HomeMy WebLinkAboutDERR-2025-000045 Stantec Consulting Services Inc. 2890 East Cottonwood Parkway Suite 300 Salt Lake City UT 84121-7283 January 2, 2025 Project/File: 203724146 Alex Jones Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West, First Floor Salt Lake City, Utah 84116 Reference: Work Plan and Budget for Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK Dear Mr. Jones, On behalf of 7-Eleven, Inc. (7-Eleven) Stantec Consulting Services Inc. (Stantec) proposes the following work plan and budget (WP&B) to perform environmental consulting services for Facility ID 4000775, Release Site OLK (the Site), located at 1344 Fort Union Boulevard, Cottonwood Heights, Utah (Figure 1). On December 10, 2024, Stantec submitted a Utah Petroleum Storage Tank (PST) Trust Fund Eligibility Application and appropriate private insurance documentation for the Site. The purpose of this work plan is to present a technical approach and cost estimate to the Utah Department of Environmental Quality (UDEQ), Division of Environmental Response and Remediation (DERR), to conduct a subsurface investigation including the following scope of work: project management and field work preparation, advancement of four soil borings completed as groundwater monitoring wells, soil and groundwater sampling, reporting, and reimbursement services. The scope of work proposed herein would be designated as WP&B OLK-01 with the objective of further defining on-site soil and groundwater petroleum hydrocarbon impacts. BACKGROUND The former underground storage tank (UST) system was installed in 1984 and closed by removal on June 26, 2024 by Stantec. The former UST system was located in the center of the property (Figure 1) and consisted of one 15,000-gallon gasoline UST, one split compartment UST (with one 8,000-gallon gasoline compartment and one 7,000-gallon diesel compartment), and four product dispensers. In October 2024, Release Site OLK was opened based on analytical laboratory results of UST closure samples which contained dissolved petroleum hydrocarbon concentrations above the screening levels established by the UDEQ DERR PST Branch. Groundwater samples GW-1 and GW-2 (Figure 1) contained benzene, toluene, total petroleum hydrocarbons (TPH) gasoline range organics (GRO), and TPH diesel range organics (DRO) concentrations above the Initial Screening Levels (ISLs). The benzene concentration of the GW-1 sample also exceeded the Tier 1 Screening Level (TSL). January 2, 2025 Alex Jones Page 2 of 4 Reference: Work Plan and Budget for Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK SCOPE OF WORK Task 1 – Project Management and Field Work Preparation Task 1 includes the preparation of this work plan, including communication and coordination with DERR. A Site-specific health and safety plan will also be prepared to address hazards associated with the proposed scope of work. Task 2 – Subsurface Investigation Following DERR approval of this work plan and budget, Stantec will oversee the advancement of four on-site direct push soil borings up to approximately 18 feet below ground surface (bgs) with collection of continuous core samples into acetate sleeves at five-foot intervals. Stantec will collect up to three soil samples per boring for laboratory analysis. At least one soil sample will be collected from the depth exhibiting the highest level of petroleum hydrocarbon impacts (based on field screening) and/or the capillary fringe. Stantec will also use field screening results to collect nonimpacted soil samples above and below the impacted zone. Soil samples will be field screened for volatile organic compounds using a Minirae 3000 photoionization detector (PID). The objective of soil sampling is to further define the vertical and lateral extent of petroleum hydrocarbon impacted soil, if encountered. Following soil sampling, each of the four soil borings will be completed as groundwater monitoring wells (MWOLK-1 through MWOLK-4). Groundwater is expected to be encountered at approximately 8 feet bgs based on groundwater encountered during tank removal activities in June 2024. The wells will be completed at a total depth of approximately 15 feet bgs. The wells will be constructed using 5 feet of 2-inch outside diameter, schedule 40 PVC casing and 10 feet of 0.010-inch slotted screen. The wells will be completed with the appropriate filter sand to one foot above the top of screen, bentonite seal to one foot below grade, and 8- inch diameter flush mount well vault installed within a 2-foot square concrete pad. The proposed well locations are shown on Figure 1. Cost bids for well installation were requested from Utah licensed drilling contractors Cascade Environmental, Pacific West Environmental, LLC (Pacific West), Direct Push Services LLC, and ET Technologies, Inc. Pacific West provided the lowest responsible bid; therefore, Stantec will award the work to Pacific West. Copies of the subcontractor cost estimates are provided in Attachment A. Soil samples will be labeled with the sample identification, collection date, and time, and placed into an ice chilled cooler for delivery to the project laboratory under chain-of-custody (COC) documentation. Soil samples will be analyzed for TPH-GRO, methyl tertiary-butyl ether, benzene, toluene, ethylbenzene, total xylenes, and naphthalene (MBTEXN) by Environmental Protection Agency (EPA) Method 8260 and TPH-DRO by EPA Method 8015. Analyses will be performed by Utah certified Pace Analytical National (Pace) of Mount Juliet, Tennessee. In order to prepare a waste profile application for the drill cuttings, one sample will be submitted to Chemtech-Ford Laboratories of Sandy, Utah for analysis of total lead by EPA Method 6010D in additional to analysis for petroleum hydrocarbon compounds. January 2, 2025 Alex Jones Page 3 of 4 Reference: Work Plan and Budget for Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK Following well installation, Stantec will survey relative top of casing elevations for the four on-site monitoring wells. Static depth to water measurements will be collected using a battery-powered water level meter and recorded to the nearest one hundredth of a foot. Stantec will then develop the wells by removing up to six well volumes of groundwater via weighted, disposable bailers. Should a well be bailed dry during development, Stantec will allow the well to recover and attempt to bail the well dry a second time. Following development and after allowing the water level in the wells to recover, each well will be sampled via bailer. Purged groundwater will be thin spread on the surface near each well location. Groundwater samples will be collected in five 40-milliliter (mL) amber glass volatile organic analysis (VOA) containers containing hydrochloric acid (HCl) preservative. VOAs will be filled in a manner to minimize sample volatilization and remove all headspace. Stantec will also submit a trip blank and blind field duplicate sample with the groundwater samples collected MWOLK-1 through MWOLK-4. Samples will be labeled with the sample identification, collection date, and time, and placed into an ice chilled cooler for delivery to the project laboratory under COC documentation. Groundwater samples will be analyzed for MBTEXN and TPH-GRO by EPA Method 8260 and TPH-DRO by EPA Method 8015. All analyses will be performed by Pace. Following completion of all field activities and receipt of analytical laboratory reports, Stantec will prepare one subsurface investigation report documenting the results of the WP&B OLK-01 scope of work. The report will include a summary of field activities, site plan, boring logs, soil and groundwater sampling results tabulated in data summary tables, groundwater isoconcentration maps, conclusions and recommendations, and laboratory reports with associated COC documentation. Task 3 – Reimbursement Services Stantec’s services will include preparation of reimbursement claims on behalf of 7-Eleven. This task includes assembling invoices paid by 7-Eleven, subcontractor invoices, details of charges, Stantec invoices, proof of payment documentation, the DERR Standardized Invoice Form, and the DERR Request for Payment Voucher Summary Worksheet. ESTIMATED COSTS The estimated costs for the scope of work described in this work plan are presented in Table 1. Non- reimbursable costs, such as subcontractor markup, have been omitted from the cost breakdown. The costs presented in Table 1 represent Stantec’s estimate of likely charges to be incurred during the implementation of the scope of work described above. Actual charges to the tasks and activities included in the scope may vary from those presented in the estimate as activities and tasks require either more or less effort than estimated. Stantec will contact the DERR project manager if there is significant diversion from the estimated cost breakdown, or if additional authorization above the total estimated cost of this work plan is required. January 2, 2025 Alex Jones Page 4 of 4 Reference: Work Plan and Budget for Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK Should you have any questions or require any additional information, please contact Anna Skinner at (801) 743-4815. Sincerely, STANTEC CONSULTING SERVICES INC. Anna Skinner Project Manager Certified Consultant #0271 Phone: (801) 743-4815 anna.skinner@stantec.com Attachments: Figure 1 – Site Plan Table 1 – Estimated Costs for WP&B OLK-01 Attachment A – Drilling Subcontractor Bids Reference: Work Plan and Budget for Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK FIGURE 1 Site Plan RUL CANOPY/DISPENSERS PUL DSL CAR W A S H 7-ELEVEN Store No. 47151 East Fort Union BLVD -SIDEWALK- -CON C R E T E - OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE P PPP P P P P P P P P P P P P PPP P P P P P P P P P P P P P P P P P P P P P P P P P P P PP P PP P The UPS Store Protein Foundry Great Clips ELECTRIC CONNECTION BOXES AIR/VACUUM DUMPSTER STORE SIGN -ASPH A L T - -ASPH A L T - -ASPH A L T - -ASPH A L T - CONCRETE UST AREA -C O N C R E T E - ELECTRIC CONNECTION BOX DRAINAGE GRATE N 0 20 40 APPROXIMATE SCALE IN FEET No warranty is made by Stantec as to the accuracy, reliability, or completeness of these data. Original data were compiled from various sources. This information may not meet National Map Accuracy Standards. This product was developed electronically, and may be updated without notification. Any reproduction may result in a loss of scale and or information. FILEPATH:\\us0395-ppfss01\shared_projects\203723864\05_report_deliv\deliverable\reports\cn\site_plan_47151_cn.pdf 410 17th Street Suite 1400 Denver, Colorado 80202 LEGEND: APPROXIMATE PROPERTY BOUNDARY WATER SEWER NATURAL GAS BURIED ELECTRICAL OVERHEAD ELECTRICAL PRODUCT LINE POWER POLE SITE LAMP PROPOSED BORING LOCATION P OE FOR: CHECKED BY:PROJECT NUMBER: © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Di Airbus DS APPROVED BY:DATE: FIGURE: 1SITE MAP AMSCCLCCL/AMS203724146 01/02/2025 7-ELEVEN No. 47151 1344 FT UNION BLVD COTTONWOOD HEIGHTS, UTAH 84121 SS-1/USC-1 GW-1 SS-2 PGW-2 SS-3SS-4/USC-2 SS-5 SS-6 SS-7 SS-9/USC-3 DRAWN BY: ~ ~ ~ E Reference: Work Plan and Budget for Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK TABLE 1 Estimated Costs for WP&B OLK-01 Section 0100 - Project Management and Work Plan Preparation • Work Plan Preparation Initial Subsurface Investigation 1 NTE @ $2,000.00 = $2,000 Section 0100 Subtotal $2,000 Section 0200 - Site Specific Health and Safety Plan • Initial Health & Safety Plan Health & Safety Plan 1 NTE @ $400.00 = $400 Section 0200 Subtotal $400 Section 0400 - Laboratory Analyses Pace Analytical National, Mount Juliet, Tennessee • Soil - EPA 8260B MBTEXN & TPH-GRO 12 samples @ $51.00 = $612 • Water - EPA 8260B MBTEXN & TPH-GRO 4 samples @ $46.00 = $184 Chemtech-Ford Analytical Laboratories, Sandy, Utah • Soil - ET Technologies UST Profile (MBTEXN, GRO, and total lead with next day rush TAT) 1 samples @ $200.00 = $200 Section 0400 Subtotal $996 Section 0500 - Project Reporting • Subsurface Investigation Report Principal P100 1 hours @ $169.00 = $169 Professional P102 2 hours @ $147.00 = $294 PM P103 8 hours @ $118.00 = $944 Field P104 12 hours @ $101.00 = $1,212 Drafter P107 5 hours @ $85.00 = $425 Admin P109 1 hours @ $62.00 = $62 Section 0500 Subtotal $3,106 Section 0600 - Groundwater Monitoring Well Installation and Soil Sampling • Drilling Subcontractor Bid - Four Wells (Pacific West) 1 bid @ $6,725.00 = $6,725 • Private Utility Locate (GPRS) 1 LS @ $2,000.00 = $2,000 • Scheduling, Oversight, and Field Support PM P103 6 hours @ $118.00 = $708 • Field Supervision Preparation P104 2 hours @ $101.00 = $202 Field P104 20 hours @ $101.00 = $2,020 • Consultant Travel (2, 15-minute round trips) Field P104 0.5 hours @ $101.00 = $51 • Equipment and Supplies PID 2 days @ $95.00 = $190 Sampling Supplies 2 days @ $25.00 = $50 Traffic Safety Equipment 2 days @ $15.00 = $30 Section 0600 Subtotal $11,976 c Table 1 Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK Estimated Costs for WP&B OLK-01 c fnl_bgt_47151_si_20250102.xlsx Page 1 of 2 Stantec Consulting Services Inc. c Table 1 Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK Estimated Costs for WP&B OLK-01 c Section 0700 - Groundwater Monitoring and Sampling (1 Event) • Scheduling, Oversight, and Field Support PM P103 4 hours @ $118.00 = $472 • Survey Top of Casing (4 Wells) Field (x2) P104 4 hours @ $101.00 = $404 • Development and Sampling (4 Wells, purging of 6 well volumes for development) Preparation P104 2 hours @ $101.00 = $202 Field (x2) P104 6 hours @ $101.00 = $606 • Consultant Travel (1, 15-minute round trip for 2 staff) Field (x2) P104 0.5 hours @ $101.00 = $51 • Equipment and Supplies Oil/Water Interface Probe 0.5 day @ $55.00 = $28 Water Level Meter 1 day @ $25.00 = $25 Sampling Supplies (x2 staff) 2 day @ $25.00 = $50 Traffic Safety Equipment 1 day @ $15.00 = $15 Survey Equipment 1 day @ $50.00 = $50 Weighted Bailer 4 each @ $11.00 = $44 Section 0700 Subtotal $1,946 Section 1200 - Waste Disposal • Solid Waste Disposal Subcontractor 1 drum @ $210.00 = $210 • Waste Disposal Coordination PM P103 4 hours @ $118.00 = $472 Section 1200 Subtotal $682 Section 1500 - Reimbursement • PST Fund Claim Preparation Senior PM P101 4 hours @ $152.00 = $608 PST Specialist P108 16 hours @ $78.00 = $1,248 Section 1500 Subtotal $1,856 Total Budget $22,962 fnl_bgt_47151_si_20250102.xlsx Page 2 of 2 Stantec Consulting Services Inc. Reference: Work Plan and Budget for Subsurface Investigation 7-Eleven Store No. 47151 1344 Fort Union Boulevard, Cottonwood Heights, Utah Facility ID 4000775, Release Site OLK ATTACHMENT A Drilling Subcontractor Bids Pacific West Environmental & Infrastructure, LLC P.O. Box 70 Azle, TX 76098 US +12148842096 poates@pwenviro.com Estimate ADDRESS Stantec- 214927- Speedway 9414 2890 East Cottonwood Parkway Suite 300 Salt Lake City, UT 84121 SHIP TO Stantec- 214927- Speedway 9414 1344 Fort Union Blvd Cottonwood Heights, UT ESTIMATE #DATE 214927 12/05/2024 SALES REP PROJECT MANAGER GN JH ACTIVITY QTY RATE AMOUNT Drilling Mobilization 1 450.00 450.00 Drilling Geoprobe Day Rate 1 1,800.00 1,800.00 Drilling 2-Inch Permanent MW 4 275.00 1,100.00 Drilling Wed Pad Completion 4 150.00 600.00 Drilling Saw-cuting/Coring 1 650.00 650.00 Drilling Hydrovac Day Rate 1 2,000.00 2,000.00 Drilling 55-gallon drum 1 125.00 125.00 Three soil borings to 18 feet. Convert soil borings to 15 feet 2-inch monitor wells set with DPT rods. 10 feet of screen, 5 feet riser. 10/20 sand and bentonite as well seal. Clear borings to 110% of auger diameter using hydrovac. SUBTOTAL 6,725.00 TAX (0.02) 0.00 TOTAL $6,725.00 Accepted By Accepted Date Stantec 12/5/2024 2890 East Cottonwood Parkway, Ste 300 197364 Salt Lake City, UT 84121 DPT Wells 7-Eleven 47151/Speedway 9414 Anna Skinner 134 Fort Union Blvd anna.skinner@stantec.com Cottonwood Heights UT Cascade Rep Contact Information Scope of Work Quantity Unit Sales Price Subtotal 1 Lump Sum 450.00$ 450.00$ Each 125.00$ -$ 1 Day 2,750.00$ 2,750.00$ 1 Day 2,950.00$ 2,950.00$ Boring Abandonment Each 15.00$ -$ 2 inch Schd 40 PVC Well Casing 32 Feet 5.00$ 160.00$ 2 inch Schd 40 PVC Prepack Well Screen 5' Sections 8 Each 175.00$ 1,400.00$ 8-inch Flush Grade Monuments 4 Each 350.00$ 1,400.00$ 55 Gallon Reconditioned DOT Drum 1 Each 160.00$ 160.00$ Concrete Coring - 12" Cores 3 Each 385.00$ 1,155.00$ Pre-Tax Total Tax Percentage Taxes Quote Total Four (4) 2-inch monitoring wells will be completed to 18-feet, using a truck mounted DPT rig. Three of the wells will be constructed in asphalt the remain well will be in the landscape. • Private utility cleared will be provided by others • The wells will be completed using schd 40 PVC using 10-feet of prepack screen per well; the surface protection will be flush grade 8" traffic rated monuments • The boring locations will be cleared to 8-feet using a air knife vac truck by the DPT crew Drill cuttings and decon/development water will be contained in 55-gallon drums and will remain on site. Expect reasonable drill rig access. Well and borings seals that take more than 25%-hole volume, will be sealed on a time and material basis. Assume 7:00AM to 5:30PM work hours and no prevailing wage requirements. Account Name Bid Date Address Quote Number Quote Revision Date Bill To Account Project Zip Project Name Contact Name Project Address Email Project City Phone Project State(801) 652-5138 Number Prepared By Trent Castner Email tcastner@cascade-env.com Description $10,425.00 Mobilization/Demobilization - DPT UT Well Logs DPT Drilling Daily Rate - Up to 10 Hours per Day Air Knife/Vac Truck - Crew This quote is based on information provided by you and is valid for 45 days from the bid date. Unless previously agreed, Cascade requires a 2-week notice prior to mobilization. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. Cascade Drilling shall not be responsible for damages to underground improvements not clearly and accurately marked. If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade. Additional costs may apply if scope is significantly changed. Well development by others may void some or all of Cascade warranties of workmanship and materials. Prices assume standard labor rates and no work hour restrictions. Utah: 5718 W AXEL PARK RD, WEST JORDAN UT 84081 ♦ (801) 542-7159 $10,425.00 20-1339913 | www.directpushservices.com Direct Push Services LLC PO Box 25784 Salt Lake City, UT 84125 +1 8014777077 sean@directpushservices.com Estimate ADDRESS Stantec Consulting 2890 East Cottonwood Parkway, Suite 300 Salt Lake City, UT 84121 ESTIMATE #240397 DATE 12/27/2024 EXPIRATION DATE 03/31/2025 P.O. NUMBER SALES REP 7-Eleven 47151/Speedway 9414 Sean Bromley DATE ACTIVITY QTY RATE AMOUNT 7822 Direct Push Rig/Tooling 2 2,250.00 4,500.00 Mob/Demob Drill rig 2 200.00 400.00 Decon 2 150.00 300.00 Daylighting 0-8' and 10% of casing diameter.4 650.00 2,600.00 55 Gallon drum 6 130.00 780.00 MC 60 in PVC liner 12 15.00 180.00 2" monitoring wells with 10' screen at 15'. Complete with sand, bentonite, 8" flush mount, 2x2 concrete pad around each 4 850.00 3,400.00 Asphalt cutting for 2x2 pads 3 225.00 675.00 7-Eleven 47151/Speedway 9414 located at 1344 Fort Union Blvd, Cottonwood Heights. -Advancement of 4 direct push borings and completion of each as a monitoring well. -Asphalt coring for 3 out of 4 locations (one location will be in landscaping). -Borehole clearance to 8 ft bgs and 110% of auger diameter. -Boring depth will be approximately 18 ft. -Continuous soil core samples via acetate sleeves. -2-inch diameter monitoring wells set at 15 ft. Schedule 40 PVC casing and 10 ft of 10 slot screen. 10/20 silica sand filter pack across the screened interval to 2 ft above the screen. The remainder of the annulus should be backfilled with bentonite chips to 1 ft bgs. Surface completions of 8-inch diameter steel vault set flush with grade and 2x2-foot diameter concrete pad. Contain all investigation derived waste in 55-gallon drums TOTAL $12,835.00 3110 W. California Ave., suite D Salt Lake City, UT  84104 (801) 977-0731    ettechusa.com     Estimate ESTIMATE #1038290615 DATE PO # CUSTOMER Stantec Consulting Anna Skinner 3995 S 700 East, suite 300 Salt Lake City, UT, 84107 anna.skinner@stantec.com   SERVICE LOCATION Stantec Consulting Speedway #9414 1344 E Fort Union Blvd Salt Lake City, Utah, 84121-2860 anna.skinner@stantec.com DESCRIPTION the below scope of work (SOW): Advancement of 4 direct push borings and completion of each as a monitoring well. - Asphalt coring for 3 out of 4 locations (one location will be in landscaping). - Borehole clearance to 8 ft bgs and 110% of auger diameter. - Boring depth will be approximately 18 ft. - Continuous soil core samples via acetate sleeves. - 2-inch diameter monitoring wells set at 15 ft. o Schedule 40 PVC casing and 10 ft of 10 slot screen. o 10/20 silica sand filter pack across the screened interval to 2 ft above the screen. o The remainder of the annulus should be backfilled with bentonite chips to 1 ft bgs. - Surface completions of 8-inch diameter steel vault flush with grade and 2-foot diameter concrete pad. - Appropriate number of 55-gallon drums for investigation derived waste. Private utility locating will be provided by others. Please include your available start date for this scope of work with your bid. ** First available start date is 1/15/2025 Estimate Description Qty Rate Tax Total Drill Crew Operator + Helper 2.00 $2,800.00 $0.00 $5,600.00 Monitoring Well 4.00 $900.00 $0.00 $3,600.00 Drums 1.00 $150.00 $0.00 $150.00 HydroVac Subcontractor 1.00 $2,500.00 $0.00 $2,500.00 CUSTOMER MESSAGE  Estimate Total:$11,850.00