Loading...
HomeMy WebLinkAboutDAQ-2025-000300,.dttFfinctorr January 15,2024 Mr. Bryce Bird, Director Division of Air Quality Utah Dept. of Environmental Quality 195 North 1950 West Salt Lake city, utah 84116-4820 RE: Fugitive Volatile Organic Compound OOC) Monitoring Report - 4th Quarter 2023 Director: HF Sinclair Woods Cross Refining LLC, HFSWCR, is submitting the 4ft Quarter 2023 Fugitive Volatile Organic Compound Monitoring Report for the HF Sinclair Woods Cross Refining LLC - Woods Cross Refinery. This report complies with the provisions in the Utah Air Conservation Regulation R307-326- 9(7) and 40 CFR Part 60 Subpart VV, Wa, and GGGa. The monthly component monitoring summaries are presented in the attached tables for each operating unit. There are currently l0 components on the Delay of Repair list at Woods Cross Refinery. There are currently 15 chronically leaking valves that are awaiting a unit turnaround for repair. During each instance of startup and shutdown, the shutdown and startup procedures were in accordance with those specified in the startup, shutdown, and malfunction plans, and with standard operating procedures. If you have any questions or need additional information, please contact Al Vargas at Jose.Vareas((rHFSinclair.com or by phone at (801) 299-6645. I certiff that, except as noted herein, the VOC monitoring reported for this quarter was performed as stipulated in R307-326-9. Sincerely, )nU"- 5 i"^'^^-^"/5 Dustin Simmonds Vice President and Refinery Manager Attachment cc: E. Benson (r)File2.2.2 HF Sinclair Woods Cross Refining LLC 1070 W. 500 S, West Bountiful, UT 84087 801 -299-6600 | HFSinclair.com UTAH DEPARTMENT OF ENVIRONMENTAL OUAIJTY JAN 1 | Z.l2l DIVISION OF AIR QUALTTV Certified Mail:7022 0410 0002 3551 6776 REVIEWEDInitials:Date: Jan 15, 2025Complinace Status: OKFile #: 10123 (B2) Sinclair Woods Cross Refining LLC rk Detection and Repair Report C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. y 1to December 31, 2023 ICESS UNIT:04 FCCU ;JEid # ;td{rro*8,lil4i, Valves Unit Valve Count L571 ="ir iJir*.+;i1,.l i;-j*ti,-*ri ::ii iil l { i t57t y'alves Monitored sl 1505 4 L577 Unit DTM's Count ffiffiIimffirl$! fi,trffi.llffi 35 l==E;ffiE-1fiii. :liCl.ffl- i: +ri;ill[]' l 3! )TM Valves Monitored 0 36 0 0 tlew DOR's 0 0 0l 0l 0 Added - Valves gffiSt&$ffiffiiWgEid Sf. 3At'$in*'#i&rx;iltr#& fPrlemoved From Service-Valves 4 \,lumber of Leaking Valves >500 ppm 0 0 0 \,lumber of Missed First Attempts at Repair (5 Davs)0 0 0 -eakine Valves Not Reoaired As Reouired (15 Davs)0 0 0 Pumps Jnit Pump Count lsldf).#iffiii.t*st$rlkd{W'€€;*=15 )umps Monitored t2 15 121 t2 L2 t2 )ual-Mechanical seal pumps Count r:ti1$f*+=3 lfll"{bFffi g}#}$.s1i {'iiri :ii;ii 3 )ual-Mechanical seal pumps monitored 0 3 0l \ew DOR's 0 0 0 Added - Pumps 'i5 ffiffifssffift,n}#.; qiLlEfui$F.fit*.tsEr 3: 1.. ! tlemoved From Service-Pumos tlumber of Leakine Pumos >2.000 oom 0 1 1 tlumber of Missed First Attempts at Repair (5 Davs)0 0 0 -eaking Pumps Not Repaired As Required (15 Davs)0 0 0 3ompressors Jnit Comp. Count 7 3ompressors Monitored 1 0 tlew DOR's 0 0 0 \dded - Compressors lemoved From Service-ComDressors !umber of Leakine Comoressors >2.000 oom 0 0 ol c tlumber of Missed First Attempts at Repair (5 Davs)0 0 0 c -eaking Compressors Not Repaired As Required (15 days)0 0 0 c !\rslPRv Jnit CVS/PRV Count 221Hi$ii,$#lMffi ffi$* Wlllt#{ilWlt 22 f/S/PRV Comoonents Monitored 0 22 0l 0l 21 )RV's to Atmosphere Count 0]Nll#,+18$$ie*1i.ft*iffi i,li:c {umber Of PRV'S to Atm. Components Monitored 0 0 0l {ew DOR's ol 0 c \dded CVS Components l*d.r{o.rjlemoved From Service- CVS/PRV tlumber of Leakins CVS/PRV > 500 oom 0 0l c tlumber of Missed First Attempts at Repair (5 Davs)0 0 c -eaking CVS/PRV Not Repaired By Required (15 Days)0 C 0 c )rains Jnit Drains Count 261E*:"ffii+duii#H[2( Drains Components Monitored 0 2e c Added Drain Components c Removed From Service- Drains C Number of Leakine Drains> 10.000 oom 0l c 0 C Leaking Drains Not Repaired By Required (15 Days)o c 0 c Explanation for Missed Monitoring: Five (5) components on TOS. Five (5) components added in Unit 4, initially monitored within 30-days of commiss One (1) component found during routine monitoring, not monitored within 30-days. Delay of Repair (DOR): LDAR # Date/Reason None. Unit Shutdowns: Date: Time (hours) Description None. Late Repairs: None. ioning. E MENNVIRONMENTAL OI ITYComments J,1il 1 I 202t D VISION OFAIR QUI HF Sinclair Woods Cross Refining [tC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December tt,2O2t PROCESS UNITr 6 REFORMER .I5i,{B MslEIr"T},:ffir,i'Si4h'iil1m*t y'alves Jnit Valve Count 7741 l*€:alk!1ii€i-l=€ii'rlrffirrf iirli:.$L743 y'alves Monitored 15 1782 3t 28 D3e 1C Jnit DTM's Count 4i \ffite€+.$*ta 47 )TM Valves Monitored 1 49 0l c C tlew DOR's 0 0 0l c c \dded - Valves L4 ffiF,m-wmm t]$,illriiriihk].ffii,1*-+1u$#-$ffr W,r t,, I ; r 1 lemoved From Service-Va lves 1( tlumber of Leaking Valves >500 ppm 0 1S 1 7 C tlumber of Missed First Attempts at Repair (5 Davs)0 0 c c -eaking Valves Not Repaired As Required (15 Davsl 0 0l c c Pumps Jnit Pump Count 72 t2 )umps Monitored 6 T2 €e )ual-Mechanical seal oumos Count e )ual-Mechanical seal pumps monitored 0 C c c !ew DOR's 0 0 C c c \dded - Pumos ,i..v;;tlmiTlfifffiL.r.rt1_ -{S" fr&r.l1rhl*,r,,4},lit c lemoved From Service-Pumos c tlumber of Leakine Pumos >2.000 oom 2 L 0 L t !umber of Missed First Attempts at Repair (5 Davs)0 0 c c -eakins Pumos Not Reoaired As Reouired {15 Davsl 0 0 c c Compressors Jnit Como. Count ]i|ffi$]lffiffi{-1u}ffiffiffiir1fit$}{ l 7lEf*8ffi&W$ni"iii*ili5*2l210l2cc \lew DOR's ((c \dded - Compressors c lemoved From Service-Comoressors c tlumber of Leakine Comoressors >2.000 oom 1 0 2 C c \umber of Missed First Attemots at Reoair (5 Davs)0 0 0 C c -eaking Compressors Not Repaired As Required (15 days)0 0 0l C c c\rslPRv Jnit CVS/PRV Count $f,>21 H,,Sdt 27 :VS/PRV Components Monitored 7 27 OI 19 )RV's to Atmosohere Count c tlumber Of PRV's to Atm. Comoonents Monitored 0 0 0 C !ew DOR's 0 0 C c c \dded CVS Comoonents c lemoved From Service- CVS/PRV c \umber of Leakine CVS/PRV > 500 oom 0 0 0 1 c tlumber of Missed First Attemots at ReDair (5 Davsl 0 0 c c -eaking CVS/PRV Not Repaired By Required (15 Days)0 0l t Draans Jnit Drains Count 4t 48 )rains Components Monitored 0 4t (C \dded Drain Comoonents c lemoved From Service- Drains c !umber of Leaking Drains> 10,000 oom 0 0l c C -eaking Drains Not Repaired By Required (15 Days)0 c c Explanation for Missed Monitoring: :ight (8) components on TOS. )ne (1) component added in Unit 6, initially monitored within 3O-days of commissioning. Delay of Repair (DOR): IDAR f Date/Reason \one. Unit Shutdowns:Date: Time (hours) Description \one. late Repairs: tlone. Comments HF Sinclair Woods Cross Refining LtC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. Iuly 1to December tL,2023 PROCESS UNIT:7 ALKY i.'+ Ualves Jnit Valve Count i ll(:+t .(i.t{U:S:E=ii,I lr 1358 $',&$[E $i:Pl-,i::,.!.t]',::. :i,,.' !.::1358 y'alves Monitored 13541 13 6 t321 11 1C Jnit DTM's Count [s$ii$ r,27 21 )TM Valves Monitored 271 0 0 0 \ew DOR's 1t 0 0 {dded - Valves 2 lemoved From Service-Valves 2 \,lumber of Leaking Valves >500 ppm 2 lumber of Missed First Attempts at Repair (5 Davs)0l 0 0 -eaking Valves Not Repaired As Required (15 Days)0l 0 0 Pumps Jnit Pumo Count 71 11 )umps Monitored 4l 17 4 4 4 )ual-Mechanical seal oumos Count 7 )ual-Mechanical seal pumos monitored 0l 0 tlew DOR's 0l 0 0 0 qdded - Pumps :8.,E :1{ I c lemoved From Service-Pumos c \,lumber of Leakine Pumos >2.000 oom 0l 0 0 tlumber of Missed First Attempts at Repair (5 Davs)0l 0 c 0 -eaking Pumps Not Repaired As Required (15 Davs)ol 0 C 0 c 3ompressors Jnit Comp. Count E.T:i;:',,-lltti.+i+:&:i;Silitfu s :l !ompressors Monitored 0l 0 c 0 tlew DOR's 0l 0 C 0 qdded - Compressors lemoved From Service-ComDressors F-:iryF]W tlumber of Leaking Compressors >2,000 ppm 0l 0 c 0 \umber of Missed First AttemDts at Repair (5 Davs)0l 0 c 0 -eaking Compressors Not Repaired As Required (15 davs)ol 0 c 0 :vs/PRv Jnit CVS/PRV Count lil*-€**ffi;&rij 3l 3l :VS/PRV Components Monitored 311 0 31 1 )RV's to Atmosphere Count tlumber Of PRV's to Atm. Components Monitored 1t 0 0 tlew DOR's 0l 0 c 0 \dded CVS Comoonents ffiffi$tilemoved From Service- CVS/PRV tlumber of Leakins CVS/PRV > 500 ppm 0l 0 c 0 \umber of Missed First Attempts at Repair (5 Davs)0l 0 c 0 -eaking CVS/PRV Not Repaired Bv Required (15 Davs)0l c )rains Jnit Drains Count 1'1:&,rr#itilF:<ij:i$'1q,f,itffit-$iiifff,, $. . *:iiil ililtr )rains Comoonents Monitored 0l 1 0 \dded Drain Comoonents lemoved From Service- Drains lumber of Leakine Drains> 10.000 oom 0l c 0 -eaking Drains Not Repaired By Required (15 Days)0t c 0 Explanation for Missed Monitoring: Thirty one (3't ) components on TOS. Three (3) components added in Unit 7, all initially monitored within 30-days of commissioning. Delay of Repair (DOR): tDARf Date/Reason Valve # 32405 512012021, Cannot be isolated, will require a unit shutdown. Valve # 06642 711312023, Cannot be isolated, will require a unit shutdown. Unit Shutdowns:Date: Time (hours) Description None. Late Repairs: None. Comments Sinclair Woods Cross Refining ILC rk Detection and Repair Report C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. p l to December 31, 2023 )CESS UNIT:8 CRUDE )ESCR|mON MONTH Jul Aug 5cp Oct Nov Dec Valves Unit Valve Count 81t 819 y'alves Monitored 10 7 822 2 2 814 Unit DTM's Count 9 DTM Valves Monitored 0 0 0l 0 0 New DOR's 0 0 0 0 0 Added - Valves 1 1 lemoved From Service-Valves 0 \umber of Leaking Valves >500 ppm 0 0 L 1 1 \umber of Missed First Attempts at Repair (5 Davs)0 0 0 0 -eaking Valves Not Repaired As Required (15 Davs)0 0 0 0 c Pumps Jnit Pumo Count 6)umps Monitored 4 6 4 4 4 4 )ual-Mechanical seal pumps Count 2 )ual-Mechanical seal pumps montiored 0t 2 OI 0 c \ew DOR's 0 0 0 0 \dded - Pumps lemoved From Service-Pumos \umber of Leakine Pumps >2.000 oom 0 0 0 t.Iumber of Missed First Attempts at Repair (5 Davs)0 0 0 -eaking Pumps Not Repaired As Required (15 Davs)0 0 0 Compressors Jnit Como. Count lompressors Monitored 0 0 0 0 \ew DOR's 0l 0 0 0 \dded - Compressors lemoved From Service-Comoressors \umber of Leakine Compressors >2,000 ppm 0 0 0 0 \umber of Missed First Attempts at Repair (5 Days)0 0 0 -eaking Compressors Not Repaired As Required (15 days)0 0 0 0 !vs/PRv Jnit CVS/PRV Count 13 1: :VS/PRV Components Monitored 0 13 0 1: >RV's to Atmosphere Count 3 \umber Of PRV's to Atm. Components Monitored 0 0 3 0 lew DOR's 0 0 0 \dded CVS Comoonents lemoved From Service- CVS/PRV !umber of Leakine CVS/PRV > 500 oom 0 0 0 0 0 tlumber of Missed First Attemots at Reoair (5 Davsl 0 0 0 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 )rarn5 Jnit Drains Count 27 2t )rains Components Monitored 27 0 \dded Drain Components 0 lemoved From Service- Drains \,lumber of Leakins Drains> 10.000 oom 0 0 1 0 -eaking Drains Not Repaired By Required (15 Days)0 0 C 0 0 Comments Explanation for Missed Monitoring: Five (5) components on TOS. One (1) component added in Unit 8, initially monitored within 3O-days of commissioning. Delay of Repair (DOR): IDAR f Date/Reason None. Unit Shutdowns: Date: Time (hours) Description None. Late Repairs: None. Comments HF Sinclair Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. Iuly t to December 3t,2023 PROCESS UNIT:9 DHDS DESCRIPTIOI{ MONTH JUI Au8 seD Oct Nov Dec y'alves Jnit Valve Count 355 3s9 y'alves Monitored 0 0 35I 1 c 3s8 Jnit DTM's Count c )TM Valves Monitored 0 0 0 c c !ew DOR's 0 0 0 c c \dded - Valves lemoved From Service-Va lves !umber of Leaking Valves >500 ppm 0 1 C c c \,lumber of Missed First Attempts at Repair (5 Davs)0 c c C -eaking Valves Not Repaired As Required (15 Days)0 c c c 'umps Jnit Pump Count 1 1)umps Monitored 1 1 1 1 L 1 )ual-Mechanical seal pumps Count C )ual-Mechanical seal pumps montiored 0l 0 c c t,lew DOR's 0 c o c c \dded - Pumps c C lemoved From Service-Pumps C c Vumber of Leaking Pumps >2,000 ppm C C c c \,lumber of Missed First Attempts at Repair (5 Davs)c c C c -eaking Pumps Not Repaired As Required (15 Days)c c c C Sompressors Jnit Comp. Count c c Sompressors Monitored 0 c 0 c c tlew DOR's 0 C c 0 C 0 \dded - Compressors c 0 lemoved From Service-Compressors c c tlumber of Leaking Compressors >2,000 ppm c c c c {umber of Missed First Attempts at Repair (5 Davs)c c C C 0 -eaking Compressors Not Reoaired As Reouired (15 davsl c c c c :VS/PRV Unit CVS/PRV Count 5 CVS/PRV Components Monitored 0 0 c PRV's to Atmosphere Count C 0 Number Of PRV's to Atm. Components Monitored 0 0 c c New DOR's 0 c c 0 c 0 Added CVS Components c Removed From Service- CVS/PRV c Number of Leakine CVS/PRV > 500 ppm c c c c 0 0 Number of Missed First Attempts at Repair (5 Davs)c c c c 0 Leaking CVS/PRV Not Repaired By Required (15 Days)c c c Drains Unit Drains Count 6 Drains Components Monitored c e c Added Drain Comoonents c Removed From Service- Drains c Number of Leakine Drains> 10.000 oom C c c 0 0 reaking Drains Not Repaired By Required (15 Davs)c c C 0 0 Comments Explanation for Missed Monitoring: One (1) component on TOS. Five (5) components added in Unit 9, initially monitored within 3O-days of commissioning. Delay of Repair (DOR): LDAR # Date/Reason None. Unit Shutdowns: Date Time (hours) Description Comments 1112612023 379.2 Scheduled maintenance DOR # 29677 was repaired during T/A Late Repairs: None. HF Sinclair Woods Cross Refining LIC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 3L,2023 PROCESS UNIT:10 SDA DESCmmON MONIH Jul Aug Sep Oct Nov Dec y'alves Jnit Valve Count 68C 58C y'alves Monitored 7 687 1 0 677 Jnit DTM's Count 11 t7 )TM Valves Monitored 1 7L c 0 0 tlew DOR's 0t 0 c 0 0 \dded - Valves 7 lemoved From Service-Valves c !umber of Leaking Valves >500 ppm L 2 c 4 1 !umber of Missed First Attempts at Repair (5 Days)0 c 0 -eaking Valves Not Repaired As Required (15 Davs)0 c 0 'umps Jnit Pumo Count 3 3 )umps Monitored 0 0 C 0t 0 0 )ual-Mechanical seal pumos Count 3 3 )ual-Mechanical seal pumos montiored 0 3 c 0 0 0 t,lew DOR's 0 0 c 0 0 0 \dded - Pumps c 0 lemoved From Service-Pumps c 0 tlumber of Leakins Pumps >2.000 oom 0 0 c C 0 0tlumber of Missed First Attempts at Repair (5 Days)0 0 c C 0 0 -eaking Pumps Not Repaired As Required (15 Days)0 0 C C 0 0 3ompressors Jnit Comp. Count 1 1 lompressors Monitored 1 0 c t 0 0 tlew DOR's 0 0 c 0 0 \dded - Compressors c lemoved From Service-Compressors 0 c tlumber of Leaking Compressors >2,000 ppm 0 0 0 C 0 c tlumber of Missed First Attempts at Repair (5 Days)0 0 0 C 0 c -eaking Compressors Not Repaired As Required (15 days)0 0 0 c 0 :VS/PRV Jnit CVS/PRV Count 1 1: CVS/PRV Com oonents Monitored 0 13 0 1 PRV's to Atmosphere Count 0 Number Of PRV's to Atm. Components Monitored 0 0 0 0 New DOR's 0 o Added CVS Components Removed From Service- CVS/PRV 1 Number of Leaking CVS/PRV > 500 ppm 0 1 c C Number of Missed First Attempts at Repair (5 Days)0 0 c c Leaking CVS/PRV Not Repaired By Required (15 Days)0 7 c C Drains Jnit Drains Count 11 11 )rains Components Monitored 0 17 Added Drain Components lemoved From Service- Drains \,lumber of Leakine Drains> 10.000 oom 0 0 1 C -eaking Drains Not Repaired By Required (15 Days)0 0 0 c Comments Explanation for Missed Monitoring: Four (4) components on TOS. Delay of Repair (DOR): LDAR # Date/Reason None. Unit Shutdowns: Date: Time (hours) Description None. Late Repairs: None. Comments HF Sinclair Woods Cross Refining LtC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 31,2023 PROCESS UNIT:ll GAS P,,,,NT ; *ii#Jxaliilj'.isrili.i*!.ridlf.rl$i.ilrlr{,$.1liiir[i*rj y'alves Jnit Valve Count 7471 :'rtritlE$,r.":Es]EE€€ i:4-11) ii€a:7471 y'alves Monitored t4 5 1421 3 2 139( Jnit DTM's Count tl9-'!!("ii$!,?3A 3t )TM Valves Monitored 0 c 34 0 tlew DOR's 0 0 0 c Added - Valves l*--1I;1 I r:rRemoved From Service-Valves Number of Leaking Valves >500 ppm 7 0 2 0 C Number of Missed First Attempts at Repair (5 Days)0 0 C 0 c Leaking Valves Not Repaired As Required (15 Days)0 0 C 0 c Pumps Unit Pump Count 1 f.T:$g{n-ait=io;],:1 Pumps Monitored 10 12 c 9 9 Dual-Mechanical seal pumps Count n" :*.€*t:'; Dual-Mechanical seal pumps montiored 0 3 (0 0 New DOR's 0 0 1 0 0 7 Added - Pumps c Removed From Service-Pumos c Number of Leakins Pumos >2.000 oom 3 1 0 t 7 Number of Missed First Attempts at Repair (5 Days)0 c 0 l-eaking Pumps Not Repaired As Required (15 Davs)0 c 0 0 Compressorc Jnit Comp. Count iilt-o*t 1 Compressors Monitored 1 0 c 7 0 \ew DOR's 0 0 c 0 c Added - ComDressors c Hs.,) c lemoved From Service-Comoressors c c \umber of Leaking Compressors >2,000 ppm c 0 c (0 ctlumber of Missed First Attempts at Repair (5 Days)c 0 c (0 c -eaking Compressors Not Repaired As Required (15 days)c 0 c (0 c cvs/PRv Jnit CVS/PRV Count 26 +.ii 26 :VS/PRV Comoonents Monitored 0l 0 24 0 24 )RV's to Atmosphere Count c \umber Of PRV's to Atm. Components Monitored 0l 0 c 0 \ew DOR's 0 0 0 c 0 \dded CVS Components c lemoved From Service- CVS/PRV c tlumber of Leaking CVS/PRV > 500 ppm 0 0 0 c 0 tlumber of Missed First Attempts at Repair (5 Davs)0 c 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 c )rains Jnit Drains Count 208,ffi1ffi?s€&1'* k;hii 2( )rains Comoonents Monitored C 2( \dded Drain Comoonents lemoved From Service- Drains !umber of Leakins Drains> 10.000 oom 0 c c C -eaking Drains Not Repaired By Required (15 Days)0 0 0 c Explanation for Missed Monitoring: Thirty three (33) components on TOS. Delay of Repair (DOR): tDARf Date/Reason Pump # 03676 9126122,lsolated from VOC service. Unit Shutdowns:Date: Time (hours) Descriptaon None. Late Repairs: None. Comments Sinclair Woods Cross Refining ILC k Detection and Repair Report C R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. | 1to December 31, 2023 ICESS UNIT:72 NHDS :r;iiJlS+*ffiE$rltlr;,li.;llfliY.lrtf I ll lrri /alves Jnit Valve Count uPrt*id{h 80(806 /alves Monitored 3 3 82:19 L7 808 Jnit DTM's Count 2(ijCffiii:itui.fl$iiit 2C )TM Valves Monitored 0 0 2(0 0 \,lew DOR's 0 0 0l c Added - Valves &W .itr'Fd'#:l1 i;i4ffi,;U:dks*llt i . ft t4:.r*.H'#li,+. r t.mh: :=. "'1,;"131 3 lemoved From Service-Valves \umber of Leaking Valves >500 ppm 7 0 l7 0\,lumber of Missed First Attempts at Repair (5 Davs)0 0 0 -eaking Valves Not Repaired As Required (15 Days)0 0 c 0 Pumps Jnit Pump Count 3 11 il'..il;liiilitril {1i,Il}?:id,1fliiffi,:,1il.rd1;.'-:i4+ )umps Monitored 0l 3 c 0 )ual-Mechanical seal pumps Count t*{#_EE,ffiffi ffi1#i#.i$ilil 3 I {ilrllllsii$m|lir i (' l{iff-.,'."I| ffi i!49si9.:.-i, )ual-Mechanical seal pumps montiored 0l 3 0 0 tlew DOR's c 0 0 \dded - Pumps c lemoved From Service-Pumps c S.$drt \,lumber of Leaking Pumps >2,000 ppm c c c 0 0 lumber of Missed First Attemots at Reoair (5 Davs)c 0 0 0 -eaking Pumps Not Repaired As Required (15 Days)c 0 0 0 :ompressors Jnit Comp. Count 1 k:+,#:k!:ie.--',:€SE :h" ril!ir:;.'it,iri 1 Sompressors Monitored L 0 1 0 tlew DOR's t 1 0 0 \dded - Compressors !!iii!!S,.*:l#{*r,$$iffi ,SE}-{J# ( lemoved From Service-Com pressors C tlumber of Leaking Compressors >2,000 ppm 0 0 0 C Number of Missed First Attempts at Repair (5 Davs)0 0 0 C Leaking Compressors Not Repaired As Required (15 days)0 0 0 c /PRV Unit CVS/PRV Count 1 2 l;ff"ffii$$#ffi ffi fitiJiilptu#,w irw;s t2 CVs/PRV Components Monitored 3 2 131 t2 PRV's to Atmosphere Count 0llfg$qffi,il.&W$ jii'crEts'{,*P#c Number Of PRV's to Atm. Components Monitored 0 0 New DOR's 0 0l0lc c Added CVS Components 2t"ffiffiffimx 21ffi#'a*m#H$rikr? c lemoved From Service- CVS/PRV c \umber of Leakine CVS/PRV > 500 oom 0 C c c c \umber of Missed First Attempts at Repair (5 Davs)0 C c c c -eaking CVS/PRV Not Repaired By Required (15 Davs)C c c c Drains Jnit Drains Count 2C Iei-;,jdtq:9.i:ii'1!,ll*!2A )rains Components Monitored 0l 2C c C \dded Drain Components ffi c lemoved From Service- Drains c tlumber of Leakins Drains> 10.0O0 oom 0l c c t 0 -eaking Drains Not Repaired By Required (15 Days)ol c c 0 0 Explanation for Missed Monitoring: One (1) component on TOS. Three (3) components added in Unit 12, all initially monitored within 3O-days of commissioning. Delay of Repair (DOR): IDAR # Date/Reason Compressor # 33958 712612021, Cannot be isolated, will require a unit shutdown. Unit Shutdowns:Date Time (hours) Description None. Late Repairs: None. Comments F Sinclair Woods Cross Refining LLC rak Detection and Repair Report AC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. rfy 1to December 31,2023 ,.dttFSnctorr IOCESS UNIT:13 |SOM )ESCmmoir MONIH Jul Aur Seo Oct Nov Dec /alves Jnit Valve Count 744 744 /alves Monitored 8 8 76 72 7 74t Unit DTM's Count 27 21 DTM Valves Monitored 0 0 27 0 0 New DOR's 0 0 0 Added - Valves Removed From Service-Va lves 1 Number of Leaking Valves >500 ppm 7 2 Number of Missed First Attempts at Repair (5 Days)0 0 c Leaking Valves Not Repaired As Required (15 DaVs)0 0 c Pumps Unit Pump Count Pumps Monitored 6 7 6 Dual-Mechanical seal pumps Count 2 Dual-Mechanical seal pumps montiored 0 0 2 ol C New DOR's 0 0 0l qdded - Pumps Removed From Service-Pumps Number of Leakins Pumos >2.000 ppm 0 1 1 t 7 Number of Missed First Attempts at Repair (5 Days)0 0 C Leaking Pumps Not Repaired As Required (15 Days)0 0 c Compressors Jnit Comp. Count 7 3ompressors Monitored 1 0 L C \ew DOR's 0 0 t c Added - Comoressors Removed From Service-Comoressors \umber of Leaking Compressors >2,000 ppm 0 0 1 c \umber of Missed First Attempts at Repair (5 Days)0 0 0 c -eaking Compressors Not Repaired As Required (15 days)0 0 0 c cvs/PRV Jnit CVS/PRV Count :VS/PRV Com oonents Monitored 0 1 0 )RV's to Atmosphere Count \umber Of PRV's to Atm. Components Monitored 0 0l \ew DOR's 0 0 0 c Added CVS Components 1 lemoved From Service- CVS/PRV 1. \umber of Leakins CVS/PRV > 500 ppm 0 0 T 0 C \umber of Missed First Attempts at Repair (5 Days)0 0 0 c -eaking CVS/PRV Not Repaired By Required (15 Days)0 C Drains Jnit Drains Count 24 2t )rains Components Monitored 0 0 24 \dded Drain Comoonents lemoved From Service- Drains \,lumber of Leaking Drains> 10,000 ppm 0 1 C -eaking Drains Not Repaired By Required (15 Davs)0 0 c Comments Explanation for Missed Monitoring: None. Delay of Repair (DOR): LDAR # Date/Reason Compressor # 32505 10110123 Cannot be isolated, will require a unit shutdown. Unit Shutdowns: Date Time (hours) Description Comments 1112612023 370.1 Scheduled maintenance DOR #32505, was repaired but would not pass reinspection. Late Repairs: None. HF Sinclair Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 31,2023 PROCESS UNIT:16 AMINE DESCRIPnON MONTH lul Auc SeD Oct Nov Dec y'alves Jnit Valve Count 101 101 /alves Monitored 0 0 101 3 0 101 Jnit DTM's Count c )TM Valves Monitored 0 0 C 0 0 tlew DOR's 0 0 c 0 0 \dded - Valves 3 lemoved From Service-Valves 2 tlumber of Leaking Valves >500 ppm 0 c 0 \,lumber of Missed First Attempts at Repair (5 Days)0 C 0 -eaking Valves Not Repaired As Required (15 Days)c 0 c 0 0 rumps Jnit Pump Count c 0 )umps Monitored 0 0 C 0 0 0 )ual-Mechanical seal pumps Count c )ual-Mechanical seal pumps montiored 0 0 C 0 0 0 tlew DOR's 0 0 c 0 0 0 \dded - Pumos c 0 lemoved From Service-Pumos c 0 !umber of Leaking Pumps >2,000 ppm 0 0 c C 0 0 ,,lumber of Missed First Attempts at Repair (5 Days)0 0 c 0 c -eaking Pumps Not Repaired As Required (15 Days)0 0 c 0 0 -ompressors Jnit Comp. Count c 0 lompressors Monitored 0 0 c 0 0 0 tlew DOR's 0 0 C 0 0 0 \dded - Compressors C 0 lemoved From Service-Com pressors C 0 tlumber of Leaking Compressors >2,000 oom 0 0 c t 0 0 tlumber of Missed First Attemots at Reoair {5 Davsl 0 0 c c 0 0 -eakins Comoressors Not Reoaired As Reouired (15 davs)0 0 C c 0 c :vs/PRv Jnit CVS/PRV Count 4 :VS/PRV Components Monitored 0 0 4 0 0 )RV's to Atmosphere Count 0 tlumber Of PRV's to Atm. Components Monitored 0 0 c 0 0 tlew DOR's 0 0 0 0 0 \dded CVS Components c lemoved From Service- CVS/PRV C tlumber of Leakine CVS/PRV > 500 ppm 0 0 0 C 0 tlumber of Missed First Attempts at Reoair (5 Davs)0 0 0 c 0 eaking CVS/PRV Not Repaired By Required (15 Days)c 0 C 0 )ralns Unit Drains Count Drains Components Monitored 0 C Added Drain Comoonents Removed From Service- Drains Number of Leaking Drains> 10,000 ppm 0 0 c C Leaking Drains Not Repaired By Required (15 Days)0 0 C c Comments Explanation for Missed Monitoring: None. Delay of Repair (DOR): LDAR f Date/Reason None. Unit Shutdowns: Date Time (hours) Description None. Late Repairs: None. Comments Sinclair Woods Cross Refining LLC rk Detection and Repair Report rC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. y l to December 31,2023 )CESS UNIT:17 SRU DESCRIPTION MOT{TH Jul AUP Seo Oct Nov Dec Valves Unit Valve Count y'alves Monitored 0 0 0 C Jnit DTM's Count )TM Valves Monitored 0 0 0 c \ew DOR's 0 0 0 C \dded - Valves lemoved From Service-Valves \,lumber of Leaking Valves >500 ppm 0 0 0 C \umber of Missed First Attempts at Repair (5 Days)0 0 c -eaking Valves Not Repaired As Required (15 Days)0 0 c ,umps Jnit Pump Count C )umps Monitored 0 0 0 c c )ual-Mechanical seal pumps Count )ual-Mechanical seal pumps montiored 0 0 0 c c tlew DOR's 0 0 0 c c \dded - Pumps c lemoved From Service-Pumps c !umber of Leaking Pumps >2,000 ppm c 0 0 0 c !umber of Missed First Attempts at Repair (5 Davs)c 0 0 0 c -eaking Pumps Not Repaired As Required (15 Davs)c 0 c 0 0 c Sompressors Jnit Comp. Count 0 c lompressors Monitored 0 0 0 0 0 c tJew DOR's 0 0 0 0 0 c \dded - Compressors 0 c Removed From Service-Compressors c c Number of Leakine Compressors >2,000 ppm c 0 0 0 c Number of Missed First Attempts at Repair (5 Davs)c 0 0 c -eaking Compressors Not Repaired As Required (15 days)c 0 0 c cvs/PRV Unit CVS/PRV Count c CVS/PRV Components Monitored 0l 0 0 c PRV's to Atmosphere Count c Number Of PRV's to Atm. Components Monitored 0i 0 0 C New DOR's ol 0 0 c Added CVS Comoonents 0 Removed From Service- CVS/PRV c Number of Leaking CVS/PRV > 500 ppm 0 c 0 0 0 Number of Missed First Attempts at Repair (5 Davs)0 c 0 0 0 Leaking CVS/PRV Not Repaired By Required (15 Days)0 C 0 0 0 Drains Unit Drains Count 0 Drains Components Monitored 0 c 0 0 0 Added Drain Components lemoved From Service- Drains \umber of Leakine Drains> 10.000 oom 0 C 0 0 -eaking Drains Not Repaired By Required (15 Days)0 c 0 0 Comments Explanation for Missed Monitoring: \one. Delay of Repair (DOR): LDAR # Date/Reason \one. Unit Shutdowns: Date Time (hours) Description \one. Late Repairs: tlone. Comments HF Sinclair Woods Cross Refining LtC Detection and Repair Report ,.ttt\finclorrAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. l to December 31, 2023 Removed From Service-Valves Number of Leaking Valves >500 ppm Number of Missed First Attempts at Repair (5 Da Leaking Valves Not Repaired As Required (15 Unit Pumo Count Dual-Mechanical seal oumos Count Dual-Mechanical seal pumos montiored Removed From Service-P Number of Leaking Pumps >2 Number of Missed First Attem Leaking Pumps Not Repaired As red (15 Days) Removed From Service-Com Number of Leaking Compressors >2,000 Number of Missed First Attempts at Repair (5 Not Repaired As Required (15 RV's to Atmosphere Count umber Of PRV's to Atm. Components Monitored emoved From Service- CVS/PRV umber of Leaking CVS/PRV > 500 umber of Missed First Attem CVS/PRV Not Repaired By Required (15 From Service- Drains mber of Leakins Drains> 10 Drains Not Repaired Bv Required (15 for Missed Monitoring: (90) component added in Unit 19, initially monitored within 30-days. of Repair (DOR): Date/Reason Date Time (hours) Repairs: Description Comments HF Sinclair Woods Cross Refining [tC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 3L,2023 PROCESS UNIT: 20 cHC fiil,ffiffi,, ilffi Valves Unit Valve Count 765 =;I fii,-il"ri -irilili i r$,it # iri il 765y'alves Monitored 1 768 4 759 Jnit DTM's Count )TM Valves Monitored 0 c 0 0 \ew DOR's 0 c 0 {dded - Valves ad ( lemoved From Service-Valves C tlumber of Leaking Valves >500 ppm 0 3 (0 2tlumber of Missed First Attempts at Repair (5 Days)0 0 0 c -eaking Valves Not Repaired As Required (15 Days)0 0 0 c Pumps Jnit Pump Count 4 i:it:1::+i.'=:i:_+.."r,"E)umps Monitored 0 4 c 0 0 )ual-Mechanical seal pumps Count I Ltii.'[i].r.q 4 )ual-Mechanical seal pumps montiored 0 4 c 0 \.lew DOR's 0l 0 c 0 \dded - Pumps c lemoved From Service-Pumos c tlumber of Leaking Pumps >2,000 ppm 0 c 0 c !umber of Missed First Attemots at Reoair (5 Davsl c 0 C 0 c -eaking Pumps Not Repaired As Required (15 Davs)c 0 c (0 c !ompressors Jnit Como. Count c c lompressors Monitored 0l 0 c (0 c tlew DOR's c 0 c (0 c \dded - Compressors ! 0lemoved From Service-ComDressors tlumber of Leaking Compressors >2.000 oom 0 0 0 c 0 tlumber of Missed First Attempts at Repair (5 Davs)0 0 0 c -eaking Compressors Not Repaired As Required (15 days) |0l (c ,PRV Jnit CVS/PRV Count tt 7t :VS/PRV Components Monitored 0l L4 C 1 ,RV's to Atmosphere Count :.*:*;.$ tlumber Of PRV's to Atm. Components Monitored 0 0 c New DOR's 0 0 c ( \dded CVS Components lemoved From Service- CVS/PRV \umber of Leaking CVS/PRV > 500 ppm 0 0 0 c tlumber of Missed First Attempts at Repair (5 Davs)0 0 0 c -eaking CVS/PRV Not Repaired By Required (15 Days)0 0 0 c Drains Jnit Drains Count L4 74 )rains Components Monitored t4 ( \dded Drain Components C lemoved From Service- Drains ( \,lumber of Leaking Drains> 10,000 ppm C 0 0 c C -eaking Drains Not Repaired By Required (15 Days)C 0 0 c ( Explanation for Missed Monitoring: Eight teen (18) components on TOS. Delay of Repair (DOR): LDAR #Date/Reason Valve # 28087 612112023, Unit shutdown required. Unit Shutdowns:Date Time (hours) Description None. Late Repairs: None. Comments HF Sinclair Woods Cross Refining ttC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 31,2023 PROCESS UNIT:21 NAHS t/alves Jnit Valve Count t24 f;filrii 724 y'alves Monitored 0 0 724 0 0 724 Jnit DTM's Count c c )TM Valves Monitored 0 0 c 0 0 c lew DOR's 0 0 c 0 0 c \dded - Valves c c lemoved From Service-Valves c c !umber of Leaking Valves >500 ppm 0 c 0 c !umber of Missed First Attemots at ReDair (5 Davsl c 0 c c 0 c -eaking Valves Not Repaired As Required (15 Days)c 0 C c 0 0 rumps Jnit Pump Count c 0,umps Monitored c 0 c c 0 0 )ual-Mechanical seal oumos Count c 0 )ual-Mechanical seal oumos montiored c 0 c c 0 0 {ew DOR's 0 0 0 0 0 \dded - Pumps 0 :{J lemoved From Service-Pumos 0 tlumber of Leaking Pumos >2.000 oom 0 0 0 0 0 {umber of Missed First Attempts at Reoair (5 Davs)0 0 0 0 0 -eaking Pumps Not Repaired As Required (15 Days)0 0 0 0 0 :ompressors Jnit Comp. Count I.a: lompressors Monitored 0 0 0 tlew DOR's 0 0 0 \dded - Compressors 0 lemoved From Service-Compressors tlumber of Leaking Compressors >2,000 opm 0 0 tlumber of Missed First Attempts at Repair (5 Days)0 0 c .eaking Comoressors Not Reoaired As Reouired (15 davsl 0 0 c 'PRV Unit CVS/PRV Count CVS/PRV Components Monitored 0 0 2RV's to Atmosohere Count Number Of PRV's to Atm. Components Monitored 0 0 !ew DOR's 0 0 0 0 Added CVS Components lemoved From Service- CVS/PRV \umber of Leakine CVS/PRV > 500 oom 0 0 \umber of Missed First Attempts at Reoair (5 Davs)0 0 0 c -eaking CVS/PRV Not Repaired By Required (15 Days)0 0 0 Drains Jnit Drains Count 1 *%ffibE-ffij#*risdi 7 )rains Components Monitored 0 0 \dded Drain Components c lemoved From Service- Drains c !umber of Leakine Drains> 10.000 oom (0 t 0 c -eaking Drains Not Repaired By Required (15 Days)(0 c (0 c Explanation for Missed Monitoring: None. Delay of Repair (DOR): LDAR # Date/Reason None. Unit Shutdowns:Date Time (hours) Description None. Late Repairs: None. Comments HF Sinclair Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1 to December 31,2023 PROCESS UNIT:23 BENSAT DESCilmON MONTH Jul Aug Sep Oct Not,Dec Valves Unit Valve Count c Valves Monitored 0l C 0 0 c Unit DTM's Count c DTM Valves Monitored 0 c 0 0 C New DOR's 0 c 0 0 0 Added - Valves 0 Removed From Service-Va lves 0 Number of Leaking Valves >500 ppm 0 c 0 0 0 Number of Missed First Attempts at Repair (5 Days)0 C 0 0 c Leaking Valves Not Repaired As Required (15 Days)0 c 0 0 Pumps Unit Pump Count 0 Pumps Monitored 0 C 0 0 0 Dual-Mechanical seal pumps Count 0 Dual-Mechanical seal pumps montiored 0 c 0 0 0 New DOR's 0 c 0 0 Added - Pumps Removed From Service-Pumos Number of Leaking Pumps >2,000 ppm 0 c 0 0 Number of Missed First Attempts at Repair (5 Days)0 c 0 0 Leaking Pumps Not Repaired As Required (15 Days)0 c 0 0 Compressors Unit Comp. Count 3omoressors Monitored 0 c 0 0 New DOR's 0 c 0 0 Added - Compressors Removed From Service-Comoressors Number of Leaking Compressors >2,000 ppm 0 C 0 0 Number of Missed First Attempts at Repair (5 Days)0 C 0 0 Leaking Compressors Not Repaired As Required (15 days)0 c 0 0 cvs/PRv Jnit CVS/PRV Count :VS/PRV Com oonents Monitored 0 c 0 )RV's to Atmosphere Count \umber Of PRV's to Atm. Components Monitored 0l 0 0 \ew DOR's 0 c 0 0 Added CVS Comoonents iemoved From Service- CVS/PRV \umber of Leaking CVS/PRV > 500 ppm 0 c 0 0 \umber of Missed First Attemots at Reoair (5 Davsl 0 c 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 C 0 Drains Jnit Drains Count 1 1 )rains Components Monitored 0 c 17 Added Drain Components c lemoved From Service- Drains c \,lumber of Leakine Drains> 10.000 oDm 0 0 C 0 0 -eaking Drains Not Repaired By Required (15 Days)0 0 c 0 0 Comments Explanation for Missed Monitoring: \one. Delay of Repair (DOR): LDAR # Date/Reason \one. Unit Shutdowns: Date Time (hours) Description !one Late Repairs: \one. Comments HF Sinclair Woods Cross Refining LtC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly l to December 31,2023 PROCESS UN!T:24 CRUDE #2 - : ..,,',.::, . l .:,,_.1._:j;::lit;"! il$CHEfEfI' llr'.,:'.:-::ii -1., y'alves Jnit Valve Count 993 $-tiffi#f$*F=993 y'alves Monitored 1002 1 7 993 7 Jnit DTM'S Count Hllt#rBiffiffiffiE 9 ffiHffiMrffim, ffiW c )TM Valves Monitored sl 0 0 tolo c !ew DOR's 0 0 0 0 c \dded - Valves 0]ffi c lemoved From Service-Valves c tlumber of Leaking Valves >500 ppm 1 1 0 c {umber of Missed First Attemots at Reoair {5 Davs)c 0 0 0 c Leaking Valves Not Repaired As Required (15 Davsl c 0 0 0 c Pumps Unit Pumo Count Uj$SffiffiW+,=j 8 Pumos Monitored 2 8 2 2 Dual-Mechanical seal pumps Count [w'ffiffi#]ffi 6 Dual-Mechanical seal oumps montiored ol 6 0 0 0 New DOR's 0l 0 0 0 C Added - Pumps 9.&"i3 ol*itsffiffi,tas,M,0 Removed From Service-Pumos $il@i{St$.e$g$,}Xi,SS€e::C+il 0]i#.S$Wr'}$ffiW;Wm&rffift\iB$0 Number of Leakins Pumos >2.000 oom 0 0l c 0 0 Number of Missed First Attempts at Repair (5 Davs)0 0l c 0 0 Leaking Pumps Not Repaired As Required (15 Days)0 0l c 0 0 Compressors Unit Comp. Count Olrffiffii$frffir+<#S'#rtlto 0 Compressors Monitored 0l 0l 0 0 0 New DOR's 0 ol (c 0 0 Added - Comoressors F".Sffiffi,ffi,ffid (id$ffiss:iffifrffiffiffi,tr 0 Removed From Service-Comoressors 0 Number of Leaking Compressors >2,000 ppm 0 0 c 0 0 Number of Missed First Attempts at Repair (5 Days)0 0 c 0 0 Leaking Compressors Not Repaired As Required (15 days)0 0l 0 0 cvs/PRv Unit CVS/PRV Count tm,lEr$fixffi$fls$*\qw$i 7i :VS/PRV Components Monitored 72 0 t2 0 )RV's to Atmosphere Count ,$tw#*ffiwrflffiH:':g o l,ilth# llrffiffiMffirm$*dgw tlumber Of PRV's to Atm. Comoonents Monitored 0l 0l 0l \ew DOR's 0 0l 0 Added CVS Components ffiiliiffi,*ffi lemoved From Service- CVS/PRV gJht{*ffi+.ffiWk$ffi;E offiffiiiHtffikl$.,rit!{€ lumber of Leakins CVS/PRV > 500 ppm 0 0l 0 \umber of Missed First Attempts at Repair (5 Davs)0 0l 0 c -eaking CVS/PRV Not Repaired By Required (15 Davs)0 ol C Drains Jnit Drains Count sd'|Ire#1iffffiW*$ffi 14 ffiffi&€El#*t{,ryfi.L4 )rains Components Monitored 0 ol 74 {dded Drain Comoonents ffiire ( lemoved From Service- Drains ( \umber of Leaking Drains> 10,000 ppm 0 0 C 0 0 -eaking Drains Not Repaired By Required (15 Days)0 0 c 0 0 Explanation for Missed Monitoring: \one. Delay of Repair (DOR): IDAR# Date/Reason \one. Unit Shutdowns:Date Time (hours) Description \one. Late Repairs: !one. Comments HF Sinclair Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 31,2023 PROCESS UNIT:25 FCCU #2 DESCTmON MONTH Jul Aus Seo Oct l{ov Dec y'alves Jnit Valve Count 1882 1882 y'alves Monitored 2 1854 1 1 1881 1 Jnit DTM's Count 3 3 )TM Valves Monitored 0 3 c 0 0 tlew DOR's 0 0 c 0 0 \dded - Valves c iemoved From Service-Va lves c tlumber of Leaking Valves >500 ppm 0 1 c 0 1 tlumber of Missed First Attemots at Reoair (5 Davsl 0 0 c 0 0 -eaking Valves Not Repaired As Required (15 Days)0 0 c 0 0 'umps Jnit Pump Count 16 i)umos Monitored 2 16 2 2 2 2 )ual-Mechanical seal pumps Count 74 74 )ual-Mechanical seal oumos montiored 0 74 c 0 0 tlew DOR's 0t 0 c 0 0 \dded - Pumps c lemoved From Service-Pumos c \umber of Leakins Pumps >2,000 oom 0 0 c 0 0 !umber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking Pumps Not Repaired As Required (15 Days)0 0 c 0 0 lompressors Jnit Comp. Count 2 2 lompressors Monitored 2 0 c 2 2 tlew DOR's 0 1 c 0 I \dded - Compressors c lemoved From Service-Compressors c t,lumber of Leaking Compressors >2,000 ppm 1 0 c 1 1 !umber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking Compressors Not Repaired As Required (15 davs)0 0 c 0 0 3VS/PRV Jnit CVS/PRV Count 2L 27 :VS/PRV Components Monitored 0 27 0 2L )RV's to Atmosphere Count c \umber Of PRV's to Atm. Components Monitored 0 c 0 tlew DOR's 0t 0 c 0 0 \dded CVS Components lemoved From Service- CVS/PRV \umber of Leakine CVS/PRV > 500 oom 0 0 c 0 0 \umber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 c 0 C )rains Jnit Drains Count 4C 4C )rains Components Monitored 0 c 40 0 \dded Drain Components c lemoved From Service- Drains c Vumber of Leaking Drains> 10.000 ppm 0 c 0 -eaking Drains Not Repaired By Required (15 Days)0 c 0 Comments Explanation for Missed Monitoring: )ne (1 ) component on TOS. Delay of Repair (DOR): IDAR # Date/Reason 3ompressor # 21292 1113012023,lsolated from VOC service. Unit Shutdowns: Date Time (hours) Description \one. -ate Repairs: tlone. Comments HF Sinclair Woods Cross Refining LLC teak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. lufy 1to December 3L,2023 PROCESS UNIT:26 POLY llFSnclorr )ESCRIPTION MONTH Jul AUT SeD Oct Nov Dec ,alves Jnit Valve Count 7284 1279 /alves Monitored 6 5 1287 6 5 L27E Jnit DTM's Count A 4 )TM Valves Monitored 0 0 A 0 0 tlew DOR's 0 0 0 0 0 \dded - Valves 7 lemoved From Service-Valves 1 tlumber of Leaking Valves >500 ppm 0 0 0 1 2 tlumber of Missed First Attempts at Repair (5 Days)0 0 0 0 eaking Valves Not Repaired As Required (15 Days)0 0 0 0 'umps Jnit Pumo Count 1l 11 )umps Monitored 7 0 1 0 )ual-Mechanical seal pumps Count 11 1t )ual-Mechanical seal pumps montiored 1 10 1 0 New DOR's 0 0 0 0 Added - Pumos 1 Removed From Service-Pumos 1 Number of Leakins Pumos >2.000 oom 0 0 0 0 Number of Missed First Attempts at Repair (5 Days)0 0 0 0 0 Leaking Pumps Not Repaired As Required (15 Days)0 0 0 0 0 LOmpressors Unit Comp. Count 0 3ompressors Monitored 0 0 0 0 0 New DOR's 0 0 0 0 0 Added - Compressors 0 Removed From Service-Comoressors 0 Number of Leaking Compressors >2,000 ppm 0 0 0 0 Number of Missed First Attempts at Repair (5 Days)0 0 0 0 Leaking Compressors Not Repaired As Required (15 days)0 0 0 0 cvs/PRv Unit CVS/PRV Count L9 19 :VS/PRV Components Monitored 0 0 1S 0 1S PRV's to Atmosohere Count 0 Number Of PRV's to Atm. Components Monitored 0 0 0 \ew DOR's 0 0 0 0 c Added CVS Components lemoved From Service- CVS/PRV \umber of Leaking CVS/PRV > 500 ppm 0 0 0 \umber of Missed First Attempts at Repair (S Davs)0 0 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 0 DrainS Jnit Drains Count 18 1 )rains Comoonents Monitored 0 0 18 Added Drain Components lemoved From Service- Drains \umber of Leakins Drains> 10.000 oom 0 0 0 0 -eaking Drains Not Repaired By Required (15 Days)0 0 0 Comments Explanation for Missed Monitoring: )ne (1 ) component on TOS. )ne (1) component added in Unit 26, initially monitored within 30 days. Delay of Repair (DOR): IDAR # Date/Reason \one. Unit Shutdowns: Date Time (hours) Description \one. [ate Repairs: tlone. Comments F Sinclair Woods Cross Refining LLC lak Detection and Repair Report AC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. rly 1to December 31,2023 IOCESS UN!T:29 SRU Bockuo DESCRIPnON MOI{TH Jul Auc Sep Oct Nov Dec y'alves Jnit Valve Count 35 35 /alves Monitored 35 35 c 0 35 Jnit DTM's Count c )TM Valves Monitored 0 0 c 0 0 tlew DOR's 0 0 c 0 0 \dded - Valves C iemoved From Service-Va lves c !umber of Leaking Valves >500 ppm 0 0 c 0 0 !umber of Missed First Attempts at Repair (5 Davs)0 c 0 0 -eaking Valves Not Repaired As Required (15 Davs)0 0 c 0 0 rumps Jnit Pumo Count c )umos Monitored 0 0 c 0 0 )ual-Mechanical seal oumos Count c )ual-Mechanical seal oumos montiored 0 0 c 0 0 \ew DOR's 0 0 C 0 0 \dded - Pumos c lemoved From Service-Pumps c !umber of Leaking Pumps >2,000 ppm 0 0 c 0 0 \umber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking Pumps Not Repaired As Required (15 Davs)0 0 C 0 0 3ompressorc Jnit Comp. Count c lompressors Monitored 0 0 C 0 0 \ew DOR's 0 0 C 0 0 qdded - Comoressors C iemoved From Service-Com oressors \umber of Leakine Compressors >2,000 ppm 0 0 0 0 \umber of Missed First Attempts at Repair (5 Days)0 0 0 0 -eaking Compressors Not Repaired As Required (15 days)0 0 0 0 cvs/PRV Jnit CVS/PRV Count 1 7 :VS/PRV Com oonents Monitored 7 1 0 L )RV's to Atmosohere Count \umber Of PRV's to Atm. Components Monitored 0 c 0 \ew DOR's 0 c 0 Added CVS Components lemoved From Service- CVS/PRV \umber of Leakine CVS/PRV > 500 pom 0 c 0 \umber of Missed First Attempts at Repair (5 Davs)0 c 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 C 0 Drains Jnit Drains Count )rains Comoonents Monitored 0 c 0 Added Drain Comoonents lemoved From Service- Drains \umber of Leakine Drains> 10.000 oom 0 c 0 -eaking Drains Not Repaired Bv Required (15 Davs)0 c 0 Comments Explanation for Missed Monitoring: None. Delay of Repair (DOR): LDAR # Date/Reason None. Unit Shutdowns: Date Time (hours) Description None. Late Repairs: None. Comments HF Sinclair Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 3L,2O2, PROCESS UNlT:Sl BOILERS DESCRPflON MONTH Jul Aus SeD Oct Nor Dec y'alves Jnit Valve Count l4t 346y'alves Monitored 93 5 352 5 1 346 Jnit DTM's Count 7 )TM Valves Monitored 9 0 9 0 0 0 tlew DOR's 0 0 0 0 0 \dded - Valves 4 1 lemoved From Service-Valves 4 1 !umber of Leaking Valves >500 ppm 1 0 0 0 0 \,lumber of Missed First Attempts at Repair (5 Davs)C 0 0 0 Leaking Valves Not Repaired As Required (15 Days)c 0 0 Pumps Unit Pump Count Pumps Monitored 0 0 0 Dual-Mechanical seal pumps Count Dual-Mechanical seal pumps montiored 0 0 0 New DOR's 0 0 0 Added - Pumps Removed From Service-Pumps Number of Leakine Pumos >2.000 oom 0 0 0 Number of Missed First Attempts at Repair (5 Days)0 c 0 0 Leaking Pumps Not Repaired As Required (15 Days)0 c 0 0 Compressors Unit Comp. Count :ompressors Monitored 0 c 0 0 New DOR's 0 C 0 0 Added - Compressors Removed From Service-Compressors Number of Leaking Compressors >2,000 ppm 0 c 0 0 Number of Missed First Attempts at Repair (5 Days)0 c 0 0 Leaking Compressors Not Repaired As Required (15 davs)0 c 0 0 cvs/PRv Jnit CVS/PRV Count 4 :VS/PRV Components Monitored 3 c 0 2 )RV's to Atmosphere Count c\,lumber Of PRV's to Atm. Components Monitored 0 c 0 \ew DOR's 0 0 c 0 0 C Added CVS Components lemoved From Service- CVS/PRV tlumber of Leakins CVS/PRV > 500 ppm 0 0 c 0 0 c \umber of Missed First Attempts at Repair (5 Days)0 0 c 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 C )ralns Jnit Drains Count 7 t- )rains Components Monitored 0 0 c 1 0 c \dded Drain Components C 0 lemoved From Service- Drains C 0tlumber of Leaking Drains> 10,000 ppm 0 0 C c 0 0 -eaklng Drains Not Repaired By Required (15 Davs)0 0 c c 0 0 Comments Explanation for Missed Monitoring: None. Delay of Repair (DOR): LDAR f Date/Reason AOV # 30219 512712022, Cannot be isolated, will require a unit shutdown. Unit Shutdowns: Date Time (hours) Description Comments None. Late Repairs: None. HF Sinclair Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 31,2023 PROCESS UNIT:66 FI.ARE Sitrifi.Yfd* { uu{s:ir, Valves Unit Valve Count IffiffimffiWlHnmMm$ffi 42 4 W1.{ilffi;f.S=€.s;-,&'#-t+,-1ii$424 y'alves Monitored 0 42 0 424 rJnit DTM's Count t+=?:$'ri**.;.+,!,!rsii{$,b-ti-:}"4 )TM Valves Monitored 0 3 0t 0 \ew DOR's 0 c OI 0 Added - Valves lemoved From Service-Valves ti,#ffil*0lHiffip,s \umber of Leaking Valves >500 ppm 0 c 0 \umber of Missed First Attempts at Repair (5 Davs)0 c 0t 0 -eaking Valves Not Repaired As Required (15 Days)0 c 0t Pumps Jnit Pumo Count hft i€+*E'Ei'=lt**i'*ff *.;3,€*.-$,i?trr 6Etirlr&Hru$-gE+'!i{i!r*:= =-€1})umps Monitored 5 c 5 5 )ual-Mechanical seal oumos Count )ual-Mechanical seal pumos montiored 0 c OI \ew DOR's 0 c 0 0 qdded - Pumps lemoved From Service-Pumps !umber of Leakins Pumps >2.000 oom 0 C 0l \umber of Missed First Attempts at Repair (5 Davs)0 c 0l -eaking Pumps Not Repaired As Required (15 Davs)0 c 0t ,ompressors Jnit Comp. Count k:. l}fffi*fl-tuiffi{r i-qP*,1&s*i**isiriti&.r.rr 3ompressors Monitored 2 c 2l \ew DOR's L0l c 0l0lc Added - Compressors Ittrffiffi olffiffilri ffiW olF,;ffi+' p.dit,r*H. *'k*"]lemoved From Service-Comoressors E=:€;.U$*ffiffi*i;l*Si! \,lumber of Leaking Compressors >2,000 ppm 0 c 0t \umber of Missed First Attempts at Repair (5 Days)0 c 0t -eaking Compressors Not Repaired As Required (15 days)0 c 0l cvs/PRv Jnit CVS/PRV Count 2 :VS/PRV Components Monitored 0l 2 2 rRV's to Atmosphere Count $ffiffi1,ffiI#F=*ffi;X \,,lumber Of PRV's to Atm. Comoonents Monitored 0l c \ew DOR's 0 c 0 Added CVS Components lemoved From Service- CVS/PRV tlumber of Leakins CVS/PRV > 500 ppm 0 c 0l c lumber of Missed First Attempts at Repair (5 Davs)0 0 (0t c -eakins CVS/PRV Not Reoaired Bv Reouired (15 Davs)0 0 0l c Drains Jnit Drains Count B*i($<e 01ffiffit1#w"ts{ffi rffiNr )rains Components Monitored 0l 0 (0 c Added Drain Comoonents ffi C lemoved From Service- Drains 0tffid$w"*ui#$wsffiffii \,lumber of Leakine Drains> 10.000 oom 0l 0 (0l c -eaking Drains Not Repaired By Required (15 Days)ol 0 (0l 0 Explanation for Missed Monitoring: 3ne (1 ) component on TOS. Delay of Repair (DOR): IDAR# Date/Reason \one. Unit Shutdowns:Date Time (hours) Desciption \one. Late Repairs: \one. Comments HF Sinclair Woods Cross Refining t[C Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 31,2023 PROCESS UNIT:68 ETF $r.*iliL*$|i3$i ,alves Jnit Valve Count [.qGM]rffiffii, tu, }fr]ffiffi 839 i.€iri;:Frl.f lil 84C /alves Monitored 4l 830 4 4 830 t Jnit DTM's Count *L$$:.i.€!+c c )TM Valves Monitored 0l 0 c 0 0 c lew DOR's ol 0 c 0 0 c \dded - Valves $it"i*;:l ft'5;n $c lemoved From Service-Valves 1(c {umber of Leaking Valves >500 ppm c 0 1 c !umber of Missed First Attempts at Reoair (5 Davs)0l 0 0 ( -eaking Valves Not Repaired As Required (15 Days)0l 0 0 ( )umps Jnit Pump Count 1(16 )umos Monitored 161 It 1(7E 16 76 Dual-Mechanical seal pumps Count c Dual-Mechanical seal pumps montiored ol 0 c New DOR's 0l 0 c Added - Pumps c Removed From Service-Pumos c Number of Leakine Pumos >2.000 ppm 0l t 0 c Number of Missed First Attempts at Repair (5 Davs)0l 0 c Leaking Pumps Not Repaired As Required (15 Davs)ol 0 c Compresso,5 Unit Comp. Count c Comoressors Monitored ol (c 0 c New DOR's 0l C c 0 0 Added - ComDressors ,",c,1r 0 Removed From Service-Comoressors 0 Number of Leaking Compressors >2,000 ppm 0l C c 0 0 Number of Missed First Attempts at Repair (5 Days)0l C c 0 0 Leaking Compressors Not Repaired As Required (15 days)0l C c 0 cvs/PRv Unit CVS/PRV Count 4(40 CVS/PRV Components Monitored 0l 3S 38 c PRV's to Atmosphere Count 1 Number Of PRV's to Atm. Components Monitored ol 0 New DOR's 0t c 0 0 Added CVS Comoonents Removed From Service- CVS/PRV Number of Leakine CVS/PRV > 500 oom 0l c 0 0 Number of Missed First Attempts at Repair (5 Davs)0l c 0 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0l c 0 Drains Jnit Drains Count ,.l&!d$li!:: )rains Components Monitored 0l c 2 Added Drain Components lemoved From Service- Drains \umber of Leaking Drains> 10,000 ppm ol c C 0 c -eaking Drains Not Repaired By Required (15 Days)ol 0 (0 c Explanation for Missed Monitoring: I'wenty two (22) components on TOS. Delay of Repair (DORI: IDAR# Date/Reason \one. Unit Shutdowns:Date Time (hoursl Description \one. Late Repairs: !one. Comments HF Sinclair Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July l to December 31,2023 PROCESS UNIT:68WTF llfSnchr Ualves Jnit Valve Count W 3405 EWf,{S&iffi}:t*jsj.+?riti,iil }i :: I ltoa y'alves Monitored 3433 1:29 338s 16 1C Jnit DTM's Count 65 *,;:ffi li$3-ER&Skl:Si$,i,$.i;ir 65 )TM Valves Monitored 64 C 0 0 c tlew DOR's 0 0 \dded - Valves lemoved From Service-Valves tlumber of Leaking Valves >500 ppm 8 1 8 tlumber of Missed First Attempts at Repair (5 Davs)0 c 0 0 -eakins Valves Not Reoaired As Reouired (15 Davsl 0 c 0 0 ,umps Jnit Pump Count 5i fl 1ftffi&ii$It'ifl,rfl fr,,{l,4ffies:51)umos Monitored 54 51 51 53 53 5 )ual-Mechanical seal oumos Count )ual-Mechanical seal oumos monitored 0 0 0 tlew DOR's 0 c 0 c \dded - Pumps lemoved From Service-Pumps tlumber of Leaking Pumps >2,000 ppm 6 1 2 1 [umber of Missed First Attempts at Reoair (5 Davsl 0 c 0 0 -eaking Pumps Not Repaired As Required (15 Davs)0 C 0 0 lompressors Jnit Comp. Count 0ffi&Hs&ffifrstd lompressors Monitored c 0 0l tlew DOR's c 0 c \dded - Compressors fiw#ffiffiffiffi&i;uffi;d**Et fllemoved From Service-ComDressors tlumber of Leaking Compressors >2,000 ppm c 0 0l tlumber of Missed First AttemDts at ReDair (5 Davs)0l c 0 0l Leaking Compressors Not Repaired As Required (15 davs)0l 0 0 0l cvs/PRv Unit CVS/PRV Count l"E€*it*U*i 131lffiffi#HffiffiS.F"€hq L32 CVS/PRV Components Monitored 1311 2 1 131 3l 1 PRV's to Atmosohere Count 1 E$fl?ffiffiffiffiffi..ffi*H 1 Number Of PRV's to Atm. Comoonents Monitored 1 c 1 0l New DOR's 0l 0 c 0t 0 c Added CVS Components 0Biififfiffis#iffi*ffi lemoved From Service- CVS/PRV B$m$ffidffiffiH '**ilffiffi'ffiffiffilHtr]$IMffi\umber of Leaking CVS/PRV > 500 ppm 1 0 7 \umber of Missed First AttemDts at Reoair (5 Davs'l 0t 0 0 -eaking CVS/PRV Not Repaired By Required (15 Davs)0t 0 0l Drains Jnit Drains Count 0lf,Sffiffi.{#&+q )rains Components Monitored 0l 0 c 0 Added Drain Comoonents offiffiH {ffi*t lemoved From Service- Drains oHffiffiiffiftffiffifri$dl tlumber of Leaking Drains> 10,000 ppm ol 0 c 0l -eaking Drains Not Repaired By Required (15 Davs)0l 0 c 0t Expranailon tor Mtssed Monitoring: Twenty two (22) components on TOS. Ten (10) components added in Unit 68 (WTF), initially monitored within 30-days of commissioning. Delay of Repair (DOR): LDAR# Date/Reason Valve # 19904 1212712019, Cannot be isolated, will require a unit shutdown. Valve # 9964 81912022, Cannot be isolated, will require a unit shutdown. Unit Shutdowns:Date Time (hours! Description None. Late Repairs: None. Comments F Sinclair Woods Cross Refining LLC lak Detection and Repair Report AC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. rly 1to December 31,2023 IOCESS UNIT:86 CRUDE UNLOAD ,ESCRTmON MOt{TH ,ul Aus s€D oct Nov Dec Valves Unit Valve Count 55C 55( Valves Monitored 0 0 s2t 0 512 Unit DTM's Count 1 7 DTM Valves Monitored 0 0 1 0 0 New DOR's 0 0 0 0 Added - Valves Removed From Service-Va lves Number of Leaking Valves >500 ppm 0 0 0 0 Number of Missed First Attempts at Repair (5 Days)0 0 0 0 Leaking Valves Not Repaired As Required (15 Days)0 0 0 0 Pumps Unit Pumo Count Lt 1 Pumps Monitored 77 L7 1 t7 17 fi Dual-Mechanical seal pumps Count Dual-Mechanical seal pumps montiored 0 0 0 0 New DOR's 0 0 0 0 Added - Pumos 1 Removed From Service-Pumos 1 Number of Leakine Pumos >2.000 oom 0 0 0 0 1 Number of Missed First Attempts at Repair (5 Davs)0 0 0 0 Leaking Pumps Not Repaired As Required (15 Days)0 0 0 0 Compressors Unit Comp. Count Compressors Monitored 0 0 C 0 0 New DOR's 0 0 c 0 0 c Added - Comoressors c c Removed From Service-Comoressors c c Number of Leakine Compressors >2.000 oom 0 0 c 0 0 c Number of Missed First Attempts at Repair (5 Days)0 0 C 0 0 c Leaking Compressors Not Repaired As Required (L5 days)0 0 C 0 0 c cvs/PRV Unit CVS/PRV Count 19 19 CVS/PRV Components Monitored 0 0 15 0 0 15 PRV's to Atmosphere Count c Number Of PRV's to Atm. Components Monitored 0 0 0t 0 New DOR's 0 0 c 0t 0 c Added CVS Components Removed From Service- CVS/PRV Number of Leaking CVS/PRV > 500 ppm 0 c 0 0 c Number of Missed First Attempts at Repair (5 Days)0 c 0 0 c Leaking CVS/PRV Not Repaired By Required (15 Davs)c 0 0 Drains Unit Drains Count c C Drains Components Monitored 0 C 0 0 c Added Drain Components c C Removed From Service- Drains c c Number of Leakins Drains> 10.000 oom 0 0 c 0 0 C -eaking Drains Not Repaired By Required (15 Days)0 0 C 0 0 c Comments Explanation for Missed Monitoring: Forty five (45) components on TOS. One (1) component added in Unit 86, initially monitored within 3O-days of commissioning. Delay of Repair (DOR): LDAR # None. Date/Reason UTAH I]EPARTI,II:NT OF ENVIRONI,{ENTAL QUALII Unit Shutdowns: Date Time (hours) Description None. Late Repairs: None. Comments DIVISION OF AIR OUI IT\ REVIEWEDInitials:Date: Jan 15, 2025Complinace Status: OKFile #: 10123 (B2)