Loading...
HomeMy WebLinkAboutDAQ-2025-000111YT*SJflSgRP Hunter Plant 1000 South Highway l0 P.O. Box 569 Castle Dale, UT 84513 November 7,2024 Mr. Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West P.O. Box 144820 Salt Lake City, UT 84114-4820 RE: Quarterly Compliance Report 40 CFR 63 SubPart UUUUU, Hunter Power Plant (Title V Permit #1500101004) Dear Mr. Bird: DEPAHTMENT OF ENVIBONMENTAL QUALITY NO\/ 1 B 2024 DMSION OF AIR OUALTTY The reporting requirements for periodic compliance reports changed beginning on January l, 2024. $63.10031(g) requires MATS affected sources to begin submitting quarterly compliance reports beginning with the first calendar quarter of 2024 using applicable data elements found in Appendix E to Subpart UUUUU. Appendix E section 1.0 states that the "applicable data elements in sections 2 through l3 of this appendix must be reported in the quarterly compliance reports required under $63.10031(g), in an .xml format prescribed by the Administrator." The existing Emissions Collection And Monitoring Plan System (ECMPS) 1.0 application was to be upgraded to ECMPS 2.0, a web-based platform and was to include the new quarterly MATS reporting requirements. Because of the uncertainty caused by the delay of ECMPS 2.0 and the lack of a .xml reporting schema provided by EPA for the reporting of MATS data, PacifiCorp contacted EPA Region 8 via telephone on February 29,2024 to ask for guidance. Based on this, and a subsequent discussion on March 4,2024 between PacifiCorp and EPA Region 8 representatives, it was suggested that PacifiCorp continue to submit compliance data in a file format that is most suitable for demonstrating compliance with the MATS rule and applicable elements of appendix E to Subpart UUUUU until further guidance and/or reporting schema are provided by EPA. PacifiCorp was directed to discuss the reporting format and filetype with Department of Environmental Quality contacts for each affected source and has done so. Please reference PacifiCorp's March 26,2024letter regarding this subject. Until further guidance or reporting schema are provided by EPA, PacifiCorp plans to continue to submit all compliance data required by the MATS rule in accordance with $63.10031(g) beginning with a quarterly compliance report for the first quarter,2024 in .pdf format. PacifiCorp will submit .xml files, where applicable, generated using the Electronic Reporting Tool to ECMPS 1.0, with the report. The Hunter Plant will continue to comply with all MATS related requirements for each of its affected sources. I am authorizedto make this submission on behalf of the owners and operators of the affected source or affected units for which the submission is made. I certifu under penalty of law that I REVIEWED Initials JBR Date 1/9/25 Comp Status Meets File # 10237 Blue 2 three units info in comp have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certiff that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information, or omitting statements and information, including the possibility of fine or imprisonment. Should you have any questions regarding this information, please contact Terry Guthrie, Environmental Manager, Hunter & Huntington Power Plants at (435) 748-6059 or me at (435) 748-6211. Managing Director Hunter & Huntinglon Power Plants Responsible Official Enclosures: Mercury and Air Toxics Semiannual Compliance Report with attachments A thru C - Unit I Mercury and Air Toxics Semiannual Compliance Report with attachments A thru C - Unit 2 Mercury and Air Toxics Semiannual Compliance Report with attachments A thru C - Unit 3 Eve Paulson - 310 NTO Terry Guthrie - Hunter Power Plant l?ncrFrEoRP H u nter Power PIa nt MATS Quarterly Compliance Report Unit 1 40 cFR 63.10031(e) July 1, 2024 - September 30,2024 -i TffiDFPARTMENT oF e r.r"v i iO t 1 ttt E NTAL O U ALIT:r DIVISION OF AIR OUALITY Section 1.0 - Unit I Report Summary Name and address of the affected source Hunter Power Plant, 1000 S. Highway l0 Castle Dale Utah P.O. Box 569 Castle Dale, Utah 84528 Identifrcation of each hazardous air pollutant monitored at the affected source I. Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On April 6, 2018 the Utah Department of Environmental Quality - Division of Air Quality agreed that the Hunter Plant Unit I met the requirements to qualifu as a low emitting EGU (LEE) unit. The Hunter Plant submiued a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu limit or 0.015 lb/MMBtu as required by the subpart. II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an SOz continuous emissions monitoring system (CEMS). Ill. Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap test to re-confirm LEE status. A brief description of the process unit I. Hunter Unit I is an Electric Utility Steam Generating Unit, designed as a dry bottom tangentially-fired boiler, designed by Combustion Engineering. i. Rated Heat Input Capacity of 4,750 MMBtu/hr. ii. The unit is equipped with the following add-on controls: L Pulse Jet Fabric Filter (baghouse) 2. Wet Lime Flue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technology, with closed-coupled over-fire air iii. Fuels used are sub-bituminous coal using #2 fueloil for startup fuel when needed. IL Unit Category i. Unit I is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUUUU of Part 63 IIl. The emission and operating parameter limitations i. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lb/Ir4MBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. ii. SOz CEMS as a surogate for acid gases reporting hourly averages in units of lb/MMBtu demonstrating compliance with a 30 boiler-operating-day average limit of 0.20 lb/MMBtu. iii. Hg annual EPA Method 30B sorbent trap test reporting hourly averages in units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day average of 1.2 lb/TBtu. A description of any changes in CMS. processes. or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent perfirnnance test results Table 1-l: Unit I Filterable Particulate Matter LEE Test Results Summary Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (lb/1vIW-hr) MATS PM Limit* Unit Status 2024 0211412024 0.003 0.030 0.03 0.30 LEE Achieved in 2018. Maintained with 21t412024 LEE test *Low Emitter Limits are 0.015 Ib/MM-BTU and 0.15 lbs/IvIW-HR Table 1-2: Unit I Mercury LEE Test Results Summara Test ID Test Date Hg rate (lb/TBtu) MATS Hg Threshold Unit Status 2023 1U28t2023 0.01 0.12 LEE Achieved. Maintained with 1112812023 LEE test Section 2.0 - Unit I MATS Compliance Report Root Data Elements Table 2-l: Root Data Elements 2.1 Facilitv ORIS Code 6165 2.2 Facilitv Name Hunter 2.3 Faciliw Resistrv Identifier (ORISPL)8069 2.4 Title 40 Part 63 2.5 Aoolicable Suboart UUUUU 2.6 Calendar Year 2024 2.7 Calendar Quarter 3'd Ouarter 2.8 Submission Comment (ootional)See cover letter Section 3.0 - Unit I Performance Stack Test Summary For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit I Performance Test Run Data For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted forthe quarter, Stack testing data is being provided in both .xml and .pdf formats. Section 6.0 - Unit I Conversion Parameters For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7 .0 - Unit I Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit I Compliance Averages Please see Aftachment A-l which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit I Information Section 1 1.0 - Unit I Fuel Usage Information Table 11-1 Quarterly Fuel Usage Information 4 Table 10-1: Unit Information Section Data Element Plant Data r0.t Unit ID;Unit I t0.2 Date of Last Tune-upl and Burner Tio Insoection June 6. 2024: March 20. 2024 10.3 Emergency Bypass Information.No emergency bvpass occurred during quarter Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons) July 670 82,229 August 555 77,024 September 957 72,800 Total 2,182 232,053 Note: No new fuel types were combusted during the reporting period. Section 12.0 and 13.0 - Unit I Malfunction, Deviations, and Monitoring Downtime Information Table 12-l Monitoring Equipment Manufacturer and Model number Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ Carbon Dioxide lCOz)r Thermo 4roiQ Table l2-2: Most Recent CMS Certification or Audit Ul CBMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)t0n9t2023 8t19t2024 Sulfur Dioxide (SOz)1011912023 811912024 Table l2-3: Unit Operating Time During the Reporting Period Ul Operating Period Hours of Unit Operation 3'd Quarter,2024 2208 Table 12-4: Excess Emission Summary I The COz analyzer is used as a diluent for calculating heat input-based emission limits 5 Ul Excess Emissions Summala PM SOz Hg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.0 0.0%0.0 Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Emission Limit 0.030 0.20 1.2 Emission Limitation Unit lbiMMBtu lb/MMBtu LblTBtu Em ission lim itation averaging period Quarterly Stack Testing 30 boiler operating-day 30 boiler operating-day Table l2-5: CMS performance summary Ul CMS Performance Summary SOz Downtime percent of total operating hours 1.03 % Total hour of CMS downtime 22.82 Hours due to monitoring equipment malfunctions 0 Hours due to non-monitoring equipment malfunctions 0 Hours due to quality assurance/quality control calibrations 4.97 Hours due to other known causes r 7.85 Hours due to other unknown causes 0 For applicable elements of Appendix E Sections 12.1-12.3 and l3.l-13.5, see Attachments B and C. No deviations from rule requirements occurred other than those stated on this report and attachments. Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections l4-30, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 31.0 - Other Information for Each Test or Test Series In accordance with section 31.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpart UUUUU of Part 63 is being submitted in pdf format with this quarterly compliance report. Report Certification accuracy ofthe report:Responsible, Laren Huntsman Responsible Official Managing Director - Hunter Power Plant November 07. 2024 Attachments: Attachment A: MATS 30-Day Rolling SOz lb/]vlMBtu Average Data Attachment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Attachment A MATS 30-Day Rol.ting SO2 tb/MMBtu Average Data MATS 30 Day Rolling Average Plant: HUNTER PI-ANT Report Period : 07 I 0L I 2024 Through 09 I 30 I 2024 Source: UNIT1 Parameter: SO2RMATS Date 1-Day Avg 3O-Day Avg Total Operating Valid Operating Houns Invalid Operatang Monitor Availability 7t'12024 o.o77 0.083 720 718 2 99.7o/o 7t2t2024 o.o74 0.082 720 714 2 99.7o/o 7t3t2024 0.061 0.081 720 718 2 99.7o/o 7t4t2024 0.074 0.081 720 718 2 99.7o/o 7t5t2024 0.074 0.08 720 718 2 99.70/ 7t6t2024 0.067 0.08 720 718 2 99.7o/o 7t712024 0.075 0.08 720 718 2 99.7Yo 7t8t2024 0.069 0.08 720 718 2 99.7Yo 7t912024 0.057 0.079 720 718 2 99.7o/o 7t10t2024 0.07 0.078 720 7',18 2 99.7o/o 7t11t2024 0.07 o.o77 720 718 2 99.7o/o 7t1212024 0.065 0.077 720 718 2 99.7o/o 7113t2024 0.061 0.076 720 7',t8 2 99.7o/o 7t14t2024 0.069 0.076 720 718 2 99.7Yo 7t15t2024 0.057 0.075 720 718 2 99.7o/o 7t16t2024 0.059 o.o74 720 718 2 99.7o/o 7 t17 t2024 0.065 0.073 720 718 2 99.7o/o 7t18t2024 0.066 o.072 720 7',tg 2 99.7o/o 7t19t2024 0.069 o.072 720 718 2 99.7o/o 7t20t2024 0.061 0.071 720 7',t$2 99.7o/" 7t21t2024 0.077 0.07 720 718 2 99.7% 7t22t2024 0.076 0.07 720 718 2 99.7% 7t23t2024 0.076 0.07 720 714 2 99.7o/" 7t24t2024 0.07 0.07 720 718 2 99.7o/o 7t2512024 0.071 0.07 720 718 2 99.7Yo 7t26t2024 0.07 0.07 720 7',t$2 99.7o/o 7t27t2024 0.068 0.069 720 720 0 100.0% 7t28t2024 0.065 0.069 720 720 0 100.0% 7t29t2024 0.072 0.069 720 720 0 100.0% 7t30t2024 0.057 0.068 720 718 2 99.7o/o 7t31t2024 0.066 0.068 720 715 5 99.3% 8t'12024 0.079 0.068 720 713 7 99.0% 8t2t2024 0.081 0.068 720 713 7 99.0% 8t3t2024 0.075 0.068 720 713 7 99.0% 8t4t2024 o.o77 0.069 720 713 7 99.0% 8t5t2024 0.07 0.069 720 708 12 98.3o/o 81612024 0.073 0.069 720 708 12 98.3% 8t7t2024 0.08 0.069 720 708 12 98.3% 8t8t2024 0.079 0.07 720 708 12 98.3% 81912024 0.082 0.07 720 708 12 98.3% Value = Offline Data Valuer = AveraSe represents a building 30D Average Value = Exceedance Report Generated: Ll/O6124 73:23 Report Version 5.2 HTRDAHS04\\reportuser MATS 30 Day Rolling Average P|ant: HUNTER PI.ANT Report Period : 07 I 0L I 2024 Throuqh 09 I 30 I 2024 Source: UNIT1 Parameter: SO2RMATS 811012024 o.o77 0.07 720 708 12 98.3% 811112024 0.078 0.071 720 708 12 98.3% 4t12t2024 0.083 o.o72 720 707 13 98.2o/o 811312024 0.074 0.072 720 707 13 98.2% 811412024 0.081 0.073 720 707 '13 98.2% 8115t2024 o.097 o.o74 720 706 14 98.10/o u16t2024 0.071 0.074 720 703 17 97.60/o 8t17t2024 0.073 o.o74 720 703 17 97.6% 8t18t2024 o.o77 0.075 720 703 17 97.60/" 8t19t2024 0.076 0.075 720 701 19 97.40/o 8t20t2024 0.076 0.075 720 701 19 97.4%" 8t21t2024 0.073 0.075 720 701 19 97.4o/o 8t22t2024 o.o72 0.075 720 701 19 97.4o/" 8t2312024 0.079 0.075 720 701 19 97.4o/o 8t24t2024 0.078 0.075 720 701 19 97.4o/. 8t25t2024 0.081 0.076 720 701 19 97.4o/o 8t26t2024 o.o77 0.076 720 701 '19 97.4o/" 8127t2024 0.08 0.076 720 701 19 97.4o/o 8128t2024 0.079 0.077 720 701 19 97.4% 812912024 0.08 o.o77 720 703 17 97.60/o 8t30t2024 0.08 0.078 720 706 14 98.1% 8t31t2024 0.08 0.078 720 708 12 98.3% 9t1t2024 0.08 0.078 720 708 12 98.3% 9t2t2024 0.078 0.078 720 708 12 98.3% st3t2024 o-o77 0.078 720 708 12 98.3% 91412024 0.079 0.078 720 713 7 99.0% 915t2024 0.081 0.079 720 713 7 99.0% 9t6t2024 0.078 0.078 720 713 7 99.0% 9t7t2024 0.077 0.078 720 7',t3 7 99.0% 9t8t2024 0.075 0.078 720 713 7 99.0% 9t9t2024 0.07 0.078 720 713 7 99.0% 9t'tot2024 0.069 0.078 720 713 7 99.0% 911112024 0.076 o.077 720 714 6 99.2o/o 911212024 o.o74 o.077 720 714 6 99.2% 9t13t2024 0.076 0.077 720 714 6 99.20/o 9t14t2024 0.065 0.076 720 7 5 5 99.3% 9t1512024 0.082 o.077 720 7 I 2 99.70/o 911612024 0.082 o.o77 720 7 8 2 99.7o/o 9t17t2024 0.066 0.076 720 7 5 5 99.3% 9t18t2024 0.057 0.076 720 7',t6 4 99.40h 9t19t2024 0.081 0.076 720 716 4 99.4o/o 9t20t2024 0.077 0.076 720 7',16 4 99.4o/o Value = Offline Data Valuer = AveraSe represents a building 3OD Average Value = Exceedance Report Generated: l7106l24 L3:23 Report Version 5.2 HTRDAHS04\\reportuser MATS 30 Day Rolling Average P|ant: HUNTER PI.ANT Repoft Period : 07 I 0t I 2024 Throuqh 09 I 30 I 2024 Source: UNIT1 Parameter: SO2RMATS 9121t2024 o.077 0.076 720 7',t6 4 99.4o/o 9t22t2024 0.071 0.076 720 7't6 4 99.4o/o 9t23t2024 o.o72 0.076 720 716 4 99.4o/" 9t24t2024 0.101 0.076 720 716 4 99.4% 912st2024 0.08 o.o77 720 716 4 99.4o/" 9t26t2024 0.08 o.077 720 716 4 99.4o/o 9t27t2024 0.079 0.077 720 716 4 99.4o/o 9t28t2024 o.077 0.076 720 716 4 99.4Yo 9t2912024 0.08 0.076 720 716 4 99.4o/o 9t30t2024 o.o71 0.076 720 716 4 99.4o/o Value = Offline Data valuet = Averate represents a buildinS 30D Average Value = Exceedance Report Generated: l1/06124 L3:23 Report Version 5.2 HTRDAHS04\\reportuse. Attachment B SO, Monitor Downtime Events Report Downtime Events - Duration Plant HUNTER PLANT Report Period: 07 101 12024 00:00 Through 0913012024 23:59 Time Online Criteria: 1 minute(s) Source: Parameter: lnterYal: UNITl S02RMATS 001H lncident lD Start Date/Time End Date/Time Duration (dd:hh:rnm) Reason Cod€ - Descrlption Action Code - Descrlotion 0713012O24 11:00 O7l3Ol2O24 12:59 0d - 2h - 0m 00 - Default 00 - (default) 071311202410:40 0713112O24 12:59 0d - 3h - 0m 00 - Default 00 - (default) 0810112024 08:00 0a10112024 09:59 0d - 2h - 0m 00 - Default 00 - (defautt) OUOSI2O24O7:N 08/05/2024 11:59 0d - 5h - 0m 00 - Default 00 - (default) 0811212024 09:00 0a11212024 09:59 0d - th - 0m 00 - Default 00 - (default) 08/1512024 08:00 08/15f2024 08:59 0d - th - 0m 00 - Default 00 - (default) 08/16/2024 08:00 0811612024 08:59 0d - th - 0m 00 - Default 00 - (default) 08/16/2024 15:fi)OBI16D024 16:59 0d - 2h - 0m 00 - Default 00 - (default) 081191202408:N 08/'19/2024 09:59 0d - 2h - 0m 00 - Default 00 - (default) 10 o9t17t't2024 07:N 0911712024 09:59 0d-3h-0m @ -Default 00 - (default) 11 09/18/2024 00:00 09/18/2024 00:59 0d - th - 0m 00 - Default 00 - (dsfault) NumbcrofEvont : 11 Total Duratlon: 0d - 23h - 0m ' lndicates duration incident could have additional data prior to the start date or following the end date. Report Generated'. 11106124 13:32 Report Version 4.0 HTRDAHS04\reportuser 1of 1 Attachment C Unit I Excess Emissions Report PM Excess Emissions 0.030 lb/MMBtu (Quarterly Stack Testing) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lb/MMBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Em issions lb/MMBtu Date Time Beginning Time Ending Hours lnvolved Malfunction Y/N Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Hg Excess Emissions 1.2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action PacIFIEORP Hunter Power Plant MATS Quarterly Compliance Report Unit 2 40 cFR 63.10031(e) July L, 2024 - September 30,2024 Section 1.0 - Unit 2 Report Summary Name and address of the affected source Hunter Power Plant, 1000 S. Highway l0 Castle Dale Utah P.O. Box 569 Castle Dale, Utah 84528 Identification of each hazardous air pollutant monitored at the affected source I. Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On June 6,2018 the Utah Department of Environmental Quality - Division of Air Quality agreed that the Hunter Plant Unit 2 met the requirements to qualifu as a low emitting EGU (LEE) unit. The Hunter Plant submitted a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu limit or 0.015 lb/MMBtu as required by the subpart. II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an SOz continuous emissions monitoring system (CEMS). III. Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap test to re-confirm LEE status. A brief description of the process unit Hunter Unit2 is an Electric Utility Steam Generating Unit, designed as a dry bottom tangentially-fired boiler, designed by Combustion Engineering and Wilcox. i. Rated Heat Input Capacity of 4,750 MMBtu/hr. ii. The unit is equipped with the following add-on controls: l. Pulse Jet Fabric Filter (baghouse) 2. Wet Lime Glue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technology, with separated over-fire air iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when needed. Unit Category i. Unit 2 is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUUUU of Part 63 The emission and operating parameter limitations i. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lb/MMBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. I. II. III. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of lb/MMBtu demonstrating compliance with a 30 boiler-operating-day average limit of 0.20 lb/MMBtu. Hg annual EPA Method 308 sorbent trap test reporting hourly averages in units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day average of 1.2 lb/TBtu. A description of any changes in CMS, processes. or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent perfbrmance test results ll. I ll. Table 1-l: Unit 2 Filterable Particulate Matter LEE Test Results Summary Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (b/NIW-hr) MATS PM Limit* Unit Status 2024 0211312024 0.005 0.030 0.0s 0.30 LEE Achieved in 2018. Maintained with 211312024 LEE test tlow Emitter Limits are 0.01 5 |b/MM-BTU and 0.1 5 lbs/MW-HR Table 1-2: Unit 2 Mercury LEE Test Results Summaty Test ID Test Date Hg rate (lb/TBtu) MATS Hg Threshold Unit Status 2023 1U29/2023 0.01 0.12 LEE Achieved. Maintained with 1112912023 LEE test Section 2.0 - Unit 2 MATS Compliance Report Root Data Elements Table 2-l: Root Data Elements 2.1 FaciliW ORIS Code 6165 2.2 Fac liw Name Hunter 2.3 Fac litv Resistrv Identifier (ORISPL)8069 2.4 Title 40 Part 63 2.5 Aoolicable Suboart UUUUU 2.6 Calendar Year 2024 2.7 Calendar Ouarter 3'd Ouarter 2.8 Subm ission Comment (ootional)See cover letter Section 3.0 - Unit 2 Performance Stack Test Summary For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submiued for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit 2 Performance Test Run Data For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 6.0 - Unit 2 Conversion Parameters For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7 .0 - Unit 2 Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xmland .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit 2 Compliance Averages Please see Attachment A-l which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit 2 Information Section I 1.0 - Unit 2 Fuel Usage Information Table 10-1: Unit Information Section Data Element Plant Data l0.l Unit ID Unit2 10.2 Date of Last Tune-up; Burner Insoection Mav 26.2023:March 10. 2023 10.3 Emergency Bypass Information.No emersencv bvoass occurred durins quarter Table 11-1 Quarterly Fuel Information Note: No newfuel types were combusted during the reporting period. #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons) 219,421 Section 12.0 and 13.0 - Unit 2 Malfunction, Deviations, and Monitoring Downtime Information Table 12-1 Monitoring Equipment Manufacturer and Model number Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ Carbon Dioxide (COz)r Thermo 4rOiQ Table l2-2: Most Recent CMS Certification or Audit U2 CEMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)51212024 812012024 Sulfur Dioxide (SOz)5/2/2024 8/20t2024 Table 12-3: Unit Operating Time During the Reporting Period U2 Operating Period Hourc of Unit Operation 3'd Quarter,2024 2207.98 Table l2-4: Excess Emission Summary I The COz analyzer is used as a diluent for calculating heat input based emission limits 5 U2 Excess Emissions Summary PM SOr Hg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.0 0.0%0.0 Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Emission Limit 0.030 0.20 1.2 Emission Limitation Unit lb/MMBtu lb/MMBtu LblTBtu Emission limitation averaging period Quarterly Stack Testing 30 boiler operating-day 30 boiler operating-day Table l2-5: CMS performance summary U2 CMS Performance Summary SOz Downtime percent of total operating hours 0.31% Total hour of CMS downtime 6.92 Hours due to monitoring equipment malfunctions 0 Hours due to non-monitoring equipment malfunctions 0 Hours due to quality assurance/quality control calibrations 4.93 Hours due to other known causes 1.98 Hours due to other unknown causes 0 For applicable elements of Appendix E Sections 12.l-12.3 and l3.l - 13.5, see Attachments B and C. No deviations from rule requirements occurred other than those stated on this report and attachments. Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 31.0 - Other Information for Each Test or Test Series In accordance with section 31.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpan UUUUU of Part 63 is being submitted in pdf format with this quarterly compliance report. Laren Huntsman Responsible Official Managing Director - Hunter Power Plant Date: November 7, 2024 6 Report Certification accuracy ofthe report: Attachments: Attachment A: MATS 30-Day Rolling SOz lb/IvIMBtu Average Data Attachment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Attachment A MATS 30-Day Rotting SO2 tb/MMBtu Average Data MATS 30 Day Rolling Average PIANT: HUNTER PLANT Report Period : 07 I 0L I 2024 Throush 09 I 30 I 2024 Source: UNIT2 Parameter: SO2RMATS Value = Offline Data valuer = Average represents a buildint 3oo Average Value = Exceedance Report Version 5.2 Report Generated: lL/O6/24 13:26 HTRDAHso4\\reportuser Date l-Day Avg 3O-Day Avg Total Operating Valid Operating Hourc Invalid Operating Monltor Availability 71112024 o.096 0.08 720 719 1 99.9% 7t2t2024 0.067 0.079 720 717 3 99.6% 7t3t2024 0.045 0.078 720 717 3 99.6% 7t4t2024 0.052 0.077 720 717 3 99.6% 7t512024 0.049 0.075 720 717 3 99.6% 7t6t2024 0.057 0.074 720 717 3 99.6% 7t7t2024 0.065 o.o74 720 7',17 3 99.6% 7t8t2024 0.069 0.073 720 717 3 99.6% 7t9t2024 0.063 0.072 720 717 3 99.6% 7t10t2024 0.069 o.o72 720 7',17 3 99.6% 711112024 o.o72 0.071 720 717 3 99.6% 7t1212024 0.069 0.071 720 7'.17 3 99.6% 7t13t2024 0.056 0.07 720 717 3 99.6% 7t14t2024 0.051 0.069 720 715 5 99.3% 711512024 0.073 0.068 720 7',ts 5 99.3% 7t16t2024 0.073 0.068 720 7',15 5 99.3olo 7t17t2024 0.076 0.067 720 715 5 99.3% 7t18t2024 0.062 0.066 720 7'.ts 5 99.3% 7t19t2024 0.065 0.066 720 715 5 99.3% 7t20t2024 0.066 0.065 720 715 5 99.3% 7t21t2024 0.076 0.065 720 715 5 99.3% 7t22t2024 0.073 0.065 720 715 5 99.3% 7t23t2024 o.o7 0.066 720 715 5 99.3% 7t24t2024 o.M7 0.065 720 715 5 99.3% 7t25t2024 0.038 0.004 720 715 5 99.3% 7t26t2024 0.038 0.063 720 715 5 99.3olo 7t2712024 0.035 0.062 720 715 5 99.3% 7t28t2024 0.038 0.061 720 715 5 99.3% 7t29t2024 0.038 0.06 720 715 5 99.3% 7t30t2024 0.041 0.06 720 715 5 99.3% 7131t2024 0.045 0_058 720 716 4 99.4o/o 8t'U2024 0.051 0.057 720 718 2 99.7o/o 812t2024 0.078 0.058 720 718 2 99.7o/o 81312024 0.075 0.059 720 718 2 99.7o/o 8t4t2024 o.o77 0.06 720 718 2 99.7o/o 815t2024 0.072 0.061 720 718 2 99.7o/o 8t612024 0.073 0.061 720 718 2 99.7% 8t7t2024 0.079 0.061 720 718 2 99.7o/o 8t8t2024 0.079 0.062 720 718 2 99.7o/o 8t912024 0.08 0.062 720 718 2 99.7o/o MATS 30 Day Rolling Average P|ant: HUNTER PI.ANT Repoft Period : 07 I 0U 2024 Throush 09 130 I 2024 Source: UNIT2 Parameter: SO2RMATS Value = Offline Data Valuer = Average represents a buildinS 30D Averate Value = Exceedance Report Version 5.2 Report Generated: n/o6124 L3:26 HTRDAHSO4\\reportuser 8t10t2024 0.079 0.062 720 718 2 99.7% 811'12024 0.085 0.063 720 7',t$2 99 -7o/" 8t12t2024 o.o72 0.064 720 718 2 99.70/o 8113t2024 0.o7 0.064 720 720 0 100.0% 8t14t2024 0.071 0.064 720 720 0 100.0% 8115t2024 0.077 0.064 720 720 0 100.0% 8t1612024 0.066 0.064 720 720 0 100.0% 8t17t2024 0.07 t 0.oil 720 720 0 100.0% 8118t2024 0.076 0.065 720 720 0 100.oo/" 8t19t2024 0.o74 0.065 720 720 0 100.0% 8120t2024 0.078 0.065 720 720 0 100.0% 8t21t2024 o.o74 0.065 720 720 0 100.0% 8t22t2024 0.073 0.065 720 720 0 100.0% 8t23t2024 o.o77 o.066 720 720 0 100.0% 812412024 0.078 0.067 720 720 0 100.0% 8t25t2024 0.084 0.069 720 720 0 '100.0% 8t26t2024 o.o74 0.07 720 720 0 100.0% 812712024 0.082 o.o72 720 720 0 100.0% 8t28t2024 0.077 0.073 720 720 0 100.0% 812912024 0.082 o.o74 720 720 0 100.0% 813012024 0.081 0.075 720 720 0 100.07o 8t31t2024 0.079 0.076 720 720 0 100.0% 9t'v2024 0.079 0.076 720 720 0 100.0% 9t2t2024 0.077 o.077 720 720 0 100.07o 9t3t2024 0.079 o.o77 720 720 0 't00.070 9t4t2024 0.08 0.077 724 720 0 100.0% 9t512024 0.081 o.o77 720 720 0 100.0% 9t612024 o.o77 0.077 720 720 0 100.0% 9t7t2024 o.o77 0.077 720 720 0 100_0% 9t812024 0.075 0.077 720 720 0 100.0% 9t9t2024 0.072 o.o77 720 720 0 100.0% 9t10t2024 0.071 0.076 720 720 0 100.0% 9t1',U2024 0.077 0.076 720 720 0 100.0% 9112t2024 0.076 0.077 720 720 0 100.0% 9t1312024 0.082 0.077 720 720 0 1OO.Oo/o 9t14t2024 0.065 0.077 720 720 0 100.0% 911512024 0.084 0.077 720 720 0 100.0% 9t16t2024 0.082 o.o77 720 720 0 't00.0% 9t17t2024 0.071 0.077 720 720 0 100.0% 9t18t2024 0.069 o.o77 720 718 2 99.7o/o 9t19t2024 0.067 0.077 720 718 2 99.7o/" 912012024 0.o72 o.077 720 718 2 99.7o/o MATS 30 Day Rolling Average P|ant: HUNTER PI-ANT Report Period : 07 I 0L I 2024 Throush 09 I 30 I 2024 Source: UNIT2 Parameter: SO2RMATS st21t2024 0.062 0.076 720 718 2 99.7Yo 9t2212024 0.062 0.076 720 718 2 99-7o/" 9t23t2024 o.072 0.076 720 714 2 99.7o/o 9t24t2024 0.075 0.075 720 718 2 99.7% 912512024 0.071 0.075 720 714 2 99.7o/o 9t26t2024 0.075 0.075 720 718 2 99.7Yo 9t27t2024 0.075 0.075 720 718 2 99.7o/. 9t28t2024 0.073 0.075 720 718 2 99.7o/o 9t29t2024 0.078 0.075 720 7't8 2 99.7o/o 9t30t2024 0.0M 0.074 720 718 2 99.7Yo Value = Offline Data Valuer = Average represents a building 30D Average Value = Exceedance Report Generated: lI/O5124 13:26 Report Version 5.2 HTRDAHSO4\\reportuser Attachment B SO, Monitor Downtime Events Report Downtime Events - Duration Plant: HUNTER PLANT Report Period: 0710112024 00:00 Through 0913012024 23:59 Time Online Criteria: 1 minute(s) Source: UNIT2 Paramotor: SO2RMATS lntcrv.l: 001H O71011202405:N 0710112024 05:59 0d - th - 0m 00 - Default 00 - (default) 0710212024 05:00 0710212024 05:59 0d - th - 0m 00 - Default 00 - (default) 0710212024 O7:OO OTlO2l2O24 07:59 0d - th - 0m 00 - Default 00 - (defautt) 0711412024 18:00 0711412024 19:59 0d - 2h - 0m 00 - Default 00 - (default) 0911812024 07:00 0911812O24 08:59 0d - 2h - 0m 00 - Default 00 - (default) NumberofEvents: 5 Total Duratlon: 0d - 7h - 0m ' lndicates duration incident could have additional data prior to the strart dat6 or following the end date. lncident lD Start Date/Time End Date/Time Duration (dd:hh:mm) Reason Code - Description Action Code - Descriotion Report Generated : 1 1 lOGl24 1 3:U Report Version 4.0 HTRDAHS04\reporluser 1of 1 Attachment C Unit 2 Excess Emissions Report PM Excess Emissions 0.030 lb/MMBtu (Quarterly Stack Testing) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lb/MMBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Hg Excess Emissions 1.2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission lncident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction YN Cause Corrective Action l?acrFtEoRP Hunter Power Plant MATS Quarterly Compliance Report Unit 3 40 CFR 63.10031(e) July L, 2024- September 30,2024 Section I .0 - LJnit 3 Report Summary Name and address of the afl-ected source Hunter Power Plant, 1000 S. Highway l0 Castle Dale Utah P.O. Box 569 Castle Dale, Utah 84528 Identification of each hazardous air pollutant monitored at the affected source I. Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On June 6, 201 8, the Utah Department of Environmental Quality - Division of Air Quality agreed that the Hunter Plant Unit 3 met the requirements to qualifu as a low emitting EGU (LEE) unit. The Hunter Plant submitted a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu limit, or 0.01 5 lb/MMBtu as required by the subpaft. II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an SOz continuous emissions monitoring system (CEMS). IIl. Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap test to re-confirm LEE status. A brief description of the process unit Hunter Unit 3 is an Electric Utility Steam Generating Unit, designed as a dry bottom wall-fired boiler, designed by Babcock and Wilcox. i. Rated Heat Input Capacity of 4,910 MMBtu/hr. ii. The unit is equipped with the following add-on controls: l. Pulse Jet Fabric Filter (baghouse) 2. Wet Lime Glue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technology, with over-fire air iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when needed. Unit Category i. Unit 3 is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUUUU of Part 63 The emission and operating parameter limitations i. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lb/MMBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. I. II. III. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of lb/MMBtu demonstrating compliance with a 30 boiler-operating-day average limit of 0.20lbiMMBtu. Hg annual EPA Method 308 sorbent trap test reporting hourly averages in units of Ib/TBtu demonstrating compliance with a 30 boiler-operating-day average of L2 lb/TBtu. A description of any changes in CMS, processes, or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent perfbrmance test results lt. llt. Table 1-1: Unit 3 Filterable Particulate Matter LEE Test Results Summata Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (lbl[IW-hr) MATS PM Limit* Unit Status 2024*0612012024 0.002 0.030 0.002 0.30 LEE Achieved in 2018. Maintained with 612012024 LEE test *Low Emitter Limits are 0.015 Ib./MM-BTU and 0.15 lbs./MW-HR Table 1-2: Unit 3 Mercury LEE Test Results Summala Test II)Test Date Hg rate (lbiTBtu) MATS Hg Threshold Unit Status 2023 1v2712023 0.05 0.12 LEE Achieved. Maintained with 1112712023 LEE test Section 2.0 - Unit 3 MATS Compliance Report Root Data Elements Table 2-1: Root Data Elements 2.1 Fac tv ORIS Code 6165 2.2 Fac W Name Hunter 2.3 Fac tv Reeistrv ldentifier (ORISPL)8069 2.4 Title 40 Part 63 2.5 Annlicable Subnart UUUUU 2.6 Calendar Year 2024 2.7 Calendar Ouarter 3'd Quarter 2.8 Submission Comment (optional)See cover letter Section 3.0 - Unit 3 Performance Stack Test Summary For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit 3 Performance Test Run Data For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 6.0 - Unit 3 Conversion Parameters For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7 .0 - Unit 3 Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit 3 Compliance Averages Please see Attachment A-l which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit 3 Information Section I 1.0 - Unit 3 Fuel Usage Information Table 11-1 Quarterly Fuel Usage Information Table 10-1: Unit Information Section Data Element Plant Data 10.1 Unit ID Unit 3 10.2 Date of Last Tune-up; Burner Tio Inspection June 24 - 2024: March I 5. 2024 r 0.3 Emergency Bypass Information.No emersencv bvoass occurred durins ouarter Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons) July 84,589 64,363 August 55,788 57,631 September 71,645 61,336 Total 212,022 183J30 Note: No new fuel types were combusted during the reporting period. Section 12.0 and 13.0 - Unit 3 Malfunction, Deviations, and Monitoring Downtime Information Table 12-l Monitoring Equipment Manufacturer and Model number Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ Carbon Dioxide (COz)r Thermo 4lOiQ Table l2-2: Most Recent CMS Certification or Audit U3 CEMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)10125t2023 8126t2024 Sulfur Dioxide (SOz)t0/2st2023 812612024 Table l2-3: Unit Operating Time During the Reporting Period U3 Operating Period Hours of Unit Operation 3'd Quarter, 2024 2,079.75 Table 12-4: Excess Emission Summary I The COz analyzer is used as a diluent for calculating heat input based emission limits. 5 U3 Excess Emissions Summary PM SOz Hg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.0 0.0%0.0 Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Em ssion Limit 0.030 0.20 1.2 Em ssion Limitation Unit lb/MMBtu lb/MMBtu LblTBtu Em ission lim itation averaging period Quarterly Stack Testing 30 boiler operating-day 30 boiler operating-day Table 12-5: CMS performance summary U3 CMS Performance Summara SOz Downtime percent of totaloperating hours 0.s2% Total hour of CMS downtime 10.92 Hours due to monitoring equipment malfunctions 0 Hours due to non-monitoring equipment malfunctions 0 Hours due to quality assurance/quality control calibrations 0.98 Hours due to other known causes 9.93 Hours due to other unknown causes 0 For applicable elements of Appendix E Sections 12.1-12.3 and l3.l-13.5, see Attachments B and C. No deviations from rule requirements occurred other than those stated on this report and attachments. Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections l4-30, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 31.0 - Other Information for Each Test or Test Series In accordance with section 31.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpart UUUUU of Part 63 is being submitted in pdf format with this quarterly compliance report. Responsible Offrcial Managing Director - Hunter Power Plant Date: NovEnqbed,2924 Attachments: Attachment A: MATS 30-Day Rolling SOz lb/IvIMBtu Average Data Attachment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Report Certification Attachment A MATS 30-Day Rotting SO2 tb/MMBtu Average Data MATS 30 Day Rolling Average P|ant: HUNTER PI.ANT Report Period : 07 I 0t I 2024 Throush 09 I 30 I 2024 Source: UNIT3 Parameter: SO2RMATS Date l-Day Avg 3O-Day Avg Total Operating Valid Operating Hours Invalid Operating Monitor Availability 7t1t2024 0.089 0.087 616 610 6 99.0% 7t2t2024 0.086 0.087 616 610 6 99.0% 7t3t2024 0.086 0.086 617 611 6 99.0% 7t4t2024 0.085 0.086 638 632 6 99.1% 71512024 o.085 0.086 647 u2 5 99.20/ 7t6t2024 0.085 0.086 647 642 5 99-2o/" 7t7t2024 0.085 0.086 647 u2 5 99.2o/o 7t8t2024 0.085 0.086 647 u2 5 99.2o/o 7t9t2024 0.096 0.087 660 655 5 99.2o/" 7110t2024 0.085 0.089 653 649 4 99.40/o 7111t2024 0.084 0.086 645 642 3 99.5% 711212024 0.073 0.086 665 662 3 99.5% 7t1312024 o.o74 0.084 678 675 3 99.6% 7l't4t2024 0.074 0.082 680 677 3 99.6% 7115t2024 0.08 0.081 680 677 3 99.6% 7116t2024 0.073 0.082 680 677 3 99.6% 7t17t2024 0.077 o.o82 680 677 3 99.6% 7t18t2024 0.08 0.083 680 677 3 99.6% 7t19t2024 0.083 0.084 680 677 3 99.6% 7t20t2024 0.09 0.084 680 677 3 99.6% 712',U2024 0.0s2 0.084 680 677 3 99.6% 7122t2024 0.08 0.084 680 678 2 99.70h 7123t2024 0.09 0.084 680 678 2 99.70/o 7t24t2024 0.083 0.083 680 678 2 99.7o/o 7t25t2024 0.08 0.084 682 681 99.9% 7t2612024 0.085 0.084 690 689 1 99.9% 7t27t2024 0.088 0.084 691 690 99.9% 7128t2024 0.088 0.084 691 690 1 99.9% 7t29t2024 0.088 0.084 691 690 99.9% 7t30t2024 0.087 0.084 690 689 1 99.9% 7t3',U2024 0.094 0.084 690 689 99.9% 8t112024 0.085 0.084 690 689 1 99.9% 8t212024 0.087 0.0M 689 688 99.9% 81312024 0.086 0.084 689 688 1 99.9% 814t2024 0.087 0.084 689 688 99.9% 815t2024 0.085 0.084 689 688 1 99.9olo 8t612024 0.087 0.084 689 688 I 99.9% 8t7t2024 0.081 0.084 689 688 ,|99.9% 8t812024 0.079 0.083 689 688 99.9% 8t912024 0.083 0.083 708 707 1 99.9% Value = Offline Data Valuet = Average represents a buildlng 30D Average Value = Exceedance Report Version 5.2 Report Generated: lt/o6/24 13:27 HTRDAHso4\\reportuser MATS 30 Day Rolling Average PIANT: HUNTER PLANT Repoft Period: 0710L12024 Throuqh 0913012024 Source: UNIT3 Parameter: SO2RMATS 811012024 0.083 0.083 718 714 0 100.0% 4t11t2024 0.082 0.084 718 718 0 100.0% 8t1212024 0.079 0.084 7',tB 718 0 100.0% 811312024 0.079 0.084 714 710 8 98.9% 8t14t2024 0.08 0.084 718 710 I 98.9% 8115t2024 0.085 0.084 714 709 I 98.70/o 8t16t2024 0.087 0.085 71a 709 I 98.7Yo 8t1712024 0.086 0.085 714 709 I 98.7o/o 8t18t2024 0.086 0.085 718 709 I 98.7% 8t19t2024 0 0.085 714 709 I 98.7% 8t20t2024 0 0.085 718 709 I 98.7o/o 812'12024 0 0.085 696 687 9 98.7o/" 8t22t2024 0.086 0.085 696 687 I 98.7o/o 4t23t2024 0.086 0.085 696 687 I 98.70h 8t24t2024 0.086 0.085 696 687 I 98.7% 8t2st2024 0.086 0.085 696 687 I 98.7o/. 8126t2024 0.084 0.085 696 687 I 98.7% 8t27t2024 0.086 0.085 696 687 I 98.7o/" 8t28t2024 0.086 o.085 696 687 I 98.7o/o 8t2912024 0.085 0.085 696 687 I 98.7o/" 8130t2024 0.085 0.085 696 687 I 98.7o/o 4t31t2024 0.085 0.085 697 688 9 98.70/, 91"12024 0.085 0.084 697 688 I 98.7% 9t212024 0.084 0.084 697 688 I 98.7o/o 9t312024 0.065 0.084 698 689 9 98.7% 914t2024 0.07 0.083 698 689 I 98.7o/" 9t5t2024 0.087 0.083 698 689 I 98.70/o 9t612024 0.087 0.08s 698 689 s 98.7o/. 9t7t2024 0.086 0.083 698 689 I 98-7Yo 9t8t2024 0.084 0.083 698 689 I 98.7o/o 9t9t2024 0.083 0.083 698 689 I 98.7o/o 9t10t2024 0 0.083 679 670 I 98.7o/o 9111t2024 0.084 0.083 679 670 I 98.7% 911212024 0.086 0.083 679 670 I 98.7% 9t13t2024 0.086 0.084 679 670 s 98.7o/. 9t1412024 0.076 0.084 679 678 1 99.9% 911512024 0.085 0.084 679 678 1 99.9% 9t16t2024 0.086 0.084 679 679 0 100.0% 9t17t2024 0.084 0.084 679 678 1 99.9% 9t1812024 0.083 0.084 679 678 1 99.9% 9t1912024 0.085 0.084 679 678 1 99.9% 9t20t2024 0.086 0.084 701 700 1 99.9% Value = Offline Data Valuer = Average represents a building 30D Average Value = Exceedance Report Version 5.2 Report Generate d: LL/O5/24 13:27 HTRDAHSO4\\reportuser MATS 30 Day Rolling Average PIANT: HUNTER PLANT Repoft Period : 07 10U2024 Throush 09 130 I 2024 Source: UNIT3 Parameter: SO2RMATS 9121t2024 0.085 0.084 701 700 1 99.9% 9122t2024 0.085 0.084 701 700 1 99.9% 9t23t2024 0.086 0.084 701 700 1 99.9% 9t24t2024 0.082 0.083 701 700 1 99.9% 912512024 0.079 0.083 701 700 1 99.9% 9t26t2024 0.085 0.083 701 700 1 99.9% st27t2024 0.083 0.083 701 700 1 99.9% 9128t2024 0.084 0.083 701 700 1 99.9% st29t2024 0.085 0.083 701 700 1 99.9% st30t2024 0.086 0.083 701 700 1 99.9% Value = Offline Data Valuer = Average represents a building 30D Average Value = Exceedance Report Version 5.2 Report Generated:1r/06/24 73:27 HTRDAHso4\\reportuser Attachment B SO, Monitor Downtime Events Report Downtime Events - Duration Plant: HUNTER PLANT Report Period: 0710112024 00:00 Through 0913012024 23:59 Time Online Criteria: 1 minute(s) Source: Parameter: !ntoryal: UNIT3 SO2RMATS 001H lncident lD Start Date/Time End Date/Time Duration (dd:hh:mm) Reason Code - Description Actlon Code - Description 0711112024 09:00 O7/1112024 O9:59 0d-1h-0m 00 -Defauh 00 - (default) 0U1312024 07:30 0811312024 13:59 0d - 7h - 0m 00 - Default 00 - (default) 0811312024 23:00 0811312024 23:59 0d - th - 0m 00 - Default 00 '(default) 0811512024 07:OO 0811512024 07:59 0d - th - 0m 00 - Default 00 - (default) 0911712024 12:00 0911712024 12:59 0d - th - 0m 00 - Default 00 - (default) Number of Ev6nE: 5 Totel Duratlon: 0d - 1th - 0m ' lndicates duration incident could have additional data prior to the start dat6 or following the end date. Report Generated : 1 1 lOGl24 13:35 Report Version 4.0 HTRDAHSO4Veportuser 1of I Attachment C Unit 3 Excess Emissions Report PM Excess Emissions 0.030 lb/MMBtu (Quarterly Stack Testing) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lb/MMBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action rl Hg Excess Emissions 1.2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action ,^YiffiR[,ffiPmH I'l0t,r 'l B 20?,1