October '1,2024
Mr. Bryce Bird, Director
Division of Air Quality
Utah Department of Environmental Quality
150 North 1950 West
P.O. Box 144820
Salt Lake City, Utah 84114
ocl - I 2024
DIVISION OF AIN OI,JALITY
RE: Title V Six Month Monitoring Report - US Magnesium, LLC, Rowley Facility,
Operating Permit No. 4500030003
Dear Mr. Bird,
Please find enclosed the Title V Six Month Monitoring Report for the US Magnesium,
LLC facility located at Rowley, Utah. This report covers the period from April 1,2024 to
September 30,2024 for Operating Permit # 4500030003.
lf you have any questions or require additiona! information, please feel free to contact
me at (801) 532-1522.
Sincerely,/ -"o -4/ 6T r/a r/at
/1. aoger Francom
Senior Environmental Coord inator
US Magnesium LLC
Enclosure
REVIEWED
Initials JBR Date 1/7/2025
Comp Status Meets
File # 10716 Blue 2
plant shutdown.
SIX MONTH MONITORING REPORT
April 1,2024 through September 30, 2024
Operating Permit # 4500030003
In accordance with Operating Permit provision I.S.2.a, and Utah Administrative Code (UAC)
R307-4 1 5-6a(3)(c)(i), the following monitoring report is submitted.
This report covers the period from 41112024 to 913012024.
For the indicated reporting period:
There were no deviations from any permit requirements.
Deviations from permit operating requirements are listed on Attachment A. The
list includes the information required by Operating Permit provision I.S.2.a, and
UAC R307-a 1 s-6a(3)(c)(i).
ln accordance with Operating Permit provision I.K and UAC R307-415-5d, and based on
information and belief formed after reasonable inquiry, I certify that the statements and
information in this document are true, accurate, and complete.
ro/ t lz*
Date
x
Ron Thayer, President
US M,q,CUESTM LLC
Sx Moxrn MorrroRrNc RnPonr
April 1,2024 through September 30,,2024
Attachment A
Chlorine Reduction Burner Absorber Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time I Duration. hours
During this period due to magnesium
production being temporarily stopped, the
Chlorine Reduction Burner was down.
Chlorine Reduction Burner Deviations from Operating Temperature Range
Starting and ending times are tbr the recorded I -hour block values.
Date and time I Duration, hours
During this period due to magnesium production
being temporarily stopped, the Chlorine
Reduction Burner was down.
Emergency Off-Gas Scrubber Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded I -hour block values.
Date and time Duration. hours
During this period due to magnesium
production being temporarily stopped the
Off-Gas Scrubber was down.
East Packed Tower Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time I Duration. hours
During this period due to magnesium production
being temporarily stopped the East Packed
Tower was down.
West Packed Tower Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time Duration. hours
During this period due to magnesium production
being temporarily stopped the West Packed
Tower was down.
US MaCxESIUM LLC
Srx MoNrH MoNrroRrNG Rnponr
April 1,2024 through September 30,2024
High Energy Scrubber Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time I Duration, hours
During this period due to magnesium
production being temporarily stopped, the High
Scrubber was down.
Spray Dryer 01 Scrubber Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time Duration. hours
During this period due to magnesium
production being temporarily stopped Spray
01 was down.
Spray Dryer 02 Scrubber Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time I Duration. hours
During this period due to magnesium
production being temporarily stopped Spray
02 was down.
Spray Dryer 03 Scrubber Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded 1-hour block values.
Date and time I Duration. hours
During this period due to magnesium production being
il Dryer 03 was down.
05106 Bin Scrubber Deviations from Recirculating Flow Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time I Duration. hours
During this period due to magnesium
production being temporarily stopped 05106
Bin Scrubber was not in use.
Attachment A Page 2 of 3
US M,q,cxEsruM LLC
Sx Moxrn MoxrroRrNc RrPonr
April 1,2024 through September 30,2024
05/06 Bin Scrubber Deviations from Discharge Gas Temperature Operating Parameter Range
Starting and ending times are for the recorded l-hour block values.
Date and time I Duration, hours
During this period due to magnesium
production being temporarily stopped 05/06
Bin Scrubber was not in use.
Acid Plant Sodium Hydroxide Scrubber Deviations from rolling}4-hour
Average Recirculated Liquor pH Not Less Than 8.0 Operating Limit
Duration is number of I hour blocks below the daily average limit for the calendar day.
Acid Plant Sodium Hydroxide Scrubber Deviations from Daily
Average Liquor Recirculation Rate Operating Limit
Duration is number of I hour blocks below the daily average limit for the calendar day.
Date Duration
(hours)
Percent Operating
Hours Cause
Durine this reporting period, the 36oh hydrochloric acid plant was not in production.
US Magnesium (USM) submitted a letter to UDEQ-DAQ on September 1,2023, that the stack testing on
the 63 MMBTU/hr boiler in the lithium operation would not be happening by September 30, 2023, due to
the failure of the 2 regulators that control gas flow to the boiler. Because of the lead times in getting the
new regulators and having to reschedule the stack tester, the stack test originally scheduled for September
27,2023, had to be moved to November 28,2023.
Date Duration
ftours)
Percent Operating
Hours Cause
Durins this reportins period. the 36%o hydrochloric acid plant was not in production.
UTAH DFPARTMENT OF
ENVIRONMENTAL QUALIry
DIVISION OF AIR OIJALITY
Attachment A Page 3 of3