Loading...
HomeMy WebLinkAboutDAQ-2025-000415Chcvroov Kyle Drach Salt Lake Refinery HES Manager Chevron Products Company 685 South Chevron Way North Salt Lake, UT 84054 Tel 801 539 7200 Fax 801 539 7130 Feb 19,2023 CERTIFIED MAIL RETURN RECEIPT NO. 7021 2720 00Ot 4083 7224 urAH DEpARrillFNr oFENVIRONMENTAL QUAUTY Mr. Bryce Bird, DirectorUtahDivisionofAirQuality FEu '. '' -' ri 195 North 1950 West PO Box 144820 Salt Lake City, Utah B4Lt4-4820 DIVISION OF AIH QUALIT\' bbird@utah.eov Attention: Joe Rockwell - jrockwell@.utah. gov 40 CFR Part 60 Subpart aaa - 2nd Half 2023 Semiannual Report Dear Mr. Bird, In accordance with the requirements specified in 40 CFR 60 Subpart QQQ, the following constitutes the reporting information required under $60.698 applicable to the Chevron Products Company, Salt Lake Refinery. This report covers July I through December 31,2023. The table below summarizes inspection results of the individual drain systems subject to NSPS Qaa. Inspection Results 2023 Month Number of inspections showing water seals dry or breached Number of inspections showing missing or improperly installed drain caDs or plugs Number of inspections showing cracks, gaps, or other problems that could result in VOC emissions July 0 0 0 August 0 0 0 September 0 0 0 October 0 0 0 November 0 0 0 December 0 0 0 REVIEWEDInitials: Date: August 20, 2024Complinace Status: OKFile #: 10119 (B2) Page2 Certilication of Compliance In accordance with $60.698(b)(l), I certi that all of the required inspections have been caried out in accordance with the applicable aaa standards. Please contact Joseph Moore at (801) 539-7 or j osephmoore@chevron.com with any questions. Sincerely, Kyle Drach 726.2.2 CERTIFIED MAIL NO. 7O2I 2720 Bob Gallagher 4083 723r U.S. EPA Region 8 -Montanal0 West l5th Steeg Suite 3200 Helena, MT 59626 Gallagher.Bob@epa. gov