Loading...
HomeMy WebLinkAboutDDW-2025-000824Deidre Beck <dbeck@utah.gov> Big Plans Water SSD - Canaan Springs PER and DWSP Plan 6 messages Li Qi <lqi@sunrise-eng.com>Thu, Dec 14, 2023 at 12:11 PM To: Deidre Beck <dbeck@utah.gov> Cc: Nathan Wallentine <nwallentine@sunrise-eng.com> Hi Deidre, Please use the following link to download the Combined PER and DWSP Plan of the Big Plains Water SSD – Canaan Springs Water System, System No. 27093, Source No. WS001: System No. 27093 Thank you, LI QI, P.E., CFM Project Manager lqi@sunrise-eng.com 6875 South 900 East, Salt Lake City, Utah 84047 TEL 801.838.8325   CELL 801.971.2288 sunrise-eng.com Deidre Beck <dbeck@utah.gov>Thu, Dec 14, 2023 at 4:40 PM To: Li Qi <lqi@sunrise-eng.com> Cc: Nathan Wallentine <nwallentine@sunrise-eng.com>, "J. Paul Wright" <pwright@utah.gov> 1/23/25, 2:47 PM State of Utah Mail - Big Plans Water SSD - Canaan Springs PER and DWSP Plan https://mail.google.com/mail/u/0/?ik=c26a5d4cc7&view=pt&search=all&permthid=thread-f:1785285651244276691&simpl=msg-f:17852856512442766…1/3 Received; thank you. I have logged this combined PER/DWSP Plan into our queue for review. I will reach out with any questions/comments upon review. [Quoted text hidden] -- Deidre Beck, PG, GISP Environmental Scientist III | Permitting M: (385) 271-7046 P: (801) 536-4200 drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Li Qi <lqi@sunrise-eng.com>Fri, Dec 15, 2023 at 5:50 PM To: Deidre Beck <dbeck@utah.gov> Cc: Nathan Wallentine <nwallentine@sunrise-eng.com>, "J. Paul Wright" <pwright@utah.gov> Deidre, Have you also received the following submittal? Hi Deidre, Please use the link to download the PER and DWSP Plans of the Big Plains Water SSD – Cedar Point Water System, System No. 27089, Source Numbers WS002, WS003, WS004, and WS005: System No. 27089 Let me know if you have any questions. Thank you, Li [Quoted text hidden] Deidre Beck <dbeck@utah.gov>Mon, Dec 18, 2023 at 7:35 AM To: Li Qi <lqi@sunrise-eng.com> Cc: Nathan Wallentine <nwallentine@sunrise-eng.com>, "J. Paul Wright" <pwright@utah.gov> Yes, I haven't had a chance to enter them into our database. Once I have, you'll receive a response. Thanks. [Quoted text hidden] Deidre Beck <dbeck@utah.gov>Fri, Jan 5, 2024 at 9:06 AM To: Li Qi <lqi@sunrise-eng.com> Cc: Nathan Wallentine <nwallentine@sunrise-eng.com>, "J. Paul Wright" <pwright@utah.gov> Hi Li, I have reviewed the PER for Canaan Springs; however, before the Division can concur, the following item(s) must be addressed: 1/23/25, 2:47 PM State of Utah Mail - Big Plans Water SSD - Canaan Springs PER and DWSP Plan https://mail.google.com/mail/u/0/?ik=c26a5d4cc7&view=pt&search=all&permthid=thread-f:1785285651244276691&simpl=msg-f:17852856512442766…2/3 Section 2.0 - Delineation Report The boundaries for zones 2, 3, and 4 are based only on topographic divides; however, topographic divides and surface water divides are not always groundwater divides. If a topographic divide is used in a delineation as a groundwater divide, evidence for the groundwater divide must be explained in the delineation report. One method to support the delineated zones may include an estimation of the catchment area necessary for Canaan Springs. Catchment area calculations are explained in the report titled Investigation of Hydrogeologic Mapping to Delineate Protection Zones Around Springs - Report of Two Case Studies, which I believe you have a copy of. The catchment area calculations would be similar to the ones you completed for Springdale Town's Big Spring. I have some concerns about the size of the management area. It is only 0.3 square miles and I want to be sure that the management area is large enough to accommodate the flow coming out of Canaan Springs (assuming there are no other water rights in the zones that also need to be included). I'm assuming that catchment area calculations will confirm the boundaries as they are currently delineated. If you change the delineation, please be sure to update all subsequent sections of the report. If you have any questions, please reach out. Thanks, [Quoted text hidden] Li Qi <lqi@sunrise-eng.com>Sat, Jan 6, 2024 at 5:54 PM To: Deidre Beck <dbeck@utah.gov> Cc: Nathan Wallentine <nwallentine@sunrise-eng.com>, "J. Paul Wright" <pwright@utah.gov> Hi Deidre, We will talk to our client, revise the Delineation Report, and update all related subsequent sections. Thanks, [Quoted text hidden] 1/23/25, 2:47 PM State of Utah Mail - Big Plans Water SSD - Canaan Springs PER and DWSP Plan https://mail.google.com/mail/u/0/?ik=c26a5d4cc7&view=pt&search=all&permthid=thread-f:1785285651244276691&simpl=msg-f:17852856512442766…3/3 Deidre Beck <dbeck@utah.gov> Big Plains Canaan Springs PER and DWSP Plan 7 messages Li Qi <lqi@sunrise-eng.com>Thu, Apr 25, 2024 at 1:02 PM To: Deidre Beck <dbeck@utah.gov> Hi Deidre, Please use the link below to download the PER and DWSP Plan (combined) for Canaan Springs (WS001) in Big Plains Water SSD – Canaan Springs System. This document has been revised according to your preliminary review comments. The delineation was performed using the hydrogeologic mapping method as related by Mark Jensen and others in the 1997 EPA report entitled Investigation of Hydrogeologic Mapping to Delineate Protection Zones Around Springs. Canaan Springs WS001 PER and DWSP.pdf I assumed that 15% of the average annual precipitation recharged to the springs instead of 10% as used in the 1997 EPA report. The required catchment area was 1.0 square miles, resulting in that the upstream boundaries of the DWSP zones extend over the ridgeline by approximately 3500 feet to other drainages. 1/23/25, 2:47 PM State of Utah Mail - Big Plains Canaan Springs PER and DWSP Plan https://mail.google.com/mail/u/0/?ik=c26a5d4cc7&view=pt&search=all&permthid=thread-f:1797334522077825859&simpl=msg-f:17973345220778258…1/4 Thank you for your review, LI QI, P.E., CFM Project Manager lqi@sunrise-eng.com 6875 South 900 East, Salt Lake City, Utah 84047 TEL 801.838.8325   CELL 801.971.2288 sunrise-eng.com Deidre Beck <dbeck@utah.gov>Thu, Apr 25, 2024 at 2:17 PM To: Li Qi <lqi@sunrise-eng.com> Cc: "J. Paul Wright" <pwright@utah.gov> Hi Li, Thanks. I have logged this combined plan into our queue for review. I'll reach out if I have any other questions. [Quoted text hidden] -- Deidre Beck, PG, GISP Environmental Scientist III | Permitting M: (385) 271-7046 P: (801) 536-4200 drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Li Qi <lqi@sunrise-eng.com>Thu, Apr 25, 2024 at 3:16 PM To: Deidre Beck <dbeck@utah.gov> Cc: "J. Paul Wright" <pwright@utah.gov>, Nathan Wallentine <nwallentine@sunrise-eng.com> Hi Deidre, I am wondering if you have completed the review for the PER and DWSP Plans for the four sources in the Big Plains Water SSD – Ceder Point System (27089). Looks like that our client won’t be able to pay us until obtaining the concurrence letters from DDW. We got the same problem from Angell Springs SSD (27074, update for three sources) as well. Thank you for your help, Li 1/23/25, 2:47 PM State of Utah Mail - Big Plains Canaan Springs PER and DWSP Plan https://mail.google.com/mail/u/0/?ik=c26a5d4cc7&view=pt&search=all&permthid=thread-f:1797334522077825859&simpl=msg-f:17973345220778258…2/4 [Quoted text hidden] Deidre Beck <dbeck@utah.gov>Mon, Apr 29, 2024 at 7:20 AM To: Li Qi <lqi@sunrise-eng.com> Cc: "J. Paul Wright" <pwright@utah.gov>, Nathan Wallentine <nwallentine@sunrise-eng.com> Hi Li, I sent comments to you for those sources months ago and never received a response. Please look back at that email (just forwarded you the email). [Quoted text hidden] Li Qi <lqi@sunrise-eng.com>Mon, Apr 29, 2024 at 9:15 AM To: Deidre Beck <dbeck@utah.gov> Cc: "J. Paul Wright" <pwright@utah.gov>, Nathan Wallentine <nwallentine@sunrise-eng.com> Hi Deidre, I remember that I resubmitted all the PER and DWSP Plans immediately after I revised them per your review comments. Let me find them. Thanks [Quoted text hidden] Deidre Beck <dbeck@utah.gov>Thu, May 2, 2024 at 3:00 PM To: Li Qi <lqi@sunrise-eng.com> Cc: "J. Paul Wright" <pwright@utah.gov>, Nathan Wallentine <nwallentine@sunrise-eng.com> Hi Li, I have reviewed the revised PER/DWSP Plan for Canaan Springs. I can concur with the delineation and have added it to our GIS. Before I can concur with the plan, I will need proof that a map of the final source protection zones has been provided to Washington County to be covered under their source protection ordinance. This is also required for the Operating Permit. I will also prioritize the review of the updates for Angell Springs 27074 since it is holding up payment. If you don't see something in the next month, please feel free to reach out again. Thanks, Deidre [Quoted text hidden] Li Qi <lqi@sunrise-eng.com>Thu, May 2, 2024 at 4:23 PM To: Deidre Beck <dbeck@utah.gov> Cc: "J. Paul Wright" <pwright@utah.gov>, Nathan Wallentine <nwallentine@sunrise-eng.com> Hi Deidre, Thank you for the quick review. Looks like that Nate is on vacation and he will send all the maps to Washington County next week when he comes back office. 1/23/25, 2:47 PM State of Utah Mail - Big Plains Canaan Springs PER and DWSP Plan https://mail.google.com/mail/u/0/?ik=c26a5d4cc7&view=pt&search=all&permthid=thread-f:1797334522077825859&simpl=msg-f:17973345220778258…3/4 Thanks, [Quoted text hidden] 1/23/25, 2:47 PM State of Utah Mail - Big Plains Canaan Springs PER and DWSP Plan https://mail.google.com/mail/u/0/?ik=c26a5d4cc7&view=pt&search=all&permthid=thread-f:1797334522077825859&simpl=msg-f:17973345220778258…4/4