HomeMy WebLinkAboutDAQ-2025-000294,.tttF$nchrr January 18,2024 Mr. Bryce Bird, Director Division of Air Quality Utah Department of Environmental Quality 195 North 1950 West Salt Lake city, Utah 841l6 RE: 40 CFRPart 60, SubpartJa Periodic Report July 1 through December 31,2023 Dear Mr. Bird: cerrined vrar : z gH{ffbffi Effiffi$r$? r jAI,,l :., ,,,i',?t, DIVISION OF AIR QUALITV Pursuant to 40 CFR 60 NSPS Subpart Ja and 40 CFR 60.7(c), HF Sinclair Woods Cross Refining LLC, HFSWCR, is submitting this periodic report of excess emissions in accordance with 40 CFR 60.108a(d). Additionally, HFSWCR maintains records of discharges exceeding certain amounts in accordance with 40 CFR 60.108a(c)(6). 40 CFR l08a(c)(6) requires the owner/operator to maintain records of releases that exceed 500 lbs SOz in any 24-hour period from any affected flare, discharges greater than 500 lbs SOz in excess of the allowable limits from a fuel gas combustion device or sulfur recovery plant, and discharges to an affected flare in excess of 500,000 scf above baseline in any 24-hour period. These records are to be included in periodic excess emissions reports pursuant to 40 CFR 60. l08a(d)(5). For the period of July I , 2023 through December 31,2023 the records maintained include the following: Additional requirements of reporting excess emissions as required in 40 CFR 60.7(c) and 40 CFR 60.108a were reported in quarterly CEMS reports dated 1012612023 andlllll2024. If you have any questions or need additional information, please contact F. Travis Smith at (801) 299- 6625 or email ftravis.smith@hfsinclair.com. HF Sinclair Woods Cross Refining LLC 1070 W. 500 S, West Bountiful, UT 84087 801 -299-6600 | HFSinclair.com 60.108(cX6)Discharge greater than 500 lbs SOz (24-hr period) from: Affected Flare, Fuel Gas Combustion Device, or SRU Affected Flare: None during reporting period. Fuel Gas Combustion Device: None during reporting period. SRU: None durins reportins period. Discharge in excess of 500,000 scf above baseline (24-br period) Affected Flare: None during reporting period. A flare discharge occurred as a result from a planned startup or shutdown of refinery process units on August 19,2023. During that event, the site's flare management plan was followed pursuant to 40 CFR 60.103a(d)(3). The discharge has been recorded in accordance with 60.108a(cX6). REVIEWEDInitials:Date: Jan 7, 2025Compliance Status: OKFile # 10123 (B2) I certifr under penalties of law that, based upon inquiry of personnel involved, the stalements and information contained in this report are truthful and accurate, and are a complete rccord of all monitoring related events that occurrd ilning the reporting period. Sincerely,pu'),*,-*\ Dustin Simmonds Vice hesident and Refinery Manager Attachments cc: E. Benson (r) File 2.2.7.2