HomeMy WebLinkAboutDAQ-2024-0069831 DAQC-257-24 Site ID 10238 (B5) MEMORANDUM TO: CEM FILE – PACIFICORP – Huntington Plant THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Rob Leishman, Environmental Scientist DATE: March 14, 2024 SUBJECT: Source: Huntington Power Plant Units 1 and 2 Contact: Russ Wilson – 435-687-4331 Terry Guthrie – 435-687-4334 Location: Huntington Canyon, Emery County, UT Test Contractor: Montrose Air Quality Services, LLC FRS ID#: UT00000049001501001 Permit/AO#: Title V operating permit #1501001005, dated January 22, 2020 Last revised August 26, 2021 Subject: Review of RA/PST Protocol dated February 20, 2024 On February 26, 2024, DAQ received a protocol for a RA/PST (relative accuracy/performance specification test) of the Pacificorp Huntington Plant Units 1 and 2 in Huntington, UT. Testing will be performed on April 9th and 10th, 2024, to determine the relative accuracy of the O2, CO2, NOX, SO2, and CO monitoring systems. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses: OK 2. RM 2G/H used to determine stack gas velocity and volumetric flow rate: OK 3. RM 3A used to determine dry molecular weight of the gas stream: OK 4. RM 4 used to determine moisture content: OK 5. RM 6C used to determine SO2 emissions: OK 6. RM 7E used to determine NOX concentrations of emissions: OK 7. RM 10 used to determine CO concentrations of emissions: OK 8. RM 19 used to determine volumetric flow: OK DEVIATIONS: No deviations were noted. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: Send attached protocol review and test date confirmation notice. 1 8 2 YrisJngo,s"P Huntlngton Power Plant 6 miles west of Huntinglon, Wah on Hwy. 31 P.O. tux680 Huntirytorl Utan AISZA urAH DEPARTMENT oF ENVIRONMENTAL OUAIJTY February 20,2Il,24 f [b , L Mr. Bryce Bird, Dlrec{or State of UhhDlvisionofAirQuality DIVISION OF AIR QUALIT\,Department of Environmental Quallty 195 North 1950 West Salt Lake City, Utah U11+482O Attn: Rob Leishman Re: Notlflcation of the Annua! Quallty Assurancc Retatlve Accuracy Teot Audlt on the Gontlnuous Emhslon tonltorlng Systerns at PactflGorp's Huntlngfion plant Un]ts I and 2 Dear Mr. Bird: Please be informed, the Huntington plant ls scheduling the annual quallty assurance Relatfue Accuracy Test Attdits (RATA) on the Continuous Emlssion Monitoring Systems (dEMS) on units 1 and Z. Th; testlng is scheduled to begin April 9, 2024. Testing willfollowihe scheduli listed-below. Huntlngton UnlE I & 2 RATATettng Schedute - Ap:ll2024 Unlt Date Tlme Test Load Target (ilWg) Load Rangc (tlwg) Load Separatlon (rw) 1 41912024 07:00{0:00 Lout/Mid Load Flor RATA 191 80-212 TI/A 09:00-09:30 Raise to Hlgh Load 09:30-10:30 Stmtlffcation Test .168 3//-!520 lrl/A 10:3G18:fl)High Load Gas/Flow RATA 488 3//-{520 110 2 u10t2024 07:0G09:00 Lor/Mid Load Flow RATA 188 80-209 N/A 09:fi){O:30 Raise to High Load 09:30-10:30 Stratification Test 459 338€10 N/A 10:3G18:00 High Load Gas/Flo,v RATA 459 348-510 108 Note: Tlme arc apprcxlmate and subJcc{ to change. Enclosed for your review is the testlng protocol that will be followed by the stack testing t6am, i[ontros€ Air Quality Servlces. S.hould yorfrave any questions regarding this testing schedule, please contac,t Terry Guthrle, Hunter andHuntington Plant Environmentral Manager at (435) Oe7-4334 or niyself at (4gS)fiT4211. ri Hunk and HunUngton Plent Marnglng Dlre6r Rsoporuible Oficlal Endosurec - Sourco Tect Plan, An24 Rddve Amracy Teet Audfir, Unlt I and Z, paolfiCorp HuntrgbnPoircr Plant oc: Yqrn Joun Kfn - EPA Rsglon Vlll Tom Wrcomb - ErMmnmentd Serylcoe - 210 NTO Teny G-uffi -Hunbr andHunfipton plart Envlrmmenh! Managpr Rngs Wlbon - Huntingbn Plant Fles il l Source Test Plan 2024 Relative Accuracy Test Audits Unit 1 and Unit 2 PacifiCorp Huntington Power Plant Huntington, Utah Prepared For: PacifiCorp L4O7 W North Temple, Suite 210 Salt Lake City, Utah 84116 Prepared By: Montrose Air Quali$ Services, LLC 990 West 43rd Avenue Denver, CO 80211 For Submission To: Utah Division of Air Quality 195 North 1950 West Salt Lake City, UT 84116 Document Number: GPO43AS-O36878-PP-AO7 Proposed Test Dates: April 9 - 10, 2024 Submittal Date: May 25t 2024 MUN IRU5Lffr\ [inH OTPARTMENT OF ENVIRONMENTAL OUALITY FEB 26 2tlll DI\/ISION OF AIR OUALITY r,; l Review and Ceftification I certify that, to the best of my knowledge, the information contained in this document is complete and accurate and conforms to the requirements of the Montrose Quality Management System and ASTM D7036-04. 2lt2l2o24 Tltle: eA/eC Analyst I have reviewed, technically and editorially, details and other appropriate written materlals contained herein. I hereby ceftify that to the best of my knowledge the presented material is authentic and accurate and conforms to the requlrements of the Montrose Quality Management System and ASTM D7036-04. Slgnature: Name: Name:Tim Wojtach Date: Title: 21L212024 -7./'/1 sisnature - . .-,/7 1?4 'r' Date:/.- :_. _ \ / "__ ,/. Account Manager G P043AS-036878-PP-807 Page 2 of 47 Table of Contents Section Paqe 1.0 Introduction........ .......... 5 1.1 Summary of Test Program ...........,........ 5 7,2 Applicable Regulations and Emission Limits .....,. 6 1.3 Key Personnel........... ........... 8 2.0 Plant and Sampling Location Descriptions............., .................. 9 2,L Process Description, Operation, and Control Equipment ............. ....... 9 2.2 CEMS Description ...........9 2.3 Flue Gas Sampling Locations ................10 2.4 Operatlng Conditions and Process Data....... .....10 2.5 Plant Safety .............,....10 2.5.1 Safety Responsibilities..... ....................11 2.5.2 Safety Program and Requirements .........12 3.0 Sampling and Analytical Procedures ........13 3,1 Test Methods........... ....................13 3.1.1 EPA Method 2G .......... .........13 3.1.2 EPA Method 4............. .........15 3.1.3 EPA Methods 3A, 6C, 7E, and 10 ........... ................16 3.2 Process Test Methods............ ........18 4.0 Quality Assurance and Reporting..... ......,18 4.t QA Audits.. .........18 4.2 Quality Control Procedures ............18 4.2.1 Equipment Inspection and Maintenance............. ...................18 4.2.2 Audit Samples .........18 4.3 Data Analysis and Validation ...........19 4.4 Sample Identificatlon and Custody .................19 4.5 Quality Statement ...........19 4.6 Reportlng ..........'...... .....19 4.6.1 Example Report Format .........20 4.6.2 Example Presentatlon of Test Resu|ts.............. ,......2L List of Appendices Appendix A Supporting Information ......... ...................22 Appendix A.1 Units and Abbrevlations ....................23 Appendix A.2 Accreditation Information/Certifications ........... .................31 Appendix "S" Field Work Safety P1an......... ..................33 GP043AS-036878-PP-807 Page 3 of 47 List of Tables Table 1-1 Summary of Test Program and Proposed Schedule... ....... 5 Table 1-2 Reporting Units and Applicable Standards........... .,.........6 Table 1-3 Summary of Part 60175 RA Requirements....... .,....7 Table 1-4 Test Personnel and Responsibllltles.... ...........8 Table 2-1 CEMS Information............. ........... 9 Table 2-2 Sampling Locations............ .........10 Table 4-1 Example NOx (lb/mmBtu) RATA Results - Unit Name .....2L List of Figures Figure 3-2 EPA Method 4 Sampling Train........ .............15 Figure 3-3 EPA Methods 3A, 6C, 7E, and 10 Sampling Train ..........t7 Figure 4-1 Typlcal Repoft Format ....,..........20 GP043AS-036878-PP-807 Page 4 of 47 X ,1 Surmrinary of lest FroS;F arffi PacifiCorp contracted Montrose Air Quality Services, LLC (Montrose) to perform a RATA program at Huntington Power Plant located near Huntington, Utah. Testing will be conducted in accordance with the testing requirements of Utah Department of Environmental Quality (UDEQ) Operating Permit 1501001004 and (as applicable) 40 CFR Parts 60 and 75. The specific objectives are to: . Pefform annual Relative Accuracy Test Audits (RATAs) on the Continuous Emission Monitoring Systems (CEMS) installed on Units I and 2 . Conduct the test program with a focus on safety Montrose will provide the test personnel and the necessary equipment to measure emissions as outlined in this test plan. Facility personnel will provide the process and production data to be included in the final report. A summary of the test program and proposed schedule is presented in Table 1-1. Table 1-1 Summary of Test Program and Proposed Schedule Propocod Load Acttvlty/i;;i;;t sourcc , lsval leioirn l.r,, ilo. ol i PoFtSonTgtllGthoda iRunr'" ! (fil0rrtGr, >5 min >5 min 21 min >5 min >5 min 21 min Low/Midx Volumetric Flow Rate RATA EPA 1, 2GlH,3, 4 9-724/9/2024 Unit 1 High Volumetric Flow Rate RATA EPA 1, 2G1H,3,4 9-72High COz, SOz, NOx, CO RATAs EPA 34, 6C,7E, L0 9-L2 Low/Mid* Volumetric Flow Rate MTA EPA 1, zG/H,3, 4 9-L24lt0/2024 Unit 2 High Volumetric Flow Rate RATA EPA 1, 2G/H,3, 4 g-Lz High COz, SOz, NO,, CO MTAs EPA 3A, 6C,7E, L0 9-L2 *Load levels for the flow RATAs will be determined based on a load analysis that will be run a few weeks before the RATA as required by 40 CFR 75 App F 62.3.1.3(3). To simplify this test plan, a list of Units and Abbreviations is included in Appendix A. Throughout this test plan, chemical nomenclature, acronyms, and reporting units are not defined. Please refer to the list for specific details. G P043AS-03687 I -PP -807 Page 5 of 47 t- I L.2 Applicable Regulations and Emission Limits The results from this test program are presented in units conslstent wlth those llsted ln the applicable regulations or requirements. The reportlng unlts and emlssion limits are presented in Table 1-2. Table 1-2 Rcportlng Unltr and Appllcablc Standardc SOz, NOx, CO GPO43AS-036878-PP-807 Page 6 of 47 i l The RA requirements are presented in Table 1-3. Tablc 1-3 c) Altemate ls for low flow (RM measul€ments are < 10.0 fps) (2) Alternate is for low emltter (average SOe or NOx RM concentratlons are s 250 ppm, or average NOx RM emission rates are s 0.200 lblMMBtu) I l I L I l Summaly of Part 60175 RA Rcqulrcm€nts Part 6O Sulfur Dloxlde (SOz) 1blhr PS-6 3 ZO.OVo of RM or S 10.0olo of AS I{ltrogen Oxldec (l{Or as I{Oz) tblhr PS-5 3 2O.Oo/o of RM or < 10.0olo of AS Garton llonoxlde (GO) ppmvw PS-4A 3 t0o/o of RM or 5 596 of AS or ldl + CC S 5 ppmvd CO tblhr PS-6 3 2O.Oolo of RM or S 10.0% of AS lblmmBtu PS-6 S 2O.Oo/o of RM or S 10.07o of AS Part 75 Carbon Dioxldc (COz) 96 volume wet App. B Sect. 2.3.1.2 Annual: 3 7.5o/o of RM or * O,7o/o COz 9o volume wet App. A Sect.3.3.3 Semlannual: 3 10,0olo of RM or * 1.0olo COz Yolumctrlc Flow wscfrr App. B Sect. 2.3.1.2 Annuaf : S 7.5o/o of RM or + !.$ $s(r) wscfrr App. A Sect.3.3.4 Semlannual: 3 10.09o of RM or * 2.0 frs(r) Sulfur Dioxlde (SOe) ppmvw App. B Sect. 2.3.1.2 Annual: 3 7.50yo of RM or * 12 ppm SO2G) ppmvw App.A Sect. 3.3.1 Semlannual: S 10.07o of RM or + 15.0 ppm SOz(2) Nltrogcn Oxldcr (NOr ar NOz) lb/MMBtu App. B Sect. 2.3.1.2 Annual: 3 7.5o/o of RM or + 0.015 lblqmgtutzl lblMMBtu App. A Sect.3.3.2 Semlannual: 3 10.09o of RM or + 0.020 lbltUUgtutzl GPO43AS-O36878-PP-807 PageT of 47 1.3 Key Personnel A list of project partlcipants ls included below: Facility Information Source Location: PacifiCorp Huntlngton Wyoming Plant 8 Miles West of Huntington on Hwy 31 Huntington, Utah 84528 Tom Wiscomb Sr. Environmental Advisor PacifiCorp (801) 220-2373 Tom. Wiscom b@pacifi corp.com Utah Department of Air Quality Rob Leishman (801) s36-4438 RLeishman@utah.gov Russell Willson Senior Environmental Analyst PaciflCorp (43s) 687-433t Russel l. Wi I lson@Pacifi Corp.com Testlng Gompany Information Testing Firm: Montrose Air Quality Services, LLC Contact: Craig Kormylo Title: District Manager Telephone: (303) 495-3936 Email: CKormylo@montrose-env.com Table 1-4 details the roles and responsibilities of the test team. Table 1-4 Test Personne! and Responsibilities Project Contact: Role: Company: Telephone: Email: Agency Information Regulatory Agency: Agenry Contact: Telephone: Emall: Facility interface, test crew coordinatlon Preparation, support PM G P043AS -036878-PP-807 Page 8 of 47 I i I tl r-1 rl -t l 1l 2.O Plant and Sampling Location Descriptions 2.L Process Description, Operation, and Control Equipment The Huntlngton Plant comprises two pulverized coal-fired boilers. Huntington Unlt #1 Is equipped wlth low-NO, burners and overflre alr for nltrogen oxides (NO,) control, a flue gas desulfurlzatlon (FGD) scrubber for sulfur dloxlde (SOz) control and pulse-Jet fabrlc fllters for partlculate matter (PM) control. Huntington Unlt #2 is equipped with low-Nox burners and overflre alr for NOx control, an FGD scrubber for SOz control and pulse-jet fabric fllterc for PM control. 2.2 CEMS Description The CEMS analyzers are presented ln Table 2-1. Table 2-l CEITIS Informatlon I t.r -[ il tl l Unit 1 Flow Teledyne Monltor Labs Model 150 136 COz Thermo Flsher Model 4101Q-ACN 133 SOz Thermo Flsher Model 43IQ-CAN 131 NO,Thermo Flsher Model 42|Q-ACANN L32 co Thermo Flsher Model 48|Q-CAN Hg Thermo Flsher Model 801 Unlt 2 Flow Teledyne Monltor Labs Model 150 236 COz Thermo Flsher Model 4101Q-CAN 234 SOz Thermo Flsher Model 43|Q-CAN 23t NOr Thermo Flsher Model 42IQ-ACANN 232 co Thermo Flsher Model 48|Q-ACN H9 Thermo Fisher Model 801 GP043AS-036878-PP-807 Page 9 of 47 2.:* FlLre Gas Sarupting [-$e.atic]r"is Actual stack measurements, number of traverse points, and location of traverse points will be evaluated in the field as part of the test program. Table 2-2 presents the anticipated stack measurements and traverse points for the sampling locations listed. Table 2-2 Sampling Locations i lSrmpllng Looatlon Unit 1 Unit 2 Dlrtrnca ffom llcend i Dlrturbancs Strd( Inddc Down.tr.am Dlamctcr EPA oB" Uprtflilm EPA ' llumbcr of Travcrtc i (tn.) (ln./dta.) i *A" ttn,./dla,) potntr 323.3 2sB6 t8 6 47 t z E:I #,!i'J""J' 322.7 2s8z t8 6 4s t 2 ::X #,!irJ"",{, Sample location(s) are verified in the field to conform to EPA Method 1. Acceptable cyclonic flow conditions are confirmed prior to testing using EPA Method 1, Section 11.4. L,4 CIperatirrg ("ortdftForrs' rr[:ic !,]rc]r.ess r.tata Emission tests are performed while the source/units and air pollution control devices are operating at the conditions required by the applicable regulation. The units are tested when operating at greater than 50% of rated capacity, as required by 40 CFR Part 60 or within the load levels required by 40 CFR Part 75. Plant personnel are responsible for establishing the test conditions and collecting all applicable unit-operating data. Data collected includes the following parameters: . Unit load (MW) . Relevant CEMS Parameters 2,S Plant bafet"y Montrose will comply with all safety requirements at the facility. The facility Client Sponsor, or designated point of contact, is responsible for ensuring routine compliance with plant entry, health, and safety requirements. The Client Sponsor has the authority to impose or waive facility restrictions. The Montrose test team leader has the authority to negotiate any deviations from the facility restrictions with the Client Sponsor. Any deviations must be documented. GP043AS-036878-PP-807 Page 70 of 47 .,,5, tr t:afie'luy f.l esirorrgih[][tie:g; Planning o Montrose must complete a field review with the Client Sponsor prior to the project date. The purpose of the review is to develop a scope of work that identifies the conditions, equipment, methods, and physical locations that will be utilized along with any policies or procedures that will affect our work o We must reach an agreement on the proper use of client emergency services and ensure that proper response personnel are available, as needed . The potential for chemical exposure and actions to be taken in case of exposure must be communicated to Montrose. This information must include expected concentrations of the chemicals and the equipment used to identify the substances. . Montrose will provide a list of equipment being brought to the site, if required by the client Project Day o Montrose personnel will arrive with the appropriate training and credentials for the activities they will be performing and the equipment that they will operate o Our team will meet daily to review the Project Scope, Job Hazard Assessment, and Work Permits. The Client Sponsor and Operations Team are invited to participate. o Montrose will provide equipment that can interface with the client utilities previously identified in the planning phase and only work with equipment that our client has made ready and prepared for connection . We will follow client direction regarding driving safety, safe work permitting, staging of equipment, and other crafts or work in the area o As per 40 CFR Part 60 Subpart A, Section 60.8, the facility must provide the following provisions at each sample location: o Sampling ports, which meet EPA minimum requirements for testing. The caps should be removed or be hand-tight. o Safe sampling platforms o Safe access to the platforms and test ports, including any scaffolding or man lifts o Sufficient utilities to perform all necessary testing o Montrose will use the client communication system, as directed, in case of plant or project emergency . Any adverse conditions, unplanned shutdowns or other deviations to the agreed scope and project plan must be reviewed with the Client Sponsor prior GP043AS-036878-PP-807 Page tL of 47 to continuing work. This will include any safe work permit and hazard assessment updates. Completion Montrose personnel will repoft any process concerns, incidents or near misses to the Client Sponsor prior to leaving the site Montrose will clean up our work area to the same condition as it was prior to our arrival We will ensure that all utilities, connection points or equipment have been returned to the pre-proJect condition or as stated in the safe work permit. In addition, we will walk out the job completion with Operations and the Client Sponsor if required by the facility. 2.3"2 Safety Program and Requirements Montrose has a comprehensive health and safety program that satisfies State and Federal OSHA requirements. The program includes an Illness and Injury Prevention Program, site- speclfic safety meetings, and training in safety awareness and procedures. The basic elements include: o All regulatory required policies/procedures and training for OSHA, EPA and FMCSA o Medical monitoring, as necessary . Use of Personal Protective Equipment (PPE) and chemical detection equlpment . Hazard communication o Pre-test and daily toolbox meetings o Continued evaluation of work and potential hazards . Near-miss and incident repofting procedures as required by Montrose and the Client Montrose wlll provide standard PPE to employees. The PPE will include but is not limited to; hard hats, safety shoes, glasses with side shields or goggles, hearing protectlon, hand protections, and fall protection. In addition, our trailers are equipped with four gas detectors to ensure that workspace has no unexpected equipment leaks or other ambient hazards. The detailed Site Safety Plan for this project is attached to this test plan in Appendix "S". GP043AS-036878-PP-807 Page !2 of 47 I 3.O Sampling and Analytical Procedures 3.1 Test Methods The test methods for this test program have been presented in Table 1-1. Additional information regarding speciflc applications or modificatlons to standard procedures ls presented below, 3.1,1 EPA Method 2G, Determination of Stack Gas Velocity and Volumetric Flow Rate with Two-Dimensional Probes EPA Method 2G is used to measure the veloclty pressure and the yaw angle of the flow velocity vector ln a stack or duct using a 2-D probe. Alternatively, these measurements are made by operating one of the three-dimenslonal (3-D) probes described in Method 2F, ln yaw determination-only mode. From these measurements and a determination of the stack gas density, the average near-axial velocity of the stack gas is calculated. The near-axial velocity accounts for the yaw, but not the pitch, component of flow. The average gas volumetric flow rate in the stack or duct is then determined from the average near-axlal veloclty. Pertinent information regarding the pefformance of the method ls presented below: . Target andlor Minlmum Required Sample Duration: >5 minutes The typical sampling system is detailed in Figure 3-1. GP043AS-036878-PP-807 Page 13 of 47 FIGURE 3-1 US EPA METHOD 2 SAMPLING TRAIN i GP043AS-036878-PP-807 Page L4 of 47 I I l 3.L.2 EPA Methsd 4 Determination of Moisture Content in Stack Gas EPA Method 4 is a manual, non-isokinetic method used to measure the molsture content of gas streams. Gas is sampled at a constant sampling rate through a probe and impinger train. Moisture is removed using a series of pre-weighed impingers containing methodology- specific liquids and silica gel immersed in an ice water bath. The impingers are weighed after each run to determine the percent moisture. The typical sampling system is detailed in Figure 3-2. Figure 3-2 EPA Method 4 Sampling Train i SAIIIPI.E LINE (st.nd,/dlip) THERMOCOTJPLESII BY.PASSVATVEtop*,u) VACUUMGAU iIiANOi'ETER -+ GP043AS-036878-PP-807 Page 15 of47 3.1.3 EPA Methods 3A, 6C, 7E, and 1O Determination of Oxygen, Carbon Dioxide, Sulfur Dioxide, Nitrogen Oxides, and Carbon Monoxide Concentrations in Emissions from Stationary Sources (lnstrumental Analyzer Procedures) Concentrations of Oz, COz, SOz, NOx, and CO are measured simultaneously using EPA Methods 3A, 6C, 7E, and 10, which are instrumental test methods. Conditioned gas is sent to a series of analyzers to measure the gaseous emission concentrations. The peformance requirements of the method must be met to validate the data. Pertinent information regarding the performance of the method is presented below: o Method Options: o Sampllng is performed using a dilution probe o NO and NOz are measured separately and summed to report NOx emissions o The alternatlve NOx conv€rt€r efficiency test described in EPA Method 7E Section 16.2 may be used (bag procedure) o Gas stratification testing ls performed across a grid of 12 points determined using EPA Method 1 in accordance with 40 CFR Part 60. Aopendix B. PS2 68.1.3.2 and 40 CFR Part 75. Aooendlx A. 66.5.6.1. Stratification testing is performed for two minutes per traverse polnt in accordance with 40 CFR Part 75, Appendix A, 66.5.6.1(c). If diluent and pollutant concentrations are within 5olo of their mean concentrations, subsequent gas RATA testing is performed at a single point in the stack as allowed by 40 CFR Paft 60. Appendix B. PS2 68.1.3.2 and 40 CFR Part 75. Apoendix A 66.5.6.3(b). If diluent and pollutant concentrations are within 10o/o of their mean concentrations, RATA testing is pefformed at three points located 0.4 meter, 1.0 meter and 2.0 meters from the stack wall, as requlred by 40 CFR Part 60. Apoendix B. PS2 68.1.3.2 and 40 CFR Part 75, Appendix A, 66.5.6.1(a). The typical sampling system is detailed in Figure 3-3. lL L l rl I i GP043AS-036878-PP-807 Page 16 of 47 Flgure 3-3 EPA Methods 3A, 6Ct7e, and 1O Sampllng Train GP043AS-036878-PP-807 Page t7 of 47 3.2 Process Test Methods The applicable regulations do not require process samples to be collected during this test program, 1i, (r $uaI[t.trr A.sg.. [.t['ii t,']('{, ir'Ii(i l.te;,,6., r i,irt,'7 4.L QA Audits Montrose has instituted a rigorous QA/QC program for its air quality testing. Quality assurance audits are performed as part of the test program to ensure that the results are calculated using the highest quality data available. This program ensures that the emissions data we report are as accurate as possible. The procedures included in the cited reference methods are followed during preparation, sampling, calibration, and analysis. Montrose is responsible for preparation, calibration, and cleaning of the sampling apparatus. Montrose will also perform the sampling, sample recovery, storage, and shipping. Approved contract laboratories may perform some of the preparation and sample analyses, as needed. 4.2 Quality Control Procedures Montrose calibrates and maintains equipment as required by the methods performed and applicable regulatory guidance. Montrose follows internal procedures to prevent the use of malfunctioning or inoperable equipment in test programs. All equipment is operated by trained personnel. Any incidence of nonconforming work encountered during testing is reported and addressed through the corrective action system. ,q".7,1 rr:q[{iprrretrt }ri$ip€,r.]t,Ior, ancl Marnie**r,n cq Each piece of field equipment that requires calibration is assigned a unique identification number to allow tracking of its calibration history. All field equipment is visually inspected prior to testing and includes pre-test calibration checks as required by the test method or regulatory agency. 4,?.,2 Atrrlit Sarrrtp:les When required by the test method and available, Montrose obtains EPA TNI SSAS audit samples from an accredited provider for analysis along with the samples. Currently, the SSAS program has been suspended pending the availability of a second accredited audit sample provider. If the program is reinstated, the audit samples will be ordered. If required as paft of the test program, the audit samples are stored, shipped, and analyzed along with the emissions samples collected during the test program. The audit sample results are repofted along with the emissions sample results. GP043AS-036878-PP-807 Page LB of 47 4,3 Data Analysis and Validation Montrose converts the raw field, laboratory, and process data to reporting units consistent with the permit or subpaft. Calculations are made using proprietary computer spreadsheets or data acquisition systems. One run of each test method is also verified using a separate example calculation. The example calculations are checked against the spreadsheet results and are included in the final report. The "Standard Conditions" for this project are 29.92 inches of mercury and 68 oF. 4,4 Sample Identification and Custody No samples are required to be recovered for this test program, 4.5 Quality Statement Montrose is qualified to conduct this test program and has established a quality management system that led to accreditation with ASTM Standard D7036-04 (Standard Practice for Competence of Air Emission Testing Bodies). Montrose participates in annual functional assessments for conformance with D7O36-O4 which are conducted by the American Association for Laboratory Accreditation (A21-A). All testing performed by Montrose is supervised on site by at least one Qualified Individual (QI) as defined in D7035-04 Section 8.3.2. Data quality objectives for estimating measurement uncertainty within the documented limits in the test methods are met by using approved test protocols for each project as defined in D7036-04 Sections 7.2.1and 12.10. Additional quality assurance information is included in the appendices. The content of this test plan is modeled after the EPA Emission Measurement Center Guideline Document (GD-042). 4.6 Reporting Montrose will prepare a final repoft to present the test data, calculations/equations, descriptions, and results. Prior to release by Montrose, each repoft is reviewed and ceftified by the project manager and their supervisor, or a peer. Source test reports will be submitted to the facility or appropriate regulatory agency (upon customer approval) within 25 days of the completion of the field work. The report will include a series of appendices to present copies of the intermediate calculations and example calculations, raw field data, laboratory analysis data, process data, and eQuipment calibration data. GP043AS-036878-PP-807 Page t9 of 47 4.6.1 Example Report Format The report is divided into various sections describlng the different aspects of the source testing program. Figure 4-1 presents a typical Table of Contents for the final report. Figure 4-1 Typical Repot Format Cover Page of Repoft of Contents 1.0 Introduction Plant and Sampling Location Descrlptions Sampling and Analytical Procedures Test Discussion and Results Internal QA/QC Activities .0 .0 .0 5.0 Field Data and Calculations Facility CEMS and Process Data Laboratory Analysls Data Quality Assura nce/QualiW Control Regulatory Information GP043AS-036878-PP-807 Page 20 of 47 t1 i I i li1 il r ll l 1l 1 rl 4.6,2 Example Presentation of Test Results Table 4-1 presents the typlcal tabular format that ls used to summarlze the results in the flnal source test repoft. Separate tables wlll outllne the results for each CEMS parameter/set of units and compare them to thelr respectlve RA requlrements. Tablc 4-1 Example NOx (lblmmBtu) RATA Recults - Unlt Name 1 xv)o(/rfim(noil-xxxx xx xx xx x xx 2 )ovxx/xxxx xxxx-xxxx xx xx xx x xx 3 xx/xx/xxxx xxxx-xxxx xx xx xx x xx 4 xvxvxxxx xxxx-xxxx xx )o(xx x xx 5 xvxx/xxxx xxxx-xxxx xx xx xx x xx 6 xvxx/xnfi xxxx-xxxx xx xx xx x xx 7 xv)ouxxxx xxxx-xxxx xx xx xx x xx I xvlovxno(xxxx-xxxx xx xx xx x xx 9 xvnvnoo(xxxx-xxxx xx xx xx x xx 10 xv)oux)oo(xxxx-xxxx xx xx xx x xx 11 xvxx/xxn(xrcfi-xxxx xx xx xx x xx L2 xv)ovxx)o(xxxx-xxxx xx xx xx x XX Averages xx xx xx x xx Appllcable Standad (AS)xx units Standard Deviation xx Conftdence Coefficient (CC)xx Bias AdJustment Factor (BAF)xx Unlt Load xx units RA based on mean RM value xx olo RA based on AS xx olo RA based on dlfference plus CC xx unlts RA based on absolute difference xx unlts GP043AS-036878-PP-807 Page 2L ot 47 Appendix A Supporting Information i I ," I i Appendix A.1 Units and Abbreviations I 60 tf?N,I+gLH UNITS AND ABBREVIATIONS @Xo/o 02 corrected to X% oxygen (corrected for dilution air) lCCl absolute value of the confidence coefficient ldl absolute value of the mean differencesoC degrees CelsiusoF degrees FahrenheitoR degrees Rankine " HzO inches of water column 13.6 specific gravity of mercury AH pressure drop across orifice meter, inches H2O AP velocity head of stack gas, inches H2O e total sampling time, minutes Ug microgram Pa density of acetone, mg/ml P* density of water, 0.9982 g/ml or 0.002201 lb/ml acfm actual cubic feet of gas per minute at stack conditions An cross-sectional atea of nozzle, ff As cross-sectional area of stack, square feet (ft') Btu British thermal unit B*. proportion by volume of water vapor in gas stream Ca particulate matter concentration in stack gas, gr/acf Cn e average unadjusted gas concentration, ppmv Cot, measured concentration of calibration gas, ppmv cf or ft3 cubic feet cfi"n cubic feet per minute co". average gas concentration adjusted for bias, ppmv Cv average of initial and final system bias check responses from upscale calibration gas, ppmv cm or m3 cubic meters Cr',rr actual concentration of the upscale calibration gas, ppmv Co average of initial and final system bias check responses from lowJevel calibration gas, ppmv Cp pitot tube coefficient Cs particulate matter concentration in stack gas, gr/dscf CS calibration span, % or ppmv Cs measured concentration of calibration gas, ppmv Cv manufactured certified concentration of calibration gas, ppmv D drift assessment, % of spandcf dry cubic feet dcm dry cubic meters Dn diameter of nozzle, inches Ds diameter of stack, inches dscf dry standard cubic feet dscfrn dry standard cubic feet per minutedscm dry standard cubic meters Fd F-factor, dscf/MMBtu of heat input fpm feet per minutefps feet per second ft feet # square feet gram gallonsgr grains (7000 grains per pound)gr/dscf grains per dry standard cubic feet s gal hr GP043AS-036878-PP-807 Page 24 of 47 64\ lYlgllT+gp.H UNITS AND ABBREVIATIONS I percent of isokinetic sampling in inch k kilo or thousand (metric units, multiply Oy 103; K kelvin (temperature) K3 conversion factor 0.0154 gr/mg & conversion factor 0.002668 ((in. HgXft'))/((ml)('R)) kg kilogram lq pitot tube constant (85.49 fVsec) kwscfh thousand wet standard cubic feet per hour I liters lb/hr pounds per hour lb/MMBtu pounds per million Btu lpm liters per minute m meter or milli M thousand (English units) or mega (million, metric units) m3 cubic meters ma mass of residue of acetone after evaporation, mg Md molecular weight of stack gas; dry basis, lb/lb-mole meq milliequivalent mg milligram Mg megagram (106 grams) min minute ml or mL milliliter mm millimeter MM million (English units) MMBtu/hr million Btu per hour mn total amount of particulate matter collected, mg mol mole mol. wt. or MW molecularweight Ms molecular weight of stack gas; wet basis, lb/lb-mole MW molecular weight or megawatt n number of data points ng nanogram nm nanometer Pb", barometric pressure, inches Hg pg picogram Ps stack static pressure, inches H2O Pm barometric pressure of dry gas meter, inches Hg ppb parts per billionppbv parts per billion, by volumeppbvd parts per billion by volume, dry basisppm parts per millionppmv parts per million, by volumeppmvd parts per million by volume, dry basisppmvw parts per million by volume, wet basis Ps absolute stack gas pressure, inches Hg psi pounds per square inchpsia pounds per square inch absolutepsig pounds per square inch gauge Pr,o standard absolute pressure, 29.92 inches Hg Q" volumetric flow rate, actual conditions, acfm Q. volumetric flow rate, standard conditions, scfrn Qsta volumetric flow rate, dry standard conditions, dscfm R ideal gas constant 21.85 ((in. Hg) (ft3)y(('R) (lbmole)) GP043AS-036878-PP-807 Page 25 of 47 64\ l*?.N,T+gLH UNITS AND ABBREVIATIONS SBnnal post-run system bias check, % of span SBi pre-run system bias check, % of span scf standard cubic feet scfh standard cubic feet per hour scftn standard cubic feet per minutescm standard cubic meters scmh standard cubic meters per hour sec second sf, sq. ft., or ft2 square feet std standard t metric ton (1000 kg) T o.gzs t-value T" absolute average ambient temperature, oR (+459.67 for English) Tm absolute average dry gas meter temperature, oR (+459.67 for English) ton or t ton = 2000 pounds tph or tons/hr tons per hour tpy or tons/yr tons per year Ts absolute average stack gas meter temperature, oR (+459.67 for English) Tsro absolute temperature at standard conditions Va volume of acetone blank, ml V"* volume of acetone used in wash, ml Vr. total volume HrO collected in impingers and silica gel, grams Vm volume of gas sampled through dry gas meter, ftr Vm(std) volume of gas measured by the dry gas meter, corrected to standard conditions, dscf Vm stack gas volume sampled, acf Vn volume collected at stack conditions through nozzle, act Vs average stack gas velocity, feet per second Vwclsrol volume of water vapor condensed, corrected to standard conditions, scf Vwilstol volume of water vapor in gas sampled from impingers, scf Vwss(std) volume of water vapor in gas sampled from silica gel, scf W watt Wa weight of residue in acetone wash, mg Wmp total weight of impingers, grams Wss total weight of silica gel, grams Y dry gas meter calibration factor, dimensionless GPO43AS-036878-PP-807 Page 26 of 47 6 AtgN,r+gp.H ACRONYMS AAS atomic absorption spectroscopyACDP air contaminant discharge permitACE analyzer calibration error, percent of spanAD absolute differenceADL above detection limitAETB Air Emissions Testing BodyAS applicable standard (emission limit)ASTM American Society For Testing And MaterialsBACT best achievable control technologyBDL below detection limitBHP brake horsepowerBIF boiler and industrial furnaceBLS black liquor solidsCC confidence coefficientCD calibration driftCE calibration errorCEM continuous emissions monitorCEMS continuous emissions monitoring systemCERMS continuous emissions rate monitoring systemCET calibration error testCFR Code of Federal RegulationsCGA cylinder gas auditCHNOS elemental analysis for determination of C, H, N, O, and S content in fuelsCNCG concentrated non-condensable gasCO catalytic oxidizerCOC chain of custodyCOMS continuous opacity monitoring systemCPM condensible particulate matterCPMS continuous parameter monitoring systemCT combustion turbineCTM conditional test methodCTO catalytic thermal oxidizerCVAAS cold vapor atomic absorption spectroscopyDe equivalent diameter DE destruction efficiencyDioxins polychlorinated dibenzo-p{ioxins (pcdd's)DLL detection level limitedDNCG dilute non-condensable gasECD electron capture detectorEIT Engineer ln TrainingELCD electoconductivity detector (hall detector)EMPC estimated maximum possible concentrationEPA US Environmental Protection AgencyEPRI Electric Power Research lnstituteES emission standard (applicable limit)ESP electrostatic precipitator EU emission unitFCCU fluid catalytic cracking unitFGD flue gas desulfurizationFl flame ionizationFIA flame ionization analyzerFID flame ionization detectorFPD flame photometric detectorFPM filterable particulate matterFTIR Fourier-transform infrared spectroscopyFTPB field train proof blankFTRB field train recovery blankFurans polychlorinated dibenzofurans (pcdfs)GC gas chromatography GP043AS-036878-PP-807 page 27 of 47 r I I 6(\ lf?N,I+g'S.H ACRONYMS GC/MS gas chromatography/mass spectroscopy GFAAS graphite furnace atomic absorption spectroscopy GFC gas filter correlation GHG greenhouse gas HAP hazardous air pollutant HC hydrocarbons HHV higher heating value HPLC high performance liquid chromatography HRGC/HRMS high-resolution gas chromatography/high-resolution mass spectroscopy HRSG heatrecoverysteam generator lC ion chromatography ICAP inductively-coupled argon plasmography ICPCR ion chromatography with a post-column reactor ICP-MS inductively coupled plasma-mass spectroscopy lR infrared radiation ISO lnternational Standards OrganizationkW kilowatts LFG landfillgas LHV lower heating value LPG liquified petroleum gas MACT maximum achievable control technology MDI methylene diphyenyl diisocyanate MDL method detection limit MNOC maximum normal operating conditions MRL method reporting limit MS mass spectrometry NA not applicable or not available NCASI National Council ForAirAnd Steam lmprovement NCG non-condensable gases ND notdetected NDIR nondispersive infrared NESHAP National Emissions Standards For Hazardous Air Pollutants NG natural gas NIOSH National lnstitute For Occupational Safety And Health NIST National lnstitute Of Standards And Technology NMC non-methane cutter NMOC non-methane organic compounds NMVOC non-methane volatile organic compoundsNPD nitrogen phosphorus detector NSPS New Source Performance Standards OSHA Occupational Safety And Health Administration PAH polycyclic aromatic hydrocarbons PCB polychlorinated biphenyl compounds PCWP plywood and composite wood products PE Professional EngineerPFAS per- and polyfluoroalkyl substances (PFAS) Pl photoionization PID photoionization detectorPM particulate matter PMro particulate matter less than 10 microns in aerodynamic diameter PMz s particulate matter less than 2.5 microns in aerodynamic diameter POM polycyclic organic matter PS performance specification PSD particle size distributionPSEL plant site emission limits PST performance specification test PTE permanent total enclosure PTM performance test method GP043AS-036878-PP-807 Page 28 of 47 6C l*?NI+gp.H ACRONYMS QA/OC quality assurance and quality controlQl Qualified Individual QSTI Qualified Source Testing lndividualRA relative accuracyRAA relative accuracy audit t RACT reasonably available control technologyRATA relative accuracy test auditRCTO rotary concentrator thermal oxidizerRICE stationary reciprocating internal combustion engineRM reference methodRTO regenerative thermal oxidizerSAM sulturic acid mistSCD sulfur chemiluminescent detectorSCR selective catalytic reduction systemSD standard deviationSemi-VOST semivolatile organic compounds sample trainSRM standard reference materialTAP toxic air pollutant TBD to be determinedTCA thermal conductivity analyzerTCD thermal conductivity detectorTGNENMOC total gaseous non-ethane non-methane organic compoundsTGNMOC total gaseous non-methane organic compoundsTGOC total gaseous organic compoundsTHC total hydrocarbonsTIC tentatively identified compoundTO thermal oxidizerTO toxic organic (as in EPA Method TO-15)TPM total particulate matterTSP total suspended particulate matterTTE temporary total enclosureULSD ultra-low sulfur dieselUV ultraviolet radiation rangeVE visible emissionsVOC volatile organic compoundsVOST volatile organic sample trainWC water columnWWTP waste water treatment plant GP043AS-036878-PP-807 Page 29 of 47 Se Soz Sog SO* TCDD TCDF TGOC THC TI TRS Zn Ag silver As arsenic Ba barium Be beryllium C carbon Clz H2 Hzo N2 NH: Ni 66 lt?,N,T+gLE Cd cadmium CdS cadmium sulfide CH2O formaldehyde CH3CHO acetaldehyde CH3OH methanol CHo methane C2H4O ethylene oxide CzHe ethane CaH4O acrolein CaH6O propionaldehyde CgHr propane C6H5OH phenol ClO2 chlorine dioxide CO carbon monoxideCo cobalt COz carbon dioxide Cr chromiumCu copperEtO ethylene oxideEIOH ethyl alcohol (ethanol) hydrogen water HzO, hydrogen peroxide HzS hydrogen sulfide H2SO4 sulfuric acid HCI hydrogen chlorideHg mercuryIPA isopropyl alcoholMDI methylene diphyenyl diisocyanate MeCl2 methylene chloride MEK methyl ethyl ketoneMeOH methanolMn manganese nitrogen ammonia nickelNO nitric oxide NO, nitrogen dioxide Nq nitrogen oxides 02 oxygen P phosphorus Pb lead PCDD polychlorinated dibenzo-p-dioxinsPCDF polychlorinated dibenzofurans antimony CHEMICAL NOMENCLATURE selenium sulfur dioxide sulfur trioxide sulfur oxides tetrach lorod ibenzodioxi n tetrach lorod ibenzof u ran total gaseous organic concentration total hydrocarbons thallium total reduced sulfur compounds zinc GP043AS-036878-PP-807 Page 30 of 47 Appendix A.2 Accreditation Informatio n I Certifications - $;Ae Accredited Air Emission Testing Body A2LA hos occredited MONTROSE AIR QUALITY SERVICES ln recognition of the successful completion of lhe joint A2LA ond Stock Testing Accredilotion Council (STAC) evoluolion process, lhis loborolory is occrediled to perform testing octivities in complionce with ASTM D7036:2004 - Stondord Proclice for Competence of Air Emission Tesling Bodies. PresenteQ this 4tt'doy of Febrvory 2022. Vice Presidenl, Accreditolion Services For the Accreditotion Council Certificole Number 3925.01 Volid io Februory29,2024 This arcreditation progrann is not includcd undcr the A2LA ILAC Mutt^cal Recognition Arrangement. GP043AS-036878-PP-807 Americon Associofio n for Loborofory Accreditotion Page 32 ot 47 I lll1 i Appendix *S" Field Work Safety Plan 6ft MqNTHIH SITE SAFETY PLAN BOOKLET Project: Gustomer: Location: i Units: i Client Project Manager: Revision Date: January 21,2022 I ePo43AS-o36B7B-PP-807 Page 34 of 47 '*t , ltr(- itrr t lr\ I rt Page 1 of2 Site Safety Plan and JHA Purpose and !nstructions Purpose Employee safety is the top priority of Montrose Environmental Group. All employees must be trained to assess and mitigate hazards. The District Manager and Project Manager are responsible to ensure all hazards have been properly identified and managed. All employees have Stop Work Authority in all situations where an employee feels they or their co-worker cannot perform a job safely or if there is a task for which they have not been adequately trained. The Site Safety Plan (SSP) has been developed to help assist Montrose test crews with identifying physical and health hazards and determining how the hazards will be managed. Additionally, the SSP will help each crew manage the safety of the employees by providing emergency procedures and information. The booklet contains a several safety forms that may be required in the field. lnstructions The SSP consists of the following: 1. A Pre-Mobilization Test Plan - To be completed in it's entirety by the client project Manager prior to the test. 2. A Job Hazard Analysis is a standardized, two-page, fillable form that is used to evaluated the tasUsite's particular hazards and controls. The form also includes a daily toolbox topic and daily hazard review with sign off by the team. The client Project Manager is responsible to complete the JHA form through section 8. Upon arrival at the test site, the team will review the form for accuracy, making any corrections required and complete the remainder of the JHA. Section 9 will require at least three tasks, hazards and controls be identified for the project. Each team member has the option to discuss making changes or adding to the JHA and must sign on the Job Hazard Analysis form in agreement and sign in Section 10. The JHA is to be modified when conditions change. A toolbox meeting with a daily topic in addition to a review of the hazard analysis is required daily for the duration of the test. An additional sheet of paper with the toolbox topic and signatures can be added to the SSP packet. 3. Hazard Control Matrix - contains useful information on both engineering and administrative controls that a crew can use to reduce or eliminate the hazards they have observed plus applicable PPE that may be required. 4. Emergency Action Plan - The Job Supervisor/ Client Project Manager (CPM) will complete the Emergency Action Plan form and ensure that all employees are familiar with the facility emergency and evacuation procedures, assembly/ rally points, alert systems, and signals prior to work commencing. ln the event of an emergency situation/ evacuation, the Job Supervisor/ CPM will maintain a roster and be responsible for accounting for all employees. The Job Supervisor/ CPM will ensure that this Emergency Action Plan Form is completed, communicated to all employees, signed, and posted. 5. Additional Forms, as applicable a. MEWP Lift lnspection Form b. Heat Stress Prevention Form Based on Heat lndex c. Extended Hours Form AOS-FRM.1.13R1 Page 35 of 47GP043AS-036878-PP-807 ri $viMtlNIRUSI:Page2ot2 Site Safety Plan and JHA Purpose and lnstructions The SSP is a living document. The Project Manager should continually update their SSPs as new information and conditions change or if new hazards are presented. Each completed SSP should be maintained with the Test Plan in the office for a period of 3 years. There will be an audit process developed for the Site Safety Plans. AQS.FRM-1.13R1 Page 36 of 47GP043AS-036878-PP-807 lr , i\',; r,r t l',.\ I rl Page 1 of2 PRE.MOBILIZATION TEST INFORMATION Source Tvpe: New Source: _ Revisit: _ Prj#lDateffech: Coal Fired Electric Utility: _ Ethanol Plant: _ Chemical Mfg. of CemenULime Kiln Plant: _ Specialty Mfg. of:Other: Anticipated Effluent Composition - check all that apply and fill in expected concentration in ppm/% n SOz tr voc tr other lf other, explain: Flammable: PROJECT NAME/LOCATI ON: TEST DATE: PROJECT #: PROJECT MANAGER: TEST SCOPE: SITE CONTACT: Name:Contact Phone: tr NOx Toxic: Corrosive: Dust: Engineering Controls to be lmplemented: tr co Additional Safety Equipment Required: Personal gas monitors: _ Respiratory Protection : Half Face_ Full Face_ HEPA Filters_ Supplied Air: _ (Safety Dept. Approval) Approximate Flue Gas Temperatures, (F) below 210 210 to 450 450 to 950 above 950 other lf other, explain: Approximate Duct Pressure, (iwg): -3 -3 to +3 +3 to +7 trtr tr above lf other, explain AQS-FRM-1.17 tr tr below : u other G P043AS-03587 I -PP -807 +7 Page37 of 47 l*! ' rVtt Ji'v i li\. rl Page 2 ot 2 PRE.MOBILIZATION TEST INFORMATION Sampling Location: Stack Port _ Duct Port _ Approximate Sampling Platform Height, (ft) tr below 6 lf other, explain: trtrtrtr 6 to 50 50 to 100 above 100 other Access and Protection: Elevators: _ Ladders: _ MEWP Lift: _ Scaffold: _ Equipment Hoist: _ Guardrails: _ Toe plate: _ Engineered Tie Off Points: _ Heat Shield: _ Other: Describe how equipment will be mobilized to the sampling location: Additional lnformation : Effluent Chemical Reoulatorv Limits Gas Name Chemical Formula Cal OSHA PELI (ppm) 3al OSHA STEL2 (oom) NIOSH REL TWA3 (ppm) Cal OSHA Ceiling (oom) IDLHl (ppm) 3arbon Monoxide CO 25 200 35 200 1,200 Nitric Oxide NO,25 ND5 25 ND 100 Sulfur Dioxide SOz 2 5 2 ND 100 Hvdroqen Chloride HCt 0.3 2 ND 2 50 Hydrogen Sulfide HzS 10 15 10 (10 min.)c 50 100 )alifomia Occupational Safety and Heafth Administation (OSHA) Permissible Exposurc Limit (PEL) based on an ?-hour shift; 2: Cal OSHA Short-term Exposurc Linit (STEL) based on a 1s-minute peiod; 3: National lnstrtuie for Occupational Safety and Health (NIOSH) Recommended Exposure Linit (REL) Time-weighted Avenge (TWA) based on an 8-hour shift; 4: lmmediately Dangercus to Life or Health (IDLH); 5: Not Defined (ND); C: Ceiling Limit - Maximum allowable human exposure limit for an aibome or gaseous su0sfance, which is not to be exceeded, even momentaily. Prepared by: Reviewed by: Date: Date: AQS-FRM-1.17 GP043AS-036878-PP-807 Page 38 of 47 Client ]ontacl Name Date Facilitv 3SP Writer PM Client Rep I Job Preparation Job Site Walk Through Completed Safe Work Permit Received from Clienl J Site Specific Training Complete lf the heat index is expected to be above 91', fill out the Heat Stress Prevention Form. a, rit ,,\ I ir\, \l Job Hazard Analysis Risk Time Pressure Remote Work Location > 12 hr shift Working > 8 consecutive days Lack of procedures Extreme temps, wind >30mph Personal illnesslfatigue Vague work guidance Monotonous Ac{ivity First day back after time off job locations Other: 1of3 1. 2. 3. 4. lnformation/Emergency Preparedness lf non-emergency medical attention is needed, call: AXIOM #: 877-502-9466. Plant Emergency# Certified FirstAid Person: EMS Location Evacuation Routes Rally Point Severe Weather Shelter Location Eye Wash & Safety Shower Location Yes No lnformation: (list type) : Stack Gas Temp. (oF) Stack Gas Press. ("HrO) Stack Gas Components: Stack Gas lnhalation Potential? Yes No lf ves. see List of Hazard Chemicals. Hazards Hazard Controls Dust Mask ! Goggles El Other:Dust Hazards Thermal Burn Eleclrical Hazards lnadequate Lighting Slip and Trip Hand Proteciion E Hot Gloves E] Heat Shields E Other Protective Clothing: El Connections Protected from Elements fl External GFCI Other: E Xe Rating Requirement ! lntrinsically Safe Requirement ! lnstall Temporary Lighting fl Headlamps ! Housekeeping E Barricade Area E Other: E cut Resistant Gloves El Pinch fts. E General Etectrical ff trp""t R""i"t"rt E other: Potential Hazaids for Consideration Secondary Permits ! El not Work E Confined Space I Excavation working from Heights ! [ ralting ouleas E Fa[ protec{ion E orop zone protection f] ehfform load ratingsSeealsoSectT i f]ScafoUinspeclion Ladderinspection EBarricadesforequipment Electrical i E exposea wire/connecior EI Veriry equipment grounding E] Arc Flash Lifting i ! Crane lifi plan E Rigging inspection E fag tines used El Hoists in place Respiratory i E Unexpected exposure E Ctremicat E Dust (combustible) El PEL provided See also Sect. I i E C"rtriOoes or suoolied air available detedion PPE E Hi-vis vests El Metatarsal Guards ENomex/FRC E Harness/Lanyard' E Hot Gtoves E other PPE: fJ Goggles E Face Shield ! Hearing Protection L] Personal Monitor Type: E Respirator Type: Hard Hats I Safety Glasses I Safety Toe Shoe/Boot Spotter AQS-FRM.1.1 Page 39 of 47G P043AS-036878 -PP-807 ,*. ,\lr ' \ t l'.\ rl Additional Wo* Place Hazards Job Hazard Analysis ritical Procedures - check all that apply - *indicates additional form must be completed or collected from client E Heat Stress Prevention. E Confined Space* E MEWP. El Roof Work E ScattotO f] CotO Weather Work I Hazardous Energy Controt' ! Exposure Monitoring E Other: From Heights Fall Protection iI Fixed Guardrails/Toe boards E Fall Prevention PPE Warning Line System Falling Objects Protection ! EI Barricaoing tr Netting ! House Keeping flTethered Tools E Catch Blanket or Tarp Fall Hazard Communication i tr AdjacenUOverhead Workers I Contraclor Contact E] Ctient Contacl 2of3 6. 7. 8.Other Considerations Environmental Hazards - Weather Forecast f] Heaucold Etigtrtning E Rain E Snow E] tce E rornado E wind speed Steps for Mitigation: Electrical Safety Planning Plant Hook up: E t t Ov D 22ol24}v E +eOv f] cenerator E Hard wired into panet Electrical Classified Area: EYes I No Trailer Grounded: E Yes E ruo plug Type Electrical Hook Up Responsibility: ist of Hazardous Chemicals E Acetone E NitricAcid Other Chemicals: ! Hydrogen Peroxide E Compressed Gases E Hexane E Sufuric Acid E lsopropyl Alcohol I Flammable Gas E Toluene E Hydrochloric Acid E LiquiO Nitrogen ! Non-Flammable Gas E nzs E carbon Monoxide Steps for Mitigation: fildlife/Fauna in Area E Poison tuy E Poison Oak f]tnsects:IWildlife: Personnel W known allergies to bees stings or other allergens? f] Yes E tto Hazards and ask 1 2 3 1 2 3 1 2 3 'l 2 3 1 2 3 1 2 3 ,| 2 3 I 2 3 AQS-FRM-1.1 Page 40 of 47GP043AS-03687 g-PP -807 IHA REVIEW: Crew Names & Signatures Printed Name Signature Date Printed Name SiEnature Date *. :)1'r\ | i"\ rl Job Hazard Analysis 3of3 11 AQS-FRM-1.18 Page 4l of 47 JHA Meetins & Review Items to review: r Change in conditions o Extended work hours o Daily Safety Topic o New workers or contractors r Occurrence of near misses or injuries lnitialing demonstrates that site conditions and hazards have not changed from the original SSP. lf changes did occur, make the updates to this JHA and add notes as applicable in Section 9. Day Discussion Topic lnitials 2 3 4 5 6 7 8 9 t0 11 GP043AS-036878-PP-807 ,1}, \l( r,\ I lrl r rI Poge 1 of 2 EMERGENCY ACTION PLAN FORM The Job Supervisor/ Client Prolect illanager (CPil) will ensure that all employees are famitiar wlth the facility emergency and evacuagonprocedures' assembly/ rally polnts, alert systems, and slgnals prlor to work commencing. ln the event of an emergency sltuagon/ evacuation' the Job Supervisor/ CPM wlll malntaln a roster and be responslble for accountlng for alt employess. The Job Superuisor/CP[l wlll ensure that this Emergency Action Plan Form ls completod, communlcated to all employees, and posted. 'Mou must follow the client's emergency actlon plan tirst, and notlfy your Supervisor lmmediately..lf lncldent ls llis threatenlng, CALL 911 IUMED|ATELLY '1, non-emergsncy medical attention is needed, call AXIOM Meclical number: 877-502-9466. AQS-FRM-1.11 GP043AS-036878-PP-807 1 MEG Job Supervisor/ CPM's Name: 2 MEG Job Supervisor/ CPM's Telephone Number: 3 MEG Job Safety Supervisor (if appticabte): 4 MEG Job Safety Supervisor's Telephone Number: 5 Plant's Emergency Telephone Number: 6 Local Hospital/ Clinic Telephone Number: 7 Emergency Ops Radio Channel: I Plant's #l Contact Pelson's Name: 9 Plant's #1 Contact Person's Telephone Number: t0 Plant's #2 Contact Person's Name: 11 Plant's #2 Contact Petson's Telephone Number: l2 Designated Assembly Point Location: 13 Evacuation Routes: 14 Severe Weather Shelter Location: 15 Eye Wash and Safety Shower Location: 16 The First Aid Kit is Located: 17 The Fire Extinguisher is Located: Page 42 of 47 lJt\r\li/,\lh\l\l AQS-FRM-1.11 GP043AS-036878-PP-807 EMERGENCY EVACUATION AND ASSEMBLY MAP Poge 2 of 2 1 Facility Name: 2 Facility Alarm (Circle):YES or NO 3 Alarm Tones:TER.IN-PI/,CE: , EB; 4 Designated Shelter(s) Description: 5 Designated Assembly Point(s) Description: N*+, s Draw the eyacuation and assemblv mao here EMERGENCY ACTION PIAN FORM AND EVACUATION ASSEMBTY MAP REVIEW: Crew Names and Signatures Printed Nome:Sionature:Date:Printed Nome:Sianature: Date: Page 43 of 47 ,*,ivI t .1 r\ i l\t \| Page 1 of 1 Daily MEWP Lift lnspection Form All checks must be completed prior to each work shift, before operation of the MEV/P lift. This checklist must be used atthe beginning of each shift or following 6 to 8 hours of use. MEWP Lift Model #:Serial Number: Make:Rented or Owned: . Check'Yes' if an item is adequate, operational, and safe.. Check "No' to indicate that a repair or other corrective action is required prior to use.. Check "N/A" to indicate "Not Applicable." Items to be lnspected 1. All MEWP lift components are in working condition (i.e. no loose or missing parts, tom orloose hoses, etc.)- if something can be easily loosened by hand then it is not sufficient. 2. Hydraulic fluid level is sufficient, with the platform fully lowered 3. Hydraulic system pressure (see manufaclurer specs) is acceptable. lf the pressure is low, determine cause and repair in accordance with accepted procedures as outlined in service manual. 4. Tires and wheel lug nuts (for tightness) 5. Hoses and cables (i.e. worn areas or chafing) 6. Platform rails and safety gate (no damage present) 7. Pivot pins secure 8. Welds are not cracked and structural members are not bent or broken 9. Waming and instruclional labels are legible and secure, and load capacity is clearly marked. 10. Manufacturer's lnstruction Manual is present inside the bucket 11. Base controls (switches and push buttons) can be properly operated 12. Platform conditions are safe (i.e. not slippery) 13. Fire extinguisher is present, mounted and fully charged, located inside the bucket 14. Headlights, safety strobe light and back-up alarm are functional 15. Workplace is free of hazards (overhead powedines, obstructions, level surface, high winds, etc.) 'Do not operate if winds are 20 mph, unless othenvise specified by manufacturcr recommendations. Yes n tr n n n tr tr tr D tr ! tr tr tr tr N/A tr tr tr No x tr n trtr NI !tr trtr ntr trD rn ntr trn trtr trtr ntr Operator Name & Signature Location Date Ground Control Name & Signature Location Date Harness lnspections: Printed Name Signature Date Printed Name Signature Date Printed Name GP043AS-036878-PP-807 Date AQS-FRM-1.16 Page 44 of 47 Signature evlr MUN i RUsb Page 1 of 1 Extended Hours Safety Audit Project Number:Date:Time: When a project is expected to extend past a 14-hour work day, this form must be completed to evaluate the condition of the crew, and the safety of the work environment. Permission to proceed into extended work hours must come from a District Manager (DM) or RegionalVice President (RVP). Technical RVPs can authorize moving fonuard, if they are in the field or if they are managing the project. 1. Hold test crew meetinE Test crew initiats: The test leader should look for signs of the following in their crews: o lrritabilityo Lack of motivation. Headaches. Giddiness . Fatigue. Depression r Reduced alertness, lack of concentration and memory The test leader should assess the environmental and hazardous concerns: . Temperature and weather . Hoistingo Lighting o PPE (i.e. respirators, etc.). Working from Heights o Pollutant concentration in ambient air (SOz, HzS, ect.) Notifv DM or RVP The PM must contact either the DM or RVP to discuss the safety issues that may arise due to the extended work period. lf the DM is the acting PM on the job site, they must contact the RVP. During this time, they can come to an agreement on how to proceed. ltemsto discuss include: a a t a Reason for extended hours Reason for delay Production lim itations lmpending Weather Contact the client The PM, DM or RVP must discuss with client any identified safety concerns, the client's needs and mutually agree on how to proceed. Discussion should also include the appropriate rest period needed before the next day's work shift can begin. The DM and/or a RVP must be informed on the finaldecision. FinalOutcome: Approver: 2. 3. OOlAS-SAFEry-FM.3 Page 45 of 47GP043AS-036878-PP-807 t 1. 2. Page 1 of 1 Heat Stress Prevention Form This form is to be used when the Expected Heat Index is above 91" F, and is to be kept with protect documentation. Proiect Manaqer (PM):Exoected Hioh Temo: Date(s):Expected Heat lndex: Review the signs of Heat Exhaustion and Heat Stroke lf Heat lndex is above 91' F:. Provide cold water and/or sports drinks to all field staff (avoid caffeinated drinks and energy drinks which can increase core temperature). o Bring no less than one gallon of water per employeeo lf employee(s) are dehydrated, on blood pressure medication or not acclimated to heat, ensure they are aware of the heightened risk for heat illness. Provide cool head bands/vests/etc.o Have ice available to employees. lmplement work shift rotations and breaks, particularly for employees working in direct sunlight.. Provide as much shade at the jobsite as possible, including tarps, tents or other acceptable temporary structures.. PM should interview each field staff periodically to evaluate for signs of heat illness lf Heat lndex is above 103" F:. Employees must stop for drinks and breaks every hour (about 4 cups/hour). Employees are not permitted to work alone for more than one hour at a time without a break offering shade and drinks. Employees should wear cool bands and vests if working outside more than one hour at a time. PM should interview each field staff every 2 hours to evaluate for signs of heat illness 3. ""-'::,"^':.:",^"-1J- OOlAS-SAFEry-FM-5 Page 46 of 47GP043AS-036878-PP-807 This is the Last Page of This Document If you have any questions, please contact one of the following individuals by email or phone. Name: Craig Kormylo Title: District Manager Region: USA - Stack - Great Plains - Operations Email : CKormylo@montrose-env.com Phone: (303) 495-3936 Name: Glen Capra Title: Vice President Region: USA - Stack Email : GCapra@montrose-env.com Phone: (sLZ) 772-6450 t tAH DEPABTIvIENT OF ENVIRONMENTAL QUALIry FEB 2 6 2C24, DIVISION OF AIR QUAUTY GPO43AS-036878-PP-807 Page 47 of 47