Loading...
HomeMy WebLinkAboutDAQ-2025-000317,.tttF&nctorr UTAH DEPARTMENT OF ENVIRONMENTAL QUAUTY DiVISION OF AIR QUALITVApril L8,2024 Director CERTIFIED MAIL: 7022 0410 0002 3551 5816 Division of Air Quality Utah Dept. of Environmental Quality 195 North 1950 West Salt Lake City, Utah 847!6 RE: External Floating RoofTank !nspection Report Director, Pursuant to our notification to you dated Janua ry 25,2024 and in accordance with R307-327-5(2), 40 CFR 60.113b(aX2), 40 CFR 53.1053(c)(1)(i) and 40 CFR 63.1063(cX2Xii), HF Sinclair Woods Cross Refining LLC performed inspections on floating roof tanks during March 2024. ln accordance with 40 CFR 63.655(9) and 40 CFR 60.115b(aX3), this letter reports information on tanks for which the seal gap did not meet specifications as summarized below. ln accordance with 40 CFR 63.1066(bX4), this information will be included in the next periodic report. lf you have any questions or need additional information, please contact me at (801) 299-6658, or Richmond.Thornley@ H FSinclair.com. HF Sinclair Woods Cross Refining LLC 1070 W. 500 S, West Bountiful, UT 84087 801-299-6600 | HFSinclair.com Tank Description of Failure Reason Tank Could Not Be Emptied Schedule of Actions 101 Secondary Seal had gap greater than 0.5"N/A Sealto be repaired bV al27l2a r.08 Sunshield/Pusher plate detached from wiper tip N/A Sunshield/Pusher repaired during inspection 3 17 124 135 Secondary Seal had gap greater than 0.5"N/A Grounding shunt displacing seal repaired during inspection 3lL3l24 Riihmond Thornley Environmental Engineer REVIEWEDInitials:Date: Jan 17, 2025Compliance Status: OKFile #: 10123 (B2) E. Benson (r) File 2.4.2.L J. Barton M. Shores A. Bowles