Loading...
HomeMy WebLinkAboutDERR-2025-000561PV VENT CAP STAGE 1 PD 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 7/19/2023 7-Eleven Air Quality Report P.O. Box 711 Dallas, TX 75221 Test Date: 7/17/2023 Order Number: 2361378 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-ELEVEN 38761 1400 N MAIN ST State ID 1000958 SPRINGVILLE, UT 84663 Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting 2 inch Pressure Decay Test TP201.3 Store Information Testing Company Site Name :7-ELEVEN 38761 Name :TANKNOLOGY INC. Address :1400 N MAIN ST State ID 1000958 SPRINGVILLE, UT 84663 Address :11000 N. MoPac Expressway Suite 500 Austin, TX 78759 Phone :385-327-9236 Phone :(800) 800-4633 Stage I System?DUAL Stage II System?NONE Total # of Nozzles :12 Products per Nozzle :3 Tanks Manifolded ?No Drop-Out tank present?NO Total # of Tanks Tested :2 Tank Information : Product Grade : Tank Capacity, gallons : Gasoline, gallons : Ullage, gallons : Testing Information : Start Time : Initial Pressure, wcg : Pressure @ 1 minute(s) : Pressure @ 2 minutes : Pressure @ 3 minutes : Pressure @ 4 minutes : Pressure @ 5 minutes : Allowable Final Pressure : Pass/Fail (Enter "GF" Gross Failure) 1 Regular RUL 19782 12620 7162 09:49 2.00 2.00 2.00 1.99 1.99 1.98 1.86 Pass 2 Premium PUL 7901 2902 4999 09:57 2.00 1.99 1.98 1.97 1.96 1.95 1.81 Pass Total 27683 15522 12161 All Comments: Tester :David Mathie Test Date :7/17/2023 Signature :Work Order :2361378 WO: 2361378 PVVC tested ==>CENTER RUL Manifolded Final Test Result (Pass / Fail) ==>Fail PVVC Manuf. ==>OPW Model Number ==>623V-2203 Is this Original or Replacement? Original If this cap is being replaced, check here: Manf Spec (CFH) Measured Leak Rate in ml/Min; Cracking (in H2O) Calc CFH (ml/min x .00212) Result (Pass /Fail) Pos Leak Rate(CFH)0.05 25 0.0530 Fail Low High Measured Pos Cracking (in H2O)2.50 6.00 2.26 Fail Neg Leak Rate (CFH)0.21 100 0.2120 Fail Low High Measured Neg Cracking (in H2O)-10.00 -6.00 -5.65 Fail PVVC tested ==>CENTER RUL Manifolded Final Test Result (Pass / Fail) ==>Pass PVVC Manuf. ==>OPW Model Number ==>723V Is this Original or Replacement? Replacement Manf Spec (CFH) Measured Leak Rate in ml/Min; Cracking (in H2O) Calc CFH (ml/min x .00212) Result (Pass /Fail) Pos Leak Rate(CFH)0.05 8 0.0170 Pass Low High Measured Pos Cracking (in H2O)2.50 6.00 3.58 Pass Neg Leak Rate (CFH)0.21 25 0.0530 Pass Low High Measured Neg Cracking (in H2O)-10.00 -6.00 -8.08 Pass PVVC tested ==>NORTH PUL Manifolded Final Test Result (Pass / Fail) ==>Fail PVVC Manuf. ==>OPW Model Number ==>623V-2203 Is this Original or Replacement? Original If this cap is being replaced, check here: Manf Spec (CFH) Measured Leak Rate in ml/Min; Cracking (in H2O) Calc CFH (ml/min x .00212) Result (Pass /Fail) Pos Leak Rate(CFH)0.05 25 0.0530 Fail Low High Measured Pos Cracking (in H2O)2.50 6.00 2.20 Fail Neg Leak Rate (CFH)0.21 100 0.2120 Fail Low High Measured Neg Cracking (in H2O)-10.00 -6.00 -5.48 Fail PVVC tested ==>NORTH PUL Manifolded Final Test Result (Pass / Fail) ==> PVVC Manuf. ==>OPW Model Number ==>723V Is this Original or Replacement? Replacement Manf Spec (CFH) Measured Leak Rate in ml/Min; Cracking (in H2O) Calc CFH (ml/min x .00212) Result (Pass /Fail) Pos Leak Rate(CFH)0.05 5 0.0106 Pass Low High Measured Pos Cracking (in H2O)2.50 6.00 3.53 Pass Neg Leak Rate (CFH)0.21 Low High Measured Neg Cracking (in H2O)-10.00 -6.00 -8.02 Pass PVVC tested ==> Manifolded Final Test Result (Pass / Fail) ==> PVVC Manuf. ==>Model Number ==> Is this Original or Replacement? Manf Spec (CFH) Measured Leak Rate in ml/Min; Cracking (in H2O) Calc CFH (ml/min x .00212) Result (Pass /Fail) Pos Leak Rate(CFH) Low High Measured Pos Cracking (in H2O) Neg Leak Rate (CFH) Low High Measured Neg Cracking (in H2O) PVVC tested ==> Manifolded Final Test Result (Pass / Fail) ==> PVVC Manuf. ==>Model Number ==> Is this Original or Replacement? Manf Spec (CFH) Measured Leak Rate in ml/Min; Cracking (in H2O) Calc CFH (ml/min x .00212) Result (Pass /Fail) Pos Leak Rate(CFH) Low High Measured Pos Cracking (in H2O) Neg Leak Rate (CFH) Low High Measured Neg Cracking (in H2O) 11000 N. MOPAC EXPRESSWAY, SUITE 500, AUSTIN, TX 78759 (800) 800-4633 QP-08-03-FF-02 Pressure Vacuum Vent Cap TP-201.1E Field Form Rev C 1/27/2011 Site Overall Test Results: Pass Total +ve LR: 0.0276 Total -ve LR: 0.0530 Test Date 7/17/2023 Technician Name David Mathie WO #2361378 Facility Name / Loc #7-ELEVEN 38761 38761 Street 1400 N MAIN ST State ID 1000958 City, St, Zip SPRINGVILLE, UT 84663 Pressure Vacuum Vent Cap Test Form TP-201.1E Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:2361378 Site ID / Name:38761 / 7-ELEVEN 38761 Address:1400 N MAIN ST State ID 1000958 City:SPRINGVILLE State:UT Zip:84663