Loading...
HomeMy WebLinkAboutDSHW-2025-000446 PART I - GENERAL INFORMATION APPLICANT: PLEASE COMPLETE ALL SECTIONS I. Application Type New Application Major Modification (see R315-311-2(1)(c)) Renewal Application Minor Modification (see R315-311-2(1)(a)) For Renewal Applications, Facility Expansion Applications, and Modifications Applications, enter current permit number: . II. Facility Name and Location Legal Name of Facility Facility Address (Street or Directions to Facility) County City Zip Code Telephone Township Range Section Quarter Section Quarter/Quarter SectionMain GateLatitude:Longitude: III. Facility Owner(s) Information Name of Facility Owner Mailing Address City State Zip Code Telephone IV. Facility Operator(s) Information Name of Facility Operator Mailing Address Click or tap here to enter text. City State Zip Code Telephone V. Property Owner(s) Information Name of Property Owner Mailing Address City State Zip Code Telephone VI. Designated Contact Information Facility Owner Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Facility Operator Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Property Owner Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) VII. Waste Types (check all that apply) VIII. Facility Area Whole waste tires Material derived from waste tires Other: Facility Area: acres Recycle Area: acres PART II - APPLICATION CHECKLIST Description of Item Rule(s) Cited Included in Submission Location in the Document/Comments Ia. Requirements for All Facilities Complete Part I - General Information R315-310-3(1)(a) Yes No, explain General facility descriptions including maps, plans, and drawings R315-310-3(1)(b) Yes No, explain Legal description of the property, proof of ownership, lease agreement, or other mechanism R315-310-3(1)(c) Yes No, explain The Plan of Operation as required by R315-302-2(2) R315-310-3(1)(e) Yes No, explain Form used to record weights or volumes of wastes received required by R315-302-2(3)(a)(i) R315-310-3(1)(f) Yes No, explain Inspection schedule and inspection log as required by R315-302-2(5)(a) R315-310-3(1)(g) Yes No, explain Closure and post-closure care plans R315-310-3(1)(h) Yes No, explain Proposed financial assurance plan that meets the requirements of R315-309 R315-310-3(1)(j) Yes No, explain Historical and archeological identification efforts R315-310-3(1)(k) Yes No, explain For a new facility owned or operated by a local government, financial information that discloses the costs of establishing and operating the facility R315-310-3(1)(l) Yes No, explain Ib. Public Participation Requirements Name and address of all owners of the property within 1,000 feet of the proposed facility R315-310-3(2)(a)(i) Yes No, explain Documentation that a notice of intent to apply for a permit for a solid waste facility has been sent to all property owners identified in R315-310-3(2)(a)(i) R315-310-3(2)(a)(ii) Yes No, explain Name of the local government with jurisdiction over the site and the mailing address of that local government office R315-310-3(2)(a)(iii) Yes No, explain II. Location Standards for Waste Tire Storage Facilities Historic preservation survey R315-302-1(2)(f) Yes No, explain A traffic impact study approved by the jurisdictional authority of the roads serving the facility that: Demonstrates requirements for safety, operation, and condition of roadways will meet forecasted needs; and Includes any improvement and maintenance agreements with the road authority. R315-302-1(2)(g) Yes No, explain IIIa. Plan of Operation for All Facilities An intended schedule of construction R315-302-2(2)(a) Yes No, explain Description of on-site solid waste handling procedures R315-302-2(2)(b) Yes No, explain Schedule for conducting inspections and monitoring R315-302-2(2)(c) Yes No, explain Contingency plans in the event of a fire or explosion R315-302-2(2)(d) Yes No, explain Corrective action programs to be initiated if groundwater is contaminated R315-302-2(2)(e) Yes No, explain Contingency plans for other releases, for example, release of explosive gases or failure of run-off containment system R315-302-2(2)(f) Yes No, explain Plan to control fugitive dust R315-302-2(2)(g) Yes No, explain Plan to control wind-blown litter R315-302-2(2)(h) Yes No, explain Description of maintenance of installed equipment including leachate and gas collection systems, and groundwater monitoring systems R315-302-2(2)(i) Yes No, explain Procedures for excluding the receipt of prohibited hazardous waste or prohibited waste containing PCBs R315-302-2(2)(j) Yes No, explain Procedures for controlling disease vectors R315-302-2(2)(k) Yes No, explain Plan for an alternative waste handling or disposal system during periods when the solid waste facility is not able to dispose of solid waste, including procedures to be followed in case of equipment breakdown R315-302-2(2)(l) Yes No, explain Closure and post-closure care plans R315-302-2(2)(m) Yes No, explain Cost estimates and financial assurance information as required by R315-309-2(3) R315-302-2(2)(n) Yes No, explain Training plan for site operations R315-302-2(2)(o) Yes No, explain IIIb. Other Site-Specific Information Pertaining to the Plan of Operation as Required by the Director A plot plan of the storage site showing the arrangement and size of the tire piles on the site, the width of fire lanes and the type and location of the fire control equipment and the location of any on-site buildings and the type of fencing to surround the site R315-314-3(3)(a)(iii)(A) through (C) Yes No, explain Documentation to show tires are only being accumulated in designated areas R315-314-3(3)(b) Yes No, explain Documentation demonstrating controlled access to the storage site by fencing R315-314-3(3)(c) Yes No, explain Plan on how the facility will limit individual tire piles to a maximum of 5,000 square feet of continuous area in size at the base of the pile R315-314-3(3)(d) Yes No, explain Plan on how the facility will limit the individual tire piles to 50,000 cubic feet in volume or ten feet in height R315-314-3(3)(e) Yes No, explain Plan on how the facility will ensure piles will be at least ten feet from any property line or any building and not exceed size feet in height if within 20 feet from any property line or building R315-314-3(3)(f) Yes No, explain Documentation showing the facility will provide a 40-foot fire lane between tire piles that contains no flammable or combustible material or vegetation R315-314-3(3)(g) Yes No, explain A vector control program to minimize mosquito breeding and the harborage of other vectors such as rats or other animals R315-314-3(3)(h) R315-314-3(3)(a)(v) Yes No, explain Documentation demonstrating the facility will provide on-site fire control equipment that is maintained in good working order R315-314-3(3)(i) Yes No, explain Display of an emergency procedures plan and inspection approval by the local fire department and require each employee to be familiar with the plan R315-314-3(3)(j) Yes No, explain Documentation demonstrating the facility will maintain a record of the number of tires received at the site, tires shipped from the site, piles of tires at the site, and tires in each pile R315-314-3(3)(l) Yes No, explain Documentation demonstrating the facility will meet the reporting requirements as required by R315-302-2(4) R315-314-3(3)(m) Yes No, explain IV. Closure and Post Closure Care Requirements for Waste Tire Storage Facilities Closure plan as required by R315-302-3meeting the requirements of R315-312-3(5)(a) R315-310-3(1)(h) R315-302-2(2)(m) Yes No, explain Post-closure care plan as required by R315-302-3(6) which includes the post-closure care and monitoring to be for five years and include the maintenance of any monitoring equipment and sampling and testing schedules as required by the Director and the inspection and maintenance of any cover material. R315-310-3(1)(h) R315-302-2(2)(m) R315-312-3(5)(b) Yes No, explain V. Financial Assurance Requirements for Waste Tire Storage Facilities Establish financial assurance for clean up and closure of the site in the amount of $150 per ton of tires stored at the site and in the form of a trust fund, letter of credit, or other mechanism as approved by the Director R315-314-3(3)(k) Yes No, explain Identification of closure costs including cost calculations as required by R315-309-2(3)(a) R315-314-3(3)(a)(iv) Yes No, explain Identification of post-closure costs including cost calculations as required by R315-309-2(3)(b) R315-314-3(3)(a)(iv) Yes No, explain Identification of a financial assurance mechanism, which will cover the costs of post-closure care, in effect and active as required by R315-309-2(5) R315-314-3(3)(a)(iv) Yes No, explain