Loading...
HomeMy WebLinkAboutDSHW-2025-000440 PART I - GENERAL INFORMATION APPLICANT: PLEASE COMPLETE ALL SECTIONS I. Application Type New Application Major Modification (see R315-311-2(1)(c)) Renewal Application Minor Modification (see R315-311-2(1)(a)) For Renewal Applications, Facility Expansion Applications, and Modifications Applications, enter current permit number: . II. Facility Name and Location Legal Name of Facility Facility Address (Street or Directions to Facility) County City Zip Code Telephone Township Range Section Quarter Section Quarter/Quarter SectionMain GateLatitude:Longitude: III. Facility Owner(s) Information Name of Facility Owner Mailing Address City State Zip Code Telephone IV. Facility Operator(s) Information Name of Facility Operator Mailing Address Click or tap here to enter text. City State Zip Code Telephone V. Property Owner(s) Information Name of Property Owner Mailing Address City State Zip Code Telephone VI. Designated Contact Information Facility Owner Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Facility Operator Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Property Owner Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) VII. Facility Area Facility Area: Acres Disposal Area: Acres PART II - APPLICATION CHECKLIST Description of Item Rule(s) Cited Included in Submission Location in the Document/ Comments Ia. Requirements For All Facilities Complete Part I - General Information R315-310-3(1)(a) Yes No, explain General facility descriptions including maps, plans, and drawings R315-310-3(1)(b) Yes No, explain Legal description of the property, proof of ownership, lease agreement, or other mechanism R315-310-3(1)(c) Yes No, explain Waste type, anticipated daily volume, and area served by the facility R315-310-3(1)(d) Yes No, explain Plan of Operation as required by R315-302-2(2) R315-310-3(1)(e) Yes No, explain Form used to record weights or volumes of waste received required by R315-302-2(3)(a)(i) R315-310-3(1)(f) Yes No, explain Inspection schedule and inspection log as required by R315-302-2(5)(a) R315-310-3(1)(g) Yes No, explain Closure and post-closure plans required by Section R315-302-3 R315-310-3(1)(h) Yes No, explain Documentation to show that any wastewater treatment facility, such as run-off or a leachate treatment system is being reviewed by the Division of Water Quality R315-310-3(1)(i) Yes No, explain Proposed financial assurance plan that meets the requirements of R-315-309 R315-310-3(1)(j) Yes No, explain Historical and archeological identification efforts R315-310-3(1)(k) Yes No, explain A new facility that is owned or operated by a local government shall include financial information that discloses the costs of establishing and operating the facility. R315-310-3(1)(l) Yes No, explain Ib. Public Participation Requirements Name and address of all owners of the property within 1,000 feet of the proposed facility R315-310-3(2)(a)(i) Yes No, explain Documentation that a notice of intent to apply for a permit for a solid waste facility has been sent to all property owners identified in R315-310-3(2)(a)(i) R315-310-3(2)(a)(ii) Yes No, explain Name of the local government with jurisdiction over the site and the mailing address of that local government office. R315-310-3(2)(a)(iii) Yes No, explain Ic. Location Standards for Landtreatment Facilities Evidence the owner or operator of a landtreatment disposal facility shall meet the standards for performance specified in Section R315-303-2. R315-307-1(4) Yes No, explain Evidence the owner or operator of a landtreatment disposal facility shall meet the location standards of Section R315-302-1. R315-307-1(5) Yes No, explain Evidence the facility is not located within 1000 feet of a national, state, country, or city park, monument, or recreation area, a designated wilderness or wilderness study area, a wild and scenic river area, or a stream, lake or reservoir R315-302-2(a)(i) Yes No, explain Evidence the facility is not located in ecologically and scientifically significant natural areas, including wildlife management areas and habitat for threatened or endangered species as designated pursuant to the Endangered Species Act of 1982. R315-302-1(2)(a)(ii) Yes No, explain Evidence the facility is not located within ¼ mile of existing permanent dwellings, residential areas, and other incompatible structures such as schools or churches unless otherwise allowed by local zoning or ordinance; and historic structures or properties listed or eligible to be listed in the State or National Register of Historic Places. R315-302-1(2)(a)(iii) Yes No, explain Evidence the facility is at least ten thousand feet of any airport runway end used by turbojet aircraft or within 5,000 feet of any airport runway end used by only piston-type aircraft unless the owner or operator demonstrates that the facility design and operation will not increase the likelihood of bird or aircraft collisions. R315-302-1(2)(a)(iv) Yes No, explain Evidence the facility is not located in areas with respect to archeological sites that would violate Section 9-8-404. R315-302-1(2)(v) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located within a subsidence area, a dam failure flood area, above an underground mine, above a salt dome, above a salt bed, or on or adjacent to geologic features that could compromise the structural integrity of the facility. R315-302-1(2)(b)(i) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located within 200 feet of a Holocene fault unless the owner or operator demonstrates to the director that an alternative setback distance of less than 200 feet will prevent damage to the structural integrity of the unit and will be protective of human health and the environment. R315-302-1(2)(b)(ii) Yes No, explain For new or expanding facilities: Evidence the facility is not located within a seismic impact zone unless the owner or operator demonstrates to the satisfaction of the director that any containment structures, including liners, leachate collection systems, and surface water control systems, are designed to resist the maximum horizontal acceleration in lithified earth material for the site. R315-302-1(2)(b)(iii) Yes No, explain For new or expanding facilities: If the facility is located within an unstable area, the owner or operator shall demonstrate to the satisfaction of the director that engineering measures have been incorporated into the facility design to ensure that integrity of the structural components of the facility will not be disrupted. R315-302-1(2)(b)(iv) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located on public land that is being used by a public water system for watershed control for municipal drinking water purposes. R315-302-1(2)(c)(i) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located within a floodplain unless the owner or operator demonstrates to the director that the unit will not restrict the flow of the 100-year flood, reduce the temporary water storage capacity of the floodplain, or result in a washout of solid waste so as to pose a hazard to human health or the environment. R315-302-1(2)(c)(ii) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located within wetlands R315-302-1(2)(d) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located over a sole source aquifer as designated in 40 CFR 149. R315-302-1(2)(e)(ii) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located over groundwater classed as IB under Section R317-6-3.3. R315-302-1(2)(e)(iii) Yes No, explain For new or laterally expanding facilities: The applicant for the proposed facility will make the demonstration of groundwater quality necessary to determine the appropriate aquifer classification. R315-302-1(2)(e)(iv)(C) Yes No, explain For new or laterally expanding facilities: Evidence the facility is not located in a designated drinking water source protection area or, if no source protection area is designated, within a distance to existing drinking water wells or springs for public water supplies of 250 days groundwater travel time. R315-302-1(2)(e)(v) Yes No, explain For new or laterally expanding facilities: Evidence the historical preservation survey requirement has been met. R315-302-1(2)(f) Yes No, explain For new or laterally expanding facilities: Evidence the traffic impact study requirement has been met. R315-302-1(2)(g) Yes No, explain Id. Special Requirements for a Commercial (For-Profit) Solid Waste Treatment Facility Is this a commercial facility? ☐ Yes, complete Section Id. ☐ No, skip Section Ie. Information required by 19-6-108(10), including evidence of: A proven market, including waste sources, quantity, pricing, waste generation trends, and competing facilities; Public benefits, including meeting a capacity need, recovery of energy and resources, and reduction of less suitable waste management methods; and An acceptable compliance history; And, information to demonstrate that the requirements of 19-6-108(11) are satisfied, including evidence that: The probable environmental effect outweighs the probable adverse environmental effect; and The facility serves an industry need in the state. R315-310-3(3)(a) Yes No, explain Ie. Standards for Design Evidence the facility is designed to provide interim waste storage areas that meet the requirements for piles, as specified in Rule R315-314. R315-307-2(1) Yes No, explain Evidence the facility has systems to collect and treat any run-off from a 25 year storm, and divert any run-on for the maximum flow of a 25 year storm around the active area. R315-307-2(2) Yes No, explain Evidence the facility is designed to avoid standing water anywhere on the active area. R315-307-2(3) Yes No, explain Evidence the facility is designed to avoid slopes and other features that will lead to soil and waste erosion, unless contour plowing or other measures are taken to avoid erosion. R315-307-2(4) Yes No, explain Groundwater monitoring in accordance with R315-308. R315-307-2(5) Yes No, explain Evidence that access to the facility is controlled by fencing or other means and a sign is erected as specified in Subsection R315-303-3(8). R315-307-2(6) Yes No, explain If. Standards for Maintenance and Operation Evidence the facility will avoid the disposal of garbage, infectious waste, or high-chloride wastes R315-307-3(1) Yes No, explain Evidence the facility will avoid applying wastes at rates greater than 10 times agronomic rates using the proposed cover crop, or depths greater than would allow for disking the soil by tracked vehicles R315-307-3(2) Yes No, explain Evidence the facility will provide disking of soils during the growing season and after each application of waste to maintain aerobic soil conditions, minimize odors, and lessen run-off R315-307-3(3) Yes No, explain Evidence the facility will avoid applying waste to any active area having standing water R315-307-3(4) Yes No, explain Evidence the facility will conform to the approved plan of operation and any other applicable requirements of Section R315-302-2 R315-307-3(5) Yes No, explain Provide for a written contract between landowners, waste generators, waste haulers, and waste operators requiring compliance with rules as a condition of the contract. R315-307-3(6) Yes No, explain Evidence the facility will avoid food-chain crops during the active life of the facility and until demonstrated to be safe, after closure, according to the closure and post-closure plans filed with the plan of operation. R315-307-3(7) Yes No, explain IIa. Plan of Operation for Landtreatment Facilities An intended schedule of construction R315-302-2(2)(a) Yes No, explain Description of on-site solid waste handling procedures R315-302-2(2)(b) Yes No, explain Schedule for conducting inspections and monitoring R315-302-2(2)(c) Yes No, explain Contingency plans in the event of a fire or explosion R315-302-2(2)(d) Yes No, explain Corrective action programs to be initiated if groundwater is contaminated R315-302-2(2)(e) Yes No, explain Contingency plans for other releases, for example, release of explosive gases or failure of run-off containment system R315-302-2(2)(f) Yes No, explain Plan to control fugitive dust R315-302-2(2)(g) Yes No, explain Plan to control wind-blown litter R315-302-2(2)(h) Yes No, explain Description of maintenance of installed equipment including leachate and gas collection systems, and groundwater monitoring systems R315-302-2(2)(i) Yes No, explain Procedures for excluding the receipt of prohibited hazardous waste or prohibited waste containing PCBs R315-302-2(2)(j) Yes No, explain Procedures for controlling disease vectors R315-302-2(2)(k) Yes No, explain Plan for an alternative waste handling or disposal system during periods when the solid waste facility is not able to dispose of solid waste, including procedures to be followed in case of equipment breakdown R315-302-2(2)(l) Yes No, explain Closure and post-closure care plans R315-302-2(2)(m) Yes No, explain Cost estimates and financial assurance information R315-302-2(2)(n) Yes No, explain Training plan for site operations R315-302-2(2)(o) Yes No, explain Evidence of planned recordkeeping according to the requirements R315-302-2(3) Yes No, explain Evidence of planned reporting according to the requirements R315-302-2(4) Yes No, explain Evidence of planned compliance with inspections according to the regulations R315-302-2(5) Yes No, explain Evidence of planned compliance to record the facility with the County Recorder upon closure R315-302-2(6) Yes No, explain IIb. Other Site-Specific Information as Required by the Director Geohydrological assessment of the facility site that addresses all of the factors of Subsection R315-310-4(2)(b) R315-310-6(2)(a) Yes No, explain Engineering report, plans, specifications, and calculations that address: How the facility will meet the location standards pursuant to Section R315-302-1. R315-310-6(2)(b)(i) Yes No, explain Engineering report, plans, specifications, and calculations that address: How the facility will meet the standards of Rule R315-307. R315-310-6(2)(b)(ii) Yes No, explain Engineering report, plans, specifications, and calculations that address: The basis for calculating the facility’s life. R315-310-6(2)(b)(iii) Yes No, explain Engineering report, plans, specifications and calculations that address: waste analyses and methods to periodically sample and analyze solid waste. R315-310-6(2)(b)(iv) Yes No, explain Engineering report, plans, specifications and calculations that address: design of interim waste storage facilities. R315-310-6(2)(b)(v) Yes No, explain Engineering report, plans, specifications and calculations that address: design of run-on and run-off control systems. R315-310-6(2)(b)(vi) Yes No, explain Contour map of the active area showing contours to the nearest foot. R315-310-6(2)(b)(vii) Yes No, explain Groundwater and surface water monitoring program R315-310-6(2)(b)(viii) Yes No, explain Access barriers such as fences, gate, and warning signs. R315-310-6(2)(b)(ix) Yes No, explain Operation and maintenance of run-on and run-off control systems R315-310-6(2)(c)(i) Yes No, explain Methods of taking groundwater samples and for maintaining groundwater monitoring systems. R315-310-6(2)(c)(ii) Yes No, explain Methods of applying wastes to meet the requirements of Section R315-307-3. R315-310-6(2)(c)(iii) Yes No, explain Closure plan to address: closure schedule; capacity of site in volume and tonnage; and final inspection by regulatory agencies. R315-310-6(2)(d) Yes No, explain Post-closure plan to address: estimated time period for post-closure activities; site monitoring of groundwater; changes in record of title; maintenance activities to maintain cover and run-off system; plans for food-chain crops, if any, being grown on the active areas, after closure; and identification of final closure costs including cost calculations and the funding mechanism. R315-310-6(2)(e) Yes No, explain III. Closure and Post Closure Care Requirements for Landtreatment Facilities Closure plan as required by R315-302-3meeting the requirements of R315-307-4. R315-310-3(1)(h) R315-302-2(2)(m) Yes No, explain Post-closure care plan as required by R315-302-3. R315-310-3(1)(h) R315-302-2(2)(m) Yes No, explain IV. Financial Assurance Requirements for Landtreatment Facilities Financial assurance plan, including the assurance mechanism proposed for use in accordance with R315-309. R315-307-4(1)(b) Yes No, explain Financial assurance cost estimates based on a third party performing closure or post-closure care. R315-309-2(3) Yes No, explain Identification of a financial assurance mechanism, which will cover the costs of post-closure care. R315-309-2(4) Yes No, explain