Loading...
HomeMy WebLinkAboutDAQ-2025-000038RioTinto Rio Tinto Kennecott Utah Copper, LLC 4700 Daybreak Parkway South Jordan, Utah 84009 Mr. Bryce Bird - Director Department of Environmental Quality Division of Air Quality P.O. Box 144820 Salt Lake City, Utah 84114-4820 SEP '2 O ?r,24F$a del, (ued DIVIS'ON OF AIR OIJALTTY _l September 19,2024 Attn: Joe Randolph Dear Mr. Bird RE: Smelter Monthlv Report - Auqust 2024 Rio Tinto Kennecott Utah Copper LLC (KUC) is submitting this letter in compliance with Approval Order (AO) number DAQE-ANO103460062-23 and Title V Operating Permit (Title V) Number 3500030004. lncluded herein is the monthly KUC Smelter monthly report for August 2024. The following sections present data related to the Holman Boiler, Main Stack particulate and lead emissions, and Main Stack gas flow. Holman Boiler The Holman Boiler 30-day average NOx emissions are measured as outlined in the most recently approved monitoring plan in accordance with AO condition ll.B.2.b and Title V condition 11.8.23.b.1. On August 6,2024, KUC submitted an update to the Smelter boiler alternative monitoring plan for review by UDAQ. Upon approval of the plan, KUC will update this report accordingly. The information provided in Table 1 is required to be reported monthly. ble Holm Boiler Dataana sum Were the 30-day average NOx emissions greater than 9.34 lbs/hr durino the period?N/A* Were the 30-day average 02 levels greater than 3.3% during the period?N/A** Rio Tinto Kenne@tl Utah Copper, LLC. 4700 0aybreak Parkway, South Jordan, Utah 84009 REVIEWED Initials JBR Date 7/8/2024 Comp Status Meets File # 10346 Blue 2 data recovery and avgs off due to missed samples elevator maintenance. RioTinto Rio Tinto Kennecott Utah Copper, LLC 4700 Daybreak Parkway South Jordan. Utah 84009 Main Stack Particulate Matter (PM10) and Lead (Pb) Emissions Lead Emissions Were the Holman Boiler data recovery requirements met during I run.the period?' I Notes: " For compliance with data recovery requirements, a minimum of 75% of the operating hours in each operating day must be achieved in at least 22 of 30 successive operating days. ** The Holman burner replacement is complete. KUC has completed stack testing but is still reviewing the report to determine a new oxygen limit for the new burner able 2. Main Stack Dailv Parttculate and Date Main Stack Particulate (lbs/hr) Main Stack Lead (lbs/hr) 811t2024 2q.E o.q 8t2t2024 *o.gx 8t3t2024 *o.q* 8t4t2024 q6.z 1.O 8t512024 ?2.4 o.5 8t6t2024 z6.o o.4 8t712024 *o.g* 8t8t2024 *o.g* 8t9t2024 ra.8 2.2, 8t10t2024 zt.6 o.6 8t11t2024 o.q* 8t1212024 *o.g* 8t1312024 o.g* 8t1412024 o.g* 8t15t2024 *o.g* 8t16t2024 *o.g* 8t1712024 *o.g* 8t1812024 *o.g* 8t1912024 *o.g* Rio Tinto Kenne@tt Utah Copper,4700 Daybreak Parkway, South Jordan, Utah 84009 RiOTintO Rio rinto Kennecotr utah Gopper, LLC 4700 Daybreak Parkway South Jordan, Utah 84009 8t2012024 o.g* 8t2112024 o.g* 8t22t2024 o.g* 8t23t2024 o.g* 8t2412024 o.g* 8t2512024 *o.g* 812612024 *o.g* 8t2712024 *o.g* 8t2812024 *o.g* 8t29t2024 *o.g* 8t30t2024 *o.g* 8t31t2024 *o.g* Notes: Twenty-flve samples were invalidated due to ongoing stack elevator maintenance issues and stack probe sampling hardware issues. On August znd-3td,7th - 8th, and 11th - 12th were invalidated due to stack elevator maintenance problems and 13th through 31't were all invalidated due to stack probe sampling hardware issues. The staff using the elevator encountered elevator technical issues during these periods that caused these days to be missed and have since received additional elevator training. The stack probe samolino hardware issues was resolved on September 3.2024. Particulate and lead emissions are measured and calculated in accordance with the most recently approved monitoring plan. Table 2 summarizes the daily particulate and lead emissions data. The daily main stack particulate emissions are to be compared with the permit limit of 89.5 lbs/hr as set forth in AO condition ll.B.1.a (H) and Title V condition tt.B.24.a (i). Table 3 summarizes the Main Stack particulate and lead emissions annual data calculations. This includes recovery percentages for particulate and lead emissions samples and the annual average lead emissions. The lead annual average emissions are to be compared with the permit limit of 1 .3 lbs/hr as set forth in AO condition ll.B.1.a (H) and Title V condition 11.8.24.d. Table 3: Main Stack AnnualAnVC Particulate Emissions Data Recovery"71 .9o/o Lead Emissions (Annual Average)0.5 lbs/hr Lead Emissions Data Recovery*71 .9o/o Notes: Rio Tinto Kenne@tt Utah Copper. LLC. 4700 Daybreak Parkway, South Jordan, Utah 84009 RioTinto Rio Tinto Kennecoft Utah Copper, LLC 4700 Daybreak Parkway South Jordan, Utah 84009 + - Data recovery percentages are to be compared with the 80% data recovery uirement outlined in the most recently approved monitoring plan. Main Stack Gas Flow ln accordance with AO condition 11.B.3.a.6, main stack gas flow may be estimated in the event that temperature and velocity measurements malfunction. Table 4 summarizes the instances when main stack gas flow was estimated. Table 4: Main Stack Gas Flow Estimates Number of instances when main stack gas flow was estimated during the period:Zero (0) Based on information and belief formed after reasonable inquiry, the statements and information in this document are true, accurate, and complete (R307-41 5-5d). lf you have any questions regarding this report, please contact me or Sean Daly at 801-204-2563. Yours sincerely,lr Matt Tobey General Manager - Metals Rio Tinto Kenne@tt Utah Copper, LLC. 4700 Daybreak Parkway, South Jordan, Utah 84009