Loading...
HomeMy WebLinkAboutDERR-2025-000088VCP/BROWNFIELDS SECTION – SITE VISIT REPORT SITE NAME: Park City Heights Site Visit DATE: August 26, 2024 PROJECT MANAGER: Leigh Anderson PURPOSE OF VISIT: Inspect repository and retaining wall. FIELD OBSERVATIONS: Some damage to the fence will need to be repaired. Burrows are minor and might even be old, however due to the broken fence there are signs of human activity on the repository. Some dumping is present, though may have blown off from the nearby highway, and a golf ball, but most concerning is what seems to be a child’s winter hat, suggesting children of some residents are using the repository as a sledding hill or otherwise playing on it. The retention wall has had a lot of repairs, and the cement looks almost knew. However it seems to have been repaired as is, meaning low points in the wall are still low points and almost flush with the slope. The silt fence is down along the length of the wall, and there are some signs of animal burrows under the wall near the south end. SPLIT SAMPLES COLLECTED? YES NO COMMENTS: Split samples taken the day before. IS THE WORK BEING PERFORMED IN A MANNER CONSISTENT WITH THE ACCEPTED WORKPLAN? YES NO COMMENTS: ATTACHMENTS (PHOTOS, MAPS, ETC.) YES NO Burrow under retaining wall with exit on Richardson Flat side Silt Fence down along the wall Repository dumping Possible cottontail burrow on repository side Child winter hat on repository Golf ball Fence along highway, looking north Fence alone highway, looking north Small burrow hole, possibly voles Example of damage to fence and further dumping/windblown debris