HomeMy WebLinkAboutDAQ-2024-0069651 DAQC-238-24 Site ID 10123 (B4) MEMORANDUM TO: STACK TEST FILE – HF SINCLAIR WOODS CROSS REFINING, LLC THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Paul Morris, Environmental Scientist DATE: March 12, 2024 SUBJECT: Sources: 19H1, 20H3, 24H1, 25H1, and Boiler #9 Contact: Travis Smith – 801-299-6625 Location: 393 South 800 West, Woods Cross, Davis County, UT Tester: Alliance Technical Group, Inc. FRS ID #: UT000004901100013 Permit/AO#: Approval Order (AO) AN101230057-23 dated November 15, 2023 Subject: Review of Stack Test Protocol dated February 29, 2024 On March 7, 2024, the Utah Division of Air Quality (DAQ) received a protocol for testing of the HF Sinclair Woods Cross Refining process heater units 19H1, 20H3, 24H1, 25H1, and Boiler #9 located in Woods Cross, Utah. Testing will be performed April 1-5, 2024, to determine compliance with AO Conditions II.B.6.b, II.B.6.c, and II.B.6.d. PROTOCOL CONDITIONS: 1. RM 1 used to determine sample velocity traverses; OK 2. RM 2 used to determine stack gas velocity and volumetric flow rate; OK 3. RM 3A used to determine dry molecular weight of the gas stream; OK 4. RM 4 used to determine moisture content; OK 5. RM 7E for the determination of NOx emissions; OK 6. RM 10 for the determination of CO emissions; OK 7. RM 205 used for gas dilution system certification; OK DEVIATIONS: No deviations were noted. CONCLUSION: The protocol appears to be acceptable. RECOMMENDATION: Send protocol review and test date confirmation notice. ATTACHMENTS: Pretest protocol dated February 29, 2024. 6 , 3 ,.tttF$nctorr February 29,2024 Mr. Bryce Bird, Director Division of Air Qualrty Utah Department of Environmental Quality 195 North 1950 West Salt Lake city, Utah 841l6 CertifredMail: 7022 0410 0002 3551 6707 RE:CO, NOx, and VOC Compliance Testing - 19H1, 20'H3,24H1,25IJ1, and Boiler #9. IIF Sinclair Woods Cross Refining LLC, Davis County Director Bird: ln accordance with Section R307-165-3, and Condition II.B.I.a of Approval OrderDAQE- ANl01230057-23, HF Sinclair Woods Cross Refining LLC is providing notification of source testing planned to be conducted at the Woods Cross Refinery. Alliance Technical Group, LLC of Salt Lake City, UT, has been contracted to conduct: 1. CO compliance stack testing of the following emission soruce: - 19H1, Diesel Hydro-Treater Charge Heater 2. NOx compliance stack testing of the following emission source: - Boiler #9 3. VOC compliance stack testing of the following emission sources: - 20H3, Reactor Charge Heater -24H1, Crude Ufit#2 Furnace - 25H1, FCCU #2 F eed Heater This testing program is planned for April I - April 5,2024. A copy of the test protocol is enclosed. If you have any questions or need additional infonnation, please call me at (801) 299-6625 or email at ft ravis. smith@hfsinclair.com. UTAH DEPARTMENT OF EWIRONMENTAL OIJAI.JTY MAR -1 2A24 DIVISION OF AIR QUALITV HF SinclairWoods Cross Refining LLC 1070 W. 500 S, West Bountiful, UT 84087 801-299-6600 | HFSinclair.com Environmental Specialist Enclosure E. Benson (r)File2.4.4 K. Arnold J. Barton At6rrc I L' i-l l-l t\l I L; A L t-i Ii i-)ll [-) UTAH DEPAHTMENT OF rwtnoHlaeruteu ouAuTY |' ,,.1 - -7 ','9.1' DIVISION OF AIR QUALIT\I Site Specific Test Plan HF Sinclair Woods Cross Refining, LLC 1070 West 500 South West Bountiful, UT 84087 Sources to be Tested: Multiple Sources Proposed Test Dates: April I - 5, 2024 Proj ect No. AST -2024-1 539 Prepared By Alliance Technical Group, LLC 3683 W 2270 S, Suite E West Valley City, UT 84120 T Site Specific Test Plan Test Program Summary Regulatory Information Permit No. Source Information DAQE-AN101230057-23 Source Name Refinery Gas Fired Process Heater Refinery Gas Fired Boiler Refinery Gas Fired Process Heaters Contact Information Source ID l9Hl Boiler No. 9 Heaters 20H3, 24H1, 25Hl Target Parameter CO NOx voc Test Location HF Sinclair Woods Cross Refining,LLC 1070 West 500 South West Bountiful, UT 84087 Eric Benson eric.benson@hfsinclair. com (801)299-6623 F. Travis Smith ftravis. smith@hfsinclair. com (801) 299-662s Test Company Alliance Technical Group, LLC 3683 W 2270 S, Suite E West Valley City, UT 84120 Project Manager Charles Horton charles.horton@alliancetg.com (3s2) 663-7s68 Field Team Leader Tobias Hubbard tobias. hubbard@alliancetg. com (60s) 64s-8s62 (subject to change) QA/QC Manager Kathleen Shonk katie.shonk@alliancetg.com (812) 4s2-478s Test Plan/Report Coordinator Indah Rahmadina indah.rahmadina@alliancetg. com AST-2024-1539 IIF Sinclair- West Bountiful, UT Page i pur6rpe rECI.lNJ ICAL GROUP Site Specific Test Plan Table ofContents TABLE OF CONTENTS 1.1 Emission Unit and Control Unit Descriptions............. .............. l-l 2.0 Summar of Test Program....... ............2-l 2.2 Process/Control System Parameters to be Monitored and Recorded .............2-l 2.3 Proposed Test Schedule.................. .....................2-2 3.1 U.S. EPA Reference Test Methods I and 2 - Sampling/Traverse Points and Volumetric Flow Rate..... 3-l 3.2 U.S. EPA Reference Test Method 3,{ - Oxygen/Carbon Dioxide........ ......... 3-l 3.3 U.S. EPA Reference Test Method 4 - Moisture Content........ ....................... 3-l 3.4 U.S. EPA Reference Test Method 7E - Nitrogen Oxides ...... ........................ 3-2 3.5 U.S. EPA Reference Test Method l0 - Carbon Monoxide.... ........................3-2 3.6 U.S. EPA Reference Test Method 25A -Volatile Organic Compounds ........3-2 3.7 Quality Assurance/Quality Control - U.S. EPA Reference Test Methods 3A, 7E and 10.......................3-2 3.8 Quality Assurance/Quality Control - U.S. EPA Reference Test Method 25A............. ...... 3-3 LIST OF TABLES Table 2-l: Program Outline and Tentative Test Schedu1e................... ......2-2 AST-2024-1539 IIF Sinclair- West Bountiful, UT Page ii Site Specific Test Plan Introduction 1.0 Introduction Alliance Technical Group, LLC (Alliance) was retained by HF Sinclair Woods Cross Refining,LLC (HF Sinclair) to conduct compliance testing at the Woods Cross refinery in West Bountiful, Utah. Portions of the facility are subject to provisions of the Utah Department of Environmental Quality, Division of Air Quality (UDAQ) Permit No. DAQE- AN101230057-23. Testing will be conducted to determine the emission rate of carbon monoxide (CO) at the exhaust of Heater l9Hl. Testing will also include determining the emission rate of nitrogen oxides (NOx) from the exhaust of Boiler No. 9 and the emission rate of volatile organic compounds (VOC) from the exhaust of Heaters 20H3,24H1, and 25H1. This site-specific test plan (SSTP) has been prepared to address the notification and testing requirements of the UDAQ permit. 1.1 Emission Unit and Control Unit Descriptions Unit ID Process Description Air Pollution Controls l9Hr Diesel Hydrotreater (DHT) Reactor Charge Heater,23 MMBtulhr HHV, fired on plant gas, natural draft, 3 burners, up-hred furnace. Stack temperature approximately 640 to 720'F. Low NOx bumers Boiler No. 9 Steam boiler, 89.3 MMBtU/hr HHV, fired on plant gas, forced draft, I bumer, side-fired furnace, no air preheat. Stack temperature approximately 360-500'F. Selective catalytic reduction using aqueous or anhydrous ammonia 20H3 Gas Oil Hydrocracker Charge Heater, 39.7 MMBtu/hr HHV, fired on plant gas, natural draft, 6 burners (Next Generation, Ultra Low NOx), and up-fired fumace. Stack temperature approximately 646"F. Ultra-low NOx bumers 24Ht Crude Unit No. 2 Fumace,32.5 MMBtu/hr process furnace, fired on plant gas natural draft,4 burners, and up-fired furnace. Stack temperature approximately 460'F. Ultra-low NOx bumers 25Ht Fluidized Catalytic Cracking Unit (FCCU) #2Feed Heater, 17.7 MMBtU/hr HHV, fired on plant gas, natural draft, 3 bumers, and up-fired furnace. Stack temperature approximately 650"F. Ultra-low NOx bumers AST-2024-l s39 HF Sinclair - West Bountiful, UT Page 1-l put6rpe ][CIINICAt GROL]F)Sile SpeciJic Test Plan Introduction 1.2 Project Team Personnel planned to be involved in this project are identified in the following table. Table 1-1: ProjectTeam 1.3 Safety Requirements Testing personnel will undergo site-specific safety training for all applicable areas upon arrival at the site. Alliance personnel will have current OSHA or MSHA safety training and be equipped with hard hats, safety glasses with side shields, steel-toed safety shoes, hearing protection, fire resistant clothing, and fall protection (including shock corded lanyards and full-body hamesses). Alliance personnel will conduct themselves in a manner consistent with Client and Alliance's safety policies. A Job Safety Analysis (JSA) will be completed daily by the Alliance Field Team Leader. HF Sinclair Personnel F. Travis Smith Regulatory Agency UDAQ Alliance Personnel Tobias Hubbard other field personnel assigned at time of testing event AST-2024-1539 HF Sinclair- West Bountiful, UT Page 1-2 put6r1rce ITCIlNICAI GROIJP Site SpeciJic Test Plan Summan, of Test Pros'ams 2.0 Summary of Test Program To satis$ the requirements of the UDAQ permit, the facility will conduct a performance test program to determine the compliance status of Heaters lgHl , 20H3 , 24H1, 25Hl and Boiler No. 9. 2.1 General Description All testing will be performed in accordance with specifications stipulated in U.S. EPA Reference Test Methods 7E, 10. and 25A. Table 2-l presents an outline and tentative schedule for the emissions testing program. The following is a summary of the test objectives. o Testing will be performed to demonstrate compliance with the UDAQ permit. . Emissions testing will be conducted on the exhaust of Heaters lgHl, 20H3, 24H1, 25Hl and Boiler No. 9 o Performance testing will be conducted at the maximum normal operation load for each source. o Each of the three (3) test runs will be approximately 60 minutes in duration for each source. 2.2 Process/Control System Parameters to be Monitored and Recorded Plant personnel will collect operational and parametric data at least once every 15 minutes during the testing. The following list identifies the measurements, observations and records that will be collected during the testing program: o Calculated fuel gas flow rate - mscfld or mscf/hr o Fuel gas GHV - Bhr/scf r Heat Input - MMBtu/hr o Fuel Gas Analysis o Ammonia flow rate (if the unit is equipped with SCR and if ammonia flow rate is monitored) AST-2024-1539 HF Sinclair - West Bountiful, UT Page 2-l TECHNICAL GROUP Site SpeciJic Test Plan Summarv of Test Prosrams 2.3 Proposed Test Schedule Table 2-l presents an outline and tentative schedule for the emissions testing program. Table 2-1: Program Outline and Tentative Test Schedule DAY I -April1,2024 Equipment Setup & Pretest QA/QC Checks 4hr Heater l9Hl Ozl COz 3A 3 60 min CO l0 DAY2-April2,2024 Boiler No. 9 Ozl COz 3A 3 60 min l0 hr NOx 7E DAY 3 -April3,2024 Heater 20H3 VFR t&2 J 60 min l0 hr Ozl COz 3A BWS 4 VOC 25A DAY 4 - April 4,2024 Heater 24Hl VFR t&2 3 60 min l0 hr Ozl COz 3A BWS 4 VOC 254 DAY 5 -April 5,2024 Heater 25Hl VFR t&2 J 60 min l0 hr Ozl COz 3A BWS 4 voc 25A AST-2024-1539 IIF Sinclair - West Bountifirl, UT Page2-2 pill6rpe TFCIINICAI CJROT] P Site SpeciJic Test Plan Su mmarv of Test Prosrams 2.4 Emission Limits Emission limits for each pollutant are below. Table 2-2: Emission Limits 2.5 Test Report The final test report must be submitted within 60 days of the completion of the performance test and will include the following information. o Introduction -Bief discussion of project scope of work and activities. c Results and Discussion - A summary of test results and process/control system operational data with comparison to regulatory requirements or vendor guarantees along with a description of process conditions and/or testing deviations that may have affected the testing results. c Methodologlr - A description of the sampling and analytical methodologies. o Sample Calculations - Example calculations for each target parameter. o Field Dara - Copies of actual handwritten or electronic field data sheets. o Quality Control Data - Copies of all instrument calibration data and/or calibration gas certificates. o Process Operating/Control System Data - Process operating and confol system data (as provided by HF Sinclair) to support the test results. CO: 0.040 lbA{MBtu NOx: 0.02 lbilvlMBtu VOC: 0.0054 lb/MMBtu AST-2024-1s39 IIF Sinclair - West Bountiful, UT Page2-3 pul6rrce 1 I ()lll'{l(lr\l G lt () U t) Site SpeciJic Test Plan Testins Methodolopy 3.0 Testing Methodology This section provides a description of the sampling and analytical procedures for each test method that will be employed during the test program. All equipment, procedures and quality assurance measures necessary for the completion of the test program meet or exceed the specifications of each relevant test method. The emission testing program will be conducted in accordance with the test methods listed in Table 3-1. Table 3-l: Source Testing Methodology All stack diameters, depths, widths, upstream and downstream disturbance distances and nipple lengths will be measured on site with an EPA Method I verification measurement provided by the Field Team Leader. These measurements will be included in the test report. 3.1 U.S. EPA Reference Test Methods I and 2 - Sampling/Traverse Points and Volumetric Flow Rate The sampling location and number of traverse (sampling) points will be selected in accordance with U.S. EPA Reference Test Method l. To determine the minimum number of traverse points, the upstream and downstream distances will be equated into equivalent diameters and compared to Figure l-1 (for isokinetic sampling) and/or Figure l-2 (measuring velocity alone) in U.S. EPA Reference Test Method l. Full velocity traverses will be conducted in accordance with U.S. EPA Reference Test Method 2 to determine the average stack gas velocity pressure, static pressure and temperafure. The velocity and static pressure measurement system will consist of a pitot tube and inclined manometer. The stack gas temperature will be measured with a K- type thermocouple and pyrometer. 3.2 U.S. EPA Reference Test Method 3A - Oxygen/Carbon Dioxide The oxygen (Oz) and carbon dioxide (COz) testing will be conducted in accordance with U.S. EPA Reference Test Method 3A. Data will be collected online and reported in one-minute averages. The sampling system will consist of a stainless steel probe, Teflon sample line(s), gas conditioning system and the identified gas analyzer. The gas conditioning system will be a non-contact condenser used to remove moisture from the stack gas. If an unheated Teflon sample line is used, then a portable non-contact condenser will be placed in the system directly after the probe. Otherwise, a heated Teflon sample line will be used. The quality control measures are described in Section 3.7. 3.3 U.S. EPA Reference Test Method 4 - Moisture Content The stack gas moisture content will be determined in accordance with U.S. EPA Reference Test Method 4. The gas conditioning train will consist of a series of chilled impingers. Prior to testing, each impinger will be filled with a Full Velocity TraversesVolumetric Flow Rate Oxygen / Carbon Dioxide Volatile Organic Compounds AST-2024-l 539 HF Sinclair - West Bountiful, UT Page 3-l Site Specific Test Plan Testing Methodologt known quantity of water or silica gel. Each impinger will be analyzed gravimetrically before and after each test run on the same analytical balance to determine the amount of moisture condensed. 3.4 U.S. EPA Reference Test Method 7E - Nitrogen Oxides The nitrogen oxides [NOx) testing will be conducted in accordance with U.S. EPA Reference Test Method 7E. Data will be collected online and reported in one-minute averages. The sampling system will consist of a stainless steel probe, Teflon sample line(s), gas conditioning system and the identified gas analyzer. The gas conditioning system will be a non-contact condenser used to remove moisture from the stack gas. If an unheated Teflon sample line is used, then a portable non-contact condenser will be placed in the system directly after the probe. Otherwise, a heated Teflon sample line will be used. The quality control measures are described in Section 3.7. 3.5 U.S. EPA Reference Test Method 10 - Carbon Monoxide The carbon monoxide (CO) testing will be conducted in accordance with U.S. EPA Reference Test Method 10. Data will be collected online and reported in one-minute averages. The sampling system will consist of a stainless steel probe, Teflon sample line(s), gas conditioning system, and the identified gas analyzer. The gas conditioning system will be a non-contact condenser used to remove moisture from the gas. If an unheated Teflon sample line is used, then a portable non-contact condenser will be placed in the system directly after the probe. Otherwise, a heated Teflon sample line will be used. The quality control measures are described in Section 3.7. 3.6 U.S. EPA Reference Test Method 25A -Volatile Organic Compounds The volatile organic compounds (VOC) testing will be conducted in accordance with U.S. EPA Reference Test Method 25A. Data will be collected online and reported in one-minute averages. The sampling system will consist of a stainless steel probe, heated Teflon sample line(s) and the identified gas analyzer. The quality control measures are described in Section 3.8. 3.7 Quality Assurance/Quality Control - U.S. EPA Reference Test Methods 3A, 7E and 10 Cylinder calibration gases will meet EPA Protocol 1 (+l- 2%) standards. Copies of all calibration gas certificates will be included in the Quality Assurance/Quality Control Appendix of the report. Low Level gas will be introduced directly to the analyzer. After adjusting the analyzer to the Low-Level gas concentration and once the analyzer reading is stable, the analyzer value will be recorded. This process will be repeated for the High-Level gas. For the Calibration Error Test, Low, Mid, and High-Level calibration gases will be sequentially introduced directly to the analyzer. The Calibration Error for each gas must be within 2.0 percent of the Calibration Span or 0.5 ppmv/% absolute difference. High or Mid-Level gas (whichever is closer to the stack gas concentration) will be introduced at the probe and the time required for the analyzer reading to reach 95 percent or 0.5 ppm/% (whichever was less restrictive) of the gas concentration will be recorded. The analyzer reading will be observed until it reaches a stable value, and this value will be recorded. Next, Low-Level gas will be introduced at the probe and the time required for the analyzer reading to decrease to a value within 5.0 percent or 0.5 ppmloh (whichever was less restrictive) will be recorded. If the Low- Level gas is zero gas, the acceptable response must be 5.0 percent of the upscale gas concentration or 0.5 ppm/o/o (whichever was less restrictive). The analyzer reading will be observed until it reaches a stable value, and this value will be recorded. The measurement system response time and initial system bias will be determined from these data. The System Bias for each gas must be within 5.0 percent of the Calibration Span or 0.5 ppmv/%o absolute difference. AST-2024-l 539 HF Sinclair West Bountiful, UT Page 3-2 Site Specific Test Plan Tesling Methodology High or Mid-Level gas (whichever is closer to the stack gas concentration) will be introduced at the probe. After the analyzer response is stable, the value will be recorded. Next, Low-Level gas will be introduced at the probe, and the analyzer value will be recorded once it reaches a stable response. The System Bias for each gas must be within 5.0 percent of the Calibration Span or 0.5 ppmv/oZ absolute difference or the data is invalidated, and the Calibration Error Test and System Bias must be repeated. The Drift between pre- and post-run System Bias must be within 3 percent of the Calibration Span or 0.5 ppmvloh absolute difference or the Calibration Error Test and System Bias must be repeated. To determine the number of sampling points, a gas stratification check will be conducted prior to initiating testing. The pollutant concentrations will be measured at twelve traverse points (as described in Method 1) or three points (16.7, 50.0 and 83.3 percent of the measurement line). Each traverse point will be sampled for a minimum of twice the system response time. If the pollutant concentration at each traverse point do not differ more than 5%o or 0.5 pprn/O.3% (whichever is less restrictive) of the average pollutant concentration, then single point sampling will be conducted during the test runs. If the pollutant concentration does not meet these specifications but differs less than 10oh or 1.0 ppm/0.5% from the average concentration, then three (3) point sampling will be conducted (stacks less than 7.8 feet in diameter - 16.7, 50.0 and 83.3 percent of the measurement line; stacks greater than 7.8 feet in diameter - 0.4, L0, and 2.0 meters from the stack wall). If the pollutant concentration differs by more than l0% or 1.0 ppm/0.5% from the average concentration, then sampling will be conducted at a minimum of twelve (12) traverse points. Copies of stratification check data will be included in the Quality Assurance/Quality Control Appendix of the report. An NOz - NO converter check will be performed on the analyzer prior to initiating testing or at the completion of testing. An approximately 50 ppm nitrogen dioxide cylinder gas will be introduced directly to the NOx analyzer and the instrument response will be recorded in an electronic data sheet. The instrument response must be within +/- 10 percent of the cylinder concentration. A Data Acquisition System with battery backup will be used to record the instrument response in one (1) minute averages. The data will be continuously stored as a *.CSV file in Excel format on the hard drive of a computer. At the completion of testing, the data will also be saved to the Alliance server. All data will be reviewed by the Field Team Leader before leaving the facility. Once arriving at Alliance's office, all written and electronic data will be relinquished to the report coordinator and then a final review will be performed by the Project Manager. 3.8 Quality Assurance/Quality Control - U.S. EPA Reference Test Method 25A Cylinder calibration gases will meet EPA Protocol I (+/- 2%) standards. Copies of all calibration gas certificates will be included in the Quality Assurance/Quality Control Appendix of the report. Within two (2) hours prior to testing, zero gas will be introduced through the sampling system to the analyzer. After adjusting the analyzer to the Zero gas concentration and once the analyzer reading is stable, the analyzer value will be recorded. This process will be repeated for the High-Level gas, and the time required for the analyzer reading to reach 95 percent of the gas concentration will be recorded to determine the response time. Next, Low and Mid-Level gases will be introduced through the sampling system to the analyzer, and the response will be recorded when it is stable. All values must be less than +/- 5 percent of the calibration gas concentrations. AST-2024-1539 HF Sinclair West Bountiful, UT Page 3-3 pill6rrce IECI-1 NICAL GROUP Site Specific Test Plan Testins Methodolosv Mid-Level gas will be introduced through the sampling system. After the analyzer response is stable, the value will be recorded. Next, Zero gas will be introduced through the sampling system, and the analyzer value recorded once it reaches a stable response. The Analyzer Drift must be less than +/- 3 percent of the span value. A Data Acquisition System with battery backup will be used to record the instrument response in one (l) minute averages. The data will be continuously stored as a *.CSV file in Excel format on the hard drive of a computer. At the completion of testing, the data will also be saved to the Alliance server. All data will be reviewed by the Field Team Leader before leaving the facility. Once arriving at Alliance's office, all written and electronic data will be relinquished to the report coordinator and then a final review will be performed by the Project Manager. AST-2024-1539 IIF Sinclair - West Bountiful, UT Page34 F'laAI I Site Specific Test Plan Quality Assurance Prograrn 4.0 Quality Assurance Program Alliance follows the procedures outlined in the Quality Assurance/Quality Control Management Plan to ensure the continuous production of useful and valid data throughout the course of this test program. The QC checks and procedures described in this section represent an integral part of the overall sampling and analy.tical scheme. Adherence to prescribed procedures is quite often the most applicable QC check. 4.1 Equipment Field test equipment is assigned a unique, permanent identification number. Prior to mobilizing for the test program, equipment is inspected before being packed to detect equipment problems prior to arriving on site. This minimizes lost time on the job site due to equipment failure. Occasional equipment failure in the held is unavoidable despite the most rigorous inspection and maintenance procedures. Therefore, replacements for critical equipment or components are brought to the job site. Equipment retuming from the field is inspected before it is returned to storage. During the course of these inspections, items are cleaned, repaired, reconditioned and recalibrated where necessary. Calibrations are conducted in a manner, and at a frequency, which meets or exceeds U.S. EPA specifications. The calibration procedures outlined in the U.S. EPA Methods, and those recommended within the Quality Assurance Handbook for Air Pollution Measurement Systems: Volume III (EPA-6001R-94/038c, September 1994) are utilized. When these methods are inapplicable, methods such as those prescribed by the American Society for Testing and Materials (ASTM) or other nationally recognized agency may be used. Data obtained during calibrations is checked for completeness and accuracy. Copies of calibration forms are included in the report. The following sections elaborate on the calibration procedures followed by Alliance for these items of equipment. Dry Gas Meter and Orifice. A full meter calibration using critical orifices as the calibration standard is conducted at least semi-annually, more frequently if required. The meter calibration procedure determines the meter correction factor (Y) and the meter's orifice pressure differential (AH@). Alliance uses approved Alternative Method 009 as a post-test calibration check to ensure that the correction factor has not changed more than 5%o since the last full meter calibration. This check is performed after each test series. Pitot Tubes and Manometers. Type-S pitot tubes that meet the geometric criteria required by U.S. EPA Reference Test Method 2 are assigned a coefficient of 0.84 unless a specific coefficient has been determined Ilom a wind tunnel calibration. If a specific coefficient from a wind tunnel calibration has been obtained that coefficient will be used in lieu of 0.84. Standard pitot tubes that meet the geometric criteria required by U.S. EPA Reference Test Method 2 are assigned a coefficient of 0.99. Any pitot tubes not meeting the appropriate geometric criteria are discarded and replaced. Manometers are verified to be level and zeroed prior to each test run and do not require further calibration. Temperature Measurins Devices. All thermocouple sensors mounted in Dry Gas Meter Consoles are calibrated semi-annually with a NlST-traceable thermocouple calibrator (temperature simulator) and verified during field use using a second NlST-traceable meter. NlST-traceable thermocouple calibrators are calibrated annually by an outside laboratory. Nozzles. Nozzles are measured three (3) times prior to initiating sampling with a caliper. The maximum difference between any two (2) dimensions is 0.004 in. Digital Calipers. Calipers are calibrated annually by Alliance by using gage blocks that are calibrated annually by an outside laboratory. AST-2024-l 539 HF Sinclair West Bountiful. UT Page 4-l . Barometer. The barometric pressure is obtained from a nationally recognized agency or a calibrated barometer. Calibrated barometers are checked prior to each field trip against a mercury barometer. The barometer is acceptable if the values agree within { 2 percent absolute. Barometers not meeting this requirement are adjusted or taken out of service. o Balances and Weishts. Balances are calibrated annually by an outside laboratory. A functional check is conducted on the balance each day it is use in the field using a calibration weight. Weights are re-certified every two (2) years by an outside laboratory or internally. If conducted internally, they are weighed on a NIST traceable balance. If the weight does not meet the expected criteria, they are replaced. o Other Equipment. A mass flow controller calibration is conducted on each Environics system annually following the procedures in the Manufacturer's Operation manual. A methane/ethane penetration factor check is conducted on the total hydrocarbon analyzers equipped with non-methane cutters every six (6) months following the procedures in 40 CFR 60, Subpart JJJJ. Other equipment such as probes, umbilical lines, cold boxes, etc. are routinely maintained and inspected to ensure that they are in good working order. They are repaired or replaced as needed. 4.2 Field Sampling Field sampling will be done in accordance with the Standard Operating Procedures (SOP) for the applicable test method(s). General QC measures for the test progmm include: o Cleaned glassware and sample train components will be sealed until assembly. . Sample trains will be leak checked before and after each test run. o Appropriate probe, filter and impinger temperatures will be maintained. o The sampling port will be sealed to prevent air from leaking from the port. . Dry gas meter, AP, AH, temperature and pump vacuum data will be recorded during each sample point. o An isokinetic sampling rate of 90-l l0% will be maintained, as applicable. o All raw data will be maintained in organized manner. o All raw data will be reviewed on a daily basis for completeness and acceptability. UTAH DEPAFTMENT OF ENVIRONMENTAL OUALITY . - 'AaA:. - ! .:t)(-t+ :VISION OF AIR QUALTTV AST-2024-l 539 HF Sinclair - West Bountiful, UT Page 4-2