Loading...
HomeMy WebLinkAboutDERR-2025-000684Allison Stanley <allisonstanley@utah.gov> Paxton - SCWP Addendum 11 messages Brent Robinson <BRobinson@geosyntec.com>Tue, Sep 10, 2024 at 11:26 AM To: Allison Stanley <allisonstanley@utah.gov> Cc: Brian Smith <BSmith@geosyntec.com>, Bruce Bastian <bruce@jbearlco.com> Allison, Per our discussion last week, attached is the Site Characterization Work Plan Addendum for the Paxton project (Voluntary Cleanup Site #C-129). This document provides a preliminary summary of the soil and groundwater samples that were collected in July and details additional samples that will be conducted to further characterize the site. We have tentatively scheduled to conduct the additional sampling on September 24th. We look forward to any questions or comments that you many have regarding this document. Thanks and best regards, Brent Brent C. Robinson, P.E. Senior Principal Engineer   215 South State Street, Suite 500 Salt Lake City, Utah 84111 Phone: 801-853-8185 Mobile: 801-721-4580 E-mail: brobinson@geosyntec.com   GEOSYNTEC | SIREM | SAVRON | GREEN HARBOR ENERGY 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…1/10 Paxton SCWP Addendum 9-9-2024.pdf 874K Allison Stanley <allisonstanley@utah.gov>Wed, Sep 11, 2024 at 7:47 AM To: Brent Robinson <BRobinson@geosyntec.com> Cc: Brian Smith <BSmith@geosyntec.com>, Bruce Bastian <bruce@jbearlco.com> Brent, Thank you for the document. I will take a look and get back to you shortly. Allison [Quoted text hidden] -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Allison Stanley <allisonstanley@utah.gov>Tue, Sep 17, 2024 at 5:02 PM To: Brent Robinson <BRobinson@geosyntec.com> Brent, I'm sorry I missed your call earlier. I'm briefing our toxicologist on the report tomorrow afternoon and can give you a call back after that meeting. Thanks, Allison [Quoted text hidden] Brent Robinson <BRobinson@geosyntec.com>Wed, Sep 18, 2024 at 9:25 PM To: Allison Stanley <allisonstanley@utah.gov> Hello Allison, Just a quick note to see if your toxicologist had any questions or comments regarding the SCWP Addendum. Thanks and best regards, Brent 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…2/10 From: Allison Stanley <allisonstanley@utah.gov> Sent: Tuesday, September 17, 2024 5:02 PM To: Brent Robinson <BRobinson@Geosyntec.com> Subject: Re: Paxton - SCWP Addendum CAUTION: This email originated from outside of the organizaon. Do not click links or open aachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authenc. If you suspect fraud, click "Phish Alert Report." Brent, I'm sorry I missed your call earlier. I'm briefing our toxicologist on the report tomorrow afternoon and can give you a call back after that meeting. Thanks, Allison On Wed, Sep 11, 2024 at 7:47 AM Allison Stanley <allisonstanley@utah.gov> wrote: Brent, Thank you for the document. I will take a look and get back to you shortly. Allison On Tue, Sep 10, 2024 at 11:26 AM Brent Robinson <BRobinson@geosyntec.com> wrote: Allison, Per our discussion last week, attached is the Site Characterization Work Plan Addendum for the Paxton project (Voluntary Cleanup Site #C-129). This document provides a preliminary summary of the soil and groundwater samples that were collected in July and details additional samples that will be conducted to further characterize the site. We have tentatively scheduled to conduct the additional sampling on September 24th. We look forward to any questions or comments that you many have regarding this document. Thanks and best regards, 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…3/10 Brent Brent C. Robinson, P.E. Senior Principal Engineer   215 South State Street, Suite 500 Salt Lake City, Utah 84111 Phone: 801-853-8185 Mobile: 801-721-4580 E-mail: brobinson@geosyntec.com   GEOSYNTEC | SIREM | SAVRON | GREEN HARBOR ENERGY -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…4/10 -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov [Quoted text hidden] Brent Robinson <BRobinson@geosyntec.com>Thu, Sep 19, 2024 at 12:18 PM To: Allison Stanley <allisonstanley@utah.gov> Cc: Brian Smith <BSmith@geosyntec.com>, Bruce Bastian <bruce@jbearlco.com> Allison, Thank you for your call earlier today and your questions/comments regarding the SCWP Addendum. Attached is a revised version of the document. Per our discussion, we have added an additional sample at location S-6. Please also note that we found an error in Table 2 and have made minor edits to correct. I also followed up and confirmed that an Alta Survey was previously performed for the site and identifies the building locations. Thanks and best regards, Brent 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…5/10 From: Allison Stanley <allisonstanley@utah.gov> Sent: Tuesday, September 17, 2024 5:02 PM To: Brent Robinson <BRobinson@Geosyntec.com> Subject: Re: Paxton - SCWP Addendum CAUTION: This email originated from outside of the organizaon. Do not click links or open aachments unless you recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender verbally that this email is authenc. If you suspect fraud, click "Phish Alert Report." Brent, I'm sorry I missed your call earlier. I'm briefing our toxicologist on the report tomorrow afternoon and can give you a call back after that meeting. Thanks, Allison On Wed, Sep 11, 2024 at 7:47 AM Allison Stanley <allisonstanley@utah.gov> wrote: Brent, Thank you for the document. I will take a look and get back to you shortly. Allison On Tue, Sep 10, 2024 at 11:26 AM Brent Robinson <BRobinson@geosyntec.com> wrote: Allison, Per our discussion last week, attached is the Site Characterization Work Plan Addendum for the Paxton project (Voluntary Cleanup Site #C-129). This document provides a preliminary summary of the soil and groundwater samples that were collected in July and details additional samples that will be conducted to further characterize the site. We have tentatively scheduled to conduct the additional sampling on September 24th. We look forward to any questions or comments that you many have regarding this document. Thanks and best regards, Brent 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…6/10 Brent C. Robinson, P.E. Senior Principal Engineer   215 South State Street, Suite 500 Salt Lake City, Utah 84111 Phone: 801-853-8185 Mobile: 801-721-4580 E-mail: brobinson@geosyntec.com   GEOSYNTEC | SIREM | SAVRON | GREEN HARBOR ENERGY -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…7/10 -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Paxton SCWP Addendum 9-9-2024 (updated 9-19-24).pdf 1225K Allison Stanley <allisonstanley@utah.gov>Thu, Sep 19, 2024 at 3:25 PM To: Brent Robinson <BRobinson@geosyntec.com> Brent, Thank you for the updated report. I will be sending out an email accepting the report shortly. Thanks again, Allison [Quoted text hidden] -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov [Quoted text hidden] Allison Stanley <allisonstanley@utah.gov>Mon, Sep 23, 2024 at 2:13 PM To: Brent Robinson <BRobinson@geosyntec.com> Brent, 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…8/10 Is your team still planning to sample at Paxton tomorrow? [Quoted text hidden] Brent Robinson <BRobinson@geosyntec.com>Mon, Sep 23, 2024 at 2:16 PM To: Allison Stanley <allisonstanley@utah.gov> Allison, You read my mind, as I was preparing another e-mail to send you . . . We just found out that Blue Stakes was not able to access the property (the gate was locked) so it has not been cleared for utilities. We just filed another Blue Stakes request, so the sampling will need to be delayed until this Friday. It will likely take 2 days to complete the work, so we anticipate that it will be completed next Monday (we’re not planning to work over the weekend). [Quoted text hidden] Allison Stanley <allisonstanley@utah.gov>Wed, Sep 25, 2024 at 8:48 AM To: Brent Robinson <BRobinson@geosyntec.com> Brent, Thanks for the update. I will actually be out of town from Friday-Monday so another member of my team will be out there. What time do you think you'll start sampling on Monday? [Quoted text hidden] -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov [Quoted text hidden] Brent Robinson <BRobinson@geosyntec.com>Wed, Sep 25, 2024 at 8:56 AM To: Allison Stanley <allisonstanley@utah.gov> Cc: Jessica Welch <Jessica.Welch@geosyntec.com>, Brian Smith <BSmith@geosyntec.com> Allison, Sorry that the new dates don’t work well for you. Jess (copied; phone: 801-407-5793) will be leading the field activities and is planning to start at 8am on both Friday and Monday. Please let us know who will be covering for you. [Quoted text hidden] Allison Stanley <allisonstanley@utah.gov>Wed, Sep 25, 2024 at 9:13 AM 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:1809830855317868…9/10 To: Brent Robinson <BRobinson@geosyntec.com> Cc: Jessica Welch <Jessica.Welch@geosyntec.com>, Brian Smith <BSmith@geosyntec.com>, Lincoln Grevengoed <lgrevengoed@utah.gov> Brent, It's no worries. Lincoln Grevengoed will be covering and I've copied him to this email. His number is 385-391-8132. He joined me for the soil and groundwater sampling back in July. [Quoted text hidden] -- Allison Stanley Environmental Scientist I | VCP/Brownfields Section P: (385) 391-8134 environmentalresponse.utah.gov [Quoted text hidden] 1/27/25, 7:57 AM State of Utah Mail - Paxton - SCWP Addendum https://mail.google.com/mail/u/0/?ik=e22438591e&view=pt&search=all&permthid=thread-f:1809830855317868128&simpl=msg-f:180983085531786…10/10