HomeMy WebLinkAboutDAQ-2025-000317,.tttF&nctorr UTAH DEPARTMENT OF
ENVIRONMENTAL QUAUTY
DiVISION OF AIR QUALITVApril L8,2024
Director CERTIFIED MAIL: 7022 0410 0002 3551 5816
Division of Air Quality
Utah Dept. of Environmental Quality
195 North 1950 West
Salt Lake City, Utah 847!6
RE: External Floating RoofTank !nspection Report
Director,
Pursuant to our notification to you dated Janua ry 25,2024 and in accordance with R307-327-5(2), 40
CFR 60.113b(aX2), 40 CFR 53.1053(c)(1)(i) and 40 CFR 63.1063(cX2Xii), HF Sinclair Woods Cross Refining
LLC performed inspections on floating roof tanks during March 2024. ln accordance with 40 CFR
63.655(9) and 40 CFR 60.115b(aX3), this letter reports information on tanks for which the seal gap did
not meet specifications as summarized below.
ln accordance with 40 CFR 63.1066(bX4), this information will be included in the next periodic report.
lf you have any questions or need additional information, please contact me at (801) 299-6658, or
Richmond.Thornley@ H FSinclair.com.
HF Sinclair Woods Cross Refining LLC
1070 W. 500 S, West Bountiful, UT 84087
801-299-6600 | HFSinclair.com
Tank Description of Failure Reason Tank Could Not Be
Emptied Schedule of Actions
101 Secondary Seal had
gap greater than 0.5"N/A Sealto be repaired bV al27l2a
r.08
Sunshield/Pusher
plate detached from
wiper tip
N/A Sunshield/Pusher repaired
during inspection 3 17 124
135 Secondary Seal had
gap greater than 0.5"N/A
Grounding shunt displacing seal
repaired during inspection
3lL3l24
Riihmond Thornley
Environmental Engineer
REVIEWEDInitials:Date: Jan 17, 2025Compliance Status: OKFile #: 10123 (B2)
E. Benson (r) File 2.4.2.L
J. Barton
M. Shores
A. Bowles