Loading...
HomeMy WebLinkAboutDAQ-2025-000084,.tttF$nctor HF Sinclair Woods Cross Refining LLC 1070 W. 500 S, West Bountiful, UT 84087 801 -299-6600 | HFSinclair.com UTAH DEPARTMENT OF ENVIRONMENTAL OUATJTY JAN 1 B 2023 DIVISION OF AIR QUALITY Certified Mail: 7019 1120 0000 0071 0043 January L2,2023 Mr. Bryce Bird, Director Division of Air Quality Utah Dept. of Environmental Quality 195 North 1950 West Salt Lake City, Utah 84LL5-482O RE: Fugitive Volatile Organic Compound (VOC) Monitoring Report - 4th Quarter 2022 Director: HF Sinclair Woods Cross Refining LLC, HFSWCR, is submitting the 4h Quarter 2022Fu'gitive Volatile Organic Compound Monitoring Report for the HF Sinclair Woods Cross Refinery. This report complies with the provisions in the Utah Air Conservation Regulation R307-326-9(7) and 40 CFR Part 60 Subpart W, VVa, and GGGa. The monthly component monitoring summaries are presented in the attached tables for each operating unit. There are currently 20 components on the Delay of Repair list at Woods Cross Refinery. There are currently 24 chronically leaking valves that are awaiting a unit tumaround for repair. During each instance of startup and shutdown, the shutdown and startup procedures were in accordance with those specified in the startup, shutdown, and malfunction plans, and with standard operating procedures. If you have any questions or need additional information, please contact Al Vargas at Jose.Vargas(g)HF-Sinclair.com or by phone at (801) 299-6645. I certify that, except as noted herein, the VOC monitoring reported for this quarter was performed as stipulated in R307-326-9. Sincerely, Vice President and Refinery Manager Attachment cc: E. Benson (rl File 2.2.2 REVIEWEDInitials: Date: Jan 8, 2025Complinace Status: File #: 10123 (B2) REVIEWEDInitials: Date: Jan 8, 2025Complinace Status: File #: 10123 (B2) UTAH DEPARTMENT OF ENVIRONMENTAL OUAUTY ,Frontier Woods Cross Refining ttC :Detection and Repair Report ! i;,!'i i t'^t HOLLyFNONTIER. R3O7-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.NO,V'SION OF AIH eUALlTy1 to December 3L,2022 ]ESS UNIT:04 FCCU DESCRIPTIOT{ MONTH Jul Au,Seo Oct Nov Dec y'alves Jnit Valve Count r573 1574 y'alves Monitored 6t 1605 8l 1569 A Jnit DTM's Count 35 35 )TM Valves Monitored 0 3€0l c C New DOR's 0 0 0l c c Added - Valves 1.c Removed From Service-Valves C Number of Leaking Valves >500 ppm 7 8 0 1 c Number of Missed First Attempts at Repair (5 Days)0 0 0 c Leaking Valves Not Repaired As Required (15 Days)0 0 0 c Pumps Unit Pump Count 1:15 )umps Monitored 72 15 11 72 t2 L2 )ual-Mechanical seal pumps Count )ual-Mechanical seal pumps monitored 0 3 c 0 0 lew DOR's 0l 0 0 0 0 \dded - Prrmos 0 lemoved From Service-Pumps \umber of Leaking Pumps >2,000 ppm 0 0 c 1 t,lumber of Missed First Attempts at Repair (5 Days)0 0 0 -eakins Pumps Not Repaired As Required (15 Days)0 0 0 Compressors Jnit Comp. Count 1 \ 3ompressors Monitored 1 0 7 0 0 New DOR's 0 0 OI 0 Added - Comoressors lemoved From Service-Compressors tlumber of Leakine Compressors >2,000 ppm 0 0 0 0 r,lumber of Missed First Attempts at Repair (5 Davs)0 0 0 0 -eakins Compressors Not Repaired As Required (15 days)0 0 0 0 :vs/PRv Jnit CVS/PRV Count 22 22 :VS/PRV Comoonents Monitored 0l 22 c 0 27 )RV's to Atmosphere Count 0 {umber Of PRV's to Atm. Components Monitored 0 c c 0 c tlew DOR's 0 c C 0 0 \dded CVS Comoonents C lemoved From Service- CVS/PRV c !umber of Leakine CVS/PRV > 500 ppm c c C c c 0 \umber of Missed First Attempts at Repair (5 Days)c c c c c 0 -eaking CVS/PRV Not Repaired By Required (15 Days)c C c C c Drains Jnit Drains Count 2e 2e )rains Components Monitored 2t C C \dded Drain Components c lemoved From Service- Drains c \umber of Leaking Drains> 10,000 ppm 0 0 C c c -eaking Drains Not Repaired By Required (15 Days)0 0 c c HollyFrontier Woods Cross Refining tLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 3L,2022 ,ROCESS UNIT: 6 REFORMER i+ HOLLYFRONTIER" )ESCRIPTION MONTH Jul Aug sep Oct Nov Dec y'alves Jnit Valve Count 773 t73i y'alves Monitored 702 7767 TA T2 7730 1t Jnit DTM's Count 4A 4C )TM Valves Monitored 0 42 0 0l 0 0 \ew DOR's 0 0 c 0t 0 0 \dded - Valves C 0 lemoved From Service-Valves \umber of Leaking Valves >500 ppm 1 10 1 77 \umber of Missed First Attempts at Repair (5 Days)0 0 C 0 0 -eaking Valves Not Repaired As Required (15 Days)0 0 c 0 0 Pumps Unit Pump Count t2 t2 Pumos Monitored 6 72 6 6 Dual-Mechanical seal pumps Count Dual-Mechanical seal pumps monitored 0 6 0 0 New DOR's 0 0 0 C Added - Pumps Removed From Service-Pumps Number of Leaking Pumps >2,000 ppm 0 c '1.0 Number of Missed First Attempts at Repair (5 Days)0 C 0 0 Leaking Pumps Not Repaired As Required (15 Days)0 c 0 0 Compressors Jnit Comp. Count lomoressors Monitored 2 '1.2 0 0 tlew DOR's 0 c 0 0 C \dded - Compressors c lemoved From Service-Com pressors c !umber of Leakine Compressors >2,000 ppm 7 c 1,0 c \,lumber of Missed First Attempts at Repair (5 Days)c 0 c -eaking Compressors Not Repaired As Required (15 days)c 0 0 c 3VS/PRV Jnit CVS/PRV Count 2(2C :VS/PRV Components Monitored 0 2(0 18 c )RV's to Atmosphere Count C \umber Of PRV's to Atm. Components Monitored 0 0 0 C ( \ew DOR's 0 0 C 0 0 C qdded CVS Components c c lemoved From Service- CVS/PRV 0 c \umber of Leakins CVS/PRV > 500 ppm c 0 0 0 0 c \umber of Missed First Attempts at Repair (5 Days)c 0 0 0 0 c -eaking CVS/PRV Not Repaired By Required (15 Days)U 0 c Drains Jnit Drains Count 48 42 Drains Components Monitored 0 48 7 Added Drain Components Removed From Service- Drains Number of Leaking Drains> 10,000 ppm 0 1 c -eaking Drains Not Repaired By Required (15 Days)0 0 c HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. HOLLYFRONTIER" 1 to December 31,2022 PROCESS UNIT: 7 ALKY Unit DTM's Count DTM Valves Monitored of Leaking Valves >500 ppm Missed First Attempts at Repair (5 Valves Not Repaired As Required (15 Number of Missed First Pumps Not Repaired As Required (15 of Missed First Attempts at Comoressors Not Repaired As Required (15 d it CVS/PRV Count mber Of PRV's to Atm. Components Monitored of Leakins CVS/PRV > 500 of Missed First Attempts at Repair (5 Not Repaired Bv Required (15 Unit Drains Count Removed From Service- Drains Number of Leakine Drains> Comments Explanation for Missed Monitoring: Eleven (11) components on TOS. Five (5) components added in Unit 7, initially monitored within 3O-days of commissioning. HollyFrontier Woods Cross Refining LtC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 3L,2022 HOLLYFRONTIER" t Valve Count From Service-Valves umber of Leaking Valves >500 ppm umber of Missed First Attempts at Repair (5 king Valves Not Repaired As Required (15 Unit PumD Count s Monitored al-Mechanical seal pumps Count -Mechanical seal pumps montiored of Leakine Pumps >2,000 of Missed First Attempts at Repair (5 Days) Not Repaired As Required (15 Days) From Service-Com pressors umber of Missed First Attempts at Repair (5 Days) Not Repaired As Required (15 days) PRV's to Atmosphere Count Number Of PRV's to Atm. Components Monitored Added CVS Components Number of Leaking CVS/PRV > 500 of Missed First Attempts at ing CVS/PRV Not Repaired By Required (15 ains Components Monitored From Service- Drains umber of Leakine Drains> 10,000 Dralns Not Repaired By Required (15 Days) HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 31,2022 'h+t, HOLLYFRONTIER" PROCESS UN!T:9 DHDS DESCRIPT!ON MONTH Jul Auc Seo Oct Nov Dec Valves Unit Valve Count 359 3s9 Valves Monitored 0 0 35E 3 3 3si Unit DTM's Count DTM Valves Monitored 0 C 0 New DOR's 0 c 0 Added - Valves Removed From Service-Valves Number of Leaking Valves >500 ppm 0 c 0 0 Number of Missed First Attempts at Repair (5 Davs)0 C 0 0 -eaking Valves Not Repaired As Required (15 Days)0 c 0 0 'umps Jnit Pumo Count 7 )umos Monitored 1.I 7 7 1 )ual-Mechanical seal pumps Count c )ual-Mechanical seal pumps montiored 0 c 0 0 c \,lew DOR's 0 c 0 0 c \dded - Pumos c lemoved From Service-PumDs C \umber of Leakins Pumos >2.000 ppm c 1 1 c !umber of Missed First Attempts at Repair (5 Davs)c 0 c -eaking Pumps Not Repaired As Required (15 Days)c 0 0 c 3ompressors Jnit Comp. Count c lomoressors Monitored 0 0 0 0 c \ew DOR's 0 0 0 0 C Added - Comoressors c lemoved From Service-Com oressors c c \umber of Leakine Comoressors >2.000 oom c 0 0 0 0 c \umber of Missed First Attempts at Repair (5 Davs)C 0 0 0 0 c -eaking Compressors Not Repaired As Required (15 days)c 0 0 0 0 C CVS/PRV Jnit CVS/PRV Count 5 3VS/PRV Com oonents Monitored 0 0 5 0 c )RV's to Atmosphere Count 0 c \umber Of PRV's to Atm. Components Monitored 0 0 0 c \ew DOR's 0l 0 0 0 0 c Added CVS Comoonents lemoved From Service- CVS/PRV Number of Leakine CVS/PRV > 500 oom c 0 0 c c Number of Missed First Attempts at Repair (5 Davs)c 0 0 c c Leaking CVS/PRV Not Repaired By Required (15 Days)0 0 c Drains Unit Drains Count Drains Components Monitored 0 6 c Added Drain Comoonents Removed From Service- Drains Number of Leakins Drains> 10.000 ppm 0 0 c Leaking Drains Not Repaired By Required (15 Days)0 0 c Detection and Repair Report R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. HoLLyFnONTIER" 1to December 3L,2022 Valve Count t DTM's Count umber of Leaking Valves >500 ppm umber of Missed First Attempts at Repair (5 Days) Valves Not Repaired As Required (15 Dual-Mechanical seal pumps Count Dual-Mechanical seal pumps montiored r of Leaking Pumps >2,000 of Missed First Attempts at Repair (5 Da Pumps Not Repaired As Required (15 of Leakins Comoressors >2 of Missed First Attempts at Repair (5 Not Repaired As Required (15 days) nit CVS/PRV Count umber Of PRV's to Atm. Components Monitored moved From Service- CVS/PRV ber of Leakins CVS/PRV > 500 ber of Missed First Attempts at Repair RV Not Repaired Bv Required (15 Days) From Service- Drains ber of Leaking Drains> 10,000 ppm Drains Not Repaired By Required (15 HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N.HoLLyFnONTIER. Iy 1to December lL,2022 From Service-Valves ber of Leaking Valves >500 ppm ber of Missed First Attempts at Repair (5 Valves Not Repaired As Required (15 Dual-Mechanical seal pumps montiored Removed From Service-Pu Number of Leaking Pu Number of Missed First Attempts at Re of Missed First Attempts at rs Not Repaired As Required (15 Of PRV's to Atm. Components Monitored Removed From Service- CVS/PRV Number of Leakine CVS/PRV > 500 Number of Missed First Attempts at Repair (5 Days) CVS/PRV Not Repaired By Required (15 Unit Drains Count Drain Components moved From Service- Drains mber of Leaking Drains> 10,000 Drains Not Repaired By Required (15 Comments ront:er Woods Cross Refining LLC k Detection and Repair Report HoLLyFnoNTIER" R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. 1 to December 31-,2022 nit Valve Count nit DTM'S Count Removed From Service-Valves Number of Leaking Valves >500 ppm Number of Missed First Attempts at Repair (5 Days Leaking Valves Not Repaired As Required (15 Days) Dual-Mechanical seal pumps Count Dual-Mechanical seal pumps montiored d From Service-Pu of Leaking Pumps >2,000 of Missed First Attempts at Repair (5 Not Repaired As Required (15 umber of Leaking Com umber of Missed First Attempts at Repair (5 Compressors Not Repaired As Required (15 Of PRV's to Atm. Components Monitored From Service- CVS/PRV ber of Leakins CVS/PRV > 500 ber of Missed First Attem akine CVS/PRV Not Repaired By Required (15 Days) From Service- Drains r of Leakine Drains> 10,000 ppm Drains Not Repaired By Required (15 HollyFrontier Woods Cross Refining tLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July l to December 3t,2022 HOLLYFRONTIER. alves t Valve Count umber of Leaking Valves >500 ppm umber of Missed First Attempts at Repair (5 Days) Leaking Valves Not Repaired As Required (15 Days) nical seal pumps Count -Mechanical seal pumps montiored r of Leaking Pumps >2,000 r of Missed First Attempts at Repair (5 Number of Leaking Compressors > Number of Missed First Attempts at Repair (5 Not Repaired As Required (15 Unit CVS/PRV Count Number Of PRV's to Atm. Components Monitored of Leakine CVS/PRV > 500 of Missed First Attempts at Repair (5 Da CVS/PRV Not Repaired By Required (15 nts Monitored Drain Com From Service- Drains umber of Leaking Drains> Drains Not Repaired By Required (15 HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December lL,2022 HOLLYFRONTIER. PROCESS UNITr 16 AMINE DESCRIPTION MONTH Jul Auc Sep Oct Nov Dec Valves Unit Valve Count 10(10( y'alves Monitored 0 0 10(0l 0 10( Unit DTM's Count 0 )TM Valves Monitored 0 0 0 0l 0 tlew DOR's 0 0 0 0t 0 C \dded - Valves 0 0 lemoved From Service-Va lves 0 0 tlumber of Leaking Valves >500 ppm 0 0 c c 0 0 rlumber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking Valves Not Repaired As Required (15 Days)0 c 0 rumps Jnit Pumo Count c )umps Monitored 0l 0 c 0 0 )ual-Mechanical seal pumps Count c )ual-Mechanical seal pumps montiored 0l 0 c 0 0 \ew DOR's 0t 0 0 0 \dded - Pumps lemoved From Service-Pumps tlumber of Leaking Pumps >2,000 ppm 0 C 0 \,lumber of Missed First Attempts at Repair (5 Davs)0 c 0 0 -eaking Pumps Not Repaired As Required (15 Days)0 c 0 0 Compressors Jnit Comp. Count 0 3ompressors Monitored 0 c 0 0 0 New DOR's 0 c 0 0 0 Added - Compressors c Removed From Service-Com pressors c Number of Leaking Compressors >2,000 ppm C 0 0 c Number of Missed First Attempts at Repair (5 Davs)C 0 0 c Leaking Compressors Not Repaired As Required (15 days)c 0 0 c cvs/PRV Unit CVS/PRV Count 4 CVS/PRV Comoonents Monitored 0 0 I 0l C 4 PRV's to Atmosphere Count c c Number Of PRV's to Atm. Components Monitored 0 0 0 c tlew DOR's 0 0 0 0 0 c \dded CVS Components iemoved From Service- CVS/PRV {umber of Leaking CVS/PRV > 500 ppm C 0 0 c c !umber of Missed First Attempts at Repair (5 Davs)c 0 0 C C -eaking CVS/PRV Not Repaired By Required (15 Days)0 0 c ( )rains Jnit Drains Count )rains Components Monitored 0 0 c \dded Drain Components lemoved From Service- Drains \,lumber of Leakine Drains> 10.000 ppm 0 0 0 c -eaking Drains Not Repaired By Required (15 Days)0 0 0 c HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 31,2022 HOLLYFRONTIER. PROCESS UNIT:17 SRU DESCRIPTION MONTH Jul Au8 sep Oct Nov Dec Valves Unit Valve Count Valves Monitored ol 0l 0 3 Unit DTM's Count c DTM Valves Monitored 0t 0 0l 0 c New DOR's 0l 0 0t 0 c Added - Valves 0 c lemoved From Service-Va lves 0 C tlumber of Leaking Valves >500 ppm c 0 0 0 0 c !umber of Missed First Attempts at Repair (5 Days)c 0 0 0 C c -eakine Valves Not Repaired As Required (15 Days)C 0 0 c c 'umps Jnit Pump Count >umos Monitored 0 0 0 c )ual-Mechanical seal oumps Count )ual-Mechanical seal pumps montiored 0 0 0 c \,lew DOR's 0 0 0l c Added - Pumos lemoved From Service-Pumps Number of Leaking Pumps >2,000 ppm 0 c Number of Missed First Attempts at Repair (5 Days)0 0 c -eaking Pumps Not Repaired As Required (15 Days)0 0 c 0 Compressors Unit Como. Count 0 Compressors Monitored 0 0 0 0 0 C tlew DOR's 0 0 C 0 0 0 \dded - Compressors c 0 lemoved From Service-Com pressors C tlumber of Leaking Compressors >2,000 ppm 0 0 c 0 tlumber of Missed First Attempts at Repair (5 Days)0 c 0 -eaking Compressors Not Repaired As Required (15 days)0 c 0 0 :vs/PRV Jnit CVS/PRV Count c :VS/PRV Comoonents Monitored 0 0 c 0 0 )RV's to Atmosphere Count c !umber Of PRV's to Atm. Comoonents Monitored 0 0 c 0 0 \,lew DOR's 0 0 0 0 \dded CVS Components lemoved From Service- CVS/PRV \,lumber of Leakins CVS/PRV > 500 ppm 0 c 0 !umber of Missed First Attempts at Repair (5 Days)0 C 0 -eakins CVS/PRV Not Repaired By Required (15 Days)0 c 0 Drains Jnit Drains Count )rains Comoonents Monitored 0 c 0 0 0 0 0 0 Added Drain Components 0 lemoved From Service- Drains 0 Number of Leakins Drains> 10,000 ppm 0 C 0 0 0 Leakine Drains Not Repaired By Required (15 Days)0 c 0 c HollyFrontier woods cross Refining LLC .1t. Leak Detection and Repair Report L HOLLYFRONTIER" UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 3L,2022 PROCESS UNIT: 19 DHT )ESCRIPTION MONTH Jul Aus Seo Oct Nov Dec y'alves Jnit Valve Count 932 932 ,/alves Monitored 87s I 3 81 932 74 74 Jnit DTM's Count 22 22 )TM Valves Monitored 22 0 0 c \ew DOR's 0t 0 0 C \dded - Valves lemoved From Service-Valves \umber of Leaking Valves >500 ppm 2 0 9 7 \umber of Missed First Attempts at Repair (5 Days)0 0 c c Leaking Valves Not Repaired As Required (15 Days)0 c Pumps Unit Pump Count 0 2umps Monitored 0 0 0 0l 0 Dual-Mechanical seal pumps Count 0 C )ual-Mechanical seal pumps montiored 0 0 C 0t 0 0 tlew DOR's 0 0 c 0l 0 0 \dded - Pumos C lemoved From Service-Pumps c !umber of Leakine Pumps >2.000 ppm 0 0 c 0 0 !umber of Missed First Attempts at Repair (5 Days)0 0 C 0 0 -eakins Pumps Not Repaired As Required (15 Days)0 0 c 0 0 3ompressors Jnit Comp. Count 4 lompressors Monitored 3 C 1 4 I tlew DOR's 0 c 0 \dded - Compressors iemoved From Service-Compressors \umber of Leakine Compressors >2.000 ppm 0 c 1 0 0 \umber of Missed First Attempts at Repair (5 Days)0 c 0 0 0 Leaking Compressors Not Repaired As Required (15 days)0 c 0 0 0 cvs/PRv Unit CVS/PRV Count 2!25 3VS/PRV Com oonents Monitored 25 25 0 C PRV'S to Atmosphere Count C Number Of PRV's to Atm. Components Monitored 0 0 C c New DOR's 0 0 C 0 0 c Added CVS Comoonents Removed From Service- CVS/PRV tlumber of Leakine CVS/PRV > 500 ppm c 0 0 0 c c !umber of Missed First Attempts at Repair (5 Days)0 0 0 c C -eakins CVS/PRV Not Repaired By Required (15 Days)C c c )rains Jnit Drains Count 13 13 )rains Comoonents Monitored 0 13 \dded Drain Comoonents lemoved From Service- Drains \umber of Leakins Drains> 10,000 ppm 0 0 0 c -eaking Drains Not Repaired By Required (15 Days)0 0 C c HollyFrontier Woods Cross Refining LLC teak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 31,2022 HOLLYFRONTIER" PROCESS UNIT:20 GHC DESCRIPTION MONTH Jul Auc Sep Oct Nov Dec Valves Unit Valve Count 771 777 Valves Monitored 5 76t 2 759 Unit DTM's Count 9 DTM Valves Monitored ol o 0l 0 c New DOR's 0l 0 0t 7 c Added - Valves c c lemoved From Service-Va lves 0 c !umber of Leaking Valves >500 ppm 7 7 0 0 5 c !umber of Missed First Attempts at Repair (5 Days)c 0 0 c -eakins Valves Not Repaired As Required (15 Days)C 0 0 C ,umps Jnit Pump Count 5 )umps Monitored 0l 4 0 c )ual-Mechanical seal pumps Count 5 )ual-Mechanical seal pumps montiored 0 4 0 C \ew DOR's 0 0 0l Added - Pumps Removed From Service-Pumps Number of Leaking Pumps >2,000 ppm 0 0 c 0 Number of Missed First Attempts at Repair (5 Days)0 0 c 0 -eaking Pumps Not Repaired As Required (15 Days)0 0 0 c 0 Compressors Unit Comp. Count 0 0 lomoressors Monitored 0 0 c 0l 0 0 tlew DOR's 0 0 c 0l 0 0 \dded - Comoressors C lemoved From Service-Compressors c tlumber of Leaking Compressors >2,000 ppm 0 0 c 0 0 tlumber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking Compressors Not Repaired As Required (15 days)0 0 c 0 0 :VS/PRV Jnit CVS/PRV Count 74 74 :VS/PRV Com ponents Monitored 0 !4 0 L4 )RV's to Atmosphere Count tlumber Of PRV's to Atm. Components Monitored 0 c 0 \ew DOR's 0 C 0 0 {dded CVS Components lemoved From Service- CVS/PRV \umber of Leakine CVS/PRV > 500 ppm 0 c 0 0 0 \umber of Missed First Attemots at Reoair (5 Davs)0 c 0 0 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 C 0 0 c Drains Unit Drains Count u 74 Drains Components Monitored c L4 0 C Added Drain Comoonents c Removed From Service- Drains c Number of Leakine Drains> 10.000 opm c 0 0 0 c Leakine Drains Not Repaired Bv Required (15 Davs)c 0 0 0 0 C HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. Iuly 1to December 31,2022 HOLLYFRONTIER. PROCESS UNIT:21 NAHS DESCRIPTION MONTH Jul Aue Seo Oct Nov DeC Valves Unit Valve Count 12t 724 Valves Monitored 0l 0 '1.2t 0l 0 724 Unit DTM's Count C DTM Valves Monitored 0l 0 c 0t 0 c New DOR's 0l 0 0 0l 0 c \dded - Valves 0 c lemoved From Service-Va lves C !umber of Leaking Valves >500 ppm c 0 0 c \,lumber of Missed First Attempts at Repair (5 Days)0 0 c -eaking Valves Not Repaired As Required (15 Days)0 0 c 'umps Jnit Pump Count )umps Monitored 0 0 0 c )ual-Mechanical seal pumps Count )ual-Mechanical seal pumps montiored 0 0 0l c New DOR's 0 0 Added - Pumos Removed From Service-Pumps Number of Leakins Pumos >2.000 oom 0 0 0 c 0 Number of Missed First Attempts at Repair (5 Days)0 0 0 c 0 Leaking Pumps Not Repaired As Required (15 Days)0 0 0 c 0 Compressors Unit Como. Count 0 0 lompressors Monitored 0 0 0 0 0 0 tlew DOR's 0 0 C 0 0 \dded - Compressors c lemoved From Service-Compressors c tlumber of Leakine Comoressors >2,000 opm 0 0 c 0 0 tlumber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking Compressors Not Repaired As Required (15 days)0 0 c 0 0 :VS/PRV Jnit CVS/PRV Count 3 :VS/PRV Com oonents Monitored 0 c 0 )RV's to Atmosphere Count c \umber Of PRV's to Atm. Components Monitored 0 C 0 \ew DOR's 0 c 0 \dded CVS Comoonents lemoved From Service- CVS/PRV \umber of Leaking CVS/PRV > 500 ppm 0 c 0 0 \umber of Missed First Attempts at Repair (5 Days)0 C 0 0 -eaking CVS/PRV Not Repaired By Required (15 Days)0 C 0 0 Drains Jnit Drains Count 1 )rains Components Monitored C 1 0 C Added Drain ComDonents c Removed From Service- Drains c Number of Leakine Drains> 10.000 pom c 0 c Leakine Drains Not Repaired Bv Required (15 Days)c 0 0 c lyFrontier Woods Cross Refining ILC k Detection and Repair Report 3 R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. r 1 to December 3L,2O22 HOLLYFRONTIER" CESS UNIT:23 BENSAT DESCRIPTION MONTH Jul Auc Sep Oct Nov Dec y'alves Jnit Valve Count y'alves Monitored 0 0 0 c Jnit DTM's Count )TM Valves Monitored 0 0 ol c \ew DOR's 0 0 0l Added - Valves Removed From Service-Valves 44t Number of Leaking Valves >500 ppm 0 0 c 0 Number of Missed First Attempts at Repair (5 Days)0 0 c c 0 .eaking Valves Not Repaired As Required (15 Days)0 0 c c 0 'umps Jnit Pumo Count 0 0 >umos Monitored 0 0 c 0l 0 0 )ual-Mechanical seal pumos Count c 0 )ual-Mechanical seal pumps montiored 0t 0 c 0l 0 tlew DOR's 0l 0 C 0 0 \dded - Pumps c lemoved From Service-Pumps 4 \umber of Leaking Pumps >2,000 ppm 0 0 0 0 \umber of Missed First Attempts at Repair (5 Davs)0 0 0 0 -eaking Pumps Not Repaired As Required (15 Days)0 c 0 :ompressors Jnit Comp. Count lompressors Monitored 0 c 0 0 \ew DOR's 0 c 0 0 0 Added - Compressors 0 iemoved From Service-Compressors 0 Number of Leakine Compressors >2,000 ppm 0 c 0 0 0 Number of Missed First Attempts at Repair (5 Days)0 c 0 0 0 Leaking Compressors Not Repaired As Required (15 days)0 c 0 0 VS/PRV Unit CVS/PRV Count c CVS/PRV Components Monitored ol 0 0 c PRV's to Atmosphere Count C Number Of PRV's to Atm. Components Monitored o 0 ol C New DOR's 0 0 0 0 0 c Added CVS Comoonents Removed From Service- CVS/PRV lumber of Leakine CVS/PRV > 500 ppm c 0 0 c c !umber of Missed First Attempts at Repair (5 Days)c 0 0 c c -eakins CVS/PRV Not Repaired By Required (15 Days)c 0 0 C )rains Jnit Drains Count t7 t1 )rains Comoonents Monitored 0 0 77 \dded Drain Comoonents lemoved From Service- Drains \,lumber of Leakins Drains> 10,000 ppm 0 0 0 c -eakins Drains Not Repaired By Required (15 Days)0 0 c C TFrontier Woods Cross Refining LLC Detection and Repair Report R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. 1 to December 3L,2O22 HOLLYFRONTIER" ESS UNIT:24 CRUDE #2 DESCR!PTION MONTH Jul Aug sep Oct Nov DeC y'alves Jnit Valve Count 991 99t y'alves Monitored 1000 2 7 990 3 Jnit DTM's Count )TM Valves Monitored 9 0 0 c \ew DOR's 0 0 0 c \dded - Valves L lemoved From Service-Valves 1 \umber of Leaking Valves >500 ppm 1 0 3 \umber of Missed First Attempts at Repair (5 Days)0 0 c Leaking Valves Not Repaired As Required (15 Days)0 c Pumps Unit Pump Count Pumps Monitored 2 8 2 2 )ual-Mechanical seal pumps Count 6 6 )ual-Mechanical seal pumps montiored 0 6 0 0 0 0 tlew DOR's 0 0 0 0 0 0 \dded - Prrmns 0 0 lemoved From Service-Pum ps c 0 tlumber of Leakine Pumps >2,000 ppm 0 C 0 tlumber of Missed First Attempts at Repair (5 Days)0 c 0 -eaking Pumps Not Repaired As Required (15 Days)0 C 0 !ompressors Jnit Comp. Count c lomoressors Monitored 0 0 c 0 0 \,lew DOR's 0 0 c 0 0 \dded - Compressors c lemoved From Service-Com pressors c !umber of Leaking ComDressors >2,000 ppm 0 0 c 0 0 \umber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 -eaking Compressors Not Repaired As Required (15 days)0 0 c 0 0 :vs/PRv Jnit CVS/PRV Count 72 T2 :VS/PRV Comoonents Monitored 12 c 72 )RV's to Atmosphere Count !umber Of PRV's to Atm. Components Monitored 0 c 0 \ew DOR's 0 c 0 0 \dded CVS Components lemoved From Service- CVS/PRV \umber of Leakine CVS/PRV > 500 ppm 0 c 0 0 \umber of Missed First Attempts at Repair (5 Days)0 c 0 0 -eaking CVS/PRV Not Repaired By Required (15 Days)C 0 c Drains Jnit Drains Count 7t 7A )rains Comoonents Monitored C 74 0 c Added Drain ComDonents c Removed From Service- Drains c Number of Leakins Drains> 10,000 ppm c c 0 c Leaking Drains Not Repaired By Required (15 Days)c C 0 C HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 31-,2022 '-x+t HoLLyFnONTIER. PROCESS UNIT:25 FCCU #2 DESCRIPTION MONTH Ju!Auc Sep Oct Nov Dec Ualves Unit Valve Count 1881 r87t y'alves Monitored t5l 1835 3 3 1876 Unit DTM's Count DTM Valves Monitored 0l 3 0 0 New DOR's 0 0 0 Added - Valves Removed From Service-Va lves Number of Leaking Valves >500 ppm 0 3 c 3 Number of Missed First Attempts at Repair (5 Days)0 0 C 0 Leaking Valves Not Repaired As Required (15 Days)0 0 c 0 rumps Jnit Pump Count 1(1( )umps Monitored 3 15 2 2 )ual-Mechanical seal oumps Count Lt lt )ual-Mechanical seal pumps montiored 0l T4 0l 0 lew DOR's 0 0 0t 0 0 \dded - Pumps 0 lemoved From Service-Pumps 0 \umber of Leakine Pumos >2,000 ppm C 0 0 0 \umber of Missed First Attempts at Repair (5 Days)c 0 0 0 -eaking Pumps Not Repaired As Required (15 Days)C 0 0 0 0 Compressors Unit Comp. Count 2 2 Somoressors Monitored 0 1 1 1 New DOR's 0 0 0 L Added - ComDressors Removed From Service-Compressors Number of Leaking Compressors >2,000 ppm 1 0 0 1 Number of Missed First Attempts at Repair (5 Davs)0 c 0 c -eaking Compressors Not Repaired As Required (15 days)0 c 0 c :vs/PRv Jnit CVS/PRV Count 21 27 :Vs/PRV Components Monitored 0 2t 0t 2 )RV's to Atmosphere Count rlumber Of PRV's to Atm. Components Monitored 0 0l tlew DOR's 0 c 0 c \dded CVS Components C lemoved From Service- CVS/PRV c r,lumber of Leaking CVS/PRV > 500 ppm 0 1 0 c \lumber of Missed First Attempts at Repair (5 Davs)0 c 0 C -eakins CVS/PRV Not Repaired By Required (15 Days)c 0 c )rains Jnit Drains Count 4C 4C )rains Components Monitored c 39 T 0 0 C \dded Drain Components c c lemoved From Service- Drains c c !umber of Leakins Drains> 10,000 ppm 0 0 c 0 0 C -eakins Drains Not Repaired Bv Required (15 Days)0 0 c 0 0 c Comments HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. luly 1to December 31,2022 TROCESS UNIT: 26 POLY 1F HoLLyFnoNTIER. DESCRIPTION MONTH Jul Aug sep Oct Nov Dec y'alves Jnit Valve Count 7275 7275 y'alves Monitored 22 8 728.5 L27S Jnit DTM's Count )TM Valves Monitored 0 0 4 ol C \ew DOR's 0 0 0l Added - Valves i Removed From Service-Valves Number of Leaking Valves >500 ppm 0 0 5 1 0 Number of Missed First AttemDts at Reoair (5 Davs)0 0 0 c 0 eaking Valves Not Repaired As Required (15 Days)0 0 0 c 0 0 'umps Jnit Pump Count 71 1.1 )umps Monitored 0 L7 c 0l 0 0 )ual-Mechanical seal pumps Count 11 17 )ual-Mechanical seal pumps montiored 0 11 c 0 0 !ew DOR's 0 0 C 0 0 \dded - Pumos c lemoved From Service-Pumos c t,lumber of Leakine Pumps >2.000 ppm 0 1 0 0 \umber of Missed First Attempts at Repair (5 Days)0 0 0 0 -eakine Pumos Not Repaired As Required (15 Days)0 c 0 !ompressors Jnit Comp. Count lompressors Monitored 0 c 0 0 \ew DOR's 0 c 0 0 0 Added - Compressors 0 lemoved From Service-Compressors 0 \umber of Leaking Compressors >2,000 ppm 0 c 0 0 0 Number of Missed First Attempts at Repair (5 Days)0 c 0 0 0 Leakine Compressors Not Repaired As Required (15 days)0 c 0 C cvs/PRv Unit CVS/PRV Count 1S 79 :VS/PRV Com oonents Monitored 0 1t 0 0 19 PRV's to Atmosphere Count c Number Of PRV's to Atm. Components Monitored 0 0 c c New DOR's 0 0 0t 0 c Added CVS Comoonents Removed From Service- CVS/PRV Number of Leakins CVS/PRV > 500 ppm c 0 0 0 0 c Number of Missed First Attempts at Repair (5 Days)c 0 0 0 0 c Leaking CVS/PRV Not Repaired By Required (15 Days)C 0 c )rains Jnit Drains Count 18 1 )rains Components Monitored 0 18 C \dded Drain Components lemoved From Service- Drains !umber of Leakine Drains> 10,000 pom 0 0 c -eaking Drains Not Repaired By Required (15 Days)0 0 c HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 31,2022 HOLLYFRONTIER. PROCESS UNIT:Sl BOILERS DESCRPT|ON MONTH Jul Auc Sep Oct Nov Dec Valves Unit Valve Count 34!34: Valves Monitored 4 3 352 3 3 34: Jnit DTM's Count 7 )TM Valves Monitored 0l 0 9 0 0 c !ew DOR's 0l 0 0 c 0 \dded - Valves 0 lemoved From Service-Valves 0 !umber of Leaking Valves >500 ppm 7 0 3 0 c 1 \,lumber of Missed First Attempts at Repair (5 Days)0 0 C -eaking Valves Not Repaired As Required (15 Days)0 0 0 C Pumps Jnit Pump Count >umos Monitored 0 0 ol c )ual-Mechanical seal pumps Count )ual-Mechanical seal pumps montiored 0 0 0l New DOR's 0 0 Added - Pumos Removed From Service-Pumps Number of Leakine Pumps >2,000 ppm 0 0 c 0 Number of Missed First Attempts at Repair (5 Days)0 0 c 0 Leaking Pumps Not Repaired As Required (15 Days)0 0 0 c 0 Compressors Jnit Como. Count c 0 lompressors Monitored 0 0 C 0 0 0 tlew DOR's 0 0 C 0 0 c \dded - Compressors C c lemoved From Service-Compressors C C tlumber of Leakins Comoressors >2.000 ppm 0 c 0 0 C tlumber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 C -eaking Compressors Not Repaired As Required (15 days)0 0 C 0 0 c :vs/PRv Jnit CVS/PRV Count 4 4 :VS/PRV Com ponents Monitored 0 c 4 0 )RV's to Atmosphere Count c c tlumber Of PRV's to Atm. Components Monitored 0 c 0 t,lew DOR's 0 C 0 c \dded CVS Components 1 iemoved From Service- CVS/PRV \,lumber of Leakine CVS/PRV > 500 ppm 0 c 0 0 !umber of Missed First Attempts at Repair (5 Days)0 c 0 0 -eakins CVS/PRV Not Repaired By Required (15 Days)c c 0 Drains Jnit Drains Count 1 1 )rains Components Monitored 0 c t 0 Added Drain Comoonents lemoved From Service- Drains Number of Leakine Drains> 10.000 ppm 0 c 0 Leaking Drains Not Repaired By Required (15 Days)0 C 0 HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 3L,2022 PROCESS UNIT: 66 FLARE HOLLYFRONTIER" )ESCRIPTION MONTH Jul Aue Seo Oct Not Dec y'alves Jnit Valve Count 424 424 y'alves Monitored 0l 427 0 424 Jnit DTM's Count 3 )TM Valves Monitored 0 3 0 c \ew DOR's 0 0 ol c Added - Valves lemoved From Service-Va lves \umber of Leaking Valves >500 ppm 0 c Number of Missed First Attempts at Repair (5 Days)0 0 c 0 ieaking Valves Not Repaired As Required (15 Days)0 0 c c 0 'umps Jnit Pumo Count 6 6 )umos Monitored 5 q sl 5 5 )ual-Mechanical seal pumps Count C )ual-Mechanical seal pumps montiored 0l 0 c 0 0 !ew DOR's 0l 0 c 0 0 \dded - Pumps c lemoved From Service-Pumps c \umber of Leakine Pumps >2.000 opm 0 0 \umber of Missed First Attempts at Repair (5 Days)0 C 0 -eakins Pumps Not Repaired As Required (15 Days)0 c 0 0 Compressors Jnit Comp. Count 2 Sompressors Monitored 2 C 2 0 0 New DOR's 0 c 0 0 c Added - Comoressors c Removed From Service-Com pressors c Number of Leakins Compressors >2,000 ppm c 0 0 c Number of Missed First Attempts at Repair (5 Days)c 0 0 c Leaking Compressors Not Repaired As Required (15 days)C 0 0 0 c cvs/PRV Unit CVS/PRV Count 2 2 CVS/PRV Com oonents Monitored 0 2 0 2 PRV's to Atmosphere Count 0 C rlumber Of PRV's to Atm. Components Monitored 0 0 0 C {ew DOR's 0 0 0 c \dded CVS Components lemoved From Service- CVS/PRV !umber of Leakine CVS/PRV > 500 ppm 0 0 0 c tlumber of Missed First Attempts at Repair (5 Days)0 0 0 c -eakine CVS/PRV Not Repaired By Required (15 Days)0 0 0 c Drains Jnit Drains Count )rains Components Monitored 0 0 c Added Drain Comoonents lemoved From Service- Drains Number of Leakins Drains> 10,000 ppm 0 0 0 c 0 Leakins Drains Not Repaired By Required (15 Days)0 0 0 c 0 Detection and Repair Report R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. HoLLyFRONTIER, 1 to December 31-,2022 UNIT: 68 ETF t Valve Count DTM Valves Monitored Removed From Service-Va lves Number of Leaking Valves >500 ppm mber of Missed First Attempts at Repair (5 Days) Valves Not Repaired As Required (15 hanical seal oumps Count al-Mechanical seal pumps montiored ber of Leakine Pumps >2 ber of Missed First Attempts at Repair (5 ing Pumps Not Repaired As Required (15 Number of Leakins Compressors >2 Number of Missed First Attempts at Repair (5 Days Not Repaired As Required (15 days) Unit CVS/PRV Count PRV's to Atmosphere Count Number Of PRV's to Atm. Components Monitored of Missed First Attempts at Repair (5 ing CVS/PRV Not Repaired By Required (15 Drains Count Drains Not Repaired By Required (15 Comments HollyFrontier Woods Cross Refining LLC Leak Detection and Repair Report UAC R307-325, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. July 1to December 3L,2022 HoLLyFnONTIER. PROCESS UNIT:68 WfF )ESCRIPTION MONTH Jul Aug Sep Oct Nov Dec y'alves Jnit Valve Count 3407 340 ,/alves Monitored 3462 39 4 3389 26 24 Jnit DTM'S Count 65 55 )TM Valves Monitored 55 c 0t 0 c \ew DOR's 0 1 C 0l 0 C \dded - Valves LE c lemoved From Service-Valves 4 \umber of Leaking Valves >500 ppm 28 6 18 0 c Number of Missed First Attempts at Repair (5 Days)0 0 0 0 -eaking Valves Not Repaired As Required (15 Days)0 0 0 0 Pumps Unit Pump Count 5t 51 Pumps Monitored 54 57 54 54 54 54 Dual-Mechanical seal pumps Count Dual-Mechanical seal pumps monitored 0 3 ol 0 New DOR's 0 0l 0 \dded - Pumps lemoved From Service-Pumps !umber of Leakine Pumps >2,000 ppm 3 3 4 1 lumber of Missed First Attempts at Repair (5 Davs)C 0 0 -eakins Pumps Not Repaired As Required (15 Days)c 0 0 c :ompressors Jnit Comp. Count 0 0 lomoressors Monitored 0l 0 0 0l 0 0 New DOR's 0l 0 0 C Added - Comoressors Removed From Service-Compressors Number of Leaking Compressors >2,000 ppm 0 0 c Number of Missed First Attempts at Repair (5 Days)0 0 C Leaking Compressors Not Repaired As Required (15 days)0 c 0 C :VS/PRV Jnit CVS/PRV Count t3i 131 :VS/PRV Components Monitored 131 1301 )RV's to Atmosohere Count 7 1 tlumber Of PRV's to Atm. Components Monitored 1 1 tlew DOR's 0 c 0 0 C \dded CVS Components iemoved From Service- CVS/PRV I !umber of Leakine CVS/PRV > 500 ppm T C 1 1 c \lumber of Missed First Attempts at Repair (5 Days)0 0 c 0 0 C -eaking CVS/PRV Not Repaired By Required (15 Days)0 0 Drains Jnit Drains Count c c )rains Components Monitored 0 0 c 0 0 c Added Drain Components C Removed From Service- Drains Number of Leakine Drains> 10,000 ppm 0 0 0 0 Leaking Drains Not Repaired By Required (15 Days)0 C 0 0 Comments REVIEWEDInitials: Date: Jan 8, 2025Complinace Status: File #: 10123 (B2) UlAl-: t][PAiil-iv1[lJT OF Woods Cross Refining LLC Detection and Repair Report R307-326, NSPS; W, Wa, GGGa, and Consent Decree Section V.N. [-IOLLYFRONTIER" 1 to December 3L,2022 DIVISION OF AIR QUALITY umber of Leaking Valves >500 ppm umber of Missed First Attempts at Repair (5 Days) Valves Not Repaired As Required (15 Dual-Mechanical seal pumps Count Dual-Mechanical seal pumps montiored Number of Leaking Pumps >2,000 Number of Missed First Attempts at Repair (5 Days) Leaking Pumps Not Repaired As Required (15 Days) of Leaking Comoressors >2 of Missed First Attempts at Repair (5 Days) Compressors Not Repaired As Required (15 days) Of PRV's to Atm. Comoonents Monitored umber of Leakins CVS/PRV > 500 umber of Missed First Attem nit Drains Count ns Components Monitored emoved From Service- Drains umber of Leaking Drains> 10,000 Drains Not Repaired By Required (15 Days)