6-inches high), tearing, Cell 4,A Lining System Construction sc0l4e\...\sc0i4e - TEcHNrcAL SpECrFlcrATroNS F Page 02225-2 06t:]0? D(xl I 8 lunc 2007 GeoSyntec Consultants puncturing, folding, or damaging in any way the geosynthetic materials during placement of the aggregate material. D. Damage to the geosynthetic liner system caused by the Contractor or his representatives shall be repaired by the Geosynthetic Installer, at the expense of the Contractor. E. No density or moisture requirements are specified for placement of the aggregate material. 3.03 FIELD TESTING A. The minimum frequency and details of conformance testing are provided below. This testing will be performed by the CQA Consultant. The Contractor shall take this testing frequency into account in planning the construction schedule. l. Aggregatesconformancetesting: particle-size analyses conducted in accordance with ASTM C 136 at a frequency of one test per 5,000 yd3, minimum I per project; and b. permeability tests conducted in accordance with ASTM D 2434 at a frequency of one test per 10,000 yd3, minimum I per project. SURVEY CONTROL A. The Contractor shall perform all surveys necessary for construction layout, control, and Record Drawings. PROTECTION OF WORK A. The Contractor shall use all means necessary to protect all work of this Section. B. In the event of damage, the Contractor shall make repairs and replacements to the satisfaction of the Engineer at no additional cost to the Owner. PART 4_ MEASUREMENT AND PAYMENT 4.OI GENERAL Providing for and complying with the requirements set forth in this Section for Drainage Aggregate will be incidental to the PVC pipe, and payment will be based on the unit price for PVC pipe provided on the Bid Schedule. The following are considered incidental to the work: 3.04 3.05 A. B. a a a a a a a a a Cell 4A Lining System Construction Submittals. Quality Control. Material samples, sampling, and testing. Excavation, loading, and hauling. Placing and grading. Layout survey. Rejected material. Rejected material removal, re-testing, handling, and repair. Mobilization. IEND OF SECTTON ] SCO]49\,,.\SCO349 - TECHNICAL SPECIFICATIONS F 06t t07.Doc Page 02225-3 18 June 2007 GeoSyntec Consultants SECTION 02616 POLWINYL CHLORIDE (PVC) PIPE PARTl_ GENERAL 1.01 DESCRIPTION OFWORK A. The Contractor shall furnish all labor, materials, tools, supervision, transportation, and equipment necessary to install perforated and solid wall polyvinyl chloride (PVC) Schedule 40 pipe and fittings, as shown on the Drawings and in accordance with the Construction Quality Assurance (CQA) Plan. 1.02 RELATED SECTIONS Section 02225 - Drainage Aggregate Section 02270 - Geomembrane Section 0277 1 - Geotextile Section 02772- Geonet 1.03 REFERENCES A. Drawings. B. Site CQA Plan. C. Latest version of the American Society for Testing and Materials (ASTM) standards: ASTM D 1784 Standard Specification for tugid Poly (Vinyl Chloride) (PVC) Compounds and chlorinated Poly (Vinyl Chloride) (CPVC) Compounds. ASTM D 1785 Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80 and 120. ASTM D 2466 Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40. ASTM D 2564 Standard Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings. ASTM D 2'174 Practice for Underground Installation of Thermoplastic Pressure Piping. ASTM D 2855 Standard Practice for Making Solvent-Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipe and Fittings. ASTM F 656 Standard Specification for Primers for Use in Solvent Cement Joints of Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings. Cell 4A Linins Svstem Construction sc034e\...\sc034e - TECHNIcAL spEcrFICArroNS F Page 02616-1 061307.DOC l8 June 2007 GeoSyntec Consultants 1.04 SUBMITTALS A. The Contractor shall submit to the Engineer for approval, at least 7 days prior to installation of this material, Certificates of Compliance for the pipe and fittings to be fumished. Certificates of Compliance shall consist of a properties sheet, including specified properties measured using test methods indicated herein. B. The Contractor shall submit to the Engineer, Record Drawings of the installed piping at a frequency of not less than once per every 50 feet of installed pipe. Record Drawings shall be submitted within 7 days of completion of the record survey. 1.05 CQA MONTTORTNG A. The Contractor shall ensure that the materials and methods used for PVC pipe and fittings installation meet the requirements of the Drawings and this Section. Any material or method that does not conform to these documents, or to alternatives approved in writing by the Engineer, will be rejected and shall be repaired or replaced by the Contractor at no additional cost to the Owner. PART 2 _ MATERIALS 2.OI PVC PIPE & FITTINGS A. PVC pipe and fittings shall be manufactured from a PVC compound which meets the requirements of Cell Classification 12454 polyvinyl chloride as outlined in ASTM D 1784. B. PVC pipe shall meet the requirements of ASTM D l'784 and ASTM D 1785 for Schedule 40 PVC pipe. C. PVC frttings shall meet the requirements of ASTM D 2466. D. Clean rework or recycle material generated by the Manufacturer's own production may be used so long as the pipe or fittings produced meet all the requirements of this Section. E. Pipe and fittings shall be homogenous throughout and free of visible cracks, holes, foreign inclusions, or other injurious defects, being uniform in color, capacity, density, and other physical properties. F. PVC pipe and fitting primer shall meet the requirements of ASTM F 656 and solvent cements shall meet the requirements of ASTM D 2564. 2.02 PVC PERFORATED PIPE A. Perforated pipe shall meet the requirements listed above for solid wall pipe, unless otherwise approved by the Engineer. PVC pipe perforations shall be as shown on the Drawings. 2.03 STRIP COMPOSITE A. Strip composite shall be comprised of high density polyethylene core Multi-Flow Drainage Systems l2-inch product, or Engineer approved equal. Consideration for equality will involve chemical resistance, compressive strength, and flow capacity. Strip composite shall be installed as shown on the Drawings. B. Sand bags used to continuously cover the strip composite shall be comprised of woven geotextile capable of allowing liquids to pass and shall have a minimum length of l8-inches. Cell 4A Lining System Construction sc0r4e\...rsc034e - TECHNTcAL SpECTFIcAnoNS F Page 02616-2 06ll07.Doc I ti June 2007 GeoSyntec Consultants Sand bags shall contain Utah Department of Transportation (UDOT) concrete sand having a carbonate loss of no greater than 10% by dry weight basis when tested in accordance with ASTM D 3042 and meeting the following gradation. Sieve Size Percent Passing 3i8 inch 100% No.4 95o/. to 100Y, No. 16 45%o to 80%" No.50 lUY:o to 30%" No. 100 zYo to 10o PART3- PART3EXECUTION 3.01 PVC PIPE HANDLING A. When shipping, delivering, and installing pipe, fittings, and accessories, do so to ensure a sound, undamaged installation. Provide adequate storage for all materials and equipment delivered to the site. PVC pipe and pipe httings shall be handled carefully in loading and unloading so as not to damage the pipe, fittings, or underlying materials. 3.02 PVC PIPE INSTALLATION A. PVC pipe installation shall conform to these Specifications, the Manufacturer's recommendations, and as outlined in ASTM D 2774. B. PVC perforated and solid wall pipe shall be installed as shown on the Drawings. C. PVC pipe shall be inspected for cuts, scratches, or other damages prior to installation. Any pipe showing damage, which in the opinion of the CQA Consultant will affect performance of the pipe, must be removed from the site. Contractor shall replace any material found to be defective at no additional cost to the Owner. 3.03 JOINING OF PVC PIPES C. PVC pipe and fittings shall be joined by primer and solvent-cements per ASTM D 2855. All loose dirt and moisture shall be wiped from the interior and exterior of the pipe end and the interior of fittings. All pipe cuts shall be square and perpendicular to the centerline of the pipe. All burrs, chips, etc., from pipe cutting shall be removed from pipe interior and exterior. Pipe and fittings shall be selected so that there will be as small a deviation as possible at the joints, and so inverts present a smooth surface. Pipe and fittings that do not fit together to form a tight fit will be rejected. Cell 4A Linine System Construction C A. B. D SCO349\,,,\SCO349 - TECHNICAL SPECIFICATIONS F 06 r 307.DOC Page 02616-3 I 8 June 2007 GeoSyntec Consultants 3.04 PROTECTION OF WORK A. The Contractor shall use all means necessary to protect all work of this Section. B. In the event of damage, the Contractor shall make all repairs and replacements necessary, to the satisfaction ofthe Engineer. PART 4 _ MEAST]REMENT AND PAYMENT A. Providing for and complying with the requirements set forth in this Section for 4-inch PVC Pipe will be measured as in-place lineal foot (LF) to the limits shown on the Drawings, and payment will be based on the unit price provided on the Bid Schedule. B. Providing for and complying with the requirements set forth in this Section for l8-inch PVC Pipe will be measured as in-place lineal foot (LF) to the limits shown on the Drawings, and payment will be based on the unit price provided on the Bid Schedule. C. Providing for and complying with the requirements set forth in this Section for Strip Drain, including connectors, will be measured as in-place lineal foot (LF) to the limits shown on the Drawings, and payment will be based on the unit price provided on the Bid Schedule. D. The following are considered incidental to the Work: . Submittals.o Quality Control.. Shipping, handling and storage.o Fittings.. Drainage aggregate.. Joining.o Mobilization.o Placement. . Rejected material. o Rejected material removal, handling, re-testing, and repair. r Gravel bags. IEND OF SECTTONI Cell 4A Linins Svstem Construction sc034e\...\sc034e - rEcHNrcAL spEcrrrcArloNs F Page 02616-4 06t l07.Doc I8 June 2007 GeoSyntec Consultants SECTION 02770 GEOMEMBRANE PART 1 _ GENERAL 1.01 DESCRIPTION OF WORK A. The Contractor shall furnish all labor, materials, tools, supervision, transportation, equipment, and incidentals necessary for the installation of smooth high-density polyethylene (HDPE) geomembrane, as shown on the Drawings. The work shall be performed as specified herein and in accordance with the Drawings and the site Construction Quality Assurance (CQA) Plan. B. The work shall include, but not be limited to, delivery, offloading, storage, placement, anchorage, and seaming of the geomembrane. 1.02 RELATED SECTIONS Section 02225 - Drainage Aggregate Section 02771 - Geotextile Section 02773 - Geonet 1.03 REFERENCES A. Drawings B. Site CQA Plan C. Latest version of the American Society for Testing and Materials (ASTM) standards: ASTM D 638 Standard Test Method for Tensile Properties of Plastics ASTM D 792 Standard Test Methods for Specific Gravity (Relative Density) and Density of Plastics by Displacement ASTM D 1505 Standard Test Methods for Density of Plastics by Density-Gradient Technique ASTM D 1603 Standard Test Method for Carbon Black in Olef,rn Plastics ASTM D 4439 Terminology for Geosynthetics ASTM D 4833 Standard Test Method for Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products ASTM D 5199 Standard Test Method for Measuring the Nominal Thickness of Geosynthetics ASTM D 5397 Test Method for Evaluation of Stress Crack Resistance of Polyolefin Geomembranes Using Notched Constant Tensile Load Test ASTM D 5596 Recommended Practice for Microscopical Examination of Pigment Dispersion in Plastic Compounds Cell 4A Linine Svstem Construction sc0i4e\...\sc034e - TECHNTcAL spECIFrcArloNs F Page 02770-l 06r 307.DOC 18 June 2007 GeoSyntec Consultants ASTM D 5641 Practice for Geomembrane Seam Evaluation by Vacuum Chamber ASTM D 5820 Practice for Pressurized Air Channel Evaluation of Dual Seamed Geomembranes ASTM D 6365 Standard Test Method for the Non-destructive Testing of Geomembrane Seams using the Spark Test. ASTM D 6392 Standard Test Method for Determining the Integrity of Non-reinforced Geomembrane Seams Produced using Thermo-Fusion Methods. 1.04 QUALTFTCATTONS Geomembrane Manufacturer : l. The Geomembrane Manufacturer shall be responsible for the production of geomembrane rolls from resin and shall have sufficient production capacity and qualified personnel to provide material meeting the requirements of this Section and the construction schedule for this project. 2. The Geomembrane Manufacturer shall have successfully manufactured a minimum of 20,000,000 ft2 of polyethylene geomembrane. Geosynthetics Installer: l. The Geosynthetics Installer shall be responsible and shall provide sufficient resources for field handling, deploying, seaming, temporarily restraining (against wind), and other aspects of the deployment and installation of the geomembrane and other geosynthetic components of the project. 2. The Geosynthetics Installer shall have successfully installed a minimum of 20,000,000 ft2 of polyethylene geomembrane on previous projects with similar sideslopes, bench widths, and configurations. 3. The installation crew shall have the following experience. a. The Superintendent shall have supervised the installation of a minimum of 10,000,000 square feet of polyethylene geomembrane on at least ten (10) different projects. b. At least one seamer shall have experience seaming a minimum of 2,000,000 square feet of polyethylene geomembrane using the same type of seaming apparatus to be used at this site. Seamers with such experience will be designated "master seamers" and shall provide direct supervision over less experienced seamers. c. All other seaming personnel shall have seamed at least 100,000 square feet of polyethylene geomembrane using the same type of seaming apparatus to be used at this site. Personnel who have seamed less than 100,000 square feet shall be allowed to seam only under the direct supervision of the master seamer or Superintendent. Cell 4A Lining System Construction A. B. SCO349\..,\SCO]49 . TECHNICAL SPEC]FICATIONS F 06t 307.DOC Page 02770-2 I8 lune 2007 GeoSyntec Consultants 1.05 WARRANTY A. The Geosynthetic Manufacturer shall furnish the Owner a 2}-year written walranfy against defects in materials. Warranty conditions concerning limits of liability will be evaluated by, and must be acceptable to, the Owner. B. The Geosynthetic Installer shall fumish the Owner with a l-year written warranty against defects in workmanship. Warranty conditions conceming limits of liability will be evaluated by, and must be acceptable to, the Owner. 1.06 SUBMITTALS A. The Geosynthetic Installer shall submit the following documentation on the resin used to manufacture the geomembrane to the Engineer for approval 14 days prior to transporting any geomembrane to the site. I . Copies of quality control certificates issued by the resin supplier including the production dates, brand name, and origin of the resin used to manufacture the geomembrane for the project. 2. Results of tests conducted by the Geomembrane Manufacturer to verifr the quality of the resin used to manufacture the geomembrane rolls assigned to the project. 3. Certification that no reclaimed polymer is added to the resin during the manufacturing of the geomembrane to be used for this project, or, if recycled polymer is used, the Manufacturer shall submit a certificate signed by the production manager documenting the quantity of recycled material, including a description of the procedure used to measure the quantity of recycled polymer. B. The Geosynthetic Installer shall submit the following documentation on geomembrane roll production to the Engineer for approval 14 days prior to transporting any geomembrane to the site. 1. Quality control certihcates, which shall include: a. roll numbers and identification; and b. results of quality control tests, including descriptions of the test methods used, outlined in Subpart 2.02 of this Section. 2. The manufacturer warranty specified in Subpart 1.05 of this Section. C. The Geosynthetic Installer shall submit the following information to the Engineer for approval 14 days prior to mobilization. l. A Panel Layout Drawing showing the installation layout and identifying geomembrane panel configurations, dimensions, details, locations of seams, as well as any variance or additional details that deviate from the Drawings. The Panel Layout Drawing shall be adequate for use as a construction plan and shall include dimensions, details, etc. The Panel Layout Drawing, as modified and/or approved by the Engineer, shall become Subpart of these Technical Specifications. 2. Installationschedule. Cell 4A Linins System Construction sco349\...\sc034e - TEcHNrcAL SpECrFrcATroNs F Page 02770-3 06t l07.Doc l8 Junc 2007 GeoSyntec Consultants 3. Copy of Geosynthetic Installer's letter of approval or license by the Geomembrane Manufacturer. 4. Installationcapabilities,including: a. information on equipment proposed for this project; b. average daily production anticipated for this project; and c. quality control procedures. 5. A list of completed facilities for which the Geosynthetic's Installer has installed a minimum of 20,000,000 square feet of polyethylene geomembrane, in accordance with Subpart 1.04 of this Section. The following information shall be submitted to the Engineer for each facility: a. the name and purpose of the facility, its location, and dates of installation; b. the names of the owner, Engineer, and geomembrane manufacturer; c. name of the supervisor of the installation crew; and d. thickness and surface area of installed geomembrane. 6. In accordance with Subpan 7.04, a resume of the Superintendent to be assigned to this project, including dates and duration of employment, shall be submitted at least 7 days prior to beginning geomembrane installation. 7. In accordance with Subpart 1.04, resumes of all personnel who will perform seaming operations on this project, including dates and duration of employment, shall be submitted at least 7 days prior to beginning geomembrane installation. D. A Certificate of Calibration less than l2 months old shall be submitted for each field tensiometer prior to installation of any geomembrane. E. During installation, the Geosynthetic Installer shall be responsible for the timely submission to the Engineer of: 1. Quality control documentation; and 2. Subgrade Acceptance Certificates, signed by the Geosynthetic Installer, for each area to be covered by geosynthetic materials. F. Upon completion of the installation, the Geosynthetic Installer shall be responsible for the submission to the Engineer of a warranly from the Geoslmthetic Installer as specified in Subpan 1.05.B of this Section. G. Upon completion of the installation, the Geosynthetic Installer shall be responsible for the submission to the Engineer of a Record Drawing showing the location and number of each panel and locations and numbers of destructive tests and repairs. H. The Geosynthetic Installer shall submit samples and material property cut-sheets on the proposed geomembrane to the Engineer at least 7 days prior to delivery of this material to the site. Cell 4A Linine System Construction sc0l49\...\sc0i49 - TEcHNrcAL spECrFrcArloNS F Page 02770-4 06 I 307.DOC l8 lune 2007 GeoSyntec Consultants I. The Geosynthetic Installer shall submit the following documentation on welding rod to the Engineer for approval 14 days prior to transporting welding rod to the site: l. Quality control documentation, including lot number, welding rod spool number, and results of quality control tests on the welding rod. 2. Certification that the welding rod is compatible with the geomembrane and this Section. 1.07 CONSTRUCTTON QUALITY ASSURANCE (CQA) MONITORTNG A. The Geosynthetic Installer shall be aware of and accommodate all monitoring and conformance testing required by the CQA Plan. This monitoring and testing, including random conformance testing of construction materials and completed work, will be performed by the CQA Consultant. If nonconformances or other deficiencies are found in the Geosynthetic Installer's materials or completed work, the Geosynthetic Installer will be required to repair the deficiency or replace the deficient materials. PART2_ PRODUCTS 2.OI GEOMEMBRANE PROPERTIES A. The Geomembrane Manufacturer shall furnish white-or off-white-surfaced (upper side only), smooth geomembrane having properties that comply with the required property values shown in Table 02770-1. B. In addition to the property values listed in Table 02770-1, the geomembrane shall: I . Contain a maximum of I percent by weight of additives, fillers, or extenders (not including carbon black and titanium dioxide). 2. Not have striations, pinholes (holes), bubbles, blisters, nodules, undispersed raw materials, or any sign of contamination by foreign matter on the surface or in the interior. 2.02 MANUFACTURTNG QUALTTY CONTROL (MQC) A. Rolls: 1. The Geomembrane Manufacturer shall continuously monitor geomembrane during the manufacturing process for defects. 2. No geomembrane shall be accepted that exhibits any defects. 3. The Geomembrane Manufacturer shall measure and report the geomembrane thickness at regular intervals along the roll length. 4. No geomembrane shall be accepted that fails to meet the specified thickness. Cell 4A Linins Svstem Construction sc0l49\...\sc0l49 - TECHNTcAL spEcrFrcATroNs F Page 02170-5 061 307.DOC | 8 June 2007 GeoSyntec Consultants 5. The Geomembrane Manufacturer shall sample and test the geomembrane at a minimum of once every 50,000 ff to demonstrate that its properties conform to the values specified in Table 027'10-1. At a minimum, the following tests shall be performed: Test Procedure Thickness ASTM D 5199 Specific Gravity ASTM D 792 Method A or ASTM D 1505 Tensile Properties ASTM D 638 Puncture Resistance ASTM D 4833 Carbon Black ASTMD 1603 Carbon Black Dispersion ASTM D 5596 6. Tests not listed above but listed in Table 02770-l need not be run at the I per 50,000 ft2 frequency. However, the Geomembrane Manufacturer shall certify that these tests are in compliance with this Section and have been performed on a sample that is identical to the geomembrane to be used on this project. The Geosynthetic Installer shall provide the test result documentation to the Engineer. 7. Any geomembrane sample that does not comply with the requirements of this Section will result in rejection of the roll from which the sample was obtained and will not be used for this project. 8. If a geomembrane sample fails to meet the quality control requirements of this Section, the Geomembrane Manufacturer shall sample and test, at the expense of the Manufacturer, rolls manufactured in the same resin batch, or at the same time, as the failing roll. Sampling and testing of rolls shall continue until a pattern of acceptable test results is established to bound the failed roll(s). 9. Additional testing may be performed at the Geomembrane Manufacturer's discretion and expense, to isolate and more closely identiff the non-complying rolls and/or to qualify individual rolls. B. The Geomembrane Manufacturer shall permit the Engineer to visit the manufacturing plant for project specific visits. If possible, such visits will be prior to or during the manufacturing of the geomembrane rolls for the specific project. The Engineer may elect to collect conformance samples at the manufacturing facility to expedite the acceptance of the materials. 2.03 LABELING A. Geomembrane rolls shall be labeled with the following information. l. thickness of the material; 2. length and width of the roll; 3. name of Geomembrane Manufacturer; Cell 4A Linins Svstem Construction sc034e!..\sc0i4e - TECHNTcAL spEcrFrcAnoNs F Page 02770-6 06ll07.Doc | 8 June 2007 GeoSyntec Consultants 4. productidentification; 5. lot number; and 6. roll number. 2.04 TRANSPORTATION, HANDLING AI\[D STORAGE A. The Geosynthetic Manufacturer shall be liable for any damage to the geomembrane incurred prior to and during transportation to the site. B. Handling and care of the geomembrane at the site prior to and following installation shall be the responsibility of the Geosynthetic Installer. The Geosynthetic Installer shall be liable for all damage to the materials incurred prior to final acceptance of the liner system by the Owner. C. Geosynthetic Installer shall be responsible for storage of the geomembrane at the site. The geomembrane shall be protected from excessive heat or cold, dirt, puncture, cutting, or other damaging or deleterious conditions. Any additional storage procedures required by the Geomembrane Manufacturer shall be the Geosynthetic Installer's responsibility. Geomembrane rolls shall not be stored or placed in a stack of more than two rolls high. D. The geomembrane shall be delivered at least 14 days prior to the planned deployment date to allow the CQA Consultant adequate time to perform conformance testing on the geomembrane samples as described in Subpart 3.05 or this Section. If the CQA Consultant performed a visit to the manufacturing plant and performed the required conformance sampling, geomembrane can be delivered to the site within the l4 days prior to the planned deployment date as long as there is sufficient time for the CQA Consultant to complete the conformance testing and confirm that the rolls shipped to the site are in compliance with this Section. PART 3 _ GEOMEMBRANE INSTALLATION 3.OI FAMILIARIZATION A. Prior to implementing any of the work described in this Section, the Geosynthetic Installer shall become thoroughly familiar with all portions of the work falling within this Section. B. Inspection: I . The Geosynthetic Installer shall carefully inspect the installed work of all other Sections and verify that all work is complete to the point where the work of this Section may properly commence without adverse effect. 2. If the Geosynthetic Installer has any concems regarding the installed work of other Sections, he shall notify the Engineer in writing prior to the start of the work of this Section. Failure to inform the Engineer in writing or commencing installation of the geomembrane will be construed as the Geosynthetic Installer's acceptance of the related work of all other Sections. C. A pre-installation meeting shall be held to coordinate the installation of the geomembrane with the installation of other components of the liner system. Cell 4,{ Linins Svstem Construction SCO349\...\SCO349 . TECHNICAL SPECIFICATIONS F 06r l07.Doc Page 02770-7 l8 lune 2007 GeoSyntec Consultants 3.02 GEOMEMBRANE DEPLOYMENT A. Layout Drawings: 1. The Geosynthetic Installer shall deploy the geomembrane panels in general accordance with the Panel Layout Drawing specified. The Panel Layout Drawing must be approved by the Engineer prior to installation of any geomembrane. B. Field Panel Identification: I . A geomembrane field panel is a roll or a portion of roll cut in the field. 2. Each field panel shall be given a unique identification code (number or letter-number). This identification code shall be agreed upon by the Engineer and Geosynthetic Installer. C. Field Panel Placement: 1. Field panels shall be installed, as approved or modified, at the location and positions indicated on the Panel Layout Drawing. 2. Field panels shall be placed one at a time, and each field panel shall be seamed immediately after its placement. 3. Geomembrane shall not be placed when the ambient temperature is below 40oF or above l22oF, as measured in Subpart 3.03. C. 3, unless otherwise authorized in writing by the Engineer. 4. Geomembrane shall not be placed during any precipitation, in the presence of excessive moisture (e.g., fog, dew), in an area of ponded water, or in the presence of excessive winds. 5. The Geosynthetic Installer shall ensure that: a. No vehicular traffic is allowed on the geomembrane. b. Equipment used does not damage the geomembrane by handling, trafficking, or leakage of hydrocarbons (i.e., fuels). c. Personnel working on the geomembrane do not smoke, wear damaging shoes, bring glass onto the geomembrane, or engage in other activities that could damage the geomembrane. d. The method used to unroll the panels does not scratch or crimp the geomembrane and does not damage the supporting soil or geosynthetics. e. The method used to place the panels minimizes wrinkles (especially differential wrinkles between adjacent panels). The method used to place the panels results in intimate contact befween the geomembrane and adjacent components. f. Temporary ballast and/or anchors (e.g., sand bags) are placed on the geomembrane to prevent wind uplift. Ballast methods must not damage the geomembrane. Cell 4A Linins Svstem Construction sc0l49\...\sc0349 - TEcHNIcAL spECTFICATIoNS F Page 02170-8 0(,1 l07.DOC' 18 June 200? GeoSyntec Consultants g. The geomembrane is especially protected from damage in heavily trafficked areas. h. Any rub sheets to facilitate seaming are removed prior to installation of subsequent panels. 6. Any field panel or portion thereof that becomes seriously damaged (torn, twisted, or crimped) shall be replaced with new material. Less serious damage to the geomembrane may be repaired, as approved by the Engineer. Damaged panels or portions of damaged panels that have been rejected shall be removed from the work area and not reused. D. If the Geosynthetic Installer intends to install geomembrane between one hour before sunset and one hour after sunrise, he shall notiff the Engineer in writing prior to the start of the work. The Geosynthetic Installer shall indicate additional precautions that shall be taken during these installation hours. The Geosynthetic Installer shall provide proper illumination for work during this time period. 3.03 FIELD SEAMING Seam Layout: I . In corners and at odd-shaped geometric locations, the number of field seams shall be minimized. No horizontal seam shall be constructed along a slope with an inclination steeper than 10 percent. Horizontal seams shall be considered as any seam having an alignment exceeding 20 degrees from being perpendicular to the slope contour lines, unless otherwise approved by the Engineer. No seams shall be located in an area of potential stress concentration. 2. Seams shall not be allowed within 5 feet of the top or toe of any slope. Horizontal seams can be placed on benches, as long as they are not within 5' of the top or toe of slope. Personnel: l. All personnel performing seaming operations shall be qualified as indicated in Subpart I .04 of this Section. No seaming shall be performed unless a "master seamer" is present on-site. Weather Conditions for Seaming: l. Unless authorized in writing by the Engineer, seaming shall not be attempted at ambient temperatures below 40oF or above 122'F. lf the Geosynthetic Installer wishes to use methods that may allow seaming at ambient temperatures below 40"F or above 122"F , the procedure must be approved by the Engineer. 2. A meeting will be held betrrreen the Geosynthetic Installer and Engineer to establish acceptable installation procedures. In all cases, the geomembrane shall be dry and protected from wind damage during installation. 3. Ambient temperatures, measured by the CQA Consultant, shall be measured befween 0 and 6 in. above the geomembrane surface. Cell 4A Linins Svstem Construction A. B. C. SCO349\...\SCO349 - TECHNICAL SPECIFICATIONS F 06l]07.DOC Page 02770-9 l8 Jnnc 2007 GeoSyntec Consultants D. Overlapping: l. Geomembrane shall be cut and/or trimmed such that all comers are rounded. 2. Geomembrane panels shall be shingled with the upslope panel placed over the downslope panel. 3. Geomembrane panels shall be sufficiently overlapped for welding and to allow peel tests to be performed on the seam. Any seams that cannot be destructively tested because of insufficient overlap shall be treated as failing seams. E. Seam Preparation: I . Prior to seaming, the seam area shall be clean and free of moisture, dust, dirt, debris of any kind, and foreign material. 2. If seam overlap grinding is required, the process shall be completed according to the Geomembrane Manufacturer's instructions within 20 minutes of the seaming operation and in a manner that does not damage the geomembrane. The grind depth shall not exceed ten percent of the geomembrane thickness. 3. Seams shall be aligned with the fewest possible number of wrinkles and "fishmouths." F. General Seaming Requirements: I . Fishmouths or wrinkles at the seam overlaps shall be cut along the ridge of the wrinkle to achieve a flat overlap, ending the cut with circular cut-out. The cut fishmouths or wrinkles shall be seamed and any portion where the overlap is insufficient shall be patched with an oval or round patch of geomembrane that extends a minimum of 6 in. beyond the cut in all directions. 2. Any electric generator shall be placed outside the area to be lined or mounted in a manner that protects the geomembrane from damage due to the weight and frame of the generator or due to fuel leakage. The electric generator shall be properly grounded. G. Seaming Process: L Approved processes for field seaming are extrusion welding and double-track hot- wedge fusion welding. Only equipment identified as Subpart of the approved submittal specified in Subpart 1.06 shall be used. 2. Extrusion Equipment and Procedures: a. The Geosynthetics Installer shall maintain at least one spare operable seaming apparatus on site. b. Extrusion welding apparatuses shall be equipped with gauges giving the temperatures in the apparafuses. c. Prior to beginning an extmsion seam, the extruder shall be purged until all heat- degraded extrudate has been removed from the barrel. d. A smooth insulating plate or fabric shall be placed beneath the hot welding apparafus after use. Cell 4A Lining System Construclion sc0l4el..!sc0i4e - TECHNTcAL SpECTFTcATToNS F Page 02770-10 06 l l07.Doc I8 June 2007 GeoSyntec Consultants 3. Fusion Equipment and Procedures: a. The Geosynthetic Installer shall maintain at least one spare operable seaming apparatus on site. b. Fusion-welding apparatus shall be automated vehicular-mounted devices equipped with gauges giving the applicable temperatures and speed. c. A smooth insulating plate or fabric shall be placed beneath the hot welding apparatus after use. H. Trial Seams: l. Trial seams shall be made on fragment pieces of geomembrane to verify that seaming conditions are adequate. Trial seams shall be conducted on the same material to be installed and under similar field conditions as production seams. Such trial seams shall be made at the beginning of each seaming period, typically at the beginning of the day and after lunch, for each seaming apparatus used each day, but no less frequently than once every 5 hours. The trial seam sample shall be a minimum of 5-ft long by 1-ft wide (after seaming) with the seam centered lengthwise for fusion equipment and at least 3-ft long by l-ft wide for extrusion equipment. Seam overlap shall be as indicated in Subpart 3.03.D of this Section. 2. Four coupon specimens, each l-in. wide, shall be cut from the trial seam sample by the Geosynthetics Installer using a die cutter to ensure precise l-in. wide coupons. The coupons shall be tested, by the Geosynthetic Installer, with the CQA Monitor present, in peel (both the outside and inside track) and in shear using an electronic readout field tensiometer in accordance with ASTM D 6392, at a strain rate of 2 in./min. The samples shall not exhibit failure in the seam, i.e., they shall exhibit a Film Tear Bond (FTB), which is a failure (yield) in the parent material. The required peel and shear seam strength values are listed in Table 027'70-2. At no time shall specimens be soaked in water. 3. Ifany coupon specimen fails, the trial seam shall be considered failing and the entire operation shall be repeated. If any of the additional coupon specimens fail, the seaming apparatus and seamer shall not be accepted and shall not be used for seaming until the deficiencies are corrected and two consecutive successful trial seams are achieved. I. Nondestructive Seam Continuity Testing: 1. The Geosynthetic Installer shall nondestructively test for continuify on all field seams over their full length. Continuity testing shall be carried out as the seaming work progresses, not at the completion of all field seaming. The Geosynthetic Installer shall complete any required repairs in accordance with Subpart 3.03.K of this Section. The following procednres shall apply: a. Vacuum testing in accordance with ASTM D 5641 . b. Air channel pressure testing for double-track fusion seams in accordance with ASTM D 5820 and the following: i. Insert needle, or other approved pressure feed device, from pressure gauge and inflation device into the air channel at one end of a double track seam. Cell 4A Linins System Construction sc034e\...\sc0l4e - rEcHNrcAL spECIFrcArroNS F Page 02710-11 061:107 D(X' I8 Jme 2007 GeoSyntec Consultants ii. Energize the air pump and inflate air channel to a pressure between 25 and 30 pounds per square inch (psi). Close valve and sustain the pressure for not less than 5 minutes. iii. Ifloss ofpressure exceeds 3 psi over 5 minutes, or ifthe pressure does nol stabilize, locate the faulty area(s) and repair seam in accordance with Subpart 3.03.K of this Section. iv. After 5 minutes, cut the end of air channel opposite from the end with the pressure gauge and observe release ofpressure to ensure air channel is not blocked. Ifthe channel does not depressurize, find and repair the portion of the seam containing the blockage per Subpart 3.03.K of this Section. Repeat the air pressure test on the resulting segments of the original seam created by the repair and the ends of the seam.. Repeat the process until the entire length of seam has successfully passed pressure testing or contains a repair. Repairs shall also be non-destructively tested per Subpart 3.03.K.5 of this Section. v. Remove needle, or other approved pressure feed device, and seal repair in accordance with Subpart 3.03.K of this Section. c. Spark test seam integrity verification shall be performed in accordance with ASTM D 6365 if the seam cannot be tested using other nondestructive methods. Destructive Testing: l.Destructive seam tests shall be performed on samples collected from selected locations to evaluate seam strength and integrity. Desffuctive tests shall be carried out as the seaming work progresses, not at the completion of all field seaming. Sampling: Destructive test samples shall be collected at a minimum average frequency of one test location per 500 ft oftotal seam length. Test locations shall be determined dwing seaming, and may be prompted by suspicion of excess crystallinity, contamination, offset seams, or any other potential cause of imperfect seaming. The CQA Consultant will be responsible for choosing the locations. The Geosynthetic Installer shall not be informed in advance of the locations where the seam samples will be taken. The CQA Consultant reserves the right to increase the sampling frequency ifobservations suggest an increased frequency is warranted. The CQA Consultant shall mark the destructive sample locations. Samples shall be cut by the Geosynthetic Installer at the locations designated by the CQA Consultant as the seaming progresses in order to obtain laboratory test results before the geomembrane is covered by another material. Each sample shall be numbered and the sample number and location identified on the Panel Layout Drawing. All holes in the geomembrane resulting from the destructive seam sampling shall be immediately repaired in accordance with the repair procedures described in Subpart 3.03.K of this Section. The continuity of the new seams associated with the repaired areas shall be tested according to Subpart 3.03.I of this Section. Cell 4,{ Linine Svstem Construction J. 2. SCO349\..,\SC0349. TECHNICAL SPECIFICATIONS F 061 307.DOC Page 02770-12 18 June 2007 GeoSyntec Consultants c. Two coupon strips of dimensions l-in. wide and 12 in. long with the seam centered parallel to the width shall be taken from any side of the sample location. These samples shall be tested in the field in accordance with Subpart 3.03.J.3 of this Section. If these samples pass the field test, a laboratory sample shall be taken. The laboratory sample shall be at least l-ft wide by 3.5-ft long with the seam centered along the length. The sample shall be cut into three parts and distributed as follows: i. One portion l2-inches long to the Geosynthetic Installer. ii. One portion l8- inches long to the Geosynthetic CQA Laboratory for testing. iii. One portion 12- inches long to the Owner for archival storage. 3. Field Testing: a. The two l-in. wide strips shall be tested in the field tensiometer in the peel mode on both sides of the double track fusion welded sample. The CQA Consultant has the option to request an additional test in the shear mode. If any field test sample fails to meet the requirements in Table 02170-2, then the procedures outlined in Subpart 3.03.J.5 of this Section for a failing destructive sample shall be followed. 4. Laboratory Testing: a. Testing by the Geosynthetics CQA Laboratory will include "Seam Strength" and "Peel Adhesion" (ASTM D 6392) with l-in. wide strips tested at a rate of 2 in./min. At least 5 specimens will be tested for each test method (peel and shear). Four of the five specimens per sample must pass both the shear strength test and peel adhesion test when tested in accordance with ASTM D 6392. The minimum acceptable values to be obtained in these tests are indicated in Table 02770-2. Both the inside and outside tracks of the dual track fusion welds shall be tested in peel. 5. Destructive Test Failure: a. The following procedures shall apply whenever a sample fails a destructive test, whether the test is conducted by the Geosynthetic CQA's laboratory, the Geoslmthetic Installer laboratory, or by a field tensiometer. The Geosynthetic Installer shall have two options: i. The Geosynthetic Installer can reconstruct the seam (e.g., remove the old seam and reseam) befween any fwo laboratory-passed destructive test locations created by that seaming apparatus. Trial welds do not count as a passed destructive test. ii. The Geosynthetic Installer can trace the welding path in each direction to an intermediate location, a minimum of 10 feet from the location of the failed test, and take a small sample for an additional field test at each location. If these additional samples pass the field tests, then full Iaboratory samples shall be taken. These fulI laboratory samples shall be tested in accordance with Subpart 3.03.J.4 of this Section. If these laboratory samples pass the tests, then the seam path between these Cell4A Linins Svstem Construction scor4e\...\scr)i4e - TECHNTcAL spEClFIcATIoNs F Page 02770-13 06 r 307.DO(' 18 June 2007 GeoSyntec Consultants locations shall be reconstructed and nondestructively (at a minimum) tested. If a sample fails, then the process shall be repeated, i.e. another destructive sample shall be obtained and tested at a distance of at least l0 more feet in the seaming path from the failed sample. The seam path between the ultimate passing sample locations shall be reconstructed and nondestructively (at a minimum) tested. In cases where repaired seam lengths exceed 150 ft, a destructive sample shall be taken from the repaired seam and the above procedures for destructive seam testing shall be followed. b. Whenever a sample fails destructive or non-destructive testing, the CQA Consultant may require additional destructive tests be obtained from seams that were created by the same seamer and/or seaming apparatus during the same time shift. Defects and Repairs: l. The geomembrane will be inspected before and after seaming for evidence of defects, holes, blisters, undispersed raw materials, and any sign of contamination by foreign matter. The surface of the geomembrane shall be clean at the time of inspection. The geomembrane surface shall be swept or washed by the Installer if surface contamination inhibits inspection. At observed suspected flawed location, both in seamed and non-seamed areas, shall be nondestructively tested using the methods described Subpart 3.03.I of this Section, as appropriate. Each location that fails nondestructive testing shall be marked by the CQA Consultant and repaired by the Geosynthetic Installer. When seaming of a geomembrane is completed (or when seaming of a large area of a geomembrane is completed) and prior to placing overlying materials, the CQA Consultant shall identi$ all excessive geomembrane wrinkles. The Geosynthetic Installer shall cut and reseam all wrinkles so identified. The seams thus produced shall be tested as per all other seams. Repair Procedures: a. Any portion of the geomembrane exhibiting a flaw, or failing a destructive or nondestructive test, shall be repaired by the Geosynthetic Installer. Several repair procedures are acceptable. The final decision as to the appropriate repair procedure shall be agreed upon befween the Engineer and the Geosynthetic Installer. The procedures available include: i. Patching - extrusion welding a patch to repair holes larger than l/16 inch, tears, undispersed raw materials, and contamination by foreign matter; ii. Abrading and reseaming - applying an extrusion seam to repair very small sections of faulty extruded seams; iii. Spot seaming - applying an extrusion bead to repair minor, localized flaws such as scratches and scuffs; iv. Capping - extrusion welding a geomembrane cap over long lengths of failed seams; and Cell 4A Lining System Construction K 2. J. 4. SCO]49\.,,\SCO]49 . TECHNICAL SPECIFICATIONS F 06 I l07.DOC Page 02770-14 l8 June 2007 GeoSyntec Consultants v. Strip repairing - cutting out bad seams and replacing with a strip of new material seamed into place on both sides with fusion welding. b. In addition, the following criteria shall be satisfied: i. surfaces of the geomembrane that are to be repaired shall be abraded no more than 20 minutes prior to the repair; ii. all surfaces must be clean and dry at the time of repair; iii. all seaming equipment used in repair procedures must be approved by trial seaming; iv. any other potential repair procedures shall be approved in advance, for the specific repair, by the Engineer; v. patches or caps shall extend at least 6 in. beyond the edge ofthe defect, and all corners ofpatches and holes shall be rounded with a radius ofat least 3 in.; and vi. any geomembrane below large caps shall be appropriately cut to avoid water or gas collection between the two sheets. 5. Repair Verification: a. Repairs shall be nondestructively tested using the methods described in Subpat 3.03.I of this Section, as appropriate. Repairs that pass nondestructive testing shall be considered acceptable repairs. Repairs that failed nondestructive or destructive testing will require the repair to be reconstructed and retested until passing test results are observed. At the discretion of the CQA Consultant, destructive testing may be required on any caps. 3.04 MATERIALS IN CONTACT WITH THE GEOMEMBRANE A. The Geosynthetic Installer shall take all necessary precautions to ensure that the geomembrane is not damaged during its installation. During the installation of other components of the liner system by the Contractor, the Contractor shall ensure that the geomembrane is not damaged. Any damage to the geomembrane caused by the Contractor shall be repaired by the Geosynthetic Installer at the expense of the Contractor. B. Soil and aggregate materials shall not be placed over the geomembranes at ambient temperatures below 40"F or above l04oF, unless otherwise specihed. C. All attempts shall be made to minimize wrinkles in the geomembrane. D. No vehicles of any kind shall be driven directly on the geomembrane. Construction loads permitted on the geomembrane are limited to foot traffic and ATV vehicles with a contact pressures at or lower than that exhibited by foot traffic. 3.05 CONFORMANCETESTING Samples of the geomembrane will be removed by the CQA Consultant and sent to a Geosynthetic CQA Laboratory for testing to ensure conformance with the requirements of this Section. The CQA Consultant may collect samples at the manufacturing plant or from the rolls delivered to the site. The Geosynthetic Installer shall assist the CQA Consultant in Cell 4.{ Lining System Construction A. SC0349\,.,\SC0349 - TECHNICAL SPECIFICATIONS F 061307.DOC Page 42770-15 )8 lune 2007 GeoSyntec Consultants obtaining confonnance samples from any geomembrane rolls sampled at the site. The Geosynthetic Installer and Contractor shall account for this sampling and testing requirement in the installation schedule, including the turnaround time for laboratory results. Only materials that meet the requirements of Subpart 2.02 this Section shall be installed. B. Samples will be selected by the CQA Consultant in accordance with this Section and with the procedures outlined in the CQA Plan. C. Samples will be taken at a minimum frequency of one sample per 100,000 ff. tf *re Geomembrane Manufacturer provides material that requires sampling at a frequency (due to lot size, shipment size, etc.) resulting in one sample per less than 90 percent of 100,000 ft2 (90,000 ft2;, then the Geosynthetic Installer shall pay the cost for all additional testing. D. The CQA Consultant may increase the frequency of sampling in the event that test results do not comply with the requirements of Subpart 2.02 of this Section. E. The following tests will be performed by the CQA Consultant: Test Test Method Specific Gravity ASTMDT92or D 1505 Thickness ASTM D 5I99 Tensile Properties ASTM D 638 Carbon Black Content ASTM D 1603 Carbon Black Dispersion ASTM D 5596 F. Any geomembrane that is not certified in accordance with Subpart 1.07.C of this Section, or that conformance testing indicates does not comply with Subpart 2.02 of this Section, shall be rejected. The Geosynthetic Installer shall replace the rejected material with new material. 3.06 GEOMEMBRANE ACCEPTANCE A. The Geosynthetic Installer shall retain all ownership and responsibility for the geomembrane until accepted by the Owner. B. The geomembrane will not be accepted by the Owner before: 1. the installation is completed; 2. all documentation is submitted; 3. verification of the adequacy of all field seams and repairs, including associated testing, is complete; and 4. all warranties are submitted. 3.07 PROTECTION OFWORK A. The Geosynthetic Installer and Contractor shall use all means necessary to protect all work of this Section. Cell 4,{ Linine Svstem Construction sc0r4e\...sc034e - rECHNrcAL SpECrFrcArroNs F Page 02770-16 061307.Dw- l8 June 200? GeoSyntec Consultants B. In the event of damage, the Geosynthetic Installer shall make all repairs and replacements necessary, to the satisfaction of the Engineer. PART4_ MEASUREMENT AND PAYMENT 4.OT GENERAL A. Providing for a complying with the requirements set forth in this Section for 60-mi1, smooth HDPE geomembrane will be measured as in-place square feet (SF), as measured by the suryeyor, including geomembrane in the anchor trench to the limits shown on the Drawings, and payment will be based on the unit price provided on the Bid Schedule. B. The following are considered incidental to the Work: o Submittals.o Quality Control.. Shipping, handling and storage. o Deployment.o Layout survey. o Mobilization.. Rejected material.o Rejected material removal, handling, re-testing, and repair. o Overlaps and seaming.o Temporary anchorage. o PiPe boots. . Cleaning seam area. Cell 4A Linine System Construction sc034e\...rsc034e - TECHNICAL spEClFIcArloNs F Page 02170-17 061307,DOC l8 June 2007 GeoSyntec Consultants TABLE 02770-I REQUIRED HDPE GEOMEMBRANE PROPERTIES PROPERTIES QUALIFIERS UNITS SPECIFIED VALUES TEST METHOD Phvsical Properties Thickness Average Minimum mils mils 60 54 ASTM D 5199 Density Minimum N/A 0.94 ASTM D 792 Method A or ASTM D 1505 Mechanical Prooerties Tensile Properties (each direction) 1. Tensile (Break) Strength 2. Elongation at Break 3. Tensile (Yield) Strength 4. Elongation at Yield Minimum lb/in /o lb/in % 228 700 126 t2 ASTM D 638 Puncture Minimum lb 108 ASTM D 4833 Environmental Prooerties Carbon Black Content Range /o 2-3 ASTM D 1603 Carbon Black Dispersion N/A none Note I ASTM D 5596 Environmental Stress Crack Minimum hr 400 ASTM D 5397 Notes: (l) Minimum9of l0inCategories 1or2; l0inCategories 1,2,or3. Cell 4A Linins System Construction SCO349\.,.\SCO349 - TECHNICAL SPECIFICATIONS F 06r30?.Doc Page 02770-18 l8 June 20O? GeoSyntec Consultants TABLE 02770.2 REQUIRED GEOMEMBRANE SEAM PROPERTIES Notes: (l) Alsocalled"Bonded SeamStrength". (2) FTB : Film Tear Bond means that failure is in the parent material, not the seam. The maximum seam separation is 25 percent ofthe seam area. (3) Four of five specimens per destructive sample must pass both the shear and peel strength tests. IEND OF SECTTONI PROPERTIES QUALIFIERS UNITS SPECIFIED VALUES€)TEST METHOD Shear Strensth(r) Fusion mlntmum lb/in 120 ASTM D 6392 Extrusion mtnlmum lb/in 120 ASTM D 6392 Peel Adhesion FTB(2)Visual Observation Fusion minimum lb/in 9t ASTM D 6392 Extrusion mmlmum lb/in 78 ASTM D 6392 Cell 4A Linine System Construction sc0349\...\sc034e - rEcHNrcAL spEclFrcArroNs F Page 02770-19 06t307.DOC l8 June 2007 GeoSyntec Consultants SECTION 02771 GEOTEXTILE PARTl_ GENERAL 1.OI DESCRIPTION OF WORK A. The Contractor shall furnish all labor, materials, tools, supervision, transportation, equipment, and incidentals necessary for the installation of the geotextile. The work shall be carried out as specified herein and in accordance with the Drawings and the Construction Quality Assurance (CQA) Plan. B. The work shall include, but not be limited to, delivery, offloading, storage, placement, and seaming of the various geotextile components of the project. C. Geotextile shall be used between the Drainage Aggregate and Geomembrane as shown on the Drawings. 1.02 RELATED SECTIONS Section 02200 - Earthwork Section 02225 - Drainage Aggregate Section 02770 - Geomembrane Section 02773 - Geonet 1.03 REFERENCES A. Drawings B. Site CQA Plan C. Latest version of American Society for Testing and Materials (ASTM) standards: ASTM D 4355 Standard Test Method for Deterioration of Geotextile from Exposure to Ultraviolet Light and Water ASTM D 4439 Terminology for Geosynthetics ASTM D 4491 Standard Test Method for Water Permeabilify of Geotextile by Permittivity ASTM D 4533 Standard Test Method for Trapezoid Tearing Strength of Geotextile ASTM D 4632 Standard Test Method for Breaking Load and Elongation of Geotextile (Grab Method) ASTM D 4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile ASTM D 4833 Standard Test Method for Index Puncture Resistance of Geotextile, Geomembranes, and Related Products Cell 44 Linine Svstem Construction sc0i4e\...\sc034e - TEcHNTcAL spEcrFrcArroNs F Page 0277 l-1 06r307 DOC 18 June 2007 GeoSyntec Consultants ASTM D 5261 Standard Test Method for Measuring Mass Per Unit Area of Geotextile 1.04 SUBMITTALS A. The Contractor shall submit the following information regarding the proposed geotextile to the Engineer for approval at least 7 days prior to geotextile delivery: l. manufacturer and product name; 2. minimum property values of the proposed geotextile and the corresponding test procedures; 3. projected geotextile delivery dates; and 4. list of geotextile roll numbers for rolls to be delivered to the site. B. At least 7 days prior to geotextile placement, the Contractor shall submit to the Engineer the Manufacturing Quality Control (MQC) certificates for each roll of geotextile. The certificates shall be signed by responsible parties employed by the geotextile manufacturer (such as the production manager). The MQC certificates shall include: l. lot, batch, and/or roll numbers and identification; 2. MQC test results, including a description of the test methods used; and 3. Certification that the geotextile meets or exceeds the required properties of the Drawings and this Section. 1.05 CQA MONTTORING A. The Contractor shall be aware of and accommodate all monitoring and conformance testing required by the CQA Plan. This monitoring and testing, including random conformance testing of construction materials and completed work, will be performed by the CQA Consultant. If nonconformances or other deficiencies are found in the Contractor's materials or completed work, the Contractor will be required to repair the deficiency or replace the deficient materials at no additional expense to the Owner. PART2_ PRODUCTS 2.OI GEOTEXTILE PROPERTIES A. The Geotextile Manufacturer shall furnish materials that meet or exceed the criteria specified in Table 02771-1 in accordance with the minimum average roll value (MARV), as defined by ASTM D 4439. B. The geotextile shall be nonwoven materials, suitable for use in filter/separation and cushion applications. Cell 4A Linine System Construction sc0349\...\sc0349 - TECTNTcAL spECrFrcArroNS F Page 02771-2 06t 307.D(r 18 June 2007 GeoSyntec Consultants 2.02 MANUFACTURTNG QUALTTY CONTROL (MQC) A. The geotextile shall be manufactured with MQC procedwes that meet or exceed generally accepted industry standards. B. The Geotextile Manufacturer shall sample and test the geotextile to demonstrate that the material conforms to the requirements of these Specifications. C. Any geotextile sample that does not comply with this Section shall result in rejection of the roll from which the sample was obtained. The Contractor shall replace any rejected rolls. D. If a geotextile sample fails to meet the MQC requirements of this Section the Geotextile Manufacturer shall additionally sample and test, at the expense of the Manufacturer, rolls manufactured in the same lot, or at the same time, as the failing roll. Sampling and testing of rolls shall continue until a pattem ofacceptable test results is established to def,rne the bounds of the failed roll(s). All the rolls pertaining to the failed rolls shall be rejected. E. Additional sample testing may be performed, at the Geotextile Manufacturer's discretion and expense, to identiff more closely the extent of non-complying rolls and,/or to qualify individual rolls. F. Sampling shall, in general, be performed on sacrificial portions of the geotextile material such that repair is not required. The Geotextile Manufacturer shall sample and test the geotextile to demonstrate that the geotextile properties conform to the values specified in Table 02771-1. l. At a minimum, the following MQC tests shall be performed on the geotextile (results of which shall meet the requirements specified in Table 02271): Test Procedure Frequency Grab strength ASTM D 4632 130,000 # Mass per Unit Area ASTM D 5261 130.000 ft'z Tear strength ASTM D 4533 130,000 ft2 Puncture strength ASTM D 4833 130,000 ff Permittivity ASTM D 4491 540,000 ff A.O.S.ASTM D 4751 540,000 ft2 G. The Geotextile Manufacturer shall comply with the certification and submittal requirements of this Section. 2.03 PACKING AND LABELING A. Geotextile shall be supplied in rolls wrapped in relatively impervious and opaque protective covers. B. Geotextile rolls shall be marked or tagged with the following information: l. manufacturer'sname; 2. productidentification; Cell 4,{ Lining System Construction sc0i4e\...sc034e - TECHNTcAL spEclFlcATroNs F Page 02771-3 06t 307.DOC l8 .lune 2007 GeoSyntec Consultants J.Iot or batch number; roll number; and roll dimensions. 2.04 TRANSPORTATION, HANDLING, AND STORAGE A. The Geosynthetic Manufacturer shall be liable for any damage to the geotextile incurred prior to and during transportation to the site. B. The geotextile shall be delivered to the site at least 14 days prior to the planned deployment date to allow the CQA Consultant adequate time to perform conformance testing on the geotextile samples as described in Subpart 3.06 of this Section. C. Handling, unloading, storage, and care of the geotextile at the site, prior to and following installation, are the responsibility of the Contractor. The Contractor shall be liable for any damage to the materials incurred prior to final acceptance by the Owner. D. The Contractor shall be responsible for offloading and storage of the geotextile at the site. E. The geotextile shall be protected from sunlight, puncture, or other damaging or deleterious conditions. The geotextile shall be protected from mud, dirt, and dust. Any additional storage procedures required by the geotextile Manufacturer shall be the responsibility of the Contractor. PART3_ EXECUTION 3.01 FAMILIARIZATION A. Prior to implementing any of the work described in this Section, the Contractor shall become thoroughly familiar with the site, the site conditions, and all portions of the work falling within this Section. B. If the Contractor has any concems regarding the installed work of other Sections or the site, the Engineer shall be notified, in writing, prior to commencing the work. Failure to notiff the Engineer or commencing installation of the geotextile will be construed as Contractor's acceptance ofthe related work ofall other Sections. 3.02 PLACEMENT Geotextile installation shall not commence over other materials until CQA conformance evaluations, by the CQA Consultant, of underlying materials are complete, including evaluations of the Contractor's survey results to confirm that the previous work was constructed to the required grades, elevations, and thicknesses. Should the Contractor begin the work of this Section prior to the completion of CQA evaluations for underlying materials or this material, this shall be at the risk of removal of these materials, at the Contractor's expense, to remedy the non-confornances. The Contractor shall account for the CQA conformance evaluations in the construction schedule. The Contractor shall handle all geotextile in such a manner as to ensure it is not damaged in any way. The Contractor shall take any necessary precautions to prevent damage to underlying materials during placement of the geotextile. Cell 4A Linins System Construction 4. 5. A. B. C. SCO349\,,,\SCO]49 . TECHNICAL SPECIFICATIONS F 061 307.DOC' Page 02771-4 l8 June 2007 GeoSyntec Consultants D. After unwrapping the geotextile from its opaque cover, the geotextile shall not be left exposed for a period in excess of l5 days unless a longer exposure period is approved in writing by the Geotextile Manufacturer. E. The Contractor shall take care not to entrap stones, excessive dust, or moisture in the geotextile during placement. F. The Contractor shall anchor or weight all geotextile with sandbags, or the equivalent, to prevent wind uplift. G. The Contractor shall examine the entire geotextile surface after installation to ensure that no foreign objects are present that may damage the geotextile or adjacent layers. The Contractor shall remove any such foreign objects and shall replace any damaged geotextile. 3.03 SEAMS AND OVERLAPS A. On slopes steeper than l0 horizontal to I vertical, geotextiles shall be continuous down the slope; that is, no horizontal seams are allowed. Horizontal seams shall be considered as any seam having an alignment exceeding 20 degrees from being perpendicular to the slope contour lines, unless otherwise approved by the Engineer. No horizontal seams shall be allowed within 5 feet of the top or toe of the slopes. B. Geotextile shall be overlapped a minimum of 12-inches. 3.04 REPAIR A. Any holes or tears in the geotextile shall be repaired using a patch made from the same geotextile. If a tear exceeds 50% of the width of a roll, that roll shall be removed and replaced. 3.05 PLACEMENT OF SOIL MATERIALS A. The Contractor shall place soil materials on top of the geotextile in such a manner as to ensure that: l. the geotextile and the underlying materials are not damaged; 2. minimum slippage occurs between the geotextile and the underlying layers during placement; and 3. excess stresses are not produced in the geotextile. B. Equipment shall not be driven directly on the geotextile. 3.06 CONFORMANCE TESTING A. Conformance samples of the geotextile materials will be removed by the CQA Consultant after the material has been received at the site and sent to a Geosynthetic CQA Laboratory for testing to ensure conformance with the requirements of this Section and the CQA Plan. This testing will be carried out, in accordance with the CQA Plan, prior to the start of the work of this Section. B. Samples of each geotextile will be taken, by the CQA Consultant, at a minimum frequency of one sample per 260,000 ft2 lminimum of one). Cell 4A Linine Svstem Construction scor4e\.. \s( 034e - I'ECHNTcAL spECrFrcATloNS F Page 0277 l-5 06r t07 D(xl l8 Junc 2007 GeoSyntec Consultants C. The CQA Consultant may increase the frequency of sampling in the event that test results do not comply with requirements of Subpart 2.01 of this Section until passing conformance test results are obtained for all material that is received at the site. This additional testing shall be performed at the expense of the Contractor. D. The following conformance tests will be performed (results of which shall meet the requirements specified in Table 02271): Test Procedure Grab strength ASTM D 4632 Mass per Unit Area ASTM D 5261 Puncture strength ASTM D 4833 Permittivity ASTM D 4491 A.O.S.ASTM D 4751 E. Any geotextile that is not certified in accordance with Subpart 1.04 of this Section, or that conformance testing results do not comply with Subpart 2.01 of this Section, will be rejected. The Contractor shall replace the rejected material with new material. All other rolls that are represented by failing test results will also be rejected, unless additional testing is performed to further determine the bounds of the failed material. 3.07 PROTECTION OF WORK A. The Contractor shall protect all work of this Section. B. In the event of damage, the Contractor shall make repairs and replacements to the satisfaction ofthe Engineer at the expense ofthe Contractor. PART 4 - MEASUREMENT AND PAYMENT 4.OI GENERAL A. Providing for and complying with the requirements set forth in this Section for Geotextile will be incidental to PVC Pipe, and payment will be based on the unit price provided for PVC Pipe on the Bid Schedule. B. The following are considered incidental to the work: r Submittals.r Quality Control.. Shipping, handling and storage.. Layout survey.. Mobilization. o Rejected material. . Overlaps and seaming. o Rejected material removal, handling, re-testing, and repair. o Temporary anchorage. Cell 4,A' Linins Svstem Construction sc034e\...\sc0r4e - TECHNTcAL spEcrFrcArroNs F Page 02111-6 06 I l07.DOC 18 June 2007 GeoSyntec Consultants TABLE 0277I-I REQUIRED PROPERTY VALUES FOR GEOTEXTILE I END OF SECTTON ] PROPERTIES QUALIFIERS UNITS SPECIF'IED VALUES TEST METHOD Mass per unit area Minimum ozlyd2 l6 ASTM D 5261 Apparent opening size (Oe5)Maximum mm 0.21 ASTM D 4751 Permittivity Minimum s-r 0.5 ASTM D 4491 Grab strength Minimum lb 390 ASTM D 4632 Tear strength Minimum lb r50 ASTM D 4533 Puncture strength Minimum lb 240 ASTM D 4833 Ultraviolet Resistance @ 500 hours Minimum o//o 70 ASTM D 4355 Cell 4A Linine System Construction SCO349\..,LSC0349 - TECHNICAL SPECIFICATIONS F 061 307.DOC Page 02771-7 18 June 20O7 GeoSyntec Consultants SECTION 02772 GEOSYNTHETIC CLAY LINER PARTI_ GENERAL 1.01 SCOPE A. The Geosynthetic Installer shall furnish all labor, materials, tools, supervision, transportation, equipment, and incidentals necessary for installation of the geosynthetic clay liner (GCL). The work shall be carried out as specified herein and in accordance with the Drawings and Construction Quality Assurance (CQA) Plan. B. The work shall include, but not be limited to, delivery, offloading, storage, placement, anchorage, and seaming of the GCL. I.O2 RELATED SECTIONS Section 02220 - Subgrade Preparation Section 02770 - Geomembrane 1.03 REFERENCES A. Drawings B. Site CQA Plan C. Latest Version American Society of Testing and Materials (ASTM) Standards: ASTM D 5887 Test Method for Measurement of Index Flux Through Saturated Geosynthetic Clay Liner Specimens using a Flexible Wall Permeameter ASTM D 5888 Guide for Storage and Handling of Geosynthetic Clay Liners ASTM D 5890 Test Method for Swell Index of Clay Mineral Component of Geosynthetic Clay Liners ASTM D 5891 Test Method for Fluid Loss of Clay Component of Geosynthetic Clay Liners ASTM D 5993 Test Method for Measuring Mass per Unit Area of Geosynthetic Clay Liners 1.04 QUALIFICATIONS A. GCL Manufacturer: l. The Manufacturer shall be a well-established firm with more than five (5) years of experience in the manufacturing of GCL. 2. The GCL Manufacturer shall be responsible for the production of GCL rolls and shall have sufficient production capacity and qualified personnel to provide material meeting the requirements of this Section and the construction schedule for this project. Cell 4A Linine System Construction sc034e\...\sc034e - TECHNTcAL spEcrFrcArroNs F Page 02772-l 06r307.DOC l8 June 2007 GeoSyntec Consultants B. GCL Installer: l. The Geosynthetic Installer shall install the GCL and shall meet the requirements of Section 02770 Subpart 1.04. B and this Section. 2. The Geosynthetics Installer shall be responsible and shall provide sufficient resources for field handling, deploying, temporarily restraining (against wind), and other aspects of the deployment and installation of the GCL and other geosynthetic components of the project. 1.05 SUBMITTALS A. At least 7 days before transporting any GCL to the site, the Manufacturer shall provide the following documentation to the Engineer for approval. l. list of material properties, including test methods utilized to analyze / confirm properties. 2. GCL samples. 3. projected delivery dates for this project. 4. Manufacturing quality control certificates for each shift's production for which GCL for the project was produced, signed by responsible parties employed by the Manufacturer (such as the production manager). 5. Manufacturer Quality Control (MQC) certificates, including: a. roll numbers and identification; and b. MQC results, including description of test methods used, outlined in Subpart 2.01 of this Section. 6. Certification that the GCL meets all the properties outlined in Subpart 2.01 of this Section. 1.06 CONSTRUCTION QUALTTY ASSURANCE (CQA) MONITORTNG A. The Geosynthetic Installer shall be aware of all monitoring and conformance testing required by the CQA Plan. This monitoring and testing, including random conformance testing of construction materials and completed work, will be performed by the CQA Consultant. If nonconformances or other deficiencies are found in the materials or completed work, the Geosynthetic Installer will be required to repair the deficiency or replace the deficient materials at no additional cost to the Owner. PART2_ PRODUCTS 2.OI MATERIAL PROPERTIES A. The flux of the bentonite portion of the GCL shall be no greater than I x 10-8 m3/m2-sec, when measured in a flexible wall permeameter in accordance with ASTM D 5887 under an effective confining stress of5 pounds per square inch. B. The GCL shall have the following minimum dimensions: Cell 4A Linine Svstem Construction sc0349\...\scorqe - TECHNIcAL spECrFlcATroNs F Page 02772-2 061307.DOC 18 June 2007 GeoSyntec Consultants L the minimum roll width shall be 15 feet; and 2. the linear length shall be long enough to conform with the requirements specified in this Section. C. The bentonite used to fabncate the GCL shall be comprised of at least 90 percent sodium montmorillonite. D. The bentonite component of the GCL shall be applied at a minimum concentration of 0.75 pound per square foot (psf), when measured at a water content of 0 percent. E. The GCL shall meet or exceed all required property values listed in Table 02772-1. F. The bentonite will be adhered to the backing material(s) in a manner that prevents it from being dislodged when transported, handled, and installed in a manner prescribed by the Manufacturer. The method used to hold the bentonite in place shall not be detrimental to other components of the lining system. G. The geotextile components of he GCL shall be woven and nonwoven and have a combined mass per unit area of 9 oz./SY. H. The GCL shall be needle punched. 2,02 MANUFACTURING QUALITY CONTROL (MQC) A. The GCL shall be manufactured with quality control procedures that meet or exceed generally accepted industry standards. B. The Manufacturer shall sample and test the GCL to demonstrate that the material complies with the requirements of this Section. C. Any GCL sample that does not comply with this Section will result in rejection of the roll from which the sample was obtained. The Manufacturer shall replace any rejected rolls. D. If a GCL sample fails to meet the quality control requirements of this Section, the Engineer will require that the Manufacturer sample and test, at the expense of the Manufacturer, rolls manufactured in the same lot, or at the same time, as the failing roll. Sampling and testing of rolls shall continue until a pattern of acceptable test results is established to determine the bounds of the failed roll(s). All rolls pertaining to failed tests shall be rejected. E. Additional sample testing may be performed, at the Manufacturer's discretion and expense, to more closely identify the extent of any non-complying rolls and/or to qualify individual rolls. F. Sampling shall, in general, be performed on sacrificial portions of the GCL material such that repair is not required. The Manufacturer shall sample and test the GCL to demonstrate that its properties conform to the requirements stated herein. At a minimum, the following (MQC) tests shall be performed by the Manufacturer: dry mass per unit area (ASTM D5993) and index flux at frequencies ofat least 1 per 50,000 ft2 and 1 per 200,000 ft2, respectively. G. The Manufacfurer shall comply with the certification and submittal requirements of this Section. 2.03 PACKING AND LABELING A. GCL shall be supplied in rolls wrapped in impervious and opaque protective covers. Cell 44 Lining System Construc{ion sc034e\...\sc034e - TECHNTcAL spEcrFrcAnoNs F Page 02172-3 061307.DOC 18 June 2007 GeoSyntec Consultants B. GCL shall be marked or tagged with the following information: l. Manufacturer'sname; 2. productidentification; 3. lot number; 4. roll number; and 5. roll dimensions. 2.04 TRANSPORTATION, HANDLING AND STORAGE A. The Geosynthetic Manufacturer shall be liable for any damage to the GCL incurred prior to and during transportation to the site. B. Handling, storage, and care of the GCL at the site prior to and following installation, are the responsibility of the Geosynthetic Installer, until final acceptance by the Owner. C. The GCL shall be stored and handled in accordance with ASTM D 5888. D. The Geosynthetic Installer shall be liable for all damage to the materials incurred prior to and during transportation to the site including hydration of the GCL prior to placement. E. The GCL shall be on-site at least 14 days prior to the scheduled installation date to allow for completion of conformance testing described in Subpart 3.08 of this Section. PART 3 - EXECI.TTION 3.01 FAMILIARIZATION A. Prior to implementing any of the work described in this Section, the Geosynthetic Installer shall carefully inspect the installed work of all other Sections and verify that all work is complete to the point where the installation of this Section may properly commence without adverse impact. B. If the Geosynthetic Installer has any concems regarding the installed work of other Sections, he should noti! the Engineer in wnting prior to commencing the work. Failure to notifu the Engineer or commencing installation of the GCL will be construed as Geosynthetic Installer's acceptance of the related work of all other Sections. C. A pre-installation meeting shall be held to coordinate the installation of the GCL with the installation of other components of the lining system. Cell 4A Lining Svstem Construction sc034e\...\sc034e - TECHNTcAL spEcrFrcArroNs F Page 027724 06B07.DOC 18 June 2007 GeoSyntec Consultants 3.02 SURFACE PREPARATION A. The Geosynthetics Installer shall provide certification in writing that the surface on which the GCL will be installed is acceptable. This certification of acceptance shall be given to the Engineer's representative prior to commencement of geosynthetics installation in the area under consideration. B. Special care shall be taken to maintain the prepared soil surface. The subgrade shall be moisture conditioned prior to installation of the GCL. C. No GCL shall be placed onto an area that has been softened by precipitation or that has cracked due to desiccation. The soil surface shall be observed daily to evaluate the effects of desiccation cracking and/or softening on the integrity ofthe prepared subgrade. 3.03 HANDLING AND PLACEMENT A. The Geosynthetic Installer shall handle all GCL in such a manner that it is not damaged in any way. B. In the presence of wind, all GCL shall be sufficiently weighted with sandbags to prevent their movement. C. Any GCL damaged by stones or other foreign objects, or by installation activities, shall be repaired in accordance with Subpart 3.07 by the Geosynthetic Installer, at the expense of the Geosynthetic Installer. D. The GCL shall be hydrated to l40oh moisture content. E. The GCL shall be installed with the woven geotextile facing up (against the overlying geomembrane). 3.04 OVERLAPS C On slopes steeper than 10 horizontal to I vertical, all GCL shall be continuous down the slope, i.e., no horizontal seams shall be allowed on the slope. Horizontal seams shall be considered as any seam having an alignment exceeding 20 degrees from being perpendicular to the slope contour lines, unless otherwise approved by the Engineer. All GCL shall be overlapped in accordance with the Manufacturer's recommended procedures. At a minimum, along the length (i.e., the sides) of the GCL placed on slopes steeper than 10:1 (horizontal:venical), the overlap shall be 12 inches, and along the width (i.e., the ends) the overlap shall be 24 inches. At a minimum, along the length (i.e., the sides) of the GCL placed on non-sloped areas (i.e. slopes no steeper than 10:1), the overlap shall be 6-inches, and along the width (i.e., the ends) the overlap shall be l2-inches. Cell 4,A Linins Svstenr Construction A. SCO]49\,, \SCO]49 - TECTINICAL SPECIFICATIONS F 06 I l07.DOC Page 02772-5 I 8 June 2007 3.05 MATERIALS IN CONTACT WITH THE GCL A. Installation of other components of the liner system shall be carefully performed to avoid damage to the GCL. B. Engineer approved low ground pressure equipment may be driven directly on the GCL. C. Installation of the GCL in appurtenant areas, and connection of the GCL to appurtenances shall be made according to the Drawings. The Geosynthetic Installer shall ensure that the GCL is not damaged while working around the appurtenances. REPAIR A. Any holes or tears in the GCL shall be repaired by placing a GCL patch over the defect. On slopes steeper than 10 percent, the patch shall overlap the edges ofthe hole or tear by a minimum of 2 feet in all directions. On slopes l0 percent or flatter, the patch shall overlap the edges of the hole or tear by a minimum of I foot in all directions. The patch shall be secured with a Manufacturer recommended water-based adhesive. B. Care shall be taken to remove any soil, rock, or other materials, which may have penetrated the torn GCL. C. The patch shall not be nailed or stapled. CONFORMANCE TESTING A. Samples of the GCL will be removed by the CQA Consultant and sent to a Geosynthetic CQA Laboratory for testing to ensure conformance with the requirements of this Section and the CQA Plan. The Geosynthetic Installer shall assist the CQA Consultant in obtaining conformance samples. The Geosynthetic Installer shall account for this testing in the installation schedule. B. At a minimum, the following conformance tests will be performed at a minimum frequency rate of one sample per 100,000 ft2: mass per unit area (ASTM D 5993) and bentonite moisture content (ASTM D 5993). At a minimum, the following conformance tests will be performed at a frequency of one sample per 400,000 ff : index flux (ASTM D 5887). If the GCL Manufacturer provides material that requires sampling at a frequency (due to lot size, shipment size, etc.) resulting in one sample per less than 90 percent of 100,000 ff (90,000 ft2;, then the Geosynthetic Installer shall pay the cost for all additional testing. C. The CQA Consultant may increase the frequency of sampling in the event that test results do not comply with the requirements of Subpart 2.01 of this Section until passing conformance test results are obtained for all material that is received at the site. This additional testing shall be performed at the expense of the Geosynthetic Installer. D. Any GCL that is not certified by the Manufacturer in accordance with Subpart 1.05 of this Section or that does not meet the requirements specified in Subpart 2.01 shall be rejected and replaced by the Geosynthetic Installer, at the expense of the Geosynthetic Installer. PROTECTION OFWORK A. The Geosynthetic Installer shall protect all work of this Section. Cell 44 Linins Svstem Construction 3.06 3.07 3.08 SCO349\...\SC0349. TECHNICAL SPECIFICATIONS F 061307.Dw* Page 02772-6 I 8 Junc 2007 GeoSyntec Consultants B. In the event of damage, the Geosynthetic Installer shall immediately make all repairs and replacements necessary to the approval of the Engineer, at the expense of the Geosynthetic Installer. PART 4 _ MEASUREMENT AND PAYMENT A. Providing for and complying with the requirements set forth in this Section for GCL will be measured as in-place square feet (SF), as measured by the surveyor, to the limits shown on the Drawings, and payment will be based on the unit price provided on the Bid Schedule. B. The following are considered incidental to the Work: . Submittals.o Quality Control.o Shipping, handling and storage.o Overlaps and seaming.o Layout survey. o Mobilization. . Rejected material. o Rejected material removal, handling, re-testing, and repair. o Overlaps and seaming. o Temporary anchorage.o Visqueen. TABLE 02772.I REQUIRJD GCL PROPERTY VALUES Notes: (1) Allvaluesrepresentminimumaveragerollvalues(i.e.,anyrollinalotshouldmeetorexceedthevaluesinthistable), (2) Hydraulic flux testing shall be performed under an effective confining stress of 5 pounds per square inch. (3) Measured at a moisture content ofO percent. IEND OF SECTTONI Cell 4A Linins Svstem Construction PROPERTIES QUALIFIERS UNITS SPECIFIED(') VALUES TEST METHOD Bentonite Content(3)mlntmum lb/ft2 0.75 ASTM D 5993 Bentonite Swell Index mlnlmum mLl2g 24 ASTM D 5890 Bentonite Fluid Loss maxrmum mL l8 ASTM D 589I Hydraulic Flux maxrmum mllm2-s I x 10'8 ASTM D 5887(2) sc034e\...\sc034e - TECHNTcAL spEcrFrcArloNs F Page 02772-7 06t 307.D(rc 18 luhe 2007 GeoSyntec Consultants SECTION 02773 GEONET PARTl_ GENERAL 1.01 SCOPE A. The Geosynthetic Installer shall fumish all labor, materials, tools, supervision, transportation, equipment, and incidentals necessary for installation of the geonet. The work shall be carried out as specified herein and in accordance with the Drawings and Construction Quality Assurance (CQA) Plan. B. The work shall include, but not be limited to, delivery, offloading, storage, placement, anchorage, and seaming of the geonet. 1.02 RELATED SECTIONS Section 02225 - Drainage Aggregate Section 02220 - Subgrade Preparation Section 02616 - PVC Pipe Section 02270 - Geomembrane Section 02771 - Geotextile 1.03 REFERENCES A. Drawings B. Site CQA Plan C. Latest Version American Society of Testing and Materials (ASTM) Standards: ASTM D792 Standard Test Methods for Specific Gravity and Density of Plastics by Displacement ASTM D1505 Standard Test Method for Density of Plastics by the Density-Gradient Technique ASTM D1603 Standard Test Method for Carbon Black in Olefin Plastics ASTM D4218 Standard Test Method for Determination of Carbon Black Content in Polyethylene Compounds by Muffl e-Furnace Technique ASTM D4716 Standard Test Method for Constant Head Hydraulic Transmissiviry (In-Place Flow) of Geotextiles and Geotextile Related Products ASTM D5199 Standard Test Method for Measuring Nominal Thickness of Geosynthetics Cell 4A Linine System Construction sc0i4e\...\sc034e - TECHNTcAL spEcrFlcAnoNs F Page 02773-l 061307.DOC l8 June 2007 GeoSyntec Consultants 1.04 QUALIFICATIONS A. GeonetManufacturer: l. The Manufacturer shall be a well-established firm with more than five (5) years of experience in the manufacturing of geonet. 2. The Manufacturer shall be responsible for the production of geonet rolls and shall have sufficient production capacity and qualified personnel to provide material meeting the requirements ofthis Section and the construction schedule for this project. B. Geonet Installer: I . The Geosynthetic Installer shall meet the requirements of Subpart I .04. B of Section 02770, and this Section. 2. The Geosynthetics Installer shall be responsible and shall provide sufficient resources for field handling, deploying, temporarily restraining (against wind and re-curling), and other aspects ofthe deployment and installation ofthe geonet and other geosynthetic components of the project. 1.05 SUBMITTALS A. At least 7 days before transporting any geonet to the site, the Manufacturer shall provide the following documentation to the Engineer for approval. L list of material properties, including test methods utilized to analyze / confirm properties. 2. geonet samples. 3. projected delivery dates for this project. 4. Manufacturing Quality Control (MQC) certificates for each shift's production for which geonet for the project was produced, signed by responsible parties employed by the Manufacturer (such as the production manager). MQC certificates shall include: a. roll numbers and identification; and b. MQC results, including description of test methods used, outlined in Subpart 2.01 of this Section. c. Certification that the geonet meets all the properties outlined in Subpart 2.01 of this Section. 1.06 CONSTRUCTION QUALITY ASSURANCE (CQA) A. The Geosynthetic Installer shall ensure that the materials and methods used for producing and handling the geonet meet the requirements of the Drawings and this Section. Any material or method that does not conform to these documents, or to altematives approved in writing by the Engineer, will be rejected and shall be repaired or replaced, at the Geosynthetic Installer's expense. B. The Geosynthetic Installer shall be aware of all monitoring and conformance testing required by the CQA Plan. This monitoring and testing, including random conformance testing of Cell4A Lining System Construction sc034e\...\sc034e - rEClrNrcAL spEclFlcArroNs F Page 02773-2 061 307.DOC l8 Junc 2007 GeoSyntec Consultants construction materials and completed work, will be performed by the CQA Consultant. If nonconformances or other deficiencies are found in the materials or completed work, the Geosynthetic Installer will be required to repair the deficiency or replace the deficient materials at now additional cost to the Owner. PART2_ PRODUCTS 2.OI GEONET PROPERTIES A. The Manufacturer shall furnish geonet having properties that comply with the required property values shown on Table 02773-1. B. In addition to documentation of the property values listed in Table 02073-1, the geonet shall contain a maximum of one percent by weight of additives, fillers, or extenders (not including carbon black) and shall not contain foaming agents or voids within the ribs of the geonet. 2.02 MANUFACTURTNG QUALITY CONTROL (MQC) A. The geonet shall be manufactured with MQC procedures that meet or exceed generally accepted industry standards. B. Any geonet sample that does not comply with the Specifications will result in rejection of the roll from which the sample was obtained. The Geonet Manufacturer shall replace any rejected rolls at no additional cost to Owner. C. If a geonet sample fails to meet the MQC requirements of this Section, then the Geonet Manufacturer shall sample and test each roll manufactured, in the same lot, or at the same time, as the failing roll. Sampling and testing of rolls shall continue until a pattem of acceptable test results is established. D. Additional sample testing may be performed, at the Geonet Manufacturer's discretion and expense, to more closely identify any non-complying rolls and/or to qualiff individual rolls. E. Sampling shall, in general, be performed on sacrificial portions of the geonet material such that repair is not required. The Manufacturer shall sample and test the geonet, at a minimum, once every 100,000 ft2 to demonstrate that its properties conform to the values specified in Table 02773-1. F. At a minimum, the following MQC tests shall be performed: Test Procedure Density ASTMDT92or D 1505 Thickness ASTM D 5199 Carbon Black Content ASTM D 1603 G. The hydraulic transmissivity test (ASTM D 4716) in Table 02073-l need not be performed at a frequency of one per 100,000 ft2. However, the Geonet Manufacfurer will certify that this test has been performed on a sample of geonet identical to the product that will be delivered to the Site. The Geonet Manufacturer shall provide test results as part of MQC documentation. Cell 44' Linine System Construction sc034e\...\sc0r4e - TECHNTcAL spEclFrcArroNs F Page 02773-3 06130?.Doc l8 JBne 2007 GeoSyntec Consultants H. The Geonet Manufacturer shall comply with the certification and submittal requirements of this Section. 2.03 LABELING A. Geonet shall be supplied in rolls labeled with the following information: 1. manufacturer'sname; 2. productidentification; 3. lot number; 4. roll number; and 5. roll dimensions. 2.04 TRANSPORTATION A. Transportation of the geonet shall be the responsibility of the Geonet Manufacturer. The Geonet Manufacturer shall be liable for all damages to the materials incurred prior to and during transportation to the site. B. Geonet shall be delivered to the site at least 7 days before the scheduled date of deployment to allow the CQA Consultant adequate time to inventory the geonet rolls and obtain additional conformance samples, if needed. The Geosynthetic Installer shall notify the CQA Consultant a minimum of 48 hours prior to any delivery. 2.05 HANDLING AND STORAGE A. The Geosynthetic Manufacturer shall be responsible for handling, off-loading, storage, and care of the geonet prior to and following installation at the Site. The Geosynthetic Installer shall be liable for all damages to the materials incurred prior to hnal acceptance of the geonet drainage layer by the Owner. B. The geonet shall be stored offthe ground and out ofdirect sunlight, and shall be protected from mud and dirt. The Geosynthetic Installer shall be responsible for implementing any additional storage procedures required by the Geonet Manufacturer. 2.06 CONFORMANCE TESTING A. Conformance testing, if required, shall be performed in accordance with the CQA Plan. The Geosynthetics installer shall assist the CQA Consultant in obtaining conformance samples, if requested. The CQA Consultant has the option of collecting samples at the manufacturing facility. B. Passing conformance testing results, if applicable, are required before any geonet is deployed. C. Samples shall be taken at a minimum frequency of one sample per 200,000 ft2 with a minimum of one sample per lot. If the Geonet Manufacturer provides material that requires sampling at a frequency (due to lot size, shipment size, etc.) resulting in one sample per less than 90 percent of200,000 ft2 (180,000 ft2;, then the Geosynthetic Installer shall pay the cost for all additional testing. Cell 4A Lining System Construction sc0r4e\...\sc0349 - TECHNICAL spECIFICATtoNs F Page 02773-4 06t 307.DOC I 8 June 2007 GeoSyntec Consultants D. The CQA Consultant may increase the frequency of sampling in the event that test results do not comply with the requirements of Subpan 2.01 of this Section until passing conformance test results are obtained for all material that is received at the Site. This additional testing shall be performed at the expense of the Geosynthetic Installer. E. Any geonet that are not certif,red in accordance with Subpart 1.05 of this Section, or that conformance testing indicates do not comply with Subpart 2.01 of this Section, will be rejected by the CQA Consultant. The Geonet Manufacturer shall replace the rejected material with new material at no additional cost to the Owner. PART3_ EXECUTION 3.01 HANDLINGANDPLACEMENT A. On slopes steeper than l0 horizontal to I vertical, all geonet shall be continuous down the slope, i.e., no horizontal seams shall be allowed on the slope. Horizontal seams shall be considered as any seam having an alignment exceeding 20 degrees from being perpendicular to the slope contour lines, unless otherwise approved by the Engineer. B. Geonet shall be placed with the machine direction perpendicular to the contour intervals (direction of flow). C. The geonet shall be handled in such a manner as to ensure it is not damaged in any way. D. Precautions shall be taken to prevent damage to underlying layers during placement of the geonet. E. The geonet shall be installed in a manner that minimizes wrinkles. F. Care shall be taken during placement ofgeonet to prevent dirt or excessive dust in the geonet that could cause clogging and/or damage to the adjacent materials. 3.02 JOINING AND TYING A. Adjacent panels of geonet shall be overlapped by at least 4 in. These overlaps shall be secured by tying with nylon ties. B. Tying shall be achieved by plastic fasteners or polymer braid. Tying devices shall be white or yellow for easy inspection. Metallic devices shall not be used. C. Tying shall be performed at a minimum interval of every 5 ft. along the geonet roll edges and 2 ft. along the geonet roll ends. 3.03 REPAIR A. Any holes or tears in the geonet shall be repaired by placing a patch extending I ft. beyond the edges ofthe hole or tear. The patch shall be placed under the panel and secured to the original geonet by tying every 6 in. with approved tying devices. If the hole or tear width across the roll is more than 50 percent of the width of the roll, then the damaged area shall be cut out and the two portions of the geonet shall be joined in accordance with the requirements of Subpart 3.02 of this Section. Cell 4A Linine System Construction sc0i49\...\sc0349 - TECHNTcAL spECTFTcATToNS F Page 02773-5061307.D(r l8 June 2007 GeoSyntec Consultants 3.04 PRODUCT PROTECTION B. PART 4_ A. The Geosynthetics Installer shall use all means necessary to protect all prior work, and all materials and completed work of other Sections. In the event of damage to the geonet, the Geosynthetic Installer shall immediately make all repairs per the requirements of this Section. MEASUREMENT AND PAYMENT Providing for and complying with the requirements set forth in this Section for geonet will be measured as in-place square feet (SF), as measured by the surveyor, to the limits shown on the Drawings, and payment will be based on the unit price provided on the Bid Schedule. The following are considered incidental to the Work: a a a a a a a a a a Submittals. Quality Control. Shipping, handling and storage. Overlaps and seaming. Layout survey. Offloading. Mobilization. Rejected material. Rejected material removal, handling, re-testing, and repair. Temporary anchorage. A. B. TABLE 02773-I REQUIRED GEONET PROPERTY VALUES PROPERTIES QUALIFIERS UNITS SPECIFTED(I) VALUES TEST METHOD Resin Density Minimum g/cc o.94 ASTM D792 or Dl505 Carbon Black Content Range o/2.0 - t.0 ASTM Dl603 or D4218 Thickness Minimum mils 300 ASTM D5I99 Transmissivityt'Minimum m' / sec 8 x l0-'ASTM D47I6 Notes: (1) All values (except transmissivity) represent average roll values. (2) Transmissivity shall be measured using water at 68'F with a gradient of 0.1 under a confining pressure of 7,000 lb/ft2 The geonet shall be placed in the testing device between 60-mil HDPE smooth geomembrane. Measurements are taken one hour after application of confining pressure. I END OF SECTTON ] Cell 4A Linins Svstem Construction SCO]49\.,.ISC0349. TECHNICAL SPECIFICATIONS F 06t30?.Doc Page 02713-6 18 Junc 2007 GeoSyntec Consultants SECTION O34OO CAST-IN-PLACE CONCRETE PART1_ GENERAL 1.01 DESCRIPTION OF WORK A. The Contractor shall furnish all labor, materials, tools, transportation and equipment necessary to construct a cast-in-place spillway crossing as shown on the Drawings and as specified herein. B. The Work shall include, but not be limited to, procurement, delivery, subgrade preparation, formwork, concrete placement, control joints, surface freafinent, and curing. I.O2 RELATED SECTIONS None. 1.03 REFERENCES A. Drawings B. Construction Quality Assurance (CQA) Plan C. Latest version of American Concrete Institute (ACI) standards: ACI 117 Tolerances for Concrete Construction and Materials ACI 211.1 Selecting Proportions forNormal, Heavyweight, and Mass Concrete ACI 301 Structural Concrete for Buildings ACI 304R Measuring, Mixing, Transporting, and Placing Concrete ACI 308 Standard Practice for Curing Concrete ACI 3 l8 Building Code Requirements for Reinforced Concrete ACI 347R Formwork for Concrete D. Latest version of the American Society for Testing and Materials (ASTM) standards: ASTM A 615 Deformed and Plain Billet-Steel Bars for Concrete Reinforcement ASTM C 33 Concrete Aggregates ASTM C 39 Compressive Strength of Cylindrical Concrete Specimens ASTM C 94 Ready- Mixed Concrete ASTM C 127 Specific Gravity and Adsorption of Coarse Aggregate ASTM C 128 Specific Gravity and Adsorption of Fine Aggregate ASTM C 143 Slump of Hydraulic Cement Concrete Cell 4A Lining System Construction sc0i49\...\sc0349 - rEcrrNrcAl spEcrFrcArroNs F Page 03400- I 06t 307.DOC l8 June 2007 GeoSyntec Consultants ASTM C 150 Portland Cement ASTM C 171 Sheet Materials for Curing Concrete ASTM C 192 Making and Curing Concrete Test Specimens in the Laboratory ASTM C 309 Liquid Membrane - Forming Compounds for Curing Concrete ASTM C 403 Time of Setting of Concrete Mixtures by Penetration Resistance ASTM C 494 Chemical Admixtures for Concrete ASTM C 61 8 Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete I.O4 SUBMITTALS A. At least 7 days prior to construction of the concrete, Contractor shall submit a mix design for the type of concrete. Submit a complete list of materials including types, brands, sources, amount of cement, fly ash, pozzolans, retardants, and admixtures, and applicable reference specifications for the following: 1. Slump design based on total gallons of water per cubic yard. 2. Type and quantify of cement. 3. Brand, type, ASTM designation, active chemical ingredients, and quantity of each admixture. 4. Compressive strength based on 28-day compression tests. B. Delivery Tickets: 1. Provide duplicate delivery tickets with each load of concrete delivered, one for Contractor's records and one for Engineer, with the following information: a. Date and serial number of ticket. b. Name of ready-mixed concrete plant, operator, and job location. c. Type of cement, admixtures, if any, and brand name. d. Cement content, in bags per cubic yard (CY) of concrete, and mix design. e. Truck number, time loaded, and name of dispatcher. f. Amount of concrete (CY) in load delivered. g. Gallons of water added at job, if any, and slump of concrete after water was added. C. Delivery l. The Concrete Manufacturer shall be liable for all damage to the materials incurred prior to and during transportation to the Site. 1.05 MANUFACTURER QUALTTY CONTROL (MQC) A. Aggregates shall be sampled and tested in accordance with ASTM C 33. B. Concrete test specimens shall be made, cured, and stored in conformity with ASTM C 192 and tested in conformity with ASTM C 39. Cell 4A Linins System Construction sc034e\...rsc034e - TECHNTcAL spECrFrcArroNS F Page 03400-2 061 307.DOC l8 June 2007 GeoSyntec Consultants C. Slump shall be determined in accordance with ASTM C 143. 1.06 LIMITINGREQUIREMENTS A. Unless otherwise specified, each concrete mix shall be designed and concrete shall be controlled within the following limits: l. Concrete slump shall be kept as low as possible, consistent with proper handling and thorough compaction. Unless otherwise authorized by the Engineer, slump shall not exceed 5 in. 2. The admixture content, batching method, and time of introduction to the mix shall be in accordance with the manufacturer's recommendations for minimum shrinkage and for compliance with this Section. A water-reducing admixture may be included in concrete. PART2- PRODUCTS 2.OI PROPORTIONING AND DESIGN MIXES A. Concrete shall have the following properties. l. 3,000 psi, 28-day compressive strength. 2. Slump range of I to 5 inches. 3. Coarse Aggregate Gradation, ASTM C 33, Number 5'7 or 67. B. Retarding admixture in proportions recommended by the manufacturer to attain additional working and setting time from I to 5 hours. 2.02 CONCRETEMATERIALS A. Cement shall conform to ASTM C 150 Type II. B. Water shall be fresh, clean, and potable, free from oils, acids, alkalis, salts, organic materials, and other substances deleterious to concrete. C. Aggregates shall conform to ASTM C 33. Aggregates shall not contain any substance which may be deleteriously reactive with the alkalis in the cement, and shall not possess properties or constituents that are known to have specific unfavorable effects in concrete. D. The Contractor may use a water reducing chemical admixture. The water reducing admixture shall conform to ASTM C 494, Type A. The chemical admixture shall be approved by the Engineer. 2.03 REINFORCING STEEL A. The reinforcing steel shall be Grade 60 in accordance with ASTM A 615. B. Unless otherwise noted on the Drawings, all reinforcement bars shall be No.3 (3/8-inch diameter) in accordance with ASTM A 615 and welded wire fabric shall be sized as 6 x 6, Wl.4 x Wl.4.. Cell 4A Linins Svstem Construction sc034e\...\sc0349 - TECFTNTcAL SrECTFTcATToNS F Page 03400-3 061 107 Do(l I 8 Junc 2007 GeoSyntec Consultants PART3_ EXECUTION 3.01 BATCHING, MIXING, AND TRANSPORTING CONCRETE Batching shall be performed according to ASTM C 94, ACI 301, and ACI 304R, except as modihed herein. Batching equipment shall be such that the concrete ingredients are consistently measured within the following tolerances: I percent for cement and water, 2 percent for aggregate, and 3 percent for admixtures. Concrete Manufacturer shall fumish mandatory batch ticket information for each load of ready mix concrete. Machine mixing shall be performed according to ASTM C94 and ACI301. Mixing shall begin within 30 minutes after the cement has been added to the aggregates. Concrete shall be placed within 90 minutes of either addition of mixing water to cement and aggregates or addition of cement to aggregates. Additional water may be added, provided that both the specified maximum slump and water-cement ratio are not exceeded. When additional water is added, an additional 30 revolutions of the mixer at mixing speed is required. Dissolve admixtures in the mixing water and mix in the drum to uniformly distribute the admixture throughout the batch. Transport concrete from the mixer to the forms as rapidly as practicable. Prevent segregation or loss of ingredients. Clean transporting equipment thoroughly before each batch. Do not use aluminum pipe or chutes. Remove concrete which has segregated in transporting and dispose ofas directed. 3.02 SUBGRADE PREPARATION Subgrade shall be graded to the lines and elevations as shown on the Drawings. Standing water, mud, debris, and foreign matter shall be removed before concrete is placed. 3.03 PLACING CONCRETE C. Place concrete in accordance with ACI 301, ACI 3 I 8, and ACI 304R. Place concrete as soon as practicable after the forms and the reinforcement have been approved by the CQA Consultant. Do not place concrete when weather conditions prevent proper placement and consolidation, in uncovered areas during periods of precipitation, or in standing water. Prior to placing concrete, remove dirt, construction debris, water, snow, and ice from within the forms. Deposit concrete as close as practicable to the final position in the forms. Place concrete in one continuous operation from one end ofthe structure towards the other Ensure reinforcement is not disturbed during concrete placement. Do not allow concrete temperafure to decrease below 50 degrees F while curing. Cover concrete and provide sufficient heat to maintain 50 degrees F minimum adjacent to both the formwork and the structure while curing. Limit the rate of cooling to 5 degrees F in any I hour and 50 degrees F per 24 hours after heat application. Do not spread concrete with vibrators. Concrete shall be placed in final position without being moved laterally more than five feet. When placing of concrete is temporarily halted or delayed, provide construction joints. Concrete shall not be dropped a distance greater than five feet.F. A. B. C. A. A. B. D. E. Cell 4,{ Linin Construction SCO349\.,.\SCO349 . TECHNICAL SPECIFICATIONS F 06B07.DOC Page 03400-4 l8 June 2007 GeoSyntec Consultants G. Place concrete with aid of internal mechanical vibrator equipment capable of 9,000 cycles/min. Transmit vibration directly to concrete. H. Hot Weather: l. Comply with ACI 304R. 2. Concrete temperatue shall not exceed 90oF. 3. At air temperatures of 80oF or above, keep concrete as cool as possible during placement and curing. Cool forms by water wash. 4. Evaporation reducer shall be used in accordance with manufacturer recornmendations (Subpart 2.03). 3.04 CURING AND PROTECTION A. Immediately after placement, protect concrete from premafure drying, excessively hot or cold temperatures, and mechanical injury in accordance with ACI 308. B. Immediately after placement, protect concrete from plastic shrinkage by applying evaporation reducer in accordance with manufacturer recommendations (Subpart 2.03). C. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration ofcement and hardening ofconcrete (Subpart 2.03). D. Protect from damaging mechanical disturbances, particularly load stresses, heavy shock, and excessive vibration. E. Membrane curing compound shall be spray applied at a coverage of not more than 300 square ft per gallon. Unformed surfaces shall be covered with curing compound within 30 minutes after final finishing. If forms are removed before the end of the specified curing period, curing compound shall be immediately applied to the formed surfaces before they dry out. F. Curing compound shall be suitably protected against abrasion during the curing period. G. Film curing will not be allowed. 3.05 FORMS A. Formwork shall prevent leakage of mortar and shall conform to the requirements of ACI 347P' B. Do not disturb forms until concrete is adequately cured. C. Form system design shall be the Contractor's responsibility. 3.06 CONTROL JOINTS A. Control joints shall consist of plastic strips set flush with finished surface or % inch wide joints formed with a trowel immediately after pouring or cut with a diamond saw within 12 hours after pouring. B. Control joints shall be installed in a 15 ft x 15 ft grid spacing along the slab unless otherwise approved by the Engineer. Controljoints shall be no greater than 1 Yz inch below the surface. Cell 4A Linins System Construction sc0349\...\sc0l4e - TEcHNrcAL spEcrFlcATroNs F Page 03400-5 06t307.DOC I 8 June 2007 GeoSyntec Consultants 3.07 SLAB FINISHES A. Unformed surfaces of concrete shall be screeded and given an initial float finish followed by additional floating, and troweling where required. B. Concrete shall be broom finished. 3.08 SURVEY A. The Surveyor shall locate the features of the concrete structure. The dimensions, locations and elevations of the features shall be presented on the Surveyor's Record Drawings. PART 4 _ MEASUREMENT AND PAYMENT 4.OI GENERAL A. Providing for and complying with the requirements set forth in this Section for Cast-In-Place Concrete will be measured as lump sum (LS), and payment will be based on the unit price provided on the Bid Schedule. B. The following are considered incidental to the work: r Mobilization.o Submittals.o Quality Control.o Excavation.. Subgrade preparation.. Concrete batching, mixing, and delivery.r Layout and as-built Record Survey.. Subgrade preparation. o Reinforcing steel.o Formwork.. Concrete placement and finishing.. Sawcuffing and control joints. . Rejected material removal, handling, re-testing, repair, and replacement. IEND OF SECTTON l Cell 4,{ Linins Svstem Construction sc034e\...\sc034e - TECHNTcAL spEcrFrcATroNs r Page 03400-6 061307.DOC I 8 June 2007 REVISED CONSTRUCTION QUALITY ASSURANCE PLAN for the Construction of Cell 4A Lining System White Mesa Mill Blanding, Utah Prepared for: DENIS t Ot',1 h4 lNHs Denison Mines (USA) Corporation 6425 S. Highway 191 P.O. Box 809 Blanding, UT 84511 Phone: (306) 628-7798 Prepared by: GeosyntecD consultants Geosyntec Consultants 10875 Rancho Bernardo Rd. Suite 200 San Diego, California 92127 JUNE 2OO7 CERTIFICATION PAGE CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN FOR CELL 4A LINING SYSTEM CONSTRUCTION DENISON MINES (USA) CORPORATTON WHITE MESA MILL BLANDING, UTAH The Engineering material and data contained in this CQA Plan were prepared under the supervision and direction of the undersigned, whose seal as a registered Professional Engineer is affixed below. ory'f. Corcoran, P,E. ineer of Record ff**% ixo.aozoott.zeozi GREGORY T. .i. coRcoRAN ..r, ft,r'or;# sc0349 -coA PLAN 06t807 F.DOC 07 06 18/13:17 l. GeoSyntec Consultants TABLE OF CONTENTS INTRODUCTION .......... 1 l.l rerms "f Rrf;;;;;.:.................... . ... ................... I 1.2 Purpose and Scope of the Construction Quality Assurance PIan.................. 1 1.3 References ...........2 1.4 Organization of the Construction Quality Assurance Plan .......... .................2 DEFINITIONS RELATING TO CQA......... ........................3 2-l Owner.-..... ...........3 2.2 Construction Manager ...........3 2.3 Engineer ..............4 2.4 Contractor .-..........4 2.5 Resin Supplier .......................5 2.6 Manufacturers ........... ............5 2.7 Geosynthetic Installer ............6 2.8 CQA Consultant ....................6 2.9 Surveyor ..............7 2.10 CQA Laboratory........ ............8 2.ll Lines of Communication....... ...............-..8 2.12 Deficiency Identification and Rectification............... .................9 cQA CONSULTANTS PERSONNEL ORGANTZATION AND DUTIES.......... 11 3.1 Overview ........... ll 3.2 CQA Personnel........... ......... 1l 3.3 CQA Officer.............. ..........12 3.4 CQA Site Manager... ...........12 SITE AND PROJECT CONTROL ................... 14 4.1 Project Coordination Meetings ................ ...............14 4.1.1 Pre-Construction Meetin9............. ............. 14 4.1.2 Progress Meetings... ................. 15 4.1.3 Problem or Work Deficiency Meeting ...... 15 DOCUMENTATION .....................17 2. 3. 4. 5. nlsc0349 - c2A PLAN 061807 F.DOC 07 06 18/13:29 6. GeoSyntec Consultants 5.1 Overview .-......-..17 5.2 Daily Recordkeeping.......... ...................17 5.3 Construction Problems and Resolution Data Sheets....... .......... l8 5.4 Photographic Documentation...... .......... 19 5.5 Design and/or Specifications Changes .................... 19 5.6 CQA Report .............. ......-...20 EARTHWORK............ ............._.....22 6.1 Introduction............... ..........22 6.2 Subgrade Soil Testing Activities ...........22 6.2.1 Sample Frequency ..................-22 6.2.2 Sample Selection .....................23 6.3 CQA Monitoring Activities.. .................23 6.3.1 Vegetation Removal ................23 6.3.2 Grading ..................23 6.3.3 Subgrade Soi1........... ................24 6.3.4 Anchor Trench Construction............... ...-.-2464 lii"l**:*;;;;;;;;l:: : '':"""iiDRAINAGE AGGREGATE .......-..26 7.1 Introduction............... .--......-26 7.2 Testing Activities ................26 7.2.1 Sample Frequency .....-..--..-......26 7.2-2 Sample Selection ..........-...-.....-27 7.3 CQA Monitoring Activities.. .................27 7.3.1 Drainage Aggregate ......-..........27 7.4 Deficiencies...............- ..-......28 7 .4.1 Notification............... ...............28 7.4.2 Repairs and Re-testin9............. ..........-.......28 POLYVINYL CHLORIDE (PVC) PIPE AND STRIp composite. ......29 8.1 Material Requirements............. .............29 7. 8. IVsc0349 - cQA PLAN 061807 F.DOC 07 06 18/13:29 GeoSyntec Consultants 8.2 Manufacturer............. ......'...29 8.2.t Submittals ..............29 8.3 Handling and Laying ...........29 8.4 Perforations................ .........30 8.5 Joints .................30 8.6 Strip Composite.......... .........30 9. GEOMEMBRANE .......3I 9.1 General ..............31 9.2 Geomembrane Material Conformance.......... ..........3l 9.2.1 Introduction ............... ..............31 9.2.2 Review of Quality Control..... ....................31 9.2.2.1 Material Properties Certification................................... 3 I 9.2.2.2 Geomembrane Roll MQC Certification ............... ......... 32 9.2.3 Conformance Testing. ..............33 aa9.3 Delivery... .......... JJ aa9.3.1 Transportation and Handling ..................... JJ 9.3.2 Storage ................-..34 9.4 Geomembrane Installation........... .........34 9.4.I Introduction ............... ..............34 9.4.2 Earthwork ..............34 9.4.2.1 Surface Preparation ......-............34 9.4.2.2 Geosynthetic Termination........... ................35 9.4.3 Geomembrane Placement............ ..............35 9.4.3.1 Panel Identification............. ......35 9.4.3.2 Field Panel Placement ...............36 9.4.4 Field Seaming............ .............- 38 9.4.4.1 Requirements of Personnel .......... ...............38 9.4.4.2 Seaming Equipment and Products ................................38 9.4.4.3 Seam Preparation......... ...........-.4L 9.4.4.4 Weather Conditions for Seaming.................................. 41 9.4.4.5 Overlapping and Temporary Bonding ........41 sc0349 - cQA PLAN 061807 F.DOC O7 06 18/13:29 10. 11. vlsc0349 - cQA PLAN 061807 F.DOC 07 O6 18/13:29 12. 13. 14. sc0349 - cQA PLAN 061807 F.DOC vll 07 06 18/13:29 CeoSyntec Consultants 14.3 Lines and Grades .................72 14.4 Frequency and Spacing............... ..........72 14.5 Documentation........... .........72 TABLES 1A Test Procedures for the Evaluation of Subgrade Soil 18 Minimum Subgrade Soil Testing Frequencies 2A Test Procedures for the Evaluation of Aggregate 28 Minimum Aggregate Testing Frequencies for Conforrnance Testing 3 Geomembrane Conformance Testing Requirements 4 Geotextile Conformance Testing Requirements 5 GCL Conformance Testing Requirements 6 Geonet Conformance Testing Requirements sc0349 - cQA PLAN 061807 F.DOC vlll O'1 06 18113:29 1. 1.1 GeoSyntec Consultants INTRODUCTION Terms of Reference Geosyntec Consultants (Geosyntec) has prepared this Construction Quality Assurance (CQA) Plan for the construction of liner systems associated with the Cell 4.A. Lining System Construction at the Denison Mines (USA) Corporation (DMC) White Mesa Mill Facility (site), located at 6425 S. Highway 191, Blanding, UT 84511. This CQA Plan was prepared by Mr. Chad Bird, E.I.T., of Geosyntec Consultants (Geosyntec), and was reviewed by Mr. Gregory T. Corcoran, P.E., also of Geosyntec, in general accordance with the peer review policies of the firm. 1.2 Purpose and Scope of the Construction Oualitv Assurance Plan The purpose of the CQA Plan is to address the CQA procedures and monitoring requirements for construction of the project. The CQA Plan is intended to: (i) define the responsibilities of parties involved with the construction; (ii) provide guidance in the proper construction of the major components of the project; (iii) establish testing protocols; (iv) establish guidelines for construction documentation; and (v) provide the means for assuring that the project is constructed in conformance to the Technical Specifications, permit conditions, applicable regulatory requirements, and C onstruction Drawings. This CQA Plan addresses the soils and geosynthetic components of the liner system for the project. The soils, geosynthetic, and appurtenant components include prepared subgrade, geosynthetic clay liner (GCL), geomembrane, geotextile, geonet, drainage aggregate, and polyvinyl chloride (PVC) pipe. It should be emphasized that care and documentation are required in the placement aggregate, and in the production and installation of the geosynthetic materials installed during construction. This CQA Plan delineates procedures to be followed for monitoring construction utilizing these materials. The CQA monitoring activities associated with the selection, evaluation, and placement drainage aggregate are included in the scope of this plan. The CQA protocols applicable to manufacturing, shipping, handling, and installing all geosynthetic materials are also included. However, this CQA Plan does not specifically sc0349 - cQA PLAN 061807 F.DOC 07 O6 18/13:29 1.3 References The CQA Plan includes references to test procedures in the latest editions of the American Society for Testing and Materials (ASTM). Organization of the Construction Oualitv Assurance Plan The remainder of the CQA Plan is organized as follows: address either installation specif,rcations or materials as these requirements are addressed GeoSyntec Consultants specification of soils and geosynthetic in the Technical Specifications. 1.4 a o o a a o a a a a a a o Section 2 presents definitions relating to CQA; Section 3 describes the CQA personnel organization and duties; Section 4 describes site and project control requirements; Section 5 presents CQA documentation; Section 6 presents CQA of earthworks; Section 7 presents CQA of the drainage aggregates; Section 8 presents CQA of the pipe and fittings; Section 9 presents CQA of the geomembrane; Section 10 presents CQA of the geotextile; Section 11 presents CQA of the geosynthetic clay liner; Section 12 presents CQA of the geonet; Section l3 presents CQA of the concrete spillway; Section 14 presents CQA surveying. sc0349 - cQA PLAN 061807 F.DOC O7 06 18/13:29 GeoSyntec Consultants 2. DEFINITIONS RELATING TO CQA This CQA Plan is devoted to Construction Quality Assurance. In the context of this document, Construction Quality Assurance and Construction Quality Control are def,rned as follows: Construction Ouality Assurance (COA) - A planned and systematic pattern of means and actions designed to assure adequate confidence that materials and/or services meet contractual and regulatory requirements and will perform satisfactorily in service. CQA refers to means and actions employed by the CQA Consultant to assure conformity of the project "Work" with this CQA Plan, the Drawings, and the Technical Specificotions. CQA testing of aggregate, pipe, and geosynthetic components is provided by the CQA Consultant. Construction Oualitv Control (COC) - Actions which provide a means to measure and regulate the characteristics of an item or service in relation to contractual and regulatory requirements. Construction Quality Control refers to those actions taken by the Contractor, Manufacturer, or Geosynthetic Installer to veriff that the materials and the workmanship meet the requirements of this CQA Plan, the Drawings, and the Technical Specificatioras. In the case of the geosynthetic components and piping of the Work, CQC is provided by the Manufacturer, Geosynthetic Installer, and Contractor. Owner The Owner of this project is Denison Mines (USA) Corporation. Construction Manager Responsibilities The Construction Manager is responsible for managing the construction and implementation of the Drawings, and Technical Specifications for the project work. The Construction Manager is selected/appointed by the Owner. 2.3 2.1 2.2 sc0349 - cQA PLAN 061807 F.DOC 07 06 18/13:29 Engineer Responsibilities The Engineer is responsible for the Specifications for the project work. In this CQA Geosyntec. GeoSyntec Consultants design, Drawings, and, Technical Plan, the term "Engineer" refers to 2.4 Qualifications The Engineer of Record shall be a qualified engineer, registered as required by regulations in the State of Utah. The Engineer should have expertise, which demonstrates significant familiarity with piping, geosynthetics and soils, as appropriate, including design and construction experience related to liner systems. Contractor Responsibilities In this CQA Plan, Contractor refers to an independent party or parties, contracted by the Owner, performing the work in accordance with this CQA Plan, the Drawings, and the Technical Specifications. The Contractor will be responsible for the installation of the soils, pipe, drainage aggregate, and geosynthetic components of the liner systems. This work will include subgrade preparation, anchor trench excavation and backfill, placement of drainage aggregate for the slimes drain and the leak detection system, installation of PVC piping, placement of cast-in-place concrete, and coordination of work with the Geosynthetic Installer and other subcontractors. The Contractor will be responsible for constructing the liner system and appurtenant components in accordance with the Drawings and complying with the quality control requirements specified in the Technical Specifications. sco349 - cQA PLAN 061807 F.DOC 07 06 18113:29 2.5 GeoSyntec Consultants Qualifications Qualifications of the Contractor are specific to the construction contract. The Contractor should have a demonstrated history of successful earthworks, piping, and liner system construction and shall maintain current state and federal licenses as appropriate. Resin Supplier Responsibilities The Resin Supplier produces and delivers the resin to the Geosynthetics Manufacturer. Qualifications Qualifications of the Resin Supplier are specific to the Manufacturer's requirements. The Resin Supplier will have a demonstrated history of providing resin with consistent properties. Manufacturers Responsibilities The Manufacturers are responsible for the production of finished material (geomembrane, geotextile, geosynthetic clay liner, geonet, and pipe) from appropriate raw materials. Qualifications The Manufacturer(s) will be able to provide sufficient production capacity and qualified personnel to meet the demands of the project. The Manufacturer(s) must be a well established firm(s) that meets the requirements identified in the Technical Specifications. 2.7 2.6 sc0349 - cQA PLAN 061807 F.DOC 0'7 06 l8ll3:29 GeoSyntec Consultants Geosvnthetic Installer Responsibilities The Geosynthetic Installer is responsible for field handling, storage, placement, seaming, ballasting or anchoring against wind uplift, and other aspects of the geosynthetic material installation. The Geosynthetic Installer may also be responsible for specialized construction tasks (i.e., including construction of anchor trenches for the geosynthetic materials). Qualifications The Geosynthetic Installer will be trained and qualified to install the geosynthetic materials of the type specified for this project. The Geosynthetic Installer shall meet the qualification requirements identified in the Technical Specifications. COA Consultant Responsibilities The CQA Consultant is a party, independent from the Owner, Contractor, Manufacturer, and Geosynthetic Installer, who is responsible for observing, testing, and documenting activities related to the CQC and CQA of the earthwork, piping, and geosynthetic components used in the construction of the Project as required by this CQA Plan and the Technical Specifications. The CQA Consultant will also be responsible for issuing a CQA report at the completion of the Project construction, which documents construction and associated CQA activities. The CQA report will be signed and sealed by the CQA Officer who will be a Professional Engineer registered in the State of Utah. 2.8 Qualifications The CQA Consultant shall be a geotechnical and geosynthetic engineering that licenses necessary to conduct the geotechnical project plans and Technical Specifications. The well established firm specializing in possess the equipment, personnel, and and geosynthetic tests required by the CQA Consultant will provide qualified sco349 - cQA PLAN 061807 F.DOC 07 06 18/13:29 2.9 GeoSyntec Consultants staff for the project, as necessary, which will include, at a minimum, a CQA Officer and a CQA Site Manager. The CQA Officer will be a professionally licensed engineer as required by State of Utah regulations. The CQA Consultant will be experienced with earthwork and installation of geosynthetic materials similar to those materials used in construction of the Project. The CQA Consultant will be experienced in the preparation of CQA documentation including CQA Plans, field documentation, field testing procedures, laboratory testing procedures, construction specifications, construction Drawings, and CQA reports. The CQA Site Manager will be specifically familiar with the construction of earthworks, piping, and geosynthetic lining systems. The CQA Manager will be trained by the CQA Consultant in the duties as CQA Site Manager. Survevor Responsibilities The Surveyor is a party, independent from the Contractor, Manufacturer, and Geosynthetic Installer, that is responsible for surveying, documenting, and veriffing the location of all significant components of the Work. The Surveyor's work is coordinated and employed by the Contractor. The Surveyor is responsible for issuing Record Drawings of the construction. Qualifications The Surveyor will be a well established surveying company with at least 3 years of surveying experience in the State of Utah. The Surveyor will be a licensed professional as required by the State of Utah regulations. The Surveyor shall be fully equipped and experienced in the use of total stations and the recent version of AutoCAD. All surveying will be performed under the direct supervision of the Contractor. 2.10 sco349 - cQA PLAN 061807 F.DOC 07 O6 18/13:29 CeoSyntec Consultants COA Laboratorv Responsibilities The CQA Laboratory is a party, independent from the Contractor, Manufacturer, Geosynthetic Installer, that is responsible for conducting tests in accordance with ASTM and other applicable test standards on samples of geosynthetic materials, soil, and in the field and in either an on-site or off-site laboratory. Qualifications The CQA Laboratory will have experience in testing soils and geosynthetic materials and will be familiar with ASTM and other applicable test standards. The CQA Laboratory will be capable of providing test results within a maximum of seven days of receipt of samples and will maintain that capability throughout the duration of earthworks construction and geosynthetic materials installation. The CQA Laboratory will also be capable of transmitting geosynthetic destructive test results within 24 hours of receipt of samples and will maintain that capability throughout the duration of geosynthetic material installation. 2.tt Lines of Communication The following organization chart indicates the lines of communication and authority related to this project. sc0349 - cQA PLAN 061807 F.DOC 07 06 l8ll3:29 GeoSyntec Consultants Project Organization Chart International Uranium (USA) Corporation White Mesa Mill Cell4A 2.12 Deficiency Identification and Rectilication If a defect is discovered in the work, the CQA Engineer will evaluate the extent and nature of the defect. If the defect is indicated by an unsatisfactory test result, the CQA Engineer will determine the extent of the deficient area by additional tests, observations, a review of records, or other means that the CQA Engineer deems appropriate. After evaluating the extent and nature of a defect, the CQA Engineer will notifu the Construction Manager and schedule appropriate re-tests when the work deficiency is corrected by the Contractor. The Contractor will correct the deficiency to the satisfaction of the CQA Engineer. If a project specification criterion cannot be met, or unusual weather conditions hinder work, then the CQA Engineer will develop and present to the Design sco34e - cQA PLAN 061807 F.DOC O7 O6 18113:29 GeoSyntec Consultants Engineer suggested solutions for approval. Major modification to the Construction Drawings, Technical Specifications, or this CQA Plan must be provided to the regulatory agency for review prior to implementation. Defect corrections will be monitored and documented by CQA personnel prior to subsequent work by the Contractor in the area of the deficiency. sc0349 - cQA PLAN 061807 F.DOC 10 07 06 18/13:29 GeoSyntec Consultants 3. CQA CONSULTANTS PERSONNEL ORGANIZATION AND DUTIES 3.1 Overview The CQA Offrcer will provide supervision within the scope of work of the CQA Consultant. The scope of work for the CQA Consultant includes monitoring of construction activities including the following: . subgrade preparation; o installation of geosynthetic clay liner; o installation of geomembrane; o installation of geonet; o installation of drainage aggregate; o installation of piping; and o installation of geotextile. Duties of CQA personnel are discussed in the remainder of this section. 3.2 COA Personnel The CQA Consultant's personnel will include: o the CQA Officer, who works from the office of the CQA Consultant and who conducts periodic visits to the site as required; and o the CQA Site Manager, who is located at the site. 3.3 1lsc0349 - cQA PLAN 061807 F.DOC 07 06 18113l.29 GeoSyntec Consultants COA Officer The CQA Officer shall supervise and be responsible for monitoring and CQA activities relating to the construction of the earthworks, piping, and installation of the geosynthetic materials of the Project. Specifically, the CQA Officer: reviews the project design, this CQA Plan, Drawings, and Technical Specifications; reviews other site-specific documentation; unless otherwise agreed, such reviews are for familiarization and for evaluation of constructability only, and hence the CQA Officer and the CQA Consultant assume no responsibility for the liner system design; reviews and approves the Geosynthetic Installer's Quality Control (QC) Plan; attends Pre-Construction Meetings as needed; administers the CQA program (i.e., provides supervision of and manages on-site CQA personnel, reviews field reports, and provides engineering review of CQA related activities); provides quality control of CQA documentation and conducts site visits; reviews the Record Drawings; and with the CQA Site Manager, prepares the CQA report documenting that the project was constructed in accordance with the Construction Documents. COA Site Manaser The CQA Site Manager: acts as the on-site representative of the CQA Consultant; attends CQA-related meetings (e.g., pre-construction, daily, weekly (or designates a representative to attend the meetings)); 3.4 sc0349 - cQA PLAN 06t807 F.DOC 12 O7 06 l8l13:29 GeoSyntec Consultants . oversees the ongoing preparation of the Record Drawings; o reviews test results provided by Contractor; . assigns locations for testing and sampling; o oversees the collection and shipping of laboratory test samples; o reviews results of laboratory testing and makes appropriate recommendations; o reviews the calibration and condition of on-site CQA equipment; . prepares a daily summary report for the project; o reviews the MQC documentation; o reviews the Geosynthetic Installer's personnel Qualifications for conformance with those pre-approved for work on site; o notes on-site activities in daily field reports and reports to the CQA Officer and Construction Manager; o reports unresolved deviations from the CQA Plan, Drawings, and Technical Specifications to the Construction Manager; and o assists with the preparation of the CQA report. sc0349 - cQA PLAN 06t8o7 F.DOC l3 0'7 O6 18113:29 GeoSyntec Consultants 4. SITE AND PROJECT CONTROL 4.1 Proiect Coordination Meetinss Meetings of key project personnel are necessary to assure a high degree of quality during installation and to promote clear, open channels of communication. Therefore, Project Coordination Meetings are an essential element in the success of the project. Several types of Project Coordination Meetings are described below, including: (i) pre-construction meetings; (ii) progress meetings; and (iii) problem or work dehciency meetings. 4.1.1 Pre-Construction Meeting A Pre-Construction Meeting will be held at the site prior to construction of the Project. At a minimum, the Pre-Construction Meeting will be attended by the Contractor, the Geosynthetic Installer's Superintendent, the CQA Consultant, and the Construction Manager. Specific items for discussion at the Pre-Construction Meeting include the following: . appropriate modifications or clarifications to the CQA Plan; o the Drawings and Technical Specifications; o the responsibilities of each party; . lines of authority and communication; o methods for documenting and reporting, and for distributing documents and reports; o acceptance and rejection criteria; o protocols for testing; . protocols for handling deficiencies, repairs, and re-testing; o the time schedule for all operations; sc0349 - cQA PLAN 061807 F.DOC t4 07 06 18/13:29 GeoSyntec Consultants procedures for packaging and storing archive samples; panel layout and numbering systems for panels and seams; seaming procedures; repair procedures; and soil stockpiling locations. The Construction Manager will conduct a site tour to observe the current site conditions and to review construction material and equipment storage locations. A person in attendance at the meeting will be appointed by the Construction Manager to record the discussions and decisions of the meeting in the form of meeting minutes. Copies of the meeting minutes will be distributed to all attendees. 4.1.2 Progress Meetings Progress meetings will be held between the CQA Site Manager, the Contractor, Construction Manager, and other concerned parties participating in the construction of the project. This meeting will include discussions on the current progress of the project, planned activities for the next week, and revisions to the work plan and/or schedule. The meeting will be documented in meeting minutes prepared by a person designated by the CQA Site Manager at the beginning of the meeting. Within 2 working days of the meeting, draft minutes will be transmitted to representatives of parties in attendance for review and comment. Corrections and/or comments to the draft minutes shall be made within 2 working days of receipt of the draft minutes to be incorporated in the final meeting minutes. Problem or Work Deficiency Meeting4.1.3 A special meeting will be held when and if a problem or deficiency is present or likely to occur. The meeting will be attended by the Contractor, the Construction Manager, the CQA Site Manager, and other parties as appropriate. If the problem requires a design modification, the Engineer should either be present at, consulted prior to, or notified immediately upon conclusion of this meeting. The purpose of the work deficiency meeting is to define and resolve the problem or work deficiency as follows: sc0349 - cQA PLAN 061807 F.DOC l5 07 06 18113:29 CeoSyntec Consultants o define and discuss the problem or deficiency; o review alternative solutions; o select a suitable solution agreeable to all parties; and . implement an action plan to resolve the problem or deficiency. The Construction Manager will appoint one attendee to record the discussions and decisions of the meeting. The meeting record will be documented in the form of meeting minutes and copies will be distributed to all affected parties. A copy of the minutes will be retained in facility records. sco349 - cQA PLAN 061807 F.DOC 16 07 06 18/13:29 5. 5.1 GeoSyntec Consultants DOCUMENTATION Overview An effective CQA Plan depends largely on recognition of all construction activities that should be monitored and on assigning responsibilities for the monitoring of each activity. This is most effectively accomplished and verified by the documentation of quality assurance activities. The CQA Consultant will document that quality assurance requirements have been addressed and satisfied. The CQA Site Manager will provide the Construction Manager with signed descriptive remarks, data sheets, and logs to verifo that monitoring activities have been carried out. The CQA Site Manager will also maintain, at the job site, a complete file of Drawings and Technical Specifications, a CQA Plan, checklists, test procedures, daily logs, and other pertinent documents. 5.2 Daily Recordkeepine Preparation of daily CQA documentation will consist of daily field reports prepared by the CQA Site Manager which may include CQA monitoring logs and testing data sheets. This information may be regularly submitted to and reviewed by the Construction Manager. Daily field reports will include documentation of the observed activities during each day of activity. The daily field reports may include monitoring logs and testing data sheets. At a minimum, these logs and data sheets will include the following information : the date, project name, location, and other identification; a summary of the weather conditions; a summary of locations where construction is occurring; equipment and personnel on the project; a summary of meetings held and attendees; a description of materials used and references of results of testing and documentation; sc0i49 - cQA PLAN 061807 F.DOC t7 07 O6 18/13:29 CeoSyntec Consultants o identification of deficient work and materials; . results of re-testing corrected "deficient work;" . an identiffing sheet number for cross referencing and document control; . descriptions and locations of construction monitored; . type of construction and monitoring performed; . description of construction procedures and procedures used to evaluate construction; . a summary of test data and results; . calibrations or re-calibrations of test equipment and actions taken as a result of re-calibration; . decisions made regarding acceptance of units of work and/or corrective actions to be taken in instances of substandard testing results; . a discussion of agreements made between the interested parties which may affect the work; and . signature of the respective CQA Site Manager. 5.3 Construction Problems and Resolution Data Sheets Construction Problems and Resolution Data Sheets, to be submitted with the daily field reports prepared by the CQA Site Manager, describing special construction situations, will be cross-referenced with daily field reports, specific observation logs, and testing data sheets and will include the following information, where available: . an identifying sheet number for cross-referencing and document control; . a detailed description of the situation or deficiency; o the location and probable cause of the situation or deficiency; sc0349 - cgA PLAN 061807 F.DOC l8 07 06 l8ll3:29 GeoSyntec Consultants how and when the situation or deficiency was found or located; documentation of the response to the situation or deficiency; final results of responses; measures taken to prevent a similar situation from occurring in the future; and signature of the CQA Site Manager and a signature indicating concurrence by the Construction Manager. The Construction Manager will be made aware of significant recurring nonconformance with the Drawings, Technical Specifications, or CQA Plan. The cause of the nonconformance will be determined and appropriate changes in procedures or specifications will be recommended. These changes will be submitted to the Construction Manager for approval. When this type of evaluation is made, the results will be documented and any revision to procedures or specifications will be approved by the Contractor and Engineer. A summary of supporting data sheets, along with final testing results and the CQA Site Manager's approval of the work, will be required upon completion of construction. Photographic Documentation Photographs will be taken and documented in order to serve as a pictorial record of work progress, problems, and mitigation activities. These records will be presented to the Construction Manager upon completion of the project. Photographic reporting data sheets, where used, will be cross-referenced with observation and testing data sheet(s), and./or construction problem and solution data sheet(s). 5.5 Design and/or Specifications Changes Design and/or specifications changes may be required during construction. In such cases, the CQA Site Manager will notifu the Engineer. Design and./or specification changes will be made with the written agreement of the Engineer and will take the form of an addendum to the Drawings and Technical Specifications. 5.4 sc0349 - cQA PLAN 061807 F.DOC l9 O1 O6 18/13:29 CeoSyntec Consultants 5.6 COA Report At the completion of the Project, the CQA Consultant will submit to the Owner a CQA report signed and sealed by the Professional Engineer licensed in the State of Utah. The CQA report will acknowledge: (i) that the work has been performed in compliance with the Drawings and Technical Specifications; (ii) physical sampling and testing has been conducted at the appropriate frequencies; and (iii) that the summary document provides the necessary supporting information. At a minimum, this report will include: . MQC documentation; . a sunmary report describing the CQA activities and indicating compliance with the Drawings and Technical Specifications which is signed and sealed by the CQA Officer; . a sunlmary of CQA/CQC testing, including failures, corrective measures, and retest results; o Contractor and Installer personnel resumes and qualifications as necessary; o documentation that the geomembrane trial seams were performed in accordance with the CQA Plan and Technical Specifications; o documentation that field seams were non-deskuctively tested using a method in accordance with the applicable test standards; o documentation that nondestructive testing was monitored by the CQA Consultant, that the CQA Consultant informed the Geosynthetic Installer of any required repairs, and that the CQA Consultant monitored the seaming and patching operations for uniformity and completeness; o records of sample locations, the name of the individual conducting the tests, and the results of tests; o Record Drawings as provided by the Surveyor; o daily field reports. sc0349 - cQA PLAN 061807 F.DOC 20 O7 06 l8l13:29 GeoSyntec Consultants The Record Drawings will include scale drawings depicting the location of the construction and details pertaining to the extent of construction (e.g., plan dimensions and appropriate elevations). Record Drawings and required base maps will be prepared by a qualified Professional Land Surveyor registered in the State of Utah. These documents will be reviewed by the CQA Consultant and included as part of the CQA Report. sc0349 - cQA PLAN 061807 F.DOC 21 07 06 18/13:29 6. 6.1 GeoSyntec Consultants EARTHWORI( Introduction This section prescribes the CQA activities to be performed to monitor that prepared subgrade is constructed in accordance with Drawings and Technical Specifications. The prepared subgrade construction procedures to be monitored by the CQA Consultant, if required, shall include: vegetation removal; subgrade preparation; fine-grading; and anchor trench excavation and backfill. Suberade Soil Testins Activities Testing of subgrade soil to be used for subgrade, if required to attain grade, will be performed for material conformance. The CQA Laboratory will perform the conformance testing and CQC testing. Subgrade soil testing will be conducted in accordance with the current versions of the corresponding American Society for Testing and Materials (ASTM) test procedures. The test methods indicated in Table 1 are those that will be used for this testing unless the test methods are updated or revised prior to construction. Revisions to the test methods will be reviewed and approved by the Engineer and the CQA Site Manager prior to their usage. 6.2.1 Sample Frequency The frequency of subgrade soil testing for material qualification and material conformance will conform to the minimum frequencies presented in Table lA. The frequency of subgrade soil testing shall conform to the minimum frequencies presented in Table 18. The actual frequency of testing required will be increased by the CQA Site Manager? as necessary, if variability of materials is noted at the site, during adverse conditions, or to isolate failing areas of the construction. o a 6.2 sco349 - cQA PLAN 061807 F.DOC 22 07 06 18113:29 GeoSyntec Consultants 6.2.2 Sample Selection Sampling locations will be selected by the CQA Site Manager. Conformance samples will be obtained from borrow pits and./or stockpiles of material. The Contractor must plan the work and make subgrade soil available for sampling in a timely and organized manner so that the test results can be obtained before the material is installed. The CQA Site Manager must document sample locations so that failing areas can be immediately isolated. The CQA Site Manager will follow standard sampling procedures to obtain representative samples of the proposed subgrade soil materials. 6.3 6.3.1 COA Monitorine Activities Vegetation Removal The CQA Site Manager will monitor and document that vegetation is sufficiently cleared and grubbed in areas where geosynthetics are to be placed. Vegetation removal shall be performed as described in the Technical Specification and the Drowings. 6.3.2 Grading Construction of the Cell 4,A' liner system will require minor re-grading in certain areas. The CQA Site Manager shall monitor and document that site re-grading performed meets the requirements of the Technical Specifications and the Drawings. At a minimum, the CQA Site Manager shall monitor that: o the subgrade surface is free of sharp rocks, debris, and other undesirable materials; o the subgrade surface is smooth and uniform by visually monitoring proof rolling activities; and o the subgrade surface meets the lines and grades shown on the Drawings. sc0349 - cQA PLAN 061807 F.DOC 23 O7 O6 18113:29 6.3.3 GeoSyntec Consultants Subgrade Soil During construction, the CQA Site Manager will monitor the subgrade soil placement and compaction methods are consistent with the requirements specified in the Technical Specifications andthe Drawings. The CQA Site Manager will monitor, at a minimum, that: the subgrade soil is free of debris and other undesirable materials and that particles are no larger than 6-inches in longest dimension; the subgrade soil is constructed to the lines and grades shown on the Drawings; and compaction requirements are met as specified in the Technical Specifications. 6.3.4 Anchor Trench Construction During construction, the CQA Site Manager will monitor the anchor trench excavation and backfill methods are consistent with the requirements specified in the Technical Specifications and the Drawings. The CQA Site Manager will monitor, at a minimum, that: the anchor trench is free ofsharp rocks, debris and other undesirable materials and that particles are no larger than 6-inches in longest dimension; the anchor trench is constructed to the lines and grades shown on the Drawings; and compaction requirements are met, through visual observations, as specified in the Technical Specifications. Deficiencies If a defect is discovered in the earthwork product, the CQA Site Manager will immediately determine the extent and nature of the defect. If the defect is indicated by an unsatisfactory test result, the CQA Site Manager will determine the extent of the 6.4 sc0349 - cQA PLAN 061807 F.DOC 24 07 06 18/13:29 CeoSyntec Consultants defective area by additional tests, observations, a review of records, or other means that the CQA Site Manager deems appropriate. If the defect is related to adverse site conditions, such as overly wet soils or non-conforming particle sizes, the CQA Site Manager will define the limits and nature of the defect. 6.4.1 Notification After evaluating the extent and nature of a defect, the CQA Site Manager will notiff the Construction Manager and Contractor and schedule appropriate re- evaluation when the work deficiency is to be corrected. 6.4.2 Repairs and Re-Testing The Contractor will correct deficiencies to the satisfaction of the CQA Site Manager. If a project specification criterion cannot be met, or unusual weather conditions hinder work, then the CQA Site Manager will develop and present to the Construction Manager suggested solutions for his approval. Re-evaluations by the CQA Site Manager shall continue until it is verified that defects have been corrected before any additional work is performed by the Contractor in the area of the deficiency. sc0349 - cQA PLAN 061807 F.DOC 25 07 06 18/13:29 7. 7.1 GeoSyntec Consultants DRAINAGE AGGREGATE Introduction This section prescribes the CQA activities to be performed to monitor that drainage aggregates are constructed in accordance with Drawings and Technical Specifications. The drainage aggregates construction procedures to be monitored by the CQA Consultant include drainage aggregate placement. 7.2 Testine Activities Aggregate testing will be performed for material qualification and material conformance. These two stages of testing are defined as follows: Material qualification tests are used to evaluate the conformance of a proposed aggregate source with the Technical Specifications for qualification of the source prior to construction. Aggregate conformance testing is used to evaluate the conformance of a particular batch of aggregate from a qualified source to the Technical Specifications prior to installation of the aggregate. The Contractor will be responsible for submitting material qualification test results to the Construction Manager and to the CQA Site Manager for review. The CQA Laboratory will perform the conformance testing and CQC testing. Aggregate testing will be conducted in accordance with the current versions of the corresponding American Society for Testing and Materials (ASTM) test procedures. The test methods indicated in Table 2 are those that will be used for this testing unless the test methods are updated or revised prior to construction. Revisions to the test methods will be reviewed and approved by the Engineer and the CQA Site Manager prior to their usage. 7.2.1 Sample Frequency The frequency of aggregate testing for material qualification and material conformance will conform to the minimum frequencies presented in Table 2A. The frequency of aggregate testing shall conform to the minimum frequencies presented in sc0349 - cQA PLAN 061807 F.DOC 26 07 06 l8ll3:29 GeoSyntec Consultants Table 28. The actual frequency of testing required will be increased by the CQA Site Manager, as necessary, if variability of materials is noted at the site, during adverse conditions, or to isolate failing areas of the construction. 7.2.2 Sample Selection With the exception of qualification samples, sampling locations will be selected by the CQA Site Manager. Conformance samples will be obtained from borrow pits and/or stockpiles of material. The Contractor must plan the work and make aggregate available for sampling in a timely and organized manner so that the test results can be obtained before the material is installed. The CQA Site Manager must document sample locations so that failing areas can be immediately isolated. The CQA Site Manager will follow standard sampling procedures to obtain representative samples of the proposed aggregate materials. 7.3 7.3.1 COA Monitorins Activities Drainage Aggregate The CQA Site Manager will monitor and document the installation of the drainage aggregates. In general, monitoring of the installation of drainage aggregate includes the following activities: reviewing documentation of the material qualification test results provided by the Contractor; sampling and testing for conformance of the materials to the Technical Specifi cations ; documenting that the drainage aggregates are installed using the specified equipment and procedures; documenting that the drainage aggregates are constructed to the lines and grades shown on the Drawings; and monitoring that the construction activities do not cause damage to underlying geosynthetic materials. sco349 - cQA PLAN 061807 F.DOC 27 07 06 18/13:29 7.4 GeoSyntec Consultants Deficiencies If a defect is discovered in the drainage aggregates, the CQA Site Manager will evaluate the extent and nature of the defect. If the defect is indicated by an unsatisfactory test result, the CQA Site Manager will determine the extent of the deficient area by additional tests, observations, a review of records, or other means that the CQA Site Manager deems appropriate. 7.4.1 Notification After evaluating the extent and nature of a defect, the CQA Site Manager will notiff the Construction Manager and Contractor and schedule appropriate re-tests when the work deficiency is to be corrected. 7.4.2 Repairs and Re-testing The Contractor will correct the deficiency to the satisfaction of the CQA Site Manager. If a project specification criterion cannot be met, or unusual weather conditions hinder work, then the CQA Site Manager will develop and present to the Construction Manager suggested solutions for approval. Re-tests recommended by the CQA Site Manager shall continue until it is verified that the defect has been corrected before any additional work is performed by the Conkactor in the area of the deficiency. The CQA Site Manager will also verify that installation requirements are met and that submittals are provided. sc0349 - cQA PLAN 061807 F.DOC 28 07 06 l8l13:29 GeoSyntec Consultants 8. POLYVTNYL CHLORTDE (PVC) PIPE AND STRIP COMPOSITE 8.1 Material Requirements PVC pipe, fittings, and strip composite must conform to the requirements of the Technical Specifications. The CQA Consultant will document that the PVC pipe, fittings, and strip composite meet those requirements. 8.2 Manufacturer 8.2.1 Submittals Prior to the installation of PVC pipe and strip composite, the Manufacturer will provide to the CQA Consultant: . a properties' sheet including, at a minimum, all specified properties, measured using test methods indicated in the Technical Specifications, or equivalent; and The CQA Consultant will document that: o the property values certified by the Manufacturer meet the Technical Specifications; and o the measurements of properties by the Manufacturer are properly documented and that the test methods used are acceptable. 8.3 Handlins and Lavins Care will be taken during transportation of the pipe such that it will not be cut, kinked, or otherwise damaged. Ropes, fabric, or rubber-protected slings and straps will be used when handling pipes. Chains, cables, or hooks inserted into the pipe ends will not be used. Two slings spread apart will be used for lifting each length of pipe. Pipe or fittings will not be dropped onto rocky or unprepared ground. sc0349 - cQA PLAN 061807 F.DOC 29 0'7 06 18/13:29 8.4 GeoSyntec Consultants Pipes will be handled and stored in accordance with the Manufacturer's recommendation. The handling ofjoined pipe will be in such a manner that the pipe is not damaged by dragging it over sharp and cutting objects. Slings for handling the pipe will not be positioned at joints. Sections of the pipes with deep cuts and gouges will be removed and the ends of the pipe rejoined. Perforations The CQA Site Manager shall monitor and document that the perforations of the PVC pipe conform to the requirements of the Drawings and the Technical Specificotions. 8.5 Joints The CQA Monitor shall monitor and document that pipe and fiuings are joined by the methods indicated :rl,the Technical Specifications. Strip Compopite The CQA Site Monitor shall monitor and document that the strip composite and sandbags meet and are installed in accordance with the requirements outlined on the drawings and in the Technical Specifications. 8.6 sc0349 - cgA PLAN 061807 F.DOC 30 07 06 l8ll3:29 9. 9.1 GEOMEMBRANE General This section discusses and outlines the CQA activities high density polyethylene (HDPE) geomembrane installation. The will review the Drawings, Technical Specifications, and any regarding this material. GeoSyntec Consultants to be performed for CQA Site Manager approved Addenda Geomembrane Material Conformance Introduction The CQA Site Manager will document that the geomembrane delivered to the site meets the requirements of the Technical Specifications prior to installation. The CQA Site Manager will: review the manufacturer's submittals for compliance with the Technical Sp ecifi c ations ; document the delivery and proper storage of geomembrane rolls; and conduct conformance testing of the rolls before the geomembrane is installed. The following sections describe the CQA activities required to veriff the conformance of geomembrane. 9.2.2 Review of Quality Control 9.2.2.1 Material Properties Certification The Manufacturer will provide the Construction Manager and the CQA Site Manager with the following: 9.2 9.2.1 sc0349 - cQA PLAN 061807 F.DOC 31 O7 06 18/13:29 GeoSyntec Consultants Property data sheets, including, at a minimum, all specified properties, measured using test methods indicated in the Technical Sp e c ifi c at i o ns, or equivalent; sampling procedures and results of testing. The CQA Site Manager will document that: the property values certified by the Manufacturer meet all of the requirements of the Technical Specifications; and the measurements of properties by the Manufacturer are properly documented and that the test methods used are acceptable. 9.2.2.2 Geomembrane Roll MQC Certification Prior to shipment, the Manufacturer will provide the Construction Manager and the CQA Site Manager with MQC certificates for every roll of geomembrane provided. The MQC certificates will be signed by a responsible party employed by the Geomembrane Manufachrer, such as the production manager. The MQC certificates shall include: roll numbers and identification; and results of MQC tests - as a minimum, results will be given for thickness, specific gravity, carbon black content, carbon black dispersion, tensile properties, and puncture resistance evaluated in accordance with the methods indicated in the Technical Specificatiozs or equivalent methods approved by the Construction Manager. The CQA Site Manager will document that: sco349 - cQA PLAN 061807 F.DOC 32 07 06 18113:29 GeoSyntec Consultants o that MQC certificates have been provided at the specified frequency, and that the certificates identi$ the rolls related to the roll represented by the test results; and . review the MQC certificates and monitor that the certified roll properties meet the specifications. 9.2.3 Conformance Testing The CQA Site Manager shall obtain conformance samples (at the manufacturing facility or site) at the specified frequency and forward them to the Geosynthetics CQA Laboratory for testing to monitor conformance to both the Technical Specifications and the list of properties certified by the Manufacturer. The test procedures will be as indicated in Table 3. Where optional procedures are noted in the test method, the requirements of the Technical Specificatiozs will prevail. Samples will be taken across the width of the roll and will not include the first linear 3 ft of material. Unless otherwise specified, samples will be 3 ft long by the roll width. The CQA Site Manager will mark the machine direction on the samples with an arrow along with the date and roll number. The required minimum sampling frequencies are provided in Table 3. The CQA Site Manager will examine results from laboratory conforrnance testing and will report any non-conformance to the Construction Manager and the Geosynthetic Installer. The procedures prescribed in the Technical Specificatiorzs will be followed in the event of a failing conformance test. 9.3 Delivery 9.3.1 Transportation and Handling The CQA Site Manager will document that the transportation and handling does not pose a risk of damage to the geomembrane. Upon delivery of the rolls of geomembrane, the CQA Site Manager will document that the rolls are unloaded and stored on site as required by the Technical sc0349 - cQA PLAN 06r807 F.DOC 33 0'7 06 18/13:29 GeoSyntec Consultants Specifications. Damage caused by unloading will be documented by the CQA Site Manager and the damaged material shall not be installed. 9.3.2 Storage The Geosynthetic Installer will be responsible for the storage of the geomembrane on site. The Contractor will provide storage space in a location (or several locations) such that on-site transportation and handling are optimized, if possible, to limit potential damage. The CQA Site Manager will document that storage of the geomembrane provides adequate protection against sources of damage. 9.4 9.4.1 9.4.2 Geomembrane Installation Introduction The CQA Consultant will document that the geomembrane installation is carried out in accordance with the Drawings, Technical Specifications, and Manufacturer' s recommendations. Earthwork 9.4.2.1 Surface Preparation The CQA Site Manager will document that: the prepared subgrade meets the requirements of the Technical Specifications and has been approved; and placement of the overlying materials does not damage, create large wrinkles, or induce excessive tensile stress in any underlying geosynthetic materials. The Geosynthetic Installer will certiff in writing that the surface on which the geomembrane will be installed is acceptable. The Certificate of Acceptance, as presented in the Technical Specifications, will be signed by the Geosynthetic Installer sc0349 - cQA PLAN 061807 F.DOC 34 0'7 06 18/13:29 GeoSyntec Consultants and given to the CQA Site Manager prior to commencement of geomembrane installation in the area under consideration. After the subgrade has been accepted by the Geosynthetic Installer, it will be the Geosynthetic Installer's responsibility to indicate to the Construction Manager any change in the subgrade soil condition that may require repair work. If the CQA Site Manager concurs with the Geosynthetic Installer, then the CQA Site Manager shall monitor and document that the subgrade soil is repaired before geosynthetic installation begins. At any time before and during the geomembrane installation, the CQA Site Manager will indicate to the Construction Manager locations that may not provide adequate support to the geomembrane. 9.4.2.2 Geosynthetic Termination The CQA Site Manager will document that the geosynthetic terminations (Anchor Trench) have been constructed in accordance with the Drawings. Backfilling above the terminations will be conducted in accordance with the Technical Specifications. 9.4.3 Geomembrane Placement 9.4.3.t Panel Identification A field panel is the unit area of geomembrane which is to be seamed in the field, i.e., a field panel is a roll or a portion of roll cut in the field. It will be the responsibility of the CQA Site Manager to document that each field panel is given an "identification code" (number or letter-number) consistent with the Panel Layout Drawing. This identification code will be agreed upon by the Construction Manager, Geosynthetic Installer and CQA Site Manager. This field panel identification code will be as simple and logical as possible. Roll numbers established in the manufacturing plant must be traceable to the field panel identification code. The CQA Site Manager will establish documentation showing correspondence between roll numbers, and field panel identification codes. The field panel identification code will be used for all CQA records. sc0349 - cQA PLAN 061807 F.DOC 35 07 06 18113..29 GeoSyntec Consultants 9.4.3.2 Location Field Panel Placement The CQA Site Manager will document that held panels are installed at the location indicated in the Geosynthetic Installer's Panel Layout Drawing, as approved or modified by the Construction Manager. Installation Schedule Field panels may be installed using one of the following schedules: all field panels are placed prior to field seaming in order to protect the subgrade from erosion by rain; field panels are placed one at a time and each field panel is seamed after its placement (in order to minimize the number of unseamed field panels exposed to wind); and any combination of the above. If a decision is reached to place all field panels prior to field seaming, it is usually beneficial to begin at the high point area and proceed toward the low point with "shingle" overlaps to facilitate drainage in the event of precipitation. It is also usually beneficial to proceed in the direction of prevailing winds. Accordingly, an early decision regarding installation scheduling should be made if and only if weather conditions can be predicted with reasonable certainty. Otherwise, scheduling decisions must be made during installation, in accordance with varying conditions. In any event, the Geosynthetic Installer is fully responsible for the decision made regarding placement procedures. The CQA Site Manager will evaluate every change in the schedule proposed by the Geosynthetic Installer and advise the Construction Manager on the acceptability of that change. The CQA Site Manager will document that the condition of the subgrade soil has not changed detrimentally during installation. sco349 - cgA PLAN 06t807 F.DOC 36 0'7 06 18/13:29 GeoSyntec Consultants The CQA Site Manager will record the identification code, location, and date of installation of each field panel. Weather Conditions Geomembrane placement will not proceed unless otherwise authorized when the ambient temperature is below 40oF or above 122"F. In addition, wind speeds and direction will be monitored for potential impact to geosynthetic installation. Geomembrane placement will not be performed during any precipitation, in the presence of excessive moisture (e.g., fog, dew), and/or in an area of ponded water. The CQA Site Manager will document that the above conditions are fulfilled. Additionally, the CQA Site Manager will document that the subgrade soil has not been damaged by weather conditions. The Geosynthetics Installer will inform the Construction Manager if the above conditions are not fulfilled. Method of Placement The CQA Site Manager will document the following: equipment used does not damage the geomembrane by handling, trafficking, excessive heat, leakage of hydrocarbons or other means; the surface underlying the geomembrane has not deteriorated since previous acceptance, and is still acceptable immediately prior to geomembrane placement; geosynthetic elements immediately underlying the geomembrane are clean and free ofdebris; personnel working on the geomembrane do not smoke, wear damaging shoes, or engage in other activities which could damage the geomembrane; the method used to unroll the panels does not cause scratches or crimps in the geomembrane and does not damage the supporting soil; the method used to place the panels minimizes wrinkles (especially differential wrinkles between adjacent panels); and sc0349 - cQA PLAN 061807 F.DOC 37 O'7 O6 18/13:29 GeoSyntec Consultants adequate temporary loading and/or anchoring (e.g., sand bags, tires), not likely to damage the geomembrane, has been placed to prevent uplift by wind (in case of high winds, continuous loading, e.9., by adjacent sand bags, is recommended along edges of panels to minimize risk of wind flow under the panels). The CQA Site Manager will inform the Construction Manager if the above conditions are not fulfilled. Damaged panels or portions of damaged panels that have been rejected will be marked and their removal from the work area recorded by the CQA Site Manager. Repairs will be made in accordance with procedures described in Section9.4.5. 9.4.4 Field Seaming This section details CQA procedures to document that seams are properly constructed and tested in accordance with the Manufacturer's specifications and industry standards. 9.4.4.1 Requirements of Personnel All personnel performing seaming operations will be qualified by experience or by successfully passing seaming tests, as outlined in the Technical Specifications. The most experienced seamer, the "master seamer", will provide direct supervision over less experienced seamers. The Geosynthetic Installer will provide the Construction Manager and the CQA Site Manager with a list of proposed seaming personnel and their experience records. These documents will be reviewed by the Construction Manager and the Geosynthetics CQA Manager. 9.4.4.2 Seaming Equipment and Products Approved processes for field seaming are fillet extrusion welding and double-track fu sion welding. sc0349 - cQA PLAN 061807 F.DOC 38 07 06 18/13..29 GeoSyntec Consultants Fillet Extrus ion Process The fillet extrusion-welding apparatus will be equipped with gauges giving the temperature in the apparatus. The Geosynthetic Installer will provide documentation regarding the extrusion welding rod to the CQA Site Manager, and will certiff that the extrusion welding rod is compatible with the Technical Specification, and in any event, is comprised of the same resin as the geomembrane. The CQA Site Manager will log apparatus temperatures, ambient temperatures, and geomembrane surface temperafures at appropriate intervals. The CQA Site Manager will document that: o the Geosynthetic Installer maintains, on site, the number of spare operable seaming apparatus decided at the Pre-construction Meeting; o equipment used for seaming is not likely to damage the geomembrane; o the extruder is purged prior to beginning a seam until all heat- degraded extrudate has been removed from the barrel; o the electric generator is placed on a smooth base such that no damage occurs to the geomembrane; . a smooth insulating plate or fabric is placed beneath the hot welding apparatus after usage; and o the geomembrane is protected from damage in heavily trafficked areas. Fusion Process The fusion-welding apparatus must be automated vehicular-mounted devices. The fusion-welding apparatus will be equipped with gauges giving the applicable temperatures and pressures. sc0i49 - cQA PLAN 061807 F.DOC 39 07 06 l8l13:29 GeoSyntec Consultants The CQA Site Manager will log ambient, seaming apparatus, and geomembrane surface temperatures as well as seaming apparatus speeds. The CQA Site Manager will also document that: the Geosynthetic Installer maintains on-site the number of spare operable seaming apparatus decided at the Pre-construction Meeting; equipment used for seaming is not likely to damage the geomembrane; for cross seams, the edge of the cross seam is ground to a smooth incline (top and bottom) prior to welding; the electric generator is placed on a smooth cushioning base such that no damage occurs to the geomembrane from ground pressure or fuel leaks; a smooth insulating plate or fabric is placed beneath the hot welding apparatus after usage; and the geomembrane is protected from damage in heavily trafficked areas. 40sco349 - cQA PLAN 061807 F.DOC 07 06 18/11:.29 CeoSyntec Consultants 9.4.4.3 Seam Preparation The CQA Site Manager will document that: o prior to seaming, the seam area is clean and free of moisture, dust, dirt, debris, and foreign material; and . seams are aligned with the fewest possible number of wrinkles and "frshmouths." 9.4.4.4 Weather Conditions for Seaming The normally required weather conditions for seaming are as follows unless authorized in writing by the Engineer: . seaming will only be approved between ambient temperatures of 40"F and 122'F. If the Geosynthetic Installer wishes to use methods that may allow seaming at ambient temperatures below 40oF or above l22oF, the Geosynthetic Installer will demonstrate and certiff that such methods produce seams which are entirely equivalent to seams produced within acceptable temperature, and that the overall quality of the geomembrane is not adversely affected. The CQA Site Manager will document that these seaming conditions are fulfilled and will advise the Geosynthetics Installer if they are not. 9.4.4.s Overlapping and Temporary Bonding The CQA Site Manager will document that: o the panels of geomembrane have a finished overlap of a minimum of 3 in. for both extrusion and fusion welding; o no solvent or adhesive bonding materials are used; and sc0349 - cgA PLAN 061807 F.DOC 4t 07 06 18113:29 GeoSyntec Consultants o the procedures utilized to temporarily bond adjacent panels together does not damage the geomembrane. The CQA Site Manager will log appropriate temperatures and conditions, and will log and report non-compliances to the Construction Manager. 9.4.4.6 Trial Seams Trial seams shall be prepared with the procedures and dimensions as indicated in the Technical Specifications. The CQA Site Manager will observe trial seam procedures and will document the results of trial seams on trial seam logs. Each trial seam samples will be assigned a number. The CQA Site Manager, will log the date, time, machine temperature(s), seaming unit identification, name of the seamer, and pass or fail description for each trial seam sample tested. Separate trial seaming logs shall be maintained for fusion welded and extrusion welded trial seams. 9.4.4.7 General Seaming Procedure Unless otherwise specified, the general production seaming procedure used by the Geosynthetic Installer will be as follows: o Fusion-welded seams are continuous, commencing at one end to the seam and ending at the opposite end. o Cleaning, overlap, and shingling requirements shall be maintained. o If seaming operations are carried out at night, adequate illumination will be provided at the Geosynthetic Installer's expense. o Seaming will extend to the outside edge of panels to be placed in the anchor trench. The CQA Site Manager shall document geomembrane seaming operations on seaming logs. Seaming logs shall include,ataminimum: sc0349 - cQA PLAN 061807 F.DOC 42 07 06 18/13:.29 GeoSyntec Consultants o Seam identifications (typically associated with panels being joined); o Seam starting time and date; o Seam ending time and date; o Seam length; o Identification of person performing seam; and o Identification of seaming equipment. Separate logs shall be maintained for fusion and extrusion welded seams. In addition, the CQA Site Manager shall monitor during seaming that: o Fusion-welded seams are continuous, cofirmencing at one end of the seam and ending at the opposite end. o Cleaning, overlap, and shingling requirements are maintained. 9.4.4.8 Concept Nondestructive Seam Continuity Testing The Geosynthetic Installer will non-destructively test field seams over their length using a vacuum test unit, air pressure test (for double fusion seams only), or other method approved by the Construction Manager. The purpose of nondestructive tests is to check the continuity of seams. It does not provide information on seam skength. Continuity testing will be carried out as the seaming work progresses, not at the completion of field seaming. The CQA Site Manager will: . observe continuity testing; . record location, date, name of person conducting the test, and the results of tests; and . inform the Geosynthetic Installer of required repairs. sco349 - cQA PLAN 061807 F.DOC 43 07 06 18/13:29 GeoSyntec Consultants The Geosynthetic Installer will complete any required repairs in accordance with Section9.4.5. The CQA Site Manager will: . observe the repair and re-testing of the repair; o mark on the geomembrane that the repair has been made; and . document the results. The following procedures will apply to locations where seams cannot be non-destructively tested: All such seams will be cap-stripped with the same geomembrane. o If the seam is accessible to testing equipment prior to final installation, the seam will be non-destructively tested prior to final installation. o If the seam cannot be tested prior to final installation, the seaming and cap-stripping operations will be observed by the CQA Site Manager and Geosynthetic Installer for uniformity and completeness. The seam number, date of observation, name of tester, and outcome of the test or observation will be recorded by the CQA Site Manager. sco349 - cQA PLAN 061807 F.DOC 44 07 06 18/13:29 GeoSyntec Consultants Vacuum Testing Vacuum testing shall be performed utilizing the equipment and procedures specified in the Technical Specifications. The CQA Site Manager shall observe the vacuum testing procedures and document that they are performed in accordance with the Technical Specifications. The result of vacuum testing shall be recorded on the CQA seaming logs. Results shall include, at a minimum, the personnel performing the vacuum test and the result of the test (pass or fail), and the test date. Seams failing the vacuum test shall be repaired in accordance with the procedures listed in the Technical Specifications. The CQA Site Manager shall document seam repairs in the seaming logs. Air Pressure Testing Air channel pressure testing shall be performed on double-track seams created with a fusion welding device, utilizing the equipment and procedures specified in the Technical Specifications. The CQA Site Manager shall observe the vacuum testing procedures and document that they are performed in accordance with the Technical Specifications. The result of air channel pressure testing shall be recorded on the CQA seaming logs. Results shall include, at a minimum, personnel performing the air pressure test, the starting air pressure and time, the final air pressure and time, the drop in psi during the test, and the result of the test (pass or fail). Seams failing the air pressure test shall be repaired in accordance with the procedures listed in the Technical Specifications. The CQA Site Manager shall document seam repairs in the seaming logs. 9.4.4.9 Concept Destructive Testing Destructive seam testing will be performed on site and at the independent CQA laboratory in accordance with the Drawings and the Technical Specifications. Destructive seam tests will be performed at selected locations. The purpose of these tests is to evaluate seam strength. Seam strength testing will be done as the seaming work progresses, not at the completion of all field seaming. sc0349 - cQA PLAN 061 807 F.DOC 45 07 06 18/13:29 GeoSyntec Consultants Location and Frequency The CQA Site Manager will select locations where seam samples will be cut out for laboratory testing. Those locations will be established as follows. The frequency of geomembrane seam testing is a minimum of one destructive sample per 500 feet of weld. The minimum frequency is to be evaluated as an average taken throughout the entire facility. A minimum of one test per seaming machine over the duration of the project. Additional test locations may be selected during seaming at the CQA Site Manager's discretion. Selection of such locations may be prompted by suspicion of excess crystallinity, contamination, offset welds, or any other potential cause of imperfect welding. The Geosynthetic Installer will not be informed in advance of the locations where the seam samples will be taken. Sampling Procedure Samples will be marked by the CQA Site Manager following the procedures listed in the Technical Specifications. Preliminary samples will be taken from either side of the marked sample and tested before obtaining the full sample per the requirements of the Technical Specifications. Samples shall be obtained by the Geosynthetic Installer. Samples shall be obtained as the seaming progresses in order to have laboratory test results before the geomembrane is covered by another material. The CQA Site Manager will: observe sample cutting and monitor that corners are rounded' assign a number to each sample, and mark it accordingly; record sample location on the Panel Layout Drawing; and record reason for taking the sample at this location (e.g., statistical routine, suspicious feature of the geomembrane). 46sc0349 - cQA PLAN 061807 F.DOC 07 06 18/13:29 GeoSyntec Consultants Holes in the geomembrane resulting from destructive seam sampling will be immediately repaired in accordance with repair procedures described in Section 9.4.5. The continuity of the new seams in the repaired area will be tested in accordance with Section 9.4.4.8. Size and Distribution of Samples The destructive sample will be with the seam centered lengthwise. The distributed as follows: 12 in. (0.3 m) wide by 42 in. (1.1 m) long sample will be cut into three parts and one portion, measuring l2in. x l}in. (0.30cm x 30cm), to the Geosynthetic Installer for field testing; one portion, measuring l2in. x 18 in. (30cm x 45 cm), for CQA Laboratory testing; and one portion, measuring 12 in. x 12 in. (30 cm x 30 cm), to the Construction Manager for archive storage. Final evaluation of the destructive sample sizes and distribution will be made at the Pre-Construction Meeting. Field Testing Field testing will be performed by the Geosynthetic Installer using a gauged tensiometer. Prior to field testing the Geosynthetic Installer shall submit a calibration certificate for gauge tensiometer to the CQA Consultant for review. Calibration must have been performed within one year of use on the current project. The destructive sample shall be tested according to the requirements of the Technical Specifications. The specimens shall not fail in the seam and shall meet the strength requirements outlined in the Technical Specifications. If any field test specimen fails, then the procedures outlined in Procedures for Destructive Test Failures of this section will be followed. sc0349 - cQA PLAN 061807 F.DOC 47 O7 06 18/1329 GeoSyntec Consultants The CQA Site Manager will witness field tests and mark samples and portions with their number. The CQA Site Manager will also document the date and time, ambient temperature, number of seaming unit, name of seamer, welding apparatus temperafures and pressures, and pass or fail description. CQA Laboratory Testing Destructive test samples will be packaged and shipped, if necessary, under the responsibility of the CQA Site Manager in a manner that will not damage the test sample. The Construction Manager will be responsible for storing the archive samples. This procedure will be outlined at the Pre-construction Meeting. Samples will be tested by the CQA Laboratory. The CQA Laboratory will be selected by the CQA Site Manager with the concurrence of the Engineer. Testing will include "Bonded Seam Strength" and "Peel Adhesion." The minimum acceptable values to be obtained in these tests are given in the Technical Specifications. At least five specimens will be tested for each test method. Specimens will be selected alternately, by test, from the samples (i.e., peel, shear, peel, shear...). A passing test will meet the minimum required values in at least four out of five specimens. The CQA Laboratory will provide test results no more than 24 hours after they receive the samples. The CQA Site Manager will review laboratory test results as soon as they become available, and make appropriate recommendations to the Construction Manager. Geosynthetic Installer's Laboratory Testing The Geosynthetic Installer's laboratory test results will be presented to the Construction Manager and the CQA Site Manager for comments. Procedures for Destructive Test Failure The following procedures will apply whenever a sample fails a destructive test, whether that test conducted by the CQA Laboratory, the Geosynthetic Installer's sc0349 - cQA PLAN 061807 F.DOC 48 O7 06 18/1329 GeoSyntec Consultants or by gauged tensiometer in the field. The Geosynthetic Installer has two The Geosynthetic Installer can reconstruct the seam between two passed test locations. The Geosynthetic Installer can trace the welding path to art intermediate location at 10 ft (3 m) minimum from the point of the failed test in each direction and take a small sample for an additional field test at each location. If these additional samples pass the test, then full laboratory samples are taken. If these laboratory samples pass the tests, then the seam is reconstructed between these locations. If either sample fails, then the process is repeated to establish the zone in which the seam should be reconstructed. Acceptable seams must be bounded by two locations from which samples passing laboratory destructive tests have been taken. Repairs will be made in accordance with Section 9.4.5. The CQA Site Manager will document actions taken in conjunction with destructive test failures. 9.4.5 Defects and Repairs This section prescribes CQA activities to document that defects, tears, rips, punctures, damage, or failing seams shall be repaired. 9.4.5.1 Identification Seams and non-seam areas of the geomembrane shall be examined by the CQA Site Manager for identification of defects, holes, blisters, undispersed raw materials and signs of contamination by foreign matter. Because light reflected by the geomembrane helps to detect defects, the surface of the geomembrane shall be clean at the time of examination. Evaluation9.4.5.2 sc0349 - cQA PLAN 061807 F.DOC 49 0'l 06 18113:29 GeoSyntec Consultants Potentially flawed locations, both in seam and non-seam areas, shall be non- destructively tested using the methods described in Section 9.4.4.8 as appropriate. Each location that fails the nondestructive testing will be marked by the CQA Site Manager and repaired by the Geosynthetic Installer. Work will not proceed with any materials that will cover locations which have been repaired until laboratory test results with passing values are available. 9.4.5.3 Repair Procedures Portions of the geomembrane exhibiting a flaw, or failing a destructive or nondestructive test, will be repaired. Several procedures exist for the repair of these areas. The final decision as to the appropriate repair procedwe will be at the discretion of the CQA Consultant with input from the Construction Manager and Geosynthetic Installer. The procedures available include: patching, used to repair large holes, tears, undispersed raw materials, and contamination by foreign matter; grinding and re-welding, used to repair small sections of extruded seams; spot welding or seaming, used to repair small tears, pinholes, or other minor, localized flaws; capping, used to repair large lengths of failed seams; removing bad seam and replacing with a strip of new material welded into place (used with large lengths of fusion seams). In addition, the following provisions will be satisfied: surfaces of the geomembrane which are to be repaired will be abraded no more than2} minutes prior to the repair; surfaces must be clean and dry at the time of the repair; all seaming equipment used in repairing procedures must be approved; sc0349 - cQA PLAN 061807 F.DOC 50 07 O6 18/13:29 GeoSyntec Consultants o the repair procedures, materials, and techniques will be approved in advance by the CQA Consultant with input from the Engineer and Geosynthetic Installer; o patches or caps will extend at least 6 in. (150 mm) beyond the edge of the defect, and all corners of patches will be rounded with a radius of at least 3 in. (75 mm); o cuts and holes to be patched shall have rounded corners; and o the geomembrane below large caps should be appropriately cut to avoid water or gas collection between the two sheets. 9.4.5.4 Verification of Repairs The CQA Monitor shall monitor and document repairs. Records of repairs shall be maintained on repair logs. Repair logs shall include, at a minimum: o panel containing repair and approximate location on panel; . approximate dimensions of repair; o rePoir type, i.e. fusion weld or extrusion weld o date of repair; . seamer making the repair; and . results of repair non-destructive testing (pass or fail). Each repair will be non-destructively tested using the methods described herein, as appropriate. Repairs that pass the non-destructive test will be taken as an indication of an adequate repair. Large caps may be of sufficient extent to require destructive test sampling, per the requirements of the Technical Specifications. Failed tests shall be redone and re-tested until passing test results are observed. 9.4.5.5 Large Wrinkles When seaming of the geomembrane is completed (or when seaming of a large area of the geomembrane liner is completed) and prior to placing overlying sc0349 - cQA PLAN 061807 F.DOC 51 07 06 18113:29 GeoSyntec Consultants materials, the CQA Site Manager will observe the geomembrane wrinkles. The CQA Site Manager will indicate to the Geosynthetic Installer which wrinkles should be cut and re-seamed. The seam thus produced will be tested like any other seam. 9.4.6 Lining System Acceptance The Geosynthetic Installer and the Manufacturer(s) will retain all responsibility for the geosynthetic materials in the liner system until acceptance by the Construction Manager. The geosynthetic liner system will be accepted by the Construction Manager when: o the installation is finished; o verification of the adequacy of all seams and repairs, including associated testing, is complete; o all documentation of installation is completed including the CQA Site Manager's acceptance report and appropriate warranties; and . CQA report, including "as built" drawing(s), sealed by a registered professional engineer has been received by the Construction Manager. The CQA Site Manager will document that installation proceeded in accordance with the Technical Specificatio,ns for the project. sc0349 - cQA PLAN 061807 F.DOC 52 07 O6 18/13:29 GeoSyntec Consultants 10. 10.1 GEOTEXTILE Introduction This section of the CQA Plan outlines the CQA activities to be performed for the geotextile installation. The CQA Consultant will review the Drawings, and the Technical Specifications, and any approved addenda or changes. 10.2 Manufacturing The Manufacturer will provide the Construction Manager with a list of guaranteed "minimum average roll value" properties (defined as the mean less two standard deviations), for each type of geotextile to be delivered. The Manufacturer will also provide the Construction Manager with a written quality conkol certification signed by a responsible party employed by the Manufacturer that the materials actually delivered have property "minimum average roll values" which meet or exceed all property values guaranteed for that type of geotextile. The quality control certificates will include: roll identification numbers; and results of MQC testing. The Manufacturer will provide, as a minimum, test results for the following: mass per unit area; grab strength; tear strength; puncture strength; permittivity; and apparent opening size. a a sc0349 - cQA PLAN 061807 F.DOC 53 07 06't8/13..29 GeoSyntec Consultants MQC tests shall be performed at the frequency listed in the Technical Specifications. CQA tests on geotextile produced for the project shall be performed according to the test methods specified and frequencies presented in Table 4. The CQA Site Manager will examine Manufacturer certifications to evaluate that the property values listed on the certifications meet or exceed those specified for the particular type of geotextile and the measurements of properties by the Manufacturer are properly documented, test methods acceptable and the certificates have been provided at the specified frequency properly identiffing the rolls related to testing. Deviations will be reported to the Construction Manager. 10.3 Labelins The Manufacturer will identifu all rolls of geotextile with the following: manufacturer's name; product identifi cation; lot number; roll number; and roll dimensions. The CQA Site Manager will examine rolls upon delivery and deviation from the above requirements will be reported to the Construction Manager. 10.4 Shipment and Storage During shipment and storage, the geotextile will be protected from ultraviolet light exposure, precipitation or other inundation, mud, dirt, dust, puncture, cutting or any other damaging or deleterious conditions. To that effect, geotextile rolls will be shipped and stored in relatively opaque and watertight wrappings. Protective wrappings will be removed less than one hour prior to unrolling the geotextile. After the wrapping has been removed, a geotextile will not be exposed sc0349 - cQA PLAN 061807 F.DOC 54 O7 06 18113:29 GeoSyntec Consultants to sunlight for more than 15 days, except for UV protection geotextile, unless otherwise specified and guaranteed by the Manufacturer. The CQA Site Manager will observe rolls upon delivery at the site and deviation from the above requirements will be reported to the Geosynthetic Installer. 10.5 Conformance Testins 10.5.1 Tests Upon delivery of the rolls of geotextiles, the CQA Site Manager will obtain conformance samples and forward to the Geosynthetics CQA Laboratory for testing to evaluate conformance to Technical Specifications. Required test and testing frequency for the geotextiles are presented in Table 4. These conformance tests will be performed in accordance with the test methods specified in the Technical Specifications and will be documented by the CQA Site Manager. 10.5.2 first three The CQA Sampling Procedures Samples will be taken across the width of the roll and will not include the feet. Unless otherwise specified, samples will be 3 ft long by the roll width. Site Manager will mark the machine direction on the samples with an arrow. Unless otherwise specified, samples will be taken at a rate as indicated in Table 4 for geotextiles. 10.5.3 Test Results The CQA Site Manager will examine results from laboratory conforrnance testing and will report non-conformance with the Technical Specifications and this CQA Plan to the Construction Manager. 10.5.4 Conformance Sample Failure The following procedure will apply whenever a sample fails a conformance test that is conducted by the CQA Laboratory: sc0349 - cQA PLAN 061807 F.DOC 55 O7 O6 l8ll3:29 GeoSyntec Consultants The Manufacturer will replace every roll of geotextile that is in nonconforrnance with the Technical Specifications with a roll(s) that meets Technical Specifications; or The Geosynthetic Installer will remove conformance samples for testing by the CQA Laboratory from the closest numerical rolls on both sides of the failed roll. These two samples must conform to the Technical Specifications. If either of these samples fall, the numerically closest rolls on the side of the failed sample will be tested by the CQA Laboratory. These samples must conform to the Technical Specifications. If any of these samples fail, every roll of geotextile on site from this lot and every subsequently delivered roll that is from the same lot must be tested by the CQA Laboratory for conformance to the Technical Specificotions. This additional conformance testing will be at the expense of the Manufacturer. The CQA Site Manager will document actions taken in conjunction with conformance test failures. 10.6 Handling and Placement The Geosynthetic Installer will handle all geotextiles in such a manner as to document they are not damaged in any way, and the following will be complied with: In the presence of wind, all geotextiles will be weighted with sandbags or the equivalent. Such sandbags will be installed during placement and will remain until replaced with earth cover material. Geotextiles will be cut using an approved geotextile cutter only. If in place, special care must be taken to protect other materials from damage, which could be caused by the cutting of the geotextiles. The Geosynthetic Installer will take all necessary precautions to prevent damage to underlying layers during placement of the geotextile. During placement of geotextiles, care will be taken not to entrap in the geotextile stones, excessive dust, or moisture that could damage sc0349 - cQA PLAN 061807 F.DOC 56 07 06 18113:29 GeoSyntec Consultants the geotextile, generate clogging of drains or filters, or hamper subsequent seaming. o A visual examination of the geotextile will be carried out over the entire surface, after installation, to document that no potentially harmful foreign objects, such as needles, are present. The CQA Site Manager will note non-compliance and report it to the Construction Manager. 10.7 Seams and Overlaps All geotextiles will be continuously sewn in accordance with Technical Specifications. Geotextiles will be overlapped 12 in. prior to seaming. No horizontal seams will be allowed on side slopes (i.e. seams will be along, not across, the slope), except as part of a patch. Sewing will be done using polymeric thread with chemical and ultraviolet resistance properties equal to or exceeding those of the geotextile. 10.8 Repair Holes or tears in the geotextile will be repaired as follows: o On slopes: A patch made from the same geotextile will be double seamed into place. Should atear exceed l0percent of the width of the roll, that roll will be removed from the slope and replaced. o Non-slopes: A patch made from the same geotextile will be spot- seamed in place with a minimum of 6 in. (0.60 m) overlap in all directions. Care will be taken to remove any soil or other material that may have penetrated the torn geotextile. sc0349 - cQA PLAN 061807 F.DOC 57 07 O6 18/13:29 GeoSyntec Consultants The CQA Site Manager will observe any repair, note any non-compliance with the above requirements and report them to the Construction Manager. 10.9 Placement of Soil or Aggregate Materials The Contractor will place all soil or aggregate materials located on top of a geotextile, in such a manner as to document: a a a no damage of the geotextile; minimal slippage of the geotextile on underlying layers; and no excess tensile stresses in the geotextile. Non-compliance will be noted by the CQA Site Manager and reported to the Construction Manager. sco349 - cQA PLAN 06t8o7 F.DOC 58 07 06 18/13:29 11. 11.1 GeoSyntec Consultants GEOSYNTHETIC CLAY LINER (GCL) Introduction This section of the CQA Plan outlines the CQA activities to be performed for the geosynthetic clay liner (GCL) installation. The CQA Consultant will review the Drawings, and the Technical Specifications, and approved addenda or changes. tt.2 Manufacturing The Manufacturer provide the Construction Manager with a list of guaranteed "minimum average roll value" properties (defined as the mean less two standard deviations), for the GCL to be delivered. The Manufacturer will also provide the Construction Manager with a written quality control certification signed by a responsible party employed by the Manufacturer that the materials actually delivered have property "minimum average roll values" which meet or exceed all property values guaranteed for that GCL. The quality control certificates will include: roll identification numbers; and results of quality control testing. The Manufacturer will provide, as a minimum, test results for,the following: mass per unit area; and index flux. Quality control tests must be performed, in accordance with the test methods specified in Table 5, on GCL produced for the project. The CQA Site Manager will examine Manufacturer certifications to veriff that the property values listed on the certifications meet or exceed those specified for the GCL and the measurements of properties by the Manufacturer are properly a a sco349 - coA PLAN 061807 F.DOC 59 0'7 O6 18/13:29 GeoSyntec Consultants documented, test methods acceptable and the certificates have been provided at the specified frequency properly identiffing the rolls related to testing. Deviations will be reported to the Construction Manager. 1f3 Labeline The Manufacturer will identiff all rolls of GCL with the following: . manufacfurer's name; o product identification' o lot number; . roll number; and o roll dimensions. The CQA Site Manager will examine rolls upon delivery and deviation from the above requirements will be reported to the Construction Manager. ll.4 Shipment and Storase During shipment and storage, the GCL will be protected from ultraviolet light exposure, precipitation or other inundation, mud, dirt, dust, puncture, cutting or any other damaging or deleterious conditions. To that effect, GCL rolls will be shipped and stored in relatively opaque and watertight wrappings. The CQA Site Manager will observe rolls upon delivery at the site and any deviation from the above requirements will be reported to the Construction Manager. 11.s sc0349 - cQA PLAN 061807 F.DOC 60 0'7 06 18/13:29 o CeoSyntec Consultants Conformance Testing 11.5.1 Tests CQA personnel will sample the GCL either during production at the manufacturing facility or after delivery to the construction site. The samples will be forwarded to the Geosynthetics CQA Laboratory for testing to assess conformance with the Technical Specifications. The test methods and minimum testing frequencies are indicated in Table 5. Samples will be taken across the width of the roll and will not include the first 3 ft if the sample is cut on site. Unless otherwise specified, samples will be 3 ft long by the roll width. The CQA Consultant will mark the machine direction with an arrow and the manufacfurer's roll number on each sample. The CQA Site Manager will examine results from laboratory confornance testing and will report non-conformance to the Construction Manager. 11.5.2 Conformance Sample Failure The following procedure will apply whenever a sample fails a conformance test that is conducted by the CQA Laboratory: The Manufacturer will replace every roll of GCL that is in nonconformance with the Technical Specifications with a roll(s) that meets Technical Specifications; or The Geosynthetic Installer will remove conformance samples for testing by the CQA Laboratory from the closest numerical rolls on both sides of the failed roll. These two samples must conform to the Technical Specifications. If either of these samples fail, the numerically closest rolls on the side of the failed sample will be tested by the CQA Laboratory. These samples must conform to the Technical Specifications. If any of these samples fail, every roll of GCL on site from this lot and every subsequently delivered roll that is from the same lot must be tested by the CQA Laboratory for 61sc0349 - cQA PLAN 061807 F.DOC 0'7 06 18/13:29 GeoSyntec Consultants confornance to the Technical Specifications. This additional conformance testing will be at the expense of the Manufacturer. The CQA Site Manager will document actions taken in conjunction with conformance test failures. 11.6 GCL Deliverv and Storage Upon delivery to the site, the CQA Consultant will check the GCL rolls for defects (e.g., tears, holes) and for damage. The CQA Consultant will report to the Conskuction Manager and the Geosynthetics Installer: any rolls, or portions thereof, which should be rejected and removed from the site because they have severe flaws; and any rolls which include minor repairable flaws. The GCL rolls delivered to the site will be checked by the CQA Consultant to document that the roll numbers correspond to those on the approved Manufacturer's quality control certificate of compliance. ll.7 GCL Installation The CQA Consultant will monitor and document that the GCL is installed in accordance with the Drawings and the Technical Specifications. The Geosynthetics Installer shall provide the CQA Consultant a certif,rcate of subgrade acceptance prior to the installation of the GCL as outlined in the Technical Specifications. The GCL installation activities to be monitored and documented by the CQA Consultant include: monitoring that the GCL rolls are stored and handled in a manner which does not result in any damage to the GCL; monitoring that the GCL is not exposed to UV radiation for extended periods of time without prior approval; monitoring that the GCL are seamed in accordance with the Technical Specifications and the Manufacturer's recommendations; sco349 - cQA PLAN 061807 F.DOC 62 O7 06 18/13:29 GeoSyntec Consultants . monitoring and documenting that the GCL is installed on an approved subgrade, free of debris, protrusions, or uneven surfaces; . monitoring that the GCL is hydrated prior to completion of the construction; and . monitoring that any damage to the GCL is repaired as outlined in the Technical Specifications. The CQA Site Manager will note non-compliance and report it to the Construction Manager. sco34g-ceAPLANo6tsoT F.Doc 63 07 06 l8ll3:29 GeoSyntec Consultants 12. t2.t GEONET Introduction This section of the CQA Plan outlines the CQA activities to be performed for the geonet installation. The CQA Consultant will review the Drawings, and the Technical Specificatio,rzs, and any approved addenda or changes. 12.2 Manufacturins The Manufacturer will provide the CQA Consultant with a list of certif,red "minimum average roll value" properties for the tlpe of geonet to be delivered. The Manufacturer will also provide the CQA Consultant with a written certification signed by a responsible representative of the Manufacturer that the geonet actually delivered have "minimum average roll values" properties which meet or exceed all certified property values for that type of geonet. The CQA Consultant will examine the Manufacturers' certifications to document that the property values listed on the certifications meet or exceed those specified for the particular type of geonet. Deviations will be reported to the Construction Manager. L2.3 Labelins The Manufacturer will identi$z all rolls of geonet with the following: Manufacfurer's name; product identification; lot number; roll number; and roll dimensions. The CQA Site Manager will examine rolls upon delivery and deviation from the above requirements will be reported to the Construction Manager. a o a o sc0349 - cQA PLAN 061807 F.DOC 64 O7 O6 18113:29 GeoSyntec Consultants 12.4 Shipment and Storase During shipment and storage, the geonet will be protected from mud, dirt, dust, puncture, cutting or any other damaging or deleterious conditions. The CQA Site Manager will observe rolls upon delivery to the site and deviation from the above requirements will be reported to the Construction Manager. Damaged rolls will be rejected and replaced. The CQA Site Manager will observe that geonet is free of dirt and dust just before installation. The CQA Site Manager will report the outcome of this observation to the Construction Manager, and if the geonet is judged dirty or dusty, they will be cleaned by the Geosynthetic Installer prior to installation. 12.5 Conformance Testing 12.5.1 Tests The geonet material will be tested for transmissivity (ASTM D 4116) and for thickness (ASTM D 5199) at the frequencies presented in Table 6. 12.5.2 Sampling Procedures Upon delivery of the geonet rolls, the CQA Site Manager will document that samples are obtained from individual rolls at the frequency specified in this CQA Plan. The geonet samples will be forwarded to the CQA Laboratory for testing to evaluate conformance to both the Technical Specifications and the list of physical properties certified by the Manufacturer. Samples will be taken across the width of the roll and will not include the first 3 linear ft. Unless otherwise specified, samples will be 3 ft long by the roll width. The CQA Consultant will mark the machine direction on the samples with an arrow. sc0349 - cQA PLAN 061807 F.DOC 65 07 06 18/13:29 GeoSyntec Consultants 12.5.3 Test Results The CQA Site Manager will examine results from laboratory confornance testing and compare results to the Technical Specifications. The criteria used to evaluate acceptability are presented in the Technical Specifications. The CQA Site Manager will report any nonconformance to the Construction Manager. 12.5.4 Conformance Test Failure The following procedure will apply whenever a sample fails a conformance test that is conducted by the CQA Laboratory: The Manufacturer will replace every roll of geonet that is in nonconformance with the Technical Specifications with a roll that meets specifications; or The Geosynthetic Installer will remove conformance samples for testing by the CQA Laboratory from the closest numerical rolls on both sides of the failed roll. These two samples must conform to the Technical Specifications. If either of these samples fail, the numerically closest rolls on the side of the failed sample that is not tested, will be tested by the CQA Laboratory. These samples must conform to the Technical Specifications. If any of these samples fail, every roll of geonet on site from this lot and every subsequently delivered roll that is from the same lot must be tested by the CQA Laboratory for conformance to the Technical Specifications. The CQA Site Manager will document actions taken in conjunction with conformance test failures. 12.6 Handling and Placement The Geosynthetic Installer will handle all geonet in such a manner as to document they are not damaged in any way. The Geosynthetic Installer will comply with the following: sc0349 - cQA PLAN 061807 F.DOC 66 07 06 18/13:29 GeoSyntec Consultants If in place, special care must be taken to protect other materials from damage, which could be caused by the cutting of the geonet. The Geosynthetic Installer will take any necessary precautions to prevent damage to underlying layers during placement of the geonet. During placement of geonet, care will be taken to prevent entrapment of dirt or excessive dust that could cause clogging of the drainage system, and/or stones that could damage the adjacent geomembrane. If dirt or excessive dust is entrapped in the geonet, it should be cleaned prior to placement of the next material on top of it. In this regard, care should be taken with the handling or sandbags, to prevent rupture or damage of the sandbag. A visual examination of the geonet will be carried out over the entire surface, after installation to document that no potentially harmful foreign objects are present. The CQA Site Manager will note noncompliance and report it to the Construction Manager. 12.7 Geonet Seams and Overlaps Adjacent geonet panels will be joined in accordance with Construction Drawings and Technical Specifications. As a minimuln, the adjacent rolls will be overlapped by at least 4 in. and secured by tying, in accordance with the Technical Specifications. The CQA Consultant will note any noncompliance and report it to the Construction Manager. 12.8 Repair Holes or tears in the geonet will be repaired by placing a patch extending 2 ft beyond edges of the hole or tear. The patch will be secured by tying with approved tying devices every 6 in. If the hole or tear width across the roll is more than 50 percent sc0349 - coA PLAN 061807 F.DOC 67 07 06 18/13:29 GeoSyntec Consultants of the width of the roll, the damaged axea will be cut out and the two portions of the geonet will be joined in accordance with Section I1.7. The CQA Site Manager will observe repairs, note non-compliances with the above requirements and report them to the Construction Manager. scoi4g - cQA PIAN 061807 F.DOC 68 07 06 18/13:29 GeoSyntec Consultants 13. CONCRETE SPILLWAY 13.1 Introduction This section prescribes the CQA activities to be performed to monitor that the concrete spillway is constructed in accordance with Drawings and Technical Specifications. The concrete spillway construction procedures to be monitored by the CQA Consultant, if required, shall include: o subgrade preparation; o liner system and cushion geotextile installation; . welded wire reinforcement installation; and . concrete placement and finishing. 13.2 COA Monitorine Activities 13.2.1 Subgrade Preparation The CQA Site Manager will monitor and document that the subgrade is prepared in accordance with the Technical Specifications andthe Drawings. 13.2.2 Liner System and Cushion Geotextile Installation The CQA Site Manager shall monitor and document that the liner system components, along with the anchor trench and cushion geotextile, are installed in accordance with the requirements of the Technical Specifications andthe Drawings. 13.2.3 WeldedWireReinforcementlnstallation The CQA Site Manager shall monitor and document that the welded wire fabric reinforcement is installed in accordance with the requirements of the Technical Specifi cations and the Dr awings. sc0349 - cQA PLAN 061807 F.DOC 69 07 06 18113:29 GeoSyntec Consultants 13.2.4 Concrete Installation The CQA Site Manager shall test, monitor, and document that the concrete is installed in accordance with the requirements of the Technical Specifications and the Drawings. At a minimum, the CQA Site Manager shall review the concrete tickets prior to installing the concrete to monitor that the concrete meets the requirements outlined in the Technical Specifications. 13.2.5 Conformance Testing The Contractor shall facilitate the CQA Site Manager in the collection of samples required for testing. Compression test specimens shall be prepared by the CQA Site Manager by the following method: compression test cylinders from fresh concrete in accordance with ASTM C 172 and C 31. Compression testing shall be completed on one cylinder at 7 days, one cylinder at 14 days, and two (2) cylinders at the 28 day strength. The CQA Site Manager will examine results from laboratory conforrnance testing and will report any non-conformance with the requirements outlined in the Technical Specificatio,rus to the Construction Manager. 13.3 Deficiencies If a defect is discovered in the concrete spillway, the CQA Site Manager will immediately determine the extent and nature of the defect. The CQA Site Manager will determine the extent of the defective area by additional observations, a review of records, or other means that the CQA Site Manager deems appropriate. 13.3.1 Notification After evaluating the extent and nature of a defect, the CQA Site Manager will notifu the Construction Manager and Contractor and schedule appropriate re- evaluation when the work deficiency is to be corrected. sc0349 - cQA PLAN 061807 F.DOC 70 O'l 06 18113:29 GeoSyntec Consultants 13.3.2 Repairs The Contractor will correct deficiencies to the satisfaction of the CQA Site Manager. If a project specification criterion cannot be met, or unusual weather conditions hinder work, then the CQA Site Manager will develop and present to the Conskuction Manager suggested solutions for his approval. Re-evaluations by the CQA Site Manager shall continue until the defects have been corrected before any additional work is performed by the Contractor in the area of the deficiency. sc0349 - cQA PLAN 061807 F.DOC 71 07 06 18113:29 GeoSyntec Consultants 14. SURVEYING l4.l Survev Control Survey control will be performed by the Surveyor as needed. A permanent benchmark will be established for the site(s) in a location convenient for daily tie-in. The vertical and horizontal control for this benchmark will be established within normal land surveying standards. 14.2 Precision and Accuracv A wide variety of survey equipment is available for the surveying requirements for these projects. The survey instruments used for this work should be sufficiently precise and accurate to meet the needs of the projects. 14.3 Lines and Grades The following structures will be surveyed to veriff and document the lines and grades achieved during construction ofthe Project: o geomembrane terminations; and o centerlines of pipes. 14.4 Frequencv and Spacing A line of survey points no further than 50 ft apart must be taken at the top of pipes or other appurtenances to the liner. 14.5 Documentation Field survey notes should be retained by the Land Surveyor. The findings from the field surveys should be documented on a set of Survey Record Drawings, which shall be provided to the Construction Manager in AutoCADD 2000 format or other suitable format as directed by the Construction Manager. sc0349 - cQA PLAN 061807 F.DOC 72 07 06 18113:29 GeoSyntec Consultants TABLE 1A TEST PROCEDURES FOR THE EVALUATION OF SUBGRADE SOIL TABLE 18 MINIMUM SUBGRADE SOIL TESTING FREQUENCIES TEST METHOD DESCRIPTION TEST STANDARI) Sieve Analysis Particle Size Distribution ASTM D 422 Modifred Proctor Moisture Density Relationship ASTM D 1557 TEST TEST METHOD SUBGRADE SOIL Sieve Analysis ASTM D 422 1 per material type Modified Proctor ASTM D 1557 I per material type Nuclear Densometer - In- situ Density ASTM D 2922 1 per 500 yd3 Nuclear Densometer - In- situ Moisture Content ASTM D 3OI7 I per 500 yd3 sco349 - cQA PLAN 061807 F.DOC 73 07 06 l8ll3:29 GeoSyntec Consultants TABLE 2A TEST PROCEDURES FOR THE EVALUATION OF AGGREGATE TABLE 28 MINIMUM AGGREGATE TESTING FREQUENCIES FOR CONFORMANCE TESTING TEST METHOD DESCRIPTION TEST STANDARD Sieve Analysis Particle Size Distribution of Fine and Coarse Aggregates ASTM C 136 Hydraulic Conductivity (Rigid Wall Permeameter) Permeability of Aggregates ASTM D2434 TEST TEST METHOD DRAINAGE AGGREGATE Sieve Analysis ASTM C 136 I per 5,000 yd3 Hydraulic Conductivity ASTM D 2434 t per 10,000 yd3 sco34s - ceA PLAN o6tloz F.Doc 74 07 06 18113,'29 CeoSyntec Consultants TABLE 3 GEOMEMBRANE CONFORMANCE TESTING REQUIREMENTS Notes: I . To be performed at normal stresses of I 0, 20, and 40 psi between geomembrane and geonet. 2. Tobeperformedatnormalstressesofl0,20,and40psibetweengeomembraneandwovensideofGCL. GCLshallbehydrated for 24 hours prior to testing. TABLE 4 GEOTEXTILE CONFORMANCE TESTING REQUIREMENTS TEST NAME TEST METHOD FREQUENCY Specific Gravity ASTM D 792 Method A or ASTM D 1505 200,000 ft2 Thickness ASTM D 5199 200,000 ft2 Tensile Strength at Yield ASTM D 638 200,000 ft2 Tensile Strength at Break ASTM D 638 200,000 ft2 Elongation at Yield ASTM D 638 200,000 ft2 Elongation at Break ASTM D 638 200,000 ft2 Carbon Black Content ASTM D 1603 200,000 ft2 Carbon Black Dispersion ASTM D 5596 200,000 ft2 Interface Shear Stengthl'2 ASTM D 5327 1 perproject TEST NAME TEST METHOD MINIMUM FREQUENCY Mass per Unit Area ASTM D 5261 I test per 260,000 ft2 Grab Strength ASTM D 4632 I test per 260,000 ff Puncture Resistance ASTM D 4833 1 test per 260,000 ftz Permittivity ASTM D 4491 1 test per 260,000 ftz Apparent Opening Srze ASTM D 4751 I test per 260,000 ft2 sc034e - cQA PLAN 061807 F.DOC 75 07 06 18/13:29 GeoSyntec Consultants TABLE 5 GCL CONFORMANCE TESTING REQUIREMENTS Note: Hydraulic index flux testing shall be performed under an effective confining stress of5 pounds per square inch. TABLE 6 GEONET CONFORMANCE TESTING REQUIREMENTS Note: Transmissivity shall be measured using water at 68"F with a gradient of 0. I under a confining pressure of 7,000 lb/ff. The geonet shall be placed in the testing device between steel plates. Measurements are taken one hour after application of confining pressure.. TEST NAME TESTMETIIOD MINIMT'M FREQUENCY Mass per Unit Area ASTM D 5993 I testper 100,000 ft2 Index Flux ASTM D 5887 I test per 400,000 ft2 TEST NAME TEST METHOD MINIMUM FREQUENCY Thickness ASTM D 5199 1 test per 200,000 ft2 Hydraulic Transmissivity ASTM D 4716 I test per 400,000 ft2 sc0349 - cQA PLAN 06t807 F.DOC 76 07 06 18/13:.29 B! t .9..qr c8 8E 9eEC 8883a.9t iB g !H H iB qst , AG 9< * 1 ,F i8 Ai 6 te.3 =6 E cF6,E 6 ,6H I'301 E*- a^ ,"teEi Ea B* 19 ^l eq .P _!di a!. f, E: -\^ zc:o E3se Et 99 3 8l - y" * , 4 p P ) 5 It I {a = C =z o I 2 E!^r!r;iisB EIE Z:s eEi: gHs B E'B C) =>gH? L E{tr EEHE9FDq, SFEHt-E*oo trI C2FFrr o Io o}\gt\ Fiq lr.IoloI> l=lloH H c)oz no -oIz -{ q,l-rfl ^4.Y H$ 9(Dia:r i -36 FtooO:i:r F =g gfi'- =^vl=O I -9FE" O f sii gl o OrN);' J 3 - B-ii €. C:,6'orO @=.tJ9(O ='oz t- (1! O'l C)T'FF oD O)our 5o5 n! oE5ulr.o I5utqJ o! o|o(, r)T' HN) r)!oo zoo !oz{ (1,NoNNu,bN' u,N.'o5Olyt {J,(o (1,, No(1,55H(,rr (1, PrO N.,5I(o 00 (1,ts@P(DIN5 wP@(o O) !oo't(1, wP6(o(oIH UT (,P(o5orO 5(o (xP(o{\.19Fr{ zov{J- =o Nut{(o Nu,IH\,1 Nul{{{NP\H N(Jl{{(, @FN00 N'Ln{{N(O @o{ N(Jl{\I5NI&\l hJ(,\t@ro UJ56(o N'(,{rooAot bt5 NJ(Jl{(ots(OFb\.1 N)ul (o Or{tsblJ m at1{z6l (,(, @loN5 L,Tut&UJio5 (,(, lJl !oNur LN(,5O)b(^) (rl L,I5N' Ln{ ul(, Or b(l) ur UTulvor(o lJl(,{ 9rFJN) (/l Oto b(o mt-m =oz {mtt -lm7z N': o7T'ts\.1(rl N): o €ma-.{mvzmz6)v! ts{ur omtrr)u !{oz a'-dF t- $g n=olr l"l E I(,(rtUt 9,.o)+ I II D I $ e :--r------------:l*; lsn - ._ 16)liHE3!i pq' ts BEaiI= 2?mial IItlttlt T rrl zfr gB Ir $, s 9* a\FC$E\-3 s s\F: $sxY too> -a rEEnHEggfreEd H3EE 6: I; Ef;Nezo. 1Jrril0 oocrNo2m' iede 8f;e=* 21q1s;62 ti**z o=J TH=9qa a2 FPHrmxtr FD EIrt Ht) TJk)z.l-ka HEhtrl<DtJloz.ln T5 L'd \"* t" \ A.\B \.t. at.@ IAD(r(.) 1' olo -'r-./ -/.'2' -rt u',// i\.. \/ \ I \\i t.t. I \\I ':- -- I -:--\\\\\\.t-- '-i \.--.i-- I I I I I I E-o: HgB'- 3;; iiHsi3s IXIa eai n$;Hili 9i-oer Eff;n ^J -1 OY+ <iQ6U, r<'tl{'artmi EiEa rq g;*e Eii;g;6 3Ea<{ t'o l,-=rrA \\(a w'4. -\- ".- \'--\\_a\<) ._i:.J\ _ ->.\ \"\,i i: ilil jiii iiiillli llii ffiuii iffir (: \--/_6:Eil .)u' __- '-liS\- lD> o! ooI z()o ,/_/,-/ -/ -.a' ------t' 5rF;?6OtrGmi o, , Lli ]OMANCO ENVIRONMENTAL CORF | \ .tones & DeMille Engineering \ P 'mft;*,TJs,;ffi?;mg3'WHITE MESA MILL CELL 4A REMARKSOATE E I]E LEAK DETECTION SYSTEM CHEq:REVIEW I oRlGTN L suBillsstotr FoR AUTlloRtzATtoN L.e. 07-08 | crea, I o^r., R PROJECT NUMBER:0707-131 ""o..;"_.^^, lowcruue, ewutrs Iowccnmreo, orrowzooe |. a, Blll2oog| -Zw ISHTSET: cmNco.wHrE|[trt}l0ECEuil[dp.mtr lUpOe.fe, .---::';{:---- ll ll lY.,' Y;= t _*41,fr{'-' ,^ $3 H --------\:::::::::::i_-i,l llFe = iliei li ti ii, ::,::,::jY.:s".i"/ E+r r,,,1 :,,,,ffi::__ ::::_:_::::::* Wll ll,lrf"H;a=--1,=:-::-:--11:r---J*,: 1ltttll i Li i, i ,,", r.-___---:_:-- ---- ---:J-r; lill I ,i I ,i i i-i'tii;-----::-:-_11,-t------:-:-,.:,: ll vtll ll,//,i ".lk;t=..-tl..,.,..-:.. // Fil //,1 i/i,,' ;',ffi,,,:,.,$/l p l,l llli,i 1,,,ffi^-^:___---_:::_-y*J ii Ellllll,;' l" l,i' i;',g3:--:---l=:--:-:l* ii H Jll' llliiili",,",ok::-l-=:---:::rt: ll E 4r".i,i lll,l llii.TRa---------:-:;;n; ii E ){{".,,^l-I ll,l ,/ t' ,i.1vi:-:--___:-,$: li E .t-.- -\:- .fl),. i I i I i I ,i.*7td=_----------;o-"" il,i-*..\ /\r------'=-"::-:-::: __._::_.-. --. ijii '\-- "",*o)"$q'$/-o-" ll ..rtt1'liii '.\:xi}'" 'o ll ..-':r,:i"iii '.\:s ll .,''/'ii | -----t\.__jl__rrrr,i,',r' ll ii D "'-."-:'= ',ii/' ii ii i '"ii,..,,,,,, it li E ') ].1.Iit li .,i':i''..ii ll ,,'.'liA-..'...ti )) ii-' '-1"" "i"" ,r'i .' -----/-'-' ttt..]t' go HE)rft E E5; H8X'- tt Z;i :ie3 E rii ;;;e H=ii EiEe h iIEIIgE si l;e;f; 3Ea<{(r- -m6 lil lll" , I i$s' I lii lirs ==Hisistg *o2 ()l,oJtrlP53-E ={=H":E4T7;*.= Hs*B |da-2 IEHeT 8p' oIz8 I mmIzI !IoN ls l= ]OMANCO ENVIRONMENTAL CORF .l I Jones & DeMille Engineering P 'ffi&",TJ$,;iffil;ii*Sl' 7 ffi.Fmffi.m toWHITE MESA MILL CELL 44 DAE REMARKS ilC l) SLIMES DRAIN SYSTEM OESlql REVIEW 07-08L.G.iltE REVISIONS PROJECT NUMBER:0707-'131 SCALE: 1"=2OO' DWG NAME: ^s{U[TsSHT SEf: cil^N6-wH[ owccREATEO: 07/06/2008 llAsr 8t1t2}OgnaxoELcErqLdd?m* lupoare, t, q [' -.---__--+s--\ = .D 'Lm'?lrox==6344 86 gg lzoo.ioI, =Bggzzo0oooozz.-{ -{ooccvv $e!B Olo i9 Pdt-Frmofzl-o2 7-,-'=':==":= r;'*Jry,k:{,\-,;" ,i 'J b^" */ i\" ,$ ;r \ ud .-'-\ ..*,' "(' \ ;- .:,i ul X-r'n . ,u''\ "$* - X,n ., /\ **f a':',9= (" -o *' ..-a:Y ee>= 5E ., 1;.,g ;o *t lq.,i ,? b# 6,' t'a, N rL .0t I .Joffo ,{ ,h .*la' d" $ ^r\ 4Y it *^.uc) rj h Yrtr^r\ i'.;. \*.l'-\ \#*\.' .J \^#-(r Ua,n' '6'^ ,9i.i''\.P dP ."'\'1';:' 8' \.o\ \t\J" il' ,1. .cl "61 * t\ {f .f,C,".ff, .{* # a(' \ "9'.\ .* ", \r- -t+ tdr ii Gro= SEsBhm- I +6-laE ,9, 4/ -:( --:-F---1-.-:>'744=::--:=. --:a;4=:.t----:>_=-------'-<--:-= - --- -'-:-a-r----- EIi 1EEffi -)-----,,==1--a:=-_=-_ts_--:==;=-- =--.*=.;.t-; -a= == Ll{r ]OMANCO ENVIRONMENTAL CORF tarl fa;ones & DeMille Engineering ]/'fl'*fr J,T#$"; HT.i:il*.##' 7 tu.ioneffi.cmWHITE MESA MILL CELL 4A NO OATE :&e .vLrr..r.d .v REMARKS)OND BOTTOM SPOT ELEVATIONS RECffM DESIGN:REVIEW L.G. 07-08 cEq REVISIONSilfl"?T ozoz-131 SCALE: 1"=100'oWGCREATEOT 07/08i20O8 lLAsr u,lnoog f,3x iIlBLcElq h UPDATE:iHT SET: cilNco -wxfir 'lllrI I IIII I qrr- Ic)E--98: BBfl-{>; trl -rut>P3i e=i1o2I' -IHp-r=O A,'io< IEi rE;E :Ii 9'-r>er EBla ^= { 9,Y+ <io6o ,<'r{{ - -Fl*f Ei*3i; slE; 8 E ?A-eaAfr 2e? aiIE*3fi 3Ea6r '9rna / ir, /-'/--" ---1 -// _z/ /-' .-/ --'- --t -l---__--/--_/ i I -ll-z- I /t;/;t//ltttt/tlt .tr $qBi Hg 3eE Pd" Fu29>+ =J-o2 ET= =6344 sEEE las s =Eeg2Zc,(,ooooz2ddCCaa <=>= 5a o2f,,o !'1 !-y1* O)s(,Ol az' ,'::tZ ,i',.;.t) ,i'4; c* &tf t.;i n1i' .f' 's^ i, "q.\ J.,L'C) # .9 5-td ,y. d, da .d',,2 rfd'& l^ eia q- ,f\ X _6 ,{" ^G ,* f a it'd *.9 $'\i? s) = ^,;d .s) a? .!i3: ',y,'}rP\ c? .4',I ,tt rr? .9 .vb ;, "f ur(, o) o-l rlt d) oy $ .d' {!.9J) d m .,;'d' ',.Y ,i,e ,$' d' d2 (9 d;' ., *I$ () ,.'# ,J,'-@rlI ttsl I Il, l+u .1 B r.!;o dl' ,:fi) ri ,s"d a, ,9.a oY .$' AP,n, -o ,E .;{ .*' .(f "f,'il "J/ * ( TJ s c) ir.a s ,€ "i .la'.qlo' ^#.9 f .(:r "t9,t4*, su * s ,? cj' . arb & ,$t ,'(.) .&ot.<9 ,r' J, .oef sa rile //i.,irtr q v.j\ s ,i.l nt,e (\4 ,{J ".t^v ()\,e 9" .p!'j'"+) $' ^? o' a;'-o ,{ -(r -a "r$ #i q? ,,? s "P-# -14 ,$" d, # r ,CJ fi? ,k_6', hh ..t'ov J' C) ,f.tr.f \ 1 ,9+ ,\' &, QV .a .9 .J/,t^U\.J .c) . & t\ L-v oc -s dy da ,? cv ,,N ,(:Vf, ,:?$''o' .:y(s ---: # #I amm U)Imm{ 1' IoN ;rli" lctj tf ,9; 4, EHa HT a2fr2r{9b6il C, !7o Imtr, @ oI zoo t&1E80Unt00wd - RLith6.utc! ta701h(4t6)E${A0 Frx (.r5}!Sruffi.lauffi.ffiWHITE MESA MILL CELL 4A BOTTOM SPOT ELEVATIONS i[fl9??1 oror-13i ffi State of Utah JON M. HUNTSMAN, JR Govemor GARY HERBERT Lieutenant Govemor o Department of Environmental Quality Richard W. Sprott Executive Dire(tor DIVISION OF RADIATION CONTROL Dane L. Finerfrock Director .\ {} ,,''' August L9,2008 Mr. Harold R. Roberts Executive Vice President - US Operations Denison Mines (USA) Corp. (DUSA) 1050 17th Street, Ste. 950 Denver, CO 80225 Dear Mr. Roberts: SIJBJECT:White Mesa Uranium Mill Cell4A Overflow Spillway from Cell 3 to 4A Design Modification Approval We received an email from DUSA dated August I l, 2008 which provided a GeoSyntec drawing for modifying the overflow spillway from cell 3 to 4A. We engaged in an iterative process involving our telephonic and email comments on August 13 and 1.4,2008 respectively. Correspondingly, we received emails from DUSA each conveying unique revisions to the drawing on August 14 and 15,2008 respectively. We have reviewed this information, and hereby approve the engineering design modification as received by email August 15, 2008, and described in the attached drawing by GeoSyntec titled Spillway Splash Pad Anchor, dated August 2008, project no. SC0349. The approved drawing includes four separate listed notes that also help describe the work. This modification adds a 64- foot wide 60-mil HDPE geomembrane splash pad to the downstream side of the new spillway. This width is to accommodate a potential PMF flood stage of 2.75 feet, which corresponds to the 64-foot width. The HDPE splash pad is to be extrusion welded to the upper geomembrane liner of the cell on three sides, but as shown on the drawing, fastened at the top to the concrete spillway with a continuous or spliced steel batten bar, with anchor bolts at 12-inches on center. It is understood the HDPE splash pad sheets are to be welded together. As documented in previous correspondence, the discharge edge of the spillway was completed approximately l-foot above the DRC approved discharge elevation, as a result of deletion of a beveled taper of the concrete spillway to the upper geomembrane surface. Therefore, a splash pad addition was deemed necessary to protect the upper I{DPE geomembrane adjacent the spillway from forces related to possible flood flow, and the mentioned drop in elevation. 168 North 1950 West . Salt Lake City, UT Mailing Address: P.O. Box 144850. Salt take City, UT 841l4-4850 Telephone (801) 536-4250. Fax (801-533-4097 . T.D.D. (801) 536-4414 www,.deq.utah.gov hinted on I00% recycled paper rop'80-6I-80 F^orddv pud qsBIdS,(Ed\lllds{u^orddv dOWTNSnC\dduA:g ry:UV(I:WS'I lueulqcBnv ,fue1uceg elrlncaxg (UVOS -IOUINOJ NOIIYICVU HYIO 'flerecutg 'ddng'{ [ lc?tuoc eseeld'eloqe eqt uo suor]senb,(ue eluq no,(;1 7efle4 g00Z'6I lsntny suoqou plorBH'rIAI ili \i\ _.-,' UJ oaoF Foz dUz J otrlJl =Fz a U(,oztraxU tl! <l!Jzv =fi.<r=t ot@ ug uuo<ou6 :zou <> C i!2+ zo= uc)EUU0- ou)o ooz zzF FFo aa = xiUUU s Io 5IoUz tro t! U ul0-oIj o@ o E 6- S.H = ae :SJ = J) ->g=eg?izZ a =cB ISP Z* 3r p,$=b Eggfa A3 [iE 3ua -ilH ilE P=E ,AeE 5n!=fiqEEE$;; =E FHS ;3"'d* 6i! 2oX, dur ffi aF eH 3qE a=E 5 EP 8a #*2 E-vu Z; cj ri + otUJFzuo i6, =9ri i)@,., EE -ou>=N d9> )t <o dU ao 6L {9 2a 3 h 9H Px =F !9U OA.6 E.oT<z:<j ?U5d-O,;IUY62=J=9h=1>o@<=,ujo'tro \i $ JON M. HUNTSMAN, JR Goventor GARY HERBERT Lieutenant Governor State of Utah Department of Environmental QualitY Richard W. SPrott Executive Director Division of Radiation Control Dane L. Finerfrock Director July 29, 2008 Mr. Harold R. Roberts Executive Vice President - US Operations Denison Mines (USA) Corp. (DUSA) 1050 17th Street, Ste. 950 Denver, CO 80225 Dear Mr. Roberts: City, State, zlP+4 SUBJECT:Denison Mines (USA) Corp. (DUSA) White Mesa Uranium Mill Cell4A Operation Record of Telephone Conversations and Request for Information On July 28,2008 Mr. David Rupp contacted you via telephone and discussed some of the major items needed for DRC operational approval of the subject Cell 44. at the White Mesa Uranium Mill. We anticipate identifying other needed minor items, which we will communicate later in writing. We also held u "oni"r"r"" call with Mr. Ron Hochstein of DUSA on July 29,2008 to discuss the major issues listed below. The major items discussed with you on July 28 concerned the Cell4A BAT Monitoring, Operations and Maintenance Plan, observed construction deficiencies, and the status of the surety update and the Cell 4A Construction Quality Assurance Report. In the review of these items, some new aspects pertaining to some of them have been identified, which were not discussed on July 28, but were mentioned to Mr. Hochstein on July 29. The items are listed below, divided according to the categories mentioned above: July 16.2008 DUSA Cell4A BAT Monitorine. Operations and Maintenance Plan: a.) Detail drawings and procedures for the monitoring, operations and maintenance of the leak detection system (LDS) are needed. Similar details are also needed for the slimes drain system. b.) Some specific additional items: 1.) The water elevation in the LDS sump for pump startup must not exceed l-foot in depth below the lowest elevation of the secondary liner in the pond to conform to requirements of the Ground Water Discharge Permit [Pan I.E.8(a)(2)]. 2.) The shut-off elevation of the pump in the LDS sump is currently specified as "at the lowest level possible." Verbiage in the plan needs to include how that level will be established, and compliance made with the requirements of Part I.E.8(a)(2) of the permit. 168 North 1950 West. PO Box 144850. Salt Lake City, UT 841 l4-4850. phone (801) 536-4250'fax (801) 533'4091 T.D.D. (801) 536-4414 . www.deq.utah gov Fi LE , NAree^,ct) iltr. ill2m LTR DATEO O3IO7I2OO8. REQUEST FOR INFO FOR THE AMEND ni, irrrr- r'ro ur 1800445, LIcENSE AcrloN No 216-2006/ PG/cJ L'Iruljlt- ulr:lE --g tfEEE TfrL-!.-1 ETfEIr! ATTN NORMAN P LANIER CORP RSO TRACERCOA BUSINESS UNIT OF JOHNSON MATTHEY INC I 1 OO5 W FAIR MONT PAR KWAY LA PORTE TX 77571 7000 1670 0000 6015 9225 Print ueaily) fo De compteteo oy matter) Printed on lO0%, recvcled nnoer ,(la:ns peJa^rlep V '^\er^eJ repun f,1luarrn3 sr rualr slqJ 'V, IIof, Jo Suluorssrunuooap pu? uon€uruioar eqt Surpnloul VS1C urorg elupdn ,(la:ns pesr^ar B pe^.receJ o^ g00Z '97 ,t1n1 ug : 'Jeurl V, IIoJ eql ol pruzuq € eq lou 1I/r\ uolllpuoc Sutlstxa eqt leql alursuouap ro uorlurn8guoJ aql 01 fpaure; eyqunorddu uu esodord'u8rsap pu€uo eqt ol ruJoJuoc 01 uorlu:n?guoc srqt e8uuqc eszeld 'epls Vt IIoJ eql uo u8tsap pur8Fo er{t uuqt'ereJrns reurl aql a^oqc (,,21-,,9):aq8rq peqc:ed osp sI q?ls eql tuqt sr'rarlrua peuortueu lou lcedsu ^\eu V 'pele^eq pelcnJlsuoJ lou aJu sefpe esaql 'le,tamo11 'ecuJ:ns Jeurl oql ot qsnlJ pw pela^eq su se8pe /v\ogtno puu ^\olJul eql s^\oqs L-I uonoas 'ue^es leeqs 's8uu'rurp tcelord eql uo uaoqs sr V, puu g sllac uoel\]eq ,(umlpds ^\olJJe^o eqJ 's8urpul eq] ol eJnsodxe lcor ureJp eql eleururrle o1 ,(paure: alqu,rorddu uu esodord :o 'u8tsep luurSFo er{l ol rruoJuoo o1 uorlu:n8guoc srql e8uuqc esuald 'ururp seurrls eql Jo ,Qrpqeeurad eql af,npeJ -ro 3n1d puu'Japeeq ureJp seurls eql olur l(og ol saug ^\ollB IIrA\ IcoJ ururp eqt ol s8uruedo aseqt teqt sr'82 ,{lnl uo nof qll^\ pessnoslp lou'urelqord sqt uo tcedsu ^reu V 's8urme:p u8rsap luur8rro oql 01 rxJoJuoc lou seop uouum8guoc srql '(sqderSoloqd peqrupu :ed) repeeq ulerp seIuITs aqt;o scuqu;-oe8 eqt ur paddnc 1e,( 'pesodxe sr Jop"eq eql uI If,oJ e8eurcrp'suolluool snoJeurnu q (Z 'peAotxaJ eq ol spaeu reurl IIec aqt uo puu adola,rue eplxeloe8 eql eplslno 1co.r a8uulur6 ('1 :(edr4 uoqcelloJ IBrlueJ ro eurdg) repeeH ururq seurls eq] roJ lcog a8eururq 'suorlucglcads eql loetu ol IErJelBru eplxeloe8 uelol\ qtrtr peceldeJ aq ol speeu Ieuelutu slql '11ac oqt Jo Joruoc lsueguou eql Jueu Jepueq uruJp sarulls Jo pue reddn eqt lu JIrqeJ do1 eqi se pellulsur ueeq ser{ 'et8uel uI }eeJ-SZ lnoqe 'luueiulx olllxaloa8 ua,rotr-uou Jo uolloes V ' BO0Z' gz,(1n1 palup qctels JUC peqcerB aes 'IcoJ ururp lenur8 pue elrlxeloeS;o edolelue Jepzeq ururp seurls eql uqlr/y\ pellBlsur eJ? lBrll suorlses ursJp sauIIS eql e^oq? 1uauu8t1u ul oq puB re^oJ ol /v\oJpur^\ JepBaq urEJp seturls eql oluo pepuelxe aq 01 peeu sSuqpuu5 ('g 'sSeqpuus qll/r\ peJe^oc,(pedord eq ot peeu Jepueq urzrp serurs eql qlr/( suorlcunf leql lu surerp-dr.qs pasodxe er{J ('Z 'suorlusol IIB l? etu?s eql JeAoc o1 pelsnlpe eq ol poeu um:p-du1s eql asodxe qclq,\{ sSuqpueg ('1 :sururp-du1g eql JeAo ra^oJ Suqpuug 'p,rorddu JoJ perluqns eq ol peeu IIr \ IJo^\ aql Sutlueuncop sqdurSoloqd 'pesodord no,( sy 'qeln Jo elpls aql ur acrlcurd ot pesuecrl :aeut8ue puotsse;ord peralsr?a: z ,(q pelelduroc sB pagtga, oq ol peeu IIr/n ,fto8elec srql ur suelr aql'passnJslp sV 'sluarualnbeJ esaql elerod:ocur ol epetu eq 01 peeu 1xe1 ueld eql ot sluer[lsnfpe puu s8urmu:(J 'pepJooeJ aq stuelueJnsueu Jer{}o uleuac pue 'pepr^ord sr uorlu,rela Jalui( durns eql;o SuFolruo[u snonulluoc ]uq1 sernber [€'{'I pua (1)(e)g'g'1sgu6] lr.ured aSruqcsrq ralsl(\ punorD eqJ ('E 'III ('c ('q ('e 'II z a?ed g00z '62 ^lnfsueqou plorPH '{Atr Mr. Harold Roberts July 29, 2008 Page 3 bond or other instrument corresponding to the final approved amount must be received before approval to use will be issued. fV. Cell4A Construction Oualitv Assurance Report: Our comments regarding the report are listed on our letter of July .22,2008, which was hand- delivered to you on July 23,2008. DUSA's response and resolution to items 1-4 in that letter are considered major items for DRC operational approval. Please review the above comments, and submit the requested information. If you have any questions on the above, please contact me or Mr. Rupp. Sincerely, [T^-#",-1, Dane L. FinQgfrock Director DAR:dr Cc: Mr. Ron Hochstein, President, DUSA Enclosures: Photographs 2, 5, 6, 7, 8, L2, and F:\drupp\DUSA\Op Issues 7-29-08 13 oo sn N,q(\ \A\ - ---1,2 -l-ll1X31O3C N3AO,r s30ts H1083d t ol3vdsfrEodnoc dtuls ('arr) cyg 6t{yt &, m-til m U-tr Etv @ mz=o(O H\t1co(/)r !rm 3:o Cg o =-E a- N W li NN ls. iil r fr ,/cndo?ucsolJ \*, ogxy,Eil" a67a r I I I l-/.nr,, :.Frrr Fuo s fv? | - p"t 17 pztz,to, ogt ol I v"t? u,atf - 4,4e I | ' ,,o/r /7 7,t* l;:ta;l,;#ff;i! QZGal //"0 ls tCb/T5oo 6 'SZ .I]'E ooooa g)^x tJo(D -.1 aN)P(D* OA@x o{z LTJo 3@ ocFJo o o a o oo o' o Oa o? -o oo !e o 0a oo- o- pqa?zoo oq FD o-o o-o o{oo o o(D @ DOoa? :9 o 1.,) oo oc) o o dtoao'o oo o-d19oa-FD ID @ oq a. r& ,ll <-oo5r o='3ooO i.a;5. (Do. os ol0ooaO@ 2.NI.-?D oa :-+ o5E' OA.O. F) 30or (D=' E. ii ONA@ o q FDo,( I zooEoo,fox o o o o 6 c.>r -d oo; OOoaoAil! o!-oV,nu* 3+ Oo;:9X ;oO dfoo='6Od!o a€? Eo 9a =o €! oc f; =6YA..?,E O! o:oyo! gd =o-- =O-{->?-o= ? CL-o9e o{: r-Ec @>o.ON.9ato >_Eoo.Eo>o?aE,^Eetsc@:f .E€ Dgc>6OLOoo:ox>-coc) a*OY ii! -Oa! 6c =Eo'= o .:oiq 5o6C oo OL+o.Eu6go Za.t -E -Y :.9 FqEc -1, qObo6 '= c,uOr "th!,;a ;6 .! o trO aC L-d oO -L i, c tJ,l brl I 6o oc'a .Orr ul 3- ?aOJ 50{9 6ut o3 or o= 50@3 3:9 o-oo ; r')io o. a\ 8lp {oi;;or 99cr@oo -!. : JJ Y t\.) N 90-l o (D o o oq 7 {ce,pooQ6@ oY -o 3oaq!- o t.o-d =a" p o F) o 5 I I E! o,< o!)Eo o- F)t o-p 0a oc +'o { DDo Q'V 5^ d;ot/:N) ooel x' pX' {oN5 od OO9r o5^o!o !T:;.oE€\<o o: 9.'< !n dn.o9iYo-OE o=o o9. oo- ooi( bo.Ed 6d oxo- 'iou,, b9 6) E9 L+s a-A- o+1!=Ycn;*5A o+ caJ oxo'tsFo4rbBBoaZ- oi \o= ^O 4 '+ oU Loroo 'iZ E A ri o- + o o o! o-oo o -; P-> i -a GfL Cc.F s:lo_ Etrr O 7A l^i cu5.E.Cf)CCzw €, tr"lJlJl-o IJIsFm(? DZO I ?u sn 0e// la Ja/c 2 oo( W,r,r:fr*',;r?x:!l *t 4 f,;:;fi*:"r,?x:(l +#*/rrslacs I Hb^ ,*'i"' /::ff;;,.o I k] W*yt:;;r*ir,-;i;"t:;*,*j I ll$.1 \0,,'an'Jbd.s(-)2. g " . f 7, /", l, \,{fi* \ SPACED 1 PER OTH SIDES SAND BAG (ryp.) STRIP COMPOSITE tD.P"fi) State of Utah JON M. HUNTSMAN, JR. Govemor GARY HERBERT Lieutenant Govemor Department of Environmental Quality Richard W. Sprott Executive Director DTVISION OF RADIATION CONTROL. Dane L. Finerfrock Director September 9, 2008 Mr. Harold R. Roberts Executive Vice President - US Operations Denison Mines (USA) Corp. (DUSA) 1050 17d'Sheer, Ste. 950 Denver, CO 80225 Dear Mr. Roberts: SUBJECT: September 3, 2008 DUSA Letter of Response to Request for Information (MI); August 18, 2008 DRC RFI Letter regarding Sandbag Placement; August 11, 2008 DUSA Response Letter to RFI; August 6, 2008 DRC RFI Letter on Cell4,A. Construction Quality Assurance Report; Approval of DUSA Cell4A Construction Quality Assurance Report including Cell4,A. Slimes Drain Sandbag Adjustments We received and reviewed the subject DUSA letters above. These letters conveyed information by Compact Disks, drawings, and other materials which were compared to the requests made by DRC letters dated August 18, 2008 and August 6, 2008. The issues raised by the DRC letters have been resolved by these submittals. Therefore, the Cell 4A Construction Quality Assurance Report including the DUSA Cell 4A slimes drain sandbag adjustment documentation are hereby approved. This accomplishment by DUSA is a major step towards receiving operation approval for use of Cell 44, as outlined in our letter of July 29,2008. It appears that the remaining item to be completed is DUSA's submittal and our approval of the Cell 4A BAT Monitoring, Operations and Maintenance Plan. If you have any questions on the above, please contact Mr. David Rupp of DRC. UTAH RADIATION CONTROL BOARD Dane L. Executive Secretary DLF:LBM:DAR:dT cc: Mr. Ron Hochstein, President F:\DUSA\Cetl 4A\Op Approval\ Completion Report\Approval 09-09-08 168 North 1950 West. Salt l:ke City, UT Mailing Address: P.O. Box 144850 . Salt Lake City, UT 84114-4850 rerephone (80 I ) s36-42s0 . Ylj1];Tf;1ie7 . r D.D (80I ) s36-44I 4 Printed on 100% recycled paper {.ffi State of Utah JON M. HUNTSMAN, JR. Govetnor GARY HERBERT Lieutenant Governor o-Department of Environmental Quality Richard W. Sprott Executive Director DTVISION OF RADIATION CONTROL Dane L. Finerfrock Di,.ector August 18,2008 Mr. Harold R..Roberts Executive Vice President - US Operations Denison Mines (USA) Corp. (DUSA) 1050 17th Street, Ste. 950 Denver, CO 80225 Dear Mr. Roberts: SUBJECT: July 29,2008 DRC Letter Regarding White Mesa Uranium Mill Cell 44 Operation; July 31, 2008 DUSA Email Regarding 252 Photos on C.D. (received August 1, 2008), Showing Work Completed on Cell44. Sand Bag Placement; August 7,2008 DRC Email, Subject: Sandbag Adjustments (Parrial Response to Submitted C.D. Photographs). Request for Information As we mentioned earlier in the subject DRC email, our concern with some of the sandbag placement on the slimes drains system in Cell 4A is due to the sensitivity of the slimes drain system to plugging by fine tailings material. The slimes drain collection system on the bottom of Cell 4A includes "strip-drains" acting as ribs, connecting to a backbone "header" of drain pipe covered with drain rock and enveloped by geotextile materials. As you are aware, the sand bags should act as filters to protect: 1) The strip-drains that feed the slimes drain header, and 2) The outer margin of the slimes drain header from plugging. Thus, special attention and effort to place the bags according to the approved plans and the agreed configurations are critical in order to maximize performance of the slimes drain system. As you are aware, there are three areas which need sandbags: on strip-drains, on the headers above the strip-drains and along the sides ofthe gravel header. As discussed in our email of August 7, 2008, some of the subject photographs of sandbags on the strip- drains show sandbag coverage which departs from the original design. Some additional effort will be needed for bag placement to conform to the approved plans. Also, in our telephone discussions and mutual correspondence we defined the use of additional sandbags to be placed on the header above the projection of the strip-drain lines (i.e. at the junction between the strip-drains and the slimes drain header), as well as along the sides of the slimes drain header at the outer margin of the geotextile. Along the sides of the slimes drain header, woven geotextile is specified to prevent intrusion of tailings fines into the header collection pipe and gravel filter around the pipe, as well as the escape of drain rock from the geotextile envelope. This line of additional sand bags on both sides of the header collection system will also partially cover the junction areas, where the strip-drains merge with the header pipe, thereby ensuring hydraulic continuity with the collection pipe network. 168 North 1950 West. Salt Lake City, UT Mailing Address: P.O. Box 144850. Salt lake City, UT 84114-4850 Telephone (801) 536-4250. Fax (801-533-4097. T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled plper Mr. Harold Roberts August 18,2008 Page 2 We have received your August 11, 2008 submittal wherein you acknowledge the sandbag problem, and explain that efforts have begun to correct it. As promised in our August 7 ,2008 email, this letter represents detailed cornments regarding the previous sandbag photographs. The most common problems fall into five categories, as follows: 1. The tails (sewn end) of some bags are not positioned downward, which would allow the bag to drape over the margin of the strip drain. This is the most common error. If the bag tails are not positioned downward, the tail area usually exposes the strip-drain. E.g., picture 1336 shows the two bags immediately to the right of the labeled bag both with one of their tails incorrectly positioned. Many of the other pictures show bag tails with this, some are referenced below.' Gaps at the tied or opening end of the bag. E.g. picture 1313 shows a gap on the right side of the bag just right of the lab.eled bag. Other photos which show the opening end of bags with gaps are referenced below." Bags which are elevated on other bags. E.g. picture 1321 shows an elevated bag two bags to the right of the labeled bag. Other elevated bag photos are referenced below."' Not enough bags on the slimes drain header, to cover the projected strip-drain areas as provided in the DRC letter of July 29 , 2008 with the attached DRC drawing dated July 25, 2008. E.g. see picture 1262. Missing sandbags on the outer margin of the slimes drain header to ballast the edge of the geotextile. Documentation on this item needs to be completed. E.g. see picture 1262. Photograph 0816 (sent by DUSA email of July 31, 2008) is a fading perspective photo of part of the sandbag efforts on the header. Additional photos are needed to document completion on this item. We request that DUSA: A. Consider these comments as typical items for adjusting and adding sandbags as necessary to cover the strip-drains and the slimes drain header appropriately. B. Address these items by taking appropriate actions with the sandbags, and photo document these efforts for the entire slimes drain system in Cell 4,A., by use of an adequate number of representative photographs for each of the strip-drain lines as well as photos showing sandbag completion on the margins of the slimes drain header, and submit such for approval. C. As discussed in our letter of July 29,2008, we request this submittal be certified as completed, by a registered professional engineer licensed to practice in the State of Utah. We have also given further consideration to the July 2, 2008 email from GeoSyntec, wherein it was reported that the effect of these sandbag problems would increase the time needed to de-water Cell 44. tailings from 5.5 to 6.4 years (see attached email and spread sheet). This claim is based on the assumption that none of the sand bag problems in question causes complete blockage of longitudinal flow down the axis of either the strip-drains, or the collection header piping. rPhotos1256,1268,t217,1280,1282,1284,1288,1290,1292,1296,1300,1315,1321,1323,1330,1336,1338,1345,1347,1354,1361,1365, 1373,1388,1375,1378,1380,1381,t393,1399,1407,1411,1417,1438,1452,1463,1473,t415,1487,1499,1507 & 1509. " Photo, 1290, 1303, t384, 1405, 1479,1485,1495, & 1507. "' Photo, 1330, 1342, 1425, 1432, 1436, 1461, & 1475. 2. -1. 4. 5. Mr. Harold Roberts August 18, 2008 Page 3 After review of these arguments, we are willing to accept the increased tailings de-watering time projected in the above GeoSyntec submittal as part of the approved design basis for Cell 4A. However, it is now apparent that the slimes drain performance standard currently stipulated in the Ground Water Discharge Permit is in need of revision to make it consistent with the July 2,2008 GeoSyntec submittal. Accordingly, we propose Part I.D.6 (c) of the permit to be revised was follows: c) Slimes Drain Monthly and Annual Average Recovery Head Criteria - after the Permittee initiates pumping conditions in the slimes drain layer in Cell4A, the Permittee will provide: llcontinuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b).and 2) a maxinr nieasLrred from tlre lowest point of upper flexible membrane liner') in 6.4 years or less. We request you review the above comments, and submit the requested information. If you have any questions, please contact Mr. David Rupp.eM . Morton, P.G., Manager hnical Services Section LBM:DAR:dr Attachments: DRC drawing dated July 25,2008 July 2,2008 GeoSyntec Email Mr. Ron Hochstein, President, DUSA F:\drupp\DUSA\4A\OP Appr\Dtld.Cmts.Sandbag Placement 8-l 8-08.doc Lore DZO lags anJ l"o/", i !:3,'/,1; ;u n h so vuc{'ii'i""Jlier tfr. i//* .'*r'/ ly t7ccs, sh,b'/^,n arca.h '6. covcd b7 sarJ' ?rsa 0e// la v,/or/c 2 ao( (!Lco (d.)o- E ut r! =_or.- P(Y) ='O)oczu €,E IIJJFo UJsFu G ,I rlt \*I TIt: $ )t S*rr=D;-i r eia etpcscd (aac orerc/) 67'hca/cr, o/to- ancorrrrl bq 9a,./6afo a/so, x,(.o/ri"r/"ria )N gaaloags SPACEO 1 PEROTH SIDES SAND 8Ac (rYP.) STRIP COMPOSITE t '$ {\)t\ eJg" nf 7.r/.r/;L WOIEN GEOTEXTILE_ ^' Izl-- ,- a' d SCH 40 pVC _ GRA\EL oo Dave Rupp - RE: DUSA Cell4A Construction: Two Items noted. Page i of4 From: <GCorcoran@Geosyntec.com> To: <DRUPP@utah.gov>, <hroberts @denisonmines.com>, <Ssnyder@denisonmines.com> Date: 71212008 5:42PM Subject: RE: DUSA Cell4A Construction: Two Items noted. CC: <JCox@Geosyntec.com>, <LMORTON@utah.gov> Attachments: Slimes Drain Drainage.070208.pdf Dave, I have revised the calculations presented in the Analysis of Slimes Drain included in the Cell 4A lnterrogatories. The original calculation was based on an area for flow to pass into the strip composite of 14 inches per foot of length (12 inches across the top and two sides at 1 inch each). This calculation, using the maximum liquid depth resulted in a drainage time of approximately 5.5 years. The sand bag coverage issue likely only impacts a discreet amount of the sides of the strip composite (probably much less than 10%). However, taking a conservative approach, I assumed that all two inches of the sides of the entire strip composite is not available for flow. lncorporating the 12 inches per foot of length f low area into the maximum liquid level model calculation results in a drainage time of approximately 6.4 years (see attached), an increase of approximately 0.9 years. Given that the relationship is linear, one can interpolate between 5.5 and 6.4 years to estimate the impact of the percentage of strip composite sides that are not covered by sand bags. lf this value is 107o, one can estimate that the drainage time would b9 approximately 5.6 years (0.9 years x 10% + 5.5 years). We believe that this minor change meets the design intent. Please let us know if you have additional comments, and confirm that this addresses your concerns. Regards, Greg From: Dave Rupp [mailto:DRUPP@utah.gov] Sent: Wednesday, July 02,2008 1:54 PM To r h roberts@denisonm i nes.com; Ss nyder@den ison m ines.com ; Greg Corcoran Cc: Jim Cox; Jephory McMichen; Loren Morton Subject: RE: DUSA Cell 4A Construction: Two Items noted, Greg, Thanks for your response. As I view section C-5 of the drawings, the sandbags drape over the both edges of the strip-drain, and preclude access to the edge and top of the strip-drain by the tailings. This will be a criterion we will use in inspecting for conformance to the existing plans. The first photograph DRC sent on 6-25-08 regarding this problem shows six openings through the filo.//f-.\T\n^rrffianfc anrl Qptfincc\T)rrrnn\T nnol QaffinaoYl'amn\lID--.r,ioo\/aAppllnlfl/-fT-\ A/l a/rnn9 @ NNf.- o-o.' !s.s i!'Ei: c € c o o Eo=;s E 5 !o,cc, \ (oool (t ry G!co GcS (o(ool(o(o..! N oo2o0\\l (o(oo (oo.l N Irt :o,cC racI c,3E cc cc, :c€ cGo rccn Et,-; ! cco (c G @(ool(o(oN !o, o Gc cc\ r II: ccf,€c: !!2!I cc,€€\ (Co GGi c,€€\ !!,c,c€I Tc,@@o) @(oN ^i TI,I,d!\ G o!tGi cc ir\ oc d GGoccG (o@o !5, I on|o^ +-DD 'e9b-lt E) 60OGFE onoo o rO $a?roo (oc!o + O n\@o (o oo ] II o9oo !N! Nqo :I +r?o\,c{qo@ cf Ctl rooq @n a r c nNc onO$ N j+ q @o (rr (f)qoo J, c r.l.o.qoN Na? N () Nlst ory @c? co CCr N \i a- LtY quoE2trtu=o>-o{ Nolo o I (oqrt {, <, raNc u?n r{' o?o @ a? F sq N N o @qo x,t.Nn N sq N \oc) I! 3? a o6l N<t N nn dr) a.I I Nq NF. )rnc (ou?oo Nnoo r) doN g:?, o 6 No 9!!@ N dN ,\,t), eE$ E gi = o.:-o E {{IN; N oNu? N () o? c{ t {\,\r!:r !3ll\ No.tN Jt t. (nN1NN r rl € q:ft N o?oo r No ar !) ica c( o.rx N sf T, o) N+ r T, $Nqa r! :,1a a ca INI ! Nq @(o !! n \ dt c)t, rNo?o co Om r tr q,! \ N(ocN <. !nI !! u FE EGo 6o=f 5AFoJ- E o o I a s I a o ulor; q U. Ar sfo uJ ri s UJq rJ) IO LJJ dl\t =tI|o,\$ I L.l.lF-q$ o uJIq$ o uJ n a u.l6c! s [!o + o I,J.J q so t1l oq ( L $o UJ@u?o If Ll31 u.rlI ! J.J s I o s u! s J. c 1 so tUNc! N sftl \] +c JJ<lcl \to Lll N so ulNq rtO I,JJ(o1 vo IUoa? <io uJ<f.: lr)o LrJ olo oI IJfq lr)o TU ol(o roo uJNn6 6oI!Il){ roo IUNq N 6o u.lNq ooo^r=EF ro G l4 s ,No o !\N !ra !I N o 6 N o tr){N o t I c sE'E 6-:JTG -- JEo- T,(Ro (q sf o!s I { u?) <1 :Iq rn c.\+ni+Isf i Sd .l$ni+c'i\t ni+ N N rnd n+\d Ii{ri\t n{ c q\t\t <t+d!i' qo(o(o$ eo{t-.+ q Nsf I I{ qost o$ g=^lltr6'=OEc> oo- { I d \to uJ u?(o sf U u? (o Lr G $o uJ q(o vf, JJ 11! $o tl'J 6 <; s I t.I o UJ u?(o I I c a <t J.l € st st ! I r. o uJ u?(o q {o LIJ ul(o $O ui so tU ( I a s I I :t s uJ ul @ $ Ll n I c sf $o trJ u? (,o o IU q @ { ! ct o UJ q @ {)x uJ ul @ o tIJ u?(o o UJ o(o o Lu u?(o (? @ q @ tI q(o a 6(o u') @ !o J] ! 6 ! t.r =olIo(,0o-\ io o- x o U q lf) +3 C .io UJ dlo f ! l u '? ! I $o LIJ a?o L! tr? $o UJ a?o I( $o uJ ao {st o tU a?o jo I,IJ alo d I \to u.l qo $o [J ori jo uJ em ! D tlj c?o o ul alo o UJ C?o ) ! ; o UJ a?o o ul o {3 J.l IJ r? D ! I UJ oo (l3 JJ ! IJ ID 3 IJ q I, !c II $o I.JJ e(o o UJ c?ocla?o !, -'E =oilsEJOE P=i;F=<.c siE5o a cdoNoNqocI,6.c Eo .c6oq o)Ea q .EGocoq)ioco ec6 JON M. HI.JNTSMAN, JR. Govemor GARY HERBERT Lieulenanl Governor State of Utah Department of Environmental Quality Richard W. Sprott Exet'utive Director Division of Radiation Control Dane L. Finerfrock Director August 6,2008 Mr. Harold R. Roberts Executive Vice President - US Operations Denison Mines (USA) Corp. (DUSA) 1050 l7'h Sheet, Sre. 950 Denver, CO 80225 Dear Mr. Roberts: SIIBJECT: August 1,2008 DUSA Response to Request for Information; July 22,2OO8 DRC Findings and Request for Information; July 2,2008 DUSA Cell4A Construction Quality Assurance Report; Request for Information We received the subject response to our request for information.on August 4, 2008. The response contained the as-built primary and secondary liner drawings by Comanco construction and the final revised construction drawings of the original seven sheets by GeoSyntec Consultants. We have reviewed the referenced submittals, and have comments, which follow the numeric format of our previous letter of July 22,20O8: I. We note that the work of correcting the sandbag covering of the strip-drains, mentioned in previous correspondence, is progressing as documented in the photographs sent by DUSA on compact disk, received August l, 2008. Our comments regarding that work will be pursued under separate cover. 2. An explanation regarding the repairs on the production seam surnnary log on pages 771103 and 791103 was received. However, the Comanco drawings for the primary liner do not show any panel numbers, as referenced in the explanation. Please provide a revised drawing showing the panel numbers for the primary liner. 3. Regarding location coordinates, the survey drawings from Comanco (Jones & DeMille Engineering) show the vertical elevations of numerous piping, drains, sumps etc. Please inform us of the extent of information you have regarding horizontal coordinates. Also, please supply the horizontal coordinates of important facilities in the LDS and slimes drain system such as beginning and end of sumps, "spine backbone" header pipes, collector drains to the headers. etc. No comment. 168 North 1950 West . PO Box I u14850 . Salt Lake City, UT 841 14-4850 . phooe (801 ) 5364250. fax (801 ) 533-4On T.D.D. (801 ) 536-4414. ww.deq.utah. gov 4. hinted on 100% recycled paper Mr. Harold R. Roberts August 6, 2008 Page 2 5. No comment. 6. No commen Please review the above comments, and submit the requested information. If you have any questions onthe above, please contact me. Sincerely, d,rr"l4ruf David A. Rupp, P.E. \ Geotechnical Services Section DR:dr Cc: Mr. Ron Hochstein, President DUSA Mr. Greg Corcoran, GeoSyntec Consultants F:\drupp\DUSA\4A\Completion Report\Request for Information 08-06-08 roN M. HIMAN, rR Governor GARY HERBERT Lieutenanl Goventor State of Utah Department of Environmental Quality Richard W. Sprott Executive Director Division of Radiation Control Dane L. Finerfrock Director Jluly 22,2008 Mr. Harold R. Roberts Executive Vice President - US Operations Denison Mines (USA) Corp.(DUSA) 1050 17th Street, Ste. 950 Denver, CO 80225 Dear Mr. Roberts: SUBJECT:July 2,2008, Cell4A Construction Quality Assurance Report Findings and Request for Information We received the subject report on July 7,2008. We conveyed to you at that time that the as-built drawings for the project had not been submitted. We received hard copies of two as-built drawings by Comanco construction on JuJy 2I,2008. These drawings regard the primary and secondary geomembrane liner, respectively. We have reviewed the referenced submittals, and have the following comments: As you know, the sandbags covering the strip-drains as originally constructed, do not conform to the plans and specifications. Several emails have been exchanged regarding this problem. On July 16, 2008 you suggested I visit the site to evaluate the field changes that have been made on the sandbag configuration. This should be accomplished on my visit to the site July 23,2008. Once an approvable configuration is accepted by DRC, it must be submitted as part of the final as-built drawings. In volume II, Appendix F of the report, two repaired areas of the primary geomembrane are shown in the production seam summary log on pages 771103 and 791103. However the outcome of these repairs is not clear. Please add verbiage with references to the report text and location on the drawings regarding the outcome of these repairs. The basis of the surveying coordinates (x,y, and z) used to locate repair and other work is not clear. Please add verbiage and show on the drawings the basis of the coordinates. Also, please submit the surveyed coordinates of piping, drains, sumps etc. l63North I950west.POBoxl44850.SaltLakeCity,UT84ll4-4850.phone(801)536-4250.fax(801)533-4097 T.D.D. (80 I ) 536-441 4 . wwu,.de q.utah. gov 1. 2. J. Printed on 1007, recycled paper JP:UC[ uQIlseS secr^res IEcluqcolooD \ 'g'6'ddn5'V pl^B(t +'yry/y 'oru lc€luoo asueld 'eloqe eq] uo suoqsenb ,(uu ea.uq no,( 51 'uorleuuoJur pelsenber or{} uuqns puu 'quaruuroc enoqu eql A\erAoJ asueld 'L ruql I staoqs 's8urrvrurp uorlcn4suoc leurJ ol pelFrrll tou lnq 'epnlcur III/I\ slql 'uoder eq] ur papnlcur oq ol peeu s8urnurp uoqcrulsuoc pesrleJ pulg elelduroc eql 'pesr^al s3/$ uorJcnJlsuos eqi A\oq sllslap qclq^\ 'uode: eql Jo 1'g'g qdur8ured ,{q poqlrcsep suonrpuoc tlmq-s€ oql ol lcadse: qirlt petoerroc oq ol spaeu Lp g loeqs posrla; uo SurrnuJp BeJu duns eq]'g xrpuaddy u1 'euurqureuroeB tf,tepuoces puu (ruuFd aqt qtoq ro; sSurzneJp llrnq-su ocupruoJ eql uo srrcda"r eseql Jo uoriucol orlt ^roqs esueld 'polequl puu eppru eJaA\ sploJ puu sap{ulJm 'e8uuup luolul;o -rmdar JoJ serpoq laued euuJqruoruoe8 eql uo splem uorsnJlxa pnprnrpul 7 a?e4 SOOZ,ZZ IVT sueqou 'u plorsH'{N ,9 '9 ,v Page I of I Dave Rupp - DUSA Cell 4A Construction: Two ltems noted. From: Dave Rupp To: Harold R. Roberts; Ssnyder@denisonmines.com Date: 612512008 9:08 AM Subject: DUSA Cell 4A Construction: Two Items noted. CC: gcorcoran@geosyntec.com; jmcmichen@geosyntec.com; Loren Morton Attachments: Two issues on site visit of 6-20-08.doc Harold/Steve: On a site visit last Friday, I had two items of concern I wanted to point out for your resolution. The main one is the covering by the sand bags on the strip drains. Incomplete covering of the drains is seen now, and does not conform to the drawings, which show the bags completely covering the drains. On site I spoke with Messrs. D.Turk of DUSA and J.McMichen of GeoSyntec regarding this. The other item is the inconsistent grade of the last few feet of some of the strip-drains near their connection to the herring backbone interceptor piping. The is grade waving, which if left would impede the flow from the strip-drain into the piping. These items are illustrated in the attached photos. These items will need to be resolved prior to DRC final acceptance. Please contact me if you have questions. - - David A. Rupp, P.E. Utah Division of Radiation Control P. O. Box 144850 Salt Lake city, uT 84114-4850 Telephone (801) 536-4023 Fax (801) 533-4091 Email: drupp@utah.gov file://C:\Documents and Settings\Drupp\Local Settings\TempU(Pgrpwise\4862080DEQD... 612512008 Two Issues Reeardine DRC Site Visit of 6-20-08 (Four Photographs in Total) Bags partially covering the strip-drains. This does not conform to the drain coverage depicted by the plans. Similar to the above. Another angle view of the above regarding bag covering of slimes drain. Issue of the grades of some strip-drains near the connection to the "backbone" header pipe. Note in this photo that the close up strip-drain, as well as the next strip-drain slope, (near the gravel covered backbone piping) is waving. The grade is waving, which if left so would impede flow from the strip-drain into the piping. oauepartment or State of Utah JON M. HUNTSMAN, JR. Govemor GARY HERBERT Lieutenant Governor TO: FROM: DATE: SUBJECT: DUSA FILE _ IUCO5.OI.d3 Environmental Quality Richard W. Sprott Execulive Diredor DIVISION OF RADIATION CONTROL Dane L. Finerfrock Dirertor MEMORANDUM DaveRuppvp:- /ru/l Sept. 29,2008 DUSA Cell 44, Construction Inspection on May 21,2008 On the subject date above I visited the site and reviewed the construction progress. Nineteen photos of the work site are herewith attached via a compact disk. These include photos nos. P5080018jpg through P5080036jpg. A review ofthe resident engineer's and contractor records regarding the liner systems was done. Their filing systems regarding respective QA and QC liner documentation appeared to be in good order. A few sandbags and strip-drain "ribs" for the slimes drain system are just beginning to be installed. The photos show the pond to be 99%o enclosed by the upper layer of the FML. DUSA has been installing FML from l0 p.m. to 10 a.m. daily to avoid effects of thermal expansion. Management expects the project to be completely installed by June 10, 2008. No problems were identified. This inspection mostly focused on storm drainage issues. Other inspection work on this visit included review of storm water, Module 77 issues on the ground. Separate correspondence in the ground water file on storm water best management practices plan will cover the inspection results. -END- 168 North 1950 West. Salt lake City, IJT Mailing Address: P.O. Box 144850 . Salt t-ake City, LIT 84114-4850 Telephone (801) 536-4250. Fax (801-533-4097 . T.D.D. (801) 536-4414 ww,w.deq.utah. gov hinted on 100% recycled paper State of Utah Department of Environmental Quality Richard W. Sprott Exetutive Director DTVISION OF RADIATION CONTROL Dane L. Finerfrock Director TO: FROM: DATE: SUBJECT: ,o*,r. rOrMAN.rR Govemor CARY HERBERT Lieulenant Governor MEMORANDUM FILE (Division of Radiation Control) DRC David Esser DKe Division of Radiation Control 4on May 21, 2008 Denison Mine cell 4,A - April 29,2008Inspection This memo is a summary of the Apil 29, 2008 (7:45 am to I l:30 am) ad hoc inspection regarding Denison Mines Cell4,A. construction. The Inspection and close out was escorted and held with Denison representatives Dave Turk, and Harold Roberts. Denison representatives asked that the Cell 4,A. pond construction and approval be review as soon as possible with construction to be completed in July. It appears that 857o of the primary liner, geo-net to the Cell 4A pond has been installed, and 407o of the secondary liner has been installed. The inspection on April 29,2008 was from an engineering stand point. The review looked at: liner, QA/QC and construction drawings, sand bag placement, geo-net, geo-net zip-ties, tie back trench, clay compaction, erosion, fusion and extrusion welding, shear and peal testing machine, records, leak detection system, and material placement. The following is a list of inspection items and inspection notes with findings and recommendations for future inspections. Please see inspection pictures in the file for additional reference. 1) Liner- All visible liners appeared to look in good condition. 2) QA/QC and Construction drawings - Before the next inspection we need to review the leak detection plans and the requirements for the shear and peel tests. 3) Sand bag placement - Looked good 2 foot spacing or less. 4) Geo-net (drainage net) - Looked good, no holes or big gaps. 5) Geo-net (drainage net) zip ties - Good spacing and placement. 6) Tie back trench - Seemed to fit the plans, width good, and the compaction or sand bags looked good. Needs to be completed on North end. 7) Clay compaction - Look good in the trench (by visual), but inspection report numbers must be looked at later. 168 North 1950 West . PO Box 144850. Salt Lake City, UT 841 14-4850. phone (801) 536-4250. fax (801) 533-4097 T.D-D. (801) 536-4414 . www.deq.utah.gov Page 2 8) Erosion - Rivulet and gullies in the North end not completed, look at later. 9) Fusion and Extrusion welding - looked good, check paper work for testing results. 10) Shear and Peel testing machine - looked good, check paper work for testing results. l l) Records - On site paper work looked good we need to, check all paperwork at the end of the project. l2)Leak detection system - The Company stated that they were going to change the constructed leak detection system, so it fit the plans and they failed to build the leak detection system per plan. View the plans and re-inspect at a later date, but the leak detection system needs piping and secondary liner, and the sump location may be incorrect. l3) Material placement - The material placement looked good, and no problems were witnessed. Look at daily inspection reports at a later date. ll^?"br'+5 : $s*vesd, o 4) Yr4-q,'^*J 6;rs\- r.reL oL f ,-\ .r l' t I i / n ) 11 c\rn e- -. P-'1.[ .@: bu(t- w,e.{cl szs.'.Js+; eo^\r\ -(r-iti)t i ?'g"{fAffi1,}%p*t o$ (t ,-r. G> p^1^t.tl"4r '. '(ornco[\&I inhLr*Y 't NPc U$,{wra r-\ruar^r\r? ,{. Nrc:Dvc ,te.,;{-{ $-^A*,;k. -a-.;r.;,^*il tw7 t 5t,d+7 -t'*Tz4z ' ?d'ru!w,q,tr*w,*x,& l* ti,h cZ I b"5*; r^sb b r^-- c1^ *Izr-,4" s"^A ,*rd tLc*s 1i. u-in,"-.--. ph^ , 1 ltg|6taL bl,* rt*, s[8)0,,".; albhc + &,R,X +P, a tfrvlAil*,'{ }4kr/rs ,.+ ,o,, *. frMAN. rR Govenktr GARY HERBERT Li?utenanl Govermtr State of Utah Department of Environmental Quality Richard W. Sprott Executive Director DIVISION OF RADIATION CONTROL Dane L. Finerfiock Direrktr MEMORANDUM File -DUSA IUC 05.01.d3 Construction of Cell 4A DaveRuppT DATE:November 29,2007 SUBJECT: Denison Mines (DUSA) White Mesa Uranium Mill Cell 4A Relining Project: Construction Site Visit, ll-29-07 On November 28,2007 | visited the Cell 4A project site with Harold Roberts of DUSA. The ambient temperature in the cell taken by the contractor was 31o F. However, the wind was strong, so the wind chill correction was to 17'F. The contractor's workers were heavily clothed. They did not install FML during the inspection due to welding difficulties associated with the low temperatures and high wind. The secondary liner looks about 85Vo complete. Photographs of the work are attached to this memo. The work looks behind the current schedule by about l-week. This places liner system completion by December 24,2007 . The lining is only being installed contiguously. I met with Messrs. Roberts and Snyder of DUSA and Mr. Libby of Comanco Construction. We mainly discussed cold-weather welding. The owner, engineer and contractor came to agreement that welding could proceed as long as trial weld seams could appropriately pass tests. This is in accordance with the specification procedure as documented in the attached email. Therefore, it appears construction on the secondary liner will proceed ahead, unless precipitation stops it. Mr. Roberts felt that the geonet probably should not be installed until spring, because it is a silt trap, and would need to be removed and cleaned prior to upper FML installation, and not worth the risk to install now. Therefore, I expect the project to be shut down once the secondary is completed and anchor trenches are ballasted about December 24,2007 , barring snow and ice conditions causing earlier shutdown. l(r8Northlt)50West.P0 lloxl44850.SaltLakc('ity.tlT84ll44850.phonc{t{01)5-16-.11-50.lax(801)533-4091 T. t). D. (80 I ) 5ll6-4.1 I 4 . rtt'tt'.de q. u tu h. gr t Denison Mines (DUSA) White Mesa Uranium Mill Cell 4,A, Relining Project: Construction Site Visit Wednesday, November 29, 2007 Page 2 Last month Mr. Libby was concerned that if there were any significant rain, that the unlined sump area would be flooded. DUSA has now furnished a faster pump. -END- Enclosures: Photographs Email Printout F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos\Drupp Insp I 1-28-07\Site Visil I 1-28-07.doc DUSA Cell 4A Construction ll 128 12007; Secondary Liner Installation West to East View: Sec. Liner. Patches along frmr temperature joint. Along south dike. Note LDS pipe trench at toe of slope. Along west dike. Note LDS pipe trench at toe of slope as well. Ready LDS sump to use for dewatering pond with pump and pipe. ine view from N dike. LDS drain spine view towards S.W. corner. GCL lain down ahead of FML. Temp 31oF. With hard wind adj. for chill 17oF. Masked worker walking on extended unhydrated GCL. Warming patch surfaces with flare heater without extrusion material. Heavily sampled "3-way'Junction area. To be patched. Typical seaming issues passing through LDS collection trench "bone." GCL passage on LDS collection trench. See green towing strip at left. Initial deployed GCL spanning LDS collection trench. GCL preceding FML. FML edge ballasted with sandbags. Working standing on deploying GCL to act as ballast, preventing wind uplift. Top View N to S View along Eastern area ol-work or.r 11i28'07 about 9 a.nt. Remaining stockpile of FML and Geonet. Page I of 3 Dave Rupp - FW: Denison Mines - Welding Temperatures From: "Harold R. Roberts" To: "'Dave Rupp"' , "'Steve Snyder"' , "'Rich Bartlett"' Date: Ill28l200l 10:43 AM Subject: FW: Denison Mines - Welding Temperatures Dave: See the attached communications from Geosyntec and Comanco regarding cold weather seaming. i:lax:lct R. Roherts Uxccr-rtive Vice Presiclent - l.iS Op*:rations Denison Mines {USA) Coip. t.103) 389-4160 From : GCorco ra n @Geosyntec.com I ma i lto : GCorco ra n @ Geosyntec. com ] Sent: Tuesday, November 27, 2007 B:30 PM To: blibby@comanco.com Cc: j pryor@coma nco.com ; hroberts@den ison m i nes. com ; rba rtlett@den isonm i nes.com ; j herna ndez@coma nco.com ; blu ng @coma nco. com ; BBa rbacane@Geosyntec. com Subject: RE: Denison Mines - Welding Temperatures Brian, Geosyntec takes no exception to demonstrating acceptable welding procedures using the pre- welds test results. I have spoken with Brent Barbacane about this issue earlier tonight and he is aware that pre-weld results will determine whether welding can proceed. Regards, fife://C:\Documents and Settings\Drupp\Local Settings\Temp\XPgrpwise\474D4663EQDOMAINEQRAD... Ill29l20O7 Page 2 of 3 From: Brian Libby [mailto:blibby@comanco.com] Sent: Tuesday, November 27,2007 5:40 PM To: Greg Corcoran Cc: Jerry Pryor; hroberts@denisonmines.com; rbartlett@denisonmines.com; Jose A. Hernandez; Bob Lung; Brent Barbacane Subject: Denison Mines - Welding Temperatures Greg, As your well aware winter and cold weather have finally arrived to the Blanding jobsite. Daily ambient air temperatures have been averaging around 42F degrees during the day and that average temperature is going to slowly drop over the course of the next several weeks and months. With that in mind according to the Spec. Geomembrane Sec 2770, page 02770-8, Section 3.02, Subsection C, Paragraph 3 states: "Geomembrane shall not be placed when the ambient temperature is below 40F degrees or above 122F degrees, as measured in Subpart 3.03.C.3, unless otherwise authorized in writing by the Engineer." Tomorrows daytime high is only going to be around 36F - 38F degrees. lf COMANCO can demonstrate to Geosyntec lnspectors on site, on days below 40F degrees, that the prewelds meet or exceed the spec requirements COMANCO will be able to continue fonvard with this project faster than if we waited for a day above 40F degrees. I am quite sure Geosyntec feels the same way as COMANCO does and that is to do what it takes to get the job done without compromising quality. file://C:\Documents and Settings\Drupp\Local Settings\Temp\XPgrpwise\474D4663EQDOMAINEQRAD... lll29l2O07 Page 3 of 3 Please let me know at your earliest convenience whether COMANCO can proceed under the criteria lined out above. Thank you, COMAATCO ENITTRONTUIEATTAT* CARPOP"AT ZON Brian K. Libby Project Manager 1 135 Terminal Way, Suite 204-A Reno, Nevada 89502 Office (775) 324-7707 Mobile (714) 651-5408 Fax (813) 386-7396 blibblGcomanco. net, roww. comanco , com file://C:\Documents and Settings\Drupp\Local Settings\Temp\XPgrpwise\474D4663EQDOMAINEQRAD... lll291200'7 loN rur. nGrnleN, rn GARY HERBERT I -i?ut?nanl Governor State of Utah Department of Environmental Quality Richard W. Sprott Executive Director DTVISION OF RADIATION CONTROL Dane L. Finerfrock Directttr MEMORANDUM File - DUSA IUC 05.01.d3 Construction of Cell 4A DareRupp %(tn DATE:November 9,2007 SLIBJECT: Denison Mines (DUSA) White Mesa Uranium Mill Cell 4,A. Relining Project: Construction Site Visit, 10-l l-07 On October 31,2001 I visited the Cell 4A project site with David Turk of DUSA and Brian Libby of Comanco Construction. It was dry and the temperature was roughly 65" F. I took numerous photographs pertaining to Cell 4,{ construction work. Removal of obstructing subgrade boulders is nearly complete. The southwest corner sump being excavated has some boulders in it. Some rock excavation equipment was parked in the cell on the east side. The secondary lining work seems to be progressing at half cell width at about 5 panel widths per day, i.e. roughly 110 feet, traveling easterly. If that rate is maintained, the secondary liner should be done in about 24 calendar days, i.e. November 25,2007. The secondary panel installation work is roughly 20Vo complete. The lining is only in one contiguous location. The projected milestones for the project have not changed. All liner installation is to be completion by December ll ,2001 . This would require the geonet and the upper FML to go down much faster than the previous GCL and secondary FML courses. I also visited with Jeffrey Stewart, Geosyntec site manager and Brent Barbacane of Geosyntec, resident inspector. Mr. Stewart shared TRI laboratory data showing that GLC hydration was all above 507o, correlating with the microwave drying and weighing for in-house testing. GeoSyntec continues to keep records of testing and other documents in binders kept locked in their trucks. The subgrade acceptance is the only acceptance document being used to date. Layer acceptance documents envisioned by the contractor, such as GCL, secondary FML, etc. forms have not been implemented. These acceptance forms are not required by the contract documents, with exception of the subgrade acceptance form. 168 North 1950 West. PO Box 144850. Salt L.ake ('ity. LiT 841 l4-4850. phone (801) 536-4250. lax (80t) 533-4097 T. D. D. ( ttO I ) 5 36-44 I 4 . vtu,w. de cl. utu lt. gt n, Denison Mines (DUSA) *n?*"ra Uranium Mill Cell44. Relining Project: Construction Site Visit Wednesday, October 31, 2007 Page 2 Messrs. Turk, Stewart, and I spoke about continuing the project during winter months. Mr. Turk said it was DUSA's intent to press on through the winter as needed. Mr. Stewart said there were industry standard winter construction procedures, but not currently part of the specifications. Later by email on November 5,2007 I requested the approved FML winter construction specifications or the status of such from Steve Snyder of DUSA. Mr. Libby was concerned that if there were any significant rain, that the unlined sump area would be flooded. He felt the pump currently supplied by DUSA would not be able to evacuate the water rapidly enough to avoid creating a problem area. I spoke with Steve Snyder of DUSA regarding this. He had ordered a faster pump, but felt that having the pump on a norrnal delivery schedule was adequate. The GCL seems to be being appropriately covered with geomembrane after watering. The microwave drying tests were being used to verify the installed GCL moisture content prior to covering. The contractor is using 5 men to run the FML down the cell side slopes and the bottom prior to welding. Four welding machines are being used simultaneously. Twenty-two captioned photographs are attached to this memo. -END- Enclosures: Photographs (F:\drupp\Denison Mines\Cell4A\Constr Inspections & Photos\DRupp Insp l0-31-07\*.ppt) F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos\Drupp Insp l0-31-07\Site Visit l0-31-07.doc Photos at Denison Mines White Mesa Uranium Mill 10-3I-07byD.A.R. "-<QrlL +a ) . View of S.W. corner. Note non-liner ramp area in corner. Photo at top of dike of wet clay extracted from sump at S.W. corner. B.Barbacane behind small hydraulic hammer for rocks in sump in S.W. cor. of Cell4A. Note GCL yet to be covered. S.W. cor. Note hydraulic hammer and track hoe at right, digging sump for LDS and Slimes drainage. Random water drops on secondary FML. Welder cleaning underside and top of FML with cloths, prior to welding. Rub sheet being pulled forward under the FML lap to keep welder wheels clean, i.e. off subgrade. ..; 2..r rv -----tJr'=- 'rl( **iF FML welder cleaning ahcad of self-proposellcd wclding machine. Typical FML welder: Dbl weld with air space. I a One of 4 welders on l0l3l/07 S.W. cor C-4A Typ. trapezoidal LDS leeder trench. *-G6," Folded back secondary liner to be placed over hydrated GCL at lelt. --4 -.+ A- &,. { -i'. Another view Backbone underlaid with secondary FML. South dike with LDS collection trench at toe. with "herrins backbone"across Cell. Track hoe digging sump. Previous views seeable. '(\ D. Turk in loreground. Ballasted edge of FML is being used lor cxpansion/contraction joint lbr temperature lbrgiveness. probably until final weld lor secondary liner alon_q that joint. Hisher vier.v taken al*' Same as above. Sand bag ballasted anchor trench. ,o*, )rrMAN,rR(i0r,e mor GARY HERBERT l-ieutenant Goverrutr State of Utah Department of Environmental Quality Richard W. Sprott Executive Direcmr DIVISION OF RADIATION CONTROL Dane L. Finerfrock Director MEMORANDUM File - DUSA IUC 05.01.d3 Construction of Cell 4A, Dave Rupp DATE: October 17,2007 SLIBJECT: Denison Mines (DUSA) White Mesa Uranium Mill Cell 44' Relining Project: Construction Site Visit, l0-l l-07 On October 11,2007 I visited the Cell 44. project site with David Turk of DUSA and Brian Libby of Comanco Construction. It was dry and the temperature was roughly 75' F. It had rained the day before. Work may have been delayed that day, due to the rain. I took photographs pertaining to Cell 4A construction work. The obstruction of work progress due to the existence of subgrade boulders is decreasing, but is still occurring at some locations. Difficult excavation of the leak detection system (LDS) collection piping into the subgrade (photo 33) and surface grade excavation (photo 24) illustrate the problem. Boulders are still being broken with a hydraulic hammer, and hauled to Cell 3. The lining installation was started on Oct. 9th. The lining work had been limited to the west dike. A new schedule time-chart for the work dated October 8,2007 is enclosed with this memo. It shows all lining work is projected to be completed by December |J,2001. I discussed some of the science of the GCL hydration with Messrs. Turk and Libby. Mr. Libby felt the extra watering work being required was delaying the project schedule. Later, I mentioned again to both Steve Snyder and David Turk of DUSA my previous concern of allowing low temperature seam welding. Referring to the specifications, Section 2770, paragraph 3.02.C does not allow FML placement below 40'F without authorization in writing by the Engineer. I met Jeffrey Stewart. a site manager with Geosyntec on site. He and Brent Barbacane of Geosyntec are resident inspectors. Mr. Stewart was doing microwave drying and weighrng for in- house testing of wetted GCL clay to determine its moisture content in addition to sending official samples to the TRI lab as required by the specifications. Several iterations of drying were usually 168 North 1950 West. PO Box 144850. Salt lake City. LlT 84! l4-4850. phone (801) 536-4250. fax (801) 533-4091 T.D.D. (80f ) 536-4414. *wv-deq.utah.got' IDenison Mines (DUSA) White Mesa Uranium Mill Cell 44. Relining Project: Construction Site Visit Thursday, October lI, 2007 Page 2 required prior to stabilizing the GCL clay dry weight. He was keeping records of this testing as well as other activities in a loose leaf binder kept in his truck. Mr. Barbacane keeps the remainder of the records similarly in his vehicle. It appears to be the intent of the contractor and engineer to share certificates of acceptance for all the liner layers, such as the subgrade, GCL, secondary liners, etc. It was noted that the subgrade was being pre-moistened, l-day or less prior to installation, although it had rained the previous day, per the intent of the specifications. The GCL woven side was being correctly placed at the top. No cans were being used to measure the depth of the water application on the side slopes. GCL samples were being taken by the engineer and tested for moisture content at a rate of about 1 per 100 feet square. The GCL seemed to be being appropriately covered with geomembrane, prior to 2-hours after watering. The microwave drying tests were being used to verify the installed GCL moisture content prior to covering. Comanco was cutting out the surfaced remains of the previous synthetic liner material used for the former Cell 4. The anchor trench depth has been increased to 2.5 feet. Ballast bags will not be left and backfilled in the anchor trench. Thirty-four photographs are attached to this memo. In photo 25 the constructed angle in the western LDS collection trench at the toe of the west dike is not obvious on the plans, but is implicit in the approved design, similar to the design requirement of a22.5" bend used in a rib of a herringbone collection trench shown in photo 34. -END- Enclosures: Updated time chart for construction. Photographs (F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos\DRupp Insp 10-11-07\*.ppt) F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos\Drupp Insp l0-l l-07\Site Visit l0-l l-07.doc oo =z .)a6 0E SgEE;1i= =,1 = o E==f- f6'6ir g> =o -* $E f, o- s * 5 i-s i ; a $ i i e,i'a $ $f i E " H'fi g in s;:P Fgig ;;iETIi! gE i.A r E i,F= H Boq N o * r'i N d l, I a y i E g N N - -.jo-o. a a q ; e a ; q ; ; d o e q e a o e Ej,ol irigi{Fss E :$f Fjifid 3 * H E g e * i isa e g e s $ d e g = ; {=qEir355l1,:iEiirsdEE*ig; L \ IJ I I \t !$'{ A R,\ oi- o I I S L)o! (D L)?- ID o O o ooFt +,oo 5F o!, UOoHa.(DBoFn oli O) g V)oo o.F't 7 !' ooo,t 3 a4ai.)ri * r..> 5!l(" ='B6 ox,q ED]o {t}= p 0a!) 6o o ort oq a fta ^u o OFts oOo6Hs NJ(i F) oo+ oo. o o F:O (!o og O) (D oa zo (Da .) F) (D (Do o !^ oI o t) a|oo q JDootr FD a -oo o:r z oq c) o. A)oa 9ft 'J trJ()o CD Io ()n(D q .DIa { o ,( o oo Ol o!0 o)o.)o @o o o I O!g o (D !Da !o o E oo rE o 0aq {a 'd o t ct .) oo E) o- o o- !) 7- oo a o .) 0a !J() .} o :. a oo 'd .D o c- x-.D le a .D >1 I(D o- oc!l .0I UA o- 0c o ,:. .D .D .)- o-*(} c cI .DI o->io NV I 7 o .0 o.(! z o o p-.)I ":.17-:aD (Do-, () o o- c !" f-- t rl a 0a f)7- oo o.- .0 '6!, .D o .) .oo- lio.o-.D .Do- d- .0 o- "o'doI o- N o ntoido a \] ,J,1aD a c- rJa Da a ^aa ; an a a o p Ia, D oe. a -ara D1a a o.) a ?. - E a a- oa - IJ p =C ,o -tc -lJ a- -5 aaL oo D a: C a .- a fI. - a NPbo i!v5"!o.Ora =6-(DBob- 5'ts500 o o,t oa o'B !)o(D (D o o +ot I ID @*o'H r$t ta*o)v.)NJE' u) O)6z OI =5(iroo oq3a'D) adE)0c@q oo,l @a o't A' o (D o oFnq I IA A) a NJf.) oo ots on tq Io o) Eo ? o (!n o oaj d D) F)q r+ ru o N)I oo7l oXo!o !0 V)lno B (DBo oo 5 N)!^ (Dn (D z o ooa tpo A)oa(D o. () o NJ9 (D (D In o.o o (! o tJ )-t o 0a o E o a 0a+!o o (A =o I (D4 E)B(D F) ri)oo s P =oLr N)O@o' =. oa qe<a Nono .D 0q DOo"(D oHoo) (Do. Ioo s o.oo- tJ E]IoD o d o..D .! 7i .Dr) o o o .D o o I ; U) o- o .} .0 .D-- D)ot o .D o :- ? a a ,d o- o'oat a-I rD-z .D- .D p- .D oIoI o !.J I.D D-o' o I (}o o.) o o-.D .Do qI a o : L Ca -o q a , .la ! a t :- 't. =_a o a - a -' './. IJIJ aL I,I f u .l)- ;' '' ^ia'lf ' :**- "-r !. ..' -... roN M. flMAN, rR GARY HERBERT Lieutenant Governor State of Utah Department of Environmental Quality Richard W. Sprott Executive Direttor DTVISION OF RADIATION CONTROL Dane L. Finerfrock Direttor TO: FROM: DATE: File - DUSA IUC 05.01.d3 Construction of Cell 44, MEMORANDUM ltn Dave Rupp October I,2OO7 SUBJECT: Denison Mines (DUSA) White Mesa Uranium Mill Cell4,A. Relining Project: Construction Site Visit Tuesday, August 28, 2007 On August 28,2007 I visited the Cell 44' project site with David Turk, RSO for DUSA. It was dry and warrn at the site on August 28,2007. The temperature seemed roughly high 80's to 90- degrees F. However, the work was shut down due to a few days of rain before this. Enroute to Moab the day before, I experienced brief deluges of rain. I understand from Greg Corcoran of Geosyntec, that when any significant storm occurs, the project work is usually shut down until the next day, due to muddy conditions at the site. I took 58 total photographs of Cell 4A, the other cells and White Mesa Uranium Mill area. Seventeen of those photos are attached to this memo. Significantly, the photos show that in Cell 4,A, numerous boulders are being surfaced by the grading process. This is increasing the work time on the excavation portion of the project. Concurrent to this site visit, I also did an inspection of the Storm Water Best Management Practices Plan. So, most of the balance of the photos taken that day correspond to the storm water inspection work. I met briefly with Steve Snyder, Project Engineering Manager for DUSA. He mentioned that DUSA's plan is to maintain the original design lines and grades for the project. The boulders are to be broken with a hydraulic hammer, and be hauled it away. Also, he felt that work on the GCL installation would be quite easy, as they could directly spray the GCL after installation. 168 North 1950 West . P0 Box 144850 . Salt t-ake City, UT 841 l4-4850 . phone (801 ) 536-4250 . fax (801) 533-4097 T.D.D. (801) 536-4414 . www.deq.utaltgov Denison Mines (DUSA) # Mesa Uranium Mill Cell 4,A' Relining Project: Construction Site Visit Tuesday, August 28, 2007 Page 2 I discussed some of the science of the GCL design with Steve. He seemed interested. I also mentioned to him, and later to Harold Roberts by telephone, that my main concern on the project is that since the project has been delayed, low temperatures may be allowed during liner seam welding. There could be pressure by DUSA for FML liner seaming to occur at low temperatures, and then the resultant seams possibly being of low quality. Forcing seaming work to occur at low temperatures is not a desirable course of action for DUSA to take. Steve Snyder mentioned that the concrete spillway is subcontracted, and so would probably be constructed in December 2007. Dave Turk was not aware of the status of the GCL hydration testing. I noted that Brent Barbacane of Geosyntec is one of the resident inspectors. He was interacting with Dave Turk and another DUSA employee regarding the construction. Enclosures: Photographs (F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos\DRupp Insp 08-28-07) F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos\Drupp Insp 08-28-07\Site Visit 08-28-07.doc '.:ii?r#ffi !'#"qffii:H::LYffi:1i,Y',', Tuesday, August 28, 2007 Note: The following 17 of the original 58 Photographs from this day on site have been sorted, to eliminate Storm Water Best Management Practices Plan inspection related photos. Those photos may be seen in the C4A view base rock in SW corner C4A S dike base mostly cleared of rock SE view 08-28-07 N dike looking east, note puddles. Note FML at top. Former FML perhaps See base stone heaviest (West side). View to the East 08-28-07 SW corner, see pump box Excess rock for remvl, SW corner. NW View cocked rock & puddlesjpg Rock rmvd along toe, So. Dike. Fill area on bottom, East side. Note Addnl Fill material, same as above. Page 7 Note Wet Floor 08-28-07, rain occurred both of 2-days previous to photo. Looking Swjpg GCL test pad 08-28-07 jpe JoNM.*MAN,rR. Govemor GARY HERBERT Lieutenant Governor ',1r _'.J\,tt\ DJ -.r' State of Utah Department of Environmental QualitY Dianne R. Nielson, Ph'D' Executive Director DIVISION OFRADIATION CONTROL Dane L. Finerfrock Direcor September 28,2007 Mr. Harold R. Roberts Executive Vice President - U.S. Operations Denison Mines (USA) Corporation (DUSA) 1050 Seventeenth Street Denver, CO 80265 Dear Mr. Roberts: Subject:June 25,2007 Division of Radiation Control, DUSA Cell4,{ Relining Project Design Approval; August 31,}(fJ? Geosyntec Consultants, GCL Liner Hydration Demonstration t*i* Reportiithproposed GCL Hydration Plan Modifications; September 18,2007 DRC Request for Addiiional Information; September 20,2007 Geosyntec consultanls, GCL Hydration Demonstration, Response to DRC Request for Information; September 26,20W DRC Email Requesting Revised Specifications; September 27 ,2007 Geosyntec Consultants, Revised TectrnicA Specifications and CQA Plan for GCL Hydration' Revised GCL Hydration Plan Approval We received a letter report from Geosyntec Consultants dated August 31,2007 - The original goal of the hydration project *u, to determine the duration needed by a flexible membrane liner (FML) covered glosyntt eii. .tuy liner (GCL) in contact with the subgrade on-site, to attain a fresh water pre-hydrated moisture content (M6; ;f uoVo. original estimates were that this MC would be reached between 2 and 6- weeks. This hydration did not occur during 4-week demonstration project. DUSA recognized the test pad study did not leld their desired results, and initiated a laboratory study. This study tested the specific GCi producticetco) to be installed, to determine the product's permeability to acid at the various MCs' The Division of Radiation Control (DRC) responded to the letter report above by letter dated September 18, 2OO7 requesting additional information On Septemb er 20,2007 we received a response letter from Geosyntec Consultants (GSC) to this request' Via this response letter, GSC transmitted u l"tt"t dated September 19, 2007 from John M. Allen of TRI Environmental, and responded to other concerns raised by DRC. The TRI letter conveyed data from acid - fermeability test resuld. DRC's concerns over GCL hydration loses through evaporation and subgrade soil suction were also addressed. ln a telephone conversation on September 21,2007 between Mr. Greg Corcoran of GSC and David Rupp of this office, the matter was furthir discussed. It was noted that 7 57o MC for the GCL yields the lowest acid permeability for the greatest number of pore volumes tested, i.e.2.3 X lO8 cm/sec" and that all the 168 North 1950 west. po Box 1214850. Salt lake City, UT 841 l4-4850. phone (801) 5364250 'fax (801) 533-4097 T.D.D. (801 ) 53 64414' www.deq.umh. gov Mr. Harold Roberts September 28,2007 PageZ pre-hydrated MCs for 50,75, 100 and 1401o MC yielded acid permeability results that were fairly close in magnitude for each pore discharge volume studied. Subsequently several email exchanges occurred, analyzing and agreeing to frequency ofadding waterto the subgrade, the rate of adding water to the GCL, and how to test for final GCL hydration results. DRC requested by email of September 26,20O7 that the specifications be formally revised to reflect the final criteria. On Septemb er 27 ,2007 GSC electronically transmitted revised Technical Specificatiores and Revised Construction Quality Assurance Plan for the Construction of the Cell 4A Lining System both covers dated September 2007 respectively. Individual pages of the specification are now labeled as 27 September 2007 , and individual pages of the quality assurance plan as 07 09 27109:56. These documents revise the required frequency of moistening the subgrade to be the day before GCL placement (to preclude soil suction and mud generation). Fresh water is be added to the GCL at a rate of tl8-inctr prior to being covered by flexible membrane liner (FML) within two hours (to make allowance for evaporation). The target GCL MC is 75Vo. However, test results showing the GCL is hydrated above 50Vo MC are acceptable. Samples of the GCL will be taken at a rate of one sample for every previously specified four destructive secondary FML liner seam samples. This corresponds to about 1 GCL MC being tisted per acre. GCL MC will be determined by a certified laboratory. GCL samples will be taken from the opening through the secondary FML created by the seam sampling cuts. This alternative GCL hydration plan is hereby approved. This alternative method of GCL hydration satisfies the condition four of DRC's Design Approval letter dated June 25,2007 . The remaining conditions remain in force. If you have any questions on the above, please contact Dave Rupp of this office. Sincerely, Director DAR: dr Greg Cocoran, P.8., Geosyntec Consulting Engineers Britt Quinby, P.E., URS Corp. F:\Rad ControlUuC\Cell 4A\GCL Hydration\ GCL Hydr Mod APR Sept 2007 File: IUC 05.01.d3 Cell4A bonstruction Cc: From: Dave RuppTo: hroberts@denisonmines.comDate: 701U2007 9:23 AMSubject: RE: DMC Cell 4A - GCL Hydration Attachments: GCL Hydration Mod APR Sept 2007.doc CC: Greg Corcoran Harold, As I mentioned, in our earlier email, attached is our formal approval letter on the subject. This letter was also sent via fax to DUSA on September 28, 2007 . Please contact me if you have any questions. David A. Rupp, P.E. Utah Division of Radiation Control P. O. Box 144850 Salt Lake City, UT 84114-4850 Telephone (801) 536-4023 Fax (801) 533-4097 Email: drupp@utah.qov >>> Greg Corcoran <GCorcoran@Geosvntec.com> 912712007 11:12 AM >>> Dave, As discussed, please find the revised Technical Specifications and CQA Plan for the DMC Cell 4A project.S These documents rellect the following:1. a required minimum 50% GCL moisture content (not the 75"k as indicated below, in accordance with our discussion on 26 September),2. monitoring of GCL hydration process using small containers to measure water application to the surface of the GCL,3. moisture conditioning ol the subgrade the day prior to GCL deployment to result in a subgrade soil with not more than 1 inch of dry soil thickness at the sudace upon deployment, and4. collection and testing (ASTM D 2216) oI 6-inch, hydrated GCL samples from secondary geomembrane destructive test locations at a frequency of 1 GCL sample per 4 destructive sample locations.S These documents will be distributed to the contractor today and we anticipate starting GCL deployment Friday morning 28 September. Please let us know if you need additional inlormation. Regards, Greg From: Dave Rupp Imailto:drupp@ utah.qovl Sent: Wednesday, September 26,2OO7 9:49 AM To: Greg Corcoran Cc: hroberts@ Subject: RE: DMC Cell 4A - GCL Hydration Greg, 55 Thanks for the email.S There are yet two main items to define.S Will the subgrade normally be moistened one-day ahead, unless the surface is wet already from precipitation, or do you envision scratching the surface down l-inch, and if it is "moist"there not applying any water to the subgrade? 55 The GCL water application rate submitted looks fine.5 We are no longer pursuing the water truck correlation.S However, in order to verify by measurement the MC of the CCL to be 1M'159o, samples of GCL will need to be taken from the FML covered CCL at an interval of I CCL sample per 2,000-feet.5 Removal of GCL coupons will be tiom the FML destructive seam samples which are specified to be taken at 500-foot intervals (Tech Specifications 2770, Section 3.03-J).5 Replacement of the GCL coupons will need to be by an acceptable bentonite paste or other approved method. Please review the above, and call to discuss, if necessary. The specifications will need to be lbrmally revised and approved. Thanks. - - David A. Rupp, P.E. Utah Division of Radiation Control P. O. Box 144850 Salt Lake city, UT 84114-4850 Telephone (801 ) 536-4023 Fax (801) 533-4097 Email: drupp@utah.qov >>> Greg Corcoran <GCorcoran@Geosvntec.com> 9/2512007 5:43 PM >>> Dave, I will be traveling tomorrow to Blanding, UT. You can reach me on my mobile phone at 619.279.6333. My flight leaves at 6:35 am. ln regards to the water truck measurement, although it would be a good check on the amount of water applied, I don - I think that this will iust cloud the data with respect to using this method. Regards, Greg From: Dave Rupp [mailto:drupp @ utah.qovl Sent: Tuesday, September 25,2007 3:51 PM To: Greg Corcoran Cc: hroberts@ denisonmines.com Subject: Re: DMC Cell 4A - GCL Hydration Greg, tn" ,rnorni oi*"i"r applied and would not advise Thanks. I will contact you on your ligures tomorrow. I am here at 6:45 a.m. il you wish to contact me early. After internal meetings, an additional field control measure we need is for the volume of water applied from the water lruck to the GCL area be averaged, as an additional check to the can depth. This volume over the area applied can then be compared to the required application rate, to verify it meets that minimum rate, and then if deficient, necessary additional water can be added. Please include this task to be documented by the field qa/qc manager. - - David A. Rupp, P.E. Utah Division of Radiation Control P. O. Box 144850 Salt Lake City, UT 841 14-4850 Telephone (801 ) 536-4023 Fax (801) 533-4097 Email: drupp@utah.qov >>> Greg Corcoran <GCorcoran@Geosvntec.com>9125/2007 4:19 PM >>> Dave, As we discussed in our phone conversation this afternoon, Geosyntec will require the contractor to moisture condition the subgrade in an area to be covered with GCL the following day. Soil conditions will be moist to no less than 'l inch from the surface (i.e. the top one inch of subgrade soil can be dry). During GCL hydration, Geosyntec will deploy a small can on the surface of the GCL to measure the quantity of water applied to the surface. This testing will be performed at a minimum ol once per acre ol GCL deployed. Subsequent to spraying the GCL surface with water, the contractor will be required to cover the GCL with geomembrane within 2 hours. Based on pan evaporation rates for Mexican Hat, Utah (closest weather station to the site that reports pan evaporation rates), a monthly average of 9.37 inches of pan evaporation occurs in September and a monthly average of 5.52 inches of pan evaporation occurs in October. Using the September pan evaporation value and assuming that evaporation occurs during the approximately 12 hours of daylight and half as much evaporation occurs in the 12 night hours (18 hours of equal evaporation during a single day) and a total of 30 days in July, the estimated pan evaporation rate is approximately 0.017 inches per hour. Over a time period o, 2 hours, a conservative estimate of water volume that could evaporate from free standing water is approximately 0.034 inches. Calculating the amount ol water necessary for the hydration ol 14"/" moisture content GCL, with a mass per unit area of bentonite ol 0.75 lbs/SF (specification requirement), to a moisture content oI 75"/" can be performed as follows: (75"/-147") x 0.75 lbs/SF / 62.4lbslCF water = 0.0073 ft waler = 0.088 inches of water Adding the potential evaporation of 0.034 inches in 2 hours, results in a water application rale ol 0.122 inches or 1/8 inch. The target value will be no less than .1/8 inches, or approximately 3,400 gallons per acre. Please let us know il you need additional information. Regards, Greg Gregory T Corcoran, P.E. Principal Engineer 10875 Rancho Bernardo Road Suite 200 San Diego, California 92078 Phone: 858.674.6559 roNM.,t,r*,r*. Govemor GARY HERBERT Lieutenant Govemor State of Utah Department of Environmental QualitY Dianne R. Nielson, Ph.D. Executive Drector DIVISION OFRADIATION CONTROL Dane L. Finerfrock Director September 18,2007 Mr. Harold R. Roberts Executive Vice President - U.S. Operations Denison Mines (USA) Corporation (DUSA) 1050 Seventeenth Street Denver, CO 80265 Dear Mr. Roberts: Subject:June 25,2007 Division of Radiation Control, DUSA Cell4A Relining Project Design Approval; August 3!,2CfJ7 Geosyntec Consultants, GCL Liner Hydration Demonstration fiiter Report with proposed GCL Hydration Plan Modifications Request for Additional Information On Septemb er 5,2007 we received the subject letter report from Geosyntec Consultants. The original goal of theiydration project was to determine the duration needed by a flexible membrane liner (FML) covered geosynti,etic ctay tiner (GCL) in contact with the subgrade on-site, to attain a moisture content (MC) of iqO,ib. original estimates were that this MC would be reached between 2 and 6-weeks' This hydration did not occur during the recent demonstration project. As a result, additional testing was done in a laboratory, using freshwater pre-hyrated GCLs' Four MCs (50Vo,75Vo, IOOVo and l4Od) of the specified GCL were tested. Permeabilities (K) were determined after passage of various pore discharge volumes from each GCL MC condition. The permeability tests used hydrochloric acid. of these, K was lowest using a pre-hyration condition of 5O7o MC (yieldin gK= 2x 10-e cm/sec) after one- half pore volume. HoweverlKlncreased to 3.0 X l0-8cm/sec after 2__pore_u:lYT9.. Of all the pre- hydration cases tested , the 75Vo MC appeared to produce the lowest K (2.5 X^ l0'" cm/sec) aftet 2 or more plre ,olumes. The l00zo and l40Vo MCcases yielded K values of 3.5 X l0-8 and 4.5 X 10-8 cm/sec, respectively. Thereafter, the GCL at757o MC appears to yield the lowest permeabilities. We note that all ttre VtCs yietaeA permeability results that were fairly close in magnitude for each pore discharge volume studied. Via the subject letter report, Geosyntec recommends that the specified Cetco Bentomat ST geosynthetic clay liner (CCl), be hyirated to aminimumof 507b moisture content (MC), prior to covering with the ReiiUte membrane liner (FML). However, we note that the 75VoMC, rather than the 50VoMC recommended by the consultant, appears to be the most desirable for longest term lowest permeability for 168 North 1950 West . pO Box lrt4850 . Satt Lake City, UT 841 144850 . phone (801 ) 5364250 ' fax (801) 533-4097 T.D.D. (801) 5364414 ' www.deq.utah.Sov Mr. Harold Roberts September 18,2007 Page2 the maximum tested number of pore volumes (7). In the report, the graph in Attachment C' Figure 4 shows that after numerous (18) tests, the permeability at 7-pore volumgg appears to be stabilized at roughly 1'5 X iiii .Jr.. for rhe 75E; MC GCL, ttre lowest permeability for all the MCs tested. why this MC appears to be the most robust, having the lowest permeability performance than the o.iginurry .p".i'fiLd PiOVoMCis unknown. However, the actual specified cetco GCL material was not "^i".i*"*rd with in the literature used by DRC and uRS to specify the requirement of 1407o MC. From the results of the field test FD-3, we also have concerns in the ability of the GCL to attain this MC, simply by applying only the balance of water needed (as if the GCL will absorb it all), to attain the target MC' Therefore, we request that: 1. The specifications be revised for wetting and covering the GCL with the FML expeditiously to avoid evaPoration losses' 2. consideration be giren to adjusting the amount of water to be used to hydrate the GCL and subgrade, consia#ng evapoiationis noted above, as well as subgrade soil suction' per the enclosed article by D-aniel, Shan and Anderson.l In the FD-3 demonstration, water losses (using the direct waterini method to the GCL) appear to have been experienced, i.e. the hydration may have been lower tian anticipated, from the amount of water added. Also, in the FD-3 field test, the subgrade appears it may have been pre-hydrated as well, from the effects of pre-hydrating the subgrade in the FD-2 field test' 3. As per item 7 of our email to Greg Corcoran of Geosyntec from Loren Morton of DRC dated September 4, ZOO1,please provide the lab data used in making the permeability vs. time and pore ,oiu*" graphs for the four MCs tested. Any additional completed lab data since the report submission is also requested' please review the above cornrnents, and submit a written response. If you have any questions on the above, please contact me. l*;/" David A. RupP, P.E. Geotechnical Services Section LBM/DAR: dr Enclosure: Copy of Email Exchange (dated 4 and 6 Sept. 2007) Footnoted Article Cc:Greg Cocoran, P.8., Geosyntec Consulting Engineers Britt Quinby, P.E', URS CorP' F:\Rad ControlVUC\Cell 4A\GCL Hydration Mod Cmt Sept 2007 File: IUC 05.01.d3 Cell 44 Construction r Daniel, Shan, and Anderson ( lgg3). 'Effects of Partial wetting on the Performance of the Bentonite component of a Geosynthetic Clay Liner." Indusuial Fabrics Association International, Vol' 3' pp' 1483-1496' pn1t2O,}i) Dave Rupp - RE: Deniion Mines (USA)Corp - White Mes_a MillCell44 - GCL Hydration From: To: Date: Subject: Attachments: Greg Corcoran <GCorcoran @Geosyntec.com> Loren Morton <lmorton@ utah.gov> 911712007 9:29 AM RE: Denison Mines (USA) Corp - White Mesa MillCell44 - GCL Hydration Moisture Content Summary.pdf "hroberts@denisonmines.com" <hroberts@denisonmines.com>, Dane Finerfrock...CC: Loren, Please find the attached table summarizing the moisture content test data. Also, TRI is stillworking on the final reports. Regards, Greg -----Original Message----- : Loren Morton [mailto:lmorton@utah.gov] uesday, September 04,2007 4:33 PM To: G Corcoran Cc:@denisonmines.com; Dane Finerfrock; Dean Henderson; Dave Rupp Subject:: Denison Mines (USA) Corp - White Mesa Mill Cell4A - GCL Hydration Greg, Thanks for the 1/07 letter report on the GCL hydration test pad. Unfortunately, Dave Rupp is out of the ollice on the remainder of the week, but will be in the office on Monday, September 10. ln order to keep the moving forward, I looked over your 8131107 letter report and have a few can resolve during Dave's absence. When Dave returns, lwillask him toquestions, that pe review your 8131lO7 and respond back to you ASAP, if he has anything else to add. ln the meantime, here are issues that need to be clarified and/or resolved: 1. Field Demonstrations 2 and 3 D-2 and 3): Timing of HDPE Placement - please provide the amount of time that passed between of water to the soilfoundation and/ or GCL, and the time HDPE for field demonstrations FD-2 and FD-3.cover was fixed in place on the test 2. Confusion in Sample ldentifications:ec Report, Appendix B - in the description of the testing 1,2, and 3 (FD-1 thru FD-3), the Geosyntec report )pp.and samples collected for Field DemonstraN 3-4) lists the total numbers of samples during each phase of the field demonstration, but fails to discretely identify each sample collected for phase of the project. This contributes to some confusion for the reviewer. One example of this ion is found in the fieldsheets in Appendix Bm where there are two different sets of GCL named GCL-1 thru 6. One set of samples was collected on May 24, and the second set collected confusion. July 17. Please explain and eliminate this 3. Missing Field Sheets and Lab Results: Soil Moisture Attachment B for the initial moisture content samples lor (FD-1) - no field sheets were provided in pad foundation soils for Field Demonstation FD-1, i.e., soil samples SMC-I ,2, ot 3.were there lab results provided for these samples in Attachment C. Although reference is made on of the Geosyntec report to these data, review of Attachment C shows only a 611107 TR|/Envrionmental summary and transmittal sheet. No lab test results were included. Please provide both the fieldsheet(s samples SMC-1 thru SMC-3. the complete lab results for soil li o=ro?r*ArroN SUMMARY OF LABORATORY MOISTURE CONTENTS DENISON MINES CORPORATION WHITE MESA MILL, CELL 4A BLANDING, UTAH Date Sampled Date Tested Moisture Content Description =ield Demonstration -l SMC-1 SMC-2 SMC-3 5t24t2007 61112007 13.4% 11.2% 12.3% Soil samples obtained from the top 3 inches of subgrade prior to the GCL lnstallation. Average | 12.3% GCL.1 GCL-2 GCL.3 GCL-4 GCL-5 GCL-6 5t24t2007 6t1t2007 16.8% 13.0% 14.4% 11.6% 13.1% 15.0% 12-inch square samples of the GCL in its dry state. Average | 14.0% l GCL-7 GCL-8 GCL-9 GCL-10 3CL-11jCL-12 61112007 61712007 23.8% 26.7% 21.9% 23.6% 20.7% 2O.OYo 12-inch square samples of the GCL after one week. Average/22.8% GCL-13 3CL-14 3CL-15 SCL-16 3CL-17 3CL-18 61712007 6t1312007 24.4o/o 27.7% 28.0% 26.6% 24.7o/o 26.7% 12-inch square samples of the GCL after two weeks. Averagel 26.4% Field Demonstration -2 S1 S2 S3 711012007 711612007 19.4% 33.8% 24.1o/o Soil Samples obtained from the top 3 inches of subgrade prior to the GCL lnstallation. Averagel 2s.8% GCL-1 GCL-2 GCL-3 GCL.4 GCL-5 GCL-6 7t17t2007 712012007 25.7% 25.5% 30.8% 24.5o/o 23.6% 25.90/, l2-inch square samples of the GCL after one week. Averagel 26.00/, I Field Demonstation -3 GCL-1OO GCL-101 3CL-102 3CL-103 3CL-104 3CL-105 711912007 7t25t2007 89.9% 104.8%o 103.0% 100.0% 86.0% 102.0% 12-inch square samples of the GCL in the first day. Averaqe 97.6'/0 Moisture Content Summary.xls 911712007 Loren, f have been out of the office until today on e-maiIs. I will answer your questions and am just now catching up below, in red. Please 1et us know if you need additional information. Regards, Greg -Original Message From: Loren Morton [mailto: lmorton@utah. govJ Sent: Tuesday, Sept,ember 04, 2007 4:33 PM To: Greg Corcoran Cc: hroberts@denisonmines. com; Dane Finerfrock; Dean Henderson; Rupp Subject: Re: Denison Mines (USA) Corp White Mesa Mil1 Ce11 4A Hydration Dave GCL Greg, Thanks for the 8/31/07 letter report on the GCL hydration test pad. Unfortunately, Dave Rupp is out of the office on vacation for the remainder of the week, but will be in the office on Monday, Sept.ember 10. In order to keep the project moving forward, I looked over your file://C:\Documents and Settings\Drupp\Local Settings\TempU(Pgrpwise\46E03D5FEQDOMAINEQRADl... 911012007 Page 2 of ,7' I /31/ 07 letter report and have a f ew quest.ions, that perhaps you can resolve during Dave's absence. When Dave returns, I will ask him to review your 8/31-/07 submittal and respond back to you ASAP, if he has anyt,hing else to add. In the meantime, here are some issues that need t.o be clari f ied and/ or resolved: l-. Field Demonstrations 2 and 3 (FD-2 and 3 ) : Timing of HDPE Placement please provide the amount of time that passed between application of water to the soil foundation and/ or GCL, and the time HDPE cover was fixed in place on the test pad for field demonstrations FD-2 and FD-3. FD-2 allowed for approximately 30 minutes of t.ime for the water to soak into the subgrade prior to placement of the GCL on the subgrade. Once the GCL was in position, the HDPE geomembrane was pu11ed over top of the GCL and t.he 3 shallow anchor trenches were backfilled. This process took approximately 15 minutes to complete. FD-3 entailed placing the GCL on the subgrade then wetting the surface of the GCL by directly spraying from the water t.ruck. Upon complet ion of the GCL wetti.g, the HDPE geomembrane was pulled over the GCL (within approximately 1-5 minut.es ) and the shallow anchor trenches were backfilled. 2. Confusion in Sample Identifications: Geosyntec Report, Appendix B in the description of the testing and samples collected for Field Demonstrations L, 2, and 3 (FD-1 thru FD-3), the Geosyntec report )pp. 3-4) lists the total numbers of samples collected during each phase of the field demonstration, but fails to discretely identify each sample collected for each phase of the project. This contribut.es to some confusion f or the reviewer. One example of this confustion is found in the fieldsheets in Appendix Bm where there are Lwo different sets of GCL samples both named GCL-1 thru 6. One set of samples was collected on May 24, and t.he second set. collected on ,Ju1y 1,7 . Please explain and eliminate t.his confusion. We will prepare a table of the 1ab data in an effort to eliminate this confusion. file://C:\Documents and Settings\Drupp\Local Settings\TempU(Pgrpwise\46E03D5FEQDOMAINEQRAD1... 911012007 Page 3 of7 3. Missing Field Sheets and Lab Results: Soil Moisture Content (FD- l- ) no field sheets were provided in Attachment B for the initial moisture content samples for the test pad foundation soils for Field Demonstation FD-1, i .e. , soil samples SMC-1, 2 , or 3 . Neither were t.here lab results provided for t.hese samples in Attachment C. Although reference is made on page 5 of the Geosyntec report to thesedata, review of Attachment. C shows only a 6/L/07 TRI/Envrionmental Inc. summary and transmittal sheet.. No 1ab test results were included. Please provide both the fieldsheeL(s) and the complete labresults for soil samples SMC-1 thru SMC-3. We will inquire with the laboratory to obtain the actual lab dat.a sheets for t.he t.esting. 4. Missing Field Sheets and Lab Results: Soil Moisture Content (FD- 2) the Geosyntec report (p. 3) refers to soil moisture content samples and test.s conducted f or Field Demonstrat.ion FD-2. These samples were collected from the soil foundat.ion before installation of t.he second GCL . However, rro f ield sheets f or these samples are f ound in Att.achment B. Neither are there any 1ab result.s f or these samples found in Attachment C. Please provide the missing records . We will inquire with the laboratory to obtain the actual lab data sheets f or the test.ing. 5. Missing Bentonite Mass per Unit Area Tests (FD-3) the Geosyntec report (p.4 ) says that both moisture content (ASTM D 221,6 ) and bent.onite mass per unit area (ASTM D 5993 ) t.ests were run on the GCL samples f rom Field Demonstration 3 (FD-3 ) . In Att.achment C results for both of these tests are found for samples GCL-1 thru L2. However, Do bentonite mass per unit area tests (ASTM D 5993 ) result.s are found for remainj-ng GCL samples. Please provide the missing Iab results, or explain why such tests are not necessary. Moisture content of the GCL was the primary obj ective of t.he lab testing. Initially, mass per unit area and moisture content were tested. However, mass per unit area testing was dropped. FD-3 samples were tested for moisture content on1y. file://C:\Documents and Settings\Drupp\Local Settings\TempU(Pgrpwise\46E03D5FEQDOMAINEQRAD1... 911012007 Page 4 of J' 6. Additional 'Justif ication for Type of Acid Used in Lab Permeability Tests Attachment C of the B/31/07 Geosyntec letter report i-ncludes a 8 / 31, / 07 laboratory report f rom TRI /Environmental Inc. (letter by,John M. Allen t.o Gregory T. Corcoran, 5 pp.) which shows that a hydrochloric (HC1) acid solution was used in the laboratory permeability testing of the GCL material. Please provide additional justification for why use of this acid is representative, or conservative of the sulfuric acid solutions that will be present in Ce1l 4A. The use of hydrochloric acid is consistent with the testing cited in the interrogatories (Ruhl and Daniel, see attached) and the basis of the original i-409." moisture content value selected by UDEQ. 7 . GCL Permeability Test Results Needed regarding the permeability performance graphs of the GCL in the presence of HC1 acid (Figures 1 thru 8) in the 8/3!/07 laboratory report from TRI/Environmental (letter report f rom ,fohn M. A11en t.o Gregory T . Corcoran) , please provide the testing results found in each of the graphs, i. e. , permeability test results and corresponding time, and pore volumes. Testing results will be reported in accordance with t.he ASTM test method procedures. As this t.esting is still on-going, final lab results are not yet available. However, given the travel time, the long term result.s are not critical and we are reporting the early dat.a to justify the moist.ure content of the GCL to perform in acidic conditions. 8. Justificat.ion for Porosity and Pore Volume Calculations please provide explanation and j usti f icat.ion f or : a) Use of a 75% porosity for the bentonite material in the pore volume calculation. Please explain if this value represents the total or effective porosity of the bentonite. If t,his value represents the tot.al porosity, please justify why this value is representative of f ield conditions, and Foose, et. al . see at.tached, Table L, page 327 b) The calculated pore volume by Geosyntec (0.57 ml) is inconsist.ent with the pore volume reported by the testing laboratory, TRI/Environmental (0.50 ml) . Please explain and justify the file://C:\Documents and Settings\Drupp\Local Settings\TempUGgrpwise\46E03DsFEQDOMAINEQRADl... 911012007 , di f f erences in t.he two di f f erent values reported. Geosyntec nominal thickness of 0.3 inches (0.762 cm) , a unit area of 1 the porosity of 0.75 to estimate the pore volume of 0.57 mL. data is estimated until completion of the actual tests when thicknesses can be measured. Page 5 of7 used a cm2 , and The TRI the 9. Additional Justification for Travel Time Based on GCL Permeability at 0.5 Pore Volume the travel time calculation (L37 years) for one-ha1f of a pore volume of HC1 fluid to pass t.hru the GCL (Geosyntec report, F. 7) is based on a 1ab permeability characteristic for a GCL pre-wetted with deionized water to 508 moisture content (before application of the HCl acid) . From thepermeability behavior shown in Figure 2 of the 8/31/07 TRI /Environmental fnc report, it is clear that: 1) the GCL permeability under these conditions continues to increase with subsequent. pore volumes, and 2) the GCL permeability does not reach a st.eady-statecondition until after 10 pore volumes of exposure to the HCl acid. Given the fact that the tailings will be permanently disposed of in Ce11 4A, please explain and justify why a permeability value from anearly time of exposure (0.5 pore volume) should be consideredrepresentative of long-term GCL performance. The operat.ing conditions related to Ce11 4A are such that the head above the GCL isvery small (based on ALR calculations at fu11 depth of cel1). Theseconditions are anticipated to last several years, dt which time the ce11 will begin to be drained. Based on previous estimates for the drainage time, the head above the primary liner in the cell will decrease rapidly within a f ew years of st.arting the draining process, thereby further decreasing the head above the secondary geomembrane and the underlying GCL. Based on the results of the laboratorytesting, if the cell were to be operated in a fu11 liquid conditionfor 100 years (very unlikely), the GCL would experience less than l,pore volume of pH l- liquid migration into the GCL. If you have questions regarding any of these findings, please call me at, 801--536-4262. Thanks, tile://C:\Documents and Settings\Drupp\Local Settings\TempU(Pgrpwise\46E03D5FEQDOMAINEQRAD1... 911012007 Pa$e 6ofJ ' Loren Morton utah Division of Radiation Control Phone 801--536- 4262 Fax 8 01-- 533 -4097 Email lmorton@utah. gov Dane, fn accordance with Utah Department of Environmental Quality Design Approval letter dated 25 ,June 2007, on behal f of Denison Mines (USA) Corp (DMC) , Geosyntec is submitting the attached GCL Hydration letter report for the DMC White Mesa Mill CelI 4A construction proj ect . Please let us know if you need additional inf ormat.ion. Regards, Greg Gregory T Corcoran, P. E. file://C:\Documents and Settings\Drupp\Local Settings\TempU(Pgrpwise\46E03D5FEQDOMAINEQRAD1... 911012007 | " ?r, *;, Vol.i, fi". l4?"3'tLQL. ' Q 3, I^As.rl.r^,1 A s so"l o-.1, -h f:FAr) 34s CeJa,- S+., S"ltl 8co, S+. ?,*,1, Mv ssro r EFFECTS OF PARTIAL WETTING ON THE PERFORMANCE OF TI{E BENTONITE COMPONENT OF A GEOSYNTT{ETIC CLAY LINER D. E. DANIEL AND H. Y. SHAN THE I.JNIVERSITY OF TEXAS DEPARTMENT OF CTUL ENGINEERING AUSTIN, TX 78712 J. D. ANDERSON GUNDLE LINING SYSTEMS, INC. 19103 GUNDLE ROAD HOUSTON, TX 77073 ABSTRACT The bentonite component of samples of a geosynthetic clay liner (GCL) was moistened under controlled conditions. Three separate items were investigated: soil suction or soil water potential, permeability to hydrocarbons, and shear strength. The first two interrelate to the ability of the GCL to act as a barrier to hydrocarbons while the shear strength is a more general issue. The water content of the bentonite stabilized in I to 3 weeks at 504o when the soil suction was 15 bars and lNVo for a soil suction of I bar. Ttre_lon&term shear strength of the bentoni-te.was insensitive to Water content for water contents 2 50Vo. When the water content was ( 50Vo, the bentonite was very penneable to hydrocarbons (permeability = lO-7 m/s), but when the water content was ) lO0?o, the permeability was very low (< 10-11 m/s). INTRODUCTION Geosynthetic clay liners (GCL's) consist of a layer of clay (typically sodium bentonite) sandwiched between two geotextiles or attached with an adhesive to a geomembrane. The bentonite in the manufactured GCL's is essentially dry (water content = 15 to 20Vo). Dry bentonite is strong, but bentonite saturated with water has very low shear strength. For example, Shan and Daniel (1991) report that the angle of internal friction (Q) for dry, unreinforced bentonite in a GCL is about 30o, but for water-saturated bentonite Q drops to approximately l0o. Shan and Daniel (1991) also demonstrated that dry bentonite in a GCL does not hydrate and achieve low permeability when the dry GCL is permeated directly with a concentrated organic liquid. However, Shan and Daniel showed that bentonite hydrated with water can maintain a low permeability to organic liquids for at least several months. Gundsealo (Figure l) consists of a 3.5-mm-thick layer of sodium bentonite mixed with an adhesive and attached to a geomembrane (typically high density polyethylene, or HDPE). The GCL may be installed with the bentonite facing downward as shown in Figure I or upward. If the bentonite faces downward and the GCL is placed on soil, the bentonite will normally absorb moisture from the soil but will not become -fully saturated. The properties of . the partly wetted bentonite areexpected io be intermediate to those of dry and water-saturated bentonite, but no quantitative data were available at the beginning of this study. GCL Figure l. Geosynthetic Clay Liner (GCL) Installed with Bentonite Component Facing Downward. The purpose of this investigation was to determine the effects of partial wetting. of the bentonite do.ironl"r of a GCL 6n: (1) -the shear strength of the..bentonite, and (2) the permeabilitv oi the bentonite to hydrocarbons and common organic solvents. The shear I;;ilth i;ieriranito final cover-systeqs_Iq waste containment units (Koerner and.Daniel, ilt i;A ottir iiiuations in which the GQL. is placed on a permanen.t slope. Permeability-to hvdrocarbons is ritir"nt primarily to liningi - for seconiiary containment struct-ures for il;;t;; hydrocarbon and'chemicil storage ttnkl but in some situations may be relevant to fandfill or inipoundment liners (Daniel and Koerner, 1991). APPROACH TO ASSESSMENT OF WATER CONTENT If the bentonite in a GCL is placed against soil, the bentonite will either absorb water from tt e i"it "iyiita water to the soil, depending on.the r.elative energy of water in the soil and in tt" bentonite. Watei always flows d6wn a gradient in energy, i-e., from higher hydraulic il;;a dt&;tyarioti. head.-The lydraulic heads in unsaturated soils are negative relative to utr*rpnJri. pr,iri*i and are usually giveg names.such as "soil water q9!9nti4j' 'capillary ,iirrdrr," ..slicdon," and others. Tha tErm "suction" (defined as ttt-e negative of the soil water ;;-1!-n;|j una-"iprrir"a i, units of pressure) is used in'this paper. The unit of measure is bar (l bar = I atm = -10 m of water head). Dry bentonite has an extremety neg-ative water potential.. lf tlt bentonite.comp.onent of a GCI- # pt.il,O ,eainit soit, y{e; will ahost always tend to .flow from the soil to the 6"ntonit". ir tne ui"nioniie-in i ccl- is placed in contait with a soil having a.known suction, iti" -uirionite *iii ivintuatty equilibrit" at approximately the same suction as the soil i"rrr"-i,i[ tt i uoiu* of Joit is much larger .t\ari itrat of the bentonitel once the relationshiq between water ront*t and suction is deflned for the bentonite in a GCL, the water content of itr" Uiniorit" pfarcO-againrt soil cgr be predicted from the measured or estimated suction of if,i i"if. The'appiou."n t.t "n in this investigation was to measure_the relationship between water content urla-iu.ti* in the bentonite- component of a GCL with- two independent methods. Eneineers cin determine the equilibrium water content of the bentonite from i;ffiH;r oitirr-i suction in the soil (measrired or estimated) and the water content-suction relationship for the GCL. @ I \\\\\\\\\\\\\\,rrarrlaalarr2a\\\\\\\\\\\\\\,rrrraar))rlflat\\\\\\\\\\\\\araaruaaf?arar?\\\\\\\\\\\\\\, -2 ' ' a a a a , , , , a I a\\\\\\\\\\\\\\,rrrraaaaaaalla\\\\\\\\\\\\\\tt2rtararalaraa\\\\\\\\\\\\\\aaratrrrra/aala lillioSbtut3uD -\'\ \ \ \ \ \ \,rraaall,\\\\\\\\,raatalaa\\\\\\\\,rarrarra\\\\\\\\araalllat\\\\\\\\frrtlaara\\\\\\\\tta?/llrf,\\\\\\\\,tatrataa o ETHOMATERIALS AND M DS Geosynthetic Clay Liner. The GCL used in this investigation was Gundsealo. Standard material with a 0.5 mm (20 ml) thick high density polyethylene (IIDPE) geomembrane and 42 glmT of bentonite was tested. All tests except permeability tests weie performed on the HDPE/bentonite composite. Permeability tests were performed on the bentonite alone; the bentonite layer was carefully separated from the HDPE sheet with a knife for the permeability tests. Water Content Measurements. All water content measurements were performed by drying specimens overnight at I l0'C in accordance with procedures outlined in ASTM D-2216. All water contents reported herein are gravimetric values, i.e., mass of water lost upon drying divided by the oven-dry mass of solids and expressed as a percentage. Soil Suction Measurements. Soil suctions were measured with two techniques. With the first rcchnique, a piece of GCL that measured about 175 by 25 mm was slowly wetted by spraying a known mass of water onto the surface of the bentonite. The moistened GCL was placed in a large test tube with the bentonite facing inward. A thermocouple psychrometer was positioned in the center of the test tube, and the test tube was sealed with a rubber stopper @gure 2). The psychrometers were supplied by Wescor, Inc., and were read with a Keithley microvoltmeter. The test tubes were stored in a heavily insulated container and were read for 2 weeks, at which point equilibrium had been reached. The GCL specimen was then removed and oven dried to determine water content. Rubber Stopper GCL (Bentonite Facing lnward) Test Tube Thermocouple Psychrometer Figure 2. Suction Measurement with Thermocouple Psychrometer. 3 The second method of measurement involved placing 25 mm square pieces of GCLsamples in sealed vessels that contained salt solutioirs wiih known vaior piessures. Test :3ffiffi1tx,1",1'xs1'41ffiT;J:3r:lt,l;:1,flffi*J;t;:"l#i:,x#T,?:x?li,Jl,1 '.r;o The water contents reported h9t9i1 were measured on specimens that had been exposed to thecontrolled vapor pressures for 66 days. Rate of.Wettitlg. To evaluate rate of-wetting, 6 pieges of GCL, each measuring 100 by 25 mm,were placed directly in contact with sand'in 20 L buckets. The sand in dach buct<et waswetted to a different water content. The GCL specimens were buried below about 75 mm of s,and, and every several days a specimen was removed to determine the water content of boththe bentonite and the sand beneath the bentonite. The last (sixth) sample was removed 42 to44 days after each test had begun. ^ ^_- -{ grlln-size disribution curve for the sand, developed with procedures described inASTM D-422, is shown in Figure 3. Salt Solution 0.0218 M NaCl 0.110 M NaCl 0.357 M NaCl 1.13 M NaCl 100 20 Equilibrium Suction (bars) I 5 16 52 80 oii 60 C g40 oo- 0 .01 100.1 Opening Size of Sieve (mm) Figure 3. Grain Size Distribution Curve for Sand. T ,/ ll I JT Direct Shear Tests. Direct shear tests on 60 mm diameter specimens were performed per ASTM D-3080. Samples that were sheared in a dry condition were placed in the shear box, subjected to a normal load, and then sheared. To shear saturated samples, samples of dry GCL were first placed in the direct shear box, subjected to the desired normal load, soaked with water until swelling ceased (= 2 weeks), and then sheared. Partially wetted samples of GCL were moistened to water contents of approximately 507o or L00Vo outside of the shear box, then placed in a shear box, consolidated to the desired normal sEess, and sheared. Two rates of shear were used: 0.26 mm/min (16 mm/hr) and 0.0003 mm/min (0.02 mm/hr). The slow rate was selected to ensure full dissipation of excess pore water pressure generated during shear. (Consolidation rates were determined on separate specimens.) The.jast shear rate is more iypic+! qf s-hparing rates used for geosynthetics interfacial shear tests 1=6*6rir is commoii). - Flilure,was forced thiough-fhe bentonite as close to the center of the bentonite as possible. After shear, the water content of the bentonite was determined. Permeabilitlr. Permeability tests were performed on 100 mm diameter specimens of GCL without the HDPE. Specimens were slowly wetted to a nominal water content of 50?o, l00%a or l25%o and then placed in permeability cells. Tests on dry and water-saturated materials were also performed. The permeameters were equipped with stainless steel and Teflon@ components. Teflon@ sheeting separated the test specimens from the surrounding latex membranes. After the cells were assembled, the chambers were filled with water and the specimens were consolidated to a stress of 14 kPa. Then the organic liquid of interest was infoduced. However, for tests on water-saturated samples, the bentonite was first permeated with tap water and then with the organic liquid. The head of liquid was approximately 300 to 600 mm, and the resulting hydraulic gradient was 80 to 120. The thicknesses of the specimens used for calculating permeability were 3.5,4,0,5.5, 6.0, and 6.5 mm for initial water contents of 17,50,100, 125, and 1457o, respectively. The tests were performed per ASTM D-5084, except that the samples were not back pressured. Testing duration was typically 2 months. The organic liquids used in the investigation were benzene, gasoline, methanol, tert- butylethylether (MTBE), and trichloroethylene. Some of the properties of the liquids used in this study (obtained from the literature) are summarized in Table l. Table l. Typical Properties of Permeant Liquids Dielectric DensityConstant (g/cc) 0.8765 0.68 0.7914 r.4996 I Viscosity (.cP) 0.652 0.43 0.597 0.55 1.002 Liouid Benzene Gasoline Methanol MTBE TCE Water 2.284 32.63 3-.4 81 0I \.,I ,$tt r, ll;.ll RESULTS Water Content - Suction RelationshiB. Table 2 summarizes the warcr content and suction data llfthat were obtained with the thermocouple psychrometer and vapor equilibrium methods. Th; Ilft relationship between water content and suction is plotted in Figure 4. The measured watercontents.ranged ftgT. !7El $rV bentonite) to 145?o (bentonite soaked in warer at acompressive stress of 14 kPa). The suctions ranged from 0 to about 50 bars. Water Content (.Vo\ 1,7 t7 18 24 28 29 3l 46 54 56 66 79 89 96 101 t45 Table 2. Suction (bars) Water Content - Suction Results Method of Measurement (Water Content of GCL as Received) Thermocouple Psychrometer Thermocouple Psychrometer Thermocouple Psychrometer Thermocouple Psychrometer Vapor Equilibrium Thermocouple Psychrometer Thermocouple Psychrometer Vapor Equilibrium Thermocouple Psychrometer Thermocouple Psychrometer Thermocouple Psychrometer Vapor Equilibrium Thermocouple Psychrometer Vapor Equilibrium tDirect Soaking with 14 kPa Compressive Stress ;i 44 49 43 52 25 l4 16 8 7 6 5 4 I 0 ^ Many pgople iue unaccustomed to- dealing with suction values. One or two points of reference-may.pg helpful. One useful reference is 15 bars of suction, which is approximately equal to the wilting point of many plants. Plants can suck water out of unsaturaled soils that have suctions as large as approximately 15 bars. Plants will wilt and die if the soil suction exceeds about 15 bars. If the bentonite in the GCL studied is placed against soil at the wilting pgint (!5 bars of suction),_th9_water content of the bentonite is expecteE to equilibrate at abou"t507o. In all but very arid climates, it is reasonable to assume that the water content of the bentonite will be at least 50Vo if the bentonite is placed against the soil. Moist soils.that support lush ve-getation are likely to have suctions in the range of 0 to Ibar. The equilibrium water content of the bentonite in the GCL placed upon such ioils would be at least IAOVo and probably closer to l4A?o ifthe suction approaches 0. The following table summarizes the practical implications of the test results: (o Soil on Which the GCL is Placed Extremely Dry Soil that Will Not Support Plant Growth (Soil Suction >_15 bars) Damp Soil that Will Support Sparse Growth of Plants (1 bar ( Soil Suction < 15 bars) Moist Soil that Will Support Growth of Lush Vegetation (0 bars < Soil Suction < 1 bar) Wet (Practically Saturated) Soil (Soil Suction = 0) Approximate Water Content (7o) of Bentonite in GCt < SOVo 50Vo - 1007o lNTo - 140Vo > l4OVo 50 a a lo a a a . aa 40 100 125 150 Water Content (%) Figure 4. Relationship between Water Content and Suction for Bentonite in the GCL. Rate of Water Content Change. The water content of the GCL samples placed in contact with sands having various water contents is plotted versus time in Figure 5. Thg gquilibrium-\ilater content ranged from 507o for the driest sand to l9O7o for the wettest sand. Most of the change in water content occurred in less than I week for the wettest sand and less than 2 to 3 weeks for the driest sand. From a practical standpoint, the equilibration time for bentonite placed in contact with soil was I to 3 weeks. a (U -ct co (, -,a 20 10 75 o 200s oEtro Log] o I_ocoo o (U = t5c 100 10 Time (days) Figure 5. Wuer Content Versus Time for Samples of GCL Placed in Contact with Sand at Various Water Contents. Shear -strength. ffr" ,"rutrs. of the direct shear tests are plotted in Figure 6. The shear andnormal stresses at failure, and water contents, are tabulated in Table 3. Ilinear failure inriiopr...hoYL were co-mPuted by Jlgression analysis. Cohesion and friction ingiEs eiJoliated'wltfrthe failure envelopes plotted in Figure 6 arssummarizedin Table 4. El w-l7%, FaatshearA w€0%, Fast ShearI w-SO%, Slow ShearO w-1007o, FastShsarO w-10o%,SlowShearI w-t45%, Slow Shear 20 40 60 80 100 120 140 NormalStress (kpa) 6'g80 ooo!60o o,c'F 40 oEa 20 r r'ari I - 7o/o I 0o/o I I 5%/ / :il Br 3o/o 2% 101 ) 4 .--a Waler to Sand' o Figure 6. Mohr-Coulomb Diagrams for GCL Sheared at Various Water Contents. Table 3. Results of Direct Shear Tests. Conditions at Failure t7 t7 17 t7 t7,17 t7 t7 t7 50 50 50 50 50 50 50 50 s0 s0 r00 100 100 100 100 r00 100 100 r00 100 t45 145 t45 145 t45 17 t7 t7 t7 t7 t7 t7 t7 t7 58 57 58 57 56 38 46 51 46 81.7 82lll 92 94 79 128l0l 96 66'l' Shearing Rate Fast Fast Fast Fast Fast Slow Slow Slow Slow Fast Fast Fast Fast Fast Slow Slow Slow Slow Slow Fast Fast Fast Fast Fast Slow Slow Slow Slow Slow Slow Slow Slow Slow Slow 26.8 37.3 70.1 105 139 27.r 3s.9 71.0 106.2 26.8 37.3 70.t 105 139 26.8 37.3 70.1 r05 139 26.8 37.3 70.1 105 139 26.8 37.3 70.r 105 139 26.8 44.1 61.5 105 139 30.9 37.7 70.2 92.8 1,12 19.1 26.5 36.3 52.9 27.0 33.8 56.2 66.3 87.4 16.8 r7.0 24.5 41.8 23.9 25-.9 23.2 35.0 42.4 47,2 8.4 14.7 t7.o 20.9 23.6, 7.4 13.0 15.5 23.2 25.2 Water Cnntent (7") Nominal After Failure Normal Shearing Stress ftPa) Srress ftPa) Notes:1. Samples were wetted to the approximate desired water content, placed in direct shear box, consolidated under specified normal load, and then sheared.2. Shearing speeds wercO.26 mm/min (fast shear) and 0.0003 mm/min (slow shear). 1 Table 4. Nominal Water Content (7o) t7 17 50 50 100 100, 145 Results of Least Square Linear Regression Analysis; Shearing CohesionSpeed ,. 0<Pa) Fast Slow Fast Slow Fast Slow Slow t3 l0 15 r5 t9 8 5 Friction Angle (Desrees) 36'))2p 27 7 r2 7 9 The rate of shear had an important impact on the test results. For dry material, the angle of internal friction dropped from 36' to 22' when the rate of shear was decreased from 0.26 mm/min to 0.0003 mm/min. However, the most significant conclusion from this work is that for samples sheared slowly, even a slight wetting of the soil causes a significant reduction in the angle of internal friction of the bentoirite. For example, the friction angle for bentonite with a nominal water content of 50Vo was 7", which, within the limits of experimental accuracy, is virtually identical to the value for saturated bentonite (9'). Permeability to Hydrocarbons. Results of the permeability tests are summarized in Table 5. The permeability of the bentonite component of the GCL to hydrocarbons was relatively high (on the or{er of tO7 m/s, which correiponds to l0-5 cm/s) whln the initial water conteni (ws) was 177o or 507o. However, when the water content was increased to l$OVo or greater, the 1 permeability was l0-1lm/s or less. For samplerlmarked "no flow" the permeability i'ecreased roI a value that was too small to measure (< 10-tz m/s). These results are consistent with those -published by Shan and Daniel (1991) and demonstrate that the beneficial effects of hydration of the bentonite occur when the bentonite is less than fully saturated with water. Table 5. Summary of Results of Permeability Tests. Permeabiliry (rn/s) PermeatingLiquid wo = L1?o wo = 50Vo wo = 100?o wo = l|Sflo wo = l45Vo Benzene 3 x 10-7Gasoline 4 x l0-7Methanol 3 x 10-7MTBE 2 x l0'7TCE 4 x l0-5Water 1-2 x 10-11 Zx lO-7 5 x 10-ll No Flow4xl0-7 4x l0-ll NoFlow 3 x 10-7 3 x 10-11 No Flow 3 xlg.7 <l x l0-ll No Flow 4 x l0-7 3 x 10-10 No Flow No Flow No Flow No Flow No Flow No Flow Plots of permeability versus pore volurnes of flow are presented in Figures 7 - 12. lo a E() .= E(Uo E oo- 10'4 10-s. 106 10 -7 10 -8 10 -e Pore Volumes of Flow Figure 7. Coefficient of Permeability Versus Pore Volumes of Flow for Samples of the Bentonite Component of a GCL Permeated with Benzene. 104 0 0 10a El, 10 = 610(1) E 810 ol Bentonlte Prlor b Permeation wilh Chemicat 10 -e 10 Pore Volumes of Flow Figure 8. Coefficient of Permeability Versus Pore Volumes of Flow for Samples of the Bentonite Component of a GCL Permeated with Gasoline. \\, {- 17%# 50o/o -...o_ 17o/o+- 5}o/o --+- 1A0o/o 10-4 10-s 10-7 10'8 10-0 0 246 Pore Volumes of Flow Figure 9. Coefficient of Permeabitity Versus Pore Volumes of Flow for Samples of the . Bentonite Component of a GCL Permeated with Methanol. 10 -1 Aa\Cl-oV .= E(!o'E tio(L 10-6 lrfiTael 2468 Pore Volumes of Flow Figure 10. Coefficient of Permeability le_rsus Pore Volumes of Flow for Samples of the Bentonite Component of a GCL Permeated with MTBE. a E C) E10E(Eo E oo- 10 100 -o- 1l % 50 o/o \u 1 0-4 o E() .= -o(oq) Eoo- 1 0's 10-6 10-7 ol Bentonito Prior lo Permeation with Chemical 10 Pore Volumes of Flow Figure I l. Coefficient of Permeability Versus Pore Volumes of Flow for Samples of the Bentonite Component of a GCL Permeated with Trichloroethylene. 10 -7 o E() =(6o E oo- 10€ 10 -e 10-r001 Pore Volumes of Flow Figure 12. Coefficient of Permeability Versus Pore Volumes of Flow for Samples of the Bentonite Component of a GCL Permeated with Water. 2 \3 .....+- 17% --ts so"h CONCLUSIONS The following conclusions are drawn from the results of tests described in this paper. l, A relationship exists between the equilibrium water content of the bentonite componenr 'of the GCL that was investigated and the soil water potential (soil suction). Dry bentonitein the GCL has a water content of approximately l7Vo. lf the bentonite side of ihe GCL is qlacgd_ag.ainst soil that has a suction of 15 bars (the wilting point of typicat plants) and the GCL is buried beneath cover soil, the bentonite will absorb moisture from the soil andequilibrate at a water content of approximately 50Vo. If the bentonite side of the GCL is glac.ed agq$t moist soil with a suction < 1 bar, the water content of the bentonite is likely to rise to lO0Vo or more. The time required for the bentonite to absorb water and reachqquilibrium is approximately 1 to 3 weeks. ...-.--1--',.--.--'zrW'shear streng!! of the- bentonite compongnt o rUfound to be sensitive to the water content of the bentonite and the rate of sf,ear. For rapid shear of dry bentonite, a friction angle of 36' was measured. For slow shear on- bentonite with a water contenf > 50Vo, friction angles on the order of 10o were measured. solvents was found to be sensitive to the organic liquid was introduced into the test specimens. For dry bentonite and bentonite moistened to a water content of 507o, the permeability to hydrocarbons was re[atively high (on the order of l0-7 m/s or l0-5 cm/s). -When the bentonite was at a warer cohtent of 100?o or greater, the permeability remained low (on the order of l0'11 -/s ot less) for the duration of the tests, which was approximately 2 months. It was noraDl necessary.for the bentonite to be completely saturated with water for it to have a lowt! permeability to hydrocarbons and solvents. ACKNOWLEDGMENTS This research was sponsored by Gundle Lining Systems, Inc., Houston, Texas. The authors thank Mark Cadwallader and Fred Struve of Gundle for their continued support and for their suggestions and insights into issues concerning GCL and related products. I ^ REFERENCES Daniel, D.E., and R.M. Koerner (1991), "Landfill Liners from Top to Bottom," Civil Engrg., 6L(2),46-49. Koemer, R.M., and Daniel, D.E. (1992), "Better Cover tlpr," Civil Engrg.,62(5),55-57. Shan, H. Y., and D. E. Daniel (1991), "Results of Laboratory Tests on a Geotextile/Bentonite Liner Material," Geosynthetics 91, Industrial Fabrics Association International, St. Paul, MN, Vol. 2, pp. 517-535. rcnt of thl C€t to h a;ic water content of the bentonite at the time that ry JON M AN, JR GARY HERBERT Lieutenant Got,ernrtr o HUNTSM Goventor State of Utah Department of Environmental Quality Richard W. Sprott Executive Direttor DIVISION OF RADIATION CONTROL Dane L. Finerfrock Direr:tor TO: FROM: DATE: MEMORANDUM File DaveRuppfu- August 9,2001 SUBJECT: Denison Mines (DUSA) White Mesa Uranium Mill Cell 4A' Relining Project: Construction Site Visit Tuesday, August 7,2001 On August 1,2007 I visited the Cell 44' project site with David Turk, RSO for DUSA. Temperature at the site on 817107 seemed to be cooler than earlier in the cell 4a relining project, roughly high 80's to 9O-degrees F at the time I left at 10:30 a.m. No wind. Recent rains were evidenced by puddles in the region from Green River to Blanding, Utah. I did not observe any rain falling in that region on August 6 or'7 ,2007 . I took 26 photographs of the area, including some misc. photos of the White Mesa Uranium Mill site. These photos are attached to this memo. Also attached to this memo are notes from previous site visits by DRC employees Tom Rushing on July 18, 2007 and Phil Goble on July 26,2007. While on site, I met several individuals: Brent Barbacane, qa manager, and Greg Corcoran, project engineer, both of GeoSyntec Consultants, Brian Libby, project manager for the contractor, Comanco, and Steve Snyder, Project Engineering Manager for DUSA. There are two major construction issues: l. During the cutting the cell to line and grade, the contractor discovered rock outcroppings above the new grades of the cell floor, and to a smaller degree, out of the walls. The possible approaches to solving this problem are resetting the design grade higher and filling with soil to avoid the rock, or using machinery to cut, grind and reduce the outcroppings to the original lines, grades, and sieve size of 0.5-inch diameter. Machinery is to arrive on August 8,2007 and its capability observed. I mentioned to Steve and Greg that if DUSA wished to change the grade on the cell, that we would need to be involved in that decision. It is apparent they hope to maintain the 168 North 1950 West. PO Box 144850. Salt Lake City, UT 841 l4-4850. phone (801) 536-4250. fax (801) 533-4097 T.D.D. (801 ) 536-4414 . u,ww.deq.utah. gov Denison Mines (DUSA) White Mesa Uranium Mill Cell 44. Relining Project: Construction Site Visit Tuesday, August 1,2007 Page 2 same elevations and grades by using the machinery, and thus keep the same volume available for tailings disposal in the cell, rather than use any tailings volume with soil fill. The leak detection system herring bone piping grades also currently interfered in the cell floor by the rock, as this piping is to be placed below the floor grade by l-foot. 2. The other issue is the GCL hydration. The GCL demonstration pad has not yet been successful in hydratingto 1407o by GCL weight. Brent mentioned they had attained l00Vo, but did not seem to be able to rise above it. Earlier, the GCL was replaced as suspected defective material when it did not rapidly hydrate over a few weeks. However, it appears the replaced material has the same problem, even when it is directly hose-hydrated, but still fails to rise to higher percentages of moisture content after being subject to vapor condensation deposited from the FML placed above it. GeoSyntec Consultants intends prepare a report to DRC to discuss the situation using current lab analyses of the GCL, comparing its attained permeability and resistance to acid leach. Brian Libby of Comanco mentioned that their attached construction schedule would probably slide 3-weeks to the right, as shown on the attached bar chart. This would have the subgrade completed by the end of August. I feel that is probably very optimistic given the rocky conditions. Visiting the site was invaluable, opposed to obtaining this information second hand. Enclosures: Photographs F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos Earlier Reports by Tom Rushing and Phil Goble F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos\Site Visit 08-07-07.doc Photographs at White,vt Uranium Mill 08-07-07 by Ouu. nuf Primary shots are of the Cell 4,A. relining project. Photos taken from F:\drupp\Denison Mines\Cell 4A\Constr Inspections & Photos Boneyard 08-07 cl up N ofore stockpile area jpg Cell2 08-07 debris deposit shown on rtjpg Page 1 Page 2 Cell 3 08-07 boneyard deposits & wdo bugsjpg Cell 3 08-07 centerly sect shownjpg Cell3 08-07 most easterly area shown looking southjpg Cell3 08-07 section shownjpg oPage 4 de. Cell 3 08-07 shows debris from boneyard & 4Ajpg l- ,-;.n -:i:t_ r.& Cell 4,{ 08-07 Contr by floor bouldersjpg Cell 4A 08-07 dewater box SW corjpg Cell4A 08-07 DTurk on boulder SWall behindjpg Page 6 Cell4A 08-07 DTurk on dike showing stonejpg Cell4A 08-07 floor stone close-upjpg P4! Cell4A 08-07 floor with constr agoncy groups rt of minorjpg Group on N dike. Cell4,A. 08-07 in se cor looking to sw corjpg Cell4A 08-07 large floor bouldersjpg Cell4A 08-0T looking to nw corner areajpg Page 10wffi Cell4A 08-07 NDike wall stonejpg Cell4.A. 08-07 private south pasture w tumble weedsjpg Page 11 fl.!s;:,-::-"' "r ' '...,-* Cell 4,A' 08-07 reservoir tank fr dewater pump sw cornerjpg Cell4A 08-07 rock in floorjpg u**i r:i""' t Gn-l&ffi .,qqr{.ptlitn. i: " ,r.,&dl 4fr \Q\'.* Cell 4,A 08-07 se cor area on gradejpg Page 13 Cell4A 08-07 view sw cor areajpg €F .*ffi .'i.;"rffi Cell4A 08-07 Windrows of Sq Clods & Sm rockjpg Page L4 Cell4A West Dike 08-07jpg Cell4A with water truck 08-07jpg Page 15 Roberts Pond 08-07 note sediment buildupjpg Quick Check List for Tom Rushing at DUSA: Concernins Cell 4A Relinins Proiect Date & general conditions: 7118107,8:36 A.M., Sunny and Hot (mid 90's .F.) l. Status of the Geosynthetic Clay Liner (GCL) hydration test pad: According to Brian K. Libby, Project Manager, Comanco, Test samples were taken on 7/10/07 and 7/18/07. The 7/10/07 sample failed. The 7/18/07 sample was sent to Geosyntec labs but it was reported that the test would likely also fail. While on site, the Geosyntec Consultants QNQC manager, Brent Barbacane, 8.7., directed the removal of the GCL and top liner for the previous sample try and installed a new GCL under the existing liner. Prior to installing the top liner the GCL was sprayed with 25+ gallons of water. a. Is the test pad located away from the toe of the slope and preclude storm water run-on from effecting the hydration of the test pad? Yes, A photo is attached with the test pad location. b. Last hydration testing results = _7o, or1 _ ,2007 . Hydration tests have failed. No hydration test results were available at the time of the inspection. c. Does the site qa manager have a copy of the Revised GCL Demonstration Work Plan (by GeoSyntec Consultants dated 27 March2007)? Bian Libby reported that he did not have a copy of the work plan in his possession. He reported that a copy of the plan was available locally. 2. Is there a contractor site superintendent on site? The contractor site superintendent was reported to be Rob Richardson. It was reported that he was currently in a bulldozer working on vegetation removal in the cell- 3. Is there a consultant qalqc manager on site? Yes, Brent Barbacane, 8.7., Geosyntec Consultants 4- Does the above superintendent and the qa manager have copies of the approved revised plans, technical specifications, and construction qa plan (by GeoSyntec Consultants dated June 2001)? It was reported that they both had copies of the revised plan located locally but not on site. 5. Please write all your observations and input from others regarding the current construction activities, especially the earthwork processes and soil testing being performed: It was reported that currently the vegetation was being stripped from the cell interior banks. The company will then move to fine grading followed by cut &fill and trenching. A copy of the construction schedule prepared by Comanco was provided (attached.) This schedule includes a run down of the current construction schedule. It was reported that the schedule currently changes every couple of weeks. Updates on the hydration test pad are included in #1. 6. Misc. other observations/conditions: Previous GCL test material, used for first two tests, was removed while on site. 7. Updated construction schedule for GCL and HDPE liner installation. See attached construction schedule. Page I of I White Mesa Cell4 Hydration Pad Test Photo Pages White Mesa Cell4A Relining Project Inspection Date, 7 I l8l 07 Photos Cell4 White Mesa Cell4 Hydration Pad Test Photo Pages WSre: Cell4 Berm, Currently in Process of Vegetation Removal Cell4 Hydration Pad in Pond, Mid Picture White Area White Mesa Cell4 Hydration Pad Test Photo Pages I $HI-'H*d. i--.,-ri ,j:t Cell4 Hydration Test Pad, removal ofprevious failed GCL Install of new GCL under existing cover White Mesa Cell4 Hydration Pad Test Photo Pages Wetting the GCL before reinstalling cover, 25+ gallons of water A :::-?-iI**lbtii':{sEacr*rE-i -+.*ii.-' '#; ^ - -*.* i."Fl Preparing to reinstall cover White Mesa Cell4 Hydration Pad Test Photo Pages , Preparing to reinstall cover, note water on GCL White Mesa Cell4 Hydration Pad Test Photo Pages Reinstalling Sandbag Weights o Ouick Check List for D. Henderson & P. Goble at DUSA: Date & general conditions: ( -'"\r 1. Status of the Geosynthetic Clay Liner (GCL) hydration test pad: W' 2. J. 4. Work Plan? Please obtain copy _ - [N^', --J ,// apNy- ls there a contractor site superintenqent on site? Bryan Libby?' Y'o)" ^l b,n t,rhl,rffoS,tf Isthereaconsultantqalqcmanageronsite?BrentBarbacana?0eosyrl]cc /ofes {-' -' a f/oth""''^l s 'b7P G"L L T-zL- o7 tf rs f.n. , / -..'.1:! Does the abo,,re superintendent and the qa manager have copies of the approved revised l#;ffi cal spec ifi cations, and construffi T 0"2 [il ^?$p rr,.. Con s u I tants dated Please write all your observations and input from others regarding the current construction activities, especially the earthwork processes and soil testing being performed: I ). Iv- ]_ _-f\ I'. \l r' a. Is there more than one teFt pad? Where are they located? I I -----rt i b. Lasthydrationtestingresults = /0o Lo,on,au/,,' '!,zool. -",, | - -.= -l'--J-- 'l ' P "!^/'r' '----] f'.-'' l7'-54o'J,^,; 6' t'rOil t /zrr'" 2----.---t t e Z:'--c. Is the site qa manager keeping a log 6f the moisture tests for fie GCL Demonstration L I I -\ 4 lL' t'\uJ\ @ Vfir.. other observations/conditions:& heldi$irad" "rI 7 . Updated construction schedule for GCL and HDPE liner installation. UNI". /€- c,t AL {', nl V!r, I l,n',1'[ .! '",'[ , Lib, T'rr ^,P''t I'Y; t br;?,oArAN( / r< t( i-'o{ '(( ,, n"lf Vfp* AA*{eC*f., v*,"t*-,*J h a.Ztx,Xn 2 Z_3o.o-7. r o*t! ,rr tt 4356782224 lnternational uranium ,,.,f.,.,o6-'t4-2007I 212 t\aH5 Eoge- ='ox9oE' B:1O@ao-Ea6I .d ox 5D6oa)rvt!r5Eot.oa o ? a, e -ts..l\J-N'N- N h{ I J ol-IS l^,lo ooeo. ol,o U)c €No.o ts a I\ta \Ia'\ ld\tFtl*lV r4 g aoco'oc e) & (! E7 h 1't-IFlc\ l" Blq. h/rl+ U F P IF )ai..n T f!r' s It t$ t\lrr la ?lrsI$ 6 \-i 2. H IIFIrIN 1+ Itc F P I s oq \i+ t t o I1 C.AXo) HP J: 6'do=o ='tD33,HOo- oo $ 'rtOA+Y6E o -lN +\ls' Nt eKlsls,i F o!)F s E IIlclc. tr [;: zo) eH IN-laI ,lCn iNl\ I a\r;\\ al )\-1-,/ s ko. E. 5!Ia B Uo E.7 i-l\L -. L- \ o o. o o a 0q IDo-o g ox Dhoa5t.a FO5p (D-o0) o ? N o, { € 0\r\r t ort 6)r,r' I \\ s\ c: ( t N W J)3r' t LN c\ r\r' I e a.hlJer- I il CA0)p (D \- \ \ F=t('\ \ \ D\ \ s.-( Y (\lN-l.t'!'l =le] $l\l:\ :t-nl ol itv. I+lul r\ N-\ N'\\ )- (\>tt'\ d'ht-F $ Uo o d o +, $\ : \' }\F }.7 +. F (,>\\ UIL \ ct \n\ 1- $ Nq - N- IL : \f (.\) 0 \ 5IF S(, PL *$ $ $ I !A)oFDtq Ftq CA o!1o U(D 0) /1 (A '11 rJ< o'3oBo:'oil ='.HOo- Oo ITts96'i oo o- o a doa TDo-o :: x ooNa)-a IDu5 (0 ^t-o ID o 3 6 )$bD \\ o0)+Ir\r* lr T- le Il$r oerlgs-$att <\z0o !1 l+= IRl? Ils IFt: I I I (,a 7 o vo TD o o+ \ p >\{ i N.- + d](\ F)oxA)Iq €-a o o !o o-o. le (h 0a 80o-(D (D TD I roNM l*.,* GARY HERBERT Lieutenant Goverrutr State of Utah Department of Environmental Quality Richard W. Sprott Acting Executive Director DTVISION OF RADIATION CONTROL Dane L. Finerfrock Director Iune 25,2OOl Ron F. Hochstein President and C.O.O. Denison Mines (USA) Corp.(DUSA) 1050 lTth Street, Suite 950 Denver, CO 80265 Dear Mr. Hochstein: SUBJECT: White Mesa Uranium Mill, Blanding, Utah Cell 44' Relining Project Design Approval On June 22,2007 we received a final submittal from Mr. Harold Roberts of DUSA via email regarding the above project. The submittal was a revision to all the project drawings. These drawings also incorporated an earlier drawing submittal made June 19, 2007 of an acceptable sandbag filter design, to be used for covering the strip drains at the bottom of cell. The initial Cell 4A Lining System Design Report was submitted by letter to the Division dated January 31,2006. A completeness review of this initial report was performed by the Division, through its consultant, URS Corp. Thereafter, seven separate interrogatory documents to DUSA regarding the project were identified and similarly developed. The plans, specifications and other documents for the project were in most cases prepared by Geosyntec Consultants for DUSA. A summary of the current relevant design documents for the project are listed in the enclosed table dated June 25, 2007 provided by URS Corp. The final plans, specifications and other applicable documents as submitted, appear to comply with the Utah Radiation Control Rules (R313, Utah Administrative Code). A design approval for these facilities is issued subject to the conditions stated below: l. Any substantive revisions or modifications to the approved plans and specifications, relevant design documents referenced in the attachment, construction procedures or equipment, including those necessary to meet future Ground Water Discharge Permit 168 North 1950 West. PO Box 144850. Salt t-rke City, UT 841 l4-4850. phone (801) 536-4250. fax (801) 533-4097 T.D.D. (801) 536-Ml4 . www.deq.utah.gov Mr. Ron F. Hochstern Cell 4,A. Relining Project Design Approval Letter Page 2 requirements, must be submitted for review and Executive Secretary approval, before the construction or implementation thereof. 2. The new facilities may not be placed in service, until after: a. The current Ground Water Discharge Permit has been modified, opened to public comment, comments resolved, then re-issued. b. An updated surety cost estimate for reclamation and decommissioning for the new facilities, including necessary environmental closure monitoring during the reclamation and decommissioning of Cell 4,A,, has been submitted and approved. c. A corresponding amount for the above has been added to the surety financial instrument and approved by the Division of Radiation Control (DRC). d. The Division has made a final inspection, and has authorizedin writing to place the constructed facilities in service. 3. Prior to final DRC inspection, an operation and maintenance (O&M) manual for the new facilities must be submitted and approved. The manual must include, but not be limited to: a. Essential operation and maintenance procedures for the new facilities. This shall include, e.g. important operational sequences, transporting methods, equipment operation, maintenance, safety, and emergency procedures. b. The proper operation, monitoring, and evaluation of: (1). the leak detection system, (2). the slimes drainage system, and (3). the freeboard limits on the dikes. c. Actions for successful prevention of pond overflow. Planned effort must be made to properly manage and apply volume inventory controls to prevent overflow events from occurring. These efforts must be described in the operations and maintenance manual. 4. As discussed in the DRC letter to DUSA dated May 2,2007, DUSA must complete the GCL hydration demonstration project. DUSA may not begin the use of the cell until the new liner GCL hydration level is at a minimum of 140 percent. 5. DUSA acknowledges that constructing any facilities under this design approval without first receiving a Ground Water Discharge Permit presents a risk, as the permit could require additional modifications to the facilities constructed under this approval. 6. DUSA will provide the design, construction, quality assurance/quality control, and all other project management or supervision to ensure compliance with the approved plans and specifications. Prior to final DRC inspection, DUSA will submit a final As-Built Report. The report will include a set of record drawings of the completed construction as well as a written certification by a Registered Professional Engineer licensed to practice in the state of Utah, attesting that the newly constructed facilities meet the requirements of the approved plans and specifications. Mr. Ron F. Hochstein Cell 44. Relining Project Design Approval Letter Page 3 7. This Design Approval will expire one year from the issue date above, unless substantial progress is made in constructing the approved facilities, or plans and specifications are submitted and this Approval is reissued. This provision allows the Division to administer the re-issuance of approvals based on the current best available technology (BAT). This Approval does not constitute any waiver to comply with other applicable local requirements. General Project Descripti on : This project is for relining former existing tailings Cell No. 4A, at the White Mesa Uranium Mill. The mill is located in south central San Juan County, approximately six miles south of Blanding, Utah, on U.S. Highway l9l. The newly relined cell is to receive processed milled tailings from the White Mesa Uranium Mill. The primary design criteria for this project is Utah Administrative Code, Rule R313-24, titled Uranium Mills and Source Material Mill Tailings Disposal Facility Requiremerzrs, which includes by reference appropriate sections of 10 CFR 40, titled, Domestic Licensing of Source Material, and 10 CFR 40 Appendix A titled, Criteria Relating to the Operation of Uranium Mills and the Disposition of Tailings or Wastes Produced by the Extraction or Concentration of Source Material from Ores Processed Primarily for their Source Material Content. Detailed review of the various items in the above design criteria can be found in the electronic record of exchanges of interrogatories, comments and responses between the Division and DUSA. The goal of the referenced design criteria above is to have long term facility features designed to be reliably functional for 200 to 1,000-years. Some of this criteria specifically addressed in the exchanges above include the cell's protection from precipitation, floods, wind, and earthquake stability. The cell has dikes above existing adjacent exterior ground on all four sides, and is roughly 46-feet in depth from the top of the dike to the lowest point on the bottom. The bottom of the cell varies in depth below the original grade between roughly 25 and 35 feet. The bottom area is about 28 acres. The cell is shaped at the top and bottom as nearly concentric quadrilaterals of varying side dimensions. According to company estimates, the volumetric capacity of the new cell is roughly 1.6 million cubic yards with a 3-foot freeboard. The bottom of the cell is graded to the southwest, which is the lowest point in the cell. The cell lining system consists of, beginning at the bottom, a compacted soil cover over existing subgrade soils or covering the bedrock, a manufactured geosynthetic clay liner (GCL) which is O.2-inch bentonite soil centered and stitched between two geotextile layers. The GCL has a hydraulic conductivity of I X l0 e cm/second and is routinely estimated at l0-foot depth equivalent to Z-feet of compacted clay liner at I X 10-7 cm/second. The GCL is to be hydrated to a minimum of 1407o, as that level of hydration and above gives the subsurface maximum protection from acidic water infiltration through a GCL. Mr. Ron F. Hochstern Cell 44, Relining Project Design Approval Letter Page 4 As mentioned earlier, in a condition for this approval, a separate demonstration project is required for the GCL liner. This test is in the bottom of the cell. A specified separate GCL test pad is to be installed to determine the duration the GCL needs to attain acceptable hydration. The GCL must attain at least l4O7o hydration prior to bringing the cell into operational status. The GCL is covered by a 60-mil smooth HDPE liner. Above this liner there will be a geonet grid layer, and finally, the geonet is covered by another 60-mil smooth HDPE liner. A leak detection system (LDS) is incorporated into this design by use of a geonet. The geonet layer will be contiguous throughout the entire cell and anchorage trench. The geonet allows any leakage through the uppermost liner a flow path to drain down to a sump and leakage monitoring structure in the southwest corner of the cell. Slimes drain (SD) collection system. Placed on the top liner, a pipe-like collection system for conveying drainage from the tailings is to be laid out in a herringbone design on the cell bottom. SD laterals will connect to a SD 4-inch diameter PVC diagonal header. The laterals are to be installed at 50-foot centers throughout the cell bottom. These laterals are specified to be "Multi- Flow Drainage Systems strip-drains." The strip-drains are a prefabricated two-part geo- composite drain with a polymer drainage strip core surrounded by non-woven filter fabric. These type drains are used for subsurface water collection. These drains will be ballasted from movement, and protected from fines plugging by sandbags covering them continuously along the drains. The sand specified for the bags is specifically designed to filter out fine particles from plugging the strip drain fabric. The strip-drains manifold into a central SD header, as the spine of the herringbone design. The header system consists of a geotextile as a cushion placed on the upper liner then a 4-inch PVC header pipe surrounded by drain gravel in a triangular window,Z-feet deep and 2-feet wide. The gravel will be covered by a woven geotextile. The upper geotextile will be ballasted by gravel bags at lO-feet on-center, both sides. Both the LDS and SD systems are to convey drainage to a dual, but separate sump system at the southwest corner of the pond. Each system will have an lS-inch perforated pipe placed horizontally at the bottom of each sump, surrounded by drainage gravel. Both systems will have an 18-inch observation pipe or port, rising from the sump pipes at the slope of the embankment to above the top of the dike in the southwest corner of the cell. The SD sump will have the top of gravel covered by geo-textile, and the complete lining system below it, whereas the LDS sump will have the GCL and the lower HDPE below the pipe, and the remaining lining system enclosed above the sump. Three 2O-foot wide splash pads will be constructed on the north dike, to allow filling of the cell with tailings in slurry, without damaging the uppermost HDPE membrane. These pads will consist of an additional layer of 60-mil HDPE membrane. The pads will extend from the top of the dike, under the inlet pipe along the top, down the embankment, then five-feet beyond the toe Mr. Ron F. Hochstein Cell 4,A. Relining Project Design Approval Letter Page 5 of the slope over the upper geomembrane. These splash pads are to protect the upper geomembrane from scouring by inflowing tailings. An emergency spillway will be constructed between cell 3 and 4A.. The spillway will be constructed of 6-inch thick reinforced concrete slabs. The spillway will be a 4-foot deep trapezoidal channel, with 32-foot tapering length on each side of a 20-foot center section. The spillway is designed to carry the Probable Maximum Precipitation related flood event. The spillway is to protect cell 3 from overtopping, during maximum a flood event. An approved set of the final approved plans, specifications and construction quality assurance plan should be kept on-site and available for examination and inspections to be conducted by the Division, or for resolution of any conflicts or discrepancies that may arise during construction or installation. DUSA must advise us when the construction begins. If you have any questions on the above, please contact Mr. Dave Rupp of our staff. Sincerely, UTAH RADIATION CONTROL BOARD Dane L. Finerfrock Executive Secretary DLF:LBM:DAR:dT Enclosure: Summary of Documents Cc: Greg Cocoran, P.E., GeoSyntec Consulting Engineers Britt Quinby, P.E., URS Corp. Southeast Utah District Health Dept. David Ariotti, DEQ District Engineer, Price, UT F:\drupp\DUSA\Cell 4A\Design Approval lrtter June 2007 168 North 1950 West • PO Box 144850 • Salt Lake City, UT 84114-4850 • phone (801) 536-4250 • fax (801) 533-4097 T.D.D. (801) 536-4414 • www.deq.utah.gov State of Utah Department of Environmental Quality Richard W. Sprott Executive Director DIVISION OF RADIATION CONTROL Dane L. Finerfrock Director JON M. HUNTSMAN, JR. Governor GARY HERBERT Lieutenant Governor MEMORANDUM TO: FILE (Division of Radiation Control) DRC FROM: David Esser Division of Radiation Control DATE: May 21, 2008 SUBJECT: Denison Mine cell 4A – April 29, 2008 Inspection This memo is a summary of the April 29, 2008 (7:45 am to 11:30 am) ad hoc inspection regarding Denison Mines Cell 4A construction. The Inspection and close out was escorted and held with Denison representatives Dave Turk, and Harold Roberts. Denison representatives asked that the Cell 4A pond construction and approval be review as soon as possible with construction to be completed in July. It appears that 85% of the primary liner, geo-net to the Cell 4A pond has been installed, and 40% of the secondary liner has been installed. The inspection on April 29, 2008 was from an engineering stand point. The review looked at: liner, QA/QC and construction drawings, sand bag placement, geo-net, geo-net zip-ties, tie back trench, clay compaction, erosion, fusion and extrusion welding, shear and peal testing machine, records, leak detection system, and material placement. The following is a list of inspection items and inspection notes with findings and recommendations for future inspections. Please see inspection pictures in the file for additional reference. 1) Liner- All visible liners appeared to look in good condition. 2) QA/QC and Construction drawings – Before the next inspection we need to review the leak detection plans and the requirements for the shear and peel tests. 3) Sand bag placement – Looked good 2 foot spacing or less. 4) Geo-net (drainage net) – Looked good, no holes or big gaps. 5) Geo-net (drainage net) zip ties – Good spacing and placement. 6) Tie back trench – Seemed to fit the plans, width good, and the compaction or sand bags looked good. Needs to be completed on North end. 7) Clay compaction – Look good in the trench (by visual), but inspection report numbers must be looked at later. Page 2 8) Erosion – Rivulet and gullies in the North end not completed, look at later. 9) Fusion and Extrusion welding – looked good, check paper work for testing results. 10) Shear and Peel testing machine – looked good, check paper work for testing results. 11) Records – On site paper work looked good we need to, check all paperwork at the end of the project. 12) Leak detection system – The Company stated that they were going to change the constructed leak detection system, so it fit the plans and they failed to build the leak detection system per plan. View the plans and re-inspect at a later date, but the leak detection system needs piping and secondary liner, and the sump location may be incorrect. 13) Material placement – The material placement looked good, and no problems were witnessed. Look at daily inspection reports at a later date.