Loading...
HomeMy WebLinkAboutDAQ-2025-000215 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-005-25 Site IDs: 100443, 6987, 8314, 101603, 101006, 4683, 100907, 101734, 101858, 101768, 101623, 101855, 101621, 101738, 8071, 14399, 101854, 102096 (B4) Jennifer McQueen Javelin Energy Partners Management, LLC 5221 North O'Conner Boulevard, Suite 1100 Irving, TX 75039 Dear Ms. McQueen: Re: Javelin Energy Partners Management, LLC – 8-25-26-C5-3H MWF; Lake Fork Ranch 4- 26-25-B4-4H MWF; Lake Fork Ranch 4-35-36-B4-1H MWF; Presbytery 1-15-16-C4-1H MWF; Remund 1-27-28-C4-1H MWF; 8-24-23-C5-2H MWF; Betts 1-34-33-C4-2H MWF; IWM 8/7-17/18-C4-1H; NORTH MOON 1; Park City 5-6-5-C4-3H MWF; Remund Ridge 16-22-21-C4-7H MWF; SOUTH MOON 05-31-32-C4-4H; Bluebell 16- 24-23-C5-9H MWF; Ferrarini 12-26-25-B4-6H MWF; Goergen 9-13-14-C5-3H MWF; Hutchins-Chiodo 3-20C5; LFR SOUTH 27-28 B4; OLSEN 13-14-C5 MULTI-WELL FACILITY – Protocol Review and Test Date Confirmation – Duchesne County, UT The testing protocol for (4) Caterpillar G3508, (4) Caterpillar G3516, (4) Waukesha 3524GSI, (2) Cummins KTA19GCE, (1) Caterpillar G3306B TA/LCR, (1) Waukesha 5794GSI, and (2) Cummins KTA19 engines at 8-25-26-C5-3H MWF; Lake Fork Ranch 4-26-25-B4-4H MWF; Lake Fork Ranch 4-35-36-B4-1H MWF; Presbytery 1-15-16-C4-1H MWF; Remund 1-27-28-C4- 1H MWF; 8-24-23-C5-2H MWF; Betts 1-34-33-C4-2H MWF; IWM 8/7-17/18-C4-1H; NORTH MOON 1; Park City 5-6-5-C4-3H MWF; Remund Ridge 16-22-21-C4-7H MWF; SOUTH MOON 05-31-32-C4-4H; Bluebell 16-24-23-C5-9H MWF; Ferrarini 12-26-25-B4-6H MWF; Goergen 9-13-14-C5-3H MWF; Hutchins-Chiodo 3-20C5; LFR SOUTH 27-28 B4; OLSEN 13- 14-C5 MULTI-WELL FACILITY in Duchesne County, UT, dated December 22, 2024, has been reviewed and found acceptable. The agreed upon test dates are the January 27-29, 2025, February 3-7, 2025, and February 17-21, 2025, test campaigns. + 2 / 6 à Û Ù Û Þ DAQC-005-25 Page 2 Acceptance of a protocol does not relieve the owner/operator and the testing contractor from strict adherence to all applicable EPA methods, Utah Division of Air Quality (DAQ) policies, Utah Air Quality Rules (UAQR), and methods approved by the Director. Any deviation from EPA methods, DAQ policies, UAQR, and methods approved by the Director must be addressed separately and express written consent given prior to commencement of testing. The DAQ requires that all test reports include a statement that: A. Testing was conducted while the source was operating at the rate and/or conditions specified in the applicable approval order, operating permit, or federal regulation. B. During testing, the source combusted fuels, used raw materials, and maintained process conditions representative of normal operations, and operated under such other relevant conditions specified by the Director. C. Based on information and belief formed after reasonable inquiry, the statements and information contained in the report are true, accurate, and complete. If you have any questions, call me at (385) 232-4132 or e-mail me at pgbushman@utah.gov. Sincerely, Paul Bushman, Environmental Scientist Division of Air Quality PB:jl cc: TriCounty Health Department