HomeMy WebLinkAboutDAQ-2025-000415Chcvroov Kyle Drach Salt Lake Refinery
HES Manager Chevron Products Company
685 South Chevron Way
North Salt Lake, UT 84054
Tel 801 539 7200
Fax 801 539 7130
Feb 19,2023
CERTIFIED MAIL
RETURN RECEIPT NO. 7021 2720 00Ot 4083 7224 urAH DEpARrillFNr oFENVIRONMENTAL QUAUTY
Mr. Bryce Bird, DirectorUtahDivisionofAirQuality FEu '. '' -' ri
195 North 1950 West
PO Box 144820
Salt Lake City, Utah B4Lt4-4820 DIVISION OF AIH QUALIT\'
bbird@utah.eov
Attention: Joe Rockwell - jrockwell@.utah. gov
40 CFR Part 60 Subpart aaa - 2nd Half 2023 Semiannual Report
Dear Mr. Bird,
In accordance with the requirements specified in 40 CFR 60 Subpart QQQ, the following
constitutes the reporting information required under $60.698 applicable to the Chevron Products
Company, Salt Lake Refinery. This report covers July I through December 31,2023. The table
below summarizes inspection results of the individual drain systems subject to NSPS Qaa.
Inspection Results
2023 Month Number of
inspections showing
water seals dry or
breached
Number of inspections
showing missing or
improperly installed drain
caDs or plugs
Number of inspections
showing cracks, gaps, or
other problems that could
result in VOC emissions
July 0 0 0
August 0 0 0
September 0 0 0
October 0 0 0
November 0 0 0
December 0 0 0
REVIEWEDInitials: Date: August 20, 2024Complinace Status: OKFile #: 10119 (B2)
Page2
Certilication of Compliance
In accordance with $60.698(b)(l), I certi that all of the required inspections have been caried
out in accordance with the applicable aaa standards.
Please contact Joseph Moore at (801) 539-7 or j osephmoore@chevron.com with any questions.
Sincerely,
Kyle Drach
726.2.2
CERTIFIED MAIL NO. 7O2I 2720
Bob Gallagher
4083 723r
U.S. EPA Region 8 -Montanal0 West l5th Steeg Suite 3200
Helena, MT 59626
Gallagher.Bob@epa. gov