Loading...
HomeMy WebLinkAboutDAQ-2024-0069941 DAQC-235-24 Site ID 13315 (B1) MEMORANDUM TO: FILE – WHITEWATER WHIRLPOOL BATHS & SYSTEMS (WWBS) THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Joe Rockwell, Environmental Scientist DATE: March 8, 2024 SUBJECT: FULL COMPLIANCE EVALUATION (FCE), Major, Utah County, FRS UT0000004904900257 DATE OF INSPECTION: March 8, 2024 SOURCE LOCATION: Lindon Plastic Composite Plant #1 195 South Geneva Road, Lindon, UT Pleasant Grove Composite Plant #2 330 West 200 South, Pleasant Grove, UT MAILING ADDRESS: Whitewater Whirlpool Baths & Systems 195 South Geneva Road, Lindon, UT 84042 SOURCE CONTACTS: Kirk Williamson, Owner Brian Urry, Vice-President – (801)-367-1122 Trevor Urry, Operations Manager – (385)-477-8002 Marilyn Touchard: Touchard Environmental Services (801) 430-1593 – marilynstouchard@yahoo.com OPERATING STATUS: Both plants (Plant #1 and Plant # 2) were operating at time of the inspection. PROCESS DESCRIPTION: Whitewater Whirlpool Baths & Systems (WWBS) manufactures cultured marble panels, countertops, accessories, bathtubs, and acrylic sinks. WWBS operates a reinforced plastic composites plant at 195 South Geneva Road in Lindon (Lindon Plant #1) located in Utah County. WWBS has requested to perform the same operation at different locations simultaneously if needed at 330 West 200 South in Pleasant Grove (Pleasant Grove Plant #2) in Utah County. Forms are placed on a track system and transported to a spray booth where a gel coat is applied using spray guns. Overspray is drawn through the spray booth filter bank which captures any aerosol droplets. The air passing through the filters is vented through a stack on the top of the building. The gel-coated forms are then transported out of the booth to a cure area to air dry until tacky. Cured panel, accessory, and countertop forms go to a casting area where a 2 matrix of resin, Methyl Methacrylate (MMA), Methyl Ethyl Ketone Peroxide (MEKP) catalyst, filler (silica sand and/or calcium carbonate), and color may be applied. This matrix is applied by an autocaster that has a heated tip, mixing occurs at the tip. Some applications use the existing electric pot mixer, which is mostly used as a backup, specialty jobs, and the tyvarian area. Cured tub and sink forms go to a fiberglass chop or roll application area where resin and glass are applied using Venus Magnum chop guns or hand rollers. All resin-coated forms are then placed on a curing rack. Once completely cured, products are sanded in the finish area and prepped for shipment. The empty forms are then cleaned with acetone and sent back to the start of the assembly line. The tyvarian area is a flowcoat process. The glass frames are overlain with an image and flowcoated with resin. The resin is hand-rolled to remove bubbles. The process is the same except resin is manually filled using the mixing pot. HAP emissions (styrene) from the resins/gel coats are controlled by following a Work Practice Plan which conforms with the work practice standards found in Table 4 of 40 CFR 63 Subpart WWWW and by meeting the applicable emission limits listed in Table 3 of 40 CFR 63 Subpart WWWW. APPLICABLE REGULATIONS: Title V Operating Permit (TVOP) # 4900257001, dated July 12, 2017 40 CFR Part 63 Subpart A-General Provision 40 CFR Part 63 Subpart WWWW- Reinforced Plastics Composites Production SOURCE INSPECTION EVALUATION: SECTION I: GENERAL PROVISIONS I.A Federal Enforcement. Status: All terms and conditions in this permit, including those provisions designed to limit the potential to emit, are enforceable by the EPA and citizens under the Clean Air Act of 1990 (CAA) except those terms and conditions that are specifically designated as "State Requirements". (R307-415-6b) This is a statement of fact and not an inspection item. I.B Permitted Activity(ies). Status: Except as provided in R307-415-7b(1), the permittee may not operate except in compliance with this permit. (See also Provision I.E, Application Shield) This is a statement of fact and not an inspection item. I.C Duty to Comply. I.C.1 The permittee must comply with all conditions of the operating permit. Any permit noncompliance constitutes a violation of the Air Conservation Act and is grounds for any of the following: enforcement action; permit termination; revocation and reissuance; modification; or denial of a permit renewal application. (R307-415-6a(6)(a)) 3 I.C.2 It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit. (R307-415-6a(6)(b)) I.C.3 The permittee shall furnish to the Director, within a reasonable time, any information that the Director may request in writing to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. Upon request, the permittee shall also furnish to the Director copies of records required to be kept by this permit or, for information claimed to be confidential, the permittee may furnish such records directly to the EPA along with a claim of confidentiality. (R307-415-6a(6)(e)) I.C.4 Status: This permit may be modified, revoked, reopened, and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, or termination, or of a notification of planned changes or anticipated noncompliance shall not stay any permit condition, except as provided under R307-415- 7f(1) for minor permit modifications. (R307-415-6a(6)(c)) This is a statement of fact and not an inspection item. I.D Permit Expiration and Renewal. I.D.1 This permit is issued for a fixed term of five years and expires on the date shown under "Enforceable Dates and Timelines" at the front of this permit. (R307-415-6a(2)) I.D.2 Application for renewal of this permit is due on or before the date shown under "Enforceable Dates and Timelines" at the front of this permit. An application may be submitted early for any reason. (R307-415-5a(1)(c)) I.D.3 An application for renewal submitted after the due date listed in I.D.2 above shall be accepted for processing, but shall not be considered a timely application and shall not relieve the permittee of any enforcement actions resulting from submitting a late application. (R307-415-5a(5)) I.D.4 Status: Permit expiration terminates the permittee's right to operate unless a timely and complete renewal application is submitted consistent with R307-415-7b (see also Provision I.E, Application Shield) and R307-415-5a(1)(c) (see also Provision I.D.2). (R307-415-7c(2)) The permit expired on July 12, 2022. Application for renewal was received, by the DAQ, on January 11, 2022, before the due date of January 12, 2022. The DAQ has not issued the new TVOP to date. Instead, a Shield letter (DAQO-SH0133150002-22), dated February 10, 2022, was sent to Whitewater allowing them to operate under the current permit until the issuance of the new permit. I.E Application Shield. If the permittee submits a timely and complete application for renewal, the permittee's failure to have an operating permit will not be a violation of R307-415, until the Director takes final action on the permit renewal application. In such case, the terms and conditions of this permit shall remain in force until permit renewal or denial. This protection shall cease to apply if, subsequent to the completeness determination required pursuant to 4 Status: R307-415-7a(3), and as required by R307-415-5a(2), the applicant fails to submit by the deadline specified in writing by the Director any additional information identified as being needed to process the application. (R307-415-7b(2)) The application for permit renewal was submitted, to the DAQ, on January 11, 2022. See status of condition I.D.1. I.F Severability. Status: In the event of a challenge to any portion of this permit, or if any portion of this permit is held invalid, the remaining permit conditions remain valid and in force. (R307-415-6a(5)) This is a statement of fact and not an inspection item. I.G Permit Fee. I.G.1 The permittee shall pay an annual emission fee to the Director consistent with R307-415-9. (R307-415-6a(7)) I.G.2 Status: The emission fee shall be due on October 1 of each calendar year or 45 days after the source receives notice of the amount of the fee, whichever is later. (R307-415-9(4)(a)) In compliance – The annual emission fee was paid on the same day the invoice was received, August 9, 2023. I.H No Property Rights. Status: This permit does not convey any property rights of any sort, or any exclusive privilege. (R307-415-6a(6)(d)) This is a statement of fact and not an inspection item. I.I Revision Exception. Status: No permit revision shall be required, under any approved economic incentives, marketable permits, emissions trading and other similar programs or processes for changes that are provided for in this permit. (R307-415-6a(8)) This is a statement of fact and not an inspection item. I.J Inspection and Entry. I.J.1 Upon presentation of credentials and other documents as may be required by law, the permittee shall allow the Director or an authorized representative to perform any of the following: I.J.1.a Enter upon the permittee's premises where the source is located or emissions related activity is conducted, or where records are kept under the conditions of this permit. (R307-415-6c(2)(a)) 5 I.J.1.b Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit. (R307-415-6c(2)(b)) I.J.1.c Inspect at reasonable times any facilities, equipment (including monitoring and air pollution control equipment), practice, or operation regulated or required under this permit. (R307-415-6c(2)(c)) I.J.1.d Sample or monitor at reasonable times substances or parameters for the purpose of assuring compliance with this permit or applicable requirements. (R307-415- 6c(2)(d)) I.J.2 Status: Any claims of confidentiality made on the information obtained during an inspection shall be made pursuant to Utah Code Ann. Section 19-1-306. (R307-415-6c(2)(e)) In compliance – Required records were made available and no claims of confidentiality were made at time of the inspection and after the inspection. Marilyn Touchard (Touchard Environmental Services, company environmental consultant), was present at time of the inspection. I.K Certification. Status: Any application form, report, or compliance certification submitted pursuant to this permit shall contain certification as to its truth, accuracy, and completeness, by a responsible official as defined in R307-415-3. This certification shall state that, based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete. (R307-415-5d) In compliance – Reports and certifications submitted, by the facility, appeared to have certification statements and were signed by responsible officials. I.L Compliance Certification. Permittee shall submit to the Director an annual compliance certification, certifying compliance with the terms and conditions contained in this permit, including emission limitations, standards, or work practices. This certification shall be submitted no later than the date shown under "Enforceable Dates and Timelines" at the front of this permit, and that date each year following until this permit expires. The certification shall include all the following (permittee may cross-reference this permit or previous reports): (R307-415-6c(5)) I.L.1.a The identification of each term or condition of this permit that is the basis of the certification; I.L.1.b The identification of the methods or other means used by the permittee for determining the compliance status with each term and condition during the certification period. Such methods and other means shall include, at a minimum, the monitoring and related recordkeeping and reporting requirements in this permit. If necessary, the permittee also shall identify any other material information that must be included in the certification to comply with section 113(c)(2) of the Act, which prohibits knowingly making a false certification or omitting material information; 6 I.L.1.c The status of compliance with the terms and conditions of the permit for the period covered by the certification, including whether compliance during the period was continuous or intermittent. The certification shall be based on the method or means designated in Provision I.L.1.b. The certification shall identify each deviation and take it into account in the compliance certification. The certification shall also identify as possible exceptions to compliance any periods during which compliance is required and in which an excursion or exceedance as defined under 40 CFR Part 64 occurred; and I.L.1.d Such other facts as the Director may require to determine the compliance status. I.L.2 Status: The permittee shall also submit all compliance certifications to the EPA, Region VIII, at the following address or to such other address as may be required by the Director: (R307-415-6c(5)(d)) Environmental Protection Agency, Region VIII Office of Enforcement, Compliance and Environmental Justice (mail code 8ENF) 1595 Wynkoop Street Denver, CO 80202-1129 In compliance – The July 13, 2022, through June 30, 2023, annual compliance certification was received July 7, 2023. It was received on time and deemed acceptable. I.M Permit Shield. I.M.1 Compliance with the provisions of this permit shall be deemed compliance with any applicable requirements as of the date of this permit, provided that: I.M.1.a Such applicable requirements are included and are specifically identified in this permit, or (R307-415-6f(1)(a)) I.M.1.b Those requirements not applicable to the source are specifically identified and listed in this permit. (R307-415-6f(1)(b)) I.M.2 Nothing in this permit shall alter or affect any of the following: I.M.2.a The emergency provisions of Utah Code Ann. Section 19-1-202 and Section 19-2- 112, and the provisions of the CAA Section 303. (R307-415-6f(3)(a)) I.M.2.b The liability of the owner or operator of the source for any violation of applicable requirements under Utah Code Ann. Section 19-2-107(2)(g) and Section 19-2-110 prior to or at the time of issuance of this permit. (R307-415-6f(3)(b) I.M.2.c The applicable requirements of the Acid Rain Program, consistent with the CAA Section 408(a). (R307-415-6f(3)(c)) I.M.2.d Status: The ability of the Director to obtain information from the source under Utah Code Ann. Section 19-2-120, and the ability of the EPA to obtain information from the source under the CAA Section 114. (R307-415-6f(3)(d)) N/A – See section III of this permit. 7 I.N Emergency Provision. I.N.1 An "emergency" is any situation arising from sudden and reasonably unforeseeable events beyond the control of the source, including acts of God, which situation requires immediate corrective action to restore normal operation, and that causes the source to exceed a technology-based emission limitation under this permit, due to unavoidable increases in emissions attributable to the emergency. An emergency shall not include noncompliance to the extent caused by improperly designed equipment, lack of preventive maintenance, careless or improper operation, or operator error. (R307-415-6g(1)) I.N.2 An emergency constitutes an affirmative defense to an action brought for noncompliance with such technology-based emission limitations if the affirmative defense is demonstrated through properly signed, contemporaneous operating logs, or other relevant evidence that: I.N.2.a An emergency occurred and the permittee can identify the causes of the emergency. (R307-415-6g(3)(a)) I.N.2.b The permitted facility was at the time being properly operated. (R307-415-6g(3)(b)) I.N.2.c During the period of the emergency the permittee took all reasonable steps to minimize levels of emissions that exceeded the emission standards, or other requirements in this permit. (R307-415-6g(3)(c)) I.N.2.d The permittee submitted notice of the emergency to the Director within two working days of the time when emission limitations were exceeded due to the emergency. This notice must contain a description of the emergency, any steps taken to mitigate emissions, and corrective actions taken. This notice fulfills the requirement of Provision I.S.2.c below. (R307-415-6g(3)(d)) I.N.3 In any enforcement proceeding, the permittee seeking to establish the occurrence of an emergency has the burden of proof. (R307-415-6g(4)) I.N.4 Status: This emergency provision is in addition to any emergency or upset provision contained in any other section of this permit. (R307-415-6g(5)) No emergency events have been reported since the last inspection which was conducted on December 14, 2022. I.O Operational Flexibility. Operational flexibility is governed by R307-415-7d(1). I.P Off-permit Changes. Off-permit changes are governed by R307-415-7d(2). I.Q Administrative Permit Amendments. Administrative permit amendments are governed by R307-415-7e. 8 I.R Permit Modifications. Status: Permit modifications are governed by R307-415-7f. These are statements of fact and not inspection items (I.O through I.R). I.S Records and Reporting. I.S.1 Records. I.S.1.a The records of all required monitoring data and support information shall be retained by the permittee for a period of at least five years from the date of the monitoring sample, measurement, report, or application. Support information includes all calibration and maintenance records, all original strip-charts or appropriate recordings for continuous monitoring instrumentation, and copies of all reports required by this permit. (R307-415-6a(3)(b)(ii)) I.S.1.b For all monitoring requirements described in Section II, Special Provisions, the source shall record the following information, where applicable: (R307-415-6a(3)(b)(i)) I.S.1.b.1 The date, place as defined in this permit, and time of sampling or measurement. I.S.1.b.2 The date analyses were performed. I.S.1.b.3 The company or entity that performed the analyses. I.S.1.b.4 The analytical techniques or methods used. I.S.1.b.5 The results of such analyses. I.S.1.b.6 The operating conditions as existing at the time of sampling or measurement. I.S.1.c Status: Additional record keeping requirements, if any, are described in Section II, Special Provisions. In compliance – Required records were provided at time of the inspection. I.S.2 Reports. I.S.2.a Monitoring reports shall be submitted to the Director every six months, or more frequently if specified in Section II. All instances of deviation from permit requirements shall be clearly identified in the reports. (R307-415-6a(3)(c)(i)) I.S.2.b All reports submitted pursuant to Provision I.S.2.a shall be certified by a responsible official in accordance with Provision I.K of this permit. (R307-415-6a(3)(c)(i) 9 I.S.2.c The Director shall be notified promptly of any deviations from permit requirements including those attributable to upset conditions as defined in this permit, the probable cause of such deviations, and any corrective actions or preventative measures taken. Prompt, as used in this condition, shall be defined as written notification within the number of days shown under "Enforceable Dates and Timelines" at the front of this permit. Deviations from permit requirements due to breakdowns shall be reported in accordance with the provisions of R307-107. (R307-415-6a(3)(c)(ii)) I.S.3 Notification Addresses. I.S.3.a All reports, notifications, or other submissions required by this permit to be submitted to the Director are to be sent to the following address or to such other address as may be required by the Director: Utah Division of Air Quality P.O. Box 144820 Salt Lake City, UT 84114-4820 Phone: 801-536-4000 I.S.3.b Status: All reports, notifications or other submissions required by this permit to be submitted to the EPA should be sent to one of the following addresses or to such other address as may be required by the Director: For annual compliance certifications: Environmental Protection Agency, Region VIII Office of Enforcement, Compliance and Environmental Justice (mail code 8ENF) 1595 Wynkoop Street Denver, CO 80202-1129 For reports, notifications, or other correspondence related to permit modifications, applications, etc.: Environmental Protection Agency, Region VIII Office of Partnerships and Regulatory Assistance Air and Radiation Program (mail code 8P-AR) 1595 Wynkoop Street Denver, CO 80202-1129 Phone: 303-312-6114 In compliance – The required deviation report, regarding the late 2022 annual emission inventory was submitted. The six-month monitoring report, dated July 6, 2023, was received on July 7, 2023, and deemed acceptable. The six-month report, dated January 22, 2024, was received on January 24, 2024, and deemed acceptable. I.T Reopening for Cause. I.T.1 A permit shall be reopened and revised under any of the following circumstances: 10 I.T.1.a New applicable requirements become applicable to the permittee and there is a remaining permit term of three or more years. No such reopening is required if the effective date of the requirement is later than the date on which this permit is due to expire, unless the terms and conditions of this permit have been extended pursuant to R307-415-7c(3), application shield. (R307-415-7g(1)(a)) I.T.1.b The Director or EPA determines that this permit contains a material mistake or that inaccurate statements were made in establishing the emissions standards or other terms or conditions of this permit. (R307-415-7g(1)(c)) I.T.1.c EPA or the Director determines that this permit must be revised or revoked to assure compliance with applicable requirements. (R307-415-7g(1)(d)) I.T.1.d I.T.2 I.T.3 Additional applicable requirements are to become effective before the renewal date of this permit and are in conflict with existing permit conditions. (R307-415-7g(1)(e)) Additional requirements, including excess emissions requirements, become applicable to a Title IV affected source under the Acid Rain Program. Upon approval by EPA, excess emissions offset plans shall be deemed to be incorporated into this permit. (R307-415-7g(1)(b)) Proceedings to reopen and issue a permit shall follow the same procedures as apply to initial permit issuance and shall affect only those parts of this permit for which cause to reopen exists. (R307-415-7g(2)) Status: This is a statement of fact and not an inspection item. I.U Inventory Requirements. An emission inventory shall be submitted in accordance with the procedures of R307-150, Emission Inventories. (R307-150) Status: In compliance – The 2022 annual emission inventory was submitted on April 18, 2023. It is considered to be only three days late. A deviation report, regarding the late emission inventory, has been submitted. The 2023 annual emission inventory will be due on April 15, 2024. See status of condition I.S.2, emission inventory below and the SLEIS Database. I.V. Title IV and Other, More Stringent Requirements Where an applicable requirement is more stringent than an applicable requirement of regulations promulgated under Title IV of the Act, Acid Deposition Control, both provisions shall be incorporated into this permit. (R307-415-6a(1)(b)) Status: This is a statement of fact and not an inspection item. SECTION II: SPECIAL PROVISIONS II.A Emission Unit(s) Permitted to Discharge Air Contaminants. (R307-415-4(3)(a) and R307-415-4(4)) 11 II.A.1 Permitted Source Source-wide II.A.2 Spray Booths B-1 and B-2 Two (2) spray booths B-1 with 4 stacks and B-2 with 6 stacks. Equipped with paint arrestor filter system for capturing overspray. II.A.3 Non-Atomized Spray Guns Six (6) non-atomized spray guns used in the spray booths to apply gel coat finishes. No unit- specific applicable requirements. II.A.4 Mixing System with Pot Mixer Styrene resin is mixed in the mixing system equipped with a 21.6 gallon container with an exposed surface area less the 500 square inches. No unit-specific applicable requirements. II.A.5 Roll Out System Roll out system. No unit-specific applicable requirements. II.A.6 Cleaning Operations Three (3) Vat/Potwash systems. No unit-specific applicable requirements. II.A.7 Status: Natural Gas Boiler Three (3) 0.175 MMBtu/hr natural gas boiler. In compliance – It was verified that the unapproved water trap was enclosed, at plant #1, at time of the inspection. There are two spray booth stacks for spray booth #1 (item II.A.2). Spray booth #2 (item II.A.2) and spray guns (item II.A.3) have been removed from plant #2. It was also noted that there are two non-atomizing spray guns (item II.A.3) and an auto caster at plant #1. There is only one auto caster operating at plant #2. Next, the Vat/Potwash Systems (item II.A.6) is only used as a back up to the auto caster. The Vat/Potwash system has not been used for years. All three boilers have been removed from plant #1 (item II.A7). The operation of plant #2 did not start up until June of 2021, and is currently on-line. According to Marilyn Touchard, with Touchard Environmental Services, plant #2 is being equipped with a pot mixer. See status of conditions II.B.1.c and II.B.1.h. II.B Requirements and Limitations The following emission limitations, standards, and operational limitations apply to the permitted facility as indicated: II.B.1 Permitted Source. II.B.1.a Condition: Emission of styrene from both plants combined shall be no greater than 29.52 tons per 12-month period. . [Authority granted under R307-401-8(1)(a) [BACT]; condition originated in DAQE-AN133150005-17]. 12 II.B.1.a.1 Monitoring: Styrene emissions shall be determined on a rolling 12-month total. Based on the twentieth day of each month, a new 12-month total shall be calculated using the data from the previous 12 months. II.B.1.a.2 Recordkeeping: Styrene emissions shall be determined by maintaining a record of Styrene emitting materials used each month. The records shall include the following data for each material used: (a) Name of the Styrene emitting material, such as; paint, adhesive, solvent, thinner, reducers, chemical compounds, toxics, isocyanates, etc. (b) Density of each material used (pounds per gallon). (c) Percent by weight of Styrene in each material used. (d) Gallons of each Styrene emitting material used each month. (e) The amount of Styrene emitted monthly by each material used, calculated by the following procedure: Styrene = (% Styrene by Weight) x (0.09) x (Density lb) x (gal consumed) x (1 ton) (100) (gal) (2,000 lb) (f) The total amount of Styrene emitted monthly from all materials used. (g) The amount of Styrene reclaimed for the month shall be similarly quantified and subtracted from the quantities calculated above, to provide the monthly total Styrene emissions. II.B.1.a.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – Combined Styrene emissions for the rolling 12-month period February 2023 – January 2024: Pollutant Limit (Tons) Actual Emissions (Tons) Styrene 29.52 17.57 II.B.1.b Condition: Emission of methyl methacrylate (MMA) from both plants combined shall be no greater than 0.48 tons per 12-month period. [Authority granted under R307-401-8(1)(a) [BACT]; condition originated in DAQE-AN133150005-17]. II.B.1.b.1 Monitoring: MMA emissions shall be determined on a rolling 12-month total. Based on the twentieth day of each month, a new 12-month total shall be calculated using the data from the previous 12 months. II.B.1.b.2 Recordkeeping: MMA emissions shall be determined by maintaining a record of MMA emitting materials used each month. The records shall include the following data for each material used: 13 (a) Name of the MMA emitting material, such as; paint, adhesive, solvent, thinner, reducers, chemical compounds, toxics, isocyanates, etc. (b) Density of each material used (pounds per gallon). (c) Percent by weight of MMA in each material used. (d) Gallons of each MMA emitting material used each month. (e) The amount of MMA emitted monthly by each material used, calculated by the following procedure: MMA = (% MMA by Weight) x (0.09) x (Density lb) x (gal consumed) x (1 ton) (100) (gal) (2,000 lb) (f) The total amount of MMA emitted monthly from all materials used. (g) The amount of MMA's reclaimed for the month shall be similarly quantified and subtracted from the quantities calculated above, to provide the monthly total MMA emissions. II.B.1.b.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – Combined Methyl Methacrylate (MMA) for the rolling 12-month period February 2023 – January 2024: Pollutant Limit (Tons) Actual Emissions (Tons) MMA 0.48 0.0069 II.B.1.c Condition: Unless otherwise specified in this permit, at all times, including periods of startup, shutdown, and malfunction, the permittee shall, to the extent practicable, maintain and operate any permitted plant equipment, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. [Authority granted under R307-401-8(2) [BACT]; condition originated in DAQE-AN133150005-17] II.B.1.c.1 Monitoring: Records required for this permit condition will serve as monitoring. II.B.1.c.2 Recordkeeping: The permittee shall document activities performed to assure proper operation and maintenance. Records shall be maintained in accordance with Provision I.S.1 of this permit. 14 II.B.1.c.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – A log is kept of when the paint booth filters are inspected and replaced. Weekly inspections are conducted on Wednesday and filters are changed out on Thursdays. See status of condition II.B.2.a. II.B.1.d Condition: The permittee shall comply with the applicable requirements for recycling and emission reduction for class I and class II refrigerants pursuant to 40 CFR 82, Subpart F - Recycling and Emissions Reduction. [Authority granted under 40 CFR 82.150(b); condition originated in 40 CFR 82 Subpart F] II.B.1.d.1 Monitoring: The permittee shall certify, in the annual compliance statement required in Section I of this permit, its compliance status with the requirements of 40 CFR 82, Subpart F. II.B.1.d.2 Recordkeeping: All records required in 40 CFR 82, Subpart F shall be maintained consistent with the requirements of Provision S.1 in Section I of this permit. II.B.1.d.3 Status: Reporting: All reports required in 40 CFR 82, Subpart F shall be submitted as required. There are no additional reporting requirements except as outlined in Section I of this permit. In compliance – Whitewater contracts Professional Heating and Air to conduct all of their heating and air needs. Air conditioners (A/C) are maintenanced on an as-needed basis. The company certifies that all refrigerants, for on-site air conditioners, are maintained and serviced. The A/C was last serviced on October 6, 2023. II.B.1.e Condition: The permittee shall comply with all applicable requirements in 40 CFR 63, Subpart WWWW - National Emissions Standards for Hazardous Air Pollutants: Reinforced Plastic Composites Production including, but not limited to, the following: all operations, including repair operations, shall meet the applicable organic HAP emission limits and work practice standards in Table 3 and 4 of 40 CFR 63 Subpart WWWW. The permittee shall comply with the applicable General Provisions in 40 CFR 63.1-15 as identified in Table 15 of 40 CFR 63, Subpart WWWW. [Authority granted under 40 CFR 63.5780 - 63.5935; condition originated in 40 CFR 63 Subpart WWWW]. [40 CFR 63.5785(a), 40 CFR 63.5805(b), 40 CFR 63.5805(g), 40 CFR 63.5835(a)]. II.B.1.e.1 Monitoring: The permittee shall perform all applicable monitoring required in 40 CFR 63.5796; 63.5797; 63.5805; 63.5810 (first paragraph), (a), (b), and (d); 63.5895(d); 63.5900(a), (a)(2)-(a)(4), and (c); and any applicable monitoring requirements from 40 CFR 63, Subpart A -- National Emissions Standards for Hazardous Air Pollutants: General Provisions as outlined in Table 15 of 40 CFR 15 Subpart WWWW. The permittee shall certify, in the annual compliance statement required in Section I of this permit, its compliance status with the applicable requirements of 40 CFR 63, Subpart WWWW. II.B.1.e.2 Recordkeeping: The permittee shall maintain all records required in 40 CFR 63.5915(a), (c), and (d); 63.5895(c) and (d); 63.5920; and any applicable recordkeeping requirements from 40 CFR 63 Subpart A General Provisions as outlined in Table 15 of 40 CFR Subpart WWWW. There are no additional recordkeeping requirements except as outlined in Provision I.S.1 of this permit. II.B.1.e.3 Status: Reporting: The permittee shall submit all reports required in 40 CFR 63.5900; 63.5905; 63.5910(a), (b), (c), (d), (g), and (i); and any applicable reporting requirements from 40 CFR 63 Subpart A General Provisions as outlined in Table 15 of 40 CFR Subpart WWWW. There are no additional reporting requirements except as outlined in Section I of this permit. In compliance – The most recent semi-annual subpart WWWW reports, dated July 6, 2023, and January 22, 2024, were received and deemed acceptable No deviations were reported. II.B.1.f Condition: For applicable requirements originating in 40 CFR 63 Subpart WWWW: At all times, including periods of startup, shutdown, and malfunction, the permittee shall operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. During a period of startup, shutdown, or malfunction, this general duty to minimize emissions requires that the permittee reduce emissions from the affected source to the greatest extent which is consistent with safety and good air pollution control practices. The general duty to minimize emissions during a period of startup, shutdown, or malfunction does not require the permittee to achieve emission levels that would be required by the applicable standard at other times if this is not consistent with safety and good air pollution control practices, nor does it require the permittee to make any further efforts to reduce emissions if levels required by the applicable standard have been achieved. Determination of whether such operation and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. [Origin: 40 CFR 63 Subpart WWWW, 40 CFR 63 Subpart A]. [40 CFR 63.5835(c), 40 CFR 63.6(e)(1)(i)]. II.B.1.f.1 Monitoring: Records required for this permit condition will serve as monitoring. II.B.1.f.2 Recordkeeping: The permittee shall document activities performed to assure proper operation and maintenance. Records shall be maintained in accordance with Provision I.S.1 of this permit. 16 II.B.1.f.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – The most recent semi-annual subpart WWWW reports, dated July 6, 2023, and January 22, 2024, were received and deemed acceptable. No deviations were reported. Subpart WWWW is also mentioned in the current annual compliance certification received on July 7, 2023. See of conditions I.L and II.B.1.e. II.B.1.g Condition: The permittee shall store any volatile organic compound (VOC) and HAP containing materials and VOC and HAP laden rags in covered containers except when in use. [Authority granted under R307-401- 8(1)(a) [BACT]; condition originated in DAQE-AN133150005-17] II.B.1.g.1 Monitoring: Records required for this permit condition will serve as monitoring. II.B.1.g.2 Recordkeeping: The permittee shall document activities performed to assure proper operation and maintenance. Records shall be maintained in accordance with Provision I.S.1 of this permit. II.B.1.g.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – Currently only Acetone is used on-site for cleaning. No open VOC and HAP containers or VOC and HAP laden rags were noted at time of the inspection. Rags are used to clean up spills containing VOC and HAP material. The rags are put in covered containers as needed. II.B.1.h Condition: The permittee shall notify the Director in writing when the installation of new equipment at Plant #2 in the affected unit has been completed and is operational, as an initial compliance inspection is required. To ensure proper credit when notifying the Director, send your correspondence to the Director, Attn: NSR Section. If the installation has not been completed by September 23, 2018 for this condition, the Director shall be notified in writing on the status of the installation. At that time, the Director shall require documentation of the continuous installation of the operation and may revoke the AO in accordance with R307-401-18, UAC. [Authority granted under R307-401-8 [BACT]; condition originated in DAQE-AN133150005-17] 17 II.B.1.h.1 Monitoring: Records required for this permit condition will serve as monitoring. II.B.1.h.2 Recordkeeping: As applicable, the permittee shall maintain a copy of each notification required by this permit condition in accordance with Provision I.S.1 of this permit. II.B.1.h.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – According to Marilyn Touchard with Touchard Environmental Services, plant #2 has been shut down and only started to operate in June of 2021. A new pot mixer has been recently ordered for this plant. The equipment installation notice, dated December 14, 2022, was submitted. See status of condition II.A. II.B.2 Spray Booths B-1 and B-2. II.B.2.a Condition: Visible emissions shall be no greater than 10% opacity. [Authority granted under R307-401-8(1)(a) [BACT]; condition originated in DAQE-AN133150005-17] II.B.2.a.1 Monitoring: In lieu of monitoring via visible emissions observations, the external vents and particulate filters shall be inspected weekly. Inspections shall consist of the following: (a) Inspection for holes in the particulate filters. (b) Inspection of the particulate filters to determine proper installation within the support rack. II.B.2.a.2 Recordkeeping: Results of monitoring shall be maintained in accordance with Provision I.S.1 of this permit. II.B.2.a.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – According to the facility, the filters are checked for holes and are changed out every Thursday (weekly). See status of condition II.B.1.c. 18 II.B.2.b Condition: The spray booth shall be equipped with a set of paint arrestor filters to control particulate emission. The filters shall be maintained and replaced according to the manufacturer's recommendations. All air exiting the booth shall pass through this control system before being vented to the atmosphere. [Authority granted under R307-401-8 [BACT]; condition originated in DAQE- AN133150005-17] II.B.2.b.1 Monitoring: Records required for this permit condition will serve as monitoring. II.B.2.b.2 Recordkeeping: The permittee shall document activities performed to assure proper operation and maintenance. Records shall be maintained in accordance with Provision I.S.1 of this permit. II.B.2.b.3 Status: Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. In compliance – See status of conditions II.B.1.c and II.B.2.a. II.B.3 Boilers. II.B.3.a Condition: Visible emissions shall be no greater than 10% opacity. [Authority granted under R307-401-8(1)(a) [BACT]; condition originated in DAQE-AN133150005-17] II.B.3.a.1 Monitoring: Records required for this permit condition will serve as monitoring. II.B.3.a.2 Recordkeeping: In lieu of visible emissions observations, records of fuel usage shall be maintained to demonstrate that only natural gas is being burned. II.B.3.a.3 Status: III.A Reporting: There are no reporting requirements for this provision except those specified in Section I of this permit. N/A – The three boilers have been removed from plant #1. Boilers were never installed or operated in plant #2. SECTION III: PERMIT SHIELD A permit shield was not granted for any specific requirements. 19 IV.A SECTION IV: ACID RAIN PROVISIONS This source is not subject to Title IV. This section is not applicable. EMISSION INVENTORY: The 2022 Annual Emission Inventory was submitted on April 18, 2023. See status of condition I.U. Whitewater Whirlpool Baths & Systems 2022 Total Emission Inventory Summary: Pollutant Total Tons/Year PM10 0.01 PM2.5 0.01 SO2 0.00 NOx 0.16 VOC 24.31 CO 0.13 MMA 0.01 STYRENE 24.29 PREVIOUS ENFORCEMENT ACTIONS: May 12, 2022 (DAQC-505-22) – Warning Letter COMPLIANCE STATUS RECOMMENDATIONS: Whitewater Whirlpool Baths & Systems should be considered to be in compliance with the conditions of the current Title V Operating Permit #4900257001, dated July 12, 2017, at time of the inspection. HPV: N/A COMPLIANCE ASSISTANCE: Discussed the new permit, that will eventually replace the current operating Permit #4900257001. RECOMMENDATION FOR NEXT INSPECTION: Verify that the new permit has been issued. Inspect as usual. ATTACHMENTS: VEO Form Correspondence 12/14/23, 9:28 AM State of Utah Mail - Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems https://mail.google.com/mail/u/0/?ik=391b7b8965&view=pt&search=all&permthid=thread-f:1785195233626735240&simpl=msg-f:17851952336267352…1/7 Joe Rockwell <jrockwell@utah.gov> Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems 2 messages marilyn touchard <marilynstouchard@yahoo.com>Wed, Dec 13, 2023 at 12:13 PM To: Joe Rockwell <jrockwell@utah.gov> FYI Sent from Yahoo Mail for iPhone Begin forwarded message: On Monday, November 20, 2023, 9:14 AM, marilyn touchard <marilynstouchard@yahoo.com> wrote: No worries :-), just figured I would check in since I knew we were close to being out of public comment. On Thursday, November 16, 2023 at 03:46:06 PM MST, Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, Unfortunately the TV permit has been delayed on our end. NSR will need to reissue the AO to remove the Direct-fired boiler before the TV can be issued. Hopefully it can be done quickly as an administrative amendment, since it is a reduction in air pollutants. I have CC'd the NSR engineer Tad Anderson and Manager Jon Black on this email to keep them in the loop. Thank you, Jared On Thu, Nov 16, 2023 at 3:33 PM marilyn touchard <marilynstouchard@yahoo.com> wrote: Hi Jared, Has the final approval for Whitewater’s tvop been finalized. I checked the UDAQ website and it isn’t posted there so I figured I would check in with you on the status. Hope all is well! Marilyn Sent from Yahoo Mail for iPhone On Monday, August 14, 2023, 4:33 PM, Jared Crosby <jaredcrosby@utah.gov> wrote: Thank you for your review Marilyn. I have attached the RL-SO with my responses to your comments, and a clean draft of the permit. I will send the permit to public comment, with a publication date of 08/16/2023. The public comment period will last 30 days, then it will go to EPA for a 45 day review. After I get the permit back from EPA, it will go through approval and signature, which usually takes about a week. I will keep you posted as we get closer to signature. Thank you, Jared On Mon, Aug 14, 2023 at 7:44 AM marilyn touchard <marilynstouchard@yahoo.com> wrote: Hi Jared, I have reviewed the redline document. I've added a few comments but mostly clarification on issues you had comments on. Please let me know if you have any questions. Thank you so much for your help with this renewal! Have a great day! Marilyn On Monday, August 7, 2023 at 12:23:11 PM MDT, Jared Crosby <jaredcrosby@utah.gov> wrote: No worries Marilyn, thank you for the update. Next Monday is okay. Thank you, Jared On Mon, Aug 7, 2023 at 12:21 PM marilyn touchard <marilynstouchard@yahoo.com> wrote: Can you please give me until next Monday, we have our state inspection at Hill AFB this week and we've had some unusual workload increases come in recently at Hill and I apologize for the delay. If it needs to get to you sooner let me know and I can work late at night to complete the review and I am so sorry! Thanks, Marilyn On Monday, July 31, 2023 at 10:02:21 AM MDT, Jared Crosby <jaredcrosby@utah.gov> wrote: 12/14/23, 9:28 AM State of Utah Mail - Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems https://mail.google.com/mail/u/0/?ik=391b7b8965&view=pt&search=all&permthid=thread-f:1785195233626735240&simpl=msg-f:17851952336267352…2/7 Hello Marilyn, I was just wanting to check in and see if you had any questions or concerns with the draft permit. Thank you, Jared On Fri, Jul 14, 2023 at 8:44 AM Jared Crosby <jaredcrosby@utah.gov> wrote: Marilyn, Thank you for the response. I have attached the RL-SO draft with the requirements of R307-361 included, as well as comments from peer review. Please let me know if you have any comments or questions. After this review, we should be ready to go to public comment with the permit. Thank you, Jared On Fri, Jul 14, 2023 at 8:20 AM marilyn touchard <marilynstouchard@yahoo.com> wrote: Good Morning Jared, After discussions with Whitewater, it is reasonable to assume that the architectural coating rule could apply to some maintenance of their facilities and should be included in the TVOP renewal. Please give me a call if you need more information. Marilyn On Wednesday, July 5, 2023 at 09:39:49 PM MDT, marilyn touchard <marilynstouchard@yahoo.com> wrote: Hi Jared, I will need to coordinate with Brian Urry to determine if this rule would be applicable to their facility. I'm in the process of finalizing their compliance certifications that are due within the next week and will get to work on this rule review as soon as I complete and deliver their certifications which will be within the week. Does that work for you? Thanks, Marilyn On Wednesday, July 5, 2023 at 10:23:15 AM MDT, marilyn touchard <marilynstouchard@yahoo.com> wrote: Review architectural rule Sent from Yahoo Mail for iPhone Begin forwarded message: On Wednesday, July 5, 2023, 9:07 AM, Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, The T5 renewal permit for WWB&S has finished peer review, and I wanted to check with you on the the applicability of R307-361: Architectural Coatings. This is a very general rule and I was wanting to ask if any of the activities described in the rule are applicable to WWB&S. Please let me know if any of the activities described in the rule, or any of the coatings listed in Table 1 are used, or solicited for use on site. I have attached a link to the rule: https://adminrules.utah.gov/public/rule/R307-361/Current%20Rules After this, I will send the draft permit back to you for one last review before sending the permit to public comment. Thank you, Jared On Thu, May 18, 2023 at 12:50 PM Jared Crosby <jaredcrosby@utah.gov> wrote: Marilyn, Yes, I will send a draft back to you after the permit has been reviewed internally and before it goes to public comment. Thank you, Jared On Wed, May 17, 2023 at 4:39 PM marilyn touchard <marilynstouchard@yahoo.com> wrote: Will you send the final draft to me for a quick glance before it goes to public comment. Thank you! Sent from Yahoo Mail for iPhone On Wednesday, May 17, 2023, 9:23 AM, Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, 12/14/23, 9:28 AM State of Utah Mail - Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems https://mail.google.com/mail/u/0/?ik=391b7b8965&view=pt&search=all&permthid=thread-f:1785195233626735240&simpl=msg-f:17851952336267352…3/7 Thank you for sending the draft with your comments. As for the next steps, the draft will go to my peers for review, and if they have any comments, I'll let you know once I return to office. I will be out of office from Thursday, May 25th - Thursday, June 8th. After that, we'll be able to send the draft to public comment for 30 days, then to EPA for a 45 day review (they usually are much faster than 45 days). Please let me know if you have any questions. Thank you, Jared On Wed, May 17, 2023 at 9:00 AM marilyn touchard <marilynstouchard@yahoo.com> wrote: Hi Jared, I am attaching my review of the draft, there are some changes and response to your comments included. Please let me know if you have any questions. Thank you! Marilyn On Tuesday, April 25, 2023 at 10:02:03 AM MDT, Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, Thank you for the update, let's go ahead and finalize the RL-SO draft for the Title V renewal. I believe you have reviewed the initial draft, please send me your edited draft and I'll begin working on your comments. Thank you, Jared On Sun, Apr 23, 2023 at 11:57 PM marilyn touchard <marilynstouchard@yahoo.com> wrote: Hi Jared, I don't have final specs but I have drafted a replacement in kind notificationand sent it over to Whitewater along with the requirements the replacement booth will have to meet to be approved for a replacement in kind. As soon as they confirm that the replacement booth will meet the requirements of R307-401-11 and sign the notification I will talk to Tad to see if he can accept the replacement in kind notification without having the full specs. I'm optimistic that we can get it approved and finalize the redline strike comments for our new TVOP. Will this work for you? Thanks, Marilyn On Wednesday, April 19, 2023 at 09:10:30 AM MDT, Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, Any updates on the replacement in kind? Have you received final specs on the booth? Thank you, Jared On Thu, Mar 23, 2023 at 4:27 PM Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, What's the timeline look like for getting final specs on the booth? If you're confident it will be a replacement in kind, we can move forward with the draft. Thank you, Jared On Wed, Mar 22, 2023 at 9:26 PM marilyn touchard <marilynstouchard@yahoo.com> wrote: I need to submit a replacement in kind notification for the gel coat booth in Pleasant Grove. I don't have the final specs for the booth but if I need to I can try sending the notification without the final specs and just indicate it will be similar to the currently permitted booth. What do you think? I have comments for the redline that I can submit to you if you would prefer to proceed with the draft. We have decided not to change the deadline for our annual TVOP certification since I have worked out something that works well for us with the compliance division so that is one requested change we don't want to proceed with. Let me know what you think and if you think the Gelcoat booth won't be an issue I can send you my redline response to comments and proposed changes. Thank you so much for your help with this! Marilyn On Wednesday, March 22, 2023 at 03:25:44 PM MDT, Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, I wanted to follow up on this project. Are there still potential updates on equipment that you need to run by Tad? 12/14/23, 9:28 AM State of Utah Mail - Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems https://mail.google.com/mail/u/0/?ik=391b7b8965&view=pt&search=all&permthid=thread-f:1785195233626735240&simpl=msg-f:17851952336267352…4/7 Thank you, Jared On Wed, Feb 8, 2023 at 2:25 PM Jared Crosby <jaredcrosby@utah.gov> wrote: Marilyn, That works for me, it's definitely easier to wait and include all potential updates before starting public comment on this permit. Thank you for the update. Jared On Wed, Feb 8, 2023 at 2:22 PM marilyn touchard <marilynstouchard@yahoo.com> wrote: Hi Jared, I am still working through the redline, there are some changes (one that I originally requested that I will add a comment when I return the redline to you). I need to talk to Tad about some potential updates on equipment that I need to submit a replacement in kind letter for (if he thinks it's appropriate) that I would like to complete prior to sending the redline back if you are okay with that. I will keep you posted as I get close to finishing my review. Thank you so much for working with me on this! Marilyn On Tuesday, January 31, 2023 at 10:43:15 AM MST, Jared Crosby <jaredcrosby@utah.gov> wrote: Thank you for the update Marilyn. Please take time as needed, no rush. Jared On Mon, Jan 30, 2023 at 5:21 PM marilyn touchard <marilynstouchard@yahoo.com> wrote: Thank you Jared, I saw it last week and haven't had a chance to review it yet but I will get working on it tonight. Thanks, Marilyn On Monday, January 30, 2023 at 09:53:26 AM MST, Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, Just wanting to make sure you've received the RL-SO draft. Thank you, Jared On Mon, Jan 23, 2023 at 2:29 PM Jared Crosby <jaredcrosby@utah.gov> wrote: Hello Marilyn, Attached is the Redline-strikeout draft for the Title V permit renewal of Whitewater Whirlpool Bath & Systems. Please take time as needed to review the changes and respond to a couple of the questions I wrote. Feel free to reach out if you have any questions or comments. Thank you, Jared -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- 12/14/23, 9:28 AM State of Utah Mail - Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems https://mail.google.com/mail/u/0/?ik=391b7b8965&view=pt&search=all&permthid=thread-f:1785195233626735240&simpl=msg-f:17851952336267352…5/7 Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov 12/14/23, 9:28 AM State of Utah Mail - Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems https://mail.google.com/mail/u/0/?ik=391b7b8965&view=pt&search=all&permthid=thread-f:1785195233626735240&simpl=msg-f:17851952336267352…6/7 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- 12/14/23, 9:28 AM State of Utah Mail - Fw: RL-SO Draft Title V Renewal - Whitewater Whirlpool Baths & Systems https://mail.google.com/mail/u/0/?ik=391b7b8965&view=pt&search=all&permthid=thread-f:1785195233626735240&simpl=msg-f:17851952336267352…7/7 Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA -- Jared Crosby Environmental Engineer | Operating Permits Section M: (385) 229-0485 airquality.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA Joe Rockwell <jrockwell@utah.gov>Wed, Dec 13, 2023 at 12:31 PM To: marilyn touchard <marilynstouchard@yahoo.com> Thanks Marilyn. Nice talking with you today. Joe Rockwell | Environmental Scientist Phone: 385-226-3738 195 North 1950 West, Salt Lake City, UT 84116 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. [Quoted text hidden]