January 13, 2025
Matthew R. Baker
Cedar City Waterworks
10 North Main Street
Cedar City, Utah 84720
Subject:Approval Renewal of 2025 Water Line Installation Standards per R309-500-7;Cedar City Waterworks, System #11002, File #11149
This Approval expires on June 30, 2030.
Dear Matthew Baker:
The Division of Drinking Water (the Division) received the following documents on December 27, 2024:
The 2025 water line installation drawings and specifications for Cedar City Waterworks that are included in Cedar City’s construction standards.
The completed application form signed by Kent J. Fugal and dated December 26, 2024, which formally designates:
Kent J. Fugal, P.E., as the Professional Engineer (PE) having direct responsibility for the design of the entire water system, and
Kent J. Fugal, P.E., as the PE responsible for oversight of the hydraulic analysis of the entire water system.
We completed our review of the 2025 water line installation drawings and specifications, and found they basically comply with the applicable portions of Utah's Rules for Public Drinking
Water Systems in R309-550. On this basis, Cedar City Water Waterworks 2025 water line installation drawings and specifications are hereby approved.
Cedar City Waterworks has met the criteria in R309-500-7 to install water lines up to 16 inches in diameter and is not required to obtain Plan Approval or an Operating Permit for the
qualified water line projects.
Please note the following restrictions to this approval:
1. This approval does not apply to booster pump stations.
2. If minimum separation between water and sewer lines cannot meet the requirements in R309-550-8, an exception must be obtained prior to water line construction.This Approval expires
on June 30, 2030. You must notify the Division if there is a change to standard installation drawings and specifications or the designated PE for design or hydraulic analysis during
the term of this Approval. To continue using standard installation drawings and specifications for water transmission and distribution lines after the expiration date, you must submit
a complete renewal application to the Division.Please maintain a copy of this letter with your permanent records for future reference.
If you have any questions regarding this approval, please contact J. Paul Wright, P.E., DEQ Southwest District Office at (435) 986-2590, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
JPW/mrn/mdbcc:Jeremy Roberts, Southwest Utah Public Health Dept., jroberts@swuhealth.gov
J. Paul Wright, P.E., DEQ Southwest District Office, pwright@utah.gov
Matthew R. Baker, Cedar City Waterworks, mbaker@cedarcityut.gov
Jonathan Stathis, Cedar City, jstathis@cedarcityut.gov
Kent J. Fugal, P.E., Cedar City, kentf@cedarcityut.gov
PWright 11002 11149 WL Standards 2024 Renewal Approval