HomeMy WebLinkAboutDAQ-2025-000301,.tttF$nctorr
July 15,2024
Mr. Bryce Bird, Director
Division of Air Quality
Utah Dept. of Environmental Quality
195 North 1950 West
Salt Lake city, utah 841l6-4820
RE: Fugitive Volatile Organic Compound (VOC) Monitoring Report - 2od Quarter 2024
Director:
HF Sinclair Woods Cross Refining LLC, HFSWCR, is submitting the 2'd Quarter 2024 Fugitive Volatile
Organic Compound Monitoring Report for the HF Sinclair Woods Cross Refining LLC - Woods Cross
Refinery. This report complies with the provisions in the Utah Air Conservation Regulation R307-326-
9(7) and 40 CFR Part 60 Subpart VV, VVa, and GGGa.
The monthly component monitoring summaries are presented in the attached tables for each operating
unit. There are currently l0 components on the Delay of Repair list at Woods Cross Refinery. There are
currently l3 chronically leaking valves that are awaiting a unit turnaround for repair. During each
instance of startup and shutdown, the shutdown and startup procedures were in accordance with those
specified in the startup, shutdown, and malfunction plans, and with standard operating procedures.
If you have any questions or need additional information, please contact Al Vargas at
Jgs9-V_atgi6t11!llSinclair.com or by phone at (801) 299-6645.
I certify that, except as noted herein, the VOC monitoring reported for this quarter was performed as
stipulated in R307-326-9.
Sincerely,
?.r.Ur-. S, .,.-",.^ - .^ ) 1
Dustin Simmonds
Vice President and Refinery Manager
Attachment
cc: E. Benson (r)Fi\e2.2.2
HF Sinclair Woods Cross Refining LLC
1070 W 500 S. West Bountiful, UT 84087
801-299-6600 | HFSinclair.com
UTAH DEPARf,MENT OF
EIWIRONMENTAL OI'AUTY
JUL 1g ?r2,1
DIVISION OF AIR OUALIT/
Certified Mail 7022 0410 0002 3551 6790
REVIEWEDInitials:Date: Jan 15, 2025Compliance Status: OKFile #: 10123 (B2)
HF Sinclair Woods Cross Refining LLC
leak Detection and Repair Report
UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
January 1 to June 30,2024
PROCESS UNIT:04 FCCU
DESCRtmOil
MOiln{
Jan Fcb Mlr ADr MtY Jun
Ualves
Unit Valve Count t57t L571
r'alves Monitored 1 L57t 3 2 1572
Jnit DTM's Count 35 35
)TM Valves Monitored 0 0 c 0 0
New DOR's 0 0 c 0 0
{dded - Valves c 1
Removed From Service-Va lves c
Number of Leaking Valves >500 ppm 0 2 c 0 4
Number of Missed First Attempts at Repair (5 Davs)0 0 c 0 0
Leaking Valves Not Repaired As Required (15 Days)0 0 c 0 0
Pumps
Unit Pump Count 1 1t
Dumps Monitored 12 L2 L2 t2 t2 1:
Dual-Mechanical seal oumos Count
Dual-Mechanical seal pumps monitored 0 0 0
New DOR's 0 0 0l
Added - Pumps
Removed From Service-Pumps
Number of Leaking Pumps >2,000 ppm 1 I c 0
Number of Missed First Attempts at Repair (5 Davs)0 0 C 0
Leaking Pumps Not Repaired As Required (15 Days)0 0 c 0
Compressors
Unit Comp. Count 1
Compressors Monitored 1 1 0
New DOR's 0 0 0l 0
Added - Compressors
Removed From Service-Comoressors
Number of Leakine ComDressors >2,000 ppm 0 C 0
Number of Missed First Attempts at Repair (5 Days)0 0 c 0 C
I-eaking Compressors Not Repaired As Required (15 days)0 0 c 0 c
cvs/PRv
Jnit CVS/PRV Count 2i 22
CVS/PRV Components Monitored 0 27 0 21
F RV's to Atmosohere Count C
tlumber Of PRV's to Atm. Components Monitored 0 0 0 0
lew DOR'S 0 0 0 0 0
\dded CVS Components 0
iemoved From Service- CVS/PRV 0
\,lumber of Leakins CVS/PRV > 500 oom 0 0 c 0 0
tlumber of Missed First Attempts at Repair (5 Davs)0 0 c 0 0
-eaking CVS/PRV Not Repaired By Required (15 Days)0 0 c 0 0
)rains
Jnit Drains Count 2(26
)rains Components Monitored c 0 0
\dded Drain Components 0
lemoved From Service- Drains 0
tlumber of Leakins Drains> 10,000 ppm 0 0 c 0 0
-eaking Drains Not Repaired By Required (15 Days)0 0 c 0 0
Commcnt3
Explanation for Missed Monitoring:
Six (6) components on TOS.
)ne ('l ) component added in Unit 4, initially monitored within 30-days of commissioning.
Delay of Repair (DOR):
LDAR f Date/Reason
\one.
Unit Shutdowns:
Date: Time (hours) Description
\one.
Late Repairs:
\one.
Comments
: Sinclair Woods Cross Refining LLC
ak Detection and Repair Report
\C R3O7-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
nuary 1 to June 30,2024
OCESS UNIT:6 REFORMER
,ESCRtmOil
MOilTH
,en FCD Mar Apr M.Y ,un
y'alves
Jnit Valve Count L743 774
/alves Monitored t735 18 20 t727 28
Jnit DTM's Count 47 47
DTM Valves Monitored 0 C C 0 0 C
New DOR's 0 c 0 0 C
Added - Valves 7
Removed From Service-Va lves 5
Number of Leaking Valves >500 ppm c L7 1 3 L4 C
Number of Missed First Attempts at Repair (5 Days)c c c c 0 0
Leaking Valves Not Repaired As Required (15 Days)c 1 c c 0 C
Pumps
Unit Pump Count 1 7
Pumps Monitored 6 6 e 6 6
Dual-Mechanical seal pumps Count 6 6
Dual-Mechanical seal oumos monitored 0 c c 0l 0 0
New DOR's 0 c C 0l 0 0
Added - Pumps C 1
Removed From Service-Pumps c 1
Number of Leaking Pumps >2,000 ppm c c 1 c 1
Number of Missed First AttemDts at Repair (5 Davs)C c c c 0 0
Leaking Pumps Not Repaired As Required (15 Davs)c c C c 0 0
Compressors
Unit Comp. Count
Comoressors Monitored I 1 c 1 1 0
New DOR's 0 c 0 0 0
Added - Compressors 0
Removed From Service-Comoressors 0
Number of Leaking Compressors >2,000 ppm C 1 0 1 0
Number of Missed First Attemots at Repair (5 Davs)C C 0 0
Leaking Compressors Not Repaired As Required (15 davs)c C 0 0 0
'PRV
Unit CVS/PRV Count 27 27
:VS/PRV Comoonents Monitored 1 19 0t 19
PRV's to Atmosphere Count
Number Of PRV's to Atm. Components Monitored 0 c 0 0
\ew DOR's 0 0 0 0
Added CVS Components
Removed From Service- CVS/PRV
Number of Leakins CVS/PRV > 500 ppm 0 0 0 1
\,lumber of Missed First Attempts at Repair (5 Davs)0 0 0 0
-eaking CVS/PRV Not Repaired By Required (15 Days)C C 0 0
Drains
Jnit Drains Count 4t 42
)rains Components Monitored C C 0 0
{dded Drain Comoonents
lemoved From Service- Drains
\umber of Leakins Drains> 10,000 ppm 0 0 0
-eaking Drains Not Repaired By Required (15 Days)0 0 0
CommclrG
for Missed Monitoring:
(9) components on TOS.
ix (6) components added in Unit 6, initially monitored within 30-days of commissioning.
of Repair (DOR):
LDAR #
alve#34674
Date/Reason
312012024, Cannot be isolated, will require a unit shutdown.
Shutdowns:
Date: Time (hours) Description
ate Repairs:
one.
Comments
HF Sinclair Woods Cross Refining LLC
Leak Detection and Repair Report
UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
January 1 to June 30,2024
PROCESS UNIT:7 ALKY
DEgCRtmOt{
MOT{I}I
J!n FCD t!f AD?MrY Jun
i/alves
Jnit Valve Count 1355 1364
r'alves Monitored L342 11 1338 1 19
Jnit DTM's Count 27 27
)TM Valves Monitored 0 0 C 0 C
\ew DOR's 0 0 1 c
Added - Valves 16
lemoved From Service-Valves 4 6
tlumber of Leaking Valves >500 ppm 7 6 0
t'lumber of Missed First Attempts at Repair (5 Days)0
-eaking Valves Not Repaired As Required (15 Days)0 0
Pumps
Jnit Pump Count 11 1l
)umDs Monitored 4 4 4
)ual-Mechanical seal oumos Count
)ual-Mechanical seal pumps monitored 0t 0
tlew DOR's 0 0
\dded - Pumos
lemoved From Service-Pumos
\,lumber of Leaking Pumps >2,000 ppm 1 1 1
\umber of Missed First Attempts at Repair (5 Days)0
-eaking Pumps Not Repaired As Required (15 Days)0
!ompressors
Jnit Como. Count
lompressors Monitored 0 0
Vew DOR's 0 0
\dded - Compressors
lemoved From Service-Compressors
tJumber of Leakinc Comoressors >2.000 oom 0
\,lumber of Missed First Attemots at Reoair (5 Davs)0 0
-eaking Compressors Not Repaired As Required (15 days)0 0
PRV
Jnit CVS/PRV Count 3l 31
:VS/PRV ComDonents Monitored 31 31
>RV's to Atmosohere Count 1 1
tlumber Of PRV's to Atm. Comoonents Monitored 1
tlew DOR's 0 0 C
\dded CVS Components
lemoved From Service- CVS/PRV
tlumber of Leakine CVS/PRV > 500 oom 0 0 c
\,lumber of Missed First Attemots at Reoair (5 Davs)0 0 0
-eaking CVS/PRV Not Repaired By Required (15 Days)0 0
)rains
Jnit Drains Count 1 1
)rains Components Monitored 0 0
\dded Drain Comoonents
lemoved From Service- Drains
tlumber of Leakinq Drains> 10,000 DDm 0 0 0
-eaking Drains Not Repaired Bv Required (15 Davs)0 c 0 0
@trtm€ntt
Explanation for Missed Monitoring:
Sixteen (16) components on TOS.
Sixteen (16) components added in Unit 7, all initially monitored within 30-days of commissioning.
Delay of Repair (DOR):
LDAR S Date/Reason
Yalve #32405 512012021, Cannot be isolated, will require a unit shutdown.
Valve #06642 711312023, Cannot be isolated, will require a unit shutdown.
Valve #29563 311312024, Cannot be isolated, will require a unit shutdown.
Yalve #32212 412412024.lsolated from VOC service.
Valve #32666 412412024, Cannot be isolated, will require a unit shutdown.
Unit Shutdowns:Date: Time {hours} Description
None.
Late Repairs:
None.
Comments
F Sinclair Woods Cross Refining LLC
lak Detection and Repair Report
AC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
rnuary 1to June 30,2024
IOCESS UN!T:8 CRUDE
DESCRTmOil
MOI{n'l
Jan FCD Mer Apf M.Y ,un
y'alves
Jnit Valve Count 819 82(
y'alves Monitored 1 1 8L7 1 1 82t
Jnit DTM's Count
)TM Valves Monitored 0l 0 0 0 0
tlew DOR's 0 0 0 0
\dded - Valves
lemoved From Service-Valves
{umber of Leaking Valves >500 ppm 0 0 0 0
\umber of Missed First Attempts at Repair (5 Davs)0 0 0 0
-eaking Valves Not Repaired As Required (15 Days)0 0 0
'umps
Jnit PumD Count
)umps Monitored 4 4 4 4
)ual-Mechanical seal pumps Count
)ual-Mechanical seal pumps montiored 0 0 0 0
tlew DOR's 0 0 0 0
\dded - Pumps
lemoved From Service-Pumps
tlumber of Leaking Pumps >2,000 ppm 0 0 0 0
tlumber of Missed First Attempts at Repair (5 Days)0 0 0 0
-eaking Pumps Not Repaired As Required (15 Days)0 0 0 0
,ompressors
Jnit Comp. Count
Comoressors Monitored 0 0 0 0
New DOR's 0 0 0 0
Added - Compressors
Removed From Service-ComDressors
Number of Leaking Compressors >2,000 ppm 0 0 0
Number of Missed First Attempts at Repair (5 Davs)0 0 0 0
Leaking Compressors Not Repaired As Required (15 davs)0 0 0 0
cvs/PRv
Unit CVS/PRV Count 1 7
CVS/PRV Comoonents Monitored 0 0 1 0 7
PRV's to Atmosphere Count
Number Of PRV's to Atm. Components Monitored 0 0 0
New DOR's 0 0 0 C C
Added CVS Comoonents
Removed From Service- CVS/PRV
Number of Leakine CVS/PRV > 500 ppm 0 0 C c c
Number of Missed First Attempts at Repair (5 Davs)0 0 c C C c
Leaking CVS/PRV Not Repaired By Required (15 Days)C 0
0rains
Unit Drains Count 27 27
Drains Components Monitored 0 0 c
Added Drain Comoonents c c
lemoved From Service- Drains c c
!umber of Leakins Drains> 10,000 opm 0 c C c c
-eaking Drains Not Repaired By Required (15 Davs)c c C c c c
@mmentr
Explanation for Missed Monitoring:
Two (2) components on TOS.
Seven (7) components added in Unit 8, initially monitored within 30-days of commissioning.
Delay of Repair (DOR):
IDAR # Date/Reason
None.
Unit Shutdowns:
Date: Time (hours) Description Comments512312024 35.3 Sub Station #3 loss. No DOR or Chronic Leaking Components.
Late Repairs:
None.
HF Sinclair Woods Cross Refining LLC
Leak Detection and Repair Report
UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
January 1 to June 30,2024
PROCESS UNIT:9 DHDS
DE9CRIPnON
MOlrl}r
,en FCb Mer Aor MaY Jun
Valves
Unit Valve Count 3s9 359
Valves Monitored 5 c 3s8 2 2 358
Unit DTM's Count c c
DTM Valves Monitored 0 C C 0 0 c
New DOR's 0 c c 0 0 c
Added - Valves c c
Removed From Service-Valves C C
Number of Leaking Valves >500 ppm c 2 c c
Number of Missed First Attempts at Repair (5 Davs)c c c c c
-eakins Valves Not Repaired As Required (15 Davs)c c C c
rumps
Jnit Pumo Count L 1
)umos Monitored 1 1 1 1 7 t
)ual-Mechanical seal oumps Count c c
)ual-Mechanical seal pumps montiored 0 c C 0 C C
tlew DOR's 0 c c o C c
\dded - Pumps c c
lemoved From Service-Pumps c c
tlumber of Leaking Pumps >2,000 ppm 0 C c C c
tlumber of Missed First Attempts at Repair (5 Days)c c C c
-eaking Pumps Not Repaired As Required (15 Days)c c c c
!ompressors
Jnit Comp. Count c c
lompressors Monitored 0 c 0 c c
tlew DOR's 0 c 0 c c
\dded - Comnressors c c
lemoved From Service-Compressors c c
!umber of Leaking Compressors >2,000 ppm 0 C C C C
t,lumber of Missed First Attempts at Repair (5 Days)0 c c C C
-eaking Compressors Not Repaired As Required (15 days)0 c c c c
:vs/PRv
Jnit CVS/PRV Count
:VS/PRV Comoonents Monitored 0 0
)RV's to Atmosohere Count c c
!umber Of PRV's to Atm. Components Monitored 0 0 0
t,lew DOR's 0 c 0 c c
\dded CVS Comoonents
lemoved From Service- CVS/PRV
lumber of Leakine CVS/PRV > 500 ppm 0 0 c c c c
!umber of Missed First Attempts at Repair (5 Davs)0 c c C c
-eaking CVS/PRV Not Repaired By Required (15 Days)0 C
)rains
Jnit Drains Count e €
)rains Components Monitored 0 c c
\dded Drain Comoonents c c
lemoved From Service- Drains c c
!umber of Leakine Drains> 10.000 oom 0 c c c c
-eaking Drains Not Repaired By Required (15 Davs)0 C C C c
@mmarts
Explanation for Missed Monitoring:
)ne (1 ) component on TOS.
Delay of Repair (DOR):
LDAR # Date/Reason
\one.
Unit Shutdowns:
Date Time (hours) Description
i11312024 67.7 Sub Station #3 loss.)1612024 128.6 Unit shutdown for maintenance
late Repairs:
\one.
Comments
No DOR or Chronic Leaking Components.
No DOR or Chronic Leaking Components.
HF Sinclair Woods Cross Refining tLC
Leak Detection and Repair Report
UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
January 1 to June 30,2024
PROCESS UNIT:10 SDA
DESCmmON
MOITTI{
lan Feb Mrr ADf MaY Jun
y'alves
Jnit Valve Count 681 682
y'alves Monitored 5 673 6 675 1
Jnit DTM's Count 1 1
)TM Valves Monitored 0 c 2 2 0 c
\ew DOR's 0 c 0 0 C
Added - Valves C
iemoved From Service-Valves 1 c
\umber of Leaking Valves >500 ppm 0 2 0 1 C
\umber of Missed First Attempts at Repair (5 Days)0 c 0 0 c
-eaking Valves Not Repaired As Required (15 Days)0 C 0 0 C
Pumps
Unit Pump Count 3
Pumps Monitored 0 c 1 0 0 C
Dual-Mechanical seal pumps Count 3
Dual-Mechanical seal pumps montiored 0 c 1 0 0 c
New DOR's 0 0 0 c
Added - Pumps c
Removed From Service-Pumos c
Number of Leaking Pumps >2,000 ppm C 1 0 0 c
Number of Missed First Attempts at Repair (5 Davs)c 0 0 c
Leakins Pumps Not Repaired As Required (15 Davs)C 0 0 c
LOmOressors
Unit Comp. Count 1 1
Compressors Monitored 1 1 0 C
New DOR's 0 0 0 0 C
Added - Comoressors c
Removed From Service-Comoressors c
Number of Leaking Compressors >2,000 ppm c 0 0 0 c
Number of Missed First Attempts at Repair (5 Days)c 0 0 0 c
Leaking Compressors Not Repaired As Required (15 days)c 0 0 0 c
cvs/PRv
Unit CVS/PRV Count 7 13
CVS/PRV Comoonents Monitored 0 1 0 7
PRV's to Atmosphere Count c
Number Of PRV's to Atm. Components Monitored 0 0 0 c
New DOR's 0 0 0 0 C
Added CVS Comoonents
Removed From Service- CVS/PRV
Number of Leaking CVS/PRV > 500 ppm c 0 0 0 c
Number of Missed First Attempts at Reoair (5 Davs)C 0 0 0 c
-eakins CVS/PRV Not Repaired By Required (15 Days)C 0 0 0 c
)rains
Unit Drains Count t1 11
Drains Components Monitored c 0 1 c
Added Drain Components c
Removed From Service- Drains C
tlumber of Leaking Drains> 10,000 ppm C 0 0 0 C
-eaking Drains Not Repaired By Required (15 Days)c 0 0 0 C
C.omments
Explanation for Missed Monitoring:
Seven (7) components on TOS.
Delay of Repair (DOR):
LDAR f Date/Reason
None.
Unit Shutdowns:
Oate: Time (hours) Description
None.
Late Repairs:
None.
Comments
F Sinclair Woods Cross Refining LLC
lak Detection and Repair Report
AC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
rnuary 1to June 30,2024
IOCESS UNIT:11 GAS PLANT
)ESCrumOil
MOI|IH
Jan Fsb Mer AP'May Jun
y'alves
Jnit Valve Count 742i t42:
/alves Monitored 13 20 7404 3 2 139:
Jnit DTM's Count 34 3t
)TM Valves Monitored 0 0 0 C
tlew DOR's 0 0 0 C
\dded - Valves
lemoved From Service-Valves
tlumber of Leaking Valves >500 ppm 0 2 1 c C
tlumber of Missed First Attempts at Repair (5 Days)0 0 C c
-eaking Valves Not Repaired As Required (15 Days)0 0 c c
rumps
Jnit Pump Count 13 1
)umps Monitored 9 9 9 c
)ual-Mechanical seal pumps Count 3
)ual-Mechanical seal pumps montiored 0 0 0 c
t,lew DOR's 0 0 0 c
\dded - Pumps
lemoved From Service-Pumos
tlumber of Leakine Pumos >2.000 oom 0 0 0 C
t,lumber of Missed First Attemots at Reoair (5 Davs)0 0 0 c
-eaking Pumps Not Repaired As Required (15 Davs)0 0 0 c
-ompressors
Jnit Comp. Count 1 7
lompressors Monitored 1 0 t c
tlew DOR's 0 0 0 c
\dded - Comoressors
lemoved From Service-Compressors
tlumber of Leaking Compressors >2,000 ppm 0 0 0 c
tlumber of Missed First Attempts at Repair (5 Days)0 0 0 c
.eaking Compressors Not Repaired As Required (15 days)0 0 0 c
:vs/PRv
Jnit CVS/PRV Count 26 2t
:VS/PRV Components Monitored 0 2 2(0 c 2t
)RV's to Atmosphere Count 0
tlumber Of PRV's to Atm. Components Monitored 0 0 0 c
tlew DOR's 0 0 0 0 c
\dded CVS Comoonents
lemoved From Service- CVS/PRV
Number of Leaking CVS/PRV > 500 ppm c 0 0 0 1
Number of Missed First Attempts at Repair (5 Days)c 0 0 0 c
Leaking CVS/PRV Not Repaired Bv Required (15 Davs)C 0 0 0 c
Drains
iJnit Drains Count 2(2C
Drains Components Monitored C 0 0 c
Added Drain Comoonents C
lemoved From Service- Drains c
\umber of Leaking Drains> 10,000 ppm 0 0 0 c
-eaking Drains Not Repaired By Required (15 Days)0 0 c
Comments
Explanation for Missed Monitoring:
l-hirty Two (32) components on TOS.
Delay of Repair (DOR):
LDAR# Date/Reason
\one.
Unit Shutdowns:
Date: Time (hours) Description
\one.
[ate Repairs:
!one.
Comments
HF Sinclair Woods Cross Refining LLC
Leak Detection and Repair Report
UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
January 1 to June 30,2024
PROCESS UNIT:13 |SOM
DESCR|mOit
MOltTlt
,.n F!b Mrr ADT M'Y lun
Valves
Unit Valve Count 744 744
r'alves Monitored 1 8 11 630 13 741
Unit DTM's Count 2t 21
DTM Valves Monitored 0 0 c 0 0
New DOR's 0 0 c 0 0
Added - Valves c 2
lemoved From Service-Valves C 2
\umber of Leaking Valves >500 ppm 1 0 11 0 4
\umber of Missed First Attempts at Repair (5 Davs)0 0 c 0 0
-eaking Valves Not Repaired As Required (f5 Davs)0 c 0 0
Pumps
Jnit Pump Count 8
)umps Monitored 6 6,6 5
)ual-Mechanical seal oumos Count 2
)ual-Mechanical seal pumps montiored 0 C 0 0 c
\ew DOR's 0 c 0 0 c
\dded - Pumps C c
lemoved From Service-Pumps 0 c
tlumber of Leaking Pumps >2,000 ppm 1 1 1 0 0 c
lumber of Missed First Attempts at Repair (5 Davs)0 C 0 0 c
-eaking Pumps Not Repaired As Required (15 Days)0 C 0 0 c
Sompressors
Jnit Comp. Count 1
lomoressors Monitored 1 1 0 C
tlew DOR's 0 0 c
\dded - Comoressors C
lemoved From Service-ComDressors c
\,lumber of Leaking Compressors >2,000 ppm 0 0 C
tlumber of Missed First Attempts at Repair (5 Days)0 0 C
-eaking Compressors Not Repaired As Required (15 days)0 0 c
:VS/PRV
Jnit CVS/PRV Count 9
-VS/PRV Comoonents Monitored 0 1 8 c
)RV's to Atmosphere Count C
tlumber Of PRV's to Atm. Components Monitored 0 0l c
tlew DOR's 0 c 0 c c
\dded CVS Comoonents
lemoved From Service- CVS/PRV
tlumber of Leakine CVS/PRV > 500 ppm 0 C 0 c
tlumber of Missed First Attempts at Repair (5 Davs)0 C 0 C
-eaking CVS/PRV Not Repaired By Required (15 Days)0 c 0
)rains
Unit Drains Count 24 24
)rains Components Monitored C c 0
Added Drain Components 0
Removed From Service- Drains 0
Number of Leakins Drains> 10.000 ppm C 0 c 0 0
Leaking Drains Not Repaired By Required (t5 Davs)c 0 0 0
Commcnts
Explanation for Missed Monitoring:
Two (2) components added in Unit 13, initially monitored within 30-days of commissioning.
Delay of Repair (DOR):
LDAR # Date/Reason
None.
Unit Shutdowns:
Date Time (hours) Description Comments41112024 51.5 Unit shutdown continuation'from 31812024. DOR #32505 repaired.511312024 107.5 Sub Station #3 loss. No DOR or Chronic Leaking Components.61712024 75.6 Unit shutdown for unscheduled maintenance. No DOR or Chronic L-eaking Components.
Late Repairs:
None.
HF Sinclair Woods Cross Refining LLC
Leak Detection and Repair Report
UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
January 1 to June 30,2024
PROCESS UN!T:16 AMINE
DESCmmOil
MOTITH
Jan Feb Mar Aor Mav Jun
t/alves
Jnit Valve Count 101 101
y'alves Monitored 0 c 101 1,1 101
Jnit DTM's Count 0
)TM Valves Monitored 0 c 0 0
\,lew DOR's 0 0 0
Added - Valves c 1
lemoved From Service-Valves 1
\umber of Leaking Valves >500 ppm 0 c 1 0
\umber of Missed First Attempts at Repair (5 Davs)0 c C 0 0
-eaking Valves Not Repaired As Required (15 Days)0 C 0 0
Pumps
Jnit Pumo Count c
)umps Monitored 0 0 C 0 0
)ual-Mechanical seal oumps Count C
)ual-Mechanical seal pumps montiored 0 0 c 0 0
\,lew DOR's 0 0 c 0 0
ddded - Pumos c
lemoved From Service-Pumps c
t,lumber of Leaking Pumps >2,000 ppm 0 0 C 0 0
t,lumber of Missed First Attempts at Repair (5 Days)0 0 c 0 0
-eaking Pumps Not Repaired As Required (15 Days)0 0 C 0 0
!ompressors
Jnit Comp. Count c
lompressors Monitored 0 0 C 0 0
!ew DOR's 0 0 c 0 0
\dded - Compressors c
lemoved From Service-Compressors C
tlumber of Leaking Compressors >2,000 opm 0 0 c 0 0
tlumber of Missed First Attempts at Repair (5 Days)0 0 c 0 0
-eaking Compressors Not Repaired As Required (15 davs)0 0 C 0 0
:vs/PRV
Jnit CVS/PRV Count I 4
:VS/PRV Components Monitored 0 0 0 0 4
)RV's to Atmosphere Count 0
tlumber Of PRV's to Atm. Components Monitored 0 0 c 0 0
tlew DOR's 0 0 0 0 0
\dded CVS Comoonents c
lemoved From Service- CVS/PRV c
tlumber of Leakins CVS/PRV > 500 oom 0 0 c 0 0
tlumber of Missed First Attempts at Repair (5 Davs)0 0 C 0 0
eaking CVS/PRV Not Repaired By Required (15 Days)0 0 0
)rains
Jnit Drains Count
)rains Comoonents Monitored 0 0 C C
\dded Drain Components C
Removed From Service- Drains
Number of Leaking Drains> 10,000 ppm 0 c c
Leaking Drains Not Repaired By Required (15 Days)0 c c
Comnrents
Explanation for Missed Monitoring:
One (1) component added in Unit 16, initially monitored within 30-days of commissioning,
Delay of Repair (DOR):
IDAR # Date/Reason
None.
Unit Shutdowns:
Date Time (hourc) Description
None.
Late Repairs:
None.
Comments
HF Sinclair Woods Cross Refining tLC
Leak Detection and Repair Report
UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
January 1 to June 30,2024
PROCESS UNIT: 17 SRU
DESCmmOfl
MOilfi
tan Feb M8r ADT Mey Jun
y'alves
Jnit Valve Count 3 3
y'alves Monitored 0 0 3 0 0
Jnit DTM's Count c
)TM Valves Monitored 0 0 c 0 0
!ew DOR's 0 0 c 0 0
\dded - Valves c
iemoved From Service-Valves c
tlumber of Leaking Valves >500 ppm 0 0 c 0 0
tlumber of Missed First Attempts at Repair (5 Days)0 0 C 0 0
-eaking Valves Not Repaired As Required (15 Days)0 0 c 0 0
rumps
Jnit Pumo Count C
rumDs Monitored 0 0 c 0 0
)ual-Mechanical seal pumps Count c
)ual-Mechanical seal pumps montiored 0 0 c 0 0
!ew DOR's 0 0 c 0 0
\dded - Pumos c
lemoved From Service-Pumos C
!umber of Leaking Pumps >2,000 ppm 0 0 c 0 0
!umber of Missed First Attempts at Repair (5 Days)0 0 C 0
-eaking Pumps Not Repaired As Required (15 Days)c 0 c 0
-ompressors
Jnit Comp. Count c
lompressors Monitored 0 0 c 0 0
tlew DOR's 0 0 C 0 0
\dded - Comoressors c
lemoved From Service-Compressors 0
!umber of Leaking Compressors >2,000 ppm C 0 0 0
\,,lumber of Missed First Attempts at Repair (5 Days)0 0 c 0
-eaking Compressors Not Repaired As Required (15 days)0 0 0 0
:r/s/PRv
Jnit CVS/PRV Count 0
:VS/PRV Components Monitored 0 0 0 0 0
)RV's to Atmosphere Count 0
{umber Of PRV's to Atm. Components Monitored 0 0 0 0 0 0
tlew DOR's 0 0 0 0 0
\dded CVS Comoonents 0
lemoved From Service- CVS/PRV 0
tlumber of Leaking CVS/PRV > 500 ppm 0 0 c C
tlumber of Missed First Attempts at Reoair (5 Davs)0 0 C C
.eaking CVS/PRV Not Repaired By Required (15 Days)0 0 c C
)rains
Unit Drains Count
Drains Components Monitored 0 c c
\dded Drain Comoonents
lemoved From Service- Drains
\,lumber of Leaking Drains> 10,000 ppm 0 c C
-eaking Drains Not Repaired By Required (15 Days)0 C c
Comments
Explanation for Missed Monitoring:
None.
Delay of Repair (DOR):
LDAR# Date/Reason
None.
Unit Shutdowns:
Date Time (hours) Description
None.
Late Repairs:
None.
Comments
: Sinclair Woods Cross Refining [[C
ak Detection and Repair Report
\C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
nuary 1 to June 30,2024
OCESS UNIT:19 DHT
,ESCRrmOil
MOl{T}t
l.n FeD Mer Aor Mav Jun
y'alves
Jnit Valve Count 97(975
/alves Monitored 970 8 97 19 77
Jnit DTM's Count 21 21
DTM Valves Monitored 0 0 0 0
tlew DOR's 0 0 0 0
\dded - Valves
Removed From Service-Valves
Number of Leaking Valves >500 ppm 7 0 11 0
Number of Missed First Attempts at Repair (5 Days)0 0 0 0
Leaking Valves Not Repaired As Required (15 Days)0 0 0 0
Pumps
Unit Pump Count
Pumps Monitored 0 0 0 0
Dual-Mechanical seal oumos Count
Dual-Mechanical seal oumps montiored 0 0 0 0
New DOR's 0 0 0 0
Added - Pumos
Removed From Service-Pumos
Number of Leakine Pumos >2.000 oom 0 0 0
Number of Missed First Attempts at Repair (5 Davs)0 0 0
Leaking Pumps Not Repaired As Required (15 Days)0 0 0
Compressors
Unit Comp. Count 4
Sompressors Monitored 4 0 4
New DOR's 0 0 0
Added - Comoressors
Removed From Service-Compressors
Number of Leakins Comoressors >2,000 ppm 7 0 0
Number of Missed First Attempts at Repair (5 Days)0 0 0
leaking Compressors Not Repaired As Required (15 days)0 0 0 c
cvs/PRv
Unit CVS/PRV Count 2!2!
3VS/PRV Components Monitored 25 0 25
PRV's to Atmosphere Count C
Number Of PRV's to Atm. Comoonents Monitored 0 0 0
New DOR's 0 0 0 c c
Added CVS Components
lemoved From Service- CVS/PRV
\,lumber of Leakine CVS/PRV > 500 oom 0 0 c c c c
\umber of Missed First Attemots at ReDair (5 Davs)0 C C c c
-eaking CVS/PRV Not Repaired By Required (15 Days)0 c
Drains
Jnit Drains Count 13 13
)rains Comoonents Monitored c c
{dded Drain Components C c
lemoved From Service- Drains C c
\,lumber of Leaklne Drains> 10.000 oom c c c C c c
-eaking Drains Not Repaired Bv Required (15 Davs)C c c C c C
Commant3
for Missed Monitoring:
ight (8) components added in Unit 19, initially monitored within 30-days of commissioning
Two (2) components on TOS.
of Repair (DOR):
LDAR #Date/Reason
Shutdowns:
Date Time (hours)
Repairs:
Description Comments
HF Sinclair Woods Cross Refining LLC
Leak Detection and Repair Report
UAC R3O7-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
lanuary 1 to June 30,2024
PROCESS UNIT:20 GHC
)ESCRtmOil
MOTTTH
J8n F'!D illar Apr MAY ,un
Ualves
Unit Valve Count 777 771
y'alves Monitored 3 759 A 4 759 3
Unit DTM's Count
DTM Valves Monitored 0 0 0 0
New DOR's 0l 0 0 0
Added - Valves 2
Removed From Service-Valves
rlumber of Leaking Valves >500 ppm C 7 0 2 1
tlumber of Missed First Attempts at Repair (5 Days)c 0 0 0
eaking Valves Not Repaired As Required (15 Days)0 0 0 0
'umps
Jnit Pump Count
)umps Monitored 0l 0 0 0
)ual-Mechanical seal pumps Count 4
)ual-Mechanical seal pumps montiored 0 0 0 0 0 0
tlew DOR's c 0 0 0 0
\dded - Ptrmos 0 0
lemoved From Service-Pumos c 0
tlumber of Leakins Pumos >2.000 oom c c c C 0 0
tlumber of Missed First Attempts at Repair (5 Davs)c c c c 0 C
-eaking Pumps Not Repaired As Required (15 Days)c c c c 0 c
-ompressors
Jnit Como. Count c c
lomoressors Monitored o c c 0 0 0
tlew DOR's 0 c c 0 0 0
\dded - Comoressors c 0
lemoved From Service-Comoressors c c
tlumber of Leakins Comoressors >2.000 oom c c c c 0 c
tlumber of Missed First Attempts at Repair (5 Davs)c c c c 0 c
-eaking Compressors Not Repaired As Required (15 days)c c C c 0 c
:vs/PRv
Jnit CVS/PRV Count 1.4 t4
:VS/PRV Comoonents Monitored 0 t4 c 0t t4 c
)RV's to Atmosphere Count c c
\,lumber Of PRV's to Atm. Components Monitored 0 c 0 c c
tlew DOR's 0 c c 0 c c
\dded CVS Comoonents C c
lemoved From Service- CVS/PRV c c
!umber of Leaking CVS/PRV > 500 ppm c c C c C C
tlumber of Missed First Attemots at Reoair (5 Davs)c c c c c C
-eakins CVS/PRV Not Repaired Bv Required (15 Days)c C c c c c
Jratns
Jnit Drains Count L4 t4
)rains Components Monitored c c
\dded Drain Components C c
lemoved From Service- Drains c c
tlumber of Leaking Drains> 10,000 ppm C C C c 0 c
-eaking Drains Not Repaired By Required (15 Days)c c c c 0 C
CrmmenG
Explanation for Missed Monitoring:
lwelve (12) components on TOS.
Delay of Repair (DOR):
LDAR S Date/ReasonValve#28087 612112023, Unit shutdown required.
Unit Shutdowns:
Date Time (hours) Description Commentsi12012024 75.1 Unit shutdown for unscheduled maintenance. DOR #28087, was repaired but did
not pass reinspection.
Late Repairs:
tlone.
Sinclair Woods Cross Refining LLC
rk Detection and Repair Report
C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
uary 1 to June 3,O,2024
)CESS UNlT:21 NAHS
)ESCmmOr
MOT{TH
tm Feb Mar ADT Mry Jun
Valves
Unit Valve Count 124 12t
Valves Monitored 0 724 0 12t
Unit DTM's Count
DTM Valves Monitored 0 0
New DOR's 0 0
Added - Valves
Removed From Service-Va lves
Number of Leaking Valves >500 ppm 0 0 0 0
Number of Missed First Attempts at Repair (5 Davs)0 0 0 0
-eaking Valves Not Repaired As Required (15 Davs)0 0 0 0
Pumps
Unit Pump Count
)umps Monitored 0 0 0 0
)ual-Mechanical seal pumps Count
)ual-Mechanical seal pumps montiored 0 0 0 0
\ew DOR's 0 0 0 0
Added - Pumps
lemoved From Service-Pumps
\umber of Leaking Pumps >2,000 ppm 0 0 0 0
\umber of Missed First Attempts at Repair (5 Days)0 0 0 0
-eaking Pumps Not Repaired As Required (15 Days)0 0 0 0
Compressors
Jnit Comp. Count
lompressors Monitored 0 0 0 0
\ew DOR's 0 0 0 0
Added - Compressors
lemoved From Service-Compressors
\umber of Leaking Compressors >2,000 ppm 0 0 0 0
\umber of Missed First Attempts at Repair (5 Davs)0 0 0
-eaking Compressors Not Repaired As Required (15 days)0 0 0
3VS/PRV
Jnit CVS/PRV Count 3 3
:V5/PRV Components Monitored 0 0 3 0 0
)RV's to Atmosphere Count 0
\umber Of PRV's to Atm. Components Monitored 0 0 0 0
tlew DOR's 0 0 c 0 0
\dded CVS Components
lemoved From Service- CVS/PRV
tlumber of Leakine CVS/PRV > 500 oom c 0 0 C 0
!umber of Missed First Attempts at Repair (5 Davs)c 0 c C 0
-eaking CVS/PRV Not Repaired By Required (15 Days)c 0 c 0
)rains
Jnit Drains Count 1 1
)rains Components Monitored C 0 0
\dded Drain Comoonents 0
lemoved From Service- Drains c
tlumber of Leakine Drains> 10.000 oom c 0 C c
Leaking Drains Not Repaired Bv Required (15 Davs)c 0 c
Comm€nts
Explanation for Missed Monitoring:
None.
Delay of Repair (DOR):
LDAR f Date/Reason
None.
Unit Shutdowns:
Date Time (hours! Description
None.
Late Repairs:
None.
Comments
HF Sinclair Woods Cross Refining LLC
teak Detection and Repair Report
UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
,.dttffinctorr
l to June tO,2024
UNIT: 23 BENSAT
of Leaking Valves >500 ppm
of Missed First Attempts at Repair (5 Days)
Valves Not Repaired As Required (15 Days)
Mechanical seal pumDs Count
l-Mechanical seal pumps montiored
of Leaking Pumps >2,000
of Missed First Attempts at Repair (5 Days)
ired As Required (15 Days)
of Leaking Compressors >2,000 ppm
r of Missed First Attempts at Repair (5 Days)
essors Not Repaired As Required (15 days)
s to Atmosphere Count
ber Of PRV's to Atm. Components Monitored
From Service- CVS/PRV
ber of Missed First Attempts at
CVS/PRV Not Repaired Bv R
Drains Components Monitored
Removed From Service- Drains
Number of Leaking Drains> 10,000 ppm
Leaking Drains Not ired By Required (15 Days)
for Missed Monitoring:
F Sinclair Woods Cross Refining LIC
:ak Detection and Repair Report
AC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
rnuary 1to June tO,2024
IOCESS UNIT:24 CRUDE i2
)ESCRtmON
MONT}I
tan Feb Mer ADT Ma,lun
y'alves
Jnit Valve Count 993 993
/alves Monitored 993 0 c 993 1 L
Jnit DTM's Count 9
)TM Valves Monitored OI 0 C 0 0
tlew DOR's 0 0 C 0 0
\dded - Valves C
lemoved From Service-Valves C
t,lumber of Leaking Valves >500 ppm 0 0 c 1 0
tlumber of Missed First Attempts at Repair (5 Davs)0 0 c 0 0
-eakins Valves Not Repaired As Required (15 Davs)0 C 0 0
'umps
Jnit Pump Count 8
)umps Monitored 2 2 2 2 1
)ual-Mechanical seal pumps Count 6
)ual-Mechanical seal oumos montiored 0 0 C 0 0
tlew DOR's 0 0 c 0 0
\dded - Pumps c
lemoved From Service-Pumos c
tlumber of Leaking Pumps >2,000 ppm 0 c 0 0
tlumber of Missed First Attemots at Repair (5 Davs)0 c 0 0
-eakine Pumps Not Repaired As Required (15 Davs)0 c 0 0
lompressors
Jnit Comp. Count C
lompressors Monitored 0 0 c 0 0
tlew DOR's 0 0
\dded - Comoressors c
lemoved From Service-Com pressors c
tlumber of Leaking Compressors >2,000 ppm 0 0 C 0 0
!umber of Missed First Attempts at Repair (5 Days)0 0 c 0 0
-eaking Compressors Not Repaired As Required (15 days)c 0 C 0 0
:vs/PRV
Jnit CVS/PRV Count L2 L2
:VS/PRV Components Monitored L2 0 c t2 0
)RV's to Atmosphere Count 0
tlumber Of PRV's to Atm. Components Monitored 0 0 c 0 0
tlew DOR's 0 0 0 0t 0
\dded CVS Comoonents C
lemoved From Service- CVS/PRV c
tlumber of Leakine CVS/PRV > 500 oom 0 0 0 0
tlumber of Missed First AttemDts at Repair (5 Davs)0 0 0 C 0
-eaking CVS/PRV Not Repaired By Required (15 Days)0 0 c 0
)rains
Jnit Drains Count t4 l4
)rains Components Monitored 0 c 0
\dded Drain Components 0
Removed From Service- Drains
Number of Leaking Drains> 10,000 ppm 0 0 C 0
Leaking Drains Not Repaired By Required (15 Days)0 0 c 0
C.ommcnts
Explanation for Missed Monitoring:
One (1) component on TOS.
Delay of Repair (DOR):
LDAR # Date/Reason
None.
Unit Shutdowns:
Date Time (hours) Description
None.
Late Repairs:
None.
Comments
F Sinclair Woods Cross Refining tLC
lak Detection and Repair Report
AC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
rnuary 1to June 30,2024
IOCESS UNIT:25 FCCU #2
DESCmmOil
MOI{IH
trn Fcb Mrr Aor Mav ,un
y'alves
Jnit Valve Count 188i 1884
y'alves Monitored 188 2 1855
Jnit DTM's Count 3
)TM Valves Monitored 0 0 0 c
\,lew DOR's 0 0 0 c
\dded - Valves 2
lemoved From Service-Valves C
tlumber of Leaking Valves >500 ppm 0 0 1 5
\lumber of Missed First AttemDts at Reoair l5 Davs)0 0 0 c
-eaking Valves Not Repaired As Required (15 Days)0 0 0 C
'umps
Jnit Pump Count 1(1
)umos Monitored 2 2 2
)ual-Mechanical seal oumos Count 1.4 t4
)ual-Mechanical seal pumps montiored 0 o 0 c
tlew DOR's 0 0 0 c
\dded - Pumos C
lemoved From Service-Pumos c
t,lumber of Leakins Pumos >2.000 oom 0 0 c
{umber of Missed First Attemots at Reoair (5 Davs}0 c C
-eaking Pumps Not Repaired As Required (15 Days)0 0 c
-ompressors
Jnit Comp. Count
lomoressors Monitored 1 1 C
\,lew DOR's 0 c 1 c
\dded - Comoressors c
lemoved From Service-Compressors c
tlumber of Leaking Compressors >2,000 ppm 0 c 1 C
tlumber of Missed First Attempts at Repair (5 Days)0 c 0 c
-eaking Compressors Not Repaired As Required (15 days)0 c 0 C
:vs/PRv
Jnit CVS/PRV Count 27 21
:VS/PRV Comoonents Monitored 0 2 01 27 c
)RV's to Atmosphere Count c
tlumber Of PRV's to Atm. Components Monitored 0 0l c
tlew DOR's 0 c 0 C 0
Added CVS Comoonents
lemoved From Service- CVS/PRV
Number of Leakins CVS/PRV > 500 ppm 0 c 0 C
Number of Missed First Attempts at Repair (5 Days)0 C 0 c
Leaking CVS/PRV Not Repaired By Required (15 Days)0 c 0
Drains
Unit Drains Count 4C 4(
Drains Components Monitored c 0
Added Drain Components
Removed From Service- Drains
Number of Leakins Drains> 10,000 ppm 0 0 0 C
Leaking Drains Not Repaired By Required (15 Days)0 0 0 C
Conrmcnts
Explanation for Missed Monitoring:
fhirty (30) components on TOS.
fwo (2) components added in Unit 25, initially monitored within 30-days of commissioning.
Delay of Repair (DOR):
LDAR f Date/Reason
Compressor #21292 41812024,lsolated from VOC service.
Unit Shutdowns:
Date Time (hoursl Description
None.
Late Repairs:
None.
Comments
F Sinclair Woods Cross Refining tLC
lak Detection and Repair Report
AC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
rnuary l to June 3,O,2024
IOCESS UNIT:26 POLY
DESCmmOil
MOlfrlt
,en Fcb Mer Apr May Jun
y'alves
Jnit Valve Count t27E 7275
y'alves Monitored 4 3 L278 1 1 t27S
Jnit DTM's Count 4 4
)TM Valves Monitored 0 0 c 0 0
{ew DOR's 0t 0 C 0 0
\dded - Valves c
iemoved From Service-Valves 1
{umber of Leaking Valves >500 ppm 1 0 1 0 0
!umber of Missed First Attemots at Repair (5 Davs)0 0 c 0 0 0
-eaking Valves Not Repaired As Required (15 Davs)0 0 c 0 0
)umps
Jnit Pump Count 11 11
)umps Monitored 0 0 C 0 0 1
)ual-Mechanical seal pumps Count 11 11
)ual-Mechanical seal oumos montiored 0t 0 c 0 0 1
!ew DOR's 0 0 C 0 0
\dded - Pumos C
lemoved From Service-Pumps C
tlumber of Leakins Pumos >2.000 oom 0 0 c 0 0
!umber of Missed First Attempts at Repair (5 Davs)0 0 C 0 0
-eaking Pumps Not Repaired As Required (15 Davs)0 0 c 0 0
!ompressors
Jnit Comp. Count c
lompressors Monitored 0 0 c 0 0
!ew DOR's 0t 0 c 0 0
\dded - Comoressors C
lemoved From Service-Compressors C
tlumber of Leaking Compressors >2,000 ppm 0 0 C 0 0
!umber of Missed First Attempts at Repair (5 Days)0 0 c 0 0
-eaking Compressors Not Repaired As Required (15 days)0 0 c 0 0
:VS/PRV
Jnit CVS/PRV Count 19 1S
:VS/PRV Comoonents Monitored 0 c 1S 0 C 1g
)RV's to Atmosphere Count c
tlumber Of PRV's to Atm. Components Monitored 0 c c 0 0
tlew DOR's 0 0 c 0 0
\dded CVS Comoonents c
lemoved From Service- CVS/PRV c
\,lumber of Leaking CVS/PRV > 500 ppm 0 0 c 0 0
t,lumber of Missed First Attempts at Repair (5 Days)0 0 C 0 0
-eakins CVS/PRV Not Repaired By Required (15 Days)C C 0 C
)rains
Jnit Drains Count 18 1
)rains Components Monitored C C 0 0
\dded Drain Components c
lemoved From Service- Drains 0
tlumber of Leakine Drains> 10.000 pom 0 0 0 0
-eaking Drains Not Repaired By Required (15 Davs)0 0 0 0
@mments
Explanation for Missed Monitoring:
None.
Delay of Repair (DOR):
LDAR # Date/Reason
None.
Unit Shutdowns:
Date Time (hours) Description Comments512312024 26.6 Unit shutdown for unscheduled maintenance. No DOR or Chronic Leaking Components.
Late Repairs:
None.
F Sinclair Woods Cross Refining LIC
:ak Detection and Repair Report
AC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
rnuary 1to June 30,2024
IOCESS UNIT: 29 SRU Bockup
DESCRtmOil
MO]IIH
,an FCb Mer ADr Mey Jun
y'alves
Jnit Valve Count 35 3:
y'alves Monitored 0 35 C 0 35
Jnit DTM's Count C
)TM Valves Monitored 0 0 c 0 0
t,lew DOR's 0 0 C 0 0
\dded - Valves c
lemoved From Service-Valves c
!umber of Leaking Valves >500 ppm 0 0 C 0 0
\umber of Missed First Attempts at Repair (5 Days)0 0 C 0 0
-eaking Valves Not Repaired As Required (15 Days)0 0 c 0 0
)umps
Jnit Pump Count c
)umps Monitored 0 0 c 0 0
)ual-Mechanical seal pumps Count c
)ual-Mechanical seal pumps montiored 0 0 c 0 0
!ew DOR's 0t 0 C 0 0
\dded - Pumos C
lemoved From Service-Pumps c
t,lumber of Leaking Pumps >2,000 ppm 0 0 C 0 0
tlumber of Missed First Attempts at Repair (5 Days)0 0 C 0 0
-eaking Pumps Not Repaired As Required (15 Days)0 0 C 0 0
3ompressors
Jnit Comp. Count c
lompressors Monitored 0 0 c 0 0
!ew DOR's 0 0 c 0 0
\dded - Comoressors c
lemoved From Service-Compressors c
!umber of Leaking Compressors >2,000 ppm 0 0 C 0 0
\,lumber of Missed First Attempts at Repair (5 Days)0 0 C 0 0
-eaking Compressors Not Repaired As Required (15 days)0 0 c 0 0
:vs/PRV
Jnit CVS/PRV Count 1
:VS/PRV Components Monitored 0 1 c 0 1
)RV's to Atmosphere Count c
tlumber Of PRV's to Atm. Components Monitored 0 0 c 0 0
t,lew DOR's 0 0 C 0t 0
\dded CVS Comoonents c
lemoved From Service- CVS/PRV C
tlumber of Leaking CVS/PRV > 500 ppm 0 0 C 0 0
\,lumber of Missed First Attempts at Repair (5 Days)0 0 C 0
-eaking CVS/PRV Not Repaired By Required (15 Days)0 0 C 0
)rains
Jnit Drains Count 0
)rains Components Monitored 0 0 0 0
\dded Drain Components 0
lemoved From Service- Drains 0
tlumber of Leakine Drains> 10,000 ppm 0 0 0 0
-eaking Drains Not Repaired By Required (15 Davs)0 0 c 0
Commcnts
Explanation for Missed Monitoring:
None.
Delay of Repair (DOR):
IDAR # Date/Reason
None.
Unit Shutdowns:
Date Time (hours) Description
None.
Late Repairs:
None.
Comments
Sinclair Woods Cross Refining LLC
rk Detection and Repair Report
C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
uary 1 to June 3,O,2024
)CESS UNIT:Sl BOILERS
)ESCmmOil
MOilfi
,an F.b Mtr ADf M8Y lun
/alves
Jnit Valve Count 34t 346
y'alves Monitored 1 1 34(1 1 34(
Jnit DTM's Count
)TM Valves Monitored 0 0 0 0
tlew DOR's 0 0
Added - Valves
Removed From Service-Valves
Number of Leaking Valves >500 ppm 0 0 1 C
Number of Missed First Attempts at Repair (5 Days)0 0 c
Leaking Valves Not Repaired As Required (15 Days)0 c
Pumps
Unit Pump Count
Pumps Monitored 0 0
Dual-Mechanical seal Dumos Count
Dual-Mechanical seal pumps montiored 0 0 C
New DOR's 0 0 C
Added - Pumos
Removed From Service-Pumos
Number of Leaking Pumps >2,000 ppm 0 0 C
Number of Missed First Attempts at Repair (5 Days)0 0 C
Leaking Pumps Not Repaired As Required (15 Days)0 c c
Compressors
Unit Comp. Count
3ompressors Monitored 0 0 c
New DOR's 0 0 C
Added - Comoressors
Removed From Service-Comoressors
\umber of Leaking Compressors >2,000 ppm 0 0 C c
\umber of Missed First Attempts at Repair (5 Days)0 0 c C
-eaking Compressors Not Repaired As Required (15 days)0 0 c c
cvs/PRv
Jnit CVS/PRV Count 4
3VS/PRV Components Monitored 0 0l
PRV's to AtmosDhere Count
\umber Of PRV's to Atm. Components Monitored 0 ol
\ew DOR's 0 0 0 c
Added CVS Comoonents
iemoved From Service- CVS/PRV
\umber of Leaking CVS/PRV > 500 ppm 0 0 0 c
\umber of Missed First Attempts at Repair (5 Days)0 0 0 c
-eaking CVS/PRV Not Repaired By Required (15 Days)C
Drains
Jnit Drains Count 1 1
)rains Comoonents Monitored 0 0 c
Added Drain Components
lemoved From Service- Drains
!umber of Leaking Drains> 10,000 ppm 0 0 c
-eaking Drains Not Repaired By Required (15 Days)C 0 0 C
Comments
Explanation for Missed Monitoring:
\one.
Delay of Repair (DOR):
LDAR # Date/Reason
qOV #30219 512712022, Cannot be isolated, will require several units to be shutdown.
Unit Shutdowns:
Date Time (hours) Description Comments
\one.
tate Repairs:
!one.
HF Sinclair Woods Cross Refining tLC
Leak Detection and Repair Report
UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
lanuary 1 to June 30,2024
PROCESS UNlT:66 FLARE
DESCilPnOil
MOtfrH
Jan Feb Mr AP'M!y .lun
Valves
Unit Valve Count 424 424
y'alves Monitored 0 422 0 422 0
Jnit DTM's Count
)TM Valves Monitored 0 c 0 0 0
New DOR's 0 c 0 0 c
Added - Valves c
Removed From Service-Va lves C
Number of Leaking Valves >500 ppm 0 c 0 0 0
\umber of Missed First Attempts at Repair (5 Days)0 c 0 0 c
-eaking Valves Not Repaired As Required (15 Days)0 c 0 0 c
Pumps
Jnit Pump Count 6
)umos Monitored 5 5 5 5 5
)ual-Mechanical seal pumps Count c
)ual-Mechanical seal pumps montiored 0 c 0 0 0
\ew DOR's 0 c 0 0 0
Added - Pumps 0
lemoved From Service-Pumos 0
\umber of Leakine Pumps >2.000 opm 0 c 0 0 0
Number of Missed First Attempts at Reoair (5 Davs)0 c 0 0 c
Leakins Pumps Not Repaired As Required (15 Davs)0 c 0 0 0
Compressorc
Jnit Como. Count 2
lompressors Monitored 2 c 2 0 0
\ew DOR's 0 c 0 0 c
qdded - Comoressors 0
Removed From Service-Compressors 0
Number of Leaking Compressors >2,000 ppm 0 c 0 0 0
\umber of Missed First Attempts at Repair (5 Davs)0 c 0 0 0
-eaking Compressors Not Repaired As Required (15 davs)0 c 0 0
cvs/PRV
Jnit CVS/PRV Count 2
:VS/PRV Components Monitored 0 2 0l 2 c
)RV's to Atmosphere Count c
!umber Of PRV's to Atm. Comoonents Monitored 0 C 0
\ew DOR's 0l C C 0 0
Added CVS Components
lemoved From Service- CVS/PRV
\umber of Leakins CVS/PRV > 500 ppm 0 c c 0 0
\umber of Missed First Attempts at Repair (5 Davs)0 c c 0 0
-eaking CVS/PRV Not Repaired By Required (15 Days)0 C c 0 0
Drains
Jnit Drains Count c
)rains Components Monitored 0 C c 0 0
{dded Drain Components c
lemoved From Service- Drains c
\umber of Leakine Drains> 10.000 oom 0 0 c 0 0
-eaking Drains Not Repaired Bv Required (15 Davs)0 C c 0 0
Comments
Explanation for Missed Monitoring:
Ihree (3) component on TOS.
Delay of Repair (DOR):
LDAR # Date/Reason
\one.
Unit Shutdowns:
Date Time (hours) Description
\one.
[ate Repairs:
\one.
Comments
Sinclair Woods Cross Refining LLC
rk Detection and Repair Report
C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
uary 1 to June 30,2024
)CESS UNIT:68 ETF
,ESCRIPTtoil
MOT|TH
,!n FGo Mrr AD'MeY lun
y'alves
Jnit Valve Count 840 840
/alves Monitored 83C 5 830
Jnit DTM's Count 0
)TM Valves Monitored 0 0 0 0 0
tlew DOR's 0 0 0 0
\dded - Valves 2
lemoved From Service-Valves 2
tlumber of Leaking Valves >500 ppm c 3 0 0 0
tlumber of Missed First Attempts at Repair (5 Days)c 0 0 0
eaking Valves Not Repaired As Required (15 Davs)c 0 0 0
rumps
Jnit Pump Count 7 1
)umos Monitored 16 1 1 16 16 1
)ual-Mechanical seal pumps Count
)ual-Mechanical seal pumps montiored 0 0 0 0
{ew DOR's 0 0 0 0
Added - Pumos
Removed From Service-Pumos 1
Number of Leakins Pumps >2.000 oom 0 0 0 0
Number of Missed First Attempts at Repair (5 Davs)0 0 0 0
Leaking Pumps Not Repaired As Required (15 Days)0 0 0 0
Compressors
Unit Comp. Count
3ompressors Monitored 0 0 0 0
\ew DOR's 0 0 0
qdded - Compressors
lemoved From Service-Compressors
\umber of Leaking Compressors >2,000 ppm 0 0 0 0
\umber of Missed First Attempts at Repair (5 Davs)0 0 0 0
-eaking Compressors Not Repaired As Required (15 days)0 0 0 0
ws/PRv
Jnit CVS/PRV Count 39 39
:VS/PRV Components Monitored 0 38 0 38
)RV's to Atmosphere Count 1 1
tlumber Of PRV's to Atm. Comoonents Monitored 0 0 0 0
!ew DOR's 0 c 0 0
\dded CVS Comoonents
lemoved From Service- CVS/PRV
\,lumber of Leakine CVS/PRV > 500 oom 0 0 0 0
t,lumber of Missed First Attempts at Repair (5 Davs)0 0 0 0
-eaking CVS/PRV Not Repaired By Required (15 Days)0 0 0 0
)rains
Jnit Drains Count
)rains Comoonents Monitored 0 0 0 0
Added Drain Components
Removed From Service- Drains
Number of Leakine Drains> 10.000 oom 0 0 0
Leaking Drains Not Repaired By Required (15 Davs)0 0 0
Comments
Explanation for Missed Monitoring:
Eleven (11) components on TOS.
Two (2) component added in Unit 68 ETF, initially monitored within 30-days of commissioning.
Delay of Repair (DOR):
IDAR # Date/Reason
None.
Unit Shutdowns:
Date Time (hours) Desription
None.
Late Repairs:
None.
Comments
: Sinclair Woods Cross Refining LLC
ak Detection and Repair Report
\C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.
nuary 1 to June 30,2024
OCESS UN!T:68WTF
,emrmoil MONTH
Jan FcD M!t Aor M!Y ,un
Valves
Unit Valve Count 339t 339;
Valves Monitored 3397 t2 1 3398 8
Unit DTM's Count 6t 64
DTM Valves Monitored 7 0 0 0
New DOR's 0 0 0 0
Added - Valves 1
Removed From Service-Valves
Number of Leaking Valves >500 ppm 9 0 6 0
Number of Missed First Attempts at Reoair (5 Davs)0 0 0 0
Leaking Valves Not Repaired As Required (15 Davs)0 0 0 0
Pumps
Unit Pump Count 51 51
Pumos Monitored 53 53 5a 54 5 53
Dual-Mechanical seal pumps Count
Dual-Mechanical seal Dumps monitored 0 0 0 c
New DOR's 0 0 0 c 1
Added - Pumps c
Removed From Service-Pumos c
Number of Leakine Pumps >2,000 ppm 2 4 2 2 2
Number of Missed First Attempts at Repair (5 Davs)0 0 0 c c
Leaking Pumps Not Repaired As Required (15 Days)0 0 c c
Compressors
Jnit Comp. Count c
lompressors Monitored 0 0 0l c c
\ew DOR's 0 0 c 0 c c
Added - Comoressors c c
lemoved From Service-ComDressors c C
\umber of Leakine Compressors >2,000 ppm 0 0 c C c
\umber of Missed First Attempts at Repair (5 Days)0 c C c c
-eaking Compressors Not Repaired As Required (15 days)0 0 C c c
cvs/PRV
Jnit CVS/PRV Count t32 132
:VS/PRV Components Mon itored t32 1.32 c
)RV's to Atmosohere Count 1
\umber Of PRV's to Atm. Components Monitored 1 1 c c
\,lew DOR's 0 c c 0 C 0
\dded CVS Comoonents 1
lemoved From Service- CVS/PRV 1
!umber of Leakins CVS/PRV > 500 ppm 1 c c 1 0 0
!umber of Missed First Attemots at Repair (5 Davs)c c c C 0 0
-eaking CVS/PRV Not Repaired By Required (15 Days)c c c c
)rains
Jnit Drains Count c
)rains Comoonents Monitored c c c C 0
\dded Drain Comoonents C
lemoved From Service- Drains c
tlumber of Leakins Drains> 10.000 pom c C 0 c 0
-eaking Drains Not Repaired By Required (15 Days)c c 0 C 0
CammenB
EXplanauon lor Mrsseo Monttonng:
Three (3) components on TOS.
One (1) component added in Unit 68 (WTF), initially monitored within 3O-days of commissioning.
Delay of Repair (DOR):
LDAR # Date/Reason
Pump #6849 611812024,lsolated from VOC service.
Unit Shutdowns:
Date Time (hours) Description
None.
Late Repairs:
None.
Comments
F Sinclair Woods Cross Refining LLC
lak Detection and Repair Report
AC R307-326, NSPS; W, Wa, GGGa, and
rnuary 1 to June 30,2024
TOCESS UNIT: 86 CRUDE UNLOAD
Consent Decree Section V.N.
)ESCilmON
MOT{TH
Jan Feb Mar Apr Mry Jun
y'alves
Jnit Valve Count 55(55C
/alves Monitored 0 0 57i 0 0 512
Jnit DTM's Count 1(1
)TM Valves Monitored 0 0 C 0 0
tlew DOR's 0 0 c 0 0 C
\dded - Valves C
lemoved From Service-Valves c
!umber of Leaking Valves >500 ppm c 0 0 0 C
tlumber of Missed First Attemots at ReDair (5 Davs)c 0 0 0
-eaking Valves Not Repaired As Required (15 Davs)c 0 0 0
rumps
Jnit Pumo Count 1t 1
)umps Monitored t7 L7 71 t7 L7 1
)ual-Mechanical seal pumps Count C
)ual-Mechanical seal oumos montiored 0 0 0 0 c
t,lew DOR's 0 0 0 0 C
\dded - Pumps c
lemoved From Service-PumDs c
t,lumber of Leakins Pumps >2,000 opm c 0 0 0 c
tlumber of Missed First Attemots at ReDair (5 Davsl c 0 0 0 c
-eaking Pumps Not Repaired As Required (15 Davs)C 0 0 0 c
Compressors
Unit Comp. Count c
Compressors Monitored OI 0 0 0 c
tlew DOR's 0 0 0 0 c
\dded - Comoressors c
lemoved From Service-Com oressors c
t,lumber of Leaking Compressors >2,000 ppm C 0 0 0 c
Number of Missed First Attemots at Repair (5 Davs)C 0 0 0 C
Leaking Compressors Not Repaired As Required (15 days)c 0 0 0 c
cvs/PRV
Unit CVS/PRV Count 1t 19
CVs/PRV Components Monitored 0l 0 1:0 C 1
DRV's to Atmosphere Count c
Number Of PRV's to Atm. Components Monitored 0l 0 0 0
New DOR's 0 0 0 c
Added CVS Comoonents
Removed From Service- CVS/PRV c
Number of Leakins CVS/PRV > 500 oom C 0 0 C
Number of Missed First Attempls at Repair (5 Days)0 0 0 C
Leaking CVS/PRV Not Repaired By Required (15 Days)c 0 c
Drains
Unit Drains Count c
Drains Comoonents Monitored 0 c C 0 C
Added Drain Comoonents c
Removed From Service- Drains c
Number of Leaking Drains> 10,000 ppm 0 C 0 0 c
Leaking Drains Not Repaired By Required (15 Days)0 c 0 0 C
Commcntg
Explanation for Missed Monitoring:
Forty three (43) components on TOS.
Delay of Repair (DOR):
--il,?iH irl-PAR lMl:Nl
s r:iv i rro N I'4-ENI4! s U
IDAR #
None.
Unit Shutdowns:
Date Time (hours)
None.
Late Repairs:
None.
Date/Reason
I)IVISION OF AIR Ot,FDescriptionComments
TY
TY
REVIEWEDInitials:Date: Jan 15, 2025Compliance Status: OKFile #: 10123 (B2)