Loading...
HomeMy WebLinkAboutDDW-2025-000819Danielle Zebelean <dzebelean@utah.gov> JSSD (Sys #26086); File 18257 - Mayflower Tank #3 5 messages DDW PNF <ddwpnf@utah.gov>Tue, Dec 10, 2024 at 10:54 AM To: Steve Jackson <steve@jackson-engineering.com>, Danielle Zebelean <dzebelean@utah.gov> Mr. Jackson: On December 10, 2024, the Division of Drinking Water received the attached project notification form, plans, and specifications for the proposed Mayflower Tank #3 project for the Jordanelle Special Service District water system. This project is referenced as Water System #26086, File #18257 in our plan review database. Please use these numbers for future correspondence related to this project. This project will be reviewed by Dani Zebelean. Please contact her at dzebelean@utah.gov or (385) 278-5110 if you have any questions. Thank you. DDW PNF Team Division of Drinking Water Phone: (801) 536-4200 Fax: (801) 536-4211 drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 18257 PNF - Mayflower Tank #3.xlsm 36K Danielle Zebelean <dzebelean@utah.gov>Wed, Jan 22, 2025 at 8:45 AM To: Steve Jackson <steve@jackson-engineering.com> Hi Steve, Sorry for the long delay on this project still playing catchup after the holidays. Overall the drawings and specifications look good. Can you also tell me where the tank gets water from and where does it go? If this tank provides system pressure can you also submit a hydraulic modeling waiver? Thank you! Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. 1/23/25, 9:44 AM State of Utah Mail - JSSD (Sys #26086); File 18257 - Mayflower Tank #3 https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1818076926323983805&simpl=msg-f:181807692632398380…1/3 [Quoted text hidden] DDW-2018-003104 - 0901a068807dbec3.docx 29K Danielle Zebelean <dzebelean@utah.gov>Wed, Jan 22, 2025 at 9:08 AM To: Steve Jackson <steve@jackson-engineering.com> Sorry, I started reviewing the Mayflower Pump #2 and I see that the pump station delivers water to the Mayflower Tank #3. Could you let me know where the water comes from for the Pump #2? Then where it goes after the Tank #3? Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Danielle Zebelean <dzebelean@utah.gov>Wed, Jan 22, 2025 at 10:41 AM To: Steve Jackson <steve@jackson-engineering.com> Also sorry, also seeing that the hydraulic certificate is for the Pump #2 and Tank #3 that was submitted with the pump. Dani Zebelean, P.E. Environmental Engineer III | Division of Drinking Water M: (385) 278-5110 Hours: M - Th 7 am to 5 pm drinkingwater.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden] Steve Jackson <steve@jackson-engineering.com>Wed, Jan 22, 2025 at 1:09 PM Reply-To: Steve Jackson <steve@jackson-engineering.com> To: Danielle Zebelean <dzebelean@utah.gov> Dani, I have attached an exhibit for your reference, hope this is helpful. For Pump Station #2 the source is from the JSSD Lower East Park Tank. Pump Station #2 then pumps to Tank #3. The exhibit identifies the Tank #3 service area. 1/23/25, 9:44 AM State of Utah Mail - JSSD (Sys #26086); File 18257 - Mayflower Tank #3 https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1818076926323983805&simpl=msg-f:181807692632398380…2/3 Let me know of any other needs. Steve Steven L. Jackson Jackson Engineering 3376 Stonehill Lane Cottonwood Heights City, UT 84121 (801) 558-5293 (cell) steve@jackson-engineering.com This communication may contain privileged and confidential information protected by the Electronic Communications Privacy Act, 18 U.S.C. Secs. 2510-2521. It is intended only for the use of the recipient named above. If you are not the intended recipient of this communication, or the employee or agent responsible for delivering it to the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone or email. [Quoted text hidden] Mayflower Master Plan PRV Settings (9.6.22)_Pump Station2 & Tank 3 Exhibit.pdf 1738K 1/23/25, 9:44 AM State of Utah Mail - JSSD (Sys #26086); File 18257 - Mayflower Tank #3 https://mail.google.com/mail/u/0/?ik=82c167e5f1&view=pt&search=all&permthid=thread-f:1818076926323983805&simpl=msg-f:181807692632398380…3/3