Loading...
HomeMy WebLinkAboutDAQ-2025-0004270rcuolrv Chevron Products Company Salt Lake Refinery 685 South Chevron Way North Salt Lake, UT 84054 Tel (801) 539-7200 Fax (801) 539-7130 I,TAH DEPAHTMENT OF EI.IVIRONMENTAL OTJAUTY APH 1 I 2A24April08,2024 CERTIFIED MAIL NO. 7018 0680 0001 4890 034s DlvlsloN oF AIR QUALITY Mr. Bryce Bird, Director Division of Air Quality Utah Department of Environmental Quality P.O. Box 144820 195 North 1950 West Salt Lake city, uT 84114-8420 Attention: lst Quarter 2024VOC Monitoring Report Chevron Products Company, Salt Lake City, UT Refinery Mr. Bird: As required by R307-326-9(7), Chevron Salt Lake Refinery (Chevron) is submitting the 1st Quarter 2024YOC monitoring and leak data for UACR-regulated components. In compliance with the Consent Decree (C 03-04650 CRB), UACR-regulated valves in lightJiquid and gas vapor service are now being inspected quarterly (with the exception of valves in process units that are currently on alternative skip monitoring rules as allowed under Appendix K of the Consent Decree). Chevron certifies that all monitoring required by Utah Administrative Code Title R307-326-9 has been conducted during the calendar quarter at the Salt Lake Refinery. Please contact Mr. Tony Pollock at (801) 539-7162 for additional information regarding this report. Kyle Drach HSE Manager 't. Ir..Sincerely, Kyle Drach REVIEWED Initials: Date: August 16, 2024 Compliance Status: OK File #: 10119 (B2) Mr. Bryce Bird Department of Environmental Quality April08,2024 Page2 Table 1 - Component Monitoring and Leak Data lst Quarter z024u{CR-regulated Vapor Comnonents Inspection Summary: Total VOC Components Tested: VOC Components found leaking (includes S/D components): Percent of VOC Components Found Leaking: lst Quarter 2024 UAcR-regulated Liquid Components Inspection Summary: Total VOC Components Tested: VOC Components found leaking (includes SID components): Percent of VOC Components Found Leaking: lst Quarter 2024 UAcR-regulated Process Drains Inspection Summary: Total Process Drains Tested: Process Drains found leaking (10,000 PPM leak definition): Percent of Process Drains Found Leaking: 9,040 2l 0.23% 7,582 I 0.01% 308 0 0.00o/o Mr. Bryce Bird Departrrent of Environmental Quality April08,2024 Page 3 APR t I N24 Trble 2 - Lealdng Component Repoir Activity Number of Componenb on Shutdswn Listing at Beginnlng-of-Period: Number of Conponcntr ddcd lo Shutdown Listiry durtng period (Note l): Note 1: hrhdes cotnponents placed on Deloy-of-Repair listing as allowed under rules specified in,{W FR60. 482 -9. Numberof Componenfi on Shutdown Listing repairod during period: 0 Number of Components on Shutdowu Lkting at End-of-Period: DIVISION OFAIR OUALITY REVIEWED Initials: Date: August 16, 2024 Compliance Status: OK File #: 10119 (B2)