HomeMy WebLinkAboutDDW-2025-000890
January 28, 2025
Max Covey
Jordanelle SSD
P.O. Box 519
10500 North 14200 West
Heber City, Utah 84032
Subject:Plan Approval, Mayflower Tank #3 (ST021); Jordanelle SSD, System #26086, File #18257
Dear Max Covey:The Division of Drinking Water (the Division) received the plans and specifications for the Mayflower Tank #3 (ST021) from your consultant Steve Jackson of Jackson Engineering
on December 10, 2024. Written review comments were provided to your consultant on January 22, 2025. The Division received the requested information on January 22, 2025. This project
has met the conditions for receiving a plan approval.
Our understanding of the project is the construction of the Mayflower Tank #3 (identified as ST021 in the Division’s database) for the Mayflower Mountain Resort. The new 600,000-gallon
buried concrete tank will be located west of UT Highway 40. The tank capacity also included 240,000 gallons for fire suppression. The tank is filled from the Mayflower Booster Station
#2 (PF019, being reviewed under Plan Review File #18719). The water then goes to the distribution system from the Mayflower Tank #3 (ST021).
We have completed our review of the plans and specifications, stamped and signed byNick Graue, P.E., of Aqua Engineering dated March 24, 2022, and find they basically comply with the
applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for the Mayflower Tank #3 (ST021)are hereby approved.
This approval pertains to construction only. An Operating Permit must be obtained from the Director before Mayflower Tank #3 (ST021) may be put in service. A checklist outlining the
items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction
of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted
to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled.
This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.
If you have any questions regarding this approval, please contact Dani Zebelean, P.E. of this office, at (385) 278-5110, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
DZ/mrn/mdbEnclosures –Operating Permit Checklistcc:Tracy Richardson, Wasatch County Health Department, trichardson@wasatch.utah.govSteve Jackson, Jackson Engineering, steve@jackson-engineering.comNick
Graue, P.E., Aqua Engineering, nick.graue@aquaeng.comMax Covey, Jordanelle SSD, mcovery@jssd.usDani Zebelean, P.E., Division of Drinking Water, dzebelean@utah.gov
Julie Cobleigh, P.E., Division of Drinking Water, jjcobleigh@utah.govDZebelean 26086 18257 PA ST021
Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:Jordanelle SSDSystem Number: 26086Project Description: Mayflower Tank #3 (ST021)File Number:
18257
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7
and is not required to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating
Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished,
and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and
specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory
bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards:
☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA
C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive
samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes
apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be
taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the
plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☒8.If applicable, location data of new storage tank, treatment
facility, or source. Received with PA