Loading...
HomeMy WebLinkAboutDAQ-2024-007648Request For Payment form VW EVSE Division of Air Quality Department of Environmental Quality State of Utah 195 North 1950 West Salt Lake City, UT 84116 PAYABLE TO: TAX ID: CHARGE TO: Fund Agency Approp Unit Function Prog Object or BS 2158 480 2158 2113 2VWPROVO 7512 DATE DESCRIPTION TOTAL 10/20/2022 $222,030.00 $222,030.00 Reviewed and Approved By: Date: Mat Carlile Andrea Riddle NOTE:Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project. The included invoices came in at $267,718, which includes the costs of purchasing and installing all 20 EVSE units plus the warranty, and network costs for the 20 EVSE units; however, only 16 of the EVSE units have been installed and activated. Provo is requesting reimbursement for these 16 units. The reimbursable amount for these 16 EVSE units comes to $222,030, which includes costs for buying and installing 16 dual-port level 2 EVSE units, plus the warranty and network for these units. The remaining costs, which include the cost of electrical infrastructure updates, will be reimbursed when the remaining four EVSE units are installed and activated. Project complete dates: Rock Canyon Park January 15, 2021; Provo Power Complex January 26, 2021; Provo City Academy Library December 16, 2020; Provo Recreation Center February 12, 2021; Public Works Complex February 26, 2021; Spring Creek Park March 5, 2021; and Pioneer Park March 19, 2021 351 West Center St Payment to Provo City for reimbursement of the purchase and installation of 16 dual port level 2 Electric Vehicle Supply Equipment (EVSE) units ($222,030). This payment comes from Contract 200969 for Provo City through the VW Settlement funds. Transaction Id:______________________ Provo City Provo City, UT 84061 Awardee Name: _Provo City ___ Award Amount (verify that the requested amount does not exceed this amount): $_752,5001 Project Summary Proposed number of EVSEs (type and quantity of each) 20 Dual-Port Level 2 EVSE units Actual number of EVSEs (type and quantity of each) 16 Dual-Port Level 2 EVSE units Proposed address of EVSE location(s): Provo City Center 351 W. Center St. Provo, UT 84601; Provo Recreation Center 300 West 500 North Provo, Utah 84601; Provo City Academy Library 550 North University Ave. Provo, Utah 84601; Provo Power Complex 251 West 800 North Provo, Utah 84601; Public Works Complex 1377 South 350 East Provo, Utah 84601; Rock Canyon Park 500 East 2320 North Provo, Utah 84601; North Park 500 North 500 West Provo, Utah 84601; Spring Creek Park 1700 South State St. Provo, Utah 84601; and Pioneer Park 550 West 100 South Provo, Utah 84601 Actual address of EVSE location(s): Rock Canyon Park 500 East 2320 North Provo, Utah 84601; Provo Power Complex 251 West 800 North Provo, Utah 84601; Provo City Academy Library 550 North University Ave. Provo, Utah 84601; Provo Recreation Center 300 West 500 North Provo, Utah 84601; Public Works Complex 1377 South 350 East Provo, Utah 84601; Spring Creek Park 1700 South State St. Provo, Utah 84601; and Pioneer Park 100 North 400 West Provo, Utah 84601. Bid amount: $302,155.11 this includes costs for buying, installation, warranty, and network of 20 dual-port level 2, warranty and network ($267,718), and electrical system infrastructure upgrades ($34,437.11). Invoice amount: The invoices came in at $267,718, which includes the costs of purchasing and installing all 20 EVSE units plus the warranty, and network costs for the 20 EVSE units; however, only 16 of the EVSE units have been installed and activated. Provo is requesting reimbursement for these 16 units. The reimbursable amount for these 16 EVSE units comes to $222,030, which includes costs for buying and installing 16 dual-port level 2 EVSE units, plus the warranty and network for these units. The remaining costs, which include the cost of electrical infrastructure updates, will be reimbursed when the remaining four EVSE units are installed and activated. Checklist of required documents (Provide a description of any modifications from the original, proposed project). A site map showing the location of the EVSE funded by this funding assistance; Installation start date of the EVSE project March 6, 2020 (see EVSE Reimbursement Request #1 5/31/2022 submission); The date the EVSE was placed into: Rock Canyon Park January 15, 2021; Provo Power Complex January 26, 2021; Provo City Academy Library December 16, 2020; Provo Recreation Center February 12, 2021; Public Works Complex February 26, 2021; Spring Creek Park March 5, 2021; and Pioneer Park March 19, 2021 (see EVSE Reimbursement Request #1 5/31/2022 submission) A photo of the EVSE funded by this funding assistance and placed into service; 1 Please note that this payment was part of a larger project and that request is for a portion of the overall cost of the project The estimated hours per day and days per year the EVSE funded by this funding assistance will be used: A final purchase invoice for each EVSE, installation, maintenance, and other itemized actual costs from the Funding Assistance Application. The invoice shall include: a. the invoice date; b. the itemized purchase cost for each item or service listed in the competitive bid; and c. the applicant as the purchaser; If costs are higher than the original bid, are the increased costs reasonable? N/A If items purchased are different from competitive bid did entity document that they meet procurement rules for changed items (see Terms and Conditions section II B.); and Proof of payment. Did the applicant use the State Cooperative Agreement? Yes o If yes, did the invoice include shipping? No o If yes Were the shipping and EVSE cost below State Contract list price (See price breakdown)? N/A Reviewed by Mat Carlile _______________ Becky Close________________ Andrea Riddle_______________ Locations Item Application/B Qty Cost per item total cost Grant $Provo $Locations Item on Final Invoice Qty Cost Per Item Cost Grant $Provo $Invoice # Chargers gateway Model # iL2-20 $4,995.00 $99,900.00 $99,900.00 $0.00 All Locations Chargers gateway Model # iL2-eSta- sm 20 $4,995.00 $99,900.00 $79,920.00 $0.00 110619- BTCP L2 Warranty for five (5) year - first year 20 $2,500.00 $50,000.00 $50,000.00 $0.00 Warranty for five (5) year - first year FREE. Total 6 20 $2,500.00 $50,000.00 $40,000.00 $0.00 0506202N WEXS components (such as cloud service) 20 $1,790.00 $35,800.00 $35,800.00 $0.00 components (such as cloud service) and 20 $1,790.00 $35,800.00 $28,640.00 $0.00 0506202N WEXS Rock Canyon Park Materials, Engineering, and 1 $10,672.00 $10,672.00 $10,672.00 $0.00 Rock Canyon Park Labor, Materials, Engineering, and Permitting 1 $10,672.00 $10,672.00 $10,672.00 $0.00 20L2 & 041420- 20L2P2 Provo Power Complex Labor, Materials, Engineering, and 1 $7,224.00 $7,224.00 $7,224.00 $0.00 Provo Power Complex Labor, Materials, Engineering, and Permitting 1 $7,224.00 $7,224.00 $7,224.00 $0.00 02202020- 20L2 & 041420- 20L2P2 Academy Libray Labor, Materials, 1 $15,002.00 $15,002.00 $15,002.00 $0.00 Academy Libray Labor, Materials, Engineering, and 1 $15,002.00 $15,002.00 $15,002.00 $0.00 02202020- 20L2 & City Center/Pioneer Labor, Materials, 1 $15,308.00 $15,308.00 $15,308.00 $0.00 City Center/Pionee Labor, Materials, Engineering, and 1 $15,308.00 $15,308.00 $6,760.00 $0.00 02202020- 20L2 & Rec Center/North Labor, Materials, 1 $13,728.00 $13,728.00 $13,728.00 $0.00 Rec Center/North Labor, Materials, Engineering, and 1 $13,728.00 $13,728.00 $13,728.00 $0.00 02202020- 20L2 & Public Works Complex Labor, Materials, 1 $9,482.00 $9,482.00 $9,482.00 $0.00 Public Works Complex Labor, Materials, Engineering, and 1 $9,482.00 $9,482.00 $9,482.00 $0.00 02202020- 20L2 & Spring Creek Park Labor, Materials, 1 $10,602.00 $10,602.00 $10,602.00 $0.00 Spring Creek Park Labor, Materials, Engineering, and 1 $10,602.00 $10,602.00 $10,602.00 $0.00 02202020- 20L2 & $267,718.00 $267,718.00 $0.00 $267,718.00 $222,030.00 $0.00 All Locations 1 $34,437.11 $34,437.11 $34,437.11 $0.00 All Locations 1 $34,437.11 $34,437.11 $0.00 $0.00 $34,437.11 $34,437.11 $0.00 $34,437.11 $0.00 $0.00 $302,155.11 $302,155.11 $0.00 Grant Total $302,155.11 $222,030.00 $80,125.11 Sub Totals Sub Totals Upgrade Costs Grand Total Sub Totals Orignal BIDS FINAL INVOICE Upgrade Costs All Locations Sub Totals Electric Highway LLC INVOICE 63 E 11400 S #196 Sandy, UT 84070 808.256.5660 INVOICE #FINAL DATE 10/14/2022 TO Dick Blackham Provo City Facilities Services Manager 351 W Center St Provo, UT 84601 FOR Provo City EV charger infrastructure P.O. # Description Amount Itemized costs are the same as the bid provided to Provo City on Oct 10, 2019 Total 267,718 Make all checks payable to Electric Highway LLC Payment is due within 30 days. If you have any questions concerning this invoice, contact Rob Slater | 808.256.5660 | rob@gsd.systems THANK YOU FOR YOUR BUSINESS! October 10, 2019 41420 2P2 April 13 0 QUANTITY DESCRIPTION Total 40 ports 5 years Network and Extended Service for the following locations: Rock Canyon Park Provo Power Complex Academy Library City Center/ Pioneer Park Rec center/ North Park Public Works Complex Spring Creek Park $ 85,800.00 63.E 11400 S #196 Sandy UT 84070 UTAH Office Invoice Number 0506202NWEXS Invoice Date May 06,2020 To: Due upon Receipt. Provo City (Dick Blackmen) Provo City Facilities Services Manager 351 West Center Street Provo, Utah 84601 ATTN: Accounts Payable TOTAL PAY THIS AMOUNT MAKE ALL CHECKS PAYABLE TO: The Electric Highway Company LLC THANK YOU FOR YOUR BUSINESS! OCPP Network $ 35,800.00 Extended EVSE Service $50,000.00 Complete d EVSE Type Quantity Location Name EVSE Cost EVSE Installation Costs EVSE Maintenance Costs Total Project Amount 1 - Invoice 2 - Proof of Payment 3 - Photo 4 - Map 5 - Date Installation Started 6 - Date Placed Into Service 7 - Hours Per Day and Days Per Year EVSE will be used 8 - Address Level 2 Dual chargers 2 Rock Canyon Park $9,990.00 $10,672.00 $8,580.00 $29,242.00 Yes Yes Yes Yes 3/6/2020 1/15/2021 4-8 Hours a day 365 days/year Rock Canyon Park - 500 East 2320 North Provo, Utah 2019-11-06 - Electric Highway Company 110619-BTCP L2 - $99,900 Level 2 Dual chargers 2 Provo Power complex $9,990.00 $7,224.00 $8,580.00 $25,794.00 Yes Yes Yes Yes 3/6/2020 1/26/2021 4-8 Hours a day 365 days/year Provo Power complex - 251 West 800 North Provo, Utah Level 2 Dual chargers 2 Academy Library $9,990.00 $15,002.00 $8,580.00 $33,572.00 Yes Yes Yes Yes 3/6/2020 12/16/2020 4-8 Hours a day 365 days/year Academy Library - 550 North University Avenue Provo, Utah 2020-05-06 - Electric Highway Company 0506202NWEXS -$85,800 Level 2 Dual chargers 4 Provo City Recreation Center $19,980.00 $13,728.00 $17,160.00 $50,868.00 Yes Yes Yes Yes 3/6/2020 2/12/2021 4-8 Hours a day 365 days/year Provo City Recreation Center - 300 West 500 North Provo, Utah Level 2 Dual chargers 2 Provo City Public Works complex $9,990.00 $9,482.00 $8,580.00 $28,052.00 Yes Yes Yes Yes 3/6/2020 2/26/2021 4-8 Hours a day 365 days/year Provo City Public Works complex - 1377 South 350 East Provo, Utah Level 2 Dual chargers 2 Spring Creek Park $9,990.00 $10,602.00 $8,580.00 $29,172.00 Yes Yes Yes Yes 3/6/2020 3/5/2021 4-8 Hours a day 365 days/year Spring Creek Park - 1700 South State Street Provo, Utah Level 2 Dual chargers 2 Pioneer Park $9,990.00 $6,760.00 $8,580.00 $25,330.00 Yes Yes Yes Yes 3/6/2020 3/19/2021 4-8 Hours a day 365 days/year Pioneer Park - 100 North 400 West Provo, Utah Totals 16 $79,920.00 $73,470.00 $68,640.00 $222,030.00 Level 2 Dual chargers 4 Provo City Center $19,980.00 $8,548.00 $17,160.00 $45,688.00 Yes Yes Still waiting for installation Yes Still waiting for installation Installation will be scheduled as soon as the site is designed and construction begins. The completion date has been extended to November 2023 Public access to all units 24 hours/day ; 365 days/year Provo City Center - 351 West Center Street Provo, Utah Totals 20 $19,980.00 $8,548.00 $17,160.00 $45,688.00 Total Reimbursement Requests 1 &2:$99,900.00 $82,018.00 $85,800.00 $267,718.00 14 kw/h per day 2020-02-20 - Electric Highway Company 02202020-20L2 -$41,009 2020-04-13 - Electric Highway Company 041420-20L2P2 -$41,009 EVSE Reimbursement Request #1- 05/31/2022 submission Future Reimbursement Request #2 (Will be submitted after installation is complete) 300 S 500 N 100 N 100 S 800 N 400 N 700 N 400 S 1150 S 920 S OAK VIEW CIR 2230 N 2620 N BULLDOG BLVD 640 S 1560 S 2320 N 2780 N 1320 S 460 S 900 N 580 S 900 S 2200 N 1325 S 150 N 1280 S 890 S 200 N 450 N 1020 S 940 N 1120 S 860 N 2100 N 1140 S 1020 N 1340 S 150 S 1990 N 950 S 1060 N 500 S 2600 N 2150 N 20 N 1400 S 1570 S 1600 S 1850 N 1800 N 770 S 930 N 1575 N 1440 S 1130 S 2680 N B 1500 S 230 S 1280 N 2570 N 50 S 2500 N 1430 S 2120 N 70 N 1220 S 960 S 1975 N 650 N 1340 N 600 N 780 S 1200 N 1625 N 1925 N 890 N 680 S 420 N 1940 N 590 N 2170 N 690 S 1 3 00 N 1090 S 2050 N 1140 N 1100 S 1370 S ST 1230 S 980 N 1225 N 1300 S 970 S 880 S 320 N 910 S 2270 N 1120 N 1060 S 730 S 1160 S CAMB RIDGE CT 2280 N 2370 N 490 S 1040 S 1380 N 1000 S 1190 S 1050 S 1250 S 1400 S 560 N 880 N 1450 S 100 N 550 S 960 S 600 N 900 N 1950 N 1410 E 200 N N 960 N 200 S 300 N 350 N 700 N 300 N 2000 N 1080 S 200 N 350 N CAMBRIDGE CIR 1400 N 500 N 700 N 300 N 600 S 1700 N 1500 N STATE HOSPITAL 900 N 1400 E 1200 S 1300 N 600 S 1500 S 1060 N 1150 S 1020 S 450 N 400 S 520 S 1020 S 700 S 500 S N 1500 S 880 N 900 S 2550 N 560 S 1650 N 1060 N 50 S 1200 N 300 N 820 N 2680 N 520 S 1400 S CE NTER ST 100 N 2060 N 1850 N 1460 N 1020 N 800 N 500 N 900 N 800 N 700 N700 N 80 N 100 N 200 N 400 N CENTER ST 400 N CENTER ST 500 N 620 N 300 N CENTER ST 600 S 500 S 300 S 400 S 100 S 200 S 500 S 600 S 200 S 100 S 300 S 400 S ER NO SEGO LN 2050 N 2780 N STADIUM CIR 2550 N OAK CREST CIR OAK CLIFF N DR 560 N 620 N HILLSDALE CIR 300 S 900 S 640 S 1230 S 1280 S 1270 S 1400 S GREEN CANYON DR CANYON VISTA DR 1280 S 1440 S 1500 S 1300 S 1610 S 1560 S 470 S 930 S 1350 S 1370 S MCCLELLAN CT ROCK CANYON CIR Provost Park Cottonwood Greenway Provo City Cemetery Powerline Park #1 Franklin Field Franklin Field Wasatch Field Carterville Park Sertoma Park Kiwanis Park Y-Mountain Trailhead Memorial Park Harmon Park Neighborhood Park BYU Botany Pond 2230 N Trailhead Maeser Park Roadside ParkPowerline Park #3 Footprinters Park Bicentennial Park Slate Canyon Trailhead Fox Field Provost Field Provo Peaks Field Dixon Field Timpanogos Field Rock Canyon Field Riverside Country Club Grandview Field Lions Park Exchange Park Riverside Park Rock Canyon Trailhead Branbury Greenway Joaquin Park Provo River Trail Provo River Trail The Peaks Arena Franklin Park City Center Rec Center Library Power Complex Public Works Rock Canyon Park North Park Spring Creek Park Pioneer Park Proposed Provo City Electric Vehicle Charging Stations