HomeMy WebLinkAboutDAQ-2025-000041Yr.*smF"g".s"r Huntington Power Plant 8 miles west of Huntington, Utah on Hwy 31 P.O. Box 680 Huntington, Utah 84528 October 14,2024 Mr. Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West P.O. Box 144820 Salt Lake City, UT 84'114-4820 RE: Outage Notification, Unit 2, Huntington Power Plant (Title V Permit#1501001005) Dear Mr. Bird: As required by ll.B.1.f.3c of the Huntington Plant Title V operating permit, the purpose of this letter is to inform you of a boiler unit outage at the PacifiCorp, Huntington Power Plant. Boiler Unit 2 was removed from service at 9:38 PM on Thursday, October 14,2024 to make tube leak repairs. The maintenance was complete, and stable operation was achieved at 10:33 PM on Saturday, October 12s',2024. Please see the attached Maintenance Outage Report for details. I am authorized to make this submission on behalf of the owners and operators of the affected source or affected units for which the submission is made. I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and believe true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information, or omitting statements and information, including the possibility of fine or imprisonment. For further information on this outage contact Terry Guthrie, Hunter and Huntington Plant Environmental Manager, at 435-687-4334. Sincerely, Date: Managing Director, Hunter and Huntington Plants Responsible Official Enclosure: U2 Maintenance Outage Report - PacifiCorp, Huntington Plant DEPATiTMENT ENVIFIONMENTAL NO\/ - 5 2024 DIVISION OF AIR OUALITY REVIEWED Initials JBR Date 1/8/2025 Comp Status Meets File # 10238 Blue 2 outage with table cc: Terry Guthrie - Hunter and Huntington Plant Environmental Manager Scarlet Lewis - Environmental Services - NTO 210 Russ Willson - Huntington Plant Files Outage Report, Huntington Plant Boiler Unit#Z Boiler Tube Leak Date: 1011012024 Date Time Descriotion rcl1012024 9:15 PM Unit load lowered in anticipation of the outage Shut-down begins t0/10t2024 9:38 PM BFO Down-time begins t0/1012024 9:38 PM Stopped producing electricity r011212024 2:54PM BFI Start-up begins- t0/12/2024 6:33 PM Started producing electicity t0/12/2024 7:49PM <10% heat input from fuel oil BFO 10t1212024 l0:30 PM 3 coal mills in service 10t12/2024 10:33 PM Stable operation (<10% heat input from oil, 3 coal mills in service, baghouse temps >200 degrees)Start-up ends BFO - Boiler Fire Out BFI - Boiler Fire In All times shown are in Mountain Standard Time. OI\/ISION OF AIR QIJALITY Boiler Operating Hours - Duri UNIT # Outage Start Date: Outage End Date: Outage Description: Boiler Opr. Hrs. Start Date S 1011212024 14:54 1011212024 23:59 9.08 9.08Total: 80,3