HomeMy WebLinkAboutDAQ-2024-007666Request For Payment from VW EVSE Division of Air Quality Department of Environmental Quality State of Utah 195 North 1950 West Salt Lake City, UT 84116 PAYABLE TO: SLC, UT 84114 TAX ID: CHARGE TO: Fund Agency Approp Unit Function Prog Object or BS 2158 480 2158 2113 2VWUDOT 7512 DATE DESCRIPTION TOTAL 1/5/2023 $146,006.09 $146,006.09 Reviewed and Approved By: Date: Mat Carlile Andrea Riddle Project completed: April 1, 2020 Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project. Payment to UDOT for reimbursement for purchase, installation, warranty, and networking costs for two DC Fast Chargers ($146,006.09) at 216 S Main St. Monticello, UT 84535. As per the State Cooperative Agreement with Verdek shipping costs will not be reimbursed on this payment. This payment comes from the Contract 201217 for UDOT through the VW Settlement funds. Transaction Id:______________________ UDOT #VC0000179400 4501 South 2700 West Awardee Name: _UDOT-Monticello___ Award Amount (verify that the requested amount does not exceed total amount reimbursed to UDOT pursuant to the Volkswagen Eligible Mitigation Action Agreement Between State of Utah, Department of Transportation and State of Utah, Department of Environmental Quality, #201217, effective December 18, 2019, as amended March 23, 2022): $_1,047,6231 Project Summary Proposed number of EVSEs (type and quantity of each) Two DC Fast Chargers Actual number of EVSEs (type and quantity of each) Two DC Fast Chargers Proposed address of EVSE location(s): 701 E, Highway 491, Monticello Utah Actual address of EVSE location(s): 216 S Main St. Monticello, Utah Bid amount: $137,802.52. That amount was made up of $18,061 in power upgrades and $119,741.52 in Verdek install costs. Invoice amount $128,791.71, The actual costs to install the EV Chargers at this location was $146,006.09 for an increase in cost of $8,203.09. Savings associated with the power upgrades accounted for $2,261.43. Additional costs associated with Verdek installation accounted for $12,065. Verdek indicated that these additional costs above their bid price were due to multiple trips to the project location by their installers in separate vehicles due to the COVID-19 Pandemic & a change order to move the charger location that was more accessible. Checklist of required documents (Provide a description of any modifications from the original, proposed project). A site map showing the location of the EVSE funded by this funding assistance; Installation start date of the EVSE project October 1, 2020 (See Monticello Session Data) ; The date the EVSE was placed into April 1, 2020 (See Monticello Session Data) A photo of the EVSE funded by this funding assistance and placed into service; The estimated hours per day and days per year the EVSE funded by this funding assistance will be used: 1.6 hours a day 292 days a year (See Monticello Session Data). A final purchase invoice for each EVSE, installation, maintenance, and other itemized actual costs from the Funding Assistance Application. The invoice shall include: a. the invoice date; b. the itemized purchase cost for each item or service listed in the competitive bid; and c. the applicant as the purchaser; If costs are higher than the original bid, are the increased costs reasonable? The original bid amount for the install at this location was $137,802.52. That amount was made up of $18,061 in power upgrades and $119,741.52 in Verdek install costs. The actual costs to install the EV Chargers at this location was $146,006.09 for an increase in cost of $8,203.09. Savings associated with the power upgrades accounted for $2,261.43. Additional costs associated with Verdek installation accounted for $12,065. Verdek indicated that these additional costs above their bid price were due to multiple trips to the project location by 1 Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project. their installers in separate vehicles due to the COVID-19 Pandemic & a change order to move the charger location that was more accessible. If items purchased are different from competitive bid did entity document that they meet procurement rules for changed items (see Terms and Conditions section II B.); and Proof of payment. Did the applicant use the State Cooperative Agreement? Yes o If yes, did the invoice include shipping? Yes, however, VW funds will not reimburse for shipping costs because UDOT used the Verdek State Cooperative Agreements where shipping costs are not allowed. Amount authorized for reimbursement: =$146,006.09 With this authorized amount, the total amount reimbursed to UDOT to date = $739,148.33 Reviewed by Mat Carlile _______________ Becky Close________________ Andrea Riddle_______________ Locations Vendors Attachment B- Bid Item Application Bid $ VW $ UDOT $ Finial Invoice Items Contract List Price Final Invoice $ VW $ UDOT $ Invoice # 216 S Main St. Monticello, UT 84535, San Juan County CPE250- ChargePoint Express 250 $60,850.00 $60,850.00 $0.00 CPE250C-625-CCS1-CDH $74,256.00 $60,850.00 $60,850.00 $0.00 84709 Shipping $1,600.00 $1,600.00 Shipping $1,600.00 $1,600.00 84709 5 Year Warranty (Assure Plan)/ Network Plan $34,710.00 $34,710.00 $0.00 CPCLD-ENTERPRISE-DC-5 5yr Prepaid Enterprise Cloud Plan $7,424.00 $6,810.00 $6,810.00 $0.00 84709 EXPRESS-ASSURE5 Express CPE 250 5-yr Prepaid Assure Plan (per module - 2 modules per station) $29,140.00 $27,900.00 $27,900.00 $0.00 84709 Mobilzation $3,875.00 $3,875.00 $0.00 MOBILIZATION $4,654.96 $4,654.96 $0.00 84709 Design/ Equipment $3,050.00 $3,050.00 $0.00 DESIGN EQUIPMENT $3,050.00 $3,050.00 $0.00 84709 Related Improvements/R epairs $6,356.00 $6,356.00 $0.00 RELATED IMPROVEMENTS/REPAIRS $6,356.00 $6,356.00 $0.00 84709 Electrical Materials $4,646.00 $4,646.00 $0.00 ELECTRICAL MATERIALS $4,646.00 $4,646.00 $0.00 84709 Commissioning System $432.00 $432.00 $0.00 COMMISSIONING SYSTEM $432.00 $432.00 $0.00 84709 Overhead $3,304.61 $3,304.61 $0.00 OVERHEAD $3,304.61 $3,304.61 $0.00 84709 Profit $917.95 $917.95 $0.00 PROFIT $917.95 $917.95 $0.00 84709 Change Order Move Installation $11,285.00 $11,285.00 $0.00 84709 Subtotal (Verdek) $119,741.56 $119,741.56 $0.00 Subtotal (Verdek) $131,806.52 $130,206.52 $1,600.00 Empire Elctric Association, Inc Provide 3 phase power 277/480 to EV charging station for udot at 216 S i $18,061.00 $18,061.00 $0.00 Provide 3 phase power 277/480 to EV charging station for udot at 216 S Main St. Monticello, UT 84535, $14,899.57 $14,899.57 $0.00 228032 Deposit $900.00 $900.00 $0.00 53394C Subtotal Upgrades $18,061.00 $18,061.00 $0.00 Subtotal Upgrades $15,799.57 $15,799.57 $0.00 Estimated Grand Total $137,802.56 $137,802.56 $0.00 Estimated Grand Total $147,606.09 $146,006.09 $0.00 $146,006.09Grand Total Payment amount for Project Original Bid Final Invoice Amount Verdek UPGRADES UPGRADES STATEMENT Utah Department of Transportation 4501 S. 2700 W./ BOX 141510 801-965-2494 (for Accts. Receivables) DATE: STATEMENT # 201217- Department of Environmental Quality 195 N 1950 W Salt Lake City UT 84116 Customer ID: DEQ-VWGRANT COMMENTS:Per VW Eligible Mitigation Action Grant Agreement # 201217 - $ is to be reimbursed for DATE DESCRIPTION AMOUNT BALANCE //20 CURRENT 1-30 DAYS PAST DUE 31-60 DAYS PAST DUE 61-90 DAYS PAST DUE OVER 90 DAYS PAST DUE AMOUNT DUE REMITTANCE Statement #201217- Date Amount Due Amount Enclosed Make all checks payable to Utah Department of Transportation. Please include the UDOT coding block: Unit Appr XE Program 73261 Phase Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2021 4 10-29-2020 lbarker October 29, 2020 lbarker $120,521.52 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 123 Rolling Meadow Rd Check true 10/29/20VC219254 Verdek LLC $120,521.52 Madison, CT 06443 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF:MA 100 AR2842 1 25170 Vehicle components & systems including safety & security 1.00000 EA $120,521.52 84709 1 10-05-2020 $120,521.52 1 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 Partial00 2800 6816810 7203 XED 73261 10U UDOT AR2842 - MONTICELLO VISITOR CENTER AP01 $120,521.52 Page:of1 1 STATE OF UTAH PAYMENT REQUEST - COMMODITY BASED DOCUMENT TOTAL: FY:BFY: DOCUMENT DESCRIPTION: ENTERED BY: LAST USER: CREATION DATE:PERIOD: PRINT DATE: 2021 4 10-28-2020 lbarker October 28, 2020 lbarker $11,285.00 Roll Document from 2020 to 2021 DISB TYPE: VNDR LN:VENDOR NUMBER: LEGAL NAME: ADDRESS: AMOUNT: HDLG CD: ALIAS/DBA: PYMT DT: SNGL CHK FL: 1 123 Rolling Meadow Rd Check true 10/28/20VC219254 Verdek LLC $11,285.00 Madison, CT 06443 US VNDR INV #: QTY: COMM LN: COMM#: DESCRIPTION: UNIT: UNIT PRICE: TOTAL: F/A: VNDR INV LN: VNDR INV DT: WHSE#: AGREEMENT REF: 2 25170 Vehicle components & systems including safety & security 11285.00000 EA $11,285.00 84646 1 08-05-2020 $1.00 1 REF TYP:REF ACTG LN: ACCT LN: REF COMM LN: BFY: REF VNDR LN: PERIOD:FY: REF DOC: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND DEPT SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSA LINE DESC: 1 2021 PartialDO 2002209759810 1 2 1 2800 6816810 7203 XED 73261 10U UDOT AR2842 - MONTICELLO-CHANGE ORDER AP01 $11,285.00 Page:of1 1 CREATION DATE: STATE OF UTAH GENERAL ACCOUNTING EXPENDITURE DOCUMENT TOTAL: PRINT DATE: FY: DOCUMENT DESCRIPTION: VENDOR LINES: ENTERED BY: LAST USER: BFY: DOCUMENT NAME: PERIOD: 05-29-2020 2020 11 1 May 29, 2020 lbarker lbarker $900.00 ALIAS/DBA: VNDR LN: VENDOR NUMBER: LEGAL NAME: ADDRESS: SNGL CHK FL: PYMT DT: DISB TYPE: AMOUNT: HDLG CD: 1 PO Box K true 05/29/20 Check 53394C Cortez, CO 81321-0676 US $900.00EMPIRE ELECTRIC ACCT LINE DESC: ACCT LN: VNDR INV LN:VNDR INV DT: REF ACTG LN: BFY: REF VNDR LN: PERIOD:FY: VNDR INV #: LINE AMOUNT:EVENT TYPE: PRG PRDPHASEPROGMFUND SOBJUNIT DPT REVAPPR OBJ ACTY FUNCREV BSADEPT REF DOC: 1 $900.00 2800 6816810 7203 XED 73261 10U UDOT UDOT MONTICELLO ELECTRIC VEHICLE CHARGING DEPOSIT AP01 53394C 04/28/20 1 04-21-2020 Monticello Station – Welcome West 2 Monticello Station – Welcome East 1