RE: Outage Notification, Unit 2, Huntington Power Plant (Title V Permit#1501001005)
Dear Mr. Bird:
As required by ll.B.1.f.3c of the Huntington Plant Title V operating permit, the purpose of this letter is to inform you of
a boiler unit outage at the PacifiCorp, Huntington Power Plant. Boiler Unit 2 was removed from service at 9:38 PM on
Thursday, October 14,2024 to make tube leak repairs. The maintenance was complete, and stable operation was
achieved at 10:33 PM on Saturday, October 12s',2024.
Please see the attached Maintenance Outage Report for details.
I am authorized to make this submission on behalf of the owners and operators of the affected source or affected
units for which the submission is made. I certify under penalty of law that I have personally examined, and am
familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry
of those individuals with primary responsibility for obtaining the information, I certify that the statements and
information are to the best of my knowledge and believe true, accurate, and complete. I am aware that there are
significant penalties for submitting false statements and information, or omitting statements and information, including
the possibility of fine or imprisonment.
For further information on this outage contact Terry Guthrie, Hunter and Huntington Plant Environmental Manager,
at 435-687-4334.
Sincerely,
Date:
Managing Director, Hunter and Huntington Plants
Responsible Official
Enclosure: U2 Maintenance Outage Report - PacifiCorp, Huntington Plant
DEPATiTMENT
ENVIFIONMENTAL
NO\/ - 5 2024
DIVISION OF AIR OUALITY
REVIEWED
Initials JBR Date 1/8/2025
Comp Status Meets
File # 10238 Blue 2
outage with table
cc: Terry Guthrie - Hunter and Huntington Plant Environmental Manager
Scarlet Lewis - Environmental Services - NTO 210
Russ Willson - Huntington Plant Files
Outage Report, Huntington Plant Boiler Unit#Z Boiler Tube
Leak Date: 1011012024
Date Time Descriotion
rcl1012024 9:15 PM Unit load lowered in anticipation of the outage Shut-down
begins
t0/10t2024 9:38 PM BFO Down-time
begins
t0/1012024 9:38 PM Stopped producing electricity
r011212024 2:54PM BFI Start-up begins-
t0/12/2024 6:33 PM Started producing electicity
t0/12/2024 7:49PM <10% heat input from fuel oil BFO
10t1212024 l0:30 PM 3 coal mills in service
10t12/2024 10:33 PM Stable operation (<10% heat input from oil, 3 coal mills in service, baghouse temps
>200 degrees)Start-up ends
BFO - Boiler Fire Out
BFI - Boiler Fire In
All times shown are in Mountain Standard Time.
OI\/ISION OF AIR QIJALITY
Boiler Operating Hours - Duri
UNIT #
Outage Start Date:
Outage End Date:
Outage Description:
Boiler Opr. Hrs.
Start Date S
1011212024 14:54 1011212024 23:59 9.08 9.08Total: 80,3