HomeMy WebLinkAboutDERR-2025-000480PV VENT CAP
STAGE 1 PD
11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451-6334
Fax: (512) 459-1459 Date Printed and Mailed: 4/28/2022
7-Eleven Air Quality Report
P.O. Box 711
Dallas, TX 75221
Test Date: 4/26/2022
Order Number: 2355518
Dear Regulator,
Enclosed are the results of recent testing performed at the following facility:
7-Eleven 36342
975 N Main St
Tooele, UT 84074
Testing performed:
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
2 inch Pressure Decay Test
TP201.3
Store Information Testing Company
Site Name :7-Eleven 36342 Name :TANKNOLOGY INC.
Address :975 N Main St
Tooele, UT 84074
Address :11000 N. MoPac Expressway Suite 500
Austin, TX 78759
Phone :435-882-0548 Phone :(800) 800-4633
Stage I System?DUAL
Stage II System?NONE
Total # of Nozzles :8
Products per Nozzle :3
Tanks Manifolded ?No
Drop-Out tank present?NO
Total # of Tanks Tested :3
Tank Information :
Product Grade :
Tank Capacity, gallons :
Gasoline, gallons :
Ullage, gallons :
Testing Information :
Start Time :
Initial Pressure, wcg :
Pressure @ 1 minute(s) :
Pressure @ 2 minutes :
Pressure @ 3 minutes :
Pressure @ 4 minutes :
Pressure @ 5 minutes :
Allowable Final Pressure :
Pass/Fail (Enter "GF" Gross Failure)
TNK1
RUL
11627
7091
4536
12:24
2.00
1.98
1.96
1.95
1.94
1.92
1.79
Pass
TNK2
RUL 2
7690
3754
3936
12:40
2.00
1.99
1.98
1.97
1.96
1.95
1.76
Pass
TNK3
PUL
7586
3174
4412
12:32
2.00
1.96
1.92
1.89
1.86
1.83
1.79
Pass
Total
26903
14019
12884
All
Comments:
Tester :David Mathie Test Date :4/26/2022
Signature :Work Order :2355518
WO: 2355518
PVVC tested ==>RUL Manifolded
Final Test Result (Pass / Fail) ==>Fail
PVVC Manuf. ==>OPW Model Number ==>623V-2203
Is this Original or
Replacement?
Original
If this cap is being
replaced, check here:
Manf Spec
(CFH)
Measured
Leak Rate
in ml/Min;
Cracking
(in H2O)
Calc CFH
(ml/min
x
.00212)
Result
(Pass /Fail)
Pos Leak Rate(CFH)0.05 25 0.0530 Fail
Low High Measured
Pos Cracking (in H2O)2.50 6.00 2.18 Fail
Neg Leak Rate (CFH)0.21 100 0.2120 Fail
Low High Measured
Neg Cracking (in H2O)-10.00 -6.00 -5.30 Fail
PVVC tested ==>RUL Manifolded
Final Test Result (Pass / Fail) ==>Pass
PVVC Manuf. ==>OPW Model Number ==>723V
Is this Original or
Replacement?
Replacement Manf Spec
(CFH)
Measured
Leak Rate
in ml/Min;
Cracking
(in H2O)
Calc CFH
(ml/min
x
.00212)
Result
(Pass /Fail)
Pos Leak Rate(CFH)0.05 10 0.0212 Pass
Low High Measured
Pos Cracking (in H2O)2.50 6.00 3.44 Pass
Neg Leak Rate (CFH)0.21 60 0.1272 Pass
Low High Measured
Neg Cracking (in H2O)-10.00 -6.00 -8.45 Pass
PVVC tested ==>RUL2 Manifolded
Final Test Result (Pass / Fail) ==>Fail
PVVC Manuf. ==>OPW Model Number ==>623V-2203
Is this Original or
Replacement?
Original
If this cap is being
replaced, check here:
Manf Spec
(CFH)
Measured
Leak Rate
in ml/Min;
Cracking
(in H2O)
Calc CFH
(ml/min
x
.00212)
Result
(Pass /Fail)
Pos Leak Rate(CFH)0.05 25 0.0530 Fail
Low High Measured
Pos Cracking (in H2O)2.50 6.00 2.04 Fail
Neg Leak Rate (CFH)0.21 100 0.2120 Fail
Low High Measured
Neg Cracking (in H2O)-10.00 -6.00 -5.00 Fail
PVVC tested ==>RUL2 Manifolded
Final Test Result (Pass / Fail) ==>Pass
PVVC Manuf. ==>OPW Model Number ==>723V
Is this Original or
Replacement?
Replacement Manf Spec
(CFH)
Measured
Leak Rate
in ml/Min;
Cracking
(in H2O)
Calc CFH
(ml/min
x
.00212)
Result
(Pass /Fail)
Pos Leak Rate(CFH)0.05 10 0.0212 Pass
Low High Measured
Pos Cracking (in H2O)2.50 6.00 3.39 Pass
Neg Leak Rate (CFH)0.21 60 0.1272 Pass
Low High Measured
Neg Cracking (in H2O)-10.00 -6.00 -8.40 Pass
PVVC tested ==>PUL Manifolded
Final Test Result (Pass / Fail) ==>Fail
PVVC Manuf. ==>OPW Model Number ==>623V-2203
Is this Original or
Replacement?
Original
If this cap is being
replaced, check here:
Manf Spec
(CFH)
Measured
Leak Rate
in ml/Min;
Cracking
(in H2O)
Calc CFH
(ml/min
x
.00212)
Result
(Pass /Fail)
Pos Leak Rate(CFH)0.05 25 0.0530 Fail
Low High Measured
Pos Cracking (in H2O)2.50 6.00 2.09 Fail
Neg Leak Rate (CFH)0.21 100 0.2120 Fail
Low High Measured
Neg Cracking (in H2O)-10.00 -6.00 -5.10 Fail
PVVC tested ==>PUL Manifolded
Final Test Result (Pass / Fail) ==>Pass
PVVC Manuf. ==>OPW Model Number ==>723V
Is this Original or
Replacement?
Replacement Manf Spec
(CFH)
Measured
Leak Rate
in ml/Min;
Cracking
(in H2O)
Calc CFH
(ml/min
x
.00212)
Result
(Pass /Fail)
Pos Leak Rate(CFH)0.05 10 0.0212 Pass
Low High Measured
Pos Cracking (in H2O)2.50 6.00 3.51 Pass
Neg Leak Rate (CFH)0.21 60 0.1272 Pass
Low High Measured
Neg Cracking (in H2O)-10.00 -6.00 -8.62 Pass
11000 N. MOPAC EXPRESSWAY, SUITE 500, AUSTIN, TX 78759
(800) 800-4633
QP-08-03-FF-02 Pressure Vacuum Vent Cap TP-201.1E Field Form
Rev C 1/27/2011
Site Overall Test Results: Pass
Total +ve LR: 0.0636
Total -ve LR: 0.3816
Test Date 4/26/2022
Technician Name David Mathie
WO #2355518
Facility Name / Loc #7-Eleven 36342 36342
Street 975 N Main St
City, St, Zip Tooele, UT 84074
Pressure Vacuum Vent Cap Test Form TP-201.1E
Site Diagram
(This site diagram is for reference only and is not drawn to scale)
Work Order:2355518
Site ID / Name:36342 / 7-Eleven 36342
Address:975 N Main St
City:Tooele State:UT Zip:84074
W.O.# NW1-2355518
LD C9