Loading...
HomeMy WebLinkAboutDERR-2025-000676 UPSS Precision Test Report Date 01/23/2025 Report # US213504 Site On The Run 1590 S Hwy 40 Heber UT 84032 USA Test Date(s) 01/22/2025 Reason for Test Annual Compliance E-mail: jeffstevenson@leightonobrien.com Website: www.leightonobrien.com Service Distributor: Seneca Companies, Inc. www.senecaco.com Tel. 563-332-8000 EXECUTIVE SUMMARY All lines passed the tests. RECOMMENDATIONS There are no recommendations. Heber On The Run US213504 Diagnostic Report to 22-01-2025 Page 2 AIM METHODOLOGY To investigate the integrity of the UPSSs due to Annual Compliance An individual test was / were performed on the product line(s). Line was/were tested to a 0.05 gph leak rate using Leighton O'Brien PM2 test equipment & procedures. SUMMARY OF LINES RESULTS AS TESTED Product Lines - Round 1 Pressure Tests Test Date Result Diesel Tank 1 to Dispenser (13) 01/22/2025 PASS Regular Tank 2 to Dispenser (5,6) 01/22/2025 PASS Premium Tank 3 to Dispenser (5,6) 01/22/2025 PASS Ethanol Free Tank 4 to Dispenser (9,10) 01/22/2025 PASS Dyed Diesel Tank 5 to Dispenser (14) 01/22/2025 PASS COMMENTS/DISCUSSIONS All lines passed the tests. RECOMMENDATIONS There are no recommendations. FUEL SYSTEM DETAILS Fuel Operation System Pressure Tank Single Wall (Steel) Line Fibreglass Heber On The Run US213504 Diagnostic Report to 22-01-2025 Page 3 ADDENDUM Licensed Tester Garrett Herlache Report Prepared by Jeff Stevenson Leighton O'Brien Field Services Pty Ltd Phone: +61 3 9804 2200 Fax: +61 3 9804 2299 USA: +1 888 275 3781 Email: info@leightonobrien.com www.leightonobrien.com Glossary of Terms UPSSs: Underground Petroleum Storage Systems. USEPA: United States of America Environmental Protection Agency. The underground pipe and tank configurations contained in this report are deduced from information gathered at the site by Leighton O'Brien Field Services and by information given to Leighton O'Brien Field Services by the client. Test technology used: Leighton O'Brien wet test (mass based), Leighton O'Brien ullage test (pressure or vacuum), Quantitative Wet Line Test PM2 and Qualitative Dry Line Test PM2 Leighton O'Brien Field Services are provided on the terms and conditions set out in the conditions of sale document. The Leighton O'Brien service is warranted to the invoiced value of services performed in accordance with section 64A of the Australian Consumer Law (Schedule 2 of the Competition and Consumer Act 2010). Heber On The Run US213504 Diagnostic Report to 22-01-2025 Page 4 LINE TESTS DETAILS Line Tests - Round 1 Pressure Tests Date Start End Cert # Result Condition gal/hr Psi Ethanol Free Tank 4 to Dispenser (9,10)* 01/22/25 18:46 19:26 544160 PASS Wet 0 49.31 Premium Tank 3 to Dispenser (5,6)* 01/22/25 18:46 19:26 544160 PASS Wet 0 49.31 Regular Tank 2 to Dispenser (5,6)* 01/22/25 18:46 19:26 544160 PASS Wet 0 49.31 Diesel Tank 1 to Dispenser (13)* 01/22/25 17:58 18:39 544159 PASS Wet 0 49.52 Dyed Diesel Tank 5 to Dispenser (14)* 01/22/25 17:58 18:39 544159 PASS Wet 0 49.52 Lines tested to a 0.05 gph leak rate using Leighton O'Brien PM2 test equipment & procedures *Lines were manifolded during testing Heber On The Run US213504 Diagnostic Report to 22-01-2025 Page 5 SITE LOCATION