HomeMy WebLinkAboutDAQ-2025-000439Robert Checketts
Vice President
Operations and Engineering
January 8,2025
Mr. Bryce Bird
Executive Secretary
Utah Division of Air Quality
195 North 1950 West
Salt Lake City, UT 84116
cc:
A BERKSHIRE HATHAWAY ENERGY COMPANY
2755 E. Cottonwood Parliway, Suite 300
Salr Lake City, UT 84 I2 I
80 r -937-6103
UTAH DEPARTMENT OF
ENVIRONMENTAL QUAUTY
l,^,tl . .
RE:Veyo Compressor Station
Permit No. 5300050004
2024 Semiannual Monitoring Report
D:'"S:ON OF AIR QUALIT,
Dear Mr. Bird:
Kern River Gas Transmission Company (Kern River) operates the Veyo compressor station
located in Veyo, Utah, under its current Title V Operating Permit 5300050004 issued
October 22,2024.
Enclosed, please find the second 2024 Semiannual Monitoring Report covering the period from
July I ,2024, to December 31, 2024, as required by Condition I.S.2.a of the Operating Permit.
If there are any questions, or if any additional information is needed, please contact Reed Kitchen
at (801 ) 937 -6163 or reed.kitchen@kemrivergas.com.
I certifu that, based on information and belief formed after reasonable inquiry, the statements and
information in this document are true, accurate and complete.
Environmental Protection Agency
Office of Partnerships and Regulatory
Air and Radiation Program (8P-AR)
1595 Wynkoop Street
Denver, CO 80202-1129
Assistance
Sincerel
Enclosure
REVIEWED
Initials JBR Date 1/23/25
Comp Status Meets
File # 12512 Blue 2
no dev rptd none in file.
Semiannual Monitoring A BERKSHIRE HATHAWAY ENERGY COMPANY
Report
TO: Executive Secretary, Utah Air Quality Board
FROM: Kern River Gas Transmission Company, Veyo
RE: Permit # 5300050004
DATE: January 8,2025
compressor Station urAH DE'ARTMEN'r oF
ENVINONMENTAL QUAUIY
1,1 rl
l,r ll
D;":SrON OF AIR QUALITi
In accordance with Operating Permit Condition I.S.2.a and Utah Administrative Code (UAC) R307-415-
6a(3)(c)(i), the following monitoring report is submitted.
This report covers the period from July 112024 to December 31, 2024.
For the indicated reporting period:
X There were no deviations from any permit requirements.
tr Attached is a list of permit requirements for which there were deviations. The list includes the
information required by Operating Permit provision I.S.2.a, and UAC R307-415-6a(3XcXi).
tr In lieu of attaching the above list, deviation reports submitted in accordance with permit provision
I.S.2.c, and UAC R307-415-6a(3)(c)(ii) are referenced below.
In accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on information and belief
formed after le inqfry, I certifu that the statements and information in this document are true, accurate,
Ll8l2o2s
Robert Checketts, Vice President - Operations and Engineering
Name of Responsible Official
and
Page 1 of 1