Loading...
HomeMy WebLinkAboutDAQ-2025-000439Robert Checketts Vice President Operations and Engineering January 8,2025 Mr. Bryce Bird Executive Secretary Utah Division of Air Quality 195 North 1950 West Salt Lake City, UT 84116 cc: A BERKSHIRE HATHAWAY ENERGY COMPANY 2755 E. Cottonwood Parliway, Suite 300 Salr Lake City, UT 84 I2 I 80 r -937-6103 UTAH DEPARTMENT OF ENVIRONMENTAL QUAUTY l,^,tl . . RE:Veyo Compressor Station Permit No. 5300050004 2024 Semiannual Monitoring Report D:'"S:ON OF AIR QUALIT, Dear Mr. Bird: Kern River Gas Transmission Company (Kern River) operates the Veyo compressor station located in Veyo, Utah, under its current Title V Operating Permit 5300050004 issued October 22,2024. Enclosed, please find the second 2024 Semiannual Monitoring Report covering the period from July I ,2024, to December 31, 2024, as required by Condition I.S.2.a of the Operating Permit. If there are any questions, or if any additional information is needed, please contact Reed Kitchen at (801 ) 937 -6163 or reed.kitchen@kemrivergas.com. I certifu that, based on information and belief formed after reasonable inquiry, the statements and information in this document are true, accurate and complete. Environmental Protection Agency Office of Partnerships and Regulatory Air and Radiation Program (8P-AR) 1595 Wynkoop Street Denver, CO 80202-1129 Assistance Sincerel Enclosure REVIEWED Initials JBR Date 1/23/25 Comp Status Meets File # 12512 Blue 2 no dev rptd none in file. Semiannual Monitoring A BERKSHIRE HATHAWAY ENERGY COMPANY Report TO: Executive Secretary, Utah Air Quality Board FROM: Kern River Gas Transmission Company, Veyo RE: Permit # 5300050004 DATE: January 8,2025 compressor Station urAH DE'ARTMEN'r oF ENVINONMENTAL QUAUIY 1,1 rl l,r ll D;":SrON OF AIR QUALITi In accordance with Operating Permit Condition I.S.2.a and Utah Administrative Code (UAC) R307-415- 6a(3)(c)(i), the following monitoring report is submitted. This report covers the period from July 112024 to December 31, 2024. For the indicated reporting period: X There were no deviations from any permit requirements. tr Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision I.S.2.a, and UAC R307-415-6a(3XcXi). tr In lieu of attaching the above list, deviation reports submitted in accordance with permit provision I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below. In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and belief formed after le inqfry, I certifu that the statements and information in this document are true, accurate, Ll8l2o2s Robert Checketts, Vice President - Operations and Engineering Name of Responsible Official and Page 1 of 1