Loading...
HomeMy WebLinkAboutDRC-2005-001283 - 0901a06880abe0ac!1" cINrnnNerroxer.i! UnaNrul,r (use) ConponATroN Independence Plaza, Suite 950 o 1050 Seventeenth Street e Denver, CO 80265 . 303 628 7798 (main) o 303 389 4125 (fax) October 20,2005 YIA U.S. MAIL Mr. Dane L. Finerfrock Executive Secretary Utah Radiation Conhol Board Deparfinent of Environmental Quality 168 North 1950 West PO Box 144850 Salt lake City, Utah 84114-4850 Re: Ground Water Discharge Permit No. UGW370004, White Mesa Mill Dear Mr. Finerfrock: ln response to the September 2,2005letter from Johnathan Cook, I am encloslng a copy of the site contour map of the Roberts Pond area. The activities covered by the June 10, 2005 As-Built Report for Roberts Pond covered the removal of the old liner from the pond and installation of the new HDPE liner. The Pond had been in existence since the original construction of the White Mesa Mill and the earthwork activities creating the Pond were monitored during the original earthwork construction lrl-1979. The recent activities did not alter the configuration of the Pond except for minor re-grading necessary for the HDPE liner installation. If you require any additional information on the Report, please feel free to contact me. Very truly yours,za*w /u*onR. Roberts Vice President - Corporate Development Ron F. Hochstein,IUSA, w/ enclosure David C. Frydenlund,IUSA, w/ enclosure T. Kenneth Miyoshi, ruSA, d enclosure JoN M. HilMAN, rR. Governor GARY HERBERT Ueutenant Governor s\ State of Utah Departrrent of Environmental Quality Dianne R. Nielson, Ph.D. Exccutive Director DryISION OFRADIATION CONTROL Dane L. Fhetfrock Director September 2,2005 David C. Frydenlund International Uranium (ruSA) Corporation Independen ce Plaza, Suite 950 1050 Seventeenth Street Denver, CO 80265 Subject: Roberts Pond As-Built Report Dated June 10, z}Os,Groundwater Permit No. UGW370004: Request for Additional Information Dear Mr. Frydenlund, On June 10, 2005 you submitted an As-Built report for Roberts Pond, as required by Permit No UGW370004, Part I.H.18. This item required: 18. Roberrs Pond As-Built Report - within 90 days of issuance of this Piermit, the Permittee shall submit for Executive Secretary review and approval a As-Built Report for the Roberts Pond. Said report shall document: a) Alt contaminant removal and re-construction activities completed by the Permittee in 2002, b) Engineering drawings and specifications to adequately describe and verify the re c ent re c onstruction effo rt s - After review of this report, the Executive Secretary may require modification of the Reclamation Plan in order to provide adequate demolition and decontamination of the Roberts Pond at the time of facility closure, and to protect public health and the environment. In reviewing the submittal, it was noted that engineering drawings were not provided. The only drawing we received was a schematic drawing of the liner seam locations. We request that as- 168 Norrh 1950 West. PO Box 1,14850. Salt Lake City, UT 84114-4850. phone (801) 5364250 'fax (801) 533-40D7 T.D.D. (801 ) 536441 4' www.deq. utah. gov -l - '' ' Page2 built engineering drawings of the pond complete with coordinates, contours, spot elevations, pond level gauging stations, and construction details be provided. If as-built information was not maintained for this project, please provide us with a copy of the engineering design drawings, plan maps, and cross sections. If you have any questions or comments, please contact me at (801) 536-4250.re^ Johnathan P. Cook, P.E. Environmontal Engineer DF/JPC: jc F:\FACILITIESUUC - WHITE MESA\Ore Mill Building\Roberts Pond\2005-08-29 lrner -rob pond asbuilt - draftl.doc File: IUC.05.B