July 10,2024
CERTIFIED MAIL RETURN RECEIPT NO. 70I9 OTOO OOOI 5349 7788
Mr. Bryce Bird
Director, Division of Air Quality
Utah Department of Environmental Quality
P.O. Box 144820
195 Nofth 1950 West
Salt Lake City, UT 84114-4820
Attention:
UACR 2'd Quarter 2024INSPS Subpart GGGa I't Half Semiannual2024 VOC Monitoring Report
Chevron Products Company- Salt Lake Refinery
Mr. Bird:
As required by R307-326-9(7) and 40 CFR 60.592a(e), Chevron Salt Lake Refinery (Chevron) is submitting
the 2'd Quarter 2024 VOC monitoring and leak data for components subject to R307-326-9 (UACR-regulated
components), and lst Half Semiannual 2024 monitoring and leak data for components subject to 40 CFR
Subpart GGGa (NSPS-regulated components).
In accordance with the Consent Decree (C 03-04650 CRB). UACR-regulated valves in light-liquid and vapor
service are inspected quarterly (with the exception of valves in process units that are currently on alternative
skip monitoring in accordance Appendix K of the Consent Decree.
This report provides information required by R307-326-9(7) and 40 CFR 60.487a. Because the previous
UACR quarterly report was already submitted for period ending March 3l .2024, this report contains only 2"d
Quarter 2024 UACR monitoring data. Additionally. this report contains monitoring data for NSPS-regulated
components for the period of January 1,2024 to June 30,2024.
Please contact Tony Pollock at (801) 539-7162 for additional information regarding this report.
Sincerely.
-/
Chevron Products Company
685 South Chevron Way
North Salt Lake, UT 84054
Tel (801) 539-7200
Fax (80r) 539-7130
UTAH DEPARTMENT OF
EIWIRONMENTAL OUAUTY
;ii1 1i ::r: l
DIVISION OF AIR QUALTP'
Troy Tortorach
Refinery Manager
Troy Tortorich
REVIEWED Initials: Date: August 16, 2024 Compliance Status: OK File #: 10119 (B2)
Mr. Bryce Bird
Department of Environmental Quality
luly 10,2024
Page 2 of 12
SECTION I:
R3O7-326.9(N OUARTERLY REPORT FOR COMPONENTS SUBJECT TO R3O7-32G9
Reporting Period Start Date: April I ,2024
Reporting Period End Date: June30,2024
Table I - UACR Component Monitoring and Leak Data
uarter 2024 UACR-tion Summa
Total VOC C
VOC Components found leakine (includes S/D com
Percent of VOC Com ts Found Leaki
2024 UACR-
2024UAC
Percent of VOC Com
Total Process Drains Tested:
Process Drains found leakins (10.000 ppm Ieak definition):
Percent ofProcess Drains Found Leaki
Mr. Bryce Bird
Department of Environmental Quality
luly 10,2024
Page 3 of 12
Table 2 - Leaking Component Repair Activity
Number of Components on Shutdown Listing at beginning-of-Period: 0
Process Unit &
TD
Component Type VOC State Date Leak
Reoaired
None to report
Number of Components added to Shutdown Listing during period (Note l): 4
Process Unit &
ID
Component Type VOC State Date Leak
Discovered
Alky-VOC#
P360978
Pump Light Liquid 0611012024
Alky-VOC#
P3600 r
Pump Light Liquid 0611012024
FCC-VOC#
P32215
Pump Light Liquid 0sn3t2024
HDN-VOC#
P7 r 0304
Pump Light Liquid 06fi0t2024
Nole l: Includes components placed on Delay-of-Repair Listing as allowed
under R307-326-9(2).
Number of Components on Shutdown Listing repaired during period: 2
Number of Components on Shutdown Listing at End-of-Period: 2
Process Unit &
ID
Component Type VOC State Date Leak
Reoaired
FCC-VOC#
P32215
Pump Light Liquid 0st30t2024
HDN-VOC#
P7 r 030A
Pump Light Liquid 0612812024
Process Unit &
ID
Component Type VOC Sate Date Leak
Discovered
Alky-VOC#
P360978
Valve Light Liquid 06/1012024
Alky-VOC#
P36001
Valve Light Liquid 06n012024
Mr. Bryce Bird
Department of Environmental Quality
luly 10.2024
Page 4 of 12
Number of leaks not by R307-
326-9(2l:0
This information is corrective to information contained within I't Half 2023 Subpart GGGa semiannual
reporting. As per requirements at 60.482-2a the following I I pumps in the tank field unit were
inadvertently marked out of service on 61512023. They were not monitored again until 912612023.
Monitoring is required monthly as per 60.482-2a(a)(1).
P6t2t6 P61274
P6r28l P61285
P6t286 P61287
P61288 P61289
P61290 P61297
P6 I 333
The following is corrective to information contained within 2d Half 2023 Subpart GGGa semiannual
reporting. As per requirements at 60.482-7(a)(2), the following 8 valves in the Reformer unit missed
follow up monitoring after the initial monitoring for new components. Initial monitoring was completed
in August. The components were placed out of service on September l5rr'before they were able to be
monitored. Follow up rnonitoring has been completed as appropriate for components brought back in
service. For remaining components, follow up monitoring will be completed once brought back in
service.
3370 3374
3371 3375
3372 3316
3373 3377
This information is corrective to the information contained within 2d Half 2023 Subpart GGGa
semiannual reporting. As per requirements at 60.482-7a (aX I ). the following 3 valves missed monitoring
because they were put out of service on711412023 before we could monitor them. Follow up monitoring
has been completed as appropriate for components brought back in service. For remaining components,
follow up monitoring will be completed once brought back in service.
182
r83
184
This information is corrective to information contained within 2'd Half 2023 Subpart GGGa semiannual
reporting. As per 60.482-7a(aX I ) the following 4 valves in the Alky unit were placed out of service
before we were able to monitor them for the month of November 2023. Follow up monitoring has been
completed as appropriate for components brought back in service. For remaining components, follow up
monitoring will be completed once brought back in service.
4305 7301
4306 5066
repaired within l5 days after detection as required
Process unit & ID
Mr. Bryce Bird
Department of Environmental Quality
luly 10.2024
Page5ofl2
This information is findings that occurred during an internalChevron Audit in September 2023.The
following citations fall under Subpart GGGa requirements.
l. Citation $60.482-6a, Open-Ended Lines: During the field review of the Isom and Coker on
911112023 and9ll2l2023, seven instances of uncontrolled Open-Ended Lines were found.
Identification and Corrective Actions:
Tag# 732 - closed open valve(lsom) 9/l I
Tag# 382 - Plug added(lsom) 9/l I
Tag# 413 - Plug added(Coker)9112
Tag# 496 - Cap was added(Coker)9112
Tag# 34 - 3/4" closed upstream valve(Coker) 9/12
Tag# 37- 314" case drain on P7006A Plug added (Coker)9/I2
Heavy liquid case drain P7002A-Plug added (Coker) 9/12
2. Citation $60.482-7a, Overlooked Components: During the field review, components that are in
VOC service but not captured in the LDAR Program were found.
Identification and Corrective Actions:
Overlooked components in the VGO and Coker have been identified, tagged in the field, added to
Sky Bridge database. and monitored on 09/1412023.
vco-l 553,1554-9114
Coker- 1346, 1347, 1348, 1355,1 357, 1 358 and 1362 9113.
3. Citation $60.482-7a(a)(2), Missed Initial Monitoring: Newly installed valves missed a second
successive monthly inspection before beginning routine quarterly monitoring.
Identification and Corrective Actions:
Performed successive monitoring for 35XVl43 and 35XVl44 on 1112112023 and 1211212023.
Verified scheduling in Skybridge database is correct for future monitoring event on 35XVl43 and
35XV144.
4. Citation $60.482-7a(c)(2), Post Repair Follow-up Inspection: One ( I ) leaking valve missed the
first and second month post-repair follow-up inspections.
Identification and Corrective Actions:
Performed two months of consecutive monitoring for VOC tag5700 on 111812023 and
1211212023. Changed the leak definition in Skybridge database from 500PPM to 499PPM under
60GGGa rule. This will prevent another missed monitoring post follow-up exercise.
Mr. Bryce Bird
Department of Environmental Quality
luly 10,2024
Page6ofl2
SECTION 2:
40 CFR 60.592a(e) SEMI-ANNUAL REPORT FOR COMPONENTS SUBIECT TO 40 CFR 60
SUBPART GGGa
Reporting Period Start Date: January 1,2024
Reporting Period End Date: June30,2024
Number of Leakinq Valves: 40 CFR 60.487a(cx2Xi) (500 nom leak definition)
Process l]nit January February March Aoril May June
Alkr I 6 0 0 t2 0
Amine 0 0 0 0 0 0
Amine ll 0 2 0 0 0 0
Boiler 2 0 0 I 0 0
Coker 0 6 0 0 0 0
Crude 0 0 0 0 0 0
FCC 0 0 2 0 0 0
FVR 0 0 0 0 0 0
HDN 0 0 0 2 0 0
HDS 4 0 0 0 0 0
Isom 0 0 I 0 0 I
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 I 0
Reformer )0 0 2 0 0
Sulfur 0 0 0 0 0 0
Tankfield 0 0 0 0 0 4
TCLR I 0 0 0 0 0
VGO I 0 0 0 0 0
Mr. Bryce Bird
Department of Environmental Quality
luly 10,2024
Page 7 of 12
Number of Leakinq Pumps: 40 CFR 60.487a(cx2xiii)
Number of Leakine Comnressors: 40 CFR 60.487a(cx2xv)
Process Unit January February March April May June
Alkv 0 0 0 0 0 2
Am ne 0 0 0 0 0 0
Am ne II 0 0 0 0 0 0
Bo er 0 0 0 0 0 0
Coker 0 0 0 0 0
Crude 0 0 0 I 0 I
FCC 0 0 0 I I
FVR 0 0 0 0 0 0
HDN 0 0 0 0 0 I
HDS 0 0 0 0 0 0
Isom 0 0 0 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 0 0
Reformer 0 0 0 0 0 I
Sulfur 0 0 0 0 0 0
Tankfield 0 0 0 0 0 I
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 I 0
Process Unit January Februarv March Aoril May June
Alkv 0 0 0 0 0 0
Amine 0 0 0 0 0 0
Amine II 0 0 0 0 0 0
Boiler 0 0 0 0 0 0
Coker 0 0 0 0 0 0
Crude 0 0 0 0 0 0
FCC 0 0 0 0 0 0
FVR 0 0 0 0 0 0
HDN 6 0 0 J 0 0
HDS 0 J 0 0 0 0
Isom 0 0 0 0 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 0 0
Reformer 0 0 4 0 0 0
Sulfur 0 0 0 0 0 0
Tankfield 0 0 0 0 0 0
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 0 0
Process Unit January February March Aoril Mav June
Alkv 0 0 0 0 0 0
Am ne 0 0 0 0 0 0
Am ne II 0 0 0 0 0 0
Boiler 0 0 0 0 0 0
Coker 0 0 0 0 0 0
Crude 0 0 0 0 0 0
FCC 0 0 0 0 0 0
FVR 0 0 0 0 0 0
HDN I 0 0 0 0 0
HDS 0 0 0 0 0 0
Isom 0 0 0 0 0 0
Jet Treater 0 0 0 0 0 0
LPG 0 0 0 0 0 0
Reformer 0 0 0 0 0 0
Sulfur 0 0 0 0 0 0
Tankfield 0 0 0 0 0 0
TCLR 0 0 0 0 0 0
VGO 0 0 0 0 0 0
Mr. Bryce Bird
Department of Environmental Quality
July 10, 2024
Page8ofl2
Number of Leaking Valves. Pumps and Compressors not repaired after detection as required bv
660.482-7a (dXl). 860.482-2a (c)(l) and 860.482-3a (eXl). (2): 40 CFR 60.487a (cX2xii). (iv) and
oiL
Components on the Delav of Repair Listing (durins the reportins neriod: includes comnonents that
have been repaired and removed from the Delav-of-Repair Listins): 40 CFR 60.487a(cx2Xxi)
Process
Unit
TagNo.Description Type Date of
Oriein
Reason(s) Delayed
Alky P36097B P360978 Isobutane
FIush Pump/West
ofC-36030
Pump 06t10t2024 Equipment is isolated
from the process and does
not remain in VOC service.
Alky P36001 P36001 Alkine
Flush Pump
Pump 0611012024 Equipment is isolated
from the process and does
not remain in VOC service.
FCC P32215 P32215 Propane
Deprop OVHD
Pump
Pump 0511312024 Equipment is isolated from
the process and does not
remain in VOC service
HDN P7 I 030A P7l030,{ Seal- Frac
Reflux Pump
Pump 0611012024 Equipment is isolated from
the process and does not
remain in VOC service
Mr. Bryce Bird
Department of Environmental Quality
luly 10,2024
Page 9 of l2
Dates of process unit shutdowns which occurred within the reportins neriod-40 CFR 60.487a(cX3)
Process Unit Januarv Februarv March ADril Msv Jrue
Alkv 3t3-3n3 5/12-5117 6126-6128
Amine
Amine II
Boiler
Coker 419-4125
Crude 3t24-4121
FCC
FVR
HDN t lt 6-t lt9 4t11-4t22
HDS 3t29-3/31 4fi-4t22
Isom I lt6-1117 2t20-2t22 3t4-3t29 4nl-4t30 5fi-5t7
slt3-sfi8
6t7-6t9
6t18-6t20
Jet Treater
LPG
Reformer 4t9-4t21
Sulfur
Tankfield
TCLR
VGO 6t2-6t12
Mr. Bryce Bird
Department of Environmental Quality
luly 10,2024
Page l0 of l2
Process Units or Equinment for which revisions to the initial semiannual reoort information have
occurred durine the renortins neriod: 40 CFR 60.487a(cX4)
hoccss Unit Numbcof40CfR60
Sr$portffiCaGV/LL
Vnlvo rubtscrto40 cFR
60 SubpartWa
monitorinc nrlcg
Numberof40 CFR@
SubputGGGrLL Pumpr
subjsotb {0 C?R 60
SubportWsmmitoring
rulca
Uumbenoftl0trR60
Subprft eioGa
Compromoru suqpc[b40
CfR@ SubpotWa
moaitorinsrul6
Alkv 5455 36 2
Amine 2|0 0
Amine II 881 0 0
Boiler 383 0 0
Coker I 550 l3 I
Crude 2077 l6 0
FCC 3152 30 20
FVR 746 5 5
HDN r 018 5 6
HDS l5l8 2 7
Isom 840 8 I
Jet Treater ll 0 0
LPG t42t 8 I
Reformer 25tt 9 t2
Sulfur 48 0 0
Tankfield 3622 64 0
TCLR 194 2 0
VGO 2023 6 1
Mr. Bryce Bird
Department of Environmental Quality
July 10,2024
Page ll of12
This information is corrective to information contained within l't Half 2023 Subpart GGGa semiannual
reporting. As per requirements at 60.482-2a the following I I pumps in the tank field unit were
inadvertently marked out of service on 61512023. They were not monitored again until 912612023.
Monitoring is required monthly as per 60.482-2a(aX I ).
P61216 P6t274
P6l28l P61285
P61286 P61287
P61288 P61289
P61290 P61297
P6 I 333
The following is corrective to information contained within 2d Half 2023 Subpart CGGa semiannual
reporting. As per requirements at 60.482-7(a)(2), the following 8 valves in the Reformer unit missed
follow up monitoring after the initial monitoring for new components. Initial monitoring was completed
in August. The components were placed out of service on September l5'h before they were able to be
monitored. Follow up monitoring has been completed as appropriate for components brought back in
service. For remaining components, follow up monitoring will be completed once brought back in
service.
3370 3374
3371 3375
3372 3376
3373 3377
This information is corrective to the information contained within 2d Half 2023 Subpart GGGa
semiannualreporting. As per requirements at 60.482-7a(a)(l), the following 3 valves missed monitoring
because they were put out of service on 711412023 before we could monitor them. Follow up monitoring
has been completed as appropriate for components brought back in service. For remaining components.
follow up monitoring will be completed once brought back in service.
182
r83
r84
This information is corrective to information contained within 2d Half 2023 Subpart GGGa semiannual
reporting. As per 60.482-7a(aXl) the following 4 valves in the Alky unit were placed out of service
before we were able to monitor them for the month of November 2023. Follow up monitoring has been
completed as appropriate for components brought back in service. For remaining components, follow up
monitoring will be completed once brought back in service.
4305 7301
4306 5066
Mr. Bryce Bird
Depaftment of Environmental Quality
luly 10,2024
Page l2 of 12
This information is findings that occurred during an internalChevron Audit in September 2023.The
following citations fall under Subpart GGGa requirements.
l.Citation 960.482-6a, Open-Ended Lines: During the field review of the Isom and Coker on
911112023 and 911212023, seven instances of uncontrolled Open-Ended Lines were found.
Identification and Corrective Actions:
Tag# 732 - closed open valve(lsom) 9/l I
Tag# 382 - Plug added(lsom) 9/l I
Tag# 413 - Plug added(Coker) 9l12
Tag# 496 - Cap was added(Coker) 9ll2
Tag # 34 - 3/4" closed upstream valve(Coker) 9/l 2
Tag # 37 - 314" case drain on P7006A Plug added (Coker)9/l 2
Heavy liquid case drain P7002A-Plug added (Coker) 9l12
Citation $60.482-7a, Overlooked Components: During the field review. components that are in
VOC service but not captured in the LDAR Program were found.
Identification and Corrective Actions:
Overlooked components in the VGO and Coker have been identified, tagged in the field, added to
Sky Bridge database, and monitored on 09/1412023.
vco-r 553,1ss4-9114
Coker- 1346, 1347. 1348, 1355,1357. I 358 and 1362 9113.
3. Citation $60.482-7a(a)(2), Missed Initial Monitoring: Newly installed valves missed a second
successive monthly inspection before beginning routine quarterly monitoring.
Identification and Corrective Actions:
Performed successive monitoring for 35XVl43 and 35XVl44 on 1112112023 and 1211212023.
Verified scheduling in Skybridge database is correct for future monitoring event on 35XVl43 and
35XV144.
4. Citation $60.482-7a(c)(2), Post Repair Follow-up Inspection: One (l ) leaking valve missed the
first and second month post-repair follow-up inspections.
Identification and Corrective Actions:
Performed two months of consecutive monitoring for VOC tag 5700 on 111812023 and
1211212023. Changed the leak definition in Skybridge database from 500PPM to 499PPM under
60GGGa rule. This will prevent another missed monitoring post follow-up exercise.
2.