HomeMy WebLinkAboutDSHW-2025-000434
PART I - GENERAL INFORMATION APPLICANT: PLEASE COMPLETE ALL SECTIONS
I. Application Type New Application Major Modification (see R315-311-2(1)(c)) Renewal Application Minor Modification (see R315-311-2(1)(a))
For Renewal Applications, Facility Expansion Applications, and Modifications Applications, enter current permit number:
.
II. Facility Name and Location
Legal Name of Facility
Facility Address (Street or Directions to Facility)
County
City
Zip Code
Telephone
Township
Range
Section
Quarter Section
Quarter/Quarter SectionMain GateLatitude:Longitude:
III. Facility Owner(s) Information
Name of Facility Owner
Mailing Address
City
State
Zip Code
Telephone
IV. Facility Operator(s) Information
Name of Facility Operator
Mailing Address
Click or tap here to enter text.
City
State
Zip Code
Telephone
V. Property Owner(s) Information
Name of Property Owner
Mailing Address
City
State
Zip Code
Telephone
VI. Designated Contact Information
Facility Owner Designated Contact (if different than above)
Title
Mailing Address
City
State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
Facility Operator Designated Contact (if different than above)
Title
Mailing Address
City
State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
Property Owner Contact (if different than above)
Title
Mailing Address
City
State
Zip Code
Telephone
Email Address
Alternative Telephone (cell phone or other)
VII. Waste Types (check all that apply)
VIII. Facility Area
Municipal solid waste
Asbestos
Dead Animals
Construction and Demolition waste
Incinerator ash
Industrial waste
Restaurant waste liquids and greases
Sludge
Other: Click or tap here to enter text.
Facility Area: acres
Disposal Area: acres
Design Capacity: Years Cubic Yards Tons
PART II - APPLICATION CHECKLIST
I. Facility General Information
Description of Item
Rule(s) Cited
Included in Submission
Location in the Document/Comments
Ia. Requirements For All Facilities
Complete Part I - General Information
R315-310-3(1)(a)
Yes No, explain
General facility descriptions including maps, plans, and drawings
R315-310-3(1)(b)
Yes No, explain
Legal description of the property, proof of ownership, lease agreement, or other mechanism
R315-310-3(1)(c)
Yes No, explain
Types of waste to be handled at the facility and area served by the facility
R315-310-3(1)(d)
Yes No, explain
The Plan of Operation as required by R315-302-2(2)
R315-310-3(1)(e)
Yes No, explain
Form used to record weights or volumes of wastes received required by R315-302-2(3)(a)(i)
R315-310-3(1)(f)
Yes No, explain
Inspection schedule and inspection log as required by R315-302-2(5)(a)
R315-310-3(1)(g)
Yes No, explain
Closure and post-closure care plans
R315-310-3(1)(h)
Yes No, explain
Documentation to show that any wastewater treatment facility, such as run-off or a leachate treatment system is being reviewed by the Division of Water Quality
R315-310-3(1)(i)
Yes No, explain
Proposed financial assurance plan that meets the requirements of R315-309
R315-310-3(1)(j)
Yes No, explain
Historical and archeological identification efforts
R315-310-3(1)(k)
Yes No, explain
For a new facility owned or operated by a local government, financial information that discloses the costs of establishing and operating the facility
R315-310-3(1)(l)
Utah Code 19-6-108(9)(h)
Yes No, explain
Ib. Public Participation Requirements
Name and address of all owners of the property within 1,000 feet of the proposed facility
R315-310-3(2)(a)(i)
Yes No, explain
Documentation that a notice of intent to apply for a permit for a solid waste facility has been sent to all property owners
R315-310-3(2)(a)(ii)
Yes No, explain
Name of the local government with jurisdiction over the site and the mailing address of that local government office
R315-310-3(2)(a)(iii)
Yes No, explain
Ic. Special Requirements for a Commercial (For-Profit) Solid Waste Disposal Facility
Is this a commercial facility? ☐ Yes, complete Section Id. ☐ No, skip Section Id.
Information required by 19-6-108(10), including evidence of:
A proven market, including waste sources, quantity, pricing, waste generation trends, and competing facilities;
Public benefits, including meeting a capacity need, recovery of energy and resources, and reduction of less suitable waste management methods; and
An acceptable compliance history;
And, information to demonstrate that the requirements of 19-6-108(11) are satisfied, including evidence that:
The probable environmental effect outweighs the probable adverse environmental effect; and
The facility serves an industry need in the state.
R315-310-3(3)(a)
Yes No, explain
After the issuance of a solid waste permit, a commercial nonhazardous solid waste disposal facility shall meet the requirements of 19-6-108(3)(c) and provide documentation to the Director
that the facility is approved by the local government, the Legislature, and the governor
R315-310-3(3)(b)
Yes No, explain
Demonstrate that construction will not begin until the requirements of R315-310-3(2)(b) are met and approval to begin construction has been granted by the Director
R315-310-3(3)(c)
Yes No, explain
Id. Location Standards
Demonstrate the facility is not located within 1,000 of parks, monument or recreation area, wilderness area, wild and scenic river area, or stream, lake, or reservoir
R315-302-1(2)(a)(i)
Yes No, explain
Demonstrate the facility not located within an ecologically and scientifically significant natural area, including wildlife management areas and habitat for threatened or endangered
species as designated pursuant to the Endangered Species Act of 1982
R315-302-1(2)(a)(ii)
Yes No, explain
Demonstrate the facility is not located within ¼ mile of permanent dwellings, residential areas, schools or churches, and historic structures
R315-302-1(2)(a)(iii)
Yes No, explain
Demonstrate the facility is not located within ten thousand feet of any airport runway end used by turbo jet aircraft or within 5,000 feet of any airport runway end used by only piston-type
aircraft
R315-302-1(2)(a)(iv)
Yes No, explain
Demonstrate the facility is not located in an area with respect to archeological sites that would violate Section 9-8-404 (R315-302-1(2)(f)
R315-302-1(2)(a)(v)
Yes No, explain
Geology
Restrictions in a subsidence area, dam failure flood, or other geologic area that could compromise the facility structural integrity
R315-302-1(2)(b)(i)
Yes No, explain
Restrictions within 200 feet of a Holocene fault areas
R315-302-1(2)(b)(ii)
Yes No, explain
Restrictions in seismic impact zones Location restrictions
R315-302-1(2)(b)(iii)
Yes No, explain
Restrictions in unstable areas that will not disrupt structural integrity
R315-302-1(2)(b)(iv)
Yes No, explain
Surface Water
Restriction locations on water shed used for drinking water
R315-302-1(2)(c)(i)
Yes No, explain
Restrictions in floodplains
R315-302-1(2)(c)(ii)
Yes No, explain
Restrictions in wetlands
R315-302-1(2)(d)
Yes No, explain
Groundwater restrictions at or under a facility site or in designated drinking water source protection areas. Groundwater monitoring may be waived if a valid demonstration is made
R315-302-1(2)(e)
Yes No, explain
Historic preservation survey. See archeological requirement [R315-302-1(2)(a)(v)]
R315-302-1(2)(f)
Yes No, explain
Traffic impact study
[Utah Code 19-6-108(9)(g)]
R315-302-1(2)(g)
Yes No, explain
Exemptions from Location Standards - if applicable
R315-302-1(3)
Yes No, explain
Ie. Plan of Operation for Class II Landfills
An intended schedule of construction
R315-302-2(2)(a)
Yes No, explain
Description of on-site solid waste handling procedures
R315-302-2(2)(b)
Yes No, explain
Schedule for conducting inspections and monitoring
R315-302-2(2)(c)
Yes No, explain
Contingency plans in the event of a fire or explosion
R315-302-2(2)(d)
Yes No, explain
Corrective action programs to be initiated if groundwater is contaminated
R315-302-2(2)(e)
Yes No, explain
Contingency plans for other releases, for example, release of explosive gases (R315-303-2(2)) or failure of run-off containment system
R315-302-2(2)(f)
Yes No, explain
Plan to control fugitive dust (R315-303-4(2)(a)
R315-302-2(2)(g)
R315-303-4(2)(a)
Yes No, explain
Plan to control wind-blown litter (R315-303-4(2)(c)
R315-302-2(2)(h)
R315-303-4(2)(c)
Yes No, explain
Description of maintenance of installed equipment including leachate and gas collection systems, and groundwater monitoring systems
R315-302-2(2)(i)
Yes No, explain
Procedures for excluding the receipt of prohibited hazardous waste or prohibited waste containing PCBs
R315-302-2(2)(j)
Yes No, explain
Procedures for controlling disease vectors
R315-302-2(2)(k)
R315-303-4(g)
Yes No, explain
Plan for an alternative waste handling or disposal system during periods when the solid waste facility is not able to dispose of solid waste, including procedures to be followed in case
of equipment breakdown
R315-302-2(2)(l)
R315-303-4(2)(h)
Yes No, explain
Closure and post-closure care plans
R315-302-2(2)(m)
Yes No, explain
Cost estimates and financial assurance information as required by R315-309-2(3)
R315-302-2(2)(n)
Yes No, explain
Training plan for site operations
R315-302-2(2)(o)
Yes No, explain
Other site-specific information required by the Director
R315-302-2(2)(p)
Yes No, explain
If. Liquid Prevention and Management
A plan to prohibit disposal of containerized liquids larger than household size, noncontainerized liquids, sludge containing free liquids, or any waste containing free liquids in containers
larger than household size.
R315-303-3(1)(b)
Yes No, explain
A High Liquid Waste Management Plan, if applicable, that includes:
Waste acceptance criteria
Dewatering unit design and techniques
Other stabilization or treatment techniques;
A communication plan to inform customers of high liquid waste acceptance criteria
R315-303-3(2)(a)
Yes No, explain
For a facility that utilizes dewatering, stabilization, or treatment techniques, proof that:
A containment system having a permeability of no more than 1 x 10^-7 cm/sec that maintains integrity under the operation of heavy equipment will be installed and maintained for: unloading
areas and structures; staging areas; and dewatering, stabilization, and treatment areas.
Leachates derived from dewatering or stabilization will be appropriately managed.
R315-303-3(2)(b)
Yes No, explain
If required, appropriate engineering reports demonstrating that disposal of dewatered high liquid wastes will not result in unacceptable geotechnical risks or landfill cell failures.
R315-303-3(2)(c)
Yes No, explain
Ig. Additional Standards for Maintenance and Operation
Maintain and keep a daily operating record of quantity, deviations from plan of operation, training, inspections, operation, maintenance, monitoring reports and inspection logs
R315-302-2(3)
Yes No, explain
Additional inspection requirements Inspect at least quarterly, and record on a form the required information and kept for at least 3 years
R315-302-2(5)(a)
Yes No, explain
No open burning
R315-303-4(2)(b)
Yes No, explain
Prohibiting scavenging
R315-303-4(2)(d)
Yes No, explain
Conduct reclamation of facility property
R315-303-4(2)(e)
Yes No, explain
Minimum number of trained staff on site during operational hours to the public
R315-303-4(f)
Yes No, explain
Boundary posts marking active areas
R315-303-4(3)
Yes No, explain
Daily cover requirements
R315-303-4(4)(a)
Yes No, explain
Alternative daily cover requirements, limitations, and director approval
R315-303-4(4)(b) through (e)
Yes No, explain
Intermediate cover requirements
R315-303-4(4)(g)
Yes No, explain
Recycling requirements (where there is a market)
R315-303-4(6)
Yes No, explain
Disposal requirements for Hazardous Waste & PCBs
R315-303-4(7)(a)-(b)
Yes No, explain
Requirements for discovered Hazardous Waste & PCBs
R315-303-4(7)(c)
Yes No, explain
Procedures for handling particular special wastes
R315-315
Yes No, explain
II. Facility Technical Information
IIa. Geohydrological Assessment
Local and regional geology and hydrology, including faults, unstable slopes and subsidence areas on site
R315-310-4(2)(b)(i)
Yes No, explain
Evaluation of bedrock and soil types and properties, including permeability rates
R315-310-4(2)(b)(ii)
Yes No, explain
Depths to groundwater or aquifers
R315-310-4(2)(b)(iii)
Yes No, explain
Direction and flow rate of groundwater
R315-310-4(2)(b)(iv)
Yes No, explain
Quantity, location, and construction of any private and public wells on the site or within 2,000 feet of the facility boundary
R315-310-4(2)(b)(v)
Yes No, explain
Tabulation of all water rights for groundwater and surface water on the site and within 2,000 feet of the facility boundary
R315-310-4(2)(b)(vi)
Yes No, explain
Identification and description of all surface waters on the site and within one mile of the facility boundary
R315-310-4(2)(b)(vii)
Yes No, explain
Background ground and surface water quality assessment and identification of impacts on ground and surface waters
R315-310-4(2)(b)(viii)
Yes No, explain
Calculation of site water balance
R315-310-4(2)(b)(ix)
Yes No, explain
Conceptual design of a groundwater and surface water monitoring system, including proposed installation methods for these devices and where applicable, a vadose zone monitoring plan
R315-310-4(2)(b)(ix)
Yes No, explain
III. Engineering – Designs, Plans, and Specifications
Topographic map to the required scale with contours showing the boundaries of the landfill unit, groundwater monitoring wells, gas monitoring points, and the borrow and fill areas
R315-310-4(2)(a)(i)
Yes No, explain
Most recent U.S.G.S. topographic map, 7 ½ minute series, showing the waste facility boundary, property boundary, surface drainage channels; existing utilities and structures within ¼
mile of site, and direction of prevailing winds
R315-310-4(2)(a)(ii)
Yes No, explain
Engineering report, plans, specifications, and calculations of how the facility will meet location standards in R315-302-1
R315-310-4(2)(c)(i)
Yes No, explain
The basis for calculating the facility’s life
R315-310-4(2)(c)(ii)
Yes No, explain
Cell design to include liner and cover design, fill methods, elevation of final cover and bottom liner, and equipment requirements and availability
R315-310-4(2)(c)(iii)
R315-303-3(1)
R315-303-3(4)
Yes No, explain
Identification of borrow sources for daily and final cover, and for soil liners
R315-310-4(2)(c)(iv)
Yes No, explain
Designed Interim and final leachate collection, treatment, and disposal systems
R315-310-4(2)(c)(v)
R315-303-3(3)
Yes No, explain
Groundwater monitoring plan according to R315-308
R315-310-4(2)(c)(vi)
R315-303-3(8)(b)
Yes No, explain
Exemptions on liner, leachate systems, and groundwater monitoring plan requirements. A Class II Landfill may be exempt from these requirements if it meets R315-303-3(4)(e)(iv)
R315-303-3(4)(e)(iv)
Yes No, explain
Landfill gas monitoring and control that meets R315-303-3(6)
R315-310-4(2)(c)(vii)
Yes No, explain
Design and location of run-on and run-off control systems
R315-310-4(2)(c)(viii)
R315-303-3(1)(c)-(d)
Yes No, explain
QA/QC for the construction of any engineered structure or feature, excluding buildings at landfills, at a disposal facility and for any applicable activity such as groundwater monitoring
R315-310-4(2)(c)(x)
Yes No, explain
Documentation the facility meets the performance standards
R315-303-2
Yes No, explain
Gas control design and requirements
R315-303-3(6)
Yes No, explain
Design drawings signed and sealed by a professional engineer
R315-303-3(7)
Yes No, explain
Other design requirements
R315-303-3(8)
Yes No, explain
IV. Closure and Post Closure Care
Closure plan as required by R315-302-3(2)-(4)meeting the requirements of R315-303-3(5)
R315-310-3(1)(h)
R315-310-4(2)(c)(ix)
R315-310-4(2)(d)
R315-302-2(2)(m)
Yes No, explain
Post-closure care plan as required by R315-302-3(5)-(6 )
R315-310-3(1)(h)
R315-310-4(2)(e)
R315-302-2(2)(m)
Yes No, explain
V. Financial Assurance
Identification of closure costs including cost calculations as required by R315-309-2(3)(a)
R315-310-4(2)(d)(iv)
Yes No, explain
Identification of post-closure costs including cost calculations as required by R315-309-2(3)(b)
R315-310-4(2)(e)(iv)
Yes No, explain
Identification of a financial assurance mechanism, which will cover the costs of post-closure care, in effect and active as required by R315-309
R315-310-3(1)(j)
R315-302-2(2)(n)
Yes No, explain