HomeMy WebLinkAboutDAQ-2025-0005141 DAQC-084-25 Site ID 10238 (B5) MEMORANDUM TO: CEM FILE – PACIFICORP HUNTINGTON PLANT THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Rob Leishman, Environmental Scientist DATE: January 23, 2025 SUBJECT: Source: Huntington Power Plant Units 1 and 2 Contact: Russ Wilson – 435-687-4331 Terry Guthrie – 435-687-4334 Location: Huntington Canyon, Emery County, UT Test Contractor: Montrose Air Quality Services, LLC FRS ID#: UT0000004901501001 Permit/AO#: Title V operating permit #1501001006, dated November 21, 2024 Last revised November 21, 2024 Subject: Review of RA/PST Protocol dated January 9, 2025 On January 16, 2025, Utah Division of Air Quality (DAQ) received a protocol for a RA/PST (relative accuracy/performance specification test) of the Pacificorp Huntington Plant Units 1 and 2 in Huntington, Utah. Testing will be performed on March 4-5, 2025, to determine the relative accuracy of the O2, CO2, NOX, SO2, and CO monitoring systems. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses: OK 2. RM 2G/H used to determine stack gas velocity and volumetric flow rate: OK 3. RM 3A used to determine dry molecular weight of the gas stream: OK 4. RM 4 used to determine moisture content: OK 5. RM 6C used to determine SO2 emissions: OK 6. RM 7E used to determine NOX concentrations of emissions: OK 7. RM 10 used to determine CO concentrations of emissions: OK 8. RM 19 used to determine volumetric flow: OK DEVIATIONS: No deviations were noted. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: Send attached protocol review and test date confirmation notice. 1 8 2