HomeMy WebLinkAboutDAQ-2025-000036RioTinto Rio Tinto Kennecott Utah Copper, LLC
4700 Daybreak Parkway
South Jordan, Utah 84009
DI-I'AI]TMENT OF
ENVIHONMENTAL OUALITY
Aqn,l d rl lorca
OCI 3 rt 2024
DIVISION OF AIR OUALITY
Mr. Bryce Bird - Director
Department of Environmental Quality
Division of Air Quality
P.O. Box 144820
Salt Lake City, Utah 84114-4820
October 30,2024
Attn: Joe Randolph
Dear Mr. Bird
Subject: Third Quarter 2024. Deviations from Title V Permit
Conditions
Title V Operatinq Permit No.3500030004
Kennecott Utah Copper - Smelter Facilitv
Condition l.S.2.c of Kennecott's Title V Operating Permit specifies lhat'The
Director shall be notified promptly of any deviations from permit requirements
including those attributable to upset conditions..." Conditions 11.B.1.j.3 and
11.8.1.k.3 specify lhat"quafterly reports are considered prompt notification of
permit deviations required in Provision l.S.2.c of this permit... " Per conditions
11.8.1.j.3 and 11.B.1.k.3 any applicable periods when weekly pressure drop and/or
liquid flow observations triggered daily observations are included in an attached
table. No deviations occurred during the third quarter of 2024.
Based on information and beliefs formed after reasonable inquiry, the statements
and information contained in this document are true, accurate, and complete
(R307-415-5d).
Should you have any questions or need further information, please feel free to
contact me or Sean Daly at 801-569-6331.
Sincerely,
Rio Tinto K8nne@tt Utah Coppor, LLC. 4700 Daybreak Parkway, South Jfrdan, Utah 84009
REVIEWED
Initials JBR Date 7/8/2024
Comp Status Meets
File # 10346 Blue 2
No dev