Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DERR-2025-000874
Work Assignment LXX-23 2 3596 West 3100 South West Valley, Utah Quarterly Groundwater Sampling and Reporting LUST ID LXX, Facility ID 4001074 Tesoro #46 Cost Estimate Work Assignment LXX-23 Labor Category Staff Quantity Hourly Rate/ Unit Rate Subtotal Subtotal Totals P101 Senior Project Manager- Coordination 1 163.00$ 163.00$ 163.00$ P103 Project Manager - Coordinate with laboratory, project 4 127.00$ 508.00$ 508.00$ P105 Senior Technician - Preparation, pickup and drop off samples at lab, gather equipment, develop and sample wells, process samples, and travel 10 97.00$ 970.00$ 970.00$ P108 Administration Assistant - Invoicing, PST claim 1 84.00$ 84.00$ 84.00$ Labor Subtotal 1,725.00$ #REF! Direct Costs Equipment/Materials/Supplies Water Level/Free Product Interface Probe 1 55.00$ 55.00$ 55.00$ Sampling Supplies 1 25.00$ 25.00$ 25.00$ Traffic Safety Equipment 1 15.00$ 15.00$ 15.00$ Disposable Bailers 2 9.00$ 18.00$ 18.00$ Outside Services 3 90.00$ 270.00$ 270.00$ Per Diem Mileage 60 0.700$ 42.00$ 42.00$ Direct Costs Subtotal 425.00$ Summary Report Labor Category Staff Quantity Hourly Rate/ Unit Rate Subtotal Subtotal Totals P101 Senior Project Manager - Report review 1 163.00$ 163.00$ 163.00$ P102 Professional Geologist - Gradient map preparation 2 157.00$ 314.00$ 314.00$ P103 Project Manager - Report preparation, PST claim 4 127.00$ 508.00$ 508.00$ P105 Senior Technician - Data entry and report preparation 9 97.00$ 873.00$ 873.00$ P107 Drafter II - Prepare gradient map 2 90.00$ 180.00$ 180.00$ P108 Administrative - Invoicing, PST claim 1 84.00$ 62.00$ 62.00$ Labor Subtotal 2,100.00$ Task 3 Subtotal: 4,250.00$ Project Total:8,942.75$ Task 3 - Quarterly Groundwater Sampling Event - June 2025 - Collect GW elevation data from all wells and sample MW-7R, and MW-14) Laboratory - MBTEXN/TPH-GRO & DRO, plus trip blank