Loading...
HomeMy WebLinkAboutDAQ-2025-000428Chcvtottv Josh Byram HES Manager Chevron Products Company Salt Lake Refinery 685 South Chevron way North Salt Lake, UT 84054 Tel (801) 539-7200 Fax (801) 539-7130 mlAH DL,-PARTMENT? :* ENVI ROi'iMENTAL QTIAL ITY October 8,2024 7018 0680 0001 4890 0406 Mr. Bryce Bird, Director Division of Air Quality Utah Department of Environmental Quality P.O. Box 144820 195 North 1950 West Salt Lake City, UT 84114-8420 Attention: 3rd Quarter 2024 VOC Monitoring Report Chevron Products Company, Salt Lake City, UT Refinery Mr. Bird: As required by R307-326-9(7), Chevron Salt Lake Refinery (Chevron) is submitting the 3rd Quarter 2024 VOC monitoring and leak data for UACR-regulated components. In compliance with the Consent Decree (C 03-04650 CRB), UACR-regulated valves in light-liquid and gas vapor service are now being inspected quarterly (with the exception of valves in process units that are currently on alternative skip monitoring rules as allowed under Appendix K of the Consent Decree). Chevron certifies that all monitoring required by Utah Administrative Code Title R307-326-9 has been conducted during the calendar quarter at the Salt Lake Refinery. Please contact Mr. Tony Pollock at (801) 539-7162 for additional information regarding this report. Sincerely, /-?- DIVISION OF AIR OIIAI IT Josh Byram REVIEWEDInitials:Date: Jan 22, 2025Complinanc Status: OKFile #: 10119 (B2) Mr. Bryce Bird Department of Environmental Quality October 8.2024 Page 2 Table 1- Component Monitoring and Leak Data 3 rd Quarte r 2024 UACR-regulated Vapor Com ponents Inspection Sum maly : Total VOC Components Tested: VOC Components found leaking (includes S/D components): Percent of VOC Components Found Leaking: 3 rd Quarte r 2024 UACR- regulated Liq uid Components Inspection Sum ma ry: Total VOC Components Tested: VOC Components found leaking (includes S/D components): Percent of VOC Components Found Leaking: 3rd Quarter 2024 UACR-regulated Process Drains Inspection Summary: Total Process Drains Tested: Process Drains found leaking (10,000 PPM leak definition): Percent ofProcess Drains Found Leaking: 8722 l0 0.11% 7927ll 0.20% 82 0 0.00% REVIEWEDInitials:Date: Jan 22, 2025Complinanc Status: OKFile #: 10119 (B2) Mr. Bryce Bird Department of Environmental Quality October 8,2024 Page 3 -Tnfu DnPARTMENT oF r t rv r noll.tyt e NTA! O u4![v DIVISION OF AIR OUALITY 00T 1 6 2024 Table 2 - Leaking Component Repair Activity Number of Components on Shutdown Listing at Beginning-of-Periodz 2 Proecss Unit & ID Comporcrt Tvts voc ste hffiI Dissovortd Alkv- P360978 Pump Lieht Liquid 611012024 Alky- P36001 Pump Light Liquid 6n0t2024 Number of Components added to Shutdown Listing during period (Note 1): 0 PrCIc€sc Unit& ID Componont TVue VOC Stat6 Ilslg L,ak Discovord None to renort. Note 1: Includes components placed on Delay-of-Repair listing as allowed under rules specified in 40CFR60.482-9. Number of Components on Shutdown Listing repaired during period: 2 Prococs Uoit& ID Componont TVoo voc s86 D$6l,sak Rcnelned Alkv- P360978 Pump L eht Liquid 7fit2024 Alkv- P36001 Pump L sht Liouid 7nt/2024 Number of Components on Shutdown Listing at End-of-Period: Prossus Unit& ID Compomt T?oe VOC Stab Ddo tmk Diaeovoftsd None to report. REVIEWEDInitials:Date: Jan 22, 2025Complinanc Status: OKFile #: 10119 (B2)