HomeMy WebLinkAboutDAQ-2025-000429Chewonv Troy Tortorich
Refinery Manager
Salt Lake Refinery
Chevron Products Company
685 S Chevron Way
North Salt Lake, UT 84054
Tel 801 539 7200
Fax 801 539 7130
January 29,2024
CERTIFIED MAIL
RETURN RECETPT NO. 7021 2720 00014083 6937
Mr. Bryce Bird, Director
Utah Division of Air Quality
P.O. Box 144820
195 North 1950 West
Salt Lake City, UT 84114-4820
MACT DDDDD Annual Compliance Report -2023
Chevron Products Company
Salt Lake Refinery
Dear Mr. Bird:
UTAH DEPARTMENT OF
ENVIRONMENTAL OI'AUTY
FEB " 2 2c24
DIVISION OF AIR QUALITV
In compliance with the reporting requirements of 40 CFR Part 63, Subpart DDDDD, the following
constitutes the compliance report required by $63.7550(b) and (c) applicable to the Chevron Products
Company, Salt Lake Refinery. In accordance with $63.7550(h)(3) this report will be submitted to the
Environmental Protection Agency using the Compliance and Emissions Data Reporting Interface. This
compliance report covers the reporting period January 1,2023 through December 31,2023 for the
furnaces and boilers subject to annual tune-ups.
In accordance with $63.7550(c)(1), if the facility is subject to the requirements of a tune-up, the
compliance report shall contain the information in paragraphs (c)(5)(i) through (iii), (xiv) and (xvii). In
2023,the Refinery operated 3 boilers and l5 process heaters that are subject to annual tune-ups, which are
not subject to emissions limitations or operating parameter limitations for purposes of 40 CFR Part 63,
Subpart DDDDD. The table below includes information required by 963.7550(c).
Emission
Unit ID
Emission Unit
Name
Rated Heat
Input
Capacity
(MMBtu/hr)r
Subcategory Fuel Used2 Date of Most
Recent Tune-
up and
Insoection
Ft 1 00s Boiler # 5 -
Foster Wheeler
t7t Unit designed to
burn gas 1 fuels.
Refinery fuel
sas
April14,2023
Fl 1 006 Boiler # 6 -
Rentech Boiler
Svstems
17t Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
April14,2023
Fl1007 Boiler #7 225 Unit designed to
burn sas I fuels.
Refinery fuel
sas
April14,2023
F2l 001 Crude Unit
Process Heater -
John Zink
130 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
April28,2023
F21002 Crude Unit
Process Heater -
John Zink
I15.1 Unit designed to
burn gas I fuels.
Refinery fuel
gas
April28,2023
REVIEWEDInitials: Date: August 20, 2024Compliance Status: OKFile #: 10119 (B2)
Emission
Unit ID
Emission Unit
Name
Rated Heat
Input
Capacity
(MMBtu/hr)t
Subcategory Fuel Used2 Date of Most
Recent Tune-
up and
Insnection
F32023 FCC Process
Heater - Born
Ensineerins
48.2 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
June 16,2023
F35001 Reformer Process
Heater - Seilas
Corp
s2.3 Unit designed to
burn gas I fuels.
Refinery fuel
gas
June I 6,2023
F3s002 Reformer Process
Heater - Seilas
Corp
45 Unit designed to
burn gas I fuels.
Refinery fuel
gas
June 16,2023
F35003 Reformer Process
Heater - Seilas
Corp
31.7 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
June 16,2023
F3601 7 Alkylation
Process Heater -
Econo-Therm
108 Unit designed to
burn gas I fuels.
Refinery fuel
gas
June 16,2023
F6401 0 HDS Process
Heater - Tulsa
Heaters
19 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
April28,2023
F6401 1 HDS Process
Heater - Tulsa
Heaters
27.3 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
April28,2023
F661 00 VGO Process
Heater - C)nouest
40 Unit designed to
burn sas I fuels.
Refinerv fuel
sas
May 5,2023
F66200 VGO Process
Heater - Onouest
66 Unit designed to
burn sas 1 fuels.
Refinery fuel
sas
May 5,2023
F70001 Coker Unit
Process Heater -
Petro-Chem
Development
139.2 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
May 5,2023
F7 t 010 HDN Process
Heater - Petro-
Chem
Develooment
15.6 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
May 5,2023
F7 I 030 HDN Process
Heater - Petro-
Chem
Develooment
36.3 Unit designed to
burn gas 1 fuels.
Refinery fuel
gas
May 5,2023
Notes:
I Million British Thermal Units per hour
2 The fuel burned is refinery fuel gas and is not a secondary material determined by Chevron or the EPA through
a petition process to be a non-waste under $241.3 of this chapter, nor is the fuel gas a secondary material
processed from discarded non-hazardous secondary materials within the meaning of $241.3 of Chapter I.
If you have any questions, please contact Lauren Vander Werffat (801) 539-7386 or
LVanderWerff@ chevron. com.
Based on information and belief formed after reasonable inquiry, I certifr the statements and information
submitted in this report are true, accurate and complete.
Sincerely,
rroy rortorich ,wfrt,3fr'aflIt=A.J;31"
FEB - ?, ?A24
DIVISION OF AIR QUALIT'
REVIEWEDInitials: Date: August 20, 2024Compliance Status: OKFile #: 10119 (B2)