RE: Smelter Monthlv Report - Auqust 2024
Rio Tinto Kennecott Utah Copper LLC (KUC) is submitting this letter in
compliance with Approval Order (AO) number DAQE-ANO103460062-23
and Title V Operating Permit (Title V) Number 3500030004. lncluded
herein is the monthly KUC Smelter monthly report for August 2024.
The following sections present data related to the Holman Boiler, Main
Stack particulate and lead emissions, and Main Stack gas flow.
Holman Boiler
The Holman Boiler 30-day average NOx emissions are measured as
outlined in the most recently approved monitoring plan in accordance with
AO condition ll.B.2.b and Title V condition 11.8.23.b.1. On August 6,2024,
KUC submitted an update to the Smelter boiler alternative monitoring plan
for review by UDAQ. Upon approval of the plan, KUC will update this
report accordingly.
The information provided in Table 1 is required to be reported monthly.
ble Holm Boiler Dataana sum
Were the 30-day average NOx emissions greater than 9.34
lbs/hr durino the period?N/A*
Were the 30-day average 02 levels greater than 3.3% during
the period?N/A**
Rio Tinto Kenne@tl Utah Copper, LLC. 4700 0aybreak Parkway, South Jordan, Utah 84009
REVIEWED
Initials JBR Date 7/8/2024
Comp Status Meets
File # 10346 Blue 2
data recovery and avgs off
due to missed samples
elevator maintenance.
RioTinto Rio Tinto Kennecott Utah Copper, LLC
4700 Daybreak Parkway
South Jordan. Utah 84009
Main Stack Particulate Matter (PM10) and Lead (Pb) Emissions
Lead Emissions
Were the Holman Boiler data recovery requirements met during I run.the period?' I
Notes:
" For compliance with data recovery requirements, a minimum of 75% of the
operating hours in each operating day must be achieved in at least 22 of 30
successive operating days.
** The Holman burner replacement is complete. KUC has completed stack
testing but is still reviewing the report to determine a new oxygen limit for the
new burner
able 2. Main Stack Dailv Parttculate and
Date Main Stack Particulate
(lbs/hr)
Main Stack Lead
(lbs/hr)
811t2024 2q.E o.q
8t2t2024 *o.gx
8t3t2024 *o.q*
8t4t2024 q6.z 1.O
8t512024 ?2.4 o.5
8t6t2024 z6.o o.4
8t712024 *o.g*
8t8t2024 *o.g*
8t9t2024 ra.8 2.2,
8t10t2024 zt.6 o.6
8t11t2024 o.q*
8t1212024 *o.g*
8t1312024 o.g*
8t1412024 o.g*
8t15t2024 *o.g*
8t16t2024 *o.g*
8t1712024 *o.g*
8t1812024 *o.g*
8t1912024 *o.g*
Rio Tinto Kenne@tt Utah Copper,4700 Daybreak Parkway, South Jordan, Utah 84009
RiOTintO Rio rinto Kennecotr utah Gopper, LLC
4700 Daybreak Parkway
South Jordan, Utah 84009
8t2012024 o.g*
8t2112024 o.g*
8t22t2024 o.g*
8t23t2024 o.g*
8t2412024 o.g*
8t2512024 *o.g*
812612024 *o.g*
8t2712024 *o.g*
8t2812024 *o.g*
8t29t2024 *o.g*
8t30t2024 *o.g*
8t31t2024 *o.g*
Notes: Twenty-flve samples were invalidated due to ongoing stack elevator
maintenance issues and stack probe sampling hardware issues. On August
znd-3td,7th - 8th, and 11th - 12th were invalidated due to stack elevator
maintenance problems and 13th through 31't were all invalidated due to stack
probe sampling hardware issues. The staff using the elevator encountered
elevator technical issues during these periods that caused these days to be
missed and have since received additional elevator training. The stack probe
samolino hardware issues was resolved on September 3.2024.
Particulate and lead emissions are measured and calculated in
accordance with the most recently approved monitoring plan. Table 2
summarizes the daily particulate and lead emissions data. The daily main
stack particulate emissions are to be compared with the permit limit of
89.5 lbs/hr as set forth in AO condition ll.B.1.a (H) and Title V condition
tt.B.24.a (i).
Table 3 summarizes the Main Stack particulate and lead emissions
annual data calculations. This includes recovery percentages for
particulate and lead emissions samples and the annual average lead
emissions. The lead annual average emissions are to be compared with
the permit limit of 1 .3 lbs/hr as set forth in AO condition ll.B.1.a (H) and
Title V condition 11.8.24.d.
Table 3: Main Stack AnnualAnVC
Particulate Emissions Data Recovery"71 .9o/o
Lead Emissions (Annual Average)0.5 lbs/hr
Lead Emissions Data Recovery*71 .9o/o
Notes:
Rio Tinto Kenne@tt Utah Copper. LLC. 4700 Daybreak Parkway, South Jordan, Utah 84009
RioTinto Rio Tinto Kennecoft Utah Copper, LLC
4700 Daybreak Parkway
South Jordan, Utah 84009
+ - Data recovery percentages are to be compared with the 80% data recovery
uirement outlined in the most recently approved monitoring plan.
Main Stack Gas Flow
ln accordance with AO condition 11.B.3.a.6, main stack gas flow may be
estimated in the event that temperature and velocity measurements
malfunction. Table 4 summarizes the instances when main stack gas flow
was estimated.
Table 4: Main Stack Gas Flow Estimates
Number of instances when main stack gas
flow was estimated during the period:Zero (0)
Based on information and belief formed after reasonable inquiry, the
statements and information in this document are true, accurate, and
complete (R307-41 5-5d).
lf you have any questions regarding this report, please contact me or Sean
Daly at 801-204-2563.
Yours sincerely,lr
Matt Tobey
General Manager - Metals