Loading...
HomeMy WebLinkAboutDAQ-2024-0069811 DAQC-251-24 Site ID 10096 (B5) MEMORANDUM TO: CEM FILE – SUNNYSIDE COGENERATION ASSOCIATES THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Rob Leishman, Environmental Scientist DATE: March 22, 2024 SUBJECT: Source: Unit 1 – Fluidized Bed Combustion Boiler Contact: Rusty Netz – 435-888-4476 ext. 107 Location: 1 Power Plant Road, Sunnyside, Carbon County, UT 84539 Test Contractor: Montrose Air Quality Services FRS ID#: UT00000049000700030 Permit/AO#: Title V operating permit 700030005 dated March 8, 2023 Subject: Review of RA/PST Protocol dated February 16, 2024 On February 28, 2024, DAQ received a protocol for a RA/PST (relative accuracy/performance specification test) of the Sunnyside Unit 1 in East Carbon, UT. Testing will be performed on May 21, 2024, to determine the relative accuracy of the O2, CO2, NOX, SO2, and CO monitoring systems. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses: OK 2. RM 2 used to determine stack gas velocity and volumetric flow rate: OK 3. RM 3A used to determine dry molecular weight of the gas stream: OK 4. RM 4 used to determine moisture content: OK 5. RM 6C used to determine SO2 emissions: OK 6. RM 7E used to determine NOX concentrations of emissions: OK 7. RM 10 used to determine CO concentrations of emissions: OK 8. RM 19 used to determine volumetric flow: OK DEVIATIONS: No deviations were noted. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: Send attached protocol review and test date confirmation notice. 1 8 2 Sun nyside Cogeneration Associates P.O. Box 159 . Sunnyside,Utah 84-539 . (435) 888-4476' Fax(435) 888-2538 February 16,2024 Rob Leishman Division of Air Quality 195 North 1950 West Salt Lake City, Utah 84l16 Re: RATA and CO Test Protocol Title V Permit Number # 700030005 I'TAH DEPAHTMENT OF ETWIRONMENTAL OUAIITY FEB 2 B 2A24 DIVISION OF AIB QUALIT\' flear Mr. Leishman: Included is the Test Protocol for the 2024 rclative accuracy test audit (RATA) and CO compliance testing at SCA, which is scheduled for May 27,2024. Montrose Air Quality Services will be performing the tests again this year. Thc tests to be conducted are the relative accuracy test audits for sulfur dioxide (SO2), nitnogen oxide (NOx), oxygen (O2), Carbon Dioxide (CO2) and volumetric flow. AIso, being tested is carbon monoxide (CO) compliance. If you have any questions or concems regarding the test protocol, please feel free to call Rusty Netz or myself at (435) 8884476. **ru*'AUW Edward McCourt Agent for Sunnyside Cogeneration Associates Rusty Netz Plant File Source Test Plan 2fJ24 Relative Accuracy Test Audits and Compliance Testing Unit EU#1 Sun nyside Cogeneration Associates Sunnyside, Utah Prepared For: Sunnyside Cogeneration Associates 1 Power Plant Road Sunnyside, Utah 84539 Prepared By: Montrose Air Quality Services, LLC 990 West 43rd Avenue Denver, CO 80211 For Submission To: Utah Division of Air Quality 195 North 1950 West Salt Lake City, UT 84116 Document Number: GPO43AS-O25822-PP-810 Proposed Test Date: Vlay 2L, 2(J24 Submittal Date: April 21,2024 UTAH DEPARTMENT OF ENVIRONMENTAL OUAL]TY DIVISION OF AIH QUALITy a D . n,_1, sA@ffi ,* a9r* Dt$. *al I have reviewed, technically and editorialli, details and other appropriate written materials contained herein. I hereby certify that to tfe best of my knowledge the presented material is authentic and accurate and conforms to lthe requirements of the Montrose Quality Management System and ASTM D7O36-O4, Review and Ceftification I certify that, to the best of my knowledgq the information contained in this document is complete and accurate and conforms to thb requirements of the Montrose Quality 2/L5/2O24 Matthew Parks I ritt", eA/ec Anatyst 2/tsl2024 Name:Tim Wojtach Title:Account Manager GP043AS-025822-PP-8 10 Page 2 of 47 Table of Contents Section Pase 1.0 Introduction . ............ 5 1.1 Summary of Test Program .............5 1.2 Applicable Regulations and Emission Limits .........6 1.3 Key Personnel..... ........... B 2.0 Plant and Sampling Location Descriptions........ ...........9 2.1 Process Description, Operation, and Control Equipment..... ............9 2.2 CEMS Description .......9 2.3 Flue Gas Sampling Locations .........10 2.4 Operating Conditions and Process Data. .............10 2.5 Plant Safety...... .............10 2.5.1 Safety Responsibilities...... ...............11 2.5.2 Safety Program and Requirements :......... ............12 3.0 Sampling and Analytical Procedures .........13 3.1 Test Methods..... ............13 3.1.1 EPA Method 2...... .........13 3.1.2 EPA Method 4...... ..........15 3.1.3 EPA Methods 3A, 6C, 7E, and 10 ...... ,......16 3.2 Process Test Methods...... .......18 4.0 Quality Assurance and Repofting...... .....18 4.L QA Audits.. ..........18 4.2 Quality Control Procedures ..........18 4.2.L Equipment Inspection and Maintenance ........ .......18 4.2.2 AuditSamples ..........18 4.3 Data Analysis and Validation ..........19 4.4 Sample Identification and Custody ............19 4.5 Quality Statement .......19 4.6 Repofting .. ... 19 4.6.1 Example Report Format ..........2O 4.6.2 Example Presentation of Test Results........ .......2L List of Appendices Appendix A Supporting Information ...... .......22 Appendix A.1 Units and Abbreviations ............23 Appendix A.2 Accreditation Information/Certifications.... .......31 Appendix "S" Field Work Safety Plan ...........33 =i .,:=..::,:r.1.:::.:::I ::l:::.1::: GP043AS-025822-PP-B 10 List of Tables Table 1-1 Table 1-2 Table 1-3 Table 1-4 Table 1-5 Table 2-1 Table2-2 Table 4-1 Summary of Test Program and Reporting Units and Applicable Summary of Paft 60175 RA Re Summary of Emission Limits.... Test Personnel and Responsibili CEMS Information Sampling Locations Example NOx (lblmmBtu) RAT, B 9 9 10 L4 15 20 roposed Schedule... ...... 5 List of Figures Figure 3-1 EPA Method 2 SamplingTrain. Figure 3-2 EPA Method 4 Sampling Train. Figure 3-3 EPA Methods 34, 6C, 7E, and Figure 4-1 Typical Report Format GP043AS-025822-PP-8 10 Page 4 of 47 1.O Introduction 1.1 Summary of Test Program Sunnyside Cogeneration Associates contracted Montrose Air Quality Services, LLC (Montrose) to perform a testing program at Sunnyside Power Plant located near Sunnyside, Utah. Testing will be conducted in accordance with the testing requirements of Utah Depaftment of Environmental Quality (UDEQ) Operating Permit 700030002 and (as applicable) 40 CFR Parts 60 and 75. The specific objectives are to: . Perform annual Relative Accuracy Test Audits (RATAs) on the Continuous Emission Monitoring Systems (CEMS) installed on Unit EU#1 . Pefform annual carbon monoxide (CO) compliance testing on the exhaust stack of Unit EU#1 . Conduct the test program with a focus on safety Montrose will provide the test personnel and the necessary equipment to measure emissions as outlined in this test plan. Facility personnel will provide the process and production data to be included in the final report. A summary of the test program and proposed schedule is presented in Table 1-1. Table 1-1 Summary of Test Program and Proposed Schedule ::. l.::::::::::::::=:: .il r:;t:;il Lilil .ili l,i.1ii,!,.,4.:i:4::: .::::::::::::= :.::::::::::::=: .:fl :t.-+, ! !.-Actirity/ ." ,, '-'l ' , fo.oi F1"a#gtefifi,,l,,.,,,r,1 i i|i'',fiitllii;",..E#r, tt' s .-';iiB!1,ns,,, Volumetric Flow Rate RATA : EPA 1, 2,3,4 9-72 COz, SOz, NO,, CO RATAs EPA 34, 6C,7E, LO 9-L2 ./a :Pro.p.siE?Testla .i...:?.,', = l-o s6dr&=,: ,,,,-LeU D-uiEg,ign ;];riii $ri$llffiD1,rrll >5 min 21 minst2ltzoz4 Jrlt, . IiSl To simplify this test plan, a list of Units and Abbreviations is included in Appendix A. Throughout this test plan, chemical nomenclature, acronyms, and reporting units are not defined. Please refer to the list for specific details. ttili;:iii:; GP043AS-025822-PP-8 10 Page 5 of 47 L.2 Applicable Regulation and Emission Limits The results from this test program are applicable regulations or requirements. presented in Table 1-2. in units consistent with those listed in the reporting units and emission limits are Table 1-2 Reporting Units and Applicable Unit EU#1 Volumetric Flow Rate , I Unit EU#1 I COz ,. ,,-----, ,,- ,, i ,, t , Unit EU#l ' SOu, NO*, CO wscftr o/ovw ppmvw, lb/mmBtu, lblhr GP043AS-025822-PP-810 Page 6 of 47 The M requirements are presented in Table 1-3. Table 1-3 Summary of Part 60175 RA Requirements Part 6O : ppmvd ;***...*.. -..---*-.**...---.* i tblhr i Part75 j oxygen (oz) ' o/o volume dry dscfh App. B Sect. 2.3.1.2 d v______*___*_ Lll*i_ls"9lj:"1_l Volumetric Flow Annual: < 7.5o/o of RM or + 1.5 fps(l) (1) Alternate is for low flow (RM measurements are < 10.0 fps) (2) Alternate is for low emitter (average SOz or NOx RM concentrations are S 250 ppm, or average NOx RM emissbn rates are s 0.200 lb/MMBtu) GP043AS-025822-PP-8 10 PageT of 47 The applicable permit limits are presented lin Table 1-4. Table 1-4 Summaly of Emission Limits i c3 P! l-I_" 1o;ia _e_ (c-!_) lblmmBtu 700030002 1.3 Key Personnel A list of project pafticipants is included Facility Information Source Location: Sunnyside Project Contact: Role: Company: Telephone: Email: Agency Information Regulatory Agency: Agenry Contact: Telephone: Email: Sunnyside Power 1 Power Plant Sunnyside, UT 845 Rusty Netz Environmental Ad Sunnyside (435) 888-4476 x rusnetz@hotmall Utah Department Rob Leishman (801) 536-4438 RLeishman@utah. tion Associates nt Associates Air Quality Services, LLC Testing Company Information Testing Firm: Montrose Air Quali Contact: Craig Kormylo Title: DistrictManager Telephone: (303)495-3936 Email: CKormylo@ GP043AS-025822-PP-B 10 Page I of 47 r, .:,,i:::::.:= tt :i,J I r:i::l:.:=':l ::.:.:= 1' :' ::::::::=::: ::::::::= vgifi;i;,,,,r Table 1-5 details the roles and responsibilities of the test team. Table 1-5 Test Personnel and Responsibilities ttirrlrrirr,if.rima* iunfi-a9iit1i-uff"tdd*6**1ne fi pjr-u,l;it1tiy,,,i*-l€.l=,".. il,tr-i1i11,,11 Field Project Manager ' Technician Operate mobile lab Execute stack platform responsibilities Facility interface, test ;rew coordination Preparation, support PM 2.O Plant and Sampling Location Descriptions Equipment 2.L Process Description, Operation, and Control The Sunnyside Cogeneration Facility is a steam-electric generating power plant located in Sunnyside, Carbon County, Utah. The plant consists of a circulating fluidized bed (CFB) combustion boiler designated EU #1, an emergency backup diesel-fired Fump, diesel storage tanks, coal handling equipment, ash handling equipment and limestone handling equipment. EU #1 has a rating of 700 mmBtu/hr and is equipped with limestone injection and a baghouse for control of emissions. The EU #1 is fueled by coal refuse from the Sunnyside and Star Point Refuse Piles. The flylbottom ash generated from the coal combustion is disposed of in an on-site landfill or used for beneficial applications. 2.2 CEMS Description The CEMS analyzers are presented in Table 2-1. Table 2-1 CEMS Information i.l,',' ' ilonitor Location Parameter }lonitor lrlake / Irlodel Serial l{umber ,Flow _ :DuragDR2gO -4_L.7243 , SOz EcoChem MC3 425 NO' EcoChem MC3 425 GP043AS-025822-PP-B 10 Page 9 of 47 :+:::::.::::::::::= ";.a,,e i. :ii:, = :"a ..'':.= l.:.,:;; + ::l= = 2.3 Flue Gas Sampling Locations Actual stack measurements, number of traverse points, and location of traverse points will be evaluated in the field as part of the test program. Table 2-2 presents the anticipated stack measurements and traverse points for the sampling locations listed. Table 2-2 Sampling Locations 9tt=+lity,jX|iib,,!$,$.1t r rtC?rert I Disturbance Sampling =.P tiP* i'ii, i Unit EU#1 S.ta€,,,.!! ns.fitrc D,iafiatcf: (l$'Iiii1liri ffi 101" ::::::::: s..lstrgam ',, ,, ;rr. a.'t 808/8 Upstream EPA ,'A"r(in.fdla,] 202/ 2 Flow: 16 Glport) Gas; 12 (3/port) Sample location(s) are verified in the field to conform to EPA Method 1. Acceptable cyclonic flow conditions are confirmed prior to testing using EPA Method 1, Section 11.4. 2.4 Operating Conditions and Process Data Emission tests are performed while the source/units and air pollution control devices are operating at the conditions required by the applicable regulation. The units are tested when operating at greater than 50o/o of rated capacity, as required by 40 CFR Part 60 or within the load levels required by 40 CFR Part 75. Plant personnel are responsible for establishing the test conditions and collecting all applicable unit-operating data. Data collected includes the following parameters: . Unit load (MW) . Relevant CEMS Parameters 2.5 Plant Safety Montrose will comply with all safety requirements at the facility. The facility Client Sponsor, or designated point of contact, is responsible for ensuring routine compliance with plant entry, health, and safety requirements. The Client Sponsor has the authority to impose or waive facility restrictions. The Montrose test team leader has the authority to negotiate any deviations from the facility restrictions with the Client Sponsor. Any deviations must be documented. GP043AS-025822-PP-B 10 Page LO of 47 , ,1: : 2.5.1 Safety Responsibilities Planning . Montrose must complete a field review with the Client Sponsor prior to the project date. The purpose of the review is to develop a scope of work that identifies the conditions, equipment, methods, and physical locations that will be utilized along with any policies or procedures that will affect our work . We must reach an agreement on the proper use of client emergency services and ensure that proper response personnel are available, as needed . The potential for chemical exposure and actions to be taken in case of exposure must be communicated to Montrose. This information must include expected concentrations of the chemicals and the equipment used to identify the substances. . Montrose will provide a list of equipment being brought to the site, if required by the client Project Day . Montrose personnel will arrive with the appropriate training and credentials for the activities they will be performing and the equipment that they will operate . Our team will meet daily to review the Project Scope, Job Hazard Assessment, and Work Permits. The Client Sponsor and Operations Team are invited to participate. . Montrose will provide equipment that can interface with the client utilities previously identified in the planning phase and only work with equipment that our client has made ready and prepared for connection . We will follow client direction regarding driving safety, safe work permitting, staging of equipment, and other crafts or work in the area . As per 40 CFR Part 60 Subpaft A, Section 60.8, the facility must provide the following provisions at each sample location: : Sampling ports, which meet EPA minimum requirements for testing. The caps should be removed or be hand-tight. . Safe sampling platforms . Safe access to the platforms and test ports, including any scaffolding or man lifts Sufficient utilities to perform all necessary testing . Montrose will use the client communication system, as directed, in case of plant or project emergency . Any adverse conditions, unplanned shutdowns or other deviations to the agreed scope and project plan must be reviewed with the Client Sponsor prior ,rrryP;,.Y*4i",7,,,',:':"- ll ll$.ff ',;-:1:ri:::1 i:.r ::= ::::uuut: t:uuuuuu:ut i u::::i GP043AS-025822-PP-B 10 Page LL of 47 i',,i1r11?:;;til .- ]: ::: . riill.i 1.,..,11, to continuing work. This will include any safe work permit and hazard assessment updates. Completion . Montrose personnel will report any process concerns, incidents or near misses to the Client Sponsor prior to leaving the site . Montrose will clean up our work area to the same condition as it was prior to our arrival . We will ensure that all utilities, connection points or equipment have been returned to the pre-project condition or as stated in the safe work permit. In addition, we will walk out the job completion with Operations and the Client Sponsor if required by the facility. 2.5.2 Safety Program and Requirements Montrose has a comprehensive health and safety program that satisfies State and Federal OSHA requirements. The program includes an Illness and Injury Prevention Program, site- specific safety meetings, and training in safety awareness and procedures. The basic elements include: . All regulatory required policies/procedures and training for OSHA, EPA and FMCSA . Medical monitoring, as necessary . Use of Personal Protective Equipment (PPE) and chemical detection equipment . Hazard communication . Pre-test and daily toolbox meetings . Continued evaluation of work and potential hazards . Near-miss and incident reporting procedures as required by Montrose and the Client Montrose will provide standard PPE to employees. The PPE will include but is not limited to; hard hats, safety shoes, glasses with side shields or goggles, hearing protection, hand protections, and fall protection. In addition, our trailers are equipped with four gas detectors to ensure that workspace has no unexpected equipment leaks or other ambient hazards. The detailed Site Safety Plan for this project is attached to this test plan in Appendix "S". GP043AS-025822-PP-B 10 Page 12 of 47 L,,. .l iili 3.O Sampling and Analytical Procedures 3.1 Test Methods The test methods for this test program have been presented in Table 1-1. Additional information regarding specific applications or modifications to standard procedures is presented below. 3.1.1 EPA Method 2, Determination of Gas Velocity and Volumetric Flow Rate (Type S Pitot Tube) EPA Method 2 is used to measure the gas velocity using an S-type pitot tube connected to a pressure measurement device, and to measure the gas temperature using a calibrated thermocouple connected to a thermocouple indicator. Typically, Type S (Stausscheibe) pitot tubes conforming to the geometric speciflcations in the test method are used, along with an inclined manometer. The measurements are made at traverse points specified by EPA Method 1. The molecular weight of the gas stream is determined from independent measurements of Oz, COz, and moisture. The stack gas volumetric flow rate is calculated using the measured average velocity head, the area of the duct at the measurement plane, the measured average temperature, the measured duct static pressure, the molecular weight of the gas stream, and the measured moisture. Pertinent information regarding the performance of the method is presented below: o Method Options: .: S-type pitot tube coefficient is 0.84 . Method Exceptions: c None The typical sampling system is detailed in Figure 3-1. GP043AS-025822-PP-B 10 Page 13 of 47 T US EPA METHOD 2 SAMPLING TRAIN FIGURE 3-1 GPO43AS-025822-PP-81 0 Page !4 of 47 ;:;1! l:: 3.1.2 EPA Method 4 Determination of Moisture Content in Stack Gas EPA Method 4 is a manual, non-isokinetic method used to measure the moisture content of gas streams. Gas is sampled at a constant sampling rate through a probe and impinger train. Moisture is removed using a series of pre-weighed impingers containing methodology- specific liquids and silica gel immersed in an ice water bath. The impingers are weighed after each run to determine the percent moisture. The typical sampling system is detailed in Figure 3-2. Figure 3-2 EPA Method 4 Sampling Train VACUUM+ LINE ADAPTOR trI (tP) 2oo Silca Gel (modtieilnotb) (sladad tip) BY.PASS VALVE(tiredtud) VACUUM GAUGE Page 15 of 47 ilitrrtsL, lijffi r:iF 3.1.3 EPA Methods 3A, 6C, 7E, and 1O Determination of Oxygen, Carbon Dioxide, Sulfur Dioxide, Nitrogen Oxides, and Carbon Monoxide Concentrations in Emissions from Stationary Sources (Instrumental Analyzer Procedures) Concentrations of Oz, COz, SOz, NOx, and CO are measured simultaneously using EPA Methods 3A, 6C, 7E, and 10, which are instrumental test methods. Conditioned gas is sent to a series of analyzers to measure the gaseous emission concentrations. The performance requirements of the method must be met to validate the data. Pertinent information regarding the performance of the method is presented below: . Method Options: , NO and NOz are measured separately and summed to report NOx emissions r., The alternative NOx converter efficiency test described in EPA Method 7E Section 16.2 may be used (bag procedure) :; Gas stratification testing is performed across a grid of 12 points determined using EPA Method 1 in accordance with 40 CFR Part 60, Aooendix B. PS2 68.1.3.2 and 40 CFR Paft 75. Appendix A. 66.5.6.1. Stratification testing is performed for two minutes per traverse point in accordance with 40 CFR Part 75. Appendix A. 66.5.6.1(c). If diluent and pollutant concentrations are within 5o/o of their mean concentrations, subsequent gas RATA testing is performed at a single point in the stack as allowed by 40 CFR Part 60. Appendix B, PS2 68.1.3.2 and 40 CFR Part 75, Appendix A 86.5.6.3(b). If diluent and pollutant concentrations are within 10o/o of their mean concentrations, RATA testing is performed at three points located 0.4 meter, 1.0 meter and 2.0 meters from the stack wall, as required by 40 CFR Part 60. Apoendix B. PS2 68.1.3.2 and 40 CFR Part 75. Aooendix A. 66.5.6.1(a). The typical sampling system is detailed in Figure 3-3. :a:ij:a '-, ::: ::::::=:: ::a:::..=,. ,.,. t GP043AS-025822-PP-810 Page 76 of 47 ri..,, ::.rijil -,, a:.ij:,:::,,.1",:'.: :: ',,;: ' .:::= ':::'.::,,'. . ::,' I :: t 1. ,::: ] ' i.; ; iai,t rfltiiiLli,', ti|ili,,!!4t't : '',,,i ,:-.::.: i:..i1'!' Figure 3-3 EPA Methods 3A, 6C,7E, and 10 Sampling Train r-: HEATED SAMPLE LIN E SIGNAL Exha ud Sarple / C alihration Gas Exhaud BSROTAETER WTH FLflCONTRq r--------------- I-&AYER' ROTSEIERSWffH VAES Exha u$ 5&PlE'AO €Y-PS RO!NETERSWTH CETR*V{ES -----+ti CALIBRATIC,\] i GAS I 'NF 1, .l ,/,2 Calbration Gass CAUERAIIOa{ GASMANIFOLD l- CQ ANALYZER 3.2 Process Test Methods The applicable regulations do not require process samples to be collected during this test program. 4.A Quality Assurance and Reporting 4.L QA Audits Montrose has instituted a rigorous QA/QC program for its air quality testing. Quality assurance audits are performed as part of the test program to ensure that the results are calculated using the highest quality data available. This program ensures that the emissions data we report are as accurate as possible. The procedures included in the cited reference methods are followed during preparation, sampling, calibration, and analysis. Montrose is responsible for preparation, calibration, and cleaning of the sampling apparatus. Montrose will also pefform the sampling, sample recovery, storage, and shipping. Approved contract laboratories may perform some of the preparation and sample analyses, as needed. 4.2 Quality Control Procedures Montrose calibrates and maintains equipment as required by the methods peformed and applicable regulatory guidance. Montrose follows internal procedures to prevent the use of malfunctioning or inoperable equipment in test programs. All equipment is operated by trained personnel. Any incidence of nonconforming work encountered during testing is reported and addressed through the corrective action system. 4.2.t Equipment Inspection and Maintenance Each piece of field equipment that requires calibration is assigned a unique identification number to allow tracking of its calibration history. All field equipment is visually inspected prior to testing and includes pre-test calibration checks as required by the test method or regulatory agency. 4,2.2 Audit Samples When required by the test method and available, Montrose obtains EPA TNI SSAS audit samples from an accredited provider for analysis along with the samples. Currently, the SSAS program has been suspended pending the availability of a second accredited audit sample provider. If the program is reinstated, the audit samples will be ordered. If required as part of the test program, the audit samples are stored, shipped, and analyzed along with the emissions samples collected during the test program. The audit sample results are reported along with the emissions sample results. iriiffsltslllr i lir;:, rt i t1.!Y.lLi.lli,i ?;1: ':.4:aaaaaa:.:a .t ltatt I Page 1B of 47 i,::, :::l+ GP043AS-025822-PP-B 10 4.3 Data Analysis and Validation Montrose convefts the raw field, laboratory, and process data to reporting units consistent with the permit or subpart. Calculations are made using proprietary computer spreadsheets or data acquisition systems. One run of each test method is also verified using a separate example calculation. The example calculations are checked against the spreadsheet results and are included in the final report. The "Standard Conditions" for this project are 29.92 inches of mercury and 68 oF. 4.4 Sample ldentification and Custody No samples are required to be recovered for this test program. 4.5 Quality Statement Montrose is qualified to conduct this test program and has established a quality management system that led to accreditation with ASTM Standard D7036-04 (Standard Practice for Competence of Air Emission Testing Bodies). Montrose participates in annual functional assessments for conformance with D7036-04 which are conducted by the American Association for Laboratory Accreditation (A2LA). All testing performed by Montrose is supervised on site by at least one Qualified Individual (QI) as defined in D7036-04 Section 8.3.2. Data quality objectives for estimating measurement unceftainty within the documented limits in the test methods are met by using approved test protocols for each project as defined in D7036-04 Sections 7.2.1and t2.LO. Additional quality assurance information is included in the appendices. The content of this test plan is modeled after the EPA Emission Measurement Center Guideline Document (GD-042). 4.6 Reporting Montrose will prepare a final repoft to present the test data, calculations/equations, descriptions, and results. Prior to release by Montrose, each report is reviewed and certified by the project manager and their supervisor, or a peer. Source test reports will be submitted to the facility or appropriate regulatory agency (upon customer approval) within 25 days of the completion of the field work. The report will include a series of appendices to present copies of the intermediate calculations and example calculations, raw field data, laboratory analysis data, process data, and equipment calibration data. tffi GP043AS-025822-PP-B 10 Page 19 of 47 i iriii: u!=4, a-ai) -:' ffi 'l!.9.=',,,, li::::::::t::::=, I :i:i.::a::;ir:::::::: tr:]i-j-=.,, ffiiii 4.6.L Example Report Format The repoft is divided into various sections describing the different aspects of the source testing program. Figure 4-1 presents a typical Table of Contents forthe final report. Figure 4-1 Typical Repod Format Cover Page Cedification of Repoft Table of Contents Section 1.0 Introduction 2.O Plant and Sampling Location Descriptions 3.0 Sampling and Analytical Procedures 4.O Test Discussion and Results 5.0 Internal QA/QC Activities Appendices A Field Data and Calculations B Facility CEMS and Process Data C Laboratory Analysis Data D Quality Assurance/Quality Control E Regulatory Information GP043AS-025822-PP-B 10 4.6.2 Example Presentation of Test Results Table 4-1 presents the typical tabular format that is used to summarize the results in the final source test repoft. Separate tables will outline the results for each CEMS parameter/set of units and compare them to their respective RA requirements. Table 4-1 Example NOx (lblmmBtu) RATA Results - Unit Name xx/xx/xxxx xxxx-xxxx i10 :xx/xx/xxxx_i.xxxl(:Ixxx-,--Il *j ."*xI *. XT"_** ..*I ^_;. II* "-i ****'* *r ' *l '"* * - "* i :- '*--11 , xx/xx/xxxx i xxxx-xxxx , xx i xx i xx x xx :: r "" "-i T;i-i*-xx x -ix Ii 12 i "IyIYIYLL-xx)s:xxxI- r:* : , - --*'- ,*--,.-- * i i 1 "" ':_l -t 1*-*,-1 1"":'--*.j t .....-.-.-.-*t 1 I.t 1 t**-a .*, GP043AS-025822-PP-8 10 Page 21 of 47 Ap Supporti ndix A Information Appendix A.1 Units and Abbreviations 6C l*g,s,rsg[,E UNITS AND ABBREVIATIONS @X% 02 corrected to X% oxygen (corrected for dilution air) lCCl absolute value of the confidence coefficient ldl absolute value of the mean differencesoC degrees CelsiusoF degrees FahrenheitoR degrees Rankine " HzO inches of water column 13.6 specific gravity of mercury AH pressure drop across orifice meter, inches H2O AP velocity head of stack gas, inches H2O e total sampling time, minutes pS microgram Pa density of acetone, mg/ml Pw density of water, 0.9982 g/ml or 0.002201 lb/ml acfrn actual cubic feet of gas per minute at stack conditions An cross-sectional area of nozzle,ft' As cross-sectional area of stack, square feet (#) Btu British thermal unit B*. proportion by volume of water vapor in gas stream Ca particulate matter concentration in stack gas, grlacf Cnrg average unadjusted gas concentration, ppmv Coi, measured concentration of calibration gas, ppmv cf or ft3 cubic feetcfm cubic feet per minute Cc"" average gas concentration adjusted for bias, ppmv CM average of initial and final system bias check responses from upscale calibration gas, ppmv cm or mt cubic meters Crtra actual concentration of the upscale calibration gas, ppmv Co average of initial and final system bias check responses from low]evel calibration gas, ppmv Cp pitot tube coefficient C" particulate matter concentration in stack gas, gr/dscf CS calibration span, % or ppmv Cs measured concentration of calibration gas, ppmv Cv manufactured certified concentration of calibration gas, ppmv D drift assessment, % of span dcf dry cubicfeet dcm dry cubic meters Dn diameter of nozzle, inches Ds diameter of stack, inches dscf dry standard cubic feet dscfrn dry standard cubic feet per minute dscm dry standard cubic meters Fd F-factor, dscf/MMBtu of heat input fpm feet per minute fps feet per second ft feet( square feet 9 gram gal gallons gr grains (7000 grains per pound) grldscf grains per dry standard cubic feet hourhr cP043AS-025822-PP-8 10 Page 24 ot 47 60 **.o*N,I+g[,H UNITS AND ABBREVIATIONS I percent of isokinetic samplingin inch k kilo or thousand (metric units, multiply by 103)K kelvin (temperature) K3 conversion factor 0.0154 gr/mg K4 conversion factor 0.002668 ((in. HgXft'))/((mlX'R)) kg kilogram q pitot tube constant (85.49 fUsec) kwscfh thousand wet standard cubic feet per hour I liters lb/hr pounds per hour lb/MMBtu pounds per million Btu lpm liters per minutem meter or milliM thousand (English units) or mega (million, metric units) mt cubic meters ma mass of residue of acetone after evaporation, mg Md molecular weight of stack gas; dry basis, lb/lb-mole meq milliequivalent mg milligram Mg megagram (106 grams) min minute ml or mL milliliter mm millimeterMM million (English units)MMBtu/hr million Btu per hour mn total amount of particulate matter collected, mg mol mole mol. wt. or MW molecular weight Ms molecular weight of stack gas; wet basis, lb/lb-mole MW molecular weight or megawattn number of data points ng nanogram nm nanometer Pu", barometric pressure, inches Hg pg prcogram Ps stack static pressure, inches HrO P. barometric pressure of dry gas meter, inches Hg ppb parts per billionppbv parts per billion, by volumeppbvd parts per billion by volume, dry basisppm parts per millionppmv parts per million, by volumeppmvd parts per million by volume, dry basisppmvw parts per million by volume, wet basis Ps absolute stack gas pressure, inches Hg psi pounds per square inchpsia pounds per square inch absolutepsig pounds per square inch gauge Psto standard absolute pressure, 29.92 inches Hg Q, volumetric flow rate, actual conditions, acfrn Q" volumetric flow rate, standard conditions, scfm Qsta volumetric flow rate, dry standard conditions, dscfm R idealgas constant 21.85 ((in. Hg) (ft3)y(('R) (lbmole)) GP043AS-025822-PP-B 10 Page 25 of 47 60 l*?,x,T+R[,H UNITS AND ABBREVIATIONS SBrna post-run system bias check, o/o of span SBi pre-run system bias check, % ofspan scf standard cubic feet scfrr standard cubic feet per hour scftn standard cubic feet per minute scm standard cubic meters scmh standard cubic meters per hour sec second sf, sq. ft., or ft2 square feet std standard t metric ton (1000 kg) T o.szs t-value T" absolute average ambient temperature, oR (+459.67 for English) Tm absolute average dry gas meter temperature, oR (+459.67 for English) ton ort ton = 2000 pounds tph or tons/hr tons per hour tpy or tons/yr tons per year T" absolute average stack gas meter temperature, oR (+459.67 for English) T.ro absolute temperature at standard onditions V % Vil V" v. Vm(std) vm % % Vwqsto) V*i("ra) Vmgl{d1 W w" Wi.p Wss volt volume of acetone blank, ml volume of acetone used in wash, ml total volume H2O collected in impirqers and silica gel, grams volume of gas sampled through dry gas meter, ftJ volume of gas measured by the dry gas meter, corrected to standard conditions, dscf stack gas volume sampled, acf volume collected at stack conditions through nozAe, acf average stack gas velocity, feet per second volume of water vapor condensed, conected to standard conditions, scf volume of water vapor in gas samfled from impingers, scf volume of water vapor in gas sam$ed from silica gel, scf watt weight of residue in acetone wash, mg total weight of impingers, grams total weight of silica gel, grams dry gas meter calibration factor, dimensionless GP043AS-025822-PP-8 10 Page 26 of 47 60 l1?,NT+g[,E AAS ACDP ACE AD ADL AETB AS ASTM BACT BDL BHP BIF BLS CC CD CE CEM CEMS CERMS CET CFR CGA CHNOS CNCG co coc COMS CPM CPMS CT CTM cTo CVAAS D" DE Dioxins DLL DNCG ECD EIT ELCD EMPC EPA EPRI ES ESP EU FCCU FGD FI FIA FID FPD FPM FTIR FTPB FTRB Furans GC ACRONYMS atom ic absorption spectroscopy air contaminant discharge permit analyzer calibration error, percent of span absolute difference above detection limit Air Emissions Testing Body applicable standard (emission limit) American Society For Testing And Materials best achievable control technology below detection limit brake horsepower boiler and industrial furnace black liquor solids confidence coefficient calibration drift calibration error continuous emissions monitor continuous emissions monitoring system continuous emissions rate monitoring system calibration error test Code of Federal Regulations cylinder gas audit elemental analysis for determination of C, H, N, O, and S content in fuels concentrated non-condensable gas catalytic oxidizer chain of custody continuous opacity monitoring system condensible particulate matter continuous parameter monitoring system combustion turbine conditional test method catalytic thermal oxidizer cold vapor atomic absorption spectroscopy equivalent diameter destruction efficiency polychlorinated dibenzo-p-dioxins (pcdd's) detection level limited dilute non-condensable gas electron capture detector Engineer ln Training electoconductivity detector (hall detector) estimated maximum possible concentration US Environmental Protection Agency Electric Power Research lnstitute emission standard (applicable limit) electrostatic precipitator emission unit fluid catalytic cracking unit fl ue gas desulfurization flame ionization fl ame ionization analyzer fl ame ionization detector fl ame photometric detector fi lterable particulate matter Fourier-transform i nfrared spectroscopy field train proof blank field train recovery blank polychlorinated dibenzofurans (pcdf s) gas chromatography GP043AS-025822-PP-B 10 Page 27 of 47 c4\ **?,N,T*P"[A ACRONYMS GC/MS gas chromatography/mass spectroscopy GFAAS graphite furnace atomic absorption spectroscopy GFC gas filter correlation GHG greenhouse gas HAP hazardous air pollutant HC hydrocarbons HHV higher heating value HPLC high performance liquid chromatography HRGC/HRMS high-resolution gas chromatography/high-resolution mass spectroscopy HRSG heat recovery steam generator lC ion chromatography ICAP inductively-coupled argon plasmography ICPCR ion chromatography with a post-column reactor ICP-MS inductively coupled plasma-mass spectroscopy lR infrared radiation ISO lnternational Standards Organization kW kilowatts LFG landfill gas LHV lower heating value LPG liquified petroleum gas MACT maximum achievable control technology MDI methylene diphyenyl diisocyanate MDL method detection limit MNOC maximum normal operating conditions MRL method reporting limit MS mass spectrometry NA not applicable or not available NCASI National Council For Air And Steam lmprovement NCG non-condensable gases ND not detected NDIR non-dispersive infrared NESHAP National Emissions Standards For Hazardous Air Pollutants NG natural gas NIOSH National lnstitute For Occupational Safety And Health NIST National lnstitute Of Standards And Technology NMC non-methane cutter NMOC non-methane organic compounds NMVOC non-methane volatile organic compounds NPD nitrogen phosphorus detector NSPS New Source Performance Standards OSHA Occupational Safety And Health Administration PAH polycyclic aromatic hydrocarbons PCB polychlorinated biphenyl compounds PCWP plywood and composite wood products PE Professional Engineer PFAS per- and polyfluoroalkyl substances (PFAS) Pl photoionization PID photoionization detector PM particulate matter PMro particulate matter less than 10 microns in aerodynamic diameter PMz.s particulate matter less than 2.5 microns in aerodynamic diameter POM polycyclic organic matter PS performance specification PSD particle size distribution PSEL plant site emission limits PST performance specification test PTE permanent total enclosure PTM performance test method GP043AS-025822-PP-8 10 Page 28 of 47 6c ll?.#,I+gffi ACRONYMS QtuQC quality assurance and quality control Ql Qualified lndividual QSTI Qualified Source Testing lndividualRA relative accuracyRAA relative accuracy auditRACT reasonably available control technologyRATA relative accuracy test auditRCTO rotary concentrator thermal oxidizerRICE stationary reciprocating internal combustion engineRM reference methodRTO regenerative thermal oxidizerSAM sulfuric acid mist SCD sulfur chemiluminescent detectorSCR selective catalytic reduction systemSD standard deviationSemi-VOST semivolatile organic compounds sample trainSRM standard reference materialTAP toxic air pollutant TBD to be determinedTCA thermal conductivity analyzerTCD thermal conductivity detectorTGNENMOC total gaseous non-ethane non-methane organic compoundsTGNMOC total gaseous non-methane organic compoundsTGOC total gaseous organic compoundsTHC total hydrocarbonsTIC tentatively identified compoundTO thermal oxidizerTO toxic organic (as in EPA Method TO-15)TPM total particulate matterTSP total suspended particulate matterTTE temporary total enclosureULSD ultra]ow sulfur dieselUV ultraviolet radiation rangeVE visible emissions VOC volatile organic compoundsVOST volatile organic sample trainWC water column ! /WTP waste water treatment plant GP043AS-025822-PP-B 10 Page 29 of 47 66 S?,N,Iqgp.A AS silver As arsenic Ba barium Be beryllium C carbon Cd cadmium CdS cadmium sulfide CH2O formaldehyde CH3CHO acetaldehyde CH3OH methanol CHo methane C2H4O ethylene oxide CzHu ethane CaH4O acrolein CaH6O propionaldehyde C.Hu propane C6H5OH phenol Cl, chlorine ClO2 chlorine dioxide CO carbon monoxide Co cobalt CO, carbon dioxide Cr chromium Cu copper EtO ethylene oxide EtOH ethyl alcohol (ethanol) H2 hydrogen HrO water HzO, hydrogen peroxide HrS hydrogen sulfide H2SO4 sulfuric acid HCI hydrogen chloride Hg mercury IPA isopropyl alcohol MDI methylene diphyenyl diisocyanate MeCl2 methylene chloride MEK methyl ethyl ketone MeOH methanol Mn manganese N2 nitrogen NH: ammonia Ni nickel NO nitric oxide NOz nitrogen dioxide NO, nitrogen oxides 02 orygen P phosphorus Pb lead PCDD polychlorinated dibenzo-p-dioxins PCDF polychlorinateddibenzofurans Sb antimony GHEMICAL NOMENCLATURE Se selenium SO, sulfur dioxide SOe sulfur trioxide SO, sulfur oxides TCDD tetrachlorodibenzodioxinTCDF tetrachlorodibenzofuran TGOC total gaseous organic concentration THC total hydrocarbons Tl thallium TRS total reduced sulfur compounds Zn zinc GP043AS-025822-PP-B 10 Page 30 of47 Appendix A.2 Accred itation Information /Certifications i:?a44"laa lr:: ,;'. w s $ Accredited Air Emission, Testing Body A2LA hos occredited MONTROSE AIR QUALITY SERVICES ln recognilion of lhe successful completion of the joinl A2LA ond Siock Tesiing Accreditoiion Council (STAC) evoluotion process, this loboroiory is occredited to perform tesiing octivities in complionce with ASTM D7036:2004 - Stondord Proctice for Competence of Air Emission Testing Bodies. Vice Presidenl, Accreditoiion Services For the Accreditotion Council Certificote Number 3925.01 Volid to Februory 29,2024 GP043AS-025822-PP-8 10 PresenteQ ihis 4th doy ol Februory 2022. laEe 32 ot 47 Appendix r\S" Field Work Safety Plan r*lu, Bru*, WWM@ A WrWY; I BFY1W \ I &et}ru:m=ffiruffi nIil {}fi}"eE"}TY \*-Ee\/r( H\i!r r. \qj./rs* SITE SAFETIY PLAN BOOKLET Project: Customer: Location: Units: Client Project Revision Date: January 21,2022 GP043AS-025822-PP-810 Page 34 of 47 ffi, Page 1 of2 Site Safety Plan and JHA Purpose and Instructions Purpose Employee safety is the top priority of Montrose Environmental Group. All employees must be trained to assess and mitigate hazards. The District Manager and Project Manager are responsible to ensure all hazards have been properly identified and managed. All employees have Stop Work Authority in all situations where an employee feels they or their co-worker cannot perform a job safely or if there is a task for which they have not been adequately trained. The Site Safety Plan (SSP) has been developed to help assist Montrose test crews with identifying physical and health hazards and determining how the hazards will be managed. Additionally, the SSP will help each crew manage the safety of the employees by providing emergency procedures and information. The booklet contains a several safety forms that may be required in the field. Instructions The SSP consists of the following: 1. A Pre-Mobilization Test Plan - To be completed in it's entirety by the client project Manager prior to the test. 2. A Job Hazard Analysis is a standardized, two-page, fillable form that is used to evaluated the tasl</site's particular hazards and controls. The form also includes a daily toolbox topic and daily hazard review with sign off by the team. The client Project Manager is responsible to complete the JHA form through section 8. Upon arrival at the test site, the team will review the form for accuracy, making any corrections required and complete the remainder of the JHA. Section 9 will require at least three tasks, hazards and controls be identified for the project. Each team member has the option to discuss making changes or adding to the JHA and must sign on the Job Hazard Analysis form in agreement and sign in Section 10. The JHA is to be modified when conditions change. A toolbox meeting with a daily topic in addition to a review of the hazard analysis is required daily for the duration of the test. An additional sheet of paper with the toolbox topic and signatures can be added to the SSP packet. 3. Hazard Control Matrix - contains useful information on both engineering and administrative controls that a crew can use to reduce or eliminate the hazards they have observed plus applicable PPE that may be required. 4. Emergency Action Plan - The Job Supervisor/ Client Project Manager (CPM) will complete the Emergency Action Plan form and ensure that all employees are familiar with the facility emergency and evacuation procedures, assembly/ rally points, alert systems, and signals prior to work commencing. tn the event of an emergency situation/ evacuation, the Job Supervisor/ CPM will maintain a roster and be responsible for accounting for all employees. The Job Supervisor/ CPM will ensure that this Emergency Action Plan Form is completed, communicated to all employees, signed, and posted. 5. Additional Forms, as applicable a. MEWP Lift lnspection Form b. Heat Stress Prevention Form Based on Heat lndex c. Extended Hours Form AQS-FRM-1.13R1 Page 35 of 47GP043AS-025822-PP-810 Page2ot2 AQS-FRM-1.13R1 Page 36 of47 Purpose and lnstructions ger should continually update their SSPs as hazards are presented. the Test Plan in the office for a period of 3 for the Site Safety Plans. L ,1.,o J,N' if [rew a llvitn >l$Red {#.'5 ffi1tP,'I"4'H}.fi Site Safety Plan and J The SSP is a living document. The Projeet I new information and conditions change or il Each completed SSP should be maintained years. There will be an audit process devel GP043AS-025822-PP-81 0 , \! 1 1-. t \ i ffi' Page 1 of 2 PRE.MOBILIZATION TEST INFORMATION SgglggJype! New Source: _ Revisit: _ Prj#lDate/Tech: Coal Fired Electric Utility: _ Ethanol Plant: _ Chemical Mfg. of CemenVlime Kiln Plant: _ Specialty Mfg. of:Other: Anticipated Effluent Composition - check all that apply and fill in expected concentration in ppmlYo tr NOx lf other, explain: Flammable:Toxic: Corrosive: Dust: Engineering Controls to be lmplemented: tr co tr other tr VOC tr SOz PROJECT NAM E/LOCATION : TEST DATE: PROJECT #: PROJECT MANAGER: TEST SCOPE: SITE CONTACT: Name:Contact Phone: Additional Safety Equipment Required: Personal gas monitors: _ Respiratory Protection : Half Face_ Full Face_ HEPA Filters_ Supplied Air: _ (Safety Dept. Approval) Approximate Flue Gas Temperatures, (F) below 2'10 210 to 450 450 to 950 above 950 other lf other, explain: Approximate Duct Pressure, (iwg): tr above lf other, n tr below explain: _ trtr -3 -3 to +3 +3 to +7 tr +7 other AQS-FRM-1.17 GP043AS-025822-PP-810 Page 37 of 47 tr below 6 lf other, explain: trtr 6 to 50 50 to 100 tr 100 other 6',, iv'ti"JJ\ i iq$"i.}ll Page 2 of 2 PRE.MOBILIZATION TEST INFORMATION Sampling Location: Stack Port _ Duct Port _ Approximate Sampling Platform Height, (ft) tr above Access and Protection: Elevators: _ Ladders: _ MEWP Lift: _ Scaffold: _ Equipment Hoist: -Guardrails: _ Toe plate: _ Engineered Tie Off Points: _ Heat Shield: _ Other: Describe how equipment will be mobilized to the sampling location: Additional lnformation: Effluent Chemical Requlatorv Limits Gas Name Ghemical Formula Cal OSHA FELI (ppm) Cal OSHA STEL2 (onml NIOSH REL TWA3 (ppm) Cal OSHA Geiling Innml IDLHl (ppm) Carbon Monoxide CO 25 200 35 200 1,200 Nitric Oxide NO*25 ND5 25 ND 100 Sulfur Dioxide SOz 2 5 2 ND 100 Hvdroqen Chloride HCI 0.3 2 ND 2 50 Hydrogen Sulfide HzS 10 15 10 (10 min.)c 50 100 ?alifomia Occupational Safety and Health Administration (OSHA) Pemissible Exposure Limit (PEL) based on an 8-hour shift; 2: Cal OSHA Short-term Exposure Linit (STEL) based on a 15-minute peiod; 3: National lnstitute for Occupational Safety and Heafth (NIOSH) Recommended Exposure Limit (REL) Time-weighted Average (TWA) based on an 8-hour shift; 4: lmmediately Dangerous to Life or Heafth (IDLH); 5: Not Defined (ND); C: Ceiling Limit - Maximum allowable human exposure limit for an airbome or gaseous substarrce, which is not to be exceeded, even momentaily. Prepared by: Reviewed by: Date: Date: AQS-FRM-1.17 GP043AS-025822-PP-810 Page 38 of 47 3lient Contact Name Date Facility SSP Writer PM llient Rep I Job Preparation [ .too Site walk Through Completed tr f] Sate Work Permit Received from Client I Site Specific Training Complete lf the heat index is expected to be above 91', fill out the Heat Stress Prevention Form. Job Hazard Analysis 1of3 c:r:4 1. 2. 3. 4. Risk fl fime Pressure E Remote Work Location f] > 12 hr shift fl wo*ing > 8 consecutive days E u"f of procedures E Exrerne temps, wind >3omph E Personal illnesslfatigue EJ Vague work guidance E Monotonous Ac*ivity El f irst day back after time off E t tuttipp joo locations fl Other: acility lnformation/Emergency Preparedness lf non-emergency medical attention is needed, call: AXIOM #: 877-502-9466 Plant Emergency # Certified First Aid Person: EMS Location Evacuation Routes Rally Point Severe Weather Shelter Location Eye Wash & Safety Shower Location Operational: EJYes INo lnformation: (list type): Stack Gas Temp. (oF) Stack Gas Press. ("HrO) Stack Gas Components: Stack Gas lnhalation Potential? EYes E t'to tf ves. see List of Hazard Chemicats. Hazards Dust Hazards Thermal Burn Electrical Hazards lnadequate Lighting Slip and Trip Hand Proteciion Secondary Permits Working from Heights See also Sect 7 Electrical Lifting Respiratory See also Sect. 8 Hazards for Consideration Hazard Controls I Dust Mask ! Goggles E Other: [] HotGloves EHeatShields " EOtherProtediveClothing: E Connections Protected from Elements ! External GFCI E Other: E Xe nating Requirement E lntrinsically Safe Requirement E lnstall Temporary Lighting I Headlamps ! Housekeeping E Barricade Area E Other: E Cut Resistant Gloves E pincn pts. E O"n"t E other: E Hot Work E Confined Space E Excavation f] fatting objeas D Fall protection E Drop zone protection I ehtform load ratings I ScatfotO inspection E Ladder inspecfion f] Barricades for equipment ! Exposed wire/connector E Verify equipment groundinS E Arc Flash fl Crane lift plan I Rigging inspection E fag lines used f] Hoists in place E Unexpected exposure E Chemical E Dust (combustible) f] PEL provided E Cartridqes or supplied air available L] Gas detection equipment 5.RequiredPPE EHardHats !safetyGlasses lsafetyToeShoe/Boot IHearingProtection flsafetySpotter E Hi-Vis Vests E Harness/Lanyard* E Goggles ! Personal Monitor Type: E Metatarsal Guards E Hot Gloves E Face Shield E Respirator Type: E Nomex/FRC E Other PPE: AQS-FRM-1.18 Page 39 of 47GP043AS-025822-PP-B 10 .; , , . Additional Work Place Hazards Job Hazard Analysis 2of3 Critical Procedures - check all that apply - *indicates additional form must be completed or collected from client E Heat Stress Prevention" E Confined Space" El MEWP- E Roof Work E Scattotd ECotOWeatherWork IHazardousEnergyControf EExposureMonitoring EOther: Working From Heights Fall protection jI f*eO Guardrails/Toe boards E fatt Prevention PPE Warning Line System Falling Objects protection i E aarricaOing tr Netting E House Keeping fl Tethered Tools Elcatctr Blanket or Tarp Fall Hazard Communicatio. i trl AdjacenUOverhead Workers E Contractor Contact El Client Contact : 8. AQS-FRM-1.18 Page 40 of 47 Other Considerations Environmental Hazards - Weather Forecast E HeaUCold ELigntning I Rain E Snow E lce ! Tornado f] Wind Speed Steps for Mitigation: Electrical Safety Planning PlantHookup: Ettov rl22ot24ov E aaov E cenerator EHardwiredintopanel Electrical Classified Area: llYes E No Trailer Grounded: E yes ! tlo Plug Type Electrical Hook Up Responsibility: List of Hazardous Chemicals El Acetone ! ruitric ncio I Hydrogen Peroxide E compressed Gases E Hexane flSufuric Acid tr] lsopropyl Alcohol I Fhmmable Gas E Toluene E Hydrochloric Acid fJ Liquio Nitrogen f] Non-Flammable Gas E Hzs E carbon Monoxide Steps for Mitigation: Wldlife/Fauna in Area I Poison lvy ! Poison oak Elnsects:IWildlife: Personnel w/ known allergies to bees stings or other allergensZ ! Yes E r.lo Observed Hazards and Mitigation Steps 1 2 3 I 2 3 1 2 3 1 2 3 GP043AS-025822-PP-810 Job Hazard Analysis 3 of 3 JHA REVIEW: Crew Names & Signatures Printed Name Sionature Date Printed Name Siqnature Date 11 JHA Meetinq & Review Items to review: o Change in conditions o Extended work hours o Daily Safety Topic r New workers or contractors o Occurrence of near misses or injuries lnitialing demonstrates that site conditions and hazards have not changed from the original SSP. lf changes did occur, make the necessary updates to this JHA and add notes as applicable in Section 9. Day Discussion Topic lnitials 2 3 4 5 6 7 I 9 10 11 AOS-FRM-1.18 Page 4L of 47GP043AS-025822-PP-8 10 Page 1 of 2 EMERGENCY ACTION PLAN FORM The Job Supervisor/ Client Project Manager (CPM) will ensure that all employees are familiar with the facility emergency and evacuation procedures, assembly/ rally points, alert systems, and signals prbr to work commencing. ln the event of an emergency situation/ evacuation, the Job Supervisor/ CPM wilt maintain a roster and be responsible for accounting for all employees. The Job Supewisor/ CPM will ensure that this Emergency Action Plan Form is completed, communicated to all employees, and posted. .Mou must follow the client's emergency action plan first and notify your Supervisor immediately. .lf incident is life threatening, CAIL 91'l IMMEDIATELLY .[i non-emergency medical aftention is needed, call AXIOM Medical number: 877-502-9466. AQS-FRM-1.11 GP043AS-025822-PP-B 10 1 [/lEG Job Supervisor/ GPM's Name: 2 MEG Job Supervisor/ CPM's Telephone Number: 3 MEG Job Safety Supervisor (if applicable): 4 MEG Job Safety Supervisor's Telephone Number: 5 Plant's Emergency Telephone Number: 6 Local Hospital/ Clinic Telephone Number: 7 Emergency Ops Radio Channel: I Plant's #1 Contact Person's Name: 9 Plant's #1 Contact Person's Telephone Number: 10 Plant's #2 Gontact Person's Name: 11 Plant's #2 Contact Person's Telephone Number: 12 Designated Assembly Point Location: 13 Evacuation Routes: 14 Severe Weather Shelter Location: 15 Eye Wash and Safety Shower Location: 16 The First Aid Kit is Located: 17 The Fire Extinguisher is Located: Page 42 of 47 Page 2 of 2 EMERGENCY EVACUATION AND ASSEMBLY MAP 1 Facility Name: 2 Facility Alarm (Circle):YES or NO 3 Alarm Tones: VTCAL/ GAS:. .TER.IN-PLACE: ; 4 Designated Shelter(s) Description: 5 Designated Assembly Point(s) Description: N *J\uY s EMERGENCY ACTION PLAN FORM AND EVACUATION ASSEMBLY MAP REVIEW: Crew Names and Signatures Printed Name:Siqnature:Date:Printed Ndme:Signature: Date: AQS-FRM-1.11 GP043AS-025822-PP-810 Page 43 of 47 Page 1 of 1 Daily MEWP Lift lnspection Form All checks must be completed prior to each work shift, before operation of the MEWP lift. This checklist must be used atthe beginning of each shift or following 6 to 8 hours of use. MEWP Lift Model #:Serial Number: Make:Rented or Owned: . Check "Yes' if an item is adequate, operational, and safe. . Check "No" to indicate that a repair or other corrective action is required prior to use. . Check "N/A" to indicate "Not Applicable." Items to be lnspected 1. All MEWP lift components are in working condition (i.e. no loose or missing parts, torn or loose hoses, etc.) - if something can be easily loosened by hand then it is not sufficient. 2. Hydraulic fluid level is sufficient, with the platform fully lowered 3. Hydraulic system pressure (see manufacturer specs) is acceptable. lf the pressure is low, determine cause and repair in accordance with accepted procedures as outlined in service manual. 4. Tires and wheel lug nuts (for tightness) 5. Hoses and cables (i.e. worn areas or chafing) 6. Platform rails and safety gate (no damage present) 7. Pivot pins secure 8. Welds are not cracked and structural members are not bent or broken 9. Warning and instructional labels are legible and secure, and load capacity is clearly marked. '10. Manufacturer's lnstruction Manual is present inside the bucket 11. Base controls (switches and push buttons) can be properly operated '12. Platform conditions are safe (i.e. not slippery) 13. Fire extinguisher is present, mounted and fully charged, located inside the bucket 14. Headlights, safety strobe light and back-up alarm are functional '15. Workplace is free of hazards (overhead powerlines, obstructions, level surface, high winds, etc.) *Do not operate if winds are 20 mph, unless otherwise specified by manufacturer recommendations. Yes u tr n tr tr tr n tr tr tr tr u tr tr ! trtr No N/A trD trtr trtr trtr !n trn trtr trn !tr trtr Dtr utr trtr !! Operator Name & Signature Location Date Ground Control Name & Signature Location Date Harness lnspections: Printed Name Signature Date Printed Name Signature Date Printed Name GP043AS-025822-PP-8 10 Date AQS-FRM-1.16 Page 44 of 47 Signature a^'I A- ,1 !{f,t1u & i\tl.xtb&.Page 1 of 't Extended Hours Safety Audit Project Number:Date:Time: When a project is expected to extend past a 14-hour work day, this form must be completed to evaluate the condition of the crew, and the safety of the work environment. Permission to proceed into extended work hours must come from a District Manager (DM) or RegionalVice President (RVP). Technical RVPs can authorize moving forward, if they are in the field or if they are managing the project. 1. Hold test crew meetinq Test crew initials: . Temperature and weather . Hoisting. Lighting . PPE (i.e. respirators, etc.). Working from Heights . Pollutant concentration in ambient air (SOz, HzS, ect.) Notifv DM or RVP The PM must contact either the DM or RVP to discuss the safety issues that may arise due to the extended work period. lf the DM is the acting PM on the job site, they must contact the RVP. During this time, they can come to an agreement on how to proceed. ltemsto discuss include: a a I a Reason for extended hours Reason for delay Production limitations lmpending Weather Contact the client The PM, DM or RVP must discuss with client any identified safety concerns, the client's needs and mutually agree on how to proceed. Discussion should also include the appropriate rest period needed before the next day's work shift can begin. The DM and/or a RVP must be informed on the finaldecision. FinalOutcome: Approver: 3. OOlAS-SAFETY-FM.3 Page 45 of 47 The test leader should look for signs of the following in their crews: . lrritabilityr Lack of motivation. Headaches. Giddiness r Fatigue. Depression. Reduced alertness, lack of concentration and memory The test leader should assess the environmental and hazardous concerns: GP043AS-025822-PP-810 {t'a 1. 2. Page 1 of 1 Heat Stress Prevention Form This form is to be used when the Expected Heat lndex is above 91' F, and is to be kept with project documentation. Proiect Manaoer (PM):Expected Hiqh Temp: Date(s):Expected Heat !ndex: Revlew the signs of Heat Exhaustion and Heat Stroke lf Heat lndex is above 91" F:. Provide cold water and/or sports drinks to allfield staff (avoid caffeinated drinks and energy drinks which can increase core temperature). o Bring no less than one gallon of water per employee . lf employee(s) are dehydrated, on blood pressure medication or not acclimated to heat, ensure they are aware of the heightened risk for heat illness . Provide cool head bands/vests/etc.. Have ice available to employees. lmplement work shift rotations and breaks, particularly for employees working in direct sunlight.. Provide as much shade at the jobsite as possible, including tarps, tents or other acceptable temporary structures.. PM should interview each field staff periodically to evaluate for signs of heat illness lf Heat lndex is above 103" F:. Employees must stop for drinks and breaks every hour (about 4 cups/hour). Employees are not permitted to work alone for more than one hour at a time without a break offering shade and drinks. Employees should wear cool bands and vests if working outside more than one hour at a time. PM should interview each field staff every 2 hours to evaluate for signs of heat illness 3. OOlAS-SAFETY-FM-5 Page 46 of 47GP043AS-025822-PP-B 10 .Jtrl. This is the Last Page of This Document If you have any questions, please contact one of the following individuals by email or phone. Name: Craig Kormylo Title: District Manager Region: USA - Stack - Great Plains - Operations Email : CKormylo@montrose-env.com Phone: (303) 495-3936 Name: Glen Capra Title: Vice President Region: USA - Stack Email : GCapra@montrose-env.com Phone: (512) 772-6450 I'TAH DEPARTMENT OF E}WIRONMENTAL OUALJTY FEB 28 2024 DIVISION OF AIH QUALITV GP043AS-025822-PP-8 10 Page 47 of 47