Re: Kinder Morgan Altamont LLC
Altamont Main Gas Processing Plant, Title V Permit #1300006003
40 CFR 60 Subpart OOOO Annual Report
Dear Mr. Burge,
As required by a0 CFR 50.5420(b), Kinder Morgan Altamont LLC is providing an annual report
for the reciprocating compressor driven by engine ICE-10 (K-3D) located at Altamont Main Gas
Processing Plant. This compressor is an affected reciprocating compressor facility with respect
to NSPS OOOO, Standords of Performonce for Crude Oil and Natural Gos Production,
Transmission ond Distribution. This report is being submitted for the compliance period
beginning on October L5,2023, and ending on October 14,2024.
lf you have any questions about this submittal, please contact me at (303) 914-7505 or by email
at Erin_Dunman@KinderMorgan.com.
Sincerely,
Erin Dunman
Environ mental Engineer
REVIEWED
Initials JBR Date 1/9/25
Comp Status Meets
File # 10005 Blue 2
no dev 4O ice10
KINDEN;,ftAORGAN
7 ALrAuoNr LLc
Annual Compliance Report pursuant to NSPS OOOO
The following information is required to be included in the annual report pursuant to 40 CFR 60
Subpart OOOO, Stondards of Performonce for Crude Oil ond Naturol Gos
Production, Tronsmission a nd Distribution:
l. 60.5420(b)(1) (i) the company name and address of the affected facility
Company Name: Kinder Morgan Altamont LLC
Facility Name:Altamont Main Gas Processing Plant
Location: L779O West 3750 North, Altamont, UT 84001
2. 60.5420(b)(1)(ii) an identification of each affected facility being included in the annual
report
Reciprocating Compressor driven by engine ICE-10 (K-3D)
3. 60.5420(b)(1xiii) beginning and ending dates of the reporting period
Reporting period beginning date: October 15, 2023
Reporting period ending date: October L4,2O24
4. 50.5420(b)(a)(i) The cumulative number of hours of operation or the number of months
since initial startup, since October L5, 20L2, or since the previous reciprocating compressor
rod packing replacement, whichever is later.
Compressor driven by ICE-10 date of last rod packing replacement: February 29,2024
Cumulative number of months since last packing replacement as of October 1,4, 2024:7.5
5. 60.5420(b)(4)(ii) Records of deviations specified in paragraph (cX3)(iii) of this section that
occurred during the reporting period.
There were no deviations during the reporting period.
Based on information and belief formed after reasonable inquiry, the statements and
information in the document are true, accurate, and complete.
Don Perkins
Director, Operations