HomeMy WebLinkAboutDRC-2006-001262 - 0901a068809be208Page 1 of I
Dean Henderson
From: Dean Henderson
To: Frydenlund, David
Date: ttlL4l2006 11:54AM
CC: Morton, Loren
Dave,
Concerning our phone conversation yesterday on the sampling of well TW4-L4. Before the sampling protocol
for this well can be determined, Please provide the following:
1. Re-complete wellTW4-14 as a permanent monitor well in accordance to USEPA RCRA TEGD (also stated in
the October 25,2006 DRC letter) .
2. After well competition, develop the well to the 5 NTU turbidity standard in accordance to USEPA RCRA TEGD
or explain and justiff why it cant be met.
3. Determine and justify the minimum volume of water required to sample carbon tetrachloride, chloride,
chloroform, chloromethane, dichloromethane(methylene chloride), nitrate, nitrate + nitrite, and field parameters
in accordance with USEPA RCRA TEGD and your contracted laboratory.
4. Demonstrate and justify the volume of water that can be collected from TW4-14. Prior to this
demonstration please propose in writing to DRC the equipment and methods used. Also prior to this
demonstration, please notify DRC staff to have the opportunity to observe the demonstration.
5. If the water volume is insufficient to collect the samples, propose a written sampling priority for DRC review
and approval for the 6 parameters
5. After the DRC review and the Executive Secretary approval the QAP may be revised to add the sampling
protocol for TW4-14.
Please call if you have any questions.
Thanks,
Dean
file://C:\Documents and Settings\Dhenderson\Local Settings\TempU(Pgrpwise\4559AE8... lll1412006
IUC GW FILE INDEX.XLS
lnternational Uranium Corporation: White Mesa Mill
Filinq CateEories
File Jcdated N@emb€r '15. 2006
Number GrouI Cateqory
10(=ile lndex
Sroundwater Discharoe Permits
10t 3W 3W Permit Aoolication & Correspondence
1o2 I 3W \,lovember 30. 1999 Draft GW Permit
1o2E 3W )ecember 18. 2003 Draft GW Permit
102 C 3W Seotember 27. 2004 Draft GW Permit
102 DlGW )ecembe|l. 2004 Final Draft GW Permit
't02 E 3W \ilarch 8.2005 Final GW Permil
102 F 3W lovember 2. 2005 GW Permit Moditication
102 C GW lune 13. 2006 GW Permit
102 H 3W lovember 3.2006 GW Permit Modilication
103 3W Sroundwater Discharoe Permit Historv
104 GW UC Meroer
iw Permit - Related Documents / Plans
iW ieneral Permit Correspondence
iW )oncerned Citizen's Correspondence
iw lvdrooeoloqic Beports
iw \ouifer Pump Test Correspondence
4 iW )iltrlic PeriiciDation Summarv on Draft GW Permit
iw )ecember 1, 2004 Statemenl of Basis on GW Permit
1 16p iw ,lovember 2, 2005 Final Draft SER - Fansteel
1 168 iW )ublic ParticiDation Summary on tinal SER - Fansteel
iW Permit - Compliance MonitorinE & Reporting Hequit€ments
t20P iW 1st Quarter Jan.- March 2005 Groundwater Monitoring & DMT Report
l20E iw lnd Quarter April - June 2005 Groundwater Monitoring & DMT Report
120c iW ,rd Quarter Julv - Sept 2005 Groundwater Monitoring & DMT Report
120E iW Ith Quarter Oct - Dec 2005 Groundwater Monitoring & DMT Report
I 20E iw 1st Quarter Jan.- March 2006 Groundwater Monitoring & DMT Report
120F iW 2nd Quarter April - June 2006 Groundwater Monitoring & DMT Report
iw failinos Cell Wastewater Quality Reportinq
2i iw levised Hvdrooeoloqic Report
24 3W A/ork Plan - lnstallation of New Groundwater Monitorinq Wells
2a iW 3ackoround Groundwater Qualitv Reoort (Existinq Wells)
2f iw Sackoround Groundwater QualiW Report (New Wells)
21 iW failinos Cell Wastewater Samplinq Plan
2t iW Sroundwater Monitorinq Qualitv Assurance Plan
1281 3W )rotocal for Samplino Well TW4-14
2l 3W vlonitor well Remedial construction and Repair work anc, Report
3(3W vlonitor Well MW-3 Verification Report
3 3W A/hite Mesa Seeps and Sprinos Samplinq Work Plan
:4i 3W n/hite Mesa Seeps and Sprinqs Samplinq Beport
:{3W fn-Site Chemicals lnventory Report
:4t 3W nlilltration and Contaminant Transport Modeling Work Plan
3{3W nfilltration and Contaminant Transport Modeling Report
3(GW Plan lor Evaluation ot Deep Well WW-z
3i 3W DMT Monitoino Plan
3t 3W l-ailinqs Cell 4A Contaminant Removal Schedual and Report
1 38t 3W iell 4a Relinino Proiecl
3(3W lontinoencv Plan
4(3W Stormwater Best Manaoement Plan
4 GW Roberts Pond As-Built Report
14i 3W THF Demonstration Studv Work Plan and Report
14i GW Accelerated Monitorino
144t GW NOV GW Permit UGw 06-03
144E GW NOV GW Permit UGW 06-04
GW ComDliance / Enforcemenl
150 I GW GW Corrective Action Order: Chloroform Contamination (Thru 1999)
'150 B GW GW Corrective Action Order: Chloroform Contamination (2000)
150 C GW GW Corrective Action Order: Chloroform Contamination (2001
150 C iw GW Corrective Action Order: Chlorolorm Contamination (2002)
150 E iw 3W Corrective Action Order: Chloroform Contamination (2003 -
151 iW iW Classification & Proteclion Levels
152 A iW lhloroform OMR (4th Otr. 2002 to 1st Otr. 2005)
152 E JW lhlorolorm OMR 2nd Otr- 2OO5
152 C iW lhlorolorm QMR 3rd Qtr.2005
152 E iW lhlorolorm OMR 4th Otr. 2005
152 E iW lhloroform QMR lst Qtr. 2006
152 F iW lhloroform QMR 2nd Qtr. 2006
152 C iW lhloroform QMR 3rd Qtr. 2006
15i iW lhloroform CleanuD: Lono Term Pumo Test Plan / Ooerations Reoorts
154 3W )erched Zone Flow Velocity Reports
154 iW fCl and CAP Correspondance
15f 3W )perations and Maintenance Plan for Pumping Wells
15-7 IGW :ate and Transoort of Chloroform
IUC GW FILE INDEX.XLS
lnternational Uranium Corooration: White Mesa Mill
Filing Categories
File jD-dated Nryember 15, 2005
Number GrouF Cateoorv
iroundwater OualiW Monitorinq
160 A GW vlav. 1999 Solit Samolino Event (lUC samole data & corresoondence)
160 E GW vlav. 1999 Solit Samolino Event (DRC samole data)
160 (GW {ovember. 2000 SDlit SamDlino Event
160 t GW tlovember. 2001 SDlit SamDlino Event
160 E GW SeDiember. 2002 Solit Samolino Event
6 GW GW POC Monitorino Well Plan / Corresoondence
61 3W Monitoring Well As-Built Reports
OJ GW 3W Monitoring QA Plan & Correspondence
16r GW GW Qualitv Monitorino Data / Corresoondence (Shallow Aouiler)
164 3W Dassive Ditlusion Baq Samplinq Proiect
16(3W IHF Contamination lnvestioation
Groundwater - Miscellaneous
17(3W Ule Mountain Tribe Water Wells: WQ Data & Corresoondence
171 3W Vlill Site Deeo Water Suoolv Wells: WO Data & Corresoondence
iW Flow and TransDort Modelino
18r iW nfiltration Modeling Reports
181 iW /ell Spacing Modeling Reports
182 iw failinos Cell Effluent Characterization
,Vaste Related lssues/Proiects
190 I iW 'Boston Box'Eoisode
190 E iW -inde -Meat' lncident. October. 2001
191 iW y'anadium Contaminated Product Event
192 iW {RC Allernative Feed Guidance Corresoondence
19:iW Jrizon Source Material (USM) Alternative Feedstock (downblendinot
:ngineerinE Related Correspondence
20c :nO iW Permit Enoineerino Desion Review: Facilitu-Wide
{RC Related Conespondence
30c NRC
301 NRC {RC / DOE License Transfer lnlormation / CorresDondenm
31 \RC {RC lnspection Reports
311 !RC \RC Notices of Violation
32({RC IUC Tailinos Reclamation Plan
321 {RC IUC Suretv Bond Corresoondence
EPA Related Correspondence
40(:PA IERCLA Ofisite Rule Conespondence
50()EQ UC Correspondence Related to Uranium Mines
)ther Corespondence
60(itate itate Trust Lands Administration