Loading...
HomeMy WebLinkAboutDSHW-2025-000439 PART I - GENERAL INFORMATION APPLICANT: PLEASE COMPLETE ALL SECTIONS I. Application Type New Application Major Modification (see R315-311-2(1)(c)) Renewal Application Minor Modification (see R315-311-2(1)(a)) For Renewal Applications, Facility Expansion Applications, and Modifications Applications, enter current permit number: . II. Facility Name and Location Legal Name of Facility Facility Address (Street or Directions to Facility) County City Zip Code Telephone Township Range Section Quarter Section Quarter/Quarter SectionMain GateLatitude:Longitude: III. Facility Owner(s) Information Name of Facility Owner Mailing Address City State Zip Code Telephone IV. Facility Operator(s) Information Name of Facility Operator Mailing Address Click or tap here to enter text. City State Zip Code Telephone V. Property Owner(s) Information Name of Property Owner Mailing Address City State Zip Code Telephone VI. Designated Contact Information Facility Owner Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Facility Operator Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Property Owner Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) VII. Waste Types (check all that apply) VIII. Facility Area Agricultural waste Biodegradable C&D waste Domestic sewage sludge, septage, or municipal solid waste Yard waste Other:Click or tap here to enter text. Facility Area: acres Disposal Area: acres Design Capacity: Years Cubic Yards Tons PART II - APPLICATION CHECKLIST Description of Item Rule(s) Cited Included in Submission Location in the Document/Comments Ia. Requirements for All Facilities Complete Part I - General Information R315-310-3(1)(a) Yes No, explain General facility descriptions including maps, plans, and drawings R315-310-3(1)(b) Yes No, explain Legal description of the property, proof of ownership, lease agreement, or other mechanism R315-310-3(1)(c) Yes No, explain Waste type, anticipated daily volume, and area served by the facility R315-310-3(1)(d) Yes No, explain Plan of Operation R315-310-3(1)(e) Yes No, explain Form used to record weights or volumes of waste received required by R315-302-2(3)(a)(i) R315-310-3(1)(f) Yes No, explain Inspection schedule and inspection log as required by R315-302-2(5)(a) R315-310-3(1)(g) Yes No, explain Closure and post-closure care plans R315-310-3(1)(h) Yes No, explain Documentation to show that any wastewater treatment facility, such as run-off or a leachate treatment system is being reviewed by the Division of Water Quality R315-310-3(1)(i) Yes No, explain Historical and archeological identification efforts R315-310-3(1)(k) Yes No, explain For a new facility owned or operated by a local government, financial information that discloses the costs of establishing and operating the facility R315-310-3(1)(l) Yes No, explain Ib. Public Participation Requirements Name and address of all owners of the property within 1,000 feet of the proposed facility R315-310-3(2)(a)(i) Yes No, explain Documentation that a notice of intent to apply for a permit for a solid waste facility has been sent to all property owners identified in R315-310-3(2)(a)(i) R315-310-3(2)(a)(ii) Yes No, explain Name of the local government with jurisdiction over the site and the mailing address of that local government office R315-310-3(2)(a)(iii) Yes No, explain Ic. Special Requirements for a Commercial (For-Profit) Solid Waste Treatment Facility Is this a commercial facility? ☐ Yes, complete Section Id. ☐ No, skip Section Id. Information required by 19-6-108(10), including evidence of: A proven market, including waste sources, quantity, pricing, waste generation trends, and competing facilities; Public benefits, including meeting a capacity need, recovery of energy and resources, and reduction of less suitable waste management methods; and An acceptable compliance history; And, information to demonstrate that the requirements of 19-6-108(11) are satisfied, including evidence that: The probable environmental effect outweighs the probable adverse environmental effect; and The facility serves an industry need in the state. R315-310-3(3)(a) Yes No, explain Id. Location Standards for Compost Facilities Documentation the facility is not located within a wetland, watercourse, or flood plain R315-312-3(1)(a) Yes No, explain Documentation the facility is not located within 500 feet of any permanent residence, school, hospital, institution, office building, restaurant, or church R315-312-3(1)(b) Yes No, explain Historic preservation survey as required by R315-302-1(2)(f) R315-312-3(2) Yes No, explain A traffic impact study approved by the jurisdictional authority of the roads serving the facility that: Demonstrates requirements for safety, operation, and condition of roadways will meet forecasted needs; and Includes any improvement and maintenance agreements with the road authority. R315-302-1(2)(g) Yes No, explain IIa.Plan of Operation Requirements for All Facilities An intended schedule of construction R315-302-2(2)(a) Yes No, explain Description of on-site solid waste handling procedures R315-302-2(2)(b) Yes No, explain Schedule for conducting inspections and monitoring R315-302-2(2)(c) Yes No, explain Contingency plans in the event of a fire or explosion R315-302-2(2)(d) Yes No, explain Corrective action programs to be initiated if groundwater is contaminated R315-302-2(2)(e) Yes No, explain Contingency plans for other releases, for example, release of explosive gases or failure of run-off containment system R315-302-2(2)(f) Yes No, explain Plan to control fugitive dust R315-302-2(2)(g) Yes No, explain Plan to control wind-blown litter R315-302-2(2)(h) Yes No, explain Description of maintenance of installed equipment including leachate and gas collection systems, and groundwater monitoring systems R315-302-2(2)(i) Yes No, explain Procedures for excluding the receipt of prohibited hazardous waste or prohibited waste containing PCBs R315-302-2(2)(j) Yes No, explain Procedures for controlling disease vectors R315-302-2(2)(k) Yes No, explain Plan for an alternative waste handling or disposal system during periods when the solid waste facility is not able to dispose of solid waste, including procedures to be followed in case of equipment breakdown R315-302-2(2)(l) Yes No, explain Closure and post-closure care plans R315-302-2(2)(m) Yes No, explain Cost estimates and financial assurance information as required by R315-309-2(3) R315-302-2(2)(n) Yes No, explain Training plan for site operations R315-302-2(2)(o) Yes No, explain IIb. Other Site-Specific Information Pertaining to the Plan of Operation as Required by the Director Detailed plans and specifications for the entire composting facility R315-312-3(3)(a) Yes No, explain Methods of measuring, grinding, or shredding, mixing, and proportioning input materials R315-312-3(3)(b) Yes No, explain Description and location of temperature and other types of monitoring equipment and frequency of monitoring R315-312-3(3)(c) Yes No, explain Description of any additive materials, including its origin, quantity, quality, and frequency of use R315-312-3(3)(d) Yes No, explain Special precautions or procedures for operation during wind, heavy rain, snow, and freezing conditions R315-312-3(3)(e) Yes No, explain Estimated composting time duration, which is the period from initiation of the composting process to completion R315-312-3(3)(f) Yes No, explain For windrow systems, the windrow construction, including width, length and height R315-312-3(3)(g) Yes No, explain Method of aeration, including turning frequency or mechanical aeration equipment and aeration capacity R315-312-3(3)(h) Yes No, explain Description of the ultimate use for the finished compost, removal methods, and disposal plan for unused product R315-312-3(3)(i) Yes No, explain III. Utilization of Domestic Sewage Sludge, Septage, or Municipal Solid Waste Will the facility accept domestic sewage sludge, septage, or municipal solid waste? ☐ Yes, complete Section III. ☐ No, skip Section III. Procedures requiring the generator to characterize the material and certify that any material used is non-hazardous, contains no PCBs, and contains no treated wood R315-312-3(4)(g) Yes No, explain Documentation the compost piles or windrows are placed upon a surface such as sealed concrete, asphalt, clay, or an artificial liner underlying the pile or window, to prevent contamination of soil and/or groundwater, and to allow the collection of run-off and leachate R315-312-3(4)(h)(i) Yes No, explain Documentation demonstrating the run-off systems are designed, installed, and maintained to control and collect the run-off from a 25-year storm event R315-312-3(4)(h)(ii) Yes No, explain Procedures that will be used for collected leachate to be treated in a manner as approved by the Director R315-312-3(4)(h)(iii) Yes No, explain Documentation demonstrating run-on prevention systems are designed, constructed and maintained to divert the maximum flow from a 25-year storm event R315-312-3(4)(h)(iv) Yes No, explain IV. Closure and Post Closure Care Requirements for Compost Facilities Closure plan as required by R315-302-3meeting the requirements of R315-312-3(5)(a) R315-310-3(1)(h) R315-302-2(2)(m) Yes No, explain Post-closure care plan as required by R315-302-3(6) meeting the requirements ofR315-312-3(5)(b) R315-310-3(1)(h) R315-302-2(2)(m) Yes No, explain V. Financial Assurance Requirements for Compost Facilities Identification of closure costs including cost calculations as required by R315-309-2(3)(a) R315-312-2(4) Yes No, explain Identification of post-closure costs including cost calculations as required by R315-309-2(3)(b) R315-312-2(4) Yes No, explain Identification of a financial assurance mechanism, which will cover the costs of post-closure care, in effect and active as required by R315-309-2(5) R315-312-2(4) Yes No, explain