Loading...
HomeMy WebLinkAboutDSHW-2025-000433 PART I - GENERAL INFORMATION APPLICANT: PLEASE COMPLETE ALL SECTIONS I. Application Type New Application Major Modification(see R315-311-2(1)(c)) Renewal Application Minor Modification(see R315-311-2(1)(a)) For Renewal Applications, Facility Expansion Applications, and Modifications Applications, enter current permit number: . II. Facility Name and Location Legal Name of Facility Facility Address (Street or Directions to Facility) County City Zip Code Telephone Township Range Section Quarter Section Quarter/Quarter SectionMain GateLatitude:Longitude: III. Facility Owner(s) Information Name of Facility Owner Mailing Address City State Zip Code Telephone IV. Facility Operator(s) Information Name of Facility Operator Mailing Address Click or tap here to enter text. City State Zip Code Telephone V. Property Owner(s) Information Name of Property Owner Mailing Address City State Zip Code Telephone VI. Designated Contact Information Facility Owner Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Facility Operator Designated Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) Property Owner Contact (if different than above) Title Mailing Address City State Zip Code Telephone Email Address Alternative Telephone (cell phone or other) VII. Waste Types (check all that apply) VIII. Facility Area All non-hazardous solid waste (see R315-315-7(3)) for PCB specialrequirements) OR landfill accepts only the following wastes: Asbestos Construction and Demolition Dead Animals Industrial Incinerator Ash PCB’s (R315-315-7(3) only) Petroleum Contaminated Soils Restaurant waste liquids and greases Sludge Other: Facility Area: Acres Disposal Area: Acres Design Capacity:Years Cubic Yards Tons PART II - APPLICATION CHECKLIST Description of Item Rule(s) Cited Included in Submission Location in the Document/Comments Ia. General Requirements for All Facilities Complete Part I - General Information R315-310-3(1)(a) Yes No, explain General facility descriptions including maps, plans, and drawings R315-310-3(1)(b) Yes No, explain Legal description of the property, proof of ownership, lease agreement, or other mechanism R315-310-3(1)(c) Yes No, explain Types of waste to be handled at the facility and area served by the facility R315-310-3(1)(d) Yes No, explain The Plan of Operation as required by R315-302-2(2) R315-310-3(1)(e) Yes No, explain Form used to record weights or volumes of wastes received required by R315-302-2(3)(a)(i) R315-310-3(1)(f) Yes No, explain Inspection schedule and inspection log as required by R315-302-2(5)(a) R315-310-3(1)(g) Yes No, explain Closure and post-closure care plans R315-310-3(1)(h) Yes No, explain Documentation to show that any wastewater treatment facility, such as run-off or a leachate treatment system is being reviewed by the Division of Water Quality R315-310-3(1)(i) Yes No, explain Proposed financial assurance plan that meets the requirements of R315-309 R315-310-3(1)(j) Yes No, explain Historical and archeological identification efforts R315-310-3(1)(k) R315-302-1(2)(f) Yes No, explain For a new facility owned or operated by a local government, financial information that discloses the costs of establishing and operating the facility R315-310-3(1)(l) Yes No, explain Ib. Public Participation Requirements Name and address of all owners of the property within 1,000 feet of the proposed facility R315-310-3(2)(a)(i) Yes No, explain Documentation that a notice of intent to apply for a permit for a solid waste facility has been sent to all property owners identified in R315-310-3(2)(a)(i) R315-310-3(2)(a)(ii) Yes No, explain Name of the local government with jurisdiction over the site and the mailing address of that local government office R315-310-3(2)(a)(iii) Yes No, explain Ic. Special Requirements for a Commercial (For-Profit) Solid Waste Disposal Facility Is this a commercial facility? Yes, complete Section Id. No, skip Section Id. Information required by 19-6-108(10), including evidence of: A proven market, including waste sources, quantity, pricing, waste generation trends, and competing facilities; Public benefits, including meeting a capacity need, recovery of energy and resources, and reduction of less suitable waste management methods; and An acceptable compliance history; And, information to demonstrate that the requirements of 19-6-108(11) are satisfied, including evidence that: The probable environmental effect outweighs the probable adverse environmental effect; and The facility serves an industry need in the state. R315-310-3(3)(a) Yes No, explain After the issuance of a solid waste permit, a commercial nonhazardous solid waste disposal facility shall meet the requirements of 19-6-108(3)(c) and provide documentation to the Director that the facility is approved by the local government, the Legislature, and the governor R315-310-3(3)(b) Yes No, explain Demonstrate that construction will not begin until the requirements of R315-310-3(2)(b) are met and approval to begin construction has been granted by the Director R315-310-3(3)(c) Yes No, explain Id. Location Standards for All Facilities Documentation showing the facility will not be located within 1,000 feet of a nation, state, county, or city park, monument, recreation area, designated wilderness or wilderness study area, wild and scenic river area, or stream, lake, or reservoir R315-302-1(2)(a)(i) Yes No, explain Documentation showing the facility is not located within an ecologically and scientifically significant natural area, including wildlife management areas and habitat for threatened or endangered species as designated pursuant to the Endangered Species Act of 1982 R315-302-1(2)(a)(ii) Yes No, explain Documentation showing the facility is not located within ¼ mile of existing permanent dwellings, residential areas, and other incompatible structures such as schools or churches and historic structures or properties listed or eligible to be listed in the State or National Register of Historic Places R315-302-1(2)(a)(iii) Yes No, explain Documentation showing the facility is not located within 10,000’ of any airport runway end used by turbojet aircraft or within 5,000’ of any airport runway end used by only piston-type aircraft unless the owner or operator demonstrates that the facility design and operation will not increase the likelihood of bird or aircraft collisions R315-302-1(2)(a)(iv) Yes No, explain Documentation showing the owner or operator of the landfill located within 6-miles of an airport runway end notified the affected airport and the Federal Aviation Administration R315-302-1(2)(a)(v) Yes No, explain Documentation showing the facility is not located in a subsidence area, a dam failure flood area, above underground mine, above a salt dome, about a salt bed, or on or adjacent to geologic features that could compromise the structural integrity of the facility R315-302-1(2)(b)(i) Yes No, explain Documentation showing the facility is not located within 200’ of a Holocene fault unless the owner or operator demonstrates to the Director that an alternative setback distance of less than 200’ will prevent damage to the structural integrity of the unit R315-302-1(2)(b)(ii) Yes No, explain Documentation showing the facility is not located in a seismic impact zone unless the owner or operator demonstrates to the Director that any containment structures, including liners, leachate collection systems, and surface water control systems, are designed to resist the maximum horizontal acceleration in lithified earth material for the site R315-302-1(2)(b)(iii) Yes No, explain If the facility is located in an unstable area, documentation that demonstrates to the Director that engineering measures have been incorporated into the facility design to ensure the integrity of the structural components of the facility will not be disrupted R315-302-1(2)(b)(iv) Yes No, explain Documentation showing the facility is not located on any public land that is being used by a public water system for water shed control for municipal drinking water purposes R315-302-1(2)(c)(i) Yes No, explain Documentation showing the facility is not located in a flood plain unless the owner or operator demonstrates to the Director that the unit will not restrict the flow of the 100-year flood, reduce the temporary water storage capacity of the floodplain, or result in a washout of solid waste R315-302-1(2)(c)(ii) Yes No, explain Documentation showing the facility is not located in wetlands unless the owner or operator demonstrates to the Director the facility meets the requirements of R315-302-1(2)(d)(i) through (vi) R315-302-1(2)(d) Yes No, explain Groundwater restrictions at or under a facility site or in designated drinking water source protection areas; Groundwater monitoring may be waived if a valid demonstration is made R315-302-1(2)(e) Yes No, explain Documentation the applicant has paid the costs for review of a traffic impact study, any costs required by the road authority for improvements, and submit a traffic impact study as specified in R315-302-1(2)(g)(i) R315-302-1(2)(g) Yes No, explain Exemptions from Location Standards - if applicable R315-302-1(3) Yes No, explain IIa.Plan of Operation Requirements for All Facilities An intended schedule of construction R315-302-2(2)(a) Yes No, explain Description of on-site solid waste handling procedures R315-302-2(2)(b) Yes No, explain Schedule for conducting inspections and monitoring R315-302-2(2)(c) Yes No, explain Contingency plans in the event of a fire or explosion R315-302-2(2)(d) Yes No, explain Corrective action programs to be initiated if groundwater is contaminated R315-302-2(2)(e) Yes No, explain Contingency plans for other releases, for example, release of explosive gases or failure of run-off containment system R315-302-2(2)(f) Yes No, explain Plan to control fugitive dust R315-302-2(2)(g) Yes No, explain Plan to control wind-blown litter R315-302-2(2)(h) Yes No, explain Description of maintenance of installed equipment including leachate and gas collection systems, and groundwater monitoring systems R315-302-2(2)(i) Yes No, explain Procedures for excluding the receipt of prohibited hazardous waste or prohibited waste containing PCBs R315-302-2(2)(j) Yes No, explain Procedures for controlling disease vectors R315-302-2(2)(k) Yes No, explain Plan for an alternative waste handling or disposal system during periods when the solid waste facility is not able to dispose of solid waste, including procedures to be followed in case of equipment breakdown R315-302-2(2)(l) Yes No, explain Closure and post-closure care plans R315-302-2(2)(m) Yes No, explain Cost estimates and financial assurance information as required by R315-309-2(3) R315-302-2(2)(n) Yes No, explain Training plan for site operations R315-302-2(2)(o) Yes No, explain IIb. Other Site-Specific Information Pertaining to the Plan of Operation as Required by the Director Procedures for handling special wastes as required by R315-315 R315-315-1(1) Yes No, explain Other site-specific information required by the Director R315-302-2(2)(p) Yes No, explain IIc. Liquid Prevention and Management A plan to prohibit disposal of containerized liquids larger than household size, noncontainerized liquids, sludge containing free liquids, or any waste containing free liquids in containers larger than household size. R315-303-3(1)(b) Yes No, explain A High Liquid Waste Management Plan, if applicable, that includes: Waste acceptance criteria Dewatering unit design and techniques Other stabilization or treatment techniques; A communication plan to inform customers of high liquid waste acceptance criteria R315-303-3(2)(a) Yes No, explain For a facility that utilizes dewatering, stabilization, or treatment techniques, proof that: A containment system having a permeability of no more than 1 x 10^-7 cm/sec that maintains integrity under the operation of heavy equipment will be installed and maintained for: unloading areas and structures; staging areas; and dewatering, stabilization, and treatment areas. Leachates derived from dewatering or stabilization will be appropriately managed. R315-303-3(2)(b) Yes No, explain If required, appropriate engineering reports demonstrating that disposal of dewatered high liquid wastes will not result in unacceptable geotechnical risks or landfill cell failures. R315-303-3(2)(c) Yes No, explain IIIa. Geohydrological Assessment Local and regional geology and hydrology, including faults, unstable slopes, and subsidence areas on site R315-310-4(2)(b)(i) Yes No, explain Evaluation of bedrock and soil types and properties, including permeability rates R315-310-4(2)(b)(ii) Yes No, explain Depths to groundwater or aquifers R315-310-4(2)(b)(iii) Yes No, explain Direction and flow rate of groundwater R315-310-4(2)(b)(iv) Yes No, explain Quantity, location, and construction of any private and public wells on the site and within 2,000 feet of the facility boundary R315-310-4(2)(b)(v) Yes No, explain Tabulation of all water rights for groundwater and surface water on the site and within 2,000 feet of the facility boundary R315-310-4(2)(b)(vi) Yes No, explain Identification and description of all surface waters on the site and within one mile of the facility boundary R315-310-4(2)(b)(vii) Yes No, explain Background and surface water quality assessment and identification of impacts of the existing facility upon ground and surface waters from landfill leachate discharges R315-310-4(2)(b)(viii) Yes No, explain Calculation of a site water balance R315-310-4(2)(b)(ix) Yes No, explain Conceptual design of a groundwater and surface water monitoring system, including proposed installation methods for these devices and where applicable, a vadose zone monitoring plan R315-310-4(2)(b)(x) Yes No, explain IIIb. Engineering – Designs, Plans, and Specifications Topographic map of the landfill unit drawn to a scale of 200 feet to the inch containing five foot contour intervals R315-310-4(2)(a)(i) Yes No, explain Most recent full size U.S.G.S. topographic map, 7-1/2 minute series showing the waste facility boundary, the property boundary, surface drainage channels, existing utilities, and structures within 1/4-mile of the facility site, and the direction of the prevailing winds R315-310-4(2)(a)(ii) Yes No, explain Engineering report, plans, specifications, and calculations of how the facility will meet location standards in R315-302-1 R315-310-4(2)(c)(i) Yes No, explain The basis for calculating the facility’s life R315-310-4(2)(c)(ii) Yes No, explain Cell design to include liner design, cover design, fill methods, elevation of final cover and bottom liner, and equipment requirements and availability R315-310-4(2)(c)(iii) Yes No, explain Identification of borrow sources for daily and final cover, and for soil liners R315-310-4(2)(c)(iv) Yes No, explain Design and location of run-on and run-off control systems R315-310-4(2)(c)(viii) R315-303-3(1)(c)-(d) Yes No, explain Quality control and quality assurance for the construction of any engineered structure of feature, excluding buildings at the landfills, at the solid waste disposal facility and for any applicable activity such as groundwater monitoring R315-310-4(2)(c)(x) Yes No, explain Documentation the facility meets the Performance Standards R315-303-2 Yes No, explain Design drawings signed and sealed by a professional engineer R315-303-3(7) Yes No, explain Other design requirements R315-303-3(8) Yes No, explain IIIc. Liner Design and Leachate Collection Systems Leachate collection system design and calculations R315-303-3(3) Yes No, explain Interim and final leachate collection, treatment, and disposal R315-310-4(2)(c)(v) Yes No, explain Liner design using the Standard Design, Equivalent Design, Alternative Design, or Stringent Design R315-303-3(4) Yes No, explain IIId. Groundwater and Gas Monitoring Groundwater monitoring plan that meets the requirements of R315-308 R315-310-4(2)(c)(vi) Yes No, explain Landfill gas monitoring plan and control that meets the requirements of R315-303-3(6) R315-310-4(2)(c)(vii) Yes No, explain IV. Closure and Post Closure Care Requirements for Class I and V Landfills Closure plan as required by R315-302-3 R315-310-3(1)(h) R315-302-2(2)(m) R315-310-4(2)(c)(ix) Yes No, explain Closure plan to include the closure schedule, capacity of the solid waste disposal facility in volume and tonnage R315-310-4(2)(d)(i) through (iii) Yes No, explain Post-closure care plan as required by R315-302-3(6) R315-310-3(1)(h) R315-302-2(2)(m) R315-310-4(2)(c)(ix) Yes No, explain Site monitoring plans of landfill gas, groundwater, and surface water if required R315-310-4(2)(e)(i) Yes No, explain Post-closure Inspection plans R315-310-4(2)(e)(ii) Yes No, explain Maintenance activities to maintain cover and run-on and run-off systems during post-closure R315-310-4(2)(e)(iii) Yes No, explain Name, address, and telephone number of the person or office to contact about the facility during the post-closure period R315-310-4(2)(e)(vi) Yes No, explain V. Financial Assurance Requirements for Class I and V Landfills Identification of closure costs including cost calculations and the funding mechanism as required by R315-309-2(3)(a) R315-310-4(2)(d)(iv) Yes No, explain Identification of post-closure costs including cost calculations as required by R315-309-2(3)(b) R315-310-4(2)(e)(iv) Yes No, explain Identification of a financial assurance mechanism, which will cover the costs of post-closure care, in effect and active as required by R315-309-2(5) R315-310-4(2)(e)(iv) Yes No, explain