HomeMy WebLinkAboutDDW-2025-000083 January 6, 2025 Brent Powell CedarviewMontwell SSD 270 North 500 West Roosevelt, Utah 84066 Subject:Plan Approval, Water Line and Pump Station (PF001) for connection to Victory Pipeline System #07072, File #18554, SRF #3S1869AThe Division of Drinking Water (the Division) received the plans and specifications for the subject project from your consultant, Sunrise Engineering on December 20, 2024. The Division issued review comments on December 31, 2024, and your consultant supplied information addressing the comments the same day. The project consists of constructing a pump station and water line, so you have your own direct connection to the Victory Pipeline in addition to water being supplied from the Victory Pipeline through the Roosevelt Water System. The pump station is designed with three pumps supplying a total of 150 gpm at 200 psi, with room to expand to five pumps in the future. The pump station is located near the intersection of 4730 W and Crooked Sky Road and is identified in the Divisions database as PF001. The 8-inch PVC connecting water line extends from the pump station approximately 6.25 miles to the north where it connects to your existing water line near the intersection of 4000 N and 4000 W. The Division has completed its review of the plans and specifications, stamped and signed byJeffrey A. McCarty Jr., P.E., dated December 20, 2024, and find they basically comply with the applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for the Victory Pipeline Connection project are hereby approved. This approval pertains to construction only. An Operating Permit must be obtained from the Director before the water line and pump station may be put in service. A checklist outlining the items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled. This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.The project, as described herein, is generally eligible for assistance under the Drinking Water Construction Assistance Program. All change orders will need to be reviewed and approved for compliance with the Drinking Water Rules and the conditions of this construction approval.The project may now be advertised for bids. But, as a condition of the project funding, you must not award the contract or proceed with construction until the Division of Drinking Water has authorized you to do so. This is necessary to comply with applicable requirements and to protect you, as the funding recipient, by ensuring that the contract meets requirements for funded projects. Federal regulations require that a concerted effort must be made to encourage participation of small and disadvantaged business enterprises (DBE) by providing requisite information, including plans and specifications on the project. In order to provide opportunities to DBE subcontractors, utilization goals for Minority-owned Business Enterprises (MBE) and Women-owned Business Enterprises (WBE) have been determined to be 4% and 2%, respectively. As outlined in the contract documents, the prime contractor must submit a list of prepared MBE/WBE subcontractors to be used on this project and documentation of solicitation efforts with the bid. The prime contractor's efforts to provide opportunity to DBE's must be reviewed and approved by this office before the contract can be awarded. If you have any questions regarding this approval, please contact Nathan Hall, P.E., TriCounty DEQ District Engineer at (435) 630-3852 or me at (385) 515-1464. Sincerely, Michael Newberry, P.E. Permitting and Engineering Support Manager NDH/HP/mrn/mdbEnclosures –Operating Permit Checklist cc: Joe Hadlock, TriCounty Health Department, jhadlock@tricountyhealthut.gov Brent Powell, CedarviewMontwell SSD, lazybafarm@gmail.com Jeff McCarty, Sunrise Engineering, jmccarty@sunrise-eng.com Nathan Hall, P.E., DEQ District Engineer, nhall@utah.gov Heather Pattee, Division of Drinking Water, hpattee@utah.govNhall 07072 18554 PA Connection to Victory Pipeline Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number: Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7 and is not required to obtain an Operating Permit). Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished, and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards: ☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment facility, or source