HomeMy WebLinkAboutDERR-2025-000676
UPSS Precision Test Report
Date 01/23/2025
Report # US213504
Site On The Run
1590 S Hwy 40
Heber
UT 84032
USA
Test Date(s) 01/22/2025
Reason for Test Annual Compliance
E-mail: jeffstevenson@leightonobrien.com
Website: www.leightonobrien.com
Service Distributor: Seneca Companies, Inc.
www.senecaco.com
Tel. 563-332-8000
EXECUTIVE SUMMARY
All lines passed the tests.
RECOMMENDATIONS
There are no recommendations.
Heber On The Run US213504 Diagnostic Report to 22-01-2025
Page 2
AIM
METHODOLOGY
To investigate the integrity of the UPSSs due to Annual
Compliance
An individual test was / were performed on the product
line(s). Line was/were tested to a 0.05 gph leak rate
using Leighton O'Brien PM2 test equipment &
procedures.
SUMMARY OF LINES RESULTS AS TESTED
Product Lines - Round 1 Pressure Tests Test Date Result
Diesel Tank 1 to Dispenser (13) 01/22/2025 PASS
Regular Tank 2 to Dispenser (5,6) 01/22/2025 PASS
Premium Tank 3 to Dispenser (5,6) 01/22/2025 PASS
Ethanol Free Tank 4 to Dispenser (9,10) 01/22/2025 PASS
Dyed Diesel Tank 5 to Dispenser (14) 01/22/2025 PASS
COMMENTS/DISCUSSIONS
All lines passed the tests.
RECOMMENDATIONS
There are no recommendations.
FUEL SYSTEM DETAILS
Fuel Operation System Pressure
Tank Single Wall (Steel)
Line Fibreglass
Heber On The Run US213504 Diagnostic Report to 22-01-2025
Page 3
ADDENDUM
Licensed Tester Garrett Herlache
Report Prepared by Jeff Stevenson
Leighton O'Brien
Field Services Pty Ltd
Phone: +61 3 9804 2200
Fax: +61 3 9804 2299
USA: +1 888 275 3781
Email: info@leightonobrien.com
www.leightonobrien.com
Glossary of Terms
UPSSs: Underground Petroleum Storage
Systems.
USEPA: United States of America Environmental
Protection Agency.
The underground pipe and tank configurations
contained in this report are deduced from information
gathered at the site by Leighton O'Brien Field Services
and by information given to Leighton O'Brien Field
Services by the client.
Test technology used: Leighton O'Brien wet test (mass
based), Leighton O'Brien ullage test (pressure or
vacuum), Quantitative Wet Line Test PM2 and
Qualitative Dry Line Test PM2
Leighton O'Brien Field Services are provided on the
terms and conditions set out in the conditions of sale
document. The Leighton O'Brien service is warranted
to the invoiced value of services performed in
accordance with section 64A of the Australian
Consumer Law (Schedule 2 of the Competition and
Consumer Act 2010).
Heber On The Run US213504 Diagnostic Report to 22-01-2025
Page 4
LINE TESTS DETAILS
Line Tests - Round 1 Pressure Tests Date Start End Cert # Result Condition gal/hr Psi
Ethanol Free Tank 4 to Dispenser
(9,10)* 01/22/25 18:46 19:26 544160 PASS Wet 0 49.31
Premium Tank 3 to Dispenser (5,6)* 01/22/25 18:46 19:26 544160 PASS Wet 0 49.31
Regular Tank 2 to Dispenser (5,6)* 01/22/25 18:46 19:26 544160 PASS Wet 0 49.31
Diesel Tank 1 to Dispenser (13)* 01/22/25 17:58 18:39 544159 PASS Wet 0 49.52
Dyed Diesel Tank 5 to Dispenser
(14)* 01/22/25 17:58 18:39 544159 PASS Wet 0 49.52
Lines tested to a 0.05 gph leak rate using Leighton O'Brien PM2 test equipment & procedures
*Lines were manifolded during testing
Heber On The Run US213504 Diagnostic Report to 22-01-2025
Page 5
SITE LOCATION