Loading...
HomeMy WebLinkAboutDAQ-2024-007659Request For Payment from VW EVSE Division of Air Quality Department of Environmental Quality State of Utah 195 North 1950 West Salt Lake City, UT 84116 PAYABLE TO: SLC, UT 84114 TAX ID: CHARGE TO: Fund Agency Approp Unit Function Prog Object or BS 2158 480 2158 2113 2VWUDOT 7512 DATE DESCRIPTION TOTAL 1/5/2023 $158,719.46 $158,719.46 Reviewed and Approved By: Date: Mat Carlile Andrea Riddle Project completed: October 1, 2020 Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project. Payment to UDOT for reimbursement for purchase, installation, warranty, and networking costs for two DC Fast Chargers($158,718.46) at 455 W Main St. Bluff, UT 84512. As per the State Cooperative Agreement with Verdek shipping costs will not be reimbursed on this payment. This payment comes from the Contract 201217 for UDOT through the VW Settlement funds. Transaction Id:______________________ UDOT #VC0000179400 4501 South 2700 West Awardee Name: _UDOT-Bluff ___ Award Amount (verify that the requested amount does not exceed total amount reimbursed to UDOT pursuant to the Volkswagen Eligible Mitigation Action Agreement Between State of Utah, Department of Transportation and State of Utah, Department of Environmental Quality, #201217, effective December 18, 2019, as amended March 23, 2022): $_1,047,6231 Project Summary Proposed number of EVSEs (type and quantity of each) Two DC Fast Chargers Actual number of EVSEs (type and quantity of each) Two DC Fast Chargers Proposed address of EVSE location(s): 455 W Main St. Bluff, UT 84512 Actual address of EVSE location(s): 455 W Main St. Bluff, UT 84512 Bid amount: $146,672.84 Invoice amount $158,719.46.47 The original bid amount for the install at this location was $146,672.84. That amount was made up of $13,400 in power upgrades and $133,272.84 in Verdek install costs. The actual costs to install the EV Chargers at this location was $158,719.46 for an increase in cost of $12,046.62. Additional costs associated with the power upgrades accounted for $17,646.62. These additional costs were associated with the additional supply costs and costs due to the COVID-19 Pandemic. Reduction in cost associated with Verdek actual installation costs accounted for $4,000. Costs associated with Verdek related improvement/repairs, increased by $857.31, due to by $4,857.97, due to profit percentage not being taken from cost of charging equipment & cloud/warranty service. Checklist of required documents (Provide a description of any modifications from the original, proposed project). A site map showing the location of the EVSE funded by this funding assistance; Installation start date of the EVSE project April 1, 2020 (See Bluff Session Data) ; The date the EVSE was placed into October 10, 2020 (See Bluff Session Data) A photo of the EVSE funded by this funding assistance and placed into service; The estimated hours per day and days per year the EVSE funded by this funding assistance will be used: 1 hours a day 236 days a year (See Bluff Session Data). A final purchase invoice for each EVSE, installation, maintenance, and other itemized actual costs from the Funding Assistance Application. The invoice shall include: a. the invoice date; b. the itemized purchase cost for each item or service listed in the competitive bid; and c. the applicant as the purchaser; If costs are higher than the original bid, are the increased costs reasonable? The original bid amount for the install at this location was $146,672.84. That amount was made up of $13,400 in power upgrades and $133,272.84 in Verdek install costs. The actual costs to install the EV Chargers at this location was $158,719.46 for an increase in cost of $12,046.62. Additional costs associated with the power upgrades accounted for $17,646.62. These additional costs were associated with the additional supply costs and costs due to the COVID-19 Pandemic. Reduction in cost associated with Verdek actual installation costs accounted for $4,000. Costs associated with Verdek related 1 Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project. improvement/re terrain. Reduction of Verdeck profit cost decreased by $4,857.97, due to profit percentage not being taken from cost of charging equipment & cloud/warranty service. If items purchased are different from competitive bid did entity document that they meet procurement rules for changed items (see Terms and Conditions section II B.); and Proof of payment. Did the applicant use the State Cooperative Agreement? Yes o If yes, did the invoice include shipping? Yes, however, VW funds will not reimburse for shipping costs because UDOT used the Verdek State Cooperative Agreements where shipping costs are not allowed. Amount authorized for reimbursement: =$158,719.46 With this authorized amount, the total amount reimbursed to UDOT to date =$593,142.24 Reviewed by Mat Carlile _______________ Becky Close________________ Andrea Riddle_______________ Locations Vendors Attachment B- Bid Item Application Bid $ VW $ UDOT $ Finial Invoice Items Contract List Price Final Invoice $ VW $ UDOT $ Invoice # 455 W Main St. Bluff, UT 84512 CPE250- ChargePoint Express 250 $60,850.00 $60,850.00 $0.00 CPE250C-625-CCS1-CDH $74,256.00 $60,850.00 $60,850.00 $0.00 84708 Shipping $1,600.00 $1,600.00 Shipping $1,600.00 $1,600.00 84708 5 Year Warranty (Assure Plan)/ Network Plan $34,710.00 $34,710.00 $0.00 CPCLD-ENTERPRISE-DC-5 5yr Prepaid Enterprise Cloud Plan $7,424.00 $6,810.00 $6,810.00 $0.00 84708 $0.00 $0.00 EXPRESS-ASSURE5 Express CPE 250 5-yr Prepaid Assure Plan (per module - 2 modules per station) $29,140.00 $27,900.00 $27,900.00 $0.00 84708 Mobilzation $3,598.00 $3,598.00 $0.00 MOBILIZATION $3,598.00 $3,598.00 $0.00 84708 Design/ Equipment $2,959.00 $2,959.00 $0.00 DESIGN EQUIPMENT $2,956.00 $2,956.00 $0.00 84708 Related Improvements/R epairs $12,219.00 $12,219.00 $0.00 RELATED IMPROVEMENTS/REPAIRS $13,076.31 $13,076.31 $0.00 84708 Electrical Materials $6,206.00 $6,206.00 $0.00 ELECTRICAL MATERIALS $6,206.00 $6,206.00 $0.00 84708 Commissioning System $432.00 $432.00 $0.00 COMMISSIONING SYSTEM $432.00 $432.00 $0.00 84708 Overhead $4,573.88 $4,573.88 $0.00 OVERHEAD $4,573.98 $4,573.98 $0.00 84708 Profit $6,128.52 $6,128.52 $0.00 PROFIT $1,270.55 $1,270.55 $0.00 84708 Subtotal (Verdek) $133,276.40 $133,276.40 $0.00 Subtotal (Verdek) $129,272.84 $127,672.84 $1,600.00 Rocky Mountain Power Provide 3 phase power 277/480 to EV charging station for udot at455 W Main St. Bluff, $13,400.00 $13,400.00 $0.00 Provide 3 phase power 277/480 to EV charging station for udot at 455 W Main St. Bluff, UT 84512 $13,962.62 $13,962.62 $0.00 6686602 Subtotal Upgrades $13,400.00 $13,400.00 $0.00 Rocky Mountain Power - Additional Power Install Costs $1,470.00 $1,470.00 6850987 Estimated Grand Total $146,676.40 $146,676.40 $0.00 Subtotal Upgrades $13,962.62 $15,432.62 $0.00 Kilgore - 1/2 Inch HMA Paving at Site $9,902.80 $9,902.80 2600162-4 Kilgore - Retention for 1/2 Inch HMA Paving at Site $521.20 $521.20 2600162-4R Lyle Northern Electric - Electrical Install/Hookup $4,990.00 $4,990.00 1018 Lyle Northern Electric - Final Inspection $200.00 $200.00 1171 Contructon Subtotal $15,614.00 $15,614.00 Upgrade Total $29,576.62 $31,046.62 $0.00 $158,719.46Grand Total Payment amount for Project Original Bid Final Invoice Amount Verdek UPGRADES UPGRADES STATEMENT Utah Department of Transportation 4501 S. 2700 W./ BOX 141510 801-965-2494 (for Accts. Receivables) DATE: STATEMENT # 201217- Department of Environmental Quality 195 N 1950 W Salt Lake City UT 84116 Customer ID: DEQ-VWGRANT COMMENTS: Per VW Eligible Mitigation Action Grant Agreement #201217 - is to be reimbursed DATE DESCRIPTION AMOUNT BALANCE //20 CURRENT 1-30 DAYS PAST DUE 31-60 DAYS PAST DUE 61-90 DAYS PAST DUE OVER 90 DAYS PAST DUE AMOUNT DUE $ $ REMITTANCE Statement # 201217- Date Amount Due Amount Enclosed Make all checks payable to Utah Department of Transportation. Please include the UDOT coding block: Unit Appr XE Program 73261 Phase $ $ Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2021 4 10-28-2020 lbarker October 28, 2020 lbarker $129,272.84 Roll Document from 2020 to 2021 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 123 Rolling Meadow Rd Check true 10/28/20VC219254 Verdek LLC $129,272.84 Madison, CT 06443 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF: 2 25170 Vehicle components & systems including safety & security 129272.84000 EA $129,272.84 84708 1 10-05-2020 $1.00 1 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 2021 PartialDO 2002209759810 1 2 1 2800 6816810 7203 XED 73261 10U UDOT AR2842 - BLUFF MAINTENANCE STATION AP01 $129,272.84 Name Date 7/13/2020 Request # 6850987 Address WO # 6850987 City SLC State UT ZIP 84114 Acct # 56412930 002 Site ID # 125930787 006 Email Employee: p10009 Qty Unit Price TOTAL 1.0 $1,470.00 $1,470.00 TOTAL $1,470.00 Invoice costs are valid for only 90 days from invoice date! Please remit payment to address at top of invoice. Canyonlands UDOT Strategic Investments 320 North 100 West Moab, Utah 84532-2305 Attention: Lyle McMillan 4501 S 2700 W # 143600 Description install span guy, 35' span guy pole, anchor this material added to work order #6686602 due to customer adding driveway in location of anchor needed Office Use Only PRO FORMA INVOICE Customer uCalc - Invoice Version 14May20 Request #6850987 56412930 002 7/13/20207/13/2020 $1,470.00 Page:of1 1 CREATION DATE: STATE OF UTAH GENERAL ACCOUNTING EXPENDITURE DOCUMENT TOTAL: PRINT DATE: FY: DOCUMENT DESCRIPTION: VENDOR LINES: ENTERED BY: LAST USER: BFY: DOCUMENT NAME: PERIOD: 07-20-2020 2021 1 1 July 20, 2020 lbarker lbarker $1,470.00 ALIAS/DBA: VNDR LN: VENDOR NUMBER: LEGAL NAME: ADDRESS: SNGL CHK FL: PYMT DT: DISB TYPE: AMOUNT: HDLG CD: 1 320 N 100 W true 07/20/20 Check 02408CK Moab, UT 84532-2305 US $1,470.00ROCKY MOUNTAIN POWER & LIGHT CANYONLAND OPE ACCT LINE DESC: ACCT LN: VNDR INV LN:VNDR INV DT: REF ACTG LN: BFY: REF VNDR LN: PERIOD:FY: VNDR INV #: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSADEPT REF DOC: 1 $1,470.00 2800 6816810 7203 XED 73261 10U UDOT Acct # 56412930 002 AP01 6850987 1 07-13-2020 Name Date 4/28/2020 Request # 6686602 Address WO # 6686602 City SLC State UT ZIP 84114 Acct # 56412930 002 Site ID # 125930787 006 Email Employee: p10009 Qty Unit Price TOTAL 1.0 $13,962.62 $13,962.62 TOTAL $13,962.62 Invoice costs are valid for only 90 days from invoice date! Please remit payment to address at top of invoice. Office Use Only Moab, Utah 84532-2305 Description Provide 3 phase power 277/480 to EV charging station for UDOT at 350 W. Main, Bluff, UT. Canyonlands 320 North 100 West UDOT Strategic Investments Attention: Lyle McMillan 4501 S 2700 W # 143600 PRO FORMA INVOICE Customer uCalc - Invoice Version 28Apr20 1 of 6 (UT May2019 - NoAdvRfnd) Estimator; Gary Lawley Account #:56412930 002 C/C: 11406 Service ID #:125930787 006 Request #: 6686602 Monthly Contract #: GENERAL SERVICE CONTRACT (1000 KVA OR LESS) between ROCKY MOUNTAIN POWER and UDOT STRATEGIC INVESTMENTS UDOT STRATEGIC INVESTMENTS at or near 450 W MAIN ST, BLUFF, Utah. from time to time, regulate this Contract and are incorporated in this Contract. In the event of any conflict between this Contract and the Electric Service Schedules or the Electric Service request. 1. Delivery of Power. Company will provide 277/480 volt, three-phase electric service to the Customer facilities. 2. Contract Demand. The demand in kVA that Customer requires to meet its load requirement and Company agrees to supply and have available for delivery to Customer, shall be 135 kVA (diversified, based on Customer's submitted load prior to After 36 months of service the Company may reduce Contract Demand to the maximum recorded and billed demand in the previous 36 months. The reduction in Contract Demand shall become effective thirty (30) days after the Company provides notice. Demand, Company shall advise Customer in writing whether the additional power and energy is currently available, or if not currently available, initiate the processes to determine the costs to make it available. 3. Extension Costs. Customer agrees to pay Company the estimated construction costs in excess of the Customer has paid $0.00 for engineering, design, or other advance payment for The balance due is $13,962.62. 2 of 6 provided for Company lines and equipment, may be subject to refund as calculated using Company standard costs. As per tariff the refund will be 20% of the calculated cost for shared facilities. This extension has no potential TCVR refunds. 4. Contract Minimum Billing. Customer agrees to pay a contract minimum billing (the Company is ready to supply service. The Contract Minimum Billing shall be the greater of: (1) the ; or, (2) $0.00 (the monthly facilities charge) plus eighty percent (80%) of the . Billings will be based on Rate Schedule No. 6 and superseding schedules. 5. Effective. This Contract will expire unless Customer signs and returns an original of this Contract along with any required payment to Company within ninety (90) days of the Contract date shown on page 1 of this Contract. 6. Contract Minimum Billing Term. This Contract becomes binding when both Company and Customer have signed it, and will remain in effect for five (5) years In the event Customer terminates service or defaults (which results in termination of service) within the first five (5) years of this Contract, Customer shall be responsible for paying the Contract Minimum Billing for the remainder of the Term. If Customer is not ready to receive service from Company within one-hundred fifty (150) days of the date Customer signs this Contract, then Company may terminate this r design, permitting and other associated Contract costs. However, if Company has installed Improvements so that Company is ready to supply service, but Customer is not ready to receive service from Company within such one-hundred fifty (150) day period, then the failure of Customer to receive service may be treated as a Customer default, and Customer shall be responsible for paying the Contract Minimum Billing for remainder of the Term. 7. Customer Obligations. Customer agrees to: a) Provide legal rights-of-way to Company, at no cost to Company, using Co st adjoining property and any permits, fees, etc. required to cross public lands; ions; c) Install all Customer provided trench, conduit, equipment foundations, or excavations for equipment foundations within the legal rights-of-ways; and, d) 8. Special Provisions: 1 meter (200 amp); customer has chosen contract buyout @ $13,400.48; 3 of 6 9. Underground Facilities. If service is provided by an underground line extension, enching and backfilling, imported backfill material, conduit and duct, and furnish and install all equipment foundations, as designed by Company. Company may abandon in place any underground cables installed under this Contract that are no longer useful to Company. Customer warrants that all Customer provided trench and excavations for equipment foundations, and Customer installed conduit and equipment foundations are installed Service Requirements Manual, and other specifications as otherwise provided by Company. In the event Customer fails to comply with the foregoing, Customer shall be liable for the cost to Company for relocating the facilities within a legal right-of-way, acquiring right-of-way for Company facilities, repair or replacement of improperly installed conduit or foundations, and paying costs for damages that may arise to any third party as a result of Company facilities being located outside of a legal right-of-way. The provisions of this paragraph 9 shall survive the termination of this Contract. 10. Design, Construction, Ownership and Operation. Company shall design, construct, inst . Com facilities that serve or will serve Customer. Construction of the Improvements shall not begin until (1) both Company and Customer have executed (signed) this Contract, and (2) all other requirements prior to construction have been fulfilled, such as permits, payments received, inspection, etc. Any delays by the Customer concerning site preparation and right-of-way acquisition or trenching, inspection, permits, etc. may correspondingly delay completion of the Improvements. Company warrants that its work in constructing and maintaining the Improvements shall be consistent with prudent utility practices. COMPANY DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTY OF MERCHANTABILITY, FITNESS FOR PARTICULAR PURPOSE, AND SIMILAR WARRANTIES. the Improvements, or installation of the Improvements shall be limited to repair or replacement of any non-operating or defective portion of the Improvements or liable for other economic losses, including but not limited to consequential damages. Company shall not be subject to any liability or damages for inability to provide service to the extent that such failure shall be due to causes beyond the reasonable control of Company. No other party, including Customer, shall have the right to operate or maintain Improvements. 11. Payments. All bills shall be paid by the date specified on the bill, and late charges shall be imposed upon any delinquent amounts. Company reserves the right to require 4 of 6 customer payments be sent by EDI or wire transfer. If Customer disputes any portion of Customer's bill, Customer shall pay the total bill and shall designate the disputed portion. Company shall decide the dispute within sixty (60) days after Customer's notice of dispute. Any refund Company determines Customer is due shall bear interest at the rate then specified by the Commission or, if no rate is specified, the then effective prime rate as quoted in The Wall Street Journal. Company may request deposits from Customer to the extent permitted under the applicable Electric Service Regulations and the applicable Electric Service Schedule. In the event of a default by Customer in any of its obligations, Company may exercise any or all of its rights and remedies with respect to any such deposits. 12. Furnishing Information and Deposits. Customer represents that all information it has furnished or shall furnish to Company in connection with this Contract shall be accurate and complete in all material respects. Company will base its decision with respect to credit, deposits, allowances or any other material matter on information furnished under this section by Customer. Should such information be inaccurate or incomplete, Company shall have the right to revoke or modify this Contract and/or its decision to reflect the determination Company would have made had Company received accurate and complete information. Company may request deposits, for the purpose of guaranteeing payment of electric service b Electric Service Regulation No. 9. 13. Governing Law; Venue. All provisions of this Contract and the rights and obligations of the parties hereto shall in all cases be governed by and construed in accordance with the laws of the State of Utah applicable to contracts executed in and to be wholly performed in Utah by persons domiciled in the State of Utah. Each party hereto agrees that any suit, action or proceeding in connection with this Contract may only be brought before the Commission, the Federal courts located within the State of Utah, or state courts of the State of Utah, and each party hereby consents to the exclusive jurisdiction of such forums (and of the appellate courts therefrom) in any such suit, action or proceeding. 14.Assignment. The obligations under this Contract are obligations at all times of Any such assignment also shall be subject applicable Electric Service Schedule, and (ii) such successor being bound by this Contract and assuming the obligation of Customer from the date of assignment, which may be evidenced by written agreement of such successor or other means acceptable to Company. Company may condition this assignment by the posting by the successor of a deposit as permitted under the applicable Electric Service Regulations and the applicable Electric Service Schedule. Company may at any time assign its rights and delegate its obligations under this Contract to any: affiliate; successor in interest; corporation; or any other business entity in conjunction with a merger, consolidation or other business reorganization to which Company is a party. 5 of 6 15. Remedies; Waiver. Either party may exercise any or all of its rights and remedies under this Contract, the applicable Electric Service Regulations, the applicable Electric Service Schedule and under any applicable laws, rules and regulations. No provision of this Contract, the Electric Service Regulations, or the applicable Electric Service Schedule shall be deemed to have been waived unless such waiver is expressly stated in writing and signed by the waiving party. If any suit or action arising out of or related to this Contract is brought by any party, the prevailing party or parties shall be entitled to recover the costs and fees (including, without limitation, reasonable attorneys' fees, the fees and costs of experts and consultants, copying, courier and telecommunication costs, and deposition costs and all other costs of discovery) incurred by such party or parties in such suit or action, including, without limitation, any post-trial or appellate proceeding, or in the collection or enforcement of any judgment or award entered or made in such suit or action. 17. Waiver of Jury Trial. TO THE FULLEST EXTENT PERMITTED BY LAW, EACH OF THE PARTIES HERETO WAIVES ANY RIGHT IT MAY HAVE TO A TRIAL BY JURY IN RESPECT OF LITIGATION DIRECTLY OR INDIRECTLY ARISING OUT OF, UNDER OR IN CONNECTION WITH THIS CONTRACT. EACH PARTY FURTHER WAIVES ANY RIGHT TO CONSOLIDATE ANY ACTION IN WHICH A JURY TRIAL HAS BEEN WAIVED WITH ANY OTHER ACTION IN WHICH A JURY TRIAL CANNOT BE OR HAS NOT BEEN WAIVED. 18. Entire Agreement. This Contract contains the entire agreement of the parties with respect to the subject matter, and replaces and supersedes in their entirety all prior agreements between the parties related to the same subject matter. This Contract may be modified only by a subsequent written amendment or agreement executed by both parties. UDOT STRATEGIC INVESTMENTS By signature Lyle McMillan Dir, Strategic Inv NAME (type or print legibly) TITLE DATE ROCKY MOUNTAIN POWER By signature Dan Vink manager NAME (type or print legibly) TITLE DATE 6 of 6 Contract ATTENTION OF ADDRESS CITY, STATE, ZIP EMAIL ADDRESS for Executed Contract 320 N 100 W ADDRESS Moab, UT 84532 CITY, STATE, ZIP c/o Amber Wiggins EMAIL ADDRESS Page:of1 1 CREATION DATE: STATE OF UTAH GENERAL ACCOUNTING EXPENDITURE DOCUMENT TOTAL: PRINT DATE: FY: DOCUMENT DESCRIPTION: VENDOR LINES: ENTERED BY: LAST USER: BFY: DOCUMENT NAME: PERIOD: 05-06-2020 1 May 06, 2020 rvanallen rvanallen $13,962.62 ALIAS/DBA: VNDR LN: VENDOR NUMBER: LEGAL NAME: ADDRESS: SNGL CHK FL: PYMT DT: DISB TYPE: AMOUNT: HDLG CD: 1 320 N 100 W false 05/06/20 Check 02408CK Moab, UT 84532-2305 US $13,962.62ROCKY MOUNTAIN POWER & LIGHT CANYONLAND OPE ACCT LINE DESC: ACCT LN: VNDR INV LN:VNDR INV DT: REF ACTG LN: BFY: REF VNDR LN: PERIOD:FY: VNDR INV #: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSADEPT REF DOC: 1 $13,962.62 2800 6816810 7203 XED 73261 10U UDOT ACCT# 56412930 002 AP01 6686602 1 04-28-2020                               Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2020 12 06-12-2020 lbarker June 12, 2020 lbarker $9,902.80 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 P O Box 869 Check true 06/12/20VC0000157045 Kilgore Companies $9,902.80 Magna, UT 84044 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF:MA 810 169807 1 74512150160 Hot plant bituminous 12.5 (1/2") delivered pg grade 64-34 1.00000 EA $9,902.80 2600162-4 1 12-16-2019 $9,902.80 1 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 Partial00 2800 6816810 7203 XED 73261 10U UDOT 169807 - HMA - 1/2 inch - Electrical Charging Stations AP01 $9,902.80 Mth 08/20 Plus Sales Tax 0.00 Less Retainage 0.00 Total Due This Invoice 521.20 Retention Owed for Electrical Charging Station 2600162- 0 521.20 Total To Date 521.20 Description Contract Contract Item Unit Price Quantity Total Terms 7906 Electrical Charging Station 2600162-4R 08/11/20 9/10/2020 Net 30 Days Invoice Bill to: UDOT Region #4 708 South 100 West Richfield, UT 84701 Ship to:UDOT Region #4 708 South 100 West Richfield, UT 84701 Cust # Customer Ref Invoice # Invoice Date Due Date 521.20 2600162-4R 08/11/20 Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2021 4 11-02-2020 lbarker November 02, 2020 lbarker $521.20 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 P O Box 869 Check true 11/02/20VC0000157045 Kilgore Companies $521.20 Magna, UT 84044 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF:MA 810 169807 1 74512150100 Hot plant bituminous 9.5 (3/8") delivered pg grade 58-22 1.00000 EA $521.20 2600162-4R 1 08-11-2020 $521.20 1 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 Partial00 2800 6816810 7203 XED 73261 10U UDOT #169807 - Cusomer 7906 - Retention for EVSE AP01 $521.20 Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2021 1 07-23-2020 lbarker July 23, 2020 lbarker $4,990.00 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 61 W 300 N 19-10 Check true 07/23/2014319H LYLE NORTHERN ELECTRIC INC $4,990.00 BLANDING, UT 84511 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF: 1 96435 Electricians 4990.00000 JOB $4,990.00 1018 1 07-20-2020 $1.00 3 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 2021 FinalDO 2006264437810 1 1 1 2800 6816810 7203 XED 73261 10U UDOT EVSE infrastructure AP01 $4,990.00 STATE OF UTAH CONTRACT AMENDMENT AMENDMENT #: 1 CONTRACT #: 199716 Utah Department of Transportation Contact Person:Denise Johnson (Referred to as STATE)Phone Number:435-678-2415 And the following entity:Fax Number: Lyle Northern Electric Email Address:denise@lnelectric.net Vendor Code:14319H BOTH PARTIES AGREE TO AMEND THE CONTRACT AS FOLLOWS: The CONTRACT PERIOD is amended: The TOTAL CONTRACT AMOUNT is amended: Original Starting Date: 06/29/2018 Current Contract Amount: Original Expiration Date 10/28/2019 Amount Added by Amendment: Current Expiration Date: (if different from original)-New Contract Total Amount: Amended Expiration Date:4/28/2021 X This is a requirements contract. Effective Date of Amendment:10/11/2019 The purpose of this amendment is to extend the master contract for the AVL as the vendor has re-certified their ability to perform the scope for 18 months. Other changes to the contract include: All other terms and conditions of the contract, including those previously modified, shall remain in full force and effect. IN WITNESS WHEREOF, the parties sign and cause this contract to be executed. CONTRACTOR STATE OF UTAH Signature Date UDOT Procurement Manager Date Director of Operations Date Title (Print) Contract Administrator Date Purchasing Agent Phone # e-mail Kai Turner 801-965-4071 kaiturner@utah.gov Mailing Address: UDOT Procurement, P.O. Box 148260, Salt Lake City, UT 84114-8260 Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2021 3 09-08-2020 lbarker September 08, 2020 lbarker $200.00 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 61 W 300 N 19-10 Check true 09/08/2014319H LYLE NORTHERN ELECTRIC INC $200.00 BLANDING, UT 84511 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF:MA 810 199716 1 96435 Electricians 1.00000 EA $200.00 1171 1 09-01-2020 $200.00 3 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 Partial00 2800 6816810 7203 XED 73261 10U UDOT Contract 199716 - Electrical Inspection AP01 $200.00 STATE OF UTAH CONTRACT AMENDMENT AMENDMENT #: 1 CONTRACT #: 199716 Utah Department of Transportation Contact Person:Denise Johnson (Referred to as STATE)Phone Number:435-678-2415 And the following entity:Fax Number: Lyle Northern Electric Email Address:denise@lnelectric.net Vendor Code:14319H BOTH PARTIES AGREE TO AMEND THE CONTRACT AS FOLLOWS: The CONTRACT PERIOD is amended: The TOTAL CONTRACT AMOUNT is amended: Original Starting Date: 06/29/2018 Current Contract Amount: Original Expiration Date 10/28/2019 Amount Added by Amendment: Current Expiration Date: (if different from original)-New Contract Total Amount: Amended Expiration Date:4/28/2021 X This is a requirements contract. Effective Date of Amendment:10/11/2019 The purpose of this amendment is to extend the master contract for the AVL as the vendor has re-certified their ability to perform the scope for 18 months. Other changes to the contract include: All other terms and conditions of the contract, including those previously modified, shall remain in full force and effect. IN WITNESS WHEREOF, the parties sign and cause this contract to be executed. CONTRACTOR STATE OF UTAH Signature Date UDOT Procurement Manager Date Director of Operations Date Title (Print) Contract Administrator Date Purchasing Agent Phone # e-mail Kai Turner 801-965-4071 kaiturner@utah.gov Mailing Address: UDOT Procurement, P.O. Box 148260, Salt Lake City, UT 84114-8260 199716 14319H CONTRACT #: Bluff Station – West 1 Bluff Station – East 2