Loading...
HomeMy WebLinkAboutDWQ-2025-000757 McWane Ductile – Utah PO Box 1219 2550 South Industrial Parkway Provo, Utah 84601 801.373.6910 www.mcwaneductile.com January 27, 2025 Mr. John Mackey, Director Utah Department of Environmental Quality Division of Water Quality 195 North 1950 West PO Box 144870 Salt Lake City, UT 84114-4870 RE: UPDES Minor Industrial Permit UT0000612 Part I.C.3.a. - Cooling Water Intake Structure Actual Intake Flow Dear Mr. Mackey, McWane Ductile Utah (MDU) submits this report in response to UPDES Minor Industrial Permit UT0000612 Part I.C.3.a., regarding cooling water intake structure (CWIS) actual intake flow (AIF). MDU is currently limited in measuring intake flow quantity at its process water Ironton Canal intake structure. Portions of this water are metered while others are not. Previous estimates of canal water use have relied on metered city culinary makeup water use and estimating its proportion of use compared to canal water, in consultation with plant operators. The maximum flow into the CWIS is limited by pipe slope and its 12-inch diameter. MDU proposes to install one certified industrial water meter on the water line between our process water cooling pond (million-gallon pond) and the CWIS, and another certified industrial water meter on the combined pond/canal water line immediately upon its entry into our production building. The difference between the two flows is the quantity sourced from the CWIS. The two locations are marked by stars on Figure 1 below.