Loading...
HomeMy WebLinkAboutDAQ-2025-000109KTNDEa//,moRGAH 7 ALrAtoNr LLc FedEx 2807 2857 3107 October 1.6,2024 Harold Burge, Manager Major Source Compliance Section Utah Division of Air Quality 195 North 1950 West,4th Floor salt Lake city, UT 84176 E: t i Ii__-_____ _--- __l DIVISION OF AIR QtIAt ITY Re: Kinder Morgan Altamont LLC Altamont Main Gas Processing Plant, Title V Permit #1300006003 40 CFR 60 Subpart OOOO Annual Report Dear Mr. Burge, As required by a0 CFR 50.5420(b), Kinder Morgan Altamont LLC is providing an annual report for the reciprocating compressor driven by engine ICE-10 (K-3D) located at Altamont Main Gas Processing Plant. This compressor is an affected reciprocating compressor facility with respect to NSPS OOOO, Standords of Performonce for Crude Oil and Natural Gos Production, Transmission ond Distribution. This report is being submitted for the compliance period beginning on October L5,2023, and ending on October 14,2024. lf you have any questions about this submittal, please contact me at (303) 914-7505 or by email at Erin_Dunman@KinderMorgan.com. Sincerely, Erin Dunman Environ mental Engineer REVIEWED Initials JBR Date 1/9/25 Comp Status Meets File # 10005 Blue 2 no dev 4O ice10 KINDEN;,ftAORGAN 7 ALrAuoNr LLc Annual Compliance Report pursuant to NSPS OOOO The following information is required to be included in the annual report pursuant to 40 CFR 60 Subpart OOOO, Stondards of Performonce for Crude Oil ond Naturol Gos Production, Tronsmission a nd Distribution: l. 60.5420(b)(1) (i) the company name and address of the affected facility Company Name: Kinder Morgan Altamont LLC Facility Name:Altamont Main Gas Processing Plant Location: L779O West 3750 North, Altamont, UT 84001 2. 60.5420(b)(1)(ii) an identification of each affected facility being included in the annual report Reciprocating Compressor driven by engine ICE-10 (K-3D) 3. 60.5420(b)(1xiii) beginning and ending dates of the reporting period Reporting period beginning date: October 15, 2023 Reporting period ending date: October L4,2O24 4. 50.5420(b)(a)(i) The cumulative number of hours of operation or the number of months since initial startup, since October L5, 20L2, or since the previous reciprocating compressor rod packing replacement, whichever is later. Compressor driven by ICE-10 date of last rod packing replacement: February 29,2024 Cumulative number of months since last packing replacement as of October 1,4, 2024:7.5 5. 60.5420(b)(4)(ii) Records of deviations specified in paragraph (cX3)(iii) of this section that occurred during the reporting period. There were no deviations during the reporting period. Based on information and belief formed after reasonable inquiry, the statements and information in the document are true, accurate, and complete. Don Perkins Director, Operations i- L-v,,rl n- .,l\r . r'r: l.r r i ,r, - ri F,.tv:,icN.t,1ENTAl ri, ret tr v iI l---_---t Ill,rlilrij-----rli t' Ylsl?Lo.1ao!1!l]I _l