Loading...
HomeMy WebLinkAboutDAQ-2025-000429Chewonv Troy Tortorich Refinery Manager Salt Lake Refinery Chevron Products Company 685 S Chevron Way North Salt Lake, UT 84054 Tel 801 539 7200 Fax 801 539 7130 January 29,2024 CERTIFIED MAIL RETURN RECETPT NO. 7021 2720 00014083 6937 Mr. Bryce Bird, Director Utah Division of Air Quality P.O. Box 144820 195 North 1950 West Salt Lake City, UT 84114-4820 MACT DDDDD Annual Compliance Report -2023 Chevron Products Company Salt Lake Refinery Dear Mr. Bird: UTAH DEPARTMENT OF ENVIRONMENTAL OI'AUTY FEB " 2 2c24 DIVISION OF AIR QUALITV In compliance with the reporting requirements of 40 CFR Part 63, Subpart DDDDD, the following constitutes the compliance report required by $63.7550(b) and (c) applicable to the Chevron Products Company, Salt Lake Refinery. In accordance with $63.7550(h)(3) this report will be submitted to the Environmental Protection Agency using the Compliance and Emissions Data Reporting Interface. This compliance report covers the reporting period January 1,2023 through December 31,2023 for the furnaces and boilers subject to annual tune-ups. In accordance with $63.7550(c)(1), if the facility is subject to the requirements of a tune-up, the compliance report shall contain the information in paragraphs (c)(5)(i) through (iii), (xiv) and (xvii). In 2023,the Refinery operated 3 boilers and l5 process heaters that are subject to annual tune-ups, which are not subject to emissions limitations or operating parameter limitations for purposes of 40 CFR Part 63, Subpart DDDDD. The table below includes information required by 963.7550(c). Emission Unit ID Emission Unit Name Rated Heat Input Capacity (MMBtu/hr)r Subcategory Fuel Used2 Date of Most Recent Tune- up and Insoection Ft 1 00s Boiler # 5 - Foster Wheeler t7t Unit designed to burn gas 1 fuels. Refinery fuel sas April14,2023 Fl 1 006 Boiler # 6 - Rentech Boiler Svstems 17t Unit designed to burn gas 1 fuels. Refinery fuel gas April14,2023 Fl1007 Boiler #7 225 Unit designed to burn sas I fuels. Refinery fuel sas April14,2023 F2l 001 Crude Unit Process Heater - John Zink 130 Unit designed to burn gas 1 fuels. Refinery fuel gas April28,2023 F21002 Crude Unit Process Heater - John Zink I15.1 Unit designed to burn gas I fuels. Refinery fuel gas April28,2023 REVIEWEDInitials: Date: August 20, 2024Compliance Status: OKFile #: 10119 (B2) Emission Unit ID Emission Unit Name Rated Heat Input Capacity (MMBtu/hr)t Subcategory Fuel Used2 Date of Most Recent Tune- up and Insnection F32023 FCC Process Heater - Born Ensineerins 48.2 Unit designed to burn gas 1 fuels. Refinery fuel gas June 16,2023 F35001 Reformer Process Heater - Seilas Corp s2.3 Unit designed to burn gas I fuels. Refinery fuel gas June I 6,2023 F3s002 Reformer Process Heater - Seilas Corp 45 Unit designed to burn gas I fuels. Refinery fuel gas June 16,2023 F35003 Reformer Process Heater - Seilas Corp 31.7 Unit designed to burn gas 1 fuels. Refinery fuel gas June 16,2023 F3601 7 Alkylation Process Heater - Econo-Therm 108 Unit designed to burn gas I fuels. Refinery fuel gas June 16,2023 F6401 0 HDS Process Heater - Tulsa Heaters 19 Unit designed to burn gas 1 fuels. Refinery fuel gas April28,2023 F6401 1 HDS Process Heater - Tulsa Heaters 27.3 Unit designed to burn gas 1 fuels. Refinery fuel gas April28,2023 F661 00 VGO Process Heater - C)nouest 40 Unit designed to burn sas I fuels. Refinerv fuel sas May 5,2023 F66200 VGO Process Heater - Onouest 66 Unit designed to burn sas 1 fuels. Refinery fuel sas May 5,2023 F70001 Coker Unit Process Heater - Petro-Chem Development 139.2 Unit designed to burn gas 1 fuels. Refinery fuel gas May 5,2023 F7 t 010 HDN Process Heater - Petro- Chem Develooment 15.6 Unit designed to burn gas 1 fuels. Refinery fuel gas May 5,2023 F7 I 030 HDN Process Heater - Petro- Chem Develooment 36.3 Unit designed to burn gas 1 fuels. Refinery fuel gas May 5,2023 Notes: I Million British Thermal Units per hour 2 The fuel burned is refinery fuel gas and is not a secondary material determined by Chevron or the EPA through a petition process to be a non-waste under $241.3 of this chapter, nor is the fuel gas a secondary material processed from discarded non-hazardous secondary materials within the meaning of $241.3 of Chapter I. If you have any questions, please contact Lauren Vander Werffat (801) 539-7386 or LVanderWerff@ chevron. com. Based on information and belief formed after reasonable inquiry, I certifr the statements and information submitted in this report are true, accurate and complete. Sincerely, rroy rortorich ,wfrt,3fr'aflIt=A.J;31" FEB - ?, ?A24 DIVISION OF AIR QUALIT' REVIEWEDInitials: Date: August 20, 2024Compliance Status: OKFile #: 10119 (B2)