Loading...
HomeMy WebLinkAboutDAQ-2024-007668Request For Payment from VW EVSE Division of Air Quality Department of Environmental Quality State of Utah 195 North 1950 West Salt Lake City, UT 84116 PAYABLE TO: SLC, UT 84114 TAX ID: CHARGE TO: Fund Agency Approp Unit Function Prog Object or BS 2158 480 2158 2113 2VWUDOT 7512 DATE DESCRIPTION TOTAL 10/6/2022 $129,746.47 $129,746.47 Reviewed and Approved By: Date: Mat Carlile Andrea Riddle Project completed: September 18, 2020 Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project. Payment to UDOT for reimbursement for purchase, installation, warranty, and networking costs for two DC Fast Chargers at 210 West 800 South Richfield UT. As per the State Cooperative Agreement with Verdek shipping costs will not be reimbursed on this payment. This payment comes from the Contract 201217 for UDOT through the VW Settlement funds. Transaction Id:______________________ UDOT #VC0000179400 4501 South 2700 West Awardee Name: _UDOT-Richfield ___ Award Amount (verify that the requested amount does not exceed this amount): $_1,047,6231 Project Summary Proposed number of EVSEs (type and quantity of each) Two DC Fast Chargers Actual number of EVSEs (type and quantity of each) Two DC Fast Chargers Proposed address of EVSE location(s): 210 West 800 South Richfield, UT 84701 Actual address of EVSE location(s): 210 West 800 South Richfield, UT 84701 Bid amount: $130,362 Invoice amount $131,346.47 UDOT indicated that the final invoice was higher due to costs for mobilization and power upgrade equipment increasing due to the pandemic. The vendor included the shipping cost with the cost of the DC Fast charger. The State Cooperative Agreement excludes shipping costs, and it appears that the vendor had included shipping costs with the costs of the EVSE units. We are not eligible for reimbursement and will be reducing the reimbursement by $1,600. Total reimbursement is $129,746.47 ($131,346.47-$1,600=$129.746.47). Checklist of required documents (Provide a description of any modifications from the original, proposed project). A site map showing the location of the EVSE funded by this funding assistance; Installation start date of the EVSE project 04/20/20 (See email from Devon Tonks October 4, 2022) ; The date the EVSE was placed into September 18, 2020 (Richfield Session Data) A photo of the EVSE funded by this funding assistance and placed into service; The estimated hours per day and days per year the EVSE funded by this funding assistance will be used: 2 hours a day 340 days a year (see email from Devon Tonks October 4, 2022). A final purchase invoice for each EVSE, installation, maintenance, and other itemized actual costs from the Funding Assistance Application. The invoice shall include: a. the invoice date; b. the itemized purchase cost for each item or service listed in the competitive bid; and c. the applicant as the purchaser; If costs are higher than the original bid, are the increased costs reasonable? Costs for mobilization and the costs to upgrade the power infrastructure increased due to the pandemic. Installation costs increase because the vendor's employees were required to drive in separate vehicles due to social distancing. In addition, installation staff were required to make multiple trips to the project location. This increase the installation costs by $683.85 and was identified under mobilization costs. In addition, the costs for the power infrastructure upgrades increased due to the supply chain issues caused by the pandemic. The power upgrade cost increased by $300.05. If items purchased are different from competitive bid did entity document that they meet procurement rules for changed items (see Terms and Conditions section II B.); and Proof of payment. Did the applicant use the State Cooperative Agreement? Yes 1 Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project. o If yes, did the invoice include shipping? Yes Reviewed by Mat Carlile _______________ Becky Close________________ Andrea Riddle_______________ Locations Vendors Attachment B- Bid Item Application Bid $ VW $ UDOT $ Finial Invoice Items Contract List Price Final Invoice $ VW $ UDOT $ Invoice # 210 West 800 South Richfield, UT 84701 CPE250- ChargePoint Express 250 $60,850.00 $60,850.00 $0.00 CPE250C-625-CCS1-CDH $74,256.00 $60,850.00 $60,850.00 $0.00 84688 Shipping $1,600.00 $1,600.00 Shipping $1,600.00 $1,600.00 5 Year Warranty (Assure Plan)/ Network Plan $34,710.00 $34,710.00 $0.00 CPCLD-ENTERPRISE-DC-5 5yr Prepaid Enterprise Cloud Plan $7,424.00 $6,810.00 $6,810.00 $0.00 84688 $0.00 $0.00 EXPRESS-ASSURE5 Express CPE 250 5-yr Prepaid Assure Plan (per module - 2 modules per station) $29,140.00 $27,900.00 $27,900.00 $0.00 84688 Mobilzation $2,190.00 $2,190.00 $0.00 MOBILIZATION $2,873.85 $2,873.85 $0.00 84688 Design/ Equipment $2,445.76 $2,445.76 $0.00 DESIGN EQUIPMENT $2,445.76 $2,445.76 $0.00 84688 Related Improvements/R epairs $4,609.00 $4,609.00 $0.00 RELATED IMPROVEMENTS/REPAIRS $4,609.00 $4,609.00 $0.00 84688 Electrical Materials $6,976.54 $6,976.54 $0.00 ELECTRICAL MATERIALS $6,977.00 $6,977.00 $0.00 84688 Commissioning System $216.00 $216.00 $0.00 COMMISSIONING SYSTEM $216.00 $216.00 $0.00 84688 Overhead $2,958.71 $2,958.71 $0.00 OVERHEAD $2,958.84 $2,958.84 $0.00 84688 Profit $5,679.87 $5,679.87 $0.00 PROFIT $5,679.87 $5,679.87 $0.00 84688 Subtotal (Verdek) $122,235.88 $122,235.88 $0.00 Subtotal (Verdek) $122,920.32 $121,320.32 $1,600.00 Rocky Mountain Power Provide 3 phase power 277/480 to EV charging station for udot at 210 W 800 S Richfield UT. $8,126.10 $8,126.10 $0.00 Provide 3 phase power 277/480 to EV charging station for udot at 210 W 800 S Richfield UT. $8,426.15 $8,426.15 $0.00 6698952 Subtotal Upgrades $8,126.10 $8,126.10 $0.00 Subtotal Upgrades $8,426.15 $8,426.15 $0.00 Estimated Grand Total $130,361.98 $130,361.98 $0.00 Grand Total $131,346.47 $129,746.47 $0.00 Original Bid Final Invoice Amount Verdek UPGRADES UPGRADES STATEMENT Utah Department of Transportation 4501 S. 2700 W./ BOX 141510 801-965-2494 (for Accts. Receivables) DATE: , 2020 STATEMENT # 201217- Department of Environmental Quality 195 N 1950 W Salt Lake City UT 84116 Customer ID: DEQ-VWGRANT COMMENTS: Per VW Eligible Mitigation Action Grant Agreement # 201217 - $ is to be reimbursed for EVSE location. DATE DESCRIPTION AMOUNT BALANCE 0//20 $ $ CURRENT 1-30 DAYS PAST DUE 31-60 DAYS PAST DUE 61-90 DAYS PAST DUE OVER 90 DAYS PAST DUE AMOUNT DUE $ $ REMITTANCE Statement #201217- Date Amount Due $ Amount Enclosed Make all checks payable to Utah Department of Transportation. Please include the UDOT coding block: Unit Appr XE Program 73261 Phase $ , $ Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2021 3 09-25-2020 lbarker September 25, 2020 lbarker $122,920.32 Roll Document from 2020 to 2021 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 123 Rolling Meadow Rd Check true 09/25/20VC219254 Verdek LLC $122,920.32 Madison, CT 06443 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF: 2 25170 Vehicle components & systems including safety & security 122920.32000 EA $122,920.32 84688 1 09-16-2020 $1.00 1 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 2021 PartialDO 2002209759810 1 2 1 2800 6816810 7203 XED 73261 10U UDOT AR2842 - Richfield Admin Office AP01 $122,920.32 Name Date 4/28/2020 Request # 6698952 Address WO # 6698952 City SLC State UT ZIP 84114 Acct # 66081016001 Site ID # 527667030 001 Email Employee: P09622 Qty Unit Price TOTAL 1.0 $8,426.15 $8,426.15 TOTAL $8,426.15 Invoice costs are valid for only 90 days from invoice date! Please remit payment to address at top of invoice. Office Use Only Richfield, Utah 84701-1839 Attention: LYLE MCMILLAN 4501 S 2700 W # 143600 Description Provide 3 phase power 277/480 to EV charging station for udot at 210 W 800 S Richfield UT. Richfield Operations Center UDOT STRATEGIC INVESTMENTS 710 North Main St PRO FORMA INVOICE Customer uCalc - Invoice Version 27Apr20 Page:of STATE OF UTAH 05-06-2020 1 May 06, 2020 rvanallen rvanallen $8,426.15 1 710 N MAIN ST false 05/06/20 Check VC0000100532 RICHFIELD, UT 84701 US $8,426.15ROCKY MOUNTAIN POWER 1 $8,426.15 2800 6816810 7203 XED 73261 10U UDOT ACCT# 66051016001 AP01 6698952 1 04-28-2020 Richfield 1 CPE250 Station Richfield 2 CPE250 Station