Kinder Morgan Altamont LLC
Altamont South Compressor Station, Title V Permit #1300041005
40 CFR 50 Subpart OOOO Annual Report
Mr. Burge,
As required by 40 CFR 60.5420(b) and Section 11.8.8.b.3 of the above referenced Title V Operating
Permit, Kinder Morgan Altamont LLC is providing an annual report for reciprocating compressor
CE-4 located at Altamont South Compressor Station. Compressor CE-4 is an affected reciprocating
compressor facility with respect to NSPS OOOO, Standards of Performance for Crude Oil ond
Noturol Gas Production, Transmission and Distribution. This report is being submitted for the
compliance period beginning on October 75,2022, and ending on October !4,2023.
lf you have any questions about this submittal, please contact me at (303) 914-7605 or by email at
Erin_Dunman @ KinderMorgan.com.
Sincerely,
Erin Dunman
Environmental Engineer
REVIEWED
Initials JBR Date 1/9/25
Comp Status Meets
File # 10211 Blue 2
no dev comp 4 4O
KTNDEa*,noRGAN
7 ALTAMoNT LLc
Annual Compliance Report pursuant to NSPS OOOO
The following information is required to be included in the annual report pursuant to 40 CFR 60
Subpart OOOO, Standards of Performance for Crude Oil ond Natural Gas
Production, Tronsmission and Distribution:
1. 60.5420(b)(1) (i)the company name and address of the affected facility
Company Name: Kinder Morgan Altamont LLC
Facility Name: Altamont South Compressor Station
Location: Qtr/Qtr: SWSE, Section: 27, Township: 25, Range: 5W, Duchesne County
548038 m Easting, 4457884 m Northing, UTM ZoneL2
2. 50.5420(b)(1Xii) an identification of each affected facility being included in the annual report
Reciprocating Compressor CE-4
3. 60.5420(b)(1Xiii) beginning and ending dates of the reporting period
Reporting period beginning date: October 15, 2023
Reporting period ending date: October L4,2024
4. 60.5420(b)(a)(i) The cumulative number of hours of operation or the number of months since
initial startup, since October L5, 201-2, or since the previous reciprocating compressor rod
packing replacement, whichever is later.
Compressor CE-4 date of last rod packing replacement: August LO,2023
Cumulative number of months since las rod packing replacement as of October 'J,4,2024: L4
5. 60.5420(b)(a)(ii) Records of deviations specified in paragraph (cX3Xiii) of this section that
occurred during the reporting period.
There were no deviations during the reporting period.
Based on information and belief formed after reasonable inquiry, the statements and information
in the document are true, accurate, and complete.
Don Perkins
Director, Operations